JP2004213447A - Support device, support method and support program - Google Patents
Support device, support method and support program Download PDFInfo
- Publication number
- JP2004213447A JP2004213447A JP2003000907A JP2003000907A JP2004213447A JP 2004213447 A JP2004213447 A JP 2004213447A JP 2003000907 A JP2003000907 A JP 2003000907A JP 2003000907 A JP2003000907 A JP 2003000907A JP 2004213447 A JP2004213447 A JP 2004213447A
- Authority
- JP
- Japan
- Prior art keywords
- task
- project
- document
- database
- tasks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
この発明は、製品開発プロジェクトの開発管理の支援を行う支援装置とその方法に関するものである。
【0002】
【従来の技術】
従来の開発管理方法では以下のような問題点があった。
従来のプロジェクト管理ツールでは、タスクを進捗管理すべき全てのタスクに分解すると実績入力の負荷が増大するため、運用上タスクの分解に限界があった。
また、従来のプロジェクト管理ツールではタスクに対して作成後のドキュメントをリンクづけできるが、タスクと作成中のドキュメントとのリンクづけができなかった。
また、タスクの成果物(ドキュメント)から進捗状況を自動的に収集する仕組みがないため、作成者がドキュメントの作成状況を随時報告(または入力)する必要があった。
また、プロジェクト管理者のタスク設定業務および分解業務を支援する仕組みがなかった。
【0003】
従来の開発管理方法として、例えば、特許文献1においては、プロジェクトの成果物からの実績収集および作業工程の定義の仕組みが開示され、開発管理の容易化を図っている。
しかし、作業工程の定義において、標準工程からの編集や、類似プロジェクトからの流用の手段は提示されているが、仕様内容に応じて動的(ルールベース)に作業工程を提示する手段は示されていない。
このため、プロジェクト管理者がタスクの取捨選択を実施する作業に多大な労力が必要であった。
【0004】
また、特許文献2においては、ソフトウェア開発の成果物(ドキュメント、ソースコード)からオブジェクト指向開発・設計理論に従い、実績を収集する仕組みが開示されているが、ソフトウェア開発以外の分野での成果物の進捗情報収集に関する方法は開示されていない。
【0005】
【特許文献1】
特開平10−154310号公報
【特許文献2】
特開2001−209530号公報
【0006】
【発明が解決しようとする課題】
このように、従来の開発管理方法では、プロジェクト管理者がプロジェクトの進捗状況を把握する場合、プロジェクト担当者に進捗状況を問い合わせる必要があった。また、従来の開発管理システムでは管理者がプロジェクトを計画する際に、タスクに分解する作業に膨大な労力が必要であった。
【0007】
この発明は、ドキュメントの作成状況を自動収集し、実績情報収集時間を削減することを目的とする。
【0008】
また、この発明は、プロジェクト計画時に入力されたプロジェクトの情報(主に製品仕様)に従って、自動的にタスクを生成し、プロジェクト管理者のタスク設定業務の省力化を実現することを目的とする。
【0009】
【課題を解決するための手段】
この発明は、複数の工程からなるプロジェクトの各作業工程をタスクとして、複数のプロジェクトの各プロジェクトに属する複数のタスクを各プロジェクトに対応させて記憶するタスクデータベースと、
端末から送信されたプロジェクトの仕様情報に基づいて、上記タスクデータベースに記憶した複数のタスクから上記プロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成するプロジェクト生成部とを備えた、プロジェクトを支援する。
【0010】
【発明の実施の形態】
実施の形態1.
図1はこの発明を実施した場合のシステムの全体構成図である。開発管理支援装置40は、支援装置の一例であり、プロジェクトチームのメンバーであるプロジェクト管理者及びプロジェクト担当者の端末とLAN50等のネットワークで接続され、タスクデータベース10、プロジェクトデータベース20、文書データベース30に格納された各情報を利用して、プロジェクト管理者及びプロジェクト担当者を支援する。
【0011】
まず各データベースの概要について述べる。
実施の形態1のタスクデータベース10はプロジェクトを自動生成するための基本となるタスクに関するデータを格納するデータベースである。
プロジェクトデータベース20はプロジェクトに関連するデータを管理するデータベースである。
文書データベース30は、プロジェクトで作成されるドキュメントおよびテンプレートドキュメントを格納するデータベースである。文書データベース30には、例えば、XMLファイルが格納される。
【0012】
次に図1の開発管理支援装置40の内部構成について述べる。
開発管理支援装置40は、インタフェースとして、上記各データベースとのデータのやりとりを行うデータベースインタフェース部41、端末とのインタフェースを行う端末インタフェース部42をもつ。
開発管理支援装置40は、また、以下の機能を有する各部を持つ。
プロジェクト生成部43ではプロジェクトチームのプロジェクト計画時に、端末から送信されたプロジェクトの仕様情報に基づいて、タスクデータベース10に記憶した複数のタスクから上記プロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成し、プロジェクトの計画支援を行う。
ドキュメント作成部44では、プロジェクト担当者の端末からの入力にもとづき、ドキュメントの作成及び編集を行う。
プロジェクト変更部45では、プロジェクト管理者の端末からの入力にもとづき、プロジェクト計画の変更を行う。
進捗計測部46では、プロジェクトの進捗状況を計測し、プロジェクト管理者の端末に表示する。
タスクデータベースメンテナンス部47では、プロジェクト管理者の端末からの入力にもとづき、タスクデータベース10のメンテナンスを行う。
アラーム表示部48では、プロジェクト管理者の端末にアラーム(警告)を表示する。
記憶部49では、端末から入力された各種のデータを一時記憶しておく。
【0013】
図2に本プロジェクトで管理するタスクの一例を示す。
タスクはツリー構造で表現されるものとする。上位の階層から順に細かいタスク(作業内容)に分解されるものとする。図2では左に行く程上位の階層である。
ツリーの構造として以下の制限があるものとする。
1.階層数には制限のないものとする。
2.あるノードにおいて自分より下の階層にノードがない場合はそのノードには必ずドキュメントのテンプレート(テンプレートドキュメント)を保有するものとする。すなわち、タスクデータベース10には、各プロジェクトに属する複数のタスクをツリー状に関連付けて階層的に記憶し、自己より下位に関連付けられたタスクが存在しないタスクのテンプレートドキュメント名をタスクとともに記憶する。このテンプレートドキュメント自身はXML形式で文書データベース30に保存されるものであり、内部に章・節・項を必ず1つ以上保有する。テンプレートドキュメントを保有するタスクを含む、このノードを以下「最小タスクノード」と称する。
3.上記1以外タスク(自己より下位に関連付けられたタスクが存在するタスク)を含むノードはドキュメントを保有しない。このノードを以下「中間タスクノード」と称する。
ここで、タスクとは、複数の作業工程からなるプロジェクトの各工程をいう。具体的には、図2で示す各ブロックがタスクである。また、ドキュメントとは、タスクを実行した結果得られる成果物である文書をいう。また、テンプレートドキュメントとは、タスクの処理内容の初期値を示す文書をいい、具体的には図2に示す各XMLファイルがこれに該当する。
例えば、タスク「開発計画」は、自己より下位に関連付けられたタスク「体制表作成」が存在するタスクであり、タスク「体制表作成」は、自己より下位に関連付けられたタスクが存在しないタスクである。タスク「体制表作成」には、テンプレートドキュメント名「体制表」をもつXMLファイル(テンプレートドキュメント)がリンクされている。すなわち、タスクデータベース10には、初期値として、図2に示すタスク構成を記憶し、自己より下位に関連付けられたタスクが存在しないタスクに対してテンプレートドキュメント名を記憶し、また、文書データベース30に上記テンプレートドキュメント名をもつXMLファイル(テンプレートドキュメント)を記憶することによって、上記タスクとそのタスクに対応するテンプレートドキュメントをリンクし、上記データベースを用いることによって開発管理支援装置40は開発管理を支援することとなる。
【0014】
まず、プロジェクト計画時にプロジェクト生成部43が行うタスク生成支援機能について説明する。
プロジェクト計画の作業フローの概要を図3に示す。
具体的にはまず、プロジェクト生成部43は図4に示すプロジェクト登録画面を端末に表示させ(S31)、プロジェクトで開発する機種の製品仕様情報(プロジェクトの仕様情報)をプロジェクト管理者に入力させる(S32)。次に、プロジェクト生成部43はS32で入力された製品仕様情報をもとにタスクデータベース10に格納されたデータを使用して、タスクの自動生成およびタスクツリーを構築し(S33)、実行結果を図5に示すプロジェクト専用のタスクツリー編集画面に表示させる(S34)。プロジェクト管理者は今回のプロジェクトで必要なタスクを表示されたタスクツリー編集画面から選択する(S35)。なお図5において、下部の概要設計、詳細設計、初品管理、初期流動管理のタスクツリーは省略している。
図5の例において、今回のプロジェクトでは、プロジェクト管理者が「ライフサイクルDR」と「初品管理」は実施しないと決定したため、チェックが外されている。プロジェクト管理者が今回のプロジェクトで実施するタスクを選択した後、プロジェクト生成部43はプロジェクト管理者に図5の「保存」ボタンをクリックさせる。プロジェクト管理者によって選択されたプロジェクトのタスクは対応するテンプレートドキュメント名がある場合には対応するテンプレートドキュメントと共にプロジェクトデータベース20に保存される(S36)。
【0015】
タスク生成に関し、従来は類似プロジェクトからの流用や基準プロジェクトのタスクをもとにタスクを生成していた。
しかし、本実施の形態では、複数のプロジェクトの各プロジェクトに属する複数のタスクを各プロジェクトに対応させてタスクデータベース10に記憶するとともに各プロジェクトに属する複数のタスクの少なくともいずれかのタスクに対応したテンプレートドキュメント名をタスクとともに記憶する。また、タスクの処理内容の初期値を示すテンプレートドキュメントを文書データベース30に記憶する。プロジェクト生成部43は、端末から送信されたプロジェクトの仕様情報に基づいて、タスクデータベース10に記憶した複数のタスクからプロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成する。また、プロジェクト生成部43は、生成したプロジェクトに含まれるタスクに対応したテンプレートドキュメント名をタスクデータベース10から取得し、取得したテンプレートドキュメント名のテンプレートドキュメントを上記文書データベース30から取得することによって上記生成したタスクとともに対応するテンプレートドキュメントが含まれたプロジェクトを生成する。さらに、プロジェクト生成部43は、複数のタスクを含むプロジェクトを生成し、生成したプロジェクトに含まれる複数のタスクのうちから必要な複数のタスクを端末に選択させ、プロジェクト生成部43が端末に選択させた複数のタスクとこれら複数のタスクとに対応する、タスクデータベース10に記憶されたテンプレートドキュメント名とをプロジェクトデータベース20に記憶する。
このように、本実施の形態の開発管理支援装置40ではタスクデータベース10を活用し、プロジェクトに必要なタスクを含んだプロジェクトを自動生成するプロジェクト生成部43により、製品仕様(プロジェクトの仕様情報)に応じたタスクを含むプロジェクトを自動生成するため、タスク設定業務の効率化を図ることができる。
【0016】
次に、プロジェクト生成部43がS33で実行するプロジェクトに含まれるタスクの自動生成の概要について記述する。
図6にプロジェクトに含まれるタスク自動生成のフローを示す。プロジェクト生成部43はS32において入力された製品仕様情報を一時的に記憶部49にセットする(S61)。次に、プロジェクト生成部43は、記憶部49にセットされた製品仕様情報(プロジェクトの仕様情報)を検索条件として、この検索条件をもとにタスクデータベース10に記憶された全タスクを検索し(S62)、検索条件に合致するタスクだけを記憶部49に記憶し(S63)、全検索後、記憶部49に記憶した検索結果をプロジェクトデータベース20に保存する(S64)。なお、検索の詳細については後述する。
【0017】
次に、タスクデータベース10に格納されているデータの詳細について述べる。
タスクデータベース10にはタスク等の情報が図7に示される形式で保存されている。図7はプロジェクトで実施されると想定される最大限のタスクツリー形式で表したもので、個々のプロジェクトのタスクはこの中から選択される。
各ノードは上述したように中間タスクノードと最小タスクノードに分類される。中間タスクノードは属性としてタスク11、タスク抽出ルール12を持つ。最小タスクノードは属性としてタスク11、タスク抽出ルール12、テンプレートドキュメント13、進捗判定情報14を持つ。
タスクデータベース10にはこれら全ての情報が保存されている。なお、タスクデータベース10の実際のテーブル例については後述する。
【0018】
プロジェクト生成部43によって行われるタスクデータベース10の検索の詳細について述べる。
検索が実行されるとタスクツリーの上位階層から順にタスク11の検索が実行される。プロジェクト生成部43は、タスクツリーの各ノードに付随するタスク抽出ルール12と入力された製品仕様情報(プロジェクトの仕様情報)をもとに各タスク11を検索し、プロジェクトに必要なタスクを抽出する。たとえば端末から入力されたプロジェクトの仕様情報(検索条件)の中で「客先=○○電力」というプロジェクトの仕様情報があるとする。また、タスクデータベース10中のタスク11で中間タスクノードまたは最小タスクノードで、タスク抽出ルール12が「IF 客先=○○電力」のものがあるとする。
この場合、プロジェクト生成部43はタスク抽出ルール12が「IF 客先=○○電力」のタスク11はプロジェクトの仕様情報に合致されたタスクと認識する。
このようにプロジェクト生成部43はタスクデータベース10から入力された製品仕様情報(プロジェクトの仕様情報)に合致するタスク11があるかを検索し、今回のプロジェクトの仕様情報に合致するタスク11だけを抽出して、プロジェクトデータベース20に保存する。
【0019】
次に、プロジェクトの進行時にドキュメント作成部44の支援によって、各プロジェクト担当者がドキュメントの作成及び編集を行う方法について記述する。
ドキュメント作成部44は、図8のプロジェクト一覧画面よりプロジェクト担当者に担当するプロジェクトを選択させ、「プロジェクト編集」ボタンをクリックさせ、その結果、プロジェクト担当者用のタスクツリー画面を表示する。
プロジェクト担当者用のタスクツリー画面を図9に示す。プロジェクト担当者が、編集するドキュメント名15を選択すると、図10のドキュメント編集画面が表示され、ドキュメントの編集が可能となる。プロジェクト担当者は、ドキュメントの編集を終了したあと「保存」ボタンをクリックする。
ドキュメント作成部44はこれを受けてドキュメントを文書データベース30に保存する。章および節を追加する場合は「章・節」追加ボタンをクリックして、章および節の追加を行う。
【0020】
このように、本実施の形態の開発管理支援装置40のドキュメント作成部44は、プロジェクトデータベース20に記憶した複数のタスクのうちドキュメントを作成するタスクを端末に選択させ、選択させたタスクに対応するテンプレートドキュメント名を持つテンプレートドキュメントを文書データベース30から取得し、取得したテンプレートドキュメントを端末に表示することによってドキュメントの作成を行なうプロジェクト担当者を支援するとともに、文書データベース30は、ドキュメント作成部44が支援して作成されたドキュメント名を含むドキュメントをテンプレートドキュメントに対応させて記憶することで、ドキュメントの作成時においてもプロジェクトの開発の進行を促進させることができる。
【0021】
次に、プロジェクト変更部45の支援を受けて、プロジェクト管理者がプロジェクト進行時にプロジェクトの計画を見直す方法について記述する。
プロジェクト進行時にプロジェクトの計画を見直す場合、プロジェクト変更部45は、図11のプロジェクト変更画面を起動する。プロジェクト管理者はこの画面において、タスク11の追加・削除、完了予定日16の変更、進捗判定情報14の変更、完了処理を行う。
【0022】
図11の画面上でタスク11の追加・削除を行う方法について記述する。
追加・削除されるタスク11が発生した場合には、図11のタスクツリーで追加または削除したいタスクを選択し、「タスク追加」または「タスク削除」ボタンをクリックして追加または削除する。なお追加できるノードは最小タスクノードに限定される。
【0023】
「タスク追加」ボタンをクリックした後の、タスク11の追加の詳細について記述する。
タスク11を追加するためのタスク追加画面を図12に示す。図12において、プロジェクト変更部45は、プロジェクト担当者に追加するタスク名51とドキュメント名52を指定させてタスクを追加する。ここで、進捗判定情報53はページ数、行数、サイズの中から1つ選択させる。この際の進捗率を計測する対象範囲である計測対象範囲はドキュメント全体とする。計測基準54については前述の進捗判定情報53に対して基準となる数値を入力させるか又は、基準となる基準値をプロジェクト変更部45が設定することとなる。たとえば、進捗判定情報53がページ数で計測基準54が20の場合、プロジェクト変更部45は、20ページに対してドキュメントが何ページ書かれたかによって進捗率を計測することになる。また、たとえば進捗判定情報53がサイズで、計測基準54が100の場合は、100バイトに対して、ファイルに格納されたドキュメントが何バイト作成されたかによって進捗率を計測することになる。進捗判定情報53または計測対象範囲を変更したい場合は、後述する方法で変更する。
【0024】
図11に示す完了予定日16の変更する方法について記述する。
完了予定日16を変更する場合、プロジェクト管理者またはプロジェクト担当者は、図11のプロジェクト変更画面の表部の完了予定日欄を直接変更する。
【0025】
ドキュメントの作成が完了した場合の完了処理を行う方法について記述する。
ドキュメントの作成が完了したと判断した場合にはドキュメント作成部44は、タスクに対して完了処理を実施する。ドキュメント作成部44は、図11において完了処理を行うタスクをプロジェクト管理者に選択させ、「完了」ボタンをクリックさせる。これによりタスクの変更は完了したとみなされる。完了処理が行われたタスクのドキュメントは編集不可能となる。
【0026】
プロジェクト変更部45によって進捗判定情報または計測対象範囲を変更させる方法について記述する。
進捗判定情報または計測対象範囲を変更したい場合には、プロジェクト変更部45は、図11のタスクツリーで変更したいタスク11をプロジェクト管理者に選択させて、「計測方法変更」ボタンをクリックさせる。
進捗判定情報または計測対象範囲を変更するための進捗判定情報等変更画面を図13に示す。図13におけるドキュメント構造61は、タスクに設定されたドキュメント(XMLファイル)の章・節・項の構造を解析した結果を表示している。プロジェクト変更部45は、プロジェクト管理者に章・節・項の中から計測対象となる章・節・項を選択して「追加>>」ボタンをクリックさせることによって計測対象を右側の計測対象範囲62に追加し、追加した章・節・項に対して進捗判定情報53および計測基準54を設定する。すべての設定が終わったら「変更」ボタンをクリックして進捗判定情報の変更を完了する。
【0027】
次に進捗計測部46が進捗状況を表示する方法について記述する。
進捗計測部46は、まず、進捗状況を表示したいプロジェクト管理者の端末に図8のプロジェクト一覧画面を表示する。プロジェクト管理者はプロジェクト一覧画面において「進捗表示」ボタンをクリックする。この操作により、進捗計測部46はドキュメントの作成状況をリアルタイムで取得し、図14に示す進捗表示用のタスクツリーをプロジェクト管理者の端末に表示する。この際にドキュメントの作成状況を示す進捗率65が表示される。進捗率65の計算方法については後述する。
【0028】
完了予定日遅れのタスクを表示する方法について記述する。
タスクの中で、すでに完了予定日16を過ぎているものを表示する場合には、プロジェクト管理者は、図14の「完了予定日遅れ」ボタンをクリックする。これにより、完了予定日遅れのあるタスク11を下の層にもつノードがすべて赤く表示される。この機能を利用すれば、プロジェクト管理者が完了予定日16をすぎているタスクを探す際にすべてのツリーを展開して表示して探すかわりに、上位階層から赤く表示されたノードを展開していくだけで、所望のタスクにたどりつくことができる。
【0029】
完了していないタスク11を表示する方法について記述する。
完了していないタスク11を表示する場合、プロジェクト管理者は、図14の「完了ビュー」ボタンをクリックする。これにより、完了していないタスク11を下位にもつタスク11は赤く表示される。この機能を利用すれば、プロジェクト管理者が完了していないタスク11を探す際にすべてのツリーを展開して表示して探すかわりに、上位階層から赤く表示されたノードを展開していくだけで、所望のタスクにたどりつくことができる。
【0030】
上述した進捗率65の計算方法の詳細について記述する。
進捗計測部46は、現在作成されているドキュメントの作成情報およびプロジェクト全体の進捗状況を収集する。進捗情報収集の流れを図15に示す。
まず、進捗計測部46は、進捗情報収集の対象となるプロジェクト番号をプロジェクト管理者にセットさせる(S71)。
次に進捗計測部46は、プロジェクトのタスクツリーをプロジェクトデータベース20より取得し(S72)、タスクツリーのノード分、次のループ処理を実行する。
ノードが最小タスクノードであるとき、言い換えれば、自己より下位に関連付けられたタスクが存在しないタスクであるとき(S73)には、必ずXML形式のドキュメントが存在するので、進捗計測部46は、そのドキュメントの構造を解析する(S74)。
また、同時に、進捗判定情報と計測対象範囲を取得する(S75)。計測対象範囲が複数設定されている場合は各計測対象範囲を進捗判定情報に基づいて計測し(S76)、最後にマージしてドキュメントに対する進捗率65を算出する(S77)。このようにして、最小タスクノードに付属するドキュメントの進捗率65をすべて算出する。
この結果、各中間タスクノード(自己より下位に関連付けられたタスクが存在するタスク)に対しても進捗率65が計算されるので、プロジェクト全体の進捗率65を計算することができる(S78)。
ここで、下位のタスクの進捗率65をもとに上位のタスクの進捗率65を計算する際は平均をとるものとする。たとえば、下位のタスクが3つあって、それぞれの進捗率65が10%、30%、50%だったとすると、上位のタスクの進捗率は平均をとって30%とする(S78)。
【0031】
このように、進捗計測部46は、プロジェクトデータベース20に記憶したタスクに対応して記憶したドキュメント名を持つドキュメントを文書データベース30から取得し、取得したドキュメントの情報量とタスクの処理完了時に予想されるドキュメントの最終情報量である計測基準とを比較してタスクの進捗率65を計測する。また、進捗計測部46は、文書データベース30に記憶したドキュメントの構造を解析し、解析したドキュメントの構造から進捗率を計測する対象となる複数の計測対象範囲を指定し、指定した複数の計測対象範囲から1以上の計測対象範囲を端末に選択させ、選択させた計測対象範囲に対応した部分のドキュメントの情報量と計測対象範囲のタスクの処理完了時に予想される計測対象範囲の計測基準とを比較してタスクの計測対象範囲の進捗率65を計測する。さらに、進捗計測部46は、端末から送信された進捗率を判定する進捗判定情報を用いて端末から送信された計測基準と上記ドキュメントの情報量とを比較してタスクの進捗率を計測する。そして、進捗計測部46は、自己より下位に関連付けられたタスクが存在しないタスクを上記プロジェクトデータベース20から複数取得し、取得した複数のタスクの各タスクの進捗率を計測し、計測した各タスクの進捗率からプロジェクトの進捗率を計測することにより、タスク毎の進捗率やタスク内の任意の範囲についての進捗率やプロジェクト全体の進捗率をプロジェクト管理者やプロジェクト担当者に表示することができるため、プロジェクトの進捗管理を容易にすることができる。
【0032】
次に、タスクデータベースメンテナンス部47が行うタスクデータベース10のメンテナンス機能の詳細について記述する。
タスクデータベース10は上述された内容を記憶しており、すべてのプロジェクトのベースとなるタスクを管理している。
しかし、タスクは時々刻々と変化し、成果物であるドキュメントや進捗判定情報法も調達要求や制度によって常に変化する。
これに対応するため、本開発管理支援装置40ではタスクデータベース10のメンテナンス機能を有するタスクデータベースメンテナンス部47を備え、ベースとなるタスクの変化に対応が可能としている。
タスクデータベースメンテナンス部47が表示するタスクデータベースメンテナンス画面を図16に示す。図16ではタスクツリーとタスクのノードに付随する属性を表示しており、タスクツリーのノードの追加、変更、削除が可能である。
【0033】
タスクツリーのノードの追加、変更の際の画面を図17に示す。図17では各タスクの抽出条件72とドキュメント名73および計測対象範囲74、進捗判定情報75、計測基準76の設定とエリア77の設定が可能である。
タスクの抽出条件72の設定例を以下に示す。
仕様項目に「客先」、仕様入力値に「○○電力」を設定すると、プロジェクトの製品の仕様情報の客先が○○電力の際だけこのタスクは抽出される。条件の「and」や「or」は複数の仕様を組み合わせて抽出条件を作成する際に利用する。たとえば1行目の仕様項目に「客先」、仕様入力値に「○○電力」を設定し、条件に「and」を設定する。次に2行目の仕様項目に「規格」、仕様入力値に「JEC」を設定する。こうするとプロジェクトの仕様情報の客先が○○電力であり、規格がJECの際にこのタスクが抽出される。仕様入力値の候補例を図18に示す。
【0034】
ドキュメント名73の設定方法および計測対象範囲74、進捗判定情報75、計測基準76の設定について述べる。ドキュメント名73にフォームとなるXMLファイルを指定すると、ドキュメントの構造が解析され章・節・項が表示される。章・節・項の中から計測対象となる章・節・項を選択して「追加>>」ボタンをクリックして右側の計測対象範囲74に追加し、追加した章・節・項に対して進捗判定情報75および計測基準76を設定する。ここで、計測対象範囲の計測基準といった場合には、タスク中の計測対象範囲74について処理が完了したときに予想される情報量をいい、計測基準といった場合には、タスクについて処理が完了したときに予想される情報量をいう。
最後にタスクの属するエリア77を設定する。エリアの選択候補例を図19に示す。
【0035】
このように、タスクデータベース10は、タスク毎にタスクを抽出するためのタスク抽出ルール12を記憶し、タスクデータベースメンテナンス部47は、端末から送信されたタスクの抽出条件と抽出条件に合致するタスクの変更内容とに基づいてタスクの抽出条件に該当するタスク抽出ルール12を持つタスクをタスクデータベース10から抽出し、抽出したタスクを上記タスクの変更内容に基づいて変更するので、時々刻々と変化するタスクに対応してタスクデータベース10をメンテナンスすることができる。
【0036】
次に、アラーム表示部48が持つアラーム機能の詳細について記述する。
アラーム表示部48は、あらかじめ、プロジェクト管理者によってプロジェクトがどのような状況になったときにアラームメールが発信されるか、その警告条件を決定しておき、決定した警告条件を記憶部49に記憶しておく。
アラーム表示部48は、例えば、1日1回監視プログラムを起動することによって、プロジェクトの情報を収集し、プロジェクトがアラームを発信すべき状態になった際にアラームメールをプロジェクト管理者の端末へ発信する。ただし、監視プログラムによる監視は、1日複数回行ってもよく、また、数日で一回としてもよい。また、警告の方法は、メールの発信以外の方法でもプロジェクト管理者に警告できる方法であればよい。
【0037】
アラーム設定画面を図20に示す。
図20においてエリア100とタスク個数101と条件102を設定することにより、アラーム表示部48はアラームメールを発信する条件に従ってアラームメールを発信することができる。たとえば、1行目のエリアに「レビュー」、タスク個数に「5」、条件に「and」、2行目のエリアに「目標コスト」、タスク個数に「2」を設定したとする。この結果、あるプロジェクトで全タスクの中で「レビュー」のエリアコードを持つタスクが5個以下になり、しかも全タスクの中で「目標コスト」のエリアコードを持つタスクが2個以下になったときアラーム表示部48によってアラームメールが発信される。
【0038】
このように、アラーム表示部48は、生成したプロジェクトからプロジェクトに必要なタスクを端末に選択させ、選択させたタスクをプロジェクトデータベース20に記憶し、プロジェクトデータベース20に記憶したタスクのプロジェクトに対し警告を発する警告条件を記憶部49に記憶し、プロジェクトデータベース20に記憶したタスクを監視し、監視したタスクの状態に基づいてプロジェクトが上記記憶部に記憶した警告条件を満たす場合に端末に対し警告を発することによって、プロジェクト関係者に注意を促すことができる。
【0039】
図21に以上で述べた開発管理支援装置40の各部機能の構成図を示す。
【0040】
図22(a)〜(d)及び図23(d)〜(g)に以上で述べた開発管理支援装置40を実現するためのタスクデータベース10に各テーブル形式で格納された各テーブルの構成を示す。
図16で登録される基本となるタスク11のツリー構成の情報は図22(a)の基本タスクツリーテーブル81に保存される。また、図17で登録されるドキュメント名、ドキュメントの格納場所、エリア70のエリアコードも図22(a)における基本タスクツリーテーブル81に保存される。
図17で登録される計測対象範囲74、進捗判定情報75、計測基準76は図22(b)における基本計測方法テーブル82に保存される。また図17で登録されるタスクの抽出ルール(タスクの抽出条件72)は図22(c)における抽出ルールテーブル83に保存される。
図23(d)における仕様項目テーブル84および図23(e)における仕様入力値テーブル85および図23(f)におけるエリアコードテーブル86はあらかじめ決定しておく必要があり、これらのテーブルは固定である。
また、図20で登録されるアラーム式は図23(g)のアラーム式テーブル87に保存される。
【0041】
次に、図24に以上で述べた開発管理支援装置40を実現するためのプロジェクトデータベース20のテーブル形式で格納された各テーブルの構成を示す。
図4で登録される、プロジェクト名22、プロジェクト番号23、作成部門24、作成者25、完了予定日16は図24(a)におけるプロジェクトデータテーブル88に保存される。
また、図4で登録される開発区分26、環境(温度)27、環境(湿度)28等も図示されていないが図24(a)におけるプロジェクトデータテーブル88に保存される。
図5で登録されるタスク情報は図24(b)におけるプロジェクトタスクツリーテーブル89に保存される。この際にタスク名、ドキュメント名、テンプレートURL、エリアコードは図22(a)の基本タスクツリーテーブル81の対応するものが入る。初期値完了フラグには初期状態ですべて0が入り、該当タスクが完了した時に1がセットされる。完了予定日には作成した日付が入るものとする。
図12で登録される、タスク名、ドキュメント名、ドキュメントURLは図24(b)におけるプロジェクトタスクツリーテーブル89に保存される。
また、図12で登録される進捗判定情報53および計測基準54は図24(c)におけるプロジェクト計測方法テーブル90に保存される。また、図13で登録される計測対象62、進捗判定情報53、計測基準54は図24(c)におけるプロジェクト計測方法テーブルに保存される。
【0042】
図25に以上で述べた開発管理支援装置40を実現するためのドキュメント(XML)のテンプレート例を示す。テンプレートドキュメントは章・節・項などの文書の構成をあらかじめプロジェクト管理者が作成しておき、図12または図17の画面で登録する。このテンプレートドキュメントを登録することにより、ドキュメント構造が明らかになり、進捗の計測対象として認識されるようになる。テンプレートドキュメントは文書データベース30に保存される。
【0043】
図26に以上で述べた開発管理支援装置40を実現するためのドキュメント(XML)の例を示す。これはテンプレートドキュメントに文書の内容を含めたドキュメントの実体である。プロジェクト担当者がドキュメントを編集する際にはこのドキュメント(XMLファイル)を図10に示すような端末インタフェース部42によって提供されるインタフェースを通じて編集する。ドキュメントは文書データベース30に保存される。
【0044】
この実施の形態に係る開発管理支援装置40では、タスクをタスクデータベース10より製品仕様に応じて検索することにより、タスクを自動生成し開発計画を容易にすることが可能となる。
また、この実施の形態に係る開発管理支援装置40では、プロジェクトで作成されるドキュメントをXML(eXtenxsible Markup Language)ファイルとして管理することによりドキュメントから作成状況を自動的に収集することにより、プロジェクト担当者がドキュメントの作成状況を逐一報告しなくても、プロジェクト管理者が文書作成状況の把握を可能とする。
また、この実施の形態に係る開発管理支援装置40では、タスクを分類し、その分類にしたがってタスクを分析し、決められたタスクの傾向からはずれた場合にはアラームを発することにより、タスクの分解業務を支援し、プロジェクト管理者の管理業務を軽減することが可能となる。
【0045】
この実施の形態の発明によれば、開発機種情報、仕様、ホールドポイントをもとにタスク、作成文書および日程を自動的に設定することができる。これにより開発計画支援の仕組みを提供することができる。
また、管理者の管理レベルに応じて、各ホールドポイントでのタスクおよび作成ドキュメントの進捗フォローが可能となる。これにより開発スケジュールを遵守する仕組みを実現し、納期遅れを防止する。
また、各開発ステップで作成されるドキュメントの共有が可能となり、類似機種開発における流用や開発下流工程での文書参照が可能となり、開発期間の短縮および設計品質の向上に寄与する。
【0046】
図27は、開発管理支援装置40のコンピュータ基本構成図である。
図27において、プログラムを実行するCPU140は、バス138を介してモニタ141、キーボード142、マウス143、通信ポート144、磁気ディスク装置146等と接続されている。
磁気ディスク装置146には、OS147、プログラム群149、ファイル群150が記憶されている。ただし、プログラム群149、ファイル群150が一体となってオブジェクト指向のプログラム群149を形成する形態も一実施の形態として考えられる。プログラム群149には、プロジェクト生成部43、ドキュメント作成部44、プロジェクト変更部45、進捗計測部46、タスクデータベースメンテナンス部47、アラーム表示部48で実行されるプログラム等が記憶されている。また、ファイル群150には、タスクデータベース10に格納された各テーブル、プロジェクトデータベース20に格納された各テーブル、文書データベース30に格納された文書等が記憶されている。
開発管理支援装置40の各部が実行するプログラム群149は、CPU140、OS147により実行される。
上記各実施の形態では、開発管理支援装置40は、通信ポート144の機能を使用して、LAN50を経由してプロジェクト管理者またはプロジェクト担当者の使用する端末との通信を行う。
【0047】
以上に記載した「格納する」、「登録する」、「記憶する」、「表示する」、「保存する」という用語は、記録媒体に保存することを意味する。
【0048】
すべての実施の形態では、各構成要素の各動作はお互いに関連しており、各構成要素の動作は、上記に示された動作の関連を考慮しながら、一連の動作として置き換えることができる。そして、このように置き換えることにより、方法の発明の実施形態とすることができる。
また、上記各構成要素の動作を、各構成要素の処理と置き換えることにより、プログラムの実施の形態とすることができる。
また、プログラムを、プログラムを記録したコンピュータ読み取り可能な記録媒体に記憶させることで、プログラムに記録したコンピュータ読み取り可能な記録媒体の実施の形態とすることができる。
【0049】
プログラムの実施の形態及びプログラムに記録したコンピュータ読み取り可能な記録媒体の実施の形態は、すべてコンピュータで動作可能なプログラムにより構成することができる。
プログラムの実施の形態およびプログラムを記録したコンピュータ読み取り可能な記録媒体の実施の形態における各処理はプログラムで実行されるが、このプログラムは、記録装置に記録されていて、記録装置から中央処理装置(CPU)に読み込まれ、中央処理装置によって、各フローチャートが実行されることになる。
また、各実施の形態のソフトウェアやプログラムは、ROM(READ ONLY MEMORY)に記憶されたファームウェアで実現されていても構わない。あるいは、ソフトウェアとファームウェアとハードウェアとの組み合わせで前述したプログラムの各機能を実現しても構わない。
【0050】
【発明の効果】
本発明によれば、開発計画支援の仕組みを提供し、開発期間を短縮することができる。
【図面の簡単な説明】
【図1】実施の形態1の全体を示す構成図。
【図2】プロジェクトのタスク例。
【図3】プロジェクト生成作業フロー。
【図4】プロジェクト登録画面。
【図5】タスクツリー選択画面。
【図6】タスク自動生成フロー。
【図7】タスクデータベース。
【図8】プロジェクト一覧画面。
【図9】タスクツリー画面。
【図10】ドキュメント編集画面。
【図11】プロジェクト変更画面。
【図12】タスク追加画面。
【図13】進捗判定情報等変更画面。
【図14】進捗表示用タスクツリー。
【図15】進捗率計算フロー。
【図16】タスクデータベースメンテナンス画面。
【図17】タスクデータベースメンテナンス詳細画面。
【図18】仕様入力選択候補。
【図19】エリア選択候補。
【図20】アラーム設定画面。
【図21】機能構成図。
【図22】タスクデータベース構成図。
【図23】タスクデータベース構成図。
【図24】プロジェクトデータベース構成図。
【図25】テンプレートドキュメント例(XML)。
【図26】ドキュメント例(XML)。
【図27】開発管理支援装置のコンピュータ基本構成図。
【符号の説明】
10 タスクデータベース、11 タスク、14 進捗判定情報、15 ドキュメント名、16 完了予定日、20 プロジェクトデータベース、22 プロジェクト名、23 プロジェクト番号、24 作成部門、25 作成者、26 開発区分、27 環境(温度)、28 環境(湿度)、30 文書データベース、40 開発管理支援装置、41 データベースインタフェース部、42 端末インタフェース部、43 プロジェクト生成部、44 ドキュメント作成部、45 プロジェクト変更部、46 進捗計測部、47 タスクデータベースメンテナンス部、48 アラーム表示部、49 記憶部、50 LAN、51 タスク名、52 ドキュメント名、53 進捗判定情報、54 計算基準、62 計測対象範囲、65 進捗率、70 エリア、72 タスクの抽出条件、73 ドキュメント名、74 計測対象範囲、75 進捗判定情報、76 計測基準、81基本タスクツリーテーブル、82 基本計測方法テーブル、83 抽出ルールテーブル、84 仕様項目テーブル、85 仕様入力値テーブル、86 エリアコードテーブル、87 アラーム式テーブル、88 プロジェクトデータテーブル、89 プロジェクトタスクツリーテーブル、90 プロジェクト計測方法テーブル、138 バス、140 CPU、141 モニタ、142 キーボード、143 マウス、144 通信ポート、146 磁気ディスク装置、147 OS、149 プログラム群、150 ファイル群。[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a support apparatus and method for supporting development management of a product development project.
[0002]
[Prior art]
The conventional development management method has the following problems.
In a conventional project management tool, when a task is disassembled into all tasks to be progress-managed, the load of inputting actual results increases.
Further, with the conventional project management tool, a created document can be linked to a task, but a task cannot be linked to a document being created.
In addition, since there is no mechanism for automatically collecting the progress from the task deliverable (document), the creator has to report (or input) the creation status of the document at any time.
Also, there is no mechanism to support the task setting and disassembly of the project manager.
[0003]
As a conventional development management method, for example,
However, in the definition of work processes, means for editing from standard processes and diverting from similar projects are presented, but means for dynamically (rule-based) presentation of work processes according to the specifications are shown. Not.
For this reason, a great deal of effort was required for the project manager to perform the task selection.
[0004]
[0005]
[Patent Document 1]
JP-A-10-154310
[Patent Document 2]
JP 2001-209530 A
[0006]
[Problems to be solved by the invention]
As described above, in the conventional development management method, when the project manager grasps the progress of the project, it is necessary to inquire the progress of the project to the person in charge of the project. Further, in the conventional development management system, when an administrator plans a project, an enormous amount of labor is required for disassembling it into tasks.
[0007]
SUMMARY OF THE INVENTION It is an object of the present invention to automatically collect document creation status and reduce the time required to collect performance information.
[0008]
Another object of the present invention is to automatically generate a task in accordance with project information (mainly product specifications) input at the time of project planning, thereby realizing labor saving in task setting work of a project manager.
[0009]
[Means for Solving the Problems]
The present invention provides a task database that stores a plurality of tasks belonging to each project of a plurality of projects in association with each project, with each work step of a project including a plurality of processes as a task,
A project including a task corresponding to the project specification information by selecting a task belonging to a project that satisfies the project specification information from a plurality of tasks stored in the task database based on the project specification information transmitted from the terminal. And a project generation unit for generating a project.
[0010]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 is an overall configuration diagram of a system when the present invention is implemented. The development management support device 40 is an example of a support device, and is connected to the terminals of a project manager and a project staff who are members of the project team via a network such as a
[0011]
First, the outline of each database is described.
The
The
The
[0012]
Next, the internal configuration of the development management support device 40 of FIG. 1 will be described.
The development management support device 40 has, as interfaces, a
The development management support device 40 also has units having the following functions.
The
The
The
The
The task
The
The
[0013]
FIG. 2 shows an example of tasks managed in this project.
Tasks are represented in a tree structure. It is assumed that the tasks are decomposed into smaller tasks (work contents) in order from the upper layer. In FIG. 2, the higher the level, the higher the hierarchy.
Assume that the tree structure has the following restrictions.
1. There is no limit on the number of layers.
2. If there is no node at a lower level than a certain node, the node always has a document template (template document). That is, the
3. A node including a task other than 1 (a task having a task associated with a lower level than itself) does not hold a document. This node is hereinafter referred to as an “intermediate task node”.
Here, a task refers to each step of a project including a plurality of work steps. Specifically, each block shown in FIG. 2 is a task. A document is a document that is a product obtained as a result of executing a task. Further, the template document is a document indicating an initial value of the processing content of the task, and specifically corresponds to each XML file shown in FIG.
For example, the task “development plan” is a task that has a task “creation of the organization table” that is associated with a lower level than the task itself, and the task “creation of the organization table” is a task that does not have a task associated with a level lower than the self. is there. An XML file (template document) having a template document name “organization table” is linked to the task “create organization table”. That is, the
[0014]
First, a task generation support function performed by the
An outline of the work flow of the project plan is shown in FIG.
Specifically, first, the
In the example of FIG. 5, in the current project, the check is removed because the project manager has decided not to perform “life cycle DR” and “first article management”. After the project manager selects a task to be performed in the current project, the
[0015]
Conventionally, task generation has been based on tasks from a similar project or tasks of a reference project.
However, in the present embodiment, a plurality of tasks belonging to each project of a plurality of projects are stored in the
As described above, in the development management support device 40 of the present embodiment, the
[0016]
Next, an outline of automatic generation of tasks included in the project executed by the
FIG. 6 shows a flow of the task automatic generation included in the project. The
[0017]
Next, details of data stored in the
Information such as tasks is stored in the
Each node is classified into an intermediate task node and a minimum task node as described above. The intermediate task node has a
The
[0018]
The details of the search of the
When the search is executed, the search for the
In this case, the
As described above, the
[0019]
Next, a description will be given of a method in which each project staff creates and edits a document with the support of the
The
FIG. 9 shows a task tree screen for the project staff. When the project staff selects the
The
[0020]
As described above, the
[0021]
Next, a method in which the project manager reviews the project plan when the project is in progress with the support of the
When reviewing the project plan while the project is in progress, the
[0022]
A method for adding / deleting the
When a
[0023]
The details of the addition of the
FIG. 12 shows a task addition screen for adding a
[0024]
A method of changing the scheduled
When changing the scheduled
[0025]
Describes how to perform completion processing when document creation is completed.
When determining that the creation of the document has been completed, the
[0026]
A method for changing the progress determination information or the measurement target range by the
When the progress determination information or the measurement target range is to be changed, the
FIG. 13 shows a screen for changing progress determination information or progress determination information for changing the measurement target range. The
[0027]
Next, a method in which the
The
[0028]
Describes how to display tasks that are scheduled to be completed later.
When displaying a task that has already passed the scheduled
[0029]
A method for displaying a
When displaying the
[0030]
The calculation method of the above-mentioned
The
First, the
Next, the
When the node is the minimum task node, in other words, when there is no task associated with a lower level than itself (S73), since the XML format document always exists, the
At the same time, progress determination information and a measurement target range are acquired (S75). When a plurality of measurement target ranges are set, each measurement target range is measured based on the progress determination information (S76), and finally merged to calculate a
As a result, the
Here, when calculating the
[0031]
As described above, the
[0032]
Next, details of the maintenance function of the
The
However, tasks change from moment to moment, and the resulting documents and progress judgment information methods also change constantly depending on procurement requests and systems.
To cope with this, the development management support apparatus 40 includes a task
FIG. 16 shows a task database maintenance screen displayed by the task
[0033]
FIG. 17 shows a screen for adding or changing a node in the task tree. In FIG. 17, an
A setting example of the
If "customer" is set as the specification item and "XX electric power" is set as the specification input value, this task is extracted only when the customer of the specification information of the product of the project is XX electric power. The conditions “and” and “or” are used when creating an extraction condition by combining a plurality of specifications. For example, “customer” is set as the specification item on the first line, “XX power” is set as the specification input value, and “and” is set as the condition. Next, “standard” is set to the specification item on the second line, and “JEC” is set to the specification input value. In this case, the customer of the project specification information is XX power, and this task is extracted when the standard is JEC. FIG. 18 shows an example of specification input value candidates.
[0034]
The setting method of the
Finally, the
[0035]
As described above, the
[0036]
Next, details of the alarm function of the
The
The
[0037]
FIG. 20 shows the alarm setting screen.
By setting the
[0038]
As described above, the
[0039]
FIG. 21 shows a configuration diagram of the functions of each unit of the development management support device 40 described above.
[0040]
FIGS. 22 (a) to (d) and FIGS. 23 (d) to (g) show the configuration of each table stored in the
The information on the tree configuration of the
The
The specification item table 84 in FIG. 23D, the specification input value table 85 in FIG. 23E, and the area code table 86 in FIG. 23F need to be determined in advance, and these tables are fixed. .
The alarm formula registered in FIG. 20 is stored in the alarm formula table 87 in FIG.
[0041]
Next, FIG. 24 shows a configuration of each table stored in the table format of the
The
Further, although the
The task information registered in FIG. 5 is stored in the project task tree table 89 in FIG. At this time, the task name, document name, template URL, and area code correspond to those in the basic task tree table 81 of FIG. The initial value completion flag is all set to 0 in the initial state, and is set to 1 when the corresponding task is completed. The date of completion is assumed to be the date of completion.
The task name, document name, and document URL registered in FIG. 12 are stored in the project task tree table 89 in FIG.
The
[0042]
FIG. 25 shows an example of a document (XML) template for realizing the development management support device 40 described above. For the template document, the structure of the document such as chapters, sections, and sections is created in advance by the project manager, and registered on the screen shown in FIG. 12 or FIG. By registering this template document, the document structure is clarified and recognized as a progress measurement target. The template document is stored in the
[0043]
FIG. 26 shows an example of a document (XML) for realizing the development management support device 40 described above. This is the entity of the document including the contents of the document in the template document. When the project staff edits the document, the document (XML file) is edited through an interface provided by the
[0044]
In the development management support device 40 according to this embodiment, by searching for a task from the
Further, the development management support apparatus 40 according to the present embodiment automatically collects the creation status from the document by managing the document created in the project as an XML (extensible Markup Language) file, thereby enabling the project person in charge. Without reporting the document creation status one by one, the project manager can grasp the document creation status.
The development management support device 40 according to this embodiment classifies tasks, analyzes the tasks according to the classification, and issues an alarm when the task deviates from a predetermined task tendency, thereby decomposing the tasks. It is possible to support the work and reduce the management work of the project manager.
[0045]
According to the invention of this embodiment, a task, a created document, and a schedule can be automatically set based on development model information, specifications, and hold points. This can provide a development plan support mechanism.
Further, according to the management level of the manager, it is possible to follow the progress of the task and the created document at each hold point. In this way, a system that complies with the development schedule is realized, and delays in delivery are prevented.
In addition, it is possible to share documents created in each development step, and it is possible to use the documents in the development of similar models and to refer to the documents in downstream development processes, thereby contributing to shortening the development period and improving the design quality.
[0046]
FIG. 27 is a computer basic configuration diagram of the development management support device 40.
27, a
The
A
In each of the above embodiments, the development management support device 40 communicates with the terminal used by the project manager or the project staff via the
[0047]
The terms "store", "register", "store", "display", and "save" described above mean to save in a recording medium.
[0048]
In all embodiments, each operation of each component is related to each other, and the operation of each component can be replaced as a series of operations while taking into account the relation of the operations described above. Then, by substituting in this way, an embodiment of the method invention can be obtained.
Further, by replacing the operation of each of the above components with the processing of each of the components, an embodiment of a program can be realized.
In addition, by storing the program on a computer-readable recording medium on which the program is recorded, an embodiment of the computer-readable recording medium on which the program is recorded can be provided.
[0049]
The embodiment of the program and the embodiment of the computer-readable recording medium recorded in the program can all be constituted by a computer-operable program.
Each process in the embodiment of the program and the embodiment of the computer-readable recording medium on which the program is recorded is executed by the program, and the program is recorded in the recording device, and is transmitted from the recording device to the central processing unit ( CPU) and each flowchart is executed by the central processing unit.
Also, the software and programs of each embodiment may be implemented by firmware stored in a ROM (READ ONLY MEMORY). Alternatively, each function of the above-described program may be realized by a combination of software, firmware, and hardware.
[0050]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to this invention, the mechanism of a development plan support is provided and a development period can be shortened.
[Brief description of the drawings]
FIG. 1 is a configuration diagram showing an
FIG. 2 shows an example of a project task.
FIG. 3 is a project generation work flow.
FIG. 4 is a project registration screen.
FIG. 5 is a task tree selection screen.
FIG. 6 is a task automatic generation flow.
FIG. 7 is a task database.
FIG. 8 is a project list screen.
FIG. 9 is a task tree screen.
FIG. 10 is a document editing screen.
FIG. 11 is a project change screen.
FIG. 12 is a task addition screen.
FIG. 13 is a screen for changing progress determination information.
FIG. 14 is a task tree for progress display.
FIG. 15 is a progress rate calculation flow.
FIG. 16 is a task database maintenance screen.
FIG. 17 is a task database maintenance detail screen.
FIG. 18 is a specification input selection candidate.
FIG. 19 shows area selection candidates.
FIG. 20 is an alarm setting screen.
FIG. 21 is a functional configuration diagram.
FIG. 22 is a configuration diagram of a task database.
FIG. 23 is a configuration diagram of a task database.
FIG. 24 is a configuration diagram of a project database.
FIG. 25 shows an example of a template document (XML).
FIG. 26 is a document example (XML).
FIG. 27 is a computer basic configuration diagram of a development management support device.
[Explanation of symbols]
10 Task database, 11 tasks, 14 Progress judgment information, 15 Document name, 16 Scheduled completion date, 20 Project database, 22 Project name, 23 Project number, 24 Creation department, 25 Creator, 26 Development category, 27 Environment (temperature) , 28 environment (humidity), 30 document database, 40 development management support device, 41 database interface unit, 42 terminal interface unit, 43 project generation unit, 44 document creation unit, 45 project change unit, 46 progress measurement unit, 47 task database Maintenance section, 48 alarm display section, 49 storage section, 50 LAN, 51 task name, 52 document name, 53 progress judgment information, 54 calculation basis, 62 measurement target range, 65 progress rate, 70 area, 72 task extraction condition, 7 Document name, 74 Measurement target range, 75 Progress judgment information, 76 Measurement criteria, 81 Basic task tree table, 82 Basic measurement method table, 83 Extraction rule table, 84 Specification item table, 85 Specification input value table, 86 Area code table, 87 alarm type table, 88 project data table, 89 project task tree table, 90 project measurement method table, 138 bus, 140 CPU, 141 monitor, 142 keyboard, 143 mouse, 144 communication port, 146 magnetic disk device, 147 OS, 149 Programs, 150 files.
Claims (13)
端末から送信されたプロジェクトの仕様情報に基づいて、上記タスクデータベースに記憶した複数のタスクから上記プロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成するプロジェクト生成部とを備えた、プロジェクトを支援する支援装置。A task database that stores a plurality of tasks belonging to each project of a plurality of projects in association with each project, with each work step of a project including a plurality of processes as a task;
A project including a task corresponding to the project specification information by selecting a task belonging to a project that satisfies the project specification information from a plurality of tasks stored in the task database based on the project specification information transmitted from the terminal. And a project generation unit for generating a project.
タスクの処理内容の初期値を示すテンプレートドキュメントを記憶する文書データベースを備え、
上記タスクデータベースは、各プロジェクトに属する複数のタスクの少なくともいずれかのタスクに対応したテンプレートドキュメント名をタスクとともに記憶し、
上記プロジェクト生成部は、上記生成したプロジェクトに含まれるタスクに対応したテンプレートドキュメント名を上記タスクデータベースから取得し、取得したテンプレートドキュメント名のテンプレートドキュメントを上記文書データベースから取得することによって上記生成したタスクとともに対応するテンプレートドキュメントが含まれたプロジェクトを生成する請求項1に記載された支援装置。The support device further includes:
A document database that stores a template document indicating the initial value of the processing content of the task,
The task database stores a template document name corresponding to at least one of a plurality of tasks belonging to each project together with the task,
The project generation unit obtains a template document name corresponding to a task included in the generated project from the task database, and obtains a template document having the obtained template document name from the document database together with the generated task. The support device according to claim 1, wherein the support device generates a project including a corresponding template document.
上記支援装置は、さらに、
上記プロジェクト生成部が端末に選択させた複数のタスクと選択させた複数のタスクに対応する、上記タスクデータベースに記憶したテンプレートドキュメント名とを記憶するプロジェクトデータベースを備えた請求項2に記載された支援装置。The project generation unit generates a project including a plurality of tasks, and causes the terminal to select a necessary plurality of tasks among a plurality of tasks included in the generated project,
The support device further includes:
3. The support according to claim 2, further comprising a project database that stores a plurality of tasks selected by the project generation unit by the terminal and template document names stored in the task database corresponding to the plurality of selected tasks. 4. apparatus.
上記プロジェクトデータベースに記憶した複数のタスクのうちドキュメントを作成するタスクを端末に選択させ、選択させたタスクに対応するテンプレートドキュメント名を持つテンプレートドキュメントを上記文書データベースから取得し、取得したテンプレートドキュメントを端末に表示することによってドキュメントの作成を支援するドキュメント作成部を備え、
上記文書データベースは、上記ドキュメント作成部が支援して作成されたドキュメント名を含むドキュメントをテンプレートドキュメントに対応させて記憶する請求項4に記載された支援装置。The support device further includes:
The terminal selects a task for creating a document from the plurality of tasks stored in the project database, obtains a template document having a template document name corresponding to the selected task from the document database, and stores the obtained template document in the terminal. A document creation unit that supports creation of documents by displaying them on
The support apparatus according to claim 4, wherein the document database stores a document including a document name created by the assistance of the document creation unit in association with a template document.
上記プロジェクトデータベースに記憶したタスクに対応して記憶したドキュメント名を持つドキュメントを上記文書データベースから取得し、取得したドキュメントの情報量と上記タスクの処理完了時に予想されるドキュメントの最終情報量である計測基準とを比較してタスクの進捗率を計測する進捗計測部を備えた請求項5に記載された支援装置。The support device further includes:
A document having a document name stored in correspondence with the task stored in the project database is acquired from the document database, and the information amount of the acquired document and the final information amount of the document expected when the processing of the task is completed are measured. The support device according to claim 5, further comprising a progress measurement unit that measures a task progress rate by comparing with a reference.
上記支援装置は、さらに、
端末から送信されたタスクの抽出条件と抽出条件に合致するタスクの変更内容とに基づいてタスクの抽出条件に該当するタスク抽出ルールを持つタスクをタスクデータベースから抽出し、抽出したタスクを上記端末インタフェース部が受信したタスクの変更内容に基づいて変更するタスクデータベースメンテナンス部を備える請求項1に記載された支援装置。The task database stores task extraction rules for extracting tasks for each task,
The support device further includes:
A task having a task extraction rule corresponding to the task extraction condition is extracted from the task database based on the task extraction condition transmitted from the terminal and the task change content that matches the extraction condition, and the extracted task is referred to the terminal interface. The support device according to claim 1, further comprising a task database maintenance unit that changes the task based on the content of the change of the task received by the unit.
上記生成したプロジェクトからプロジェクトに必要なタスクを端末に選択させ、選択させたタスクを記憶するプロジェクトデータベースと、
上記プロジェクトデータベースに記憶したタスクのプロジェクトに対し警告を発する警告条件を記憶する記憶部と、
上記プロジェクトデータベースに記憶したタスクを監視し、監視したタスクの状態に基づいてプロジェクトが上記記憶部に記憶した警告条件を満たす場合に端末に対し警告を発するアラーム表示部とを備えた請求項1に記載された支援装置。The support device further includes:
A project database that allows the terminal to select a task necessary for the project from the generated project, and stores the selected task,
A storage unit for storing a warning condition for issuing a warning for the task project stored in the project database,
2. The alarm display unit according to claim 1, further comprising: an alarm display unit that monitors a task stored in the project database and issues a warning to a terminal when a project satisfies a warning condition stored in the storage unit based on a state of the monitored task. The described support device.
端末から送信されたプロジェクトの仕様情報に基づいて、上記タスクデータベースに記憶した複数のタスクから上記プロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成することによりプロジェクトを支援する支援方法。Each work process of a project including a plurality of processes is set as a task, and a plurality of tasks belonging to each project of the plurality of projects are stored in the task database in association with each project,
A project including a task corresponding to the project specification information by selecting a task belonging to a project that satisfies the project specification information from a plurality of tasks stored in the task database based on the project specification information transmitted from the terminal. A support method to support a project by generating a.
端末から送信されたプロジェクトの仕様情報に基づいて、上記タスクデータベースに記憶した複数のタスクから上記プロジェクトの仕様情報に当てはまるプロジェクトに属するタスクを選択することによってプロジェクトの仕様情報に応じたタスクを含むプロジェクトを生成することによりプロジェクトを支援する処理とをコンピュータに実行させる支援プログラム。A process of storing a plurality of tasks belonging to each project of a plurality of projects in a task database in association with each project, with each work process of a project including a plurality of processes as a task;
A project including a task corresponding to the project specification information by selecting a task belonging to a project that satisfies the project specification information from a plurality of tasks stored in the task database based on the project specification information transmitted from the terminal. A support program for causing a computer to execute a process for supporting a project by generating a program.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003000907A JP2004213447A (en) | 2003-01-07 | 2003-01-07 | Support device, support method and support program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003000907A JP2004213447A (en) | 2003-01-07 | 2003-01-07 | Support device, support method and support program |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004213447A true JP2004213447A (en) | 2004-07-29 |
Family
ID=32819069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003000907A Pending JP2004213447A (en) | 2003-01-07 | 2003-01-07 | Support device, support method and support program |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004213447A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007164532A (en) * | 2005-12-14 | 2007-06-28 | Toshiba Corp | Task display device, task display method, and task display program |
JP2007249572A (en) * | 2006-03-15 | 2007-09-27 | Mitsubishi Electric Corp | Project management support device, project management support method, and project management support program |
US7818197B2 (en) | 2004-11-30 | 2010-10-19 | Kabushiki Kaisha Toshiba | Schedule management apparatus, schedule management method and program |
JP2011008504A (en) * | 2009-06-25 | 2011-01-13 | Ntt Comware Corp | Device, method and program for calculating progress rate |
JP2011081513A (en) * | 2009-10-05 | 2011-04-21 | Toshiba Corp | Progress management device and progress management method |
JP2016018299A (en) * | 2014-07-07 | 2016-02-01 | 富士通株式会社 | Communication control method, communication control system, and communication control program |
JP2020135168A (en) * | 2019-02-15 | 2020-08-31 | 富士通株式会社 | Information processor, information processing device, and data storage program |
JP2021089591A (en) * | 2019-12-04 | 2021-06-10 | Tis株式会社 | Project management system, project management method, and program |
JP7365840B2 (en) | 2018-10-19 | 2023-10-20 | オラクル・インターナショナル・コーポレイション | Automatic assessment of project acceleration |
-
2003
- 2003-01-07 JP JP2003000907A patent/JP2004213447A/en active Pending
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7818197B2 (en) | 2004-11-30 | 2010-10-19 | Kabushiki Kaisha Toshiba | Schedule management apparatus, schedule management method and program |
JP2007164532A (en) * | 2005-12-14 | 2007-06-28 | Toshiba Corp | Task display device, task display method, and task display program |
JP2007249572A (en) * | 2006-03-15 | 2007-09-27 | Mitsubishi Electric Corp | Project management support device, project management support method, and project management support program |
JP2011008504A (en) * | 2009-06-25 | 2011-01-13 | Ntt Comware Corp | Device, method and program for calculating progress rate |
JP2011081513A (en) * | 2009-10-05 | 2011-04-21 | Toshiba Corp | Progress management device and progress management method |
JP2016018299A (en) * | 2014-07-07 | 2016-02-01 | 富士通株式会社 | Communication control method, communication control system, and communication control program |
JP7365840B2 (en) | 2018-10-19 | 2023-10-20 | オラクル・インターナショナル・コーポレイション | Automatic assessment of project acceleration |
JP2020135168A (en) * | 2019-02-15 | 2020-08-31 | 富士通株式会社 | Information processor, information processing device, and data storage program |
JP7176434B2 (en) | 2019-02-15 | 2022-11-22 | 富士通株式会社 | Information processing system, information processing device and data storage program |
JP2021089591A (en) * | 2019-12-04 | 2021-06-10 | Tis株式会社 | Project management system, project management method, and program |
JP7160789B2 (en) | 2019-12-04 | 2022-10-25 | Tis株式会社 | Project management system, project management method and program |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5767848A (en) | Development support system | |
JP4796185B2 (en) | Business flow diagram generation program, business flow diagram generation device, and business flow diagram generation method | |
JP3458728B2 (en) | Component data management device and computer readable storage medium storing component data management program | |
JP5157282B2 (en) | Equipment information collection management system | |
CN101776999A (en) | Platform for developing and implementing software system | |
JP6375029B2 (en) | A metadata-based online analytical processing system that analyzes the importance of reports | |
JP2004213447A (en) | Support device, support method and support program | |
CN114461612A (en) | Database-based data management method and management system | |
JPH08235231A (en) | Paralle design management system | |
CN112052343A (en) | Knowledge graph display method and device, electronic equipment and storage medium | |
JP2001014166A (en) | Device for generating ontology coordinate information | |
JP5033322B2 (en) | Information management method and apparatus using connection relation information | |
CN116932632A (en) | Method and system for data asset management and visualization | |
CN112527918A (en) | Data processing method and device | |
JP4011995B2 (en) | Product design support apparatus and method | |
CN114066418B (en) | Fire control data processing system based on data center | |
KR20060012572A (en) | System and methods for managing distributed design chains | |
JP5365308B2 (en) | Production information management system and method | |
JP2019101829A (en) | Software component management system, computor, and method | |
JP2007133577A (en) | Information sharing degree analysis system | |
JP6403864B2 (en) | Service design support system and service design support method | |
JP2000235561A (en) | Simulation model editor and machine readable recording medium recording program | |
US20240012959A1 (en) | Digital twin cooperation method, digital twin cooperation system, and digital twin cooperation program | |
US20230060475A1 (en) | Operation data analysis device, operation data analysis system, and operation data analysis method | |
JP2006127078A (en) | Software configuration estimate support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20040519 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20041026 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051128 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080507 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080520 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080625 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080819 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20090106 |