JP2004308338A - Method for pulling out existing pile and pulling-out device - Google Patents

Method for pulling out existing pile and pulling-out device Download PDF

Info

Publication number
JP2004308338A
JP2004308338A JP2003105935A JP2003105935A JP2004308338A JP 2004308338 A JP2004308338 A JP 2004308338A JP 2003105935 A JP2003105935 A JP 2003105935A JP 2003105935 A JP2003105935 A JP 2003105935A JP 2004308338 A JP2004308338 A JP 2004308338A
Authority
JP
Japan
Prior art keywords
pile
casing
pulling
existing
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003105935A
Other languages
Japanese (ja)
Inventor
Noboru Takahashi
昇 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YURI KOGYO KK
Original Assignee
YURI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YURI KOGYO KK filed Critical YURI KOGYO KK
Priority to JP2003105935A priority Critical patent/JP2004308338A/en
Publication of JP2004308338A publication Critical patent/JP2004308338A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To facilitate pile pulling-out work by attaching a pipe for high pressure water injection provided additionally on one side of a seat pile with a short casing and a wire for isolation like a lariat in a lower end part of the casing attached to a lower part of the seat pile with the short casing by a holding member and performing isolation work of the ground around a peripheral wall of the pile and the ground in a pile lower part by injection of high pressure water and pulling up the wire for cutting fringe. <P>SOLUTION: A wire for hoisting the pile and the wire for isolation like a lariat are provided by a plurality of holding members in an upper end part and a lower end part of the seat pile with the short casing to which the short casing made of a steel pipe and having larger diameter than diameter of an existing pile to be pulled out by about 10 cm, respectively, in a tip part of the seat pile. The pipe for high pressure water is additionally provided on one side of the seat pile. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は、老朽化等で取り壊した建物の跡地に新たな建物に建て替える際、この跡地の地盤中に新たな基礎構造物を構築するため、地中に打ち込まれている既設の杭を引き抜く工法及びその装置に関するものである。
【0002】
【従来の技術】
【特許文献1】特開2002−256557号公報
従来、建物の老朽化又は社会の情報化に伴ってビル等の建物の建て替えに際して、既存の建物の解体と共に地盤中に残存する既設の杭を抜き取り、新たに構築する建物の構造を支承するのに適した基礎杭や連続した地中壁等の基礎構造物を新たに構築する必要がある。このように地盤中に残存する既設の杭を抜き取るのは、取り壊す建物を支承していた既設の杭、特に、既設の杭がコンクリート製の杭である場合には、打設の際の衝撃による座屈やひび割れ、永年の使用中に杭に部分的に地圧による剪断力がかかることによる座屈やひび割れを生じており、新たに構築する建物の構造を支承するには適しておらず、また例え、座屈やひび割れを生じていなくても、新たに構築する建物の構造・形状により新たな基礎構造物の構築の際に既設の杭の存在が施工の障害となっている。
【0003】
従来、地盤中に残った既設のコンクリート製の杭を地中から引き抜く工法として、旋回掘削式の掘削機を使用し杭の周壁の地盤を杭の全長にわたって掘削して杭と地盤との縁切りをした後、杭の上部にワイヤーを掛けて杭を引き抜いていたが、杭の打設時や永年の使用により杭にひび割れや破断をしている場合があり、杭の下方部分が地盤中に取り残される場合がある。このため、上方部分の杭を抜いた後の杭孔にガイド鋼管を打込むと共に、次に、このガイド鋼管をガイドとして下部に短尺のケーシング管を取付けた鋼矢板を打込み、この短尺のケーシング管の上縁に取付けたワイヤーロープを引き上げて地盤中に取り残された杭の上部に堅く巻き付け、ワイヤーロープをクレーンで引き上げることにより杭を取り出す残された杭の下方部分を引抜く工法として「特許文献1」に記載された工法が知られている。
【0004】
この「特許文献1」に記載の引き抜き工法を図面の図13、14及び15により説明する。図13は、従来公知の残置杭の引抜きに使用する先端ケーシングの斜視図で、図14は、ケーシング管から、残置杭の上部が突出するまで先端ケーシングを打ち込んだ状態を示す図で、図15は、ケーシング管に巻き付けた台付けワイヤーロープの先端部を移動して残置杭の上部に巻き付けた状態を示す図である。
【0005】
旋回式の掘削装置などにより既設杭の長さ方向に既設杭の周壁回りの地盤を掘削し、既設杭の周壁と地盤との縁切りをする。その後、既設杭の上部に掛けたワイヤーロープをクレーン車で引き上げて杭を引き抜いたり、または、油圧式の杭抜き機により杭を引き抜いている。しかしながら上述したように、コンクリート製の杭である既設杭では、打設の際の衝撃、永年の使用中に杭に部分的に地圧による剪断力がかかることによる座屈やひび割れを生じており、既設杭を引き抜く際にこの座屈やひび割れの個所で切断されて、既設杭の下方部分が地盤中に取り残される。
【0006】
そして、この地盤中に取り残された既設杭の下方部分を引き抜くために、上方部分の既設杭が引き抜かれた杭孔にクレーン車34により第1巻上げワイヤーロープ35でガイド用鋼管39を取付けたバイブロハンマー37を吊下げて該ガイド用鋼管39を該杭孔に吊り下ろし、ガイド鋼管39の先端部を地中に残された残置杭38の上部に嵌合させる。一方、この地盤中に取り残された既設杭の下方部分を引抜く工法に用いられる先端ケーシングは、鋼矢板30の先端部に短尺の鋼管製のケーシング管31が固着されて構成されており、該ケーシング管31の上端部に一定間隔で台付けワイヤーロープ33の保持部材32が取付けられている。この保持部材32は半円形に曲げた細径の鋼線で、その両端をケーシング管31に溶接して取付けてある。台付けワイヤーロープ33の先端部を保持部材32の半円形穴を通してケーシング管31の外周に巻き付けている。
【0007】
そして、この先端ケーシングは、ガイド用鋼管39をガイドとして残置杭38の上部が一定長さだけケーシング管31から突出するまでバイブロハンマー37で打ち込まれ、残置杭38と地盤との摩擦を縁切りする。その後、台付けワイヤーロープ33を巻き上げると、保持部材32でケーシング管31の上端部に巻き付いていた台付けワイヤーロープ33は、保持部材32をケーシング管31から引き剥がし、台付けワイヤーロープ33の先端部が上昇しつつ引き絞られながら残置杭38の上部に堅く巻き付き、更に台付けワイヤーロープ33をクレーン車34からの第1巻上げワイヤーロープ35で引き上げることにより残置杭38を地上に取り出している。
【0008】
【発明が解決しようとする課題】
しかしながら、上記従来の残置杭の引抜き工法では、地盤中の既設杭を引き抜くための施工装置として、先ず、既設杭と地盤との縁切り作業のための施工装置である既設杭の周壁回りの地盤を掘削する旋回式の掘削装置と、次に、地盤中に取り残された既設杭の下方部分を引き抜くための鋼矢板の先端部に短尺の鋼管製のケーシング管を固着した先端ケーシングとこの先端ケーシングを打ち込む装置であるバイブロハンマーとが必要としている。このように異なる作業のために複数の施工装置を準備しなければならず、多くの施工装置により狭い施工現場が更に狭く煩雑になり、また複数の施工装置を準備するために多くの経費を要している。
【0009】
また、地盤中に残された杭の下方部分(残置杭)の先端部と地盤とは、打設や永年の使用で上部構造物からの荷重による圧密で堅く一体化しているために、台付けワイヤーロープで引き上げようとしても抜き取ることはなかなか大変な作業となっている。
【0010】
そこで、本発明は、上述した課題によりなされたもので、コンクリート製の既設杭を地盤中から全長を引き抜くため、高圧噴射水の噴射と短尺のケーシングの打込みとによる地盤と既設杭との杭全長にわたる縁切り作業と、打設の際の衝撃や永年の使用による座屈やひび割れの個所で切断された既設杭の下方部分の引き抜くため、切断された既設杭の下方部分の下部と地盤との縁切り作業とを一台の施工装置で行う既設杭の引抜き工法及びこれに使用する引抜き装置を提供することを目的とするものである。
【0011】
【課題を解決するための手段】
上記の目的を達成するため、本発明の請求項1に記載の発明は、既設杭より稍大径で短尺のケーシングをシートパイルの下部に固設すると共に該ケーシングを既設杭に嵌装しつつ、シートパイルの長さ方向に添設した高圧水用の配管の下端の噴射ノズルから高圧水を噴射しながら打込み手段によりシートパイルを打込み、既設杭の周壁と地山との縁切り工程、該ケーシングの上端を既設杭の下端より下方まで打込んだ後に縁切り用ワイヤーロープを引いて既設杭の下端と地山との縁切り工程、次いで、吊上げ用ワイヤーロープを引いて既設杭の下端の緊縛工程、引抜き手段と吊上げ用ワイヤーロープにより既設杭の引抜き工程、
の各工程からなることを特徴とするものである。
【0012】
上記の目的を達成するため、本発明の請求項2に記載の発明は、既設杭より稍大径で短尺のケーシングをシートパイルの下部に固設すると共に該ケーシングを既設杭に嵌装しつつ、シートパイルの長さ方向に添設した高圧水用の配管の下端の噴射ノズルから高圧水を噴射しながら打込み手段によりシートパイルを打込み、既設杭の周壁と地山との縁切り工程、短尺ケーシング付きシートパイルの引抜きと既設杭の引抜き工程、該ケーシングの上端を残置した下方部分の杭の下方まで打込んだ後に縁切り用ワイヤーロープを引いて残置した下方部分の杭の下端と地山との縁切り工程、吊上げ用ワイヤーロープを引いて残置した下方部分の杭の下端の緊縛工程、引抜き手段と吊上げ用ワイヤーロープにより残置した下方部分の杭の引抜き工程、
の各工程からなることを特徴とするものである。
【0013】
また、上記の目的を達成するため、本発明の請求項3に記載の発明は、既設杭より稍大径で短尺のケーシングを下部に固設すると共に下端に噴射ノズルを有する高圧水用の配管を長さ方向に添設したシートパイルと、該シートパイルの打込み・引き抜き手段と、該短尺のケーシングの上端縁の全周及び該ケーシングの下端縁の全周にそれぞれ複数の保持部材で吊上げ用ワイヤーロープ及び縁切り用ワイヤーロープを取付け、該高圧水用の配管の上端部には高圧水供給手段が接続されていることを特徴とするものである。
【0014】
【発明の実施の形態】
以下、本発明の既設杭の引抜き工法及び既設杭の引抜き装置の実施の態様を図1〜図12によって説明する。図1は、本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの全体図、図2は、本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの平断面図、図3は、本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの横断面図、図4は、本発明の下部にケーシングを備えたシートパイルと高圧水供給手段との接続状態図、図5は、本発明の既設杭引抜き装置の建込み前の状態図、図6は、本発明の既設杭引抜き装置に杭吊上げ用ワイヤーをセットした建込み前の状態図、図7は、本発明の既設杭引抜き装置による既設杭の引上げ状態を示す図、図8は、本発明の既設杭引抜き装置による既設杭の引倒し状態を示す図、図9は、本発明の既設杭引抜き装置の下部にケーシングを備えたシートパイルの引き上げ状態を示す図、図10は、本発明の既設杭引抜き後の杭孔に固化材注入処理状態を示す図、図11は、本発明の既設杭引抜き後の杭孔の埋め戻し処理状態を示す図、図12は、本発明の他の実施例の既設杭引抜き装置の建込み前の状態図である。
【0015】
図1〜12に図示されている本発明の既設杭の引抜き作業に使用される短尺ケーシング付きシートパイルAは、シートパイル1の先端部に引き抜かれる既設杭8の径より10cm程度大径の短尺の鋼管製のケーシング2が固着されて構成されており、該ケーシング2の上端部に一定間隔で杭吊上げ用ワイヤー7の保持部材5、5、・が取付けられている。この一定間隔で取付けられた保持部材5、5、・に杭吊上げ用ワイヤー7の先端部を通してケーシング2の外周に巻き付けられ、その一方端に輪状部を形成し、この輪状部にもう一方の杭吊上げ用ワイヤー7の先端部を通して投げ縄状としている。
【0016】
この輪状部に通したもう一方の杭吊上げ用ワイヤー7の先端部は、短尺ケーシング付きシートパイルAの上端方に延長され、後述するクレーン車15の吊下げワイヤー16のフックに掛けられるようになっている。そして、この保持部材5は、杭吊上げ用ワイヤー7がクレーン車15の吊下げワイヤー16の吊上げによって切断され、杭吊上げ用ワイヤー7がケーシング2の周壁から離脱するようになっている。
【0017】
また、短尺ケーシング付きシートパイルAの先端部に取付けられたケーシング2の下端部は、内側に折返されて曲げられてワイヤー受け部9を形成し、このワイヤー受け部9を囲むようにして一定間隔で縁切り用ワイヤー6の保持部材5、5、・が取付けられている。この一定間隔で取付けられた保持部材5、5、・に縁切り用ワイヤー6の先端部を通してケーシング2のワイヤー受け部9に収められ、その一方端に輪状部を形成し、この輪状部にもう一方の縁切り用ワイヤー6の先端部を通して投げ縄状としている。
【0018】
この輪状部に通したもう一方の縁切り用ワイヤー6の先端部は、短尺ケーシング付きシートパイルAの上端方に延長され、後述するクレーン車15の吊下げワイヤー16のフックに掛けられるようになっている。そして、この縁切り用ワイヤー6を保持している保持部材5も縁切り用ワイヤー6がクレーン車15の吊下げワイヤー16の吊上げによって切断され、杭吊上げ用ワイヤー7がケーシング2の内周壁から離脱するようになっている。このワイヤー受け部9は、短尺ケーシング付きシートパイルAの打込み時に縁切り用ワイヤー6がケーシング2から外れないための保護部となっている。
【0019】
そして、短尺ケーシング付きシートパイルAの一側には、上端に接続口を下端に噴射ノズル14を有する配管3が全長にわたって添設されており、更に、この添設された配管3はカバー体4によって保護されている。この短尺ケーシング付きシートパイルAには、地盤中にある既設杭8の長さに対応するために全長にわたってカバー体4によって保護された配管3が添設された接続用シートパイル10を接続できるようになっている。
【0020】
短尺ケーシング付きシートパイルAに添設された配管3を通して作業個所近傍に設置された水槽13と高圧水供給手段11から給水ホース12を経由して高圧水の供給を受け、短尺ケーシング付きシートパイルAの先端部に取付けられたケーシング2の下端部の噴射ノズル14から高圧水を噴射して、該ケーシング2の内周壁と既設杭8との間の地盤を泥土化することにより地盤中から既設杭8の引き抜きを容易とする。
【0021】
次に、本発明の短尺ケーシング付きシートパイルを使用した既設杭の引抜き工法及び既設杭の引抜き装置の作業手順について図5〜9により説明する。
[第1工程]
先ず、引き抜く既設杭8の近傍に設置されたクレーン車15から吊下げワイヤー16に振動式杭打機17を吊り下げると共に、該振動式杭打機17に短尺ケーシング付きシートパイルAを掴持装置により掴んで吊上げ、短尺ケーシング付きシートパイルAの下端に設けたケーシング2を露出している既設杭8の頭部に嵌装する。
【0022】
[第2工程]
次に、高圧水供給手段11により給水ホース12を経由して水槽13の水を短尺ケーシング付きシートパイルAの一側に添設された配管3の下端の噴射ノズル14からジェット噴射aをしながら振動式杭打機17を作動させ、短尺ケーシング付きシートパイルAを地盤中に打設する。すると、短尺ケーシング付きシートパイルAの下端に設けたケーシング2は地盤中に打ち込まれると共に、噴射ノズル14からのジェット噴射aにより該ケーシング2内と既設杭8の回りとの間の地盤を崩しながら泥土化し、既設杭8の周壁と地盤との縁切りを行う。
【0023】
[第3工程]
そして、短尺ケーシング付きシートパイルAの下部に取付けられた短尺のケーシング2の下部のワイヤー受け部9に複数個の保持部材5によって取付けられた縁切り用ワイヤー6をクレーン車15から吊り下げられた吊下げワイヤー(図示されていない)により吊り上げると、縁切り用ワイヤー6の引っ張りによって上記保持部材5は切断され、短尺のケーシング2から縁切り用ワイヤー6は離脱し、更に図示されていないクレーン車15からの吊下げワイヤーによって引き上げられると、投げ縄状となっている縁切り用ワイヤー6は更に絞られるので、既設杭8の下部と既設杭8の下方の間にある地盤をワイヤーにより切断する。このため、既設杭8の下部と地盤との縁切りをすることができる。
【0024】
[第4工程]
同じく、短尺ケーシング付きシートパイルAの下部に取付けられた短尺のケーシング2の上部に複数個の保持部材5によって取付けられた杭吊上げ用ワイヤー7をクレーン車15から吊り下げられた吊下げワイヤー(図示されていない)により吊り上げると、杭吊上げ用ワイヤー7の引っ張りによって上記保持部材5は切断され、短尺のケーシング2から杭吊上げ用ワイヤー7は離脱し、杭吊上げ用ワイヤー7は投げ縄状となっているので、既設杭8の下端を緊縛する。
【0025】
[第5工程]
そして、短尺ケーシング付きシートパイルAをクレーン車15から吊り下げられた吊下げワイヤー16により吊上げて引抜き、クレーン車15から吊下げワイヤー16と同じく吊下げられた振動式杭打機17とにより既設杭8を引き抜くと、既設杭8の周壁及び下端と地盤と縁切りが既になされているので、容易に引き抜くことができる。
【0026】
[第6工程]
このようにして、既設杭8の引き抜かれた杭孔22の空洞内に泥水注入装置27によって泥水を泥水注入ホース26により注入されて、空洞となった杭孔22の孔壁を自立させると共に、泥水はサンドポンプ19によって汲み上げられ処理プラントにおくられ泥水処理される。その後、固化材供給装置20でセメントなどの固結材などを混練して注入パイプ21により杭孔22内に注入すると共に、掘削装置23によって土砂などを杭孔22内に埋め戻して埋め戻し部24を形成する。
【0027】
また、上述の工程において、コンクリート製の既設杭8が打設の際の衝撃や永年の使用による座屈やひび割れの個所で切断され、既設杭の下方部分が残置杭となっている場合には、先ず、[第A工程]として、上述の[第1工程]、[第2工程]の工程を行う。
【0028】
[第B工程]
既設杭8の上部にクレーン車15から吊り下げられた吊下げワイヤー16から吊り下げられた吊下げワイヤーを掛けると共にクレーン車15の吊下げワイヤー16により短尺ケーシング付きシートパイルAと既設杭8とを引き抜く。
【0029】
[第C工程]
そして、既設杭8の上方部分のみが引き抜かれた杭孔に再び短尺ケーシング付きシートパイルAのケーシング2の上端を下方部分の残置杭の下方まで打設する。その後、該ケーシング2の下部のワイヤー受け部9に複数個の保持部材5によって取付けられた縁切り用ワイヤー6をクレーン車15から吊り下げられた吊下げワイヤー(図示されていない)により吊り上げて、縁切り用ワイヤー6の引っ張りによって上記保持部材5は切断し、短尺のケーシング2から縁切り用ワイヤー6は離脱し、更に図示されていないクレーン車15からの吊下げワイヤーによって引き上げられると、投げ縄状となっている縁切り用ワイヤー6は更に絞られるので、下方部分の残置杭の下部の地盤をワイヤーにより切断し、下方部分の残置杭の下部と地盤との縁切りをする。
【0030】
[第D工程]
同じく、短尺ケーシング付きシートパイルAの下部に取付けられた短尺のケーシング2の上部に複数個の保持部材5によって取付けられた杭吊上げ用ワイヤー7をクレーン車15から吊り下げられた吊下げワイヤー(図示されていない)により吊り上げると、杭吊上げ用ワイヤー7の引っ張りによって上記保持部材5は切断され、短尺のケーシング2から杭吊上げ用ワイヤー7は離脱し、杭吊上げ用ワイヤー7は投げ縄状となっているので、下方部分の残置杭の下端を緊縛する。
【0031】
[第E工程]
そして、短尺ケーシング付きシートパイルAをクレーン車15から吊り下げられた吊下げワイヤー16により吊上げて引抜き、クレーン車15から吊下げワイヤー16と同じく吊下げられた振動式杭打機17とにより下方部分の残置杭を引き抜くと、下方部分の残置杭の周壁及び下端と地盤と縁切りが既になされているので、容易に引き抜くことができる。その後、前記[第6工程]を行う。
【0032】
なお、環境面から作業工事時の振動規制がある区域や時間帯では、短尺ケーシング付きシートパイルAの打込み手段として、振動式杭打機17に代えて作業中に振動の発生しない油圧式杭打機25によって短尺ケーシング付きシートパイルAを打込み又は引抜きをするようにしてもよい。
【0033】
上述したように、本発明の既設杭の引抜き工法及び引抜き装置では、従来の施工法と異なり、施工現場内に異種の複数の施工装置を搬入することなく、単一の施工装置によりコンクリート製の既設杭又は途中で切断されて地盤中に残っている既設杭の下方部分を引き抜くことができる。
【0034】
また、コンクリート製の既設杭又は途中で切断されて残っている既設杭の下方部分を引き抜くために、シートパイルの下部に短尺のケーシングを取付け、該ケーシングの上端部及び下端部のそれぞれに投げ縄状とした杭吊上げ用ワイヤー及び縁切り用ワイヤーを複数個の保持部材で取付けると共に、この短尺のケーシングをシートパイルの下部に取付けた短尺ケーシング付きシートパイルを振動式杭打機又は油圧式杭打機と該シートパイルの一側に添設した高圧水噴射装置とにより、引き抜くべき既設杭を該短尺のケーシングで嵌装しながら打設して、既設杭の周壁と地盤との縁切りを行うことができる。
【0035】
該短尺のケーシングの下端部に複数個の保持部材で取付けた投げ縄状の縁切り用ワイヤーによって、既設杭の底部と地盤との縁切りを行っているので、既設杭の周壁及び底部と地盤との縁切りが充分になされているので、既設杭の引抜き作業を容易に行うことができる。また、例え、既設のコンクリート製の杭が、打設時や永年の使用でその途中でひびや切断があり、引き抜き時に杭の下方部分が地盤中に残ったとしても、他の施工装置を狭い施工現場に搬入することなく、単一の施工装置により途中で切断されて地盤中に残っている既設杭の下方部分を引き抜くことができる。
【0036】
【発明の効果】
以上説明したように、本発明の請求項1、2及び3に記載の発明は、下記の効果を奏するものである。
1)短尺ケーシング付きシートパイルの一側に添設した高圧水噴射装置と、短尺ケーシング付きシートパイルの下部に取付けたケーシングの下端部に投げ縄状とした縁切り用ワイヤーを保持部材で取付け、該杭の周壁回りの地盤や杭下部の地盤との縁切り作業とを行っているので、杭の引抜き作業を容易に行うことができる。
2)異種の複数の施工装置を搬入することなく、一台の施工装置によりコンクリート製の既設杭又は途中で切断されて残っている既設杭の下方部分を引き抜くことができ、施工装置に要する経費を軽減することができる。このため、例え狭い施工現場であっても複数の施工装置で煩雑になることはい。
【図面の簡単な説明】
【図1】本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの全体図、
【図2】本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの平断面図、
【図3】本発明の既設杭の引抜きで使用する短尺ケーシング付きシートパイルの横断面図、
【図4】本発明の下部にケーシングを備えたシートパイルと高圧水供給手段との接続状態図、
【図5】本発明の既設杭引抜き装置の建込み前の状態図、
【図6】本発明の既設杭引抜き装置に杭吊上げ用ワイヤーをセットした建込み前の状態図、
【図7】本発明の既設杭引抜き装置による既設杭の引上げ状態を示す図、
【図8】本発明の既設杭引抜き装置による既設杭の引倒し状態を示す図、
【図9】本発明の既設杭引抜き装置の下部にケーシングを備えたシートパイルの引き上げ状態を示す図、
【図10】本発明の既設杭引抜き後の杭孔に固化材注入処理状態を示す図、
【図11】本発明の既設杭引抜き後の杭孔の埋め戻し処理状態を示す図、
【図12】本発明の他の実施例の既設杭引抜き装置の建込み前の状態図、
【図13】従来公知の残置杭の引抜きに使用する先端ケーシングの斜視図、
【図14】ケーシング管から、残置杭の上部が突出するまで先端ケーシングを打ち込んだ状態を示す図、
【図15】ケーシング管に巻き付けた台付けワイヤーロープの先端部を移動して残置杭の上部に巻き付けた状態を示す図である。
【符号の説明】
A 短尺ケーシング付きシートパイル、 1 シートパイル、
2 ケーシング、 3 配管、 4 カバー体、 5 保持部材、
6 縁切り用ワイヤー、 7 杭吊上げ用ワイヤー、 8 既設杭、
9 ワイヤー受け部、 10 接続用シートパイル、 11 高圧水供給手段、
12 給水ホース、 13 水槽、 14 噴射ノズル、 15 クレーン車、
16 吊下げワイヤー、 17 振動式杭打機、 18 吊上げワイヤー、
19 サンドポンプ、 20 固化材供給装置、 21 注入パイプ、
22 杭孔、 23 掘削装置、 24 埋め戻し部、 25 油圧式杭打機、
26 泥水注入ホース、 27 泥水注入装置。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method of pulling out existing piles driven into the ground in order to construct a new foundation structure in the ground of this site when rebuilding a new building on the site of a building demolished due to aging etc. And its device.
[0002]
[Prior art]
[Patent Document 1] Japanese Unexamined Patent Application Publication No. 2002-256557 Conventionally, when a building such as a building is rebuilt due to aging of the building or computerization of society, an existing pile remaining in the ground together with the dismantling of the existing building is extracted. It is necessary to newly build a foundation structure such as a foundation pile and a continuous underground wall suitable for supporting the structure of a newly constructed building. Extracting the existing piles remaining in the ground in this way is due to the impact of the existing piles that supported the building to be demolished, especially if the existing piles are concrete piles. Buckling and cracking, buckling and cracking due to partial shear pressure applied to piles during long-term use are not suitable for supporting the structure of newly built buildings, Even if buckling or cracking does not occur, the existence of existing piles is an obstacle to construction when constructing a new foundation structure due to the structure and shape of the newly constructed building.
[0003]
Conventionally, as a method of pulling out existing concrete piles remaining in the ground from the ground, using a swiveling excavator, excavating the ground around the pile wall over the entire length of the pile and cutting off the pile and ground. After the pile was pulled out of the pile, the pile was cracked or broken due to the pile installation or long-term use.The lower part of the pile was left behind in the ground. May be. For this reason, a guide steel pipe is driven into the pile hole after the upper part of the pile has been pulled out, and then a steel sheet pile having a short casing pipe attached to the lower part is driven by using the guide steel pipe as a guide. The wire rope attached to the upper edge of the pile is pulled up and wrapped tightly around the pile left behind in the ground, and the pile is taken out by pulling up the wire rope with a crane. 1) is known.
[0004]
The drawing method described in Patent Document 1 will be described with reference to FIGS. FIG. 13 is a perspective view of a tip casing used for pulling out a conventionally known remaining pile, and FIG. 14 is a diagram showing a state where the tip casing is driven into the casing pipe until the upper portion of the remaining pile projects from the casing pipe. FIG. 4 is a diagram showing a state in which a tip end of a base wire rope wound around a casing tube is moved and wound around an upper part of a remaining pile.
[0005]
The ground around the peripheral wall of the existing pile is excavated in the length direction of the existing pile using a rotary excavator, and the peripheral wall of the existing pile is cut off from the ground. After that, the wire rope hung on the upper part of the existing pile is pulled up by a crane truck and the pile is pulled out, or the pile is pulled out by a hydraulic pile remover. However, as mentioned above, existing piles made of concrete piles are subject to buckling and cracking due to the impact during casting and the partial shear pressure applied to the piles during long-term use due to ground pressure. When the existing pile is pulled out, the pile is cut at the buckling or crack location, and the lower part of the existing pile is left in the ground.
[0006]
Then, in order to pull out the lower part of the existing pile left in the ground, a vibrator in which a guide steel pipe 39 is attached by a first hoisting wire rope 35 by a crane truck 34 to a pile hole from which the existing pile in the upper part has been pulled out. The guide steel pipe 39 is hung from the pile hole by suspending the hammer 37, and the tip of the guide steel pipe 39 is fitted to the upper part of the remaining pile 38 left in the ground. On the other hand, the tip casing used in the method of pulling out the lower part of the existing pile left in the ground is constituted by fixing a short steel pipe casing pipe 31 to the tip of a steel sheet pile 30. At the upper end of the casing tube 31, the holding members 32 of the mounting wire rope 33 are attached at regular intervals. The holding member 32 is a small-diameter steel wire bent into a semicircle, and both ends thereof are attached to the casing tube 31 by welding. The distal end of the mounting wire rope 33 is wound around the outer periphery of the casing tube 31 through the semicircular hole of the holding member 32.
[0007]
Then, the tip casing is driven by the vibratory hammer 37 with the guide steel pipe 39 as a guide until the upper portion of the remaining pile 38 protrudes from the casing pipe 31 by a certain length, thereby cutting off the friction between the remaining pile 38 and the ground. Thereafter, when the base wire rope 33 is wound up, the base wire rope 33 wound around the upper end of the casing tube 31 by the holding member 32 peels the holding member 32 from the casing tube 31, and the tip of the base wire rope 33. While the part is being lifted and squeezed, it is tightly wound around the upper part of the remaining pile 38, and furthermore, the remaining pile 38 is taken out to the ground by pulling up the mounting wire rope 33 with the first hoisting wire rope 35 from the crane truck 34.
[0008]
[Problems to be solved by the invention]
However, in the above-mentioned conventional method of drawing out the remaining pile, as a construction device for pulling out the existing pile in the ground, first, the ground around the peripheral wall of the existing pile, which is a construction device for cutting the existing pile and the ground, is used. A swivel-type excavator for excavation, and then a tip casing in which a short steel pipe casing pipe is fixed to the tip of a steel sheet pile for pulling out the lower part of the existing pile left in the ground, and this tip casing It requires a vibro hammer, which is a driving device. As described above, a plurality of construction apparatuses must be prepared for different operations, and a large number of construction apparatuses make a narrow construction site narrower and more complicated, and a large amount of expense is required to prepare the plurality of construction apparatuses. are doing.
[0009]
In addition, the tip of the lower part (remaining pile) of the pile left in the ground and the ground are tightly integrated by compaction due to the load from the upper structure during casting and long-term use, Extracting it with a wire rope is a very difficult task.
[0010]
Therefore, the present invention has been made in view of the above-mentioned problem, and in order to pull out the entire length of an existing concrete pile from the ground, the entire length of the pile between the ground and the existing pile by injection of high-pressure jet water and driving of a short casing is described. To cut off the lower part of the existing pile that was cut at the point of buckling or cracking due to the impact of casting and long-term use, cutting the lower part of the lower part of the existing pile and the ground It is an object of the present invention to provide a method of pulling out an existing pile, in which the work is performed by one construction device, and a pulling device used for the method.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, the invention according to claim 1 of the present invention is to fix a short casing slightly larger in diameter than an existing pile to a lower portion of a sheet pile and to fit the casing to the existing pile while attaching the casing to the existing pile. The sheet pile is driven in by driving means while high-pressure water is injected from the injection nozzle at the lower end of the high-pressure water pipe attached in the length direction of the sheet pile, and a step of trimming the peripheral wall of the existing pile and the ground is performed. After the upper end of the existing pile is driven below the lower end of the existing pile, pull the wire rope for trimming to trim the lower end of the existing pile and the ground, then pull the wire rope for lifting and tighten the lower end of the existing pile, Pulling process of existing piles by pulling means and lifting wire rope,
Characterized by the following steps:
[0012]
In order to achieve the above object, the invention according to claim 2 of the present invention is characterized in that a short casing slightly larger in diameter than an existing pile is fixed to a lower portion of a sheet pile and the casing is fitted to the existing pile. The sheet pile is driven in by driving means while the high-pressure water is injected from the lower end of the high-pressure water pipe attached in the length direction of the sheet pile, and the peripheral wall of the existing pile is cut off from the ground, a short casing. With the sheet pile withdrawing and the existing pile being pulled out, the upper end of the casing is driven into the lower part of the lower pile, and the lower end of the lower part of the pile where the rim wire rope is pulled and the ground is left is pulled. Beveling process, binding process of the lower end of the lower portion of the pile left by pulling the lifting wire rope, pulling out the lower portion of the pile left by the pulling means and the lifting wire rope,
Characterized by the following steps:
[0013]
Further, in order to achieve the above object, the invention according to claim 3 of the present invention provides a pipe for high-pressure water having a short casing slightly larger in diameter than an existing pile and fixed at a lower portion and having a jet nozzle at a lower end. , A sheet pile provided in the length direction thereof, a driving / pulling-out means for the sheet pile, and a plurality of holding members for lifting the entire circumference of the upper edge of the short casing and the entire circumference of the lower edge of the casing. A high-pressure water supply means is connected to an upper end of the high-pressure water pipe, with a wire rope and a trimming wire rope attached.
[0014]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of a method for pulling out an existing pile and an apparatus for pulling out an existing pile according to the present invention will be described with reference to FIGS. FIG. 1 is an overall view of a sheet pile with a short casing used for pulling out an existing pile of the present invention, FIG. 2 is a plan sectional view of a sheet pile with a short casing used for pulling out an existing pile of the present invention, and FIG. FIG. 4 is a cross-sectional view of a sheet pile with a short casing used for pulling out an existing pile of the present invention, FIG. 4 is a connection state diagram of a sheet pile having a casing at a lower portion of the present invention and high-pressure water supply means, and FIG. FIG. 6 is a state diagram of the existing pile pulling device of the present invention before installation, FIG. 6 is a state diagram of the existing pile pulling device of the present invention in which a pile lifting wire is set, and FIG. 7 is an existing state of the present invention. FIG. 8 is a diagram showing a state where the existing pile is pulled up by the pile pulling device, FIG. 8 is a diagram showing a state where the existing pile is pulled down by the existing pile pulling device of the present invention, and FIG. 9 is a casing below the existing pile pulling device of the present invention. Of sheet pile with FIG. 10 is a diagram showing a lifted state, FIG. 10 is a diagram showing a state of solidification material injection processing into a pile hole after the existing pile is drawn out of the present invention, and FIG. 11 is a state of backfilling the pile hole after the existing pile is drawn out according to the present invention. FIG. 12 is a state diagram of an existing pile pulling-out device according to another embodiment of the present invention before being built.
[0015]
The sheet pile A with the short casing used for the operation of pulling out the existing pile of the present invention shown in FIGS. 1 to 12 has a short diameter about 10 cm larger than the diameter of the existing pile 8 pulled out at the tip of the sheet pile 1. The casing 2 made of steel pipe is fixedly mounted, and holding members 5, 5,... Of the wire 7 for lifting piles are attached to the upper end of the casing 2 at regular intervals. The tips of the pile lifting wires 7 are wound around the outer periphery of the casing 2 around the holding members 5, 5,... Attached at regular intervals to form a loop at one end, and the other pile is attached to this loop. The end of the lifting wire 7 has a lasso shape.
[0016]
The tip of the other pile lifting wire 7 passed through the loop portion is extended to the upper end of the sheet pile A with the short casing, and is hooked on a hook of a hanging wire 16 of a crane truck 15 described later. ing. The holding member 5 is configured such that the pile lifting wire 7 is cut by lifting the hanging wire 16 of the crane truck 15, and the pile lifting wire 7 is separated from the peripheral wall of the casing 2.
[0017]
The lower end of the casing 2 attached to the tip of the sheet pile A with the short casing is folded inward and bent to form a wire receiving portion 9, and the wire receiving portion 9 is cut off at regular intervals so as to surround the wire receiving portion 9. The holding members 5, 5,... Of the application wire 6 are attached. The distal ends of the trimming wires 6 are passed through the holding members 5, 5,... Attached to the wire holder 9 of the casing 2 to form a loop at one end. Is formed into a lasso through the tip of the edge cutting wire 6.
[0018]
The tip of the other edge cutting wire 6 passed through the loop portion is extended toward the upper end of the sheet pile A with the short casing, and is hooked on a hook of a hanging wire 16 of a crane truck 15 described later. I have. The holding member 5 holding the edging wire 6 is also cut by the lifting of the hanging wire 16 of the crane truck 15 so that the pile lifting wire 7 is detached from the inner peripheral wall of the casing 2. It has become. The wire receiving portion 9 is a protection portion for preventing the edging wire 6 from coming off the casing 2 when the sheet pile A with the short casing is driven.
[0019]
On one side of the sheet pile A with the short casing, a pipe 3 having a connection port at an upper end and an injection nozzle 14 at a lower end is attached along the entire length, and the attached pipe 3 is a cover body 4. Protected by The sheet pile A with the short casing can be connected to a connection sheet pile 10 provided with a pipe 3 protected by a cover body 4 over the entire length so as to correspond to the length of the existing pile 8 in the ground. It has become.
[0020]
The high-pressure water is supplied from the water tank 13 installed near the work place and the high-pressure water supply means 11 through the water supply hose 12 through the pipe 3 attached to the sheet pile A with the short casing and the sheet pile A with the short casing. High-pressure water is injected from the injection nozzle 14 at the lower end of the casing 2 attached to the tip of the casing 2, and the ground between the inner peripheral wall of the casing 2 and the existing pile 8 is muddy. 8 can be easily pulled out.
[0021]
Next, an existing pile pulling method using the sheet pile with the short casing of the present invention and an operation procedure of the existing pile pulling apparatus will be described with reference to FIGS.
[First step]
First, a vibratory pile driver 17 is suspended from a crane truck 15 installed near an existing pile 8 to be pulled out to a suspension wire 16, and a sheet pile A with a short casing is gripped by the vibratory pile driver 17. The casing 2 provided at the lower end of the sheet pile A with the short casing is fitted on the exposed head of the existing pile 8.
[0022]
[Second step]
Next, the water in the water tank 13 is jet-sprayed from the jet nozzle 14 at the lower end of the pipe 3 attached to one side of the sheet pile A with the short casing via the water supply hose 12 by the high-pressure water supply means 11. The vibratory pile driver 17 is operated to drive the sheet pile A with the short casing into the ground. Then, the casing 2 provided at the lower end of the sheet pile A with the short casing is driven into the ground, and the ground between the inside of the casing 2 and around the existing pile 8 is broken by the jet injection a from the injection nozzle 14. The soil is muddy and the peripheral wall of the existing pile 8 is cut off from the ground.
[0023]
[Third step]
Then, the edge cutting wire 6 attached by the plurality of holding members 5 to the wire receiving portion 9 below the short casing 2 attached to the lower portion of the sheet pile A with the short casing is suspended from the crane truck 15. When the lifting member is lifted by a lowering wire (not shown), the holding member 5 is cut by pulling the edging wire 6, the edging wire 6 is separated from the short casing 2, and furthermore, a crane vehicle 15 (not shown) is used. When pulled up by the hanging wire, the lasso-shaped edge cutting wire 6 is further narrowed, so that the ground between the lower part of the existing pile 8 and the lower part of the existing pile 8 is cut by the wire. For this reason, the lower part of the existing pile 8 and the ground can be cut off.
[0024]
[Fourth step]
Similarly, a suspension wire 7 suspended from a crane truck 15 is a pile lifting wire 7 attached to a short casing 2 attached to a lower portion of a sheet pile A with a short casing by a plurality of holding members 5 (shown in FIG. (Not shown), the holding member 5 is cut by pulling the pile lifting wire 7, the pile lifting wire 7 is detached from the short casing 2, and the pile lifting wire 7 becomes lasso-shaped. Therefore, the lower end of the existing pile 8 is tightened.
[0025]
[Fifth step]
Then, the sheet pile A with the short casing is lifted and pulled out by the suspension wire 16 suspended from the crane truck 15, and the existing pile is suspended by the vibration type pile driver 17 suspended similarly to the suspension wire 16 from the crane truck 15. When the 8 is pulled out, the peripheral wall and lower end of the existing pile 8, the ground, and the edge have already been cut, so that the pile 8 can be easily pulled out.
[0026]
[Sixth step]
In this way, the muddy water is injected by the muddy water injection device 27 into the hollow of the pile hole 22 from which the existing pile 8 has been pulled out by the muddy water injection hose 26, and the hole wall of the hollow pile hole 22 is self-standing. The muddy water is pumped up by a sand pump 19 and sent to a treatment plant for muddy water treatment. Thereafter, a solidifying material such as cement is kneaded by the solidifying material supply device 20 and injected into the pile hole 22 by the injection pipe 21, and soil and the like are buried back into the pile hole 22 by the excavating device 23 and the backfill portion. 24 are formed.
[0027]
In the above-described process, when the existing concrete pile 8 is cut at the place of buckling or cracking due to the impact at the time of driving or long-term use, and the lower part of the existing pile is a remaining pile, First, as [Step A], the above-described steps [First Step] and [Second Step] are performed.
[0028]
[Step B]
A suspension wire suspended from a suspension wire 16 suspended from a crane truck 15 is hung above the existing pile 8 and a sheet pile A with a short casing and the existing pile 8 are suspended by the suspension wire 16 of the crane vehicle 15. Pull out.
[0029]
[Step C]
Then, the upper end of the casing 2 of the sheet pile A with the short casing is again driven into the pile hole from which only the upper part of the existing pile 8 has been pulled out, below the remaining pile in the lower part. Thereafter, the edge cutting wire 6 attached to the wire receiving portion 9 at the lower portion of the casing 2 by the plurality of holding members 5 is lifted by a hanging wire (not shown) suspended from the crane truck 15 to perform edge cutting. When the holding member 5 is cut by pulling the wire 6 for use, the edge cutting wire 6 is detached from the short casing 2 and further pulled up by a hanging wire from a crane truck 15 (not shown) to form a lasso. Since the cutting wire 6 is further narrowed, the ground below the remaining pile in the lower part is cut by the wire, and the lower part of the remaining pile in the lower part and the ground are cut.
[0030]
[Step D]
Similarly, a suspension wire 7 suspended from a crane truck 15 is a pile lifting wire 7 attached to a short casing 2 attached to a lower portion of a sheet pile A with a short casing by a plurality of holding members 5 (shown in FIG. (Not shown), the holding member 5 is cut by pulling the pile lifting wire 7, the pile lifting wire 7 is detached from the short casing 2, and the pile lifting wire 7 becomes lasso-shaped. The lower end of the remaining pile in the lower part.
[0031]
[Step E]
Then, the sheet pile A with the short casing is lifted and pulled out by the hanging wire 16 hung from the crane truck 15, and the lower portion is driven by the vibratory pile driver 17 hung from the crane truck 15 as well as the hanging wire 16. When the remaining pile is pulled out, the peripheral wall and lower end of the remaining pile at the lower portion, the ground, and the edge are already cut, so that the pile can be easily pulled out. Thereafter, the above [sixth step] is performed.
[0032]
In addition, in an area or a time zone in which vibration is restricted during work due to environmental considerations, instead of the vibratory pile driver 17, a hydraulic pile driver is used instead of the vibratory pile driver 17 as a driving means for the sheet pile A with the short casing. The sheet pile A with the short casing may be driven or pulled by the machine 25.
[0033]
As described above, in the existing pile pulling method and the pulling device of the present invention, unlike the conventional construction method, without loading a plurality of different types of construction devices into the construction site, a single construction device can be used for concrete. The lower part of the existing pile or the existing pile cut off in the middle and remaining in the ground can be pulled out.
[0034]
Also, in order to pull out the existing pile made of concrete or the lower part of the existing pile that has been cut off in the middle, a short casing is attached to the lower part of the sheet pile, and lassos are respectively attached to the upper end and the lower end of the casing. Pile lifting wire and edge cutting wire are attached by a plurality of holding members, and this short casing is attached to the lower part of the sheet pile. And the high-pressure water injection device attached to one side of the sheet pile, the existing pile to be pulled out is fitted and set in the short casing, and the peripheral wall of the existing pile and the ground are cut off. it can.
[0035]
Since the bottom of the existing pile and the ground are cut off by the lasso-shaped cutting wire attached to the lower end of the short casing with a plurality of holding members, the peripheral wall and the bottom of the existing pile and the ground are cut off. Since the rim is sufficiently cut, the work of pulling out the existing pile can be easily performed. Also, even if the existing concrete pile is cracked or cut in the middle during casting or long-term use, even if the lower part of the pile remains in the ground at the time of pulling out, other construction equipment is narrow. Without being carried into the construction site, the lower part of the existing pile that is cut in the middle by the single construction device and remains in the ground can be pulled out.
[0036]
【The invention's effect】
As described above, the inventions according to the first, second, and third aspects of the present invention have the following effects.
1) A high-pressure water injection device attached to one side of a sheet pile with a short casing, and a lasso-shaped trimming wire are attached to a lower end of a casing attached to a lower portion of the sheet pile with a short casing by a holding member. Since the cutting work with the ground around the peripheral wall of the pile and the ground under the pile is performed, the work of pulling out the pile can be easily performed.
2) It is possible to pull out the existing concrete pile or the lower part of the existing pile that has been cut and left in the middle with one construction equipment without carrying in a plurality of different construction equipment, and the cost required for the construction equipment Can be reduced. For this reason, even if it is a narrow construction site, it will not be complicated by a plurality of construction apparatuses.
[Brief description of the drawings]
FIG. 1 is an overall view of a sheet pile with a short casing used for pulling out an existing pile according to the present invention;
FIG. 2 is a plan sectional view of a sheet pile with a short casing used for pulling out an existing pile according to the present invention;
FIG. 3 is a cross-sectional view of a sheet pile with a short casing used for pulling out an existing pile according to the present invention;
FIG. 4 is a connection state diagram of a sheet pile having a casing at a lower portion of the present invention and high-pressure water supply means,
FIG. 5 is a state diagram of the existing pile pulling out device of the present invention before being built,
FIG. 6 is a state diagram before setting a pile lifting wire set in the existing pile pulling device of the present invention,
FIG. 7 is a view showing a state in which an existing pile is pulled by the existing pile pulling device of the present invention;
FIG. 8 is a diagram showing a state in which an existing pile is pulled down by the existing pile pulling device of the present invention;
FIG. 9 is a view showing a state in which a sheet pile having a casing is provided at a lower portion of an existing pile pulling device of the present invention,
FIG. 10 is a view showing a state of solidification material injection processing into a pile hole after pulling out an existing pile according to the present invention;
FIG. 11 is a diagram showing a state of backfilling a pile hole after pulling out an existing pile according to the present invention;
FIG. 12 is a state diagram of an existing pile pulling-out device according to another embodiment of the present invention before installation.
FIG. 13 is a perspective view of a tip casing used for pulling out a conventionally known remaining pile,
FIG. 14 is a diagram showing a state in which the tip casing is driven into the casing tube until the upper portion of the remaining pile projects from the casing pipe;
FIG. 15 is a view showing a state in which a tip end of a base wire rope wound around a casing tube is moved and wound around an upper part of a remaining pile.
[Explanation of symbols]
A sheet pile with short casing, 1 sheet pile,
2 casing, 3 piping, 4 cover body, 5 holding member,
6 Edge cutting wire, 7 Pile lifting wire, 8 Existing pile,
9 wire receiving section, 10 connection sheet pile, 11 high-pressure water supply means,
12 water supply hose, 13 water tank, 14 injection nozzle, 15 crane truck,
16 hanging wire, 17 vibratory pile driver, 18 lifting wire,
19 sand pump, 20 solidified material supply device, 21 injection pipe,
22 pile holes, 23 drilling rig, 24 backfilling section, 25 hydraulic pile driver,
26 Mud injection hose, 27 Mud injection device.

Claims (3)

既設杭より稍大径で短尺のケーシングをシートパイルの下部に固設すると共に該ケーシングを既設杭に嵌装しつつ、シートパイルの長さ方向に添設した高圧水用の配管の下端の噴射ノズルから高圧水を噴射しながら打込み手段によりシートパイルを打込み、既設杭の周壁と地山との縁切り工程、
該ケーシングの上端を既設杭の下端より下方まで打込んだ後に縁切り用ワイヤーロープを引いて既設杭の下端と地山との縁切り工程、
次いで、吊上げ用ワイヤーロープを引いて既設杭の下端の緊縛工程、
短尺ケーシング付きシートパイルの引抜き工程、
引抜き手段と吊上げ用ワイヤーロープにより既設杭の引抜き工程、
の各工程からなることを特徴とする既設杭の引抜き工法。
A short casing with a diameter slightly larger than that of the existing pile is fixed to the lower part of the sheet pile, and the casing is fitted to the existing pile, and the lower end of the pipe for high-pressure water attached in the length direction of the sheet pile is injected. The sheet pile is driven by the driving means while high-pressure water is sprayed from the nozzle, and the peripheral wall of the existing pile is cut off from the ground,
After driving the upper end of the casing below the lower end of the existing pile, pulling a wire rope for trimming, the step of trimming the lower end of the existing pile and the ground,
Next, pull the wire rope for lifting and tighten the lower end of the existing pile,
Drawing process of sheet pile with short casing,
Pulling process of existing piles by pulling means and lifting wire rope,
A method for pulling out existing piles, comprising the following steps:
既設杭より稍大径で短尺のケーシングをシートパイルの下部に固設すると共に該ケーシングを既設杭に嵌装しつつ、シートパイルの長さ方向に添設した高圧水用の配管の下端の噴射ノズルから高圧水を噴射しながら打込み手段によりシートパイルを打込み、既設杭の周壁と地山との縁切り工程、
短尺ケーシング付きシートパイルの引抜きと既設杭の引抜き工程、
該ケーシングの上端を残置した下方部分の杭の下方まで打込んだ後に縁切り用ワイヤーロープを引いて残置した下方部分の杭の下端と地山との縁切り工程、
吊上げ用ワイヤーロープを引いて残置した下方部分の杭の下端の緊縛工程、
引抜き手段と吊上げ用ワイヤーロープにより残置した下方部分の杭の引抜き工程、
の各工程からなることを特徴とするものである。
A short casing with a diameter slightly larger than that of the existing pile is fixed to the lower part of the sheet pile, and the casing is fitted to the existing pile, and the lower end of the pipe for high-pressure water attached in the length direction of the sheet pile is injected. The sheet pile is driven by the driving means while high-pressure water is sprayed from the nozzle, and the peripheral wall of the existing pile is cut off from the ground,
Pulling out sheet pile with short casing and pulling out existing pile,
A beveling step between the lower end of the lower portion of the lower portion of the pile left behind by pulling the wire rope for trimming after being driven below the lower portion of the pile where the upper end of the casing is left, and the ground,
Tightening process of the lower end of the lower part of the pile left by pulling the lifting wire rope,
Pulling process of the lower pile left by the pulling means and the lifting wire rope,
Characterized by the following steps:
既設杭より稍大径で短尺のケーシングを下部に固設すると共に下端に噴射ノズルを有する高圧水用の配管を長さ方向に添設したシートパイルと、該シートパイルの打込み・引き抜き手段と、該短尺のケーシングの上端縁の全周及び該ケーシングの下端縁の全周にそれぞれ複数の保持部材で吊上げ用ワイヤーロープ及び縁切り用ワイヤーロープを取付け、該高圧水用の配管の上端部には高圧水供給手段が接続されていることを特徴とする既設杭の引抜き装置。A sheet pile in which a short casing slightly larger in diameter than the existing pile is fixed at the bottom and a pipe for high-pressure water having an injection nozzle at the lower end is added in the length direction, and a driving / pulling-out means for the sheet pile, A plurality of lifting wire ropes and edge wire ropes are attached to the entire circumference of the upper edge of the short casing and the entire circumference of the lower edge of the casing, respectively. An existing pile pulling-out device to which a water supply means is connected.
JP2003105935A 2003-04-10 2003-04-10 Method for pulling out existing pile and pulling-out device Pending JP2004308338A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003105935A JP2004308338A (en) 2003-04-10 2003-04-10 Method for pulling out existing pile and pulling-out device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003105935A JP2004308338A (en) 2003-04-10 2003-04-10 Method for pulling out existing pile and pulling-out device

Publications (1)

Publication Number Publication Date
JP2004308338A true JP2004308338A (en) 2004-11-04

Family

ID=33468269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003105935A Pending JP2004308338A (en) 2003-04-10 2003-04-10 Method for pulling out existing pile and pulling-out device

Country Status (1)

Country Link
JP (1) JP2004308338A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138544A (en) * 2005-11-18 2007-06-07 Marui Kiso:Kk Method of pulling out existing pile
JP2010112040A (en) * 2008-11-05 2010-05-20 Nazetekku:Kk Pile extraction machine and pile extraction method
CN104141306A (en) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 Semi-casing-pipe vibrating pile pulling device and use method thereof
CN104988922A (en) * 2015-07-17 2015-10-21 冯克俊 Method for pulling out underground old engineering pile through high-pressure water flushing
CN105297730A (en) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 Multi-functional pile pulling sleeve and pile pulling construction method adopting multi-functional pile pulling sleeve
CN110984624A (en) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 Ultralong vertical underground steel pipe pulling-out system and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138544A (en) * 2005-11-18 2007-06-07 Marui Kiso:Kk Method of pulling out existing pile
JP2010112040A (en) * 2008-11-05 2010-05-20 Nazetekku:Kk Pile extraction machine and pile extraction method
JP4621276B2 (en) * 2008-11-05 2011-01-26 株式会社ナゼテック Pile removal machine and pile removal method
CN104141306A (en) * 2013-05-07 2014-11-12 上海建工五建集团有限公司 Semi-casing-pipe vibrating pile pulling device and use method thereof
CN104988922A (en) * 2015-07-17 2015-10-21 冯克俊 Method for pulling out underground old engineering pile through high-pressure water flushing
CN105297730A (en) * 2015-10-30 2016-02-03 中国建筑第八工程局有限公司 Multi-functional pile pulling sleeve and pile pulling construction method adopting multi-functional pile pulling sleeve
CN110984624A (en) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 Ultralong vertical underground steel pipe pulling-out system and construction method thereof
CN110984624B (en) * 2019-12-20 2024-04-05 中建一局集团建设发展有限公司 Ultra-long vertical underground steel pipe pulling-out system and construction method thereof

Similar Documents

Publication Publication Date Title
WO1996018001A1 (en) Pile head treating tool for cast-in-place pile, pile head treating method, and cast-in-place piling method
CN106759336A (en) A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN108978661B (en) Construction method for removing cast-in-situ bored pile
JP2009062711A (en) Bored precast pile method using earth drill
JP2004308338A (en) Method for pulling out existing pile and pulling-out device
JP5390919B2 (en) Removal method of earth retaining members
JP2009263966A (en) Removal method of existing pile
JP2012241329A (en) Method of removing existing pile
JP2863487B2 (en) Pile pull-out method and device
JP2007138552A (en) Pile removing device and pile removing method
JP3453664B2 (en) Shaft construction method
JP4366597B2 (en) Cutting and removing existing piles
JP5827528B2 (en) Underground pile drawing method and equipment
JP2003147771A (en) Pile extracting construction method and its device, improved ground and ground improvement construction method
JP3445979B2 (en) Ptolemy tube, its connecting structure, and its attaching and detaching method
JPH08209686A (en) Pile head processing tool and pile head processing construction method for cast-in-place pile
JP3827309B2 (en) Auxiliary pile method and embedded pile method
JP4137173B1 (en) Reinforcing bar construction in cast-in-place pile
JP3697576B2 (en) Remaining pile drawing device and remaining pile drawing method
JP5241804B2 (en) Vertical shaft construction method
JPH0224419A (en) Simultaneous backfilling with pile drawing, and pile drawer
JP3056461B2 (en) Pile removal method and pile removal casing
JP4113305B2 (en) Ground obstruction removal method
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JPH11229740A (en) Subsoil excavation method and device