JP2004244162A - Tool for replacing winding machine of elevator - Google Patents

Tool for replacing winding machine of elevator Download PDF

Info

Publication number
JP2004244162A
JP2004244162A JP2003035609A JP2003035609A JP2004244162A JP 2004244162 A JP2004244162 A JP 2004244162A JP 2003035609 A JP2003035609 A JP 2003035609A JP 2003035609 A JP2003035609 A JP 2003035609A JP 2004244162 A JP2004244162 A JP 2004244162A
Authority
JP
Japan
Prior art keywords
hoistway
beam member
elevator
winding machine
hoisting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003035609A
Other languages
Japanese (ja)
Other versions
JP4260502B2 (en
Inventor
Naohiro Takamura
尚宏 高村
Eiji Harakuma
英路 原熊
Minoru Watanabe
稔 渡辺
Hironori Mihashi
弘典 三橋
Kenji Shiraishi
賢二 白石
Naoyuki Hashiguchi
直之 橋口
Katsuto Abe
勝人 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2003035609A priority Critical patent/JP4260502B2/en
Publication of JP2004244162A publication Critical patent/JP2004244162A/en
Application granted granted Critical
Publication of JP4260502B2 publication Critical patent/JP4260502B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a tool for replacing a winding machine of an elevator allowing the efficient proceeding of replacing work of the winding machine by stably suspending a car and the winding machine by a simple procedure. <P>SOLUTION: A beam member 6 is fitted between a pair of guide rails 3a and 3b provided in a hoistway 1 of the elevator. The beam member 6 is provided with pulleys 23a and 23b and a hanging ring 24 functioning as hinges when removing and suspending the winding machine 4 of the elevator installed in the guide rail 3a. When replacing the winding machine 4, a slinging wire rope 33 provided with a chain block 34 is passed through the pulleys 23a and 23b, the slinging wire rope 33 is connected to the winding machine 4, tension is applied to the slinging wire rope 33 by operating the chain block 34, the winding machine 4 is removed from the guide rail 3a in this state, the winding machine 4 is suspended by the slinging wire rope 33, and the winding machine 4 is carried to the outside of the hoistway 1. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
この発明は、エレベータの巻上機を交換する際に使用するエレベータの巻上機交換用治具に関する。
【0002】
【従来の技術】
従来一般のエレベータにおいては、建屋の昇降路の上方部に機械室が設けられ、この機械室内に巻上機が設置され、この巻上機から昇降路内に吊りロープが繰出され、この吊りロープの一端部に乗りかごが、他端部に釣合い重りがそれぞれ連結され、これら乗りかごと釣合い重りとが重量的にほぼバランスするように昇降路内に吊り下げられている。そして巻上機により吊りロープが駆動されることにより乗りかごと釣合い重りとが昇降路内で互いに逆方向に昇降する。
【0003】
ところが、昇降路の上方部に機械室が設けられているタイプのエレベータにおいては、その機械室の分、建屋の高さが高くなる難点があり、そこで近年においては、巻上機を昇降路内に設置して機械室を省くようにしたいわゆるマシンルームレスタイプのエレベータが提供されるようになってきている。
【0004】
このマシンルームレスタイプのエレベータにおいては、昇降路内に設けられた乗りかごガイド用のガイドレールの上部の背面に巻上機が取り付けられている。
【0005】
ところで、巻上機は長期の使用等に応じて交換が必要となる場合がある。この場合、従来においては、まず乗りかごを玉掛けワイヤロープを用いてガイドレールに吊り止める一方、昇降路の内壁面の複数箇所に掛け部材を取り付け、これら掛け部材に滑車やワイヤロープを掛け、そのワイヤロープを巻上機に連結する。
【0006】
そして巻上機をガイドレールから取り外し、その取り外した巻上機を前記ワイヤロープおよび滑車を用いて吊り下げ、昇降路外に搬出するようにしている。
【0007】
【発明が解決しようとする課題】
しかしながら、上述の場合、巻上機の吊元部が昇降路の内壁面の近くとなるため、その吊り作業に先立って巻上機と昇降路の内壁面との間に配設されている巻上機の周辺機器や配線類を予め取り除いてからその吊り作業を行なわなければならず、このためその取り除きの作業に多大な労力と時間を要し、能率が低下する。
【0008】
吊り下げた巻上機は、昇降路の内壁面等との干渉を避けるために、昇降路の中央寄りに引き寄せる必要があるが、その引き寄せの作業も面倒となる。
【0009】
また、乗りかごもその両側部の2箇所を玉掛けワイヤロープで吊らねばならないから作業が面倒であるばかりでなく、その吊元部がガイドレールの途中であるため安定性に欠ける。
【0010】
さらに、巻上機の吊元部となる掛け部材を昇降路のコンクリート内壁面に取り付けるとなると、そのコンクリート面に穴等をあけなければならず、その作業時に騒音や振動等が発生し、建屋の居住者に不快感を与えてしまう。
【0011】
この発明はこのような点に着目してなされたもので、その目的とするところは、昇降路の内壁面に掛け部材を取り付けるような面倒で、かつ騒音や振動等が伴う作業を要することなく、簡易な手順で乗りかごや巻上機を昇降路の内壁面との干渉を避けつつ安定して吊り下げ、能率よく巻上機の交換作業を進めることができるエレベータの巻上機交換用治具を提供することにある。
【0012】
【課題を解決するための手段】
請求項1の発明は、エレベータの昇降路内に設けられた一対のガイドレール間に架設可能な梁部材と、この梁部材に設けられ、前記ガイドレールに設置されているエレベータの巻上機を取り外して吊るときの吊元として機能する吊元部とを具備することを特徴としている。
【0013】
請求項2に発明は、前記吊元部が、前記梁部材の長手方向の途中に回転自在に設けられた滑車を含むことを特徴としている。
【0014】
請求項3の発明は、前記梁部材が、前記各ガイドレールの頂部に設けられた支持具を介してガイドレール間に架設されることを特徴としている。
【0015】
請求項4の発明は、前記梁部材の一端部または両端部が前記ガイドレールを昇降路に固定するレールブラケットを利用してガイドレール間に架設されることを特徴としている。
【0016】
請求項5の発明は、前記吊元部としての滑車が、前記梁部材の長手方向に沿って移動可能となっていることを特徴としている。
【0017】
【発明の実施の形態】
以下、この発明の実施の形態について図面を参照して説明する。
【0018】
図1にはこの発明の第1の実施形態を示してあり、エレベータの昇降路1内には、乗りかご2の昇降をガイドする一対のガイドレール3a,3bが互いに対向して垂直に設けられている。そして一方のガイドレール3aの上部背面に、乗りかご2を駆動する巻上機4が複数のボルト等の締結部材(図示せず)を介して脱着可能に取り付けられている。
【0019】
各ガイドレール3a,3bの頂部にはそれぞれ支持具5a,5bが脱着可能に取り付けられ、これら支持具5a,5b間に梁部材6が水平に架設されている。
【0020】
前記支持具5a,5bは、図2および図3に示すように、支持具本体9を有し、この支持具本体9に刃部嵌合部10と耳部嵌合部11とが設けられ、その刃部嵌合部10内にガイドレール3a,3bの刃部12が、耳部嵌合部11内にガイドレール3a,3bの耳部13が嵌合されている。
【0021】
また、支持具本体9の上端部には前記ガイドレール3a,3bの上端面と接触して梁部材6に加わる荷重を受ける受板14が設けられているとともに、支持具本体9の背面には前記ガイドレール3a,3bの背面に接触する押し部材15が設けられている。
【0022】
支持具本体9の前面の両側部からは前記押し部材15に渡ってボルト16が螺挿され、これらボルト16の締め付けによりガイドレール3a,3bの背面が前記押し部材15により押圧され、これにより支持具5a,5bがガイドレール3a,3bに固定されている。
【0023】
また、支持具本体9の前面の両側下部には前記梁部材6の端部を受ける受部17が設けられている。
【0024】
梁部材6は、図1に示すように、互いに離間して平行に並ぶ一対のトロリービーム22を有し、これらトロリービーム22の相互間に、巻上機4を吊るときの吊元部として機能する一対の滑車23a,23bが設けられている。これら滑車23a,23bは、トロリービーム22を互いに連結した軸(図示せず)を介して回転自在に支持されている。
【0025】
前記一対の滑車23a,23bはトロリービーム22の両端寄りに配置されている。そしてトロリービーム22の中間部には、乗りかご2や巻上機4を吊るときの吊元部として機能する掛け輪24がその下方に突出するように取り付けられている。
【0026】
この梁部材6は、各トロリービーム22の両端部を前記支持具5a,5bの受部17に嵌合し、ボルト(図示せず)により固定することによりその支持具5a,5b間に架設されている。
【0027】
次に、前記巻上機4を交換する際の手順について説明する。
【0028】
まず、各ガイドレール3a,3bの頂部にそれぞれ支持具5a,5bを取り付ける。そしてこれら支持具5a,5bの受部17間に梁部材6を架設し、ボルトで固定する。
【0029】
梁部材6の掛け輪24には、吊索としての第1の玉掛けワイヤロープ30の一端部を取り付け、この玉掛けワイヤロープ30の他端部を乗りかご2に連結する。
【0030】
前記玉掛けワイヤロープ30の途中には揚重機としてのチェーンブロック31が設けられている。
【0031】
そして前記チェーンブロック31を操作して乗りかご2を前記掛け輪24を吊元部として吊り上げ、乗りかご2に連結されている吊りロープ(図示せず)を緩める。この際、釣合い重り(図示せず)も適宜な手段により吊り上げておく。吊りロープの交換が必要な場合においては、この状態でその吊りロープを交換する。この交換の作業は作業員が乗りかご2の上に乗り込んで行なうことが可能である。
【0032】
この後、吊索としての第2の玉掛けワイヤロープ33を梁部材6の滑車23a,23bに通し、この玉掛けワイヤロープ33の一端部を巻上機4に連結し、他端部を例えばガイドレール3bに掛け留める。この玉掛けワイヤロープ33の途中には揚重機としてのチェーンブロック34が設けられている。
【0033】
そして、前記チェーンブロック33を操作して玉掛けワイヤロープ33に張力をかけ、この状態で巻上機4をガイドレール3aから取り外し、この巻上機4を前記玉掛けワイヤロープ33で前記滑車23aを吊元部として吊り下げる。
【0034】
この際、巻上機4は、その吊元部としての滑車23aが昇降路1の内壁面から離れるガイドレール3a,3bの内側に位置しているから、昇降路1の内壁面と干渉することなく、ガイドレール3aの背面側から正面側つまり昇降路1の中央寄りに移行して滑車23aの下方に吊り下げられる。したがって、巻上機4と昇降路1の内壁面との間に配設されている巻上機4の周辺機器や配線類を取り除くような面倒で煩わしい作業が不要となる。
【0035】
この後、前記チェーンブロック34をさらに操作して巻上機4を昇降させて昇降路1外に搬出する。この際、巻上機4がガイドレール3aと干渉する恐れがあるときには、巻上機4をチェーンブロックを備える別の玉掛けワイヤロープ(図示せず)を用いて梁部材6の中間部の掛け輪24に吊り換え、その状態で巻上機4を昇降させて昇降路1外に搬出する。
【0036】
そして新たな巻上機を上述とは逆手順の作業により昇降路1内に取り込んでガイドレール3bの背面に取り付ける。
【0037】
このような手順によれば、巻上機4の周辺機器や配線類を取り除くような面倒で煩わしい作業を要することなく、また巻上機4が昇降路1の内壁面と干渉することなく容易に能率よく巻上機4を交換することができる。
【0038】
また、巻上機4や乗りかご2の吊元部はガイドレール3a,3bに架設された梁部材6に設けられており、このため従来のようにその吊元用の掛け部材を昇降路1の内壁面に穴をあけて取り付けるような面倒で煩わしい作業が不要となり、また昇降路1の内壁面に穴をあけるような必要がないから、振動や騒音を建屋の居住者に与えるようなことなく、静かに巻上機4の交換作業を進めることができる。
【0039】
図4には第2の実施形態を示してあり、この実施形態においては、ガイドレール3a,3b間に架設された梁部材6の一端部がレールブラケット37を介して支持されている。
【0040】
図5には、昇降路1に対するガイドレール3aの固定構造を示してあり、ガイドレール3aはレールブラケット37を介してその昇降路1の内壁面に固定されている。レールブラケット37は昇降路1の内壁面にアンカーボルト38を介して取り付けられたL状の第1のブラケット39と、ガイドレール3aにレールクリップ40を介して取り付けられたL状の第2のブラケット41とを備え、第1のブラケット39の水平部39aの上に第2のブラケット41の水平部41aがボルト42を介して締結され、これによりガイドレール3aが昇降路1の内壁面に対して固定されている。
【0041】
なお、ガイドレール3aは、同様の構造の複数のレールブラケット37を用いて所定間隔ごとの複数箇所が昇降路1の内壁面に固定されている。また、他方のガイドレール3bにおいても、図示しないが同様の構造の複数のレールブラケットを用いて所定間隔ごとの複数箇所が昇降路1の内壁面に固定されている。
【0042】
また、各ガイドレール3a,3bは、複数のレール分割体3a´,3b´に分割されていて、その各分割体3a´,3b´を順次締結具(図示せず)により繋ぎ合わせることにより一連のガイドレール3a,3bとして構成されている。
【0043】
この実施形態における梁部材6は、図4に示すように、第1の実施形態の場合と同様に一対のトロリービーム22と一対の滑車23a,23bと掛け輪24とを備えるが、前記トロリービーム22の一端側の端部が支持部22aとして幅広の二股状に拡開している点が第1の実施形態の場合と異なっている。
【0044】
巻上機4の交換作業の際には、図4に示すように、まず、ガイドレール3aの最上部に配置するレールブラケット37における第2のブラケット41を第1のブラケット39およびガイドレール3aから取り外す。そして前記第1のブラケット39の水平部39aの上にプレート43を乗せ、ボルト44で固定する。
【0045】
次に、ガイドレール3bの頂部に第1の実施形態の場合と同様の支持具5bを取り付ける。そして梁部材6の一方側の端部をその支持具5bの受部17に嵌合して固定し、この梁部材6の他方の端部における二股状の支持部22aを、その支持部22a間にガイドレール3aが介在するように前記プレート43の上に乗せ、ボルト(図示せず)で固定する。
【0046】
この状態において、第1の実施形態の場合と同様に、梁部材6の掛け輪24に、チェーンブロック31を備える玉掛けワイヤロープ30を取り付け、この玉掛けワイヤロープ30を乗りかご2に連結し、チェーンブロック31を操作してその乗りかご2を吊り上げる。
【0047】
この後、チェーンブロック34を備える玉掛けワイヤロープ33を滑車23a,23bに通し、この玉掛けワイヤロープ33の一端部を巻上機4に連結し、他端部を例えばガイドレール3bに掛け留め、チェーンブロック34を操作して玉掛けワイヤロープ33に張力をかける。
【0048】
次に、ガイドレール3aにおける最上部のレール分割体3a´とその下側のレール分割体3a´との締結を外して最上部のレール分割体3a´をその下側のレール分割体3a´から分離させる。この分離により巻上機4を備える最上部のレール分割体3a´が独立して前記玉掛けワイヤロープ33で吊られる状態となる。
【0049】
この後、チェーンブロック33を操作して巻上機4と一体のレール分割体3a´を下降させてそのレール分割体3a´の上端部を前記梁部材6の支持部22a間から引き抜く。これにより、巻上機4およびレール分割体3a´は、昇降路1の内壁面と干渉することなく、昇降路1の中央寄りに移行して滑車23aの下方に吊り下げられる。
【0050】
この後、チェーンブロック33をさらに操作して巻上機4をレール分割体3a´ごと昇降させて昇降路1外に搬出する。この際、巻上機4やレール分割体3a´がガイドレール3aと干渉する恐れがあるときには、巻上機4をチェーンブロックを備える別の玉掛けワイヤロープ(図示せず)を用いて梁部材6の中間部の掛け輪24に吊り換え、その状態で昇降させる。
【0051】
このようにこの第2の実施形態の場合には、巻上機4をガイドレール3aから取り外す面倒な作業を要することなく、その巻上機4をレール分割体3a´ごと昇降路1外に搬出することができる。
【0052】
古い巻上機4を昇降路1外に搬出した後には、その古い巻上機4に換えて新たな巻上機4を前述の逆手順により昇降路1内に搬入する。この際、その新たな巻上機4は予めレール分割体3a´に取り付けておき、そのレール分割体3a´と一体に昇降路1内に搬入して前述の逆手順によりレール分割体3a´をガイドレール3aの最上部に締結して連結する。
【0053】
このような手順によれば、暗くかつ狭い昇降路1内で巻上機4をガイドレール3a対して脱着する面倒な作業を要することなく、昇降路1外において容易に能率よく巻上機4をレール分割体3a´から取り外したり取り付けることができる。
【0054】
なお、この第2の実施形態においては、梁部材6の一端側の端部をレールブラケット37を利用して支持するようにしたが、梁部材6の両端側の端部のそれぞれを前記と同様の構造でレールブラケットを介して支持することにより、梁部材6をガイドレール3a,3b間に架設するようにしてもよく、この場合には梁部材6をガイドレール3a,3bの最上部に配置させる場合に限らず、ガイドレール3a,3bの途中の任意の区間に架設することが可能となる。
【0055】
図6には第3の実施形態を示してある。この第3の実施形態においては、前記第1の実施形態の場合と同様に、各ガイドレール3a,3bの頂部に支持具5a,5bが設けられ、これら支持具5a,5b間に梁部材6が架設されている。
【0056】
梁部材6は、互いに離間して平行に並ぶ一対のトロリービーム22を有し、これらトロリービーム22の相互間に一対の滑車23a,23bが設けられている。そしてこの第3の実施形態においては、その一方の滑車23aがトロリービーム22の長手方向に対して移動可能に支持され、その滑車23aを駆動する駆動手段としての一対の油圧シリンダ50がトロリービーム22の上に設けられ、さらに前記油圧シリンダ50に作動油を供給するコントロールユニット51がガイドレール3bの背面部に支持台52を介して支持されている。
【0057】
この第3の実施形態の場合においても、前記第1の実施形態の場合と同様に、チェーンブロック34を備える玉掛けワイヤロープ33を梁部材6の滑車23a,23bに通し、この玉掛けワイヤロープ33を巻上機4に連結し、前記チェーンブロック34を操作して玉掛けワイヤロープ33に張力をかけ、この状態で巻上機4をガイドレール3aから取り外し、この巻上機4を前記玉掛けワイヤロープ33で吊り下げる。
【0058】
この際、巻上機4がガイドレール3aと干渉する恐れがあるときには、前記コントロールユニット51を介して各油圧シリンダ50を作動させ、滑車23aを梁部材6の中間部寄りに移動させる。
【0059】
この移動により滑車23aから吊り下げられた巻上機4がガイドレール3aから大きく離れる梁部材6の中間部に配置し、したがって巻上機4とガイドレール3aとの干渉を防止することができる。
【0060】
このため、第1の実施形態の場合のように、巻上機4を別の玉掛けワイヤロープを用いて梁部材6の中間部に吊り換える作業を要することなく、巻上機4を容易に能率よく梁部材6の中間部に配置させてガイドレール3aとの干渉を避けることができる。そしてこの状態において、前記チェーンブロック34を操作して巻上機4を昇降させ、昇降路1外に搬出する。
【0061】
【発明の効果】
以上説明したようにこの発明によれば、昇降路の内壁面に掛け部材を取り付けるような面倒で、かつ騒音や振動等が伴う作業を要することなく、簡易な手順で乗りかごや巻上機を昇降路の内壁面との干渉を避けつつ安定して吊り下げ、能率よく巻上機の交換作業を進めることができる。
【図面の簡単な説明】
【図1】この発明の第1の実施形態に係る巻上機交換用治具の使用時の状態を示す斜視図。
【図2】その巻上機交換用治具における支持具の斜視図。
【図3】その巻上機交換用治具における支持具の断面図。
【図4】この発明の第2の実施形態に係る巻上機交換用治具の使用時の状態を示す斜視図。
【図5】ガイドレールの固定構造を示す正面図。
【図6】この発明の第3の実施形態に係る巻上機交換用治具の使用時の状態を示す斜視図。
【符号の説明】
1…昇降路、2…乗りかご、3a,3b…ガイドレール、4…巻上機、5a,5b…支持具、6…梁部材、22…トロリービーム、23a,23b…滑車、24…掛け輪、30…玉掛けワイヤロープ、31…チェーンブロック、33…玉掛けワイヤロープ、34…チェーンブロック、37…レールブラケット、39…第1のブラケット、41…第2のブラケット。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a jig for exchanging an elevator hoist used when exchanging an elevator hoist.
[0002]
[Prior art]
In a conventional general elevator, a machine room is provided above a hoistway of a building, a hoisting machine is installed in the machine room, and a suspending rope is fed out from the hoisting machine into the hoistway. A car is connected to one end of the car, and a counterweight is connected to the other end of the car. The car is suspended in the hoistway so that these cars and the counterweight are substantially balanced in weight. When the suspension rope is driven by the hoist, the rider and the counterweight move up and down in the directions opposite to each other in the hoistway.
[0003]
However, in elevators of the type in which a machine room is provided above the hoistway, there is a drawback that the height of the building is increased by the amount of the machine room. So-called machine roomless type elevators which are installed in a machine room to eliminate the machine room.
[0004]
In this machine roomless type elevator, a hoist is attached to the rear of the upper part of a guide rail for a car guide provided in a hoistway.
[0005]
Incidentally, the hoist may need to be replaced in accordance with long-term use or the like. In this case, in the related art, first, while the car is hung on a guide rail using a sling wire rope, a hanging member is attached to a plurality of locations on the inner wall surface of the hoistway, and a pulley or a wire rope is hung on these hanging members. Connect the wire rope to the hoist.
[0006]
Then, the hoist is detached from the guide rail, and the detached hoist is suspended using the wire rope and the pulley, and is carried out of the hoistway.
[0007]
[Problems to be solved by the invention]
However, in the case described above, since the hoisting portion of the hoisting machine is near the inner wall surface of the hoistway, prior to the suspending work, the winding device disposed between the hoisting machine and the inner wall surface of the hoistway is required. It is necessary to remove the peripheral devices and wirings of the upper machine beforehand, and then carry out the suspending work. For this reason, the removing work requires a lot of labor and time, and the efficiency is reduced.
[0008]
The suspended hoisting machine needs to be drawn toward the center of the hoistway in order to avoid interference with the inner wall surface of the hoistway, but the work of drawing the hoist becomes troublesome.
[0009]
In addition, the car has to be hung at two places on both sides of the car with slinging wire ropes, which not only complicates the work but also lacks stability because the hanging base is in the middle of the guide rail.
[0010]
Furthermore, if the hanging member serving as the hanging portion of the hoist is to be attached to the concrete inner wall surface of the hoistway, holes and the like must be made in the concrete surface, and noise and vibration are generated during the work, and the building Will cause discomfort to residents of the country.
[0011]
The present invention has been made in view of such a point, and its purpose is to eliminate the troublesome work of attaching a hanging member to the inner wall surface of a hoistway and work involving noise and vibration. An elevator hoist machine replacement jig that can stably hang a car or hoist in a simple procedure while avoiding interference with the inner wall of the hoistway, and can proceed with the hoist machine replacement work efficiently. Is to provide.
[0012]
[Means for Solving the Problems]
The invention according to claim 1 includes a beam member that can be installed between a pair of guide rails provided in an elevator shaft and an elevator hoist provided on the beam member and installed on the guide rail. And a hanging part functioning as a hanging point when detached and hung.
[0013]
The invention according to claim 2 is characterized in that the suspension portion includes a pulley rotatably provided in the longitudinal direction of the beam member.
[0014]
The invention according to claim 3 is characterized in that the beam member is installed between the guide rails via a support provided at the top of each of the guide rails.
[0015]
The invention according to claim 4 is characterized in that one end or both ends of the beam member is installed between the guide rails using a rail bracket for fixing the guide rail to a hoistway.
[0016]
The invention according to claim 5 is characterized in that the pulley as the hanging portion is movable along a longitudinal direction of the beam member.
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0018]
FIG. 1 shows a first embodiment of the present invention. A pair of guide rails 3a and 3b for vertically moving a car 2 are vertically provided in a hoistway 1 of an elevator so as to oppose each other. ing. A hoisting machine 4 for driving the car 2 is detachably attached to the upper rear surface of one of the guide rails 3a via fastening members (not shown) such as a plurality of bolts.
[0019]
Supports 5a and 5b are detachably attached to the tops of the guide rails 3a and 3b, respectively, and a beam member 6 is horizontally installed between the supports 5a and 5b.
[0020]
As shown in FIGS. 2 and 3, the supports 5 a and 5 b have a support body 9, and the support body 9 is provided with a blade fitting portion 10 and an ear fitting portion 11. The blade portions 12 of the guide rails 3 a and 3 b are fitted in the blade fitting portion 10, and the ear portions 13 of the guide rails 3 a and 3 b are fitted in the ear fitting portion 11.
[0021]
A support plate 14 is provided at the upper end of the support body 9 to receive a load applied to the beam member 6 in contact with the upper end surfaces of the guide rails 3a and 3b. A push member 15 is provided which comes into contact with the back surfaces of the guide rails 3a and 3b.
[0022]
Bolts 16 are screwed from both sides of the front surface of the support tool body 9 across the pressing member 15, and the back surfaces of the guide rails 3a, 3b are pressed by the pressing member 15 by tightening the bolts 16, thereby supporting the supporting members. Tools 5a and 5b are fixed to guide rails 3a and 3b.
[0023]
Further, receiving portions 17 for receiving the ends of the beam members 6 are provided at lower portions on both sides of the front surface of the support body 9.
[0024]
As shown in FIG. 1, the beam member 6 has a pair of trolley beams 22 spaced apart from each other and arranged in parallel, and functions as a hanging portion when the hoisting machine 4 is hung between these trolley beams 22. A pair of pulleys 23a and 23b are provided. These pulleys 23a and 23b are rotatably supported via shafts (not shown) connecting the trolley beams 22 to each other.
[0025]
The pair of pulleys 23 a and 23 b are disposed near both ends of the trolley beam 22. At the middle part of the trolley beam 22, a hanging ring 24 functioning as a hanging part for hanging the car 2 or the hoisting machine 4 is attached so as to protrude downward.
[0026]
The beam member 6 is installed between the support members 5a and 5b by fitting both ends of each trolley beam 22 to the receiving portions 17 of the support members 5a and 5b and fixing them with bolts (not shown). ing.
[0027]
Next, a procedure for replacing the hoisting machine 4 will be described.
[0028]
First, supports 5a and 5b are attached to the tops of the guide rails 3a and 3b, respectively. Then, the beam member 6 is installed between the receiving portions 17 of the supports 5a and 5b, and is fixed with bolts.
[0029]
One end of a first sling wire rope 30 as a hanging cable is attached to the hanging ring 24 of the beam member 6, and the other end of the sling wire rope 30 is connected to the car 2.
[0030]
A chain block 31 as a lifting machine is provided in the middle of the slinging wire rope 30.
[0031]
Then, by operating the chain block 31, the car 2 is lifted using the hanging ring 24 as a hanging portion, and a hanging rope (not shown) connected to the car 2 is loosened. At this time, a counterweight (not shown) is also lifted by appropriate means. If the hanging rope needs to be replaced, the hanging rope is replaced in this state. This replacement work can be performed by an operator getting on the car 2.
[0032]
Thereafter, a second sling wire rope 33 as a hanging cable is passed through the pulleys 23a and 23b of the beam member 6, one end of the sling wire rope 33 is connected to the hoisting machine 4, and the other end is connected to, for example, a guide rail. Hang on 3b. In the middle of the sling wire rope 33, a chain block 34 as a lifting machine is provided.
[0033]
Then, the chain block 33 is operated to apply tension to the sling wire rope 33, and in this state, the hoisting machine 4 is removed from the guide rail 3a, and the hoisting machine 4 is hung by the sling wire rope 33 to suspend the pulley 23a. Hang it as a base.
[0034]
At this time, the hoist 4 interferes with the inner wall surface of the hoistway 1 because the pulley 23a as a suspension portion is located inside the guide rails 3a and 3b separated from the inner wall surface of the hoistway 1. Instead, the guide rail 3a is shifted from the rear side to the front side, that is, toward the center of the hoistway 1, and is suspended below the pulley 23a. Therefore, troublesome and troublesome work of removing peripheral devices and wiring of the hoisting machine 4 disposed between the hoisting machine 4 and the inner wall surface of the hoistway 1 is not required.
[0035]
Thereafter, the hoisting machine 4 is moved up and down by further operating the chain block 34 and carried out of the hoistway 1. At this time, when there is a risk that the hoisting machine 4 may interfere with the guide rail 3a, the hoisting machine 4 is mounted on the intermediate portion of the beam member 6 using another sling wire rope (not shown) having a chain block. The hoisting machine 4 is lifted up and down in this state and carried out of the hoistway 1.
[0036]
Then, a new hoist is taken into the hoistway 1 by the operation in the reverse procedure to the above, and attached to the back of the guide rail 3b.
[0037]
According to such a procedure, there is no need for troublesome and troublesome work such as removal of peripheral devices and wirings of the hoisting machine 4, and the hoisting machine 4 easily can be prevented from interfering with the inner wall surface of the hoistway 1. The hoisting machine 4 can be exchanged efficiently.
[0038]
Further, the hoisting portions of the hoisting machine 4 and the car 2 are provided on the beam members 6 erected on the guide rails 3a and 3b. It is not necessary to make a hole in the inner wall of the hoistway 1, and it is not necessary to make a hole in the inner wall of the hoistway 1, so that vibration and noise are given to the occupants of the building. Therefore, the work of replacing the hoisting machine 4 can be performed quietly.
[0039]
FIG. 4 shows a second embodiment. In this embodiment, one end of a beam member 6 spanned between guide rails 3a and 3b is supported via a rail bracket 37.
[0040]
FIG. 5 shows a structure for fixing the guide rail 3 a to the hoistway 1. The guide rail 3 a is fixed to the inner wall surface of the hoistway 1 via a rail bracket 37. The rail bracket 37 includes an L-shaped first bracket 39 attached to the inner wall surface of the hoistway 1 via an anchor bolt 38, and an L-shaped second bracket attached to the guide rail 3a via a rail clip 40. 41, the horizontal portion 41a of the second bracket 41 is fastened on the horizontal portion 39a of the first bracket 39 via bolts 42, whereby the guide rail 3a is moved against the inner wall surface of the hoistway 1. Fixed.
[0041]
The guide rail 3a is fixed to the inner wall surface of the hoistway 1 at a plurality of locations at predetermined intervals using a plurality of rail brackets 37 having the same structure. In the other guide rail 3b, a plurality of rail brackets having a similar structure are fixed to the inner wall surface of the hoistway 1 using a plurality of rail brackets having a similar structure, not shown.
[0042]
Further, each guide rail 3a, 3b is divided into a plurality of rail divided bodies 3a ', 3b', and each of the divided bodies 3a ', 3b' is sequentially joined by a fastener (not shown). Are configured as guide rails 3a and 3b.
[0043]
As shown in FIG. 4, the beam member 6 in this embodiment includes a pair of trolley beams 22, a pair of pulleys 23a and 23b, and a hanger 24 as in the first embodiment. The second embodiment differs from the first embodiment in that the end on one end side of the 22 is widened as a wide forked shape as a support portion 22a.
[0044]
When the hoisting machine 4 is replaced, as shown in FIG. 4, first, the second bracket 41 of the rail bracket 37 disposed at the uppermost part of the guide rail 3a is removed from the first bracket 39 and the guide rail 3a. Remove. Then, the plate 43 is placed on the horizontal portion 39 a of the first bracket 39, and is fixed with bolts 44.
[0045]
Next, the same support 5b as in the first embodiment is attached to the top of the guide rail 3b. Then, one end of the beam member 6 is fitted and fixed to the receiving portion 17 of the support 5b, and the bifurcated support portion 22a at the other end of the beam member 6 is moved between the support portions 22a. Is mounted on the plate 43 so that the guide rail 3a is interposed therebetween, and fixed with bolts (not shown).
[0046]
In this state, as in the case of the first embodiment, the slinging wire rope 30 including the chain block 31 is attached to the hanging ring 24 of the beam member 6, and the slinging wire rope 30 is connected to the car 2. By operating the block 31, the car 2 is lifted.
[0047]
Thereafter, the slinging wire rope 33 having the chain block 34 is passed through the pulleys 23a and 23b, one end of the slinging wire rope 33 is connected to the hoisting machine 4, and the other end is hung on the guide rail 3b, for example. The tension is applied to the sling wire rope 33 by operating the block 34.
[0048]
Next, the uppermost rail segment 3a 'of the guide rail 3a and the lower rail segment 3a' are unfastened to separate the uppermost rail segment 3a 'from the lower rail segment 3a'. Let it separate. By this separation, the uppermost rail segment 3a 'including the hoisting machine 4 is independently suspended by the slinging wire rope 33.
[0049]
Thereafter, the rail block 3a 'integrated with the hoisting machine 4 is lowered by operating the chain block 33, and the upper end of the rail partition 3a' is pulled out from between the support portions 22a of the beam member 6. Thereby, the hoisting machine 4 and the rail segment 3a 'are shifted toward the center of the hoistway 1 and hung below the pulley 23a without interfering with the inner wall surface of the hoistway 1.
[0050]
Thereafter, the chain block 33 is further operated to move the hoisting machine 4 up and down together with the rail segment 3a 'and carry it out of the hoistway 1. At this time, when there is a possibility that the hoisting machine 4 and the rail split body 3a 'may interfere with the guide rail 3a, the hoisting machine 4 is connected to the beam member 6 using another sling wire rope (not shown) including a chain block. Is suspended by the hanging ring 24 in the middle part of the above, and is raised and lowered in that state.
[0051]
As described above, in the case of the second embodiment, the hoisting machine 4 is unloaded out of the hoistway 1 together with the rail segment 3a 'without any troublesome work of removing the hoisting machine 4 from the guide rail 3a. can do.
[0052]
After the old hoisting machine 4 is carried out of the hoistway 1, a new hoisting machine 4 is carried into the hoistway 1 in place of the old hoisting machine 4 by the above-described reverse procedure. At this time, the new hoisting machine 4 is attached to the rail divisional body 3a 'in advance, and is carried into the hoistway 1 integrally with the rail divisional body 3a', and the rail divisional body 3a 'is removed by the reverse procedure described above. It is fastened and connected to the uppermost part of the guide rail 3a.
[0053]
According to such a procedure, the hoisting machine 4 can be easily and efficiently mounted outside the hoistway 1 without the troublesome work of attaching and detaching the hoisting machine 4 to and from the guide rail 3a in the dark and narrow hoistway 1. It can be removed or attached to the rail segment 3a '.
[0054]
In the second embodiment, one end of the beam member 6 is supported by using the rail bracket 37. However, each of the ends of the beam member 6 at both ends is the same as described above. In this case, the beam member 6 may be supported between the guide rails 3a and 3b by supporting it via the rail bracket. In this case, the beam member 6 is disposed at the uppermost part of the guide rails 3a and 3b. Not only in the case where the guide rails 3a and 3b are provided, the guide rails 3a and 3b can be installed in an arbitrary section.
[0055]
FIG. 6 shows a third embodiment. In the third embodiment, supports 5a and 5b are provided at the tops of the guide rails 3a and 3b, as in the case of the first embodiment, and a beam member 6 is provided between the supports 5a and 5b. Has been erected.
[0056]
The beam member 6 has a pair of trolley beams 22 spaced apart from each other and arranged in parallel, and a pair of pulleys 23a and 23b are provided between the trolley beams 22. In the third embodiment, one of the pulleys 23a is supported so as to be movable in the longitudinal direction of the trolley beam 22, and a pair of hydraulic cylinders 50 as driving means for driving the pulley 23a is provided with a trolley beam 22. And a control unit 51 for supplying hydraulic oil to the hydraulic cylinder 50 is supported on a back surface of the guide rail 3b via a support 52.
[0057]
Also in the case of the third embodiment, as in the case of the first embodiment, the slinging wire rope 33 having the chain block 34 is passed through the pulleys 23a and 23b of the beam member 6, and the slinging wire rope 33 is The hoisting machine 4 is connected to the hoisting machine 4, and the chain block 34 is operated to apply tension to the slinging wire rope 33. In this state, the hoisting machine 4 is removed from the guide rail 3a. Hang with.
[0058]
At this time, when there is a possibility that the hoisting machine 4 may interfere with the guide rail 3a, each hydraulic cylinder 50 is operated via the control unit 51 to move the pulley 23a toward the middle of the beam member 6.
[0059]
Due to this movement, the hoisting machine 4 suspended from the pulley 23a is arranged at an intermediate portion of the beam member 6 far away from the guide rail 3a, so that interference between the hoisting machine 4 and the guide rail 3a can be prevented.
[0060]
For this reason, unlike the case of the first embodiment, it is not necessary to suspend the hoisting machine 4 to the intermediate portion of the beam member 6 using another sling wire rope, and the hoisting machine 4 can be efficiently operated. By arranging it in the middle of the beam member 6, interference with the guide rail 3a can be avoided. In this state, the hoisting machine 4 is moved up and down by operating the chain block 34 and carried out of the hoistway 1.
[0061]
【The invention's effect】
As described above, according to the present invention, it is possible to raise and lower a car and a hoist in a simple procedure without troublesome work such as attaching a hanging member to the inner wall surface of a hoistway and without work involving noise and vibration. It is possible to stably hang the hoist while avoiding interference with the inner wall surface of the road, and to efficiently perform the work of replacing the hoist.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a state when a hoist replacement jig according to a first embodiment of the present invention is used.
FIG. 2 is a perspective view of a support in the hoist changing jig.
FIG. 3 is a sectional view of a support in the jig for exchanging the hoist.
FIG. 4 is a perspective view showing a state in which a jig for exchanging a hoist according to a second embodiment of the present invention is used.
FIG. 5 is a front view showing a guide rail fixing structure.
FIG. 6 is a perspective view showing a state when a hoist replacement jig according to a third embodiment of the present invention is used.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Hoistway, 2 ... Car, 3a, 3b ... Guide rail, 4 ... Hoisting machine, 5a, 5b ... Supporting tool, 6 ... Beam member, 22 ... Trolley beam, 23a, 23b ... Pulley, 24 ... Hanging ring , 30 ... wire rope, 31 ... chain block, 33 ... wire rope, 34 ... chain block, 37 ... rail bracket, 39 ... first bracket, 41 ... second bracket.

Claims (5)

エレベータの昇降路内に設けられた一対のガイドレール間に架設可能な梁部材と、
この梁部材に設けられ、前記ガイドレールに設置されているエレベータの巻上機を取り外して吊るときの吊元として機能する吊元部と、
を具備することを特徴とするエレベータの巻上機交換用治具。
A beam member that can be installed between a pair of guide rails provided in an elevator shaft,
Provided in this beam member, a hanging portion that functions as a hanging portion when removing and hoisting the elevator hoist installed on the guide rail,
A jig for exchanging a hoist of an elevator, comprising:
前記吊元部は、前記梁部材の長手方向の途中に回転自在に設けられた滑車を含むことを特徴とする請求項1に記載のエレベータの巻上機交換用治具。2. The jig for exchanging an elevator hoist according to claim 1, wherein the suspension portion includes a pulley rotatably provided in the longitudinal direction of the beam member. 3. 前記梁部材は、前記各ガイドレールの頂部に設けられた支持具を介してガイドレール間に架設されることを特徴とする請求項1または2に記載のエレベータの巻上機交換用治具。The jig for exchanging a hoist of an elevator according to claim 1 or 2, wherein the beam member is provided between the guide rails via a support provided on a top portion of each of the guide rails. 前記梁部材は、その一端部または両端部が前記ガイドレールを昇降路に固定するレールブラケットを利用してガイドレール間に架設されることを特徴とする請求項1または2に記載のエレベータの巻上機交換用治具。3. The elevator winding according to claim 1, wherein the beam member has one end or both ends installed between guide rails using a rail bracket that fixes the guide rail to a hoistway. 4. Upper machine replacement jig. 前記吊元部としての滑車は、前記梁部材の長手方向に沿って移動可能となっていることを特徴とする請求項1ないし4のいずれかに記載のエレベータの巻上機交換用治具。The jig for exchanging an elevator hoist according to any one of claims 1 to 4, wherein the pulley as the suspension portion is movable along a longitudinal direction of the beam member.
JP2003035609A 2003-02-13 2003-02-13 Elevator hoist replacement jig Expired - Fee Related JP4260502B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003035609A JP4260502B2 (en) 2003-02-13 2003-02-13 Elevator hoist replacement jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003035609A JP4260502B2 (en) 2003-02-13 2003-02-13 Elevator hoist replacement jig

Publications (2)

Publication Number Publication Date
JP2004244162A true JP2004244162A (en) 2004-09-02
JP4260502B2 JP4260502B2 (en) 2009-04-30

Family

ID=33020985

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003035609A Expired - Fee Related JP4260502B2 (en) 2003-02-13 2003-02-13 Elevator hoist replacement jig

Country Status (1)

Country Link
JP (1) JP4260502B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009149422A (en) * 2007-12-21 2009-07-09 Toshiba Elevator Co Ltd Exchanging device and method of elevator hoisting machine
JP2010105805A (en) * 2008-10-31 2010-05-13 Mitsubishi Electric Building Techno Service Co Ltd Method for repairing existing elevator, and elevator apparatus
CN103332565A (en) * 2013-07-02 2013-10-02 重庆迪康电梯有限公司 Rope clamping plate for changing traction wheel and application thereof
CN103588092A (en) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 Auxiliary device and method for replacing steel wire rope
CN105217414A (en) * 2015-11-09 2016-01-06 江南大学 Head sheave of hoister handling handling method
CN105517936A (en) * 2013-09-26 2016-04-20 三菱电机株式会社 Elevator device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009149422A (en) * 2007-12-21 2009-07-09 Toshiba Elevator Co Ltd Exchanging device and method of elevator hoisting machine
JP2010105805A (en) * 2008-10-31 2010-05-13 Mitsubishi Electric Building Techno Service Co Ltd Method for repairing existing elevator, and elevator apparatus
CN101723222A (en) * 2008-10-31 2010-06-09 三菱电机大楼技术服务株式会社 Improving method for existing elevator and elevator device
JP4595011B2 (en) * 2008-10-31 2010-12-08 三菱電機ビルテクノサービス株式会社 Repair method and elevator apparatus for existing elevator
CN103332565A (en) * 2013-07-02 2013-10-02 重庆迪康电梯有限公司 Rope clamping plate for changing traction wheel and application thereof
CN105517936A (en) * 2013-09-26 2016-04-20 三菱电机株式会社 Elevator device
CN103588092A (en) * 2013-11-28 2014-02-19 莱芜钢铁集团有限公司 Auxiliary device and method for replacing steel wire rope
CN105217414A (en) * 2015-11-09 2016-01-06 江南大学 Head sheave of hoister handling handling method

Also Published As

Publication number Publication date
JP4260502B2 (en) 2009-04-30

Similar Documents

Publication Publication Date Title
EP0710618B2 (en) Traction sheave elevator
JP2004142927A (en) Elevator device
JP4828084B2 (en) How to install the hoist
JP4260502B2 (en) Elevator hoist replacement jig
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
JP4089986B2 (en) Hydraulic rope main rope replacement method
JP2008308248A (en) Elevator rope reeving method
JP4176188B2 (en) Elevator hoist and its installation structure
JP6605411B2 (en) Lifting bracket and hoist
JP7156530B2 (en) Elevator safety device replacement method and elevator safety device replacement device
JP3422585B2 (en) Elevating construction elevator and method of extending the elevator mast in the descending direction
JP2004168518A (en) Elevator device
JP2011195309A (en) Method for renewal of hydraulic elevator and rope elevator renewed by the method
JP2003206083A (en) Main rope changing method and device for elevator
JP4214719B2 (en) elevator
JPH08169662A (en) Elevator suspending device
JP2002128415A (en) Method and device for hoisting driving machine to height position in the vicinity of ceiling face in elevator shaft
JP2007137681A (en) Elevator
JP2004196468A (en) Elevator device
JP4239464B2 (en) Elevator equipment
JPH05186159A (en) Method for replacing main rope of elevator
JP2004168517A (en) Elevator device
CN117262959A (en) Elevator device and traction machine installation method for elevator device
JP2003238048A (en) Method and device for replacing pulley of elevator
JP2000351555A (en) Method for replacing elevator main rope

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051027

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080630

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080708

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080813

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090127

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090204

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120220

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130220

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130220

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140220

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees