JP2007164532A - Task display device, task display method, and task display program - Google Patents

Task display device, task display method, and task display program Download PDF

Info

Publication number
JP2007164532A
JP2007164532A JP2005360861A JP2005360861A JP2007164532A JP 2007164532 A JP2007164532 A JP 2007164532A JP 2005360861 A JP2005360861 A JP 2005360861A JP 2005360861 A JP2005360861 A JP 2005360861A JP 2007164532 A JP2007164532 A JP 2007164532A
Authority
JP
Japan
Prior art keywords
task
previous
project
identifier
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2005360861A
Other languages
Japanese (ja)
Inventor
Atsushi Kurihara
淳 栗原
Ryoichi Yasumori
亮一 安森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Digital Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Solutions Corp filed Critical Toshiba Corp
Priority to JP2005360861A priority Critical patent/JP2007164532A/en
Publication of JP2007164532A publication Critical patent/JP2007164532A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To extract a task meeting a designated condition and to display it in association with a related task. <P>SOLUTION: The task display device has: a storage processing part 14 for storing a task identifier to identify a specified task and its pre-task and project management data 16 with which the pre-task identifier is associated into a storage device 107; a pre-task retrieval part 11 for retrieving the pre-task associated with the task identifier with the task identifier as a key; a post-task retrieval part 12 for retrieving from the storage device 107 the task identifier associated with the pre-task identifier as a post-task of the specified task with the pre-task identifier for identifying a specified task as a key; and a display control unit 13 for associating the retrieved pre-task and a post-task with the specified task and displaying them. <P>COPYRIGHT: (C)2007,JPO&INPIT

Description

本発明は、複数のタスクを含むプロジェクトの管理においてタスクを表示するタスク表示装置、タスク表示方法及びタスク表示プログラムに関する。   The present invention relates to a task display device, a task display method, and a task display program for displaying a task in management of a project including a plurality of tasks.

一般的に、製造業界やソフトウェア業界などの各業界では、生産計画、運用計画、プロジェクト計画などの計画業務が行われている。例えばプロジェクト計画の遂行を管理する管理者は、プロジェクトを複数の作業単位に分割し、各作業単位について、作業を実行する予定の日程、作業を担当する担当者などを割り当てて、プロジェクトの進捗を管理している。この作業単位をタスクと称し、このようにプロジェクトをタスクに分割して管理することをタスク管理という。プロジェクトを構成する各タスクは、互いに依存関係をもつ場合がある。例えば、タスクAの実行の出力結果をタスクBの実行の入力に用い、タスクBの実行の出力結果をタスクCの実行の入力に用いる場合が考えられる。この場合、タスクA、タスクB及びタスクCは、独自にタスクを遂行することはできず、互いに依存関係をもつ。   Generally, in each industry such as the manufacturing industry and the software industry, planning operations such as production planning, operation planning, and project planning are performed. For example, an administrator who manages the execution of a project plan divides a project into multiple units of work, and assigns a schedule for executing the work, a person in charge of the work, etc. I manage. This unit of work is called a task, and managing a project divided into tasks in this way is called task management. The tasks that make up the project may have dependencies on each other. For example, the output result of task A execution may be used as an input for task B execution, and the output result of task B execution may be used as an input for task C execution. In this case, the task A, the task B, and the task C cannot independently perform the task and have a dependency relationship with each other.

このようなプロジェクトのタスクに関する工程計画を把握するための表示方法として、ガントチャートが利用されることがある。ガントチャートでは、タスクごとに、タスク名、タスクが属するプロジェクトのプロジェクト名、担当者名、タスクの開始予定日や終了予定日等の情報が帯状の一覧形式で表示されている。   A Gantt chart may be used as a display method for grasping a process plan related to such a project task. In the Gantt chart, information such as the task name, the project name of the project to which the task belongs, the name of the person in charge, the scheduled start date and the scheduled end date of the task are displayed in a band-like list format for each task.

また、タスクに関する工程計画を把握する他の表示方法として、タスクの依存関係を図16に示すように表示することがある。図16に示す表示例では、タスク1の終了後にタスク2が開始され、タスク2の終了後にタスク3が開始される依存関係が把握できる。   Further, as another display method for grasping the process plan related to the task, there is a case where the dependency relation of the task is displayed as shown in FIG. In the display example shown in FIG. 16, it is possible to grasp the dependency relationship in which the task 2 is started after the task 1 is finished and the task 3 is started after the task 2 is finished.

一方、担当者であるリソースに割り当てたタスクを把握することが出来るようにリソースごとに割り当てられたタスクを時系列で表示する方法がある(例えば、特許文献1記載)。この特許文献1では、各リソースがタスクを実行する処理能力を考慮するとともに、リソースとリソースが担当するタスクと、タスクの依存関係を関連付けて表示している。また、特許文献1では、一定の期間内に実行予定のタスクを表示する方法も記載されている。
特開2004−227051号公報
On the other hand, there is a method of displaying the tasks assigned to each resource in time series so that the task assigned to the resource as the person in charge can be grasped (for example, described in Patent Document 1). In Patent Document 1, the processing capability of each resource to execute a task is considered, and the resource, the task that the resource is in charge of, and the task dependency are displayed in association with each other. Patent Document 1 also describes a method for displaying a task scheduled to be executed within a certain period.
JP 2004-227051 A

上述したような従来の表示方法では、プロジェクト内におけるタスクを担当者やタスクの実行期間に着目している。そのため、従来のガントチャートの場合、各タスクの依存関係を把握することは不明であり、所定の担当者に割り当てられたタスクを把握することも困難である。また、図16で示すようにプロジェクトに属するタスクの依存関係を全て表示した場合、単に依存関係のみを表示した図16に示すようなガントチャートからは、リソースやタスクの実行の予定日を把握することはできないのに加え、プロジェクトに関するタスクの数が増えて依存関係が複雑になる程、タスクの依存関係を把握する困難性は増してくる。   In the conventional display method as described above, the task in the project is focused on the person in charge and the execution period of the task. Therefore, in the case of the conventional Gantt chart, it is unclear to grasp the dependency relationship between each task, and it is difficult to grasp the task assigned to a predetermined person in charge. Further, when all the dependency relationships of the tasks belonging to the project are displayed as shown in FIG. 16, the scheduled execution date of the resource and the task is grasped from the Gantt chart as shown in FIG. In addition to being able to do so, the more tasks that are involved in a project and the more complex the dependencies, the more difficult it becomes to understand the task dependencies.

また、あるタスクが、1つのプロジェクトのみでなく、複数のプロジェクトに関わる場合がある。例えば、第1のプロジェクトに属するタスクAの実行の出力結果を第1のプロジェクトに属するタスクBの実行の入力及び第2のプロジェクトに属するタスクCの実行の入力に用いる場合である。このような複数のプロジェクトに関連するタスクが存在する場合、従来の表示方法では対象とするタスクの属するプロジェクトを越えた別のプロジェクトに属するタスクとの依存関係を把握することは困難である。   In addition, a certain task may involve not only one project but also a plurality of projects. For example, the output result of the execution of task A belonging to the first project is used as an input for execution of task B belonging to the first project and an input of execution of task C belonging to the second project. When there are tasks related to such a plurality of projects, it is difficult to grasp the dependency relationship with a task belonging to another project beyond the project to which the target task belongs by the conventional display method.

したがって、本発明は上記事情に鑑みてなされたものであり、その目的は、タスクの属性とともに相関関係のあるタスクを関連付けて表示して、プロジェクトの着実な遂行を支援するタスク表示装置、タスク表示方法及びタスク表示プログラムを提供することである。   Therefore, the present invention has been made in view of the above circumstances, and its purpose is to display a task that correlates with a task attribute in association with the task, and to support steady execution of the project and task display. A method and a task display program are provided.

上記課題を解決するため、第1の特徴に係るタスク表示装置は、複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示装置であって、所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理部と、記憶装置から、前記タスク識別子をキーに、当該タスク識別子に関連づけられる前タスク識別子を検索する前タスク検索部と、記憶装置から、タスク識別子をキーに、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索部と、検索された前タスク及び後タスクを所定のタスクに関連付けて表示させる表示制御部とを有する。   In order to solve the above-described problem, a task display device according to a first feature includes, in managing a project including a plurality of tasks, a predetermined task, a pre-task executed before execution of the predetermined task, and the predetermined A task display device that associates and displays a post-task executed after execution of the task, and stores a task identifier for identifying the predetermined task and the pre-task, and project management data associated with the pre-task identifier Project management data storage processing unit stored in the device, and from the storage device using the task identifier as a key, the previous task search unit for searching for a previous task identifier associated with the task identifier, and from the storage device using the task identifier as a key The task associated with the previous task identifier using the previous task identifier for identifying the predetermined task as a key. It has a task search unit after searching an identifier as a task after said predetermined task, and a display control unit for displaying tasks and latter task before retrieved in association with predetermined task.

また、本発明の第2の特徴に係るタスク表示方法は、複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示方法であって、所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理ステップと、記憶装置から、タスク識別子をキーに、当該タスク識別子に関連づけられる前タスク識別子を検索する前タスク検索ステップと、記憶装置から、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索ステップと、検索された前タスク及び後タスクを所定のタスクに関連付けて表示させる表示制御ステップとを有する。   In addition, the task display method according to the second aspect of the present invention provides a predetermined task, a pre-task executed before execution of the predetermined task, and the predetermined task in managing a project including a plurality of tasks. Display method that associates and displays a post-task to be executed after the execution of the task, and stores a task identifier for identifying the predetermined task and the pre-task, and project management data associated with the pre-task identifier in the storage device Project management data storage processing step to be stored, a previous task search step for searching a previous task identifier associated with the task identifier from the storage device using the task identifier as a key, and a previous task for identifying a predetermined task from the storage device Using the identifier as a key, the task identifier associated with the previous task identifier is the predetermined task. It has a task searching step after searching the task, and a display control step of displaying the task and latter task before retrieved in association with predetermined task after.

さらに、本発明の第3の特徴に係るタスク表示プログラムは、複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示プログラムであって、所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理ステップと、記憶装置から、タスク識別子をキーに、当該タスク識別子に関連づけられる前タスク識別子を検索する前タスク検索ステップと、記憶装置から、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索ステップと、検索された前タスク及び後タスクを所定のタスクに関連付けて表示させる表示制御ステップとをコンピュータに実行させる。   Furthermore, the task display program according to the third aspect of the present invention provides a predetermined task, a previous task executed before execution of the predetermined task, and the predetermined task in managing a project including a plurality of tasks. Display program that associates and displays a post-task to be executed after execution of the task, and stores a task identifier for identifying a predetermined task and the pre-task respectively, and project management data associated with the pre-task identifier in a storage device Project management data storage processing step to be stored, a previous task search step for searching a previous task identifier associated with the task identifier from the storage device using the task identifier as a key, and a previous task for identifying a predetermined task from the storage device Using the identifier as a key, the task identifier associated with the previous task identifier And task searching step after searching the task after said predetermined task, to execute a display control step of displaying retrieved before the task and rear task associated with a given task on a computer.

本発明によれば、タスクの属性とともに相関関係のあるタスクを関連付けて表示して、プロジェクトの着実な遂行を支援することができる。   According to the present invention, it is possible to support a steady execution of a project by displaying correlated tasks in association with task attributes.

次に、図面を参照して、本発明の最良の実施の形態について説明する。以下の図面の記載において、同一または類似の部分には同一または類似の符号を付している。
(第1の実施の形態)
図1は、本発明の第1の実施の形態に係るタスク表示装置1の構成を説明する機能ブロック図であり、図2は、タスク表示装置1のハードウェア構成を説明する図である。
図1に示すようにタスク表示装置1は、前タスク検索部11、後タスク検索部12、表示制御部13、記憶処理部14、読出部15及びプロジェクト管理データ16を記憶した記憶部を有している。
Next, the best mode for carrying out the present invention will be described with reference to the drawings. In the following description of the drawings, the same or similar parts are denoted by the same or similar reference numerals.
(First embodiment)
FIG. 1 is a functional block diagram illustrating the configuration of the task display device 1 according to the first embodiment of the present invention, and FIG. 2 is a diagram illustrating the hardware configuration of the task display device 1.
As shown in FIG. 1, the task display device 1 has a storage unit that stores a previous task search unit 11, a subsequent task search unit 12, a display control unit 13, a storage processing unit 14, a reading unit 15, and project management data 16. ing.

タスク表示装置1は、図2に示すように、中央処理制御装置101、ROM(Read Only Memory)102、RAM(Random Access Memory)103及び入出力インタフェース109を有し、これらがバス110を介して接続されている。入出力インタフェース109には、入力装置104、表示装置105、通信制御装置106、記憶装置107及びリムーバブルディスク108が接続されている。   As shown in FIG. 2, the task display device 1 includes a central processing control device 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, and an input / output interface 109, which are connected via a bus 110. It is connected. An input device 104, a display device 105, a communication control device 106, a storage device 107, and a removable disk 108 are connected to the input / output interface 109.

中央処理制御装置101は、入力装置104からの入力信号に基づいてROM102からタスク表示装置1を起動するためのブートプログラムを読み出して実行し、更に記憶装置107に記憶されたオペレーティングシステムを読み出す。更に中央処理制御装置101は、入力装置104や通信制御装置106等の入力信号に基づいて、各種装置の制御を行い、RAM103や記憶装置107等に記憶されたプログラム及びデータを読み出してRAM103にロードするとともに、RAM103から読み出されたプログラムのコマンドに基づいて、データの計算または加工など、後述する一連の処理を実現する。   The central processing control device 101 reads out and executes a boot program for starting the task display device 1 from the ROM 102 based on an input signal from the input device 104, and further reads out an operating system stored in the storage device 107. Further, the central processing control device 101 controls various devices based on input signals from the input device 104, the communication control device 106, etc., reads out programs and data stored in the RAM 103, the storage device 107, etc., and loads them into the RAM 103. At the same time, based on a program command read from the RAM 103, a series of processes described later, such as data calculation or processing, is realized.

入力装置104は、操作者が各種の操作を入力するキーボード、マウスなどの入力デバイスにより構成されており、操作者の操作に基づいて入力信号を作成し、入出力インタフェース109及びバス110を介して中央処理制御装置101に送信される。   The input device 104 includes input devices such as a keyboard and a mouse through which an operator inputs various operations. The input device 104 generates an input signal based on the operation of the operator, and inputs via the input / output interface 109 and the bus 110. It is transmitted to the central processing control apparatus 101.

表示装置105は、CRT(Cathode Ray Tube)ディスプレイや液晶ディスプレイなどであり、中央処理制御装置101からバス110及び入出力インタフェース109を介して入力した出力信号を表示する。   The display device 105 is a CRT (Cathode Ray Tube) display, a liquid crystal display, or the like, and displays an output signal input from the central processing control device 101 via the bus 110 and the input / output interface 109.

通信制御装置106は、LANカードやモデムなどの装置であり、本発明に係わるタスク表示プログラムを実行するタスク表示装置1をインターネットやLANなどの通信ネットワークに接続する装置である。通信制御装置106は、通信ネットワークから受信したデータを入力信号として、入出力インタフェース109及びバス110を介して中央処理制御装置101に送信する。また、通信制御装置106は、入出力インタフェース109及びバス110を介して中央処理制御装置101から受信したデータを出力信号として、通信ネットワークに送信する。   The communication control device 106 is a device such as a LAN card or a modem, and is a device that connects the task display device 1 that executes the task display program according to the present invention to a communication network such as the Internet or a LAN. The communication control device 106 transmits data received from the communication network as an input signal to the central processing control device 101 via the input / output interface 109 and the bus 110. Further, the communication control device 106 transmits data received from the central processing control device 101 via the input / output interface 109 and the bus 110 as an output signal to the communication network.

記憶装置107は半導体記憶装置または磁気ディスク装置等であって、中央処理制御装置101で実行されるプログラムやデータが記憶されている。リムーバブルディスク108は、光ディスクやフレキシブルディスクのことであり、ディスクドライブによって読み書きされた信号は、入出力インタフェース109及びバス110を介して中央処理制御装置101に送受信される。タスク表示装置1の記憶装置107は、タスク表示プログラム及びプロジェクト管理データ16を記憶している。タスク表示プログラムが中央処理制御装置101に読み込まれることによって、前タスク検索部11、後タスク検索部12、表示制御部13、記憶処理部14及び読出部15の機能を有するタスク表示装置1が構成される。   The storage device 107 is a semiconductor storage device, a magnetic disk device, or the like, and stores programs and data executed by the central processing control device 101. The removable disk 108 is an optical disk or a flexible disk, and signals read / written by the disk drive are transmitted / received to / from the central processing control apparatus 101 via the input / output interface 109 and the bus 110. The storage device 107 of the task display device 1 stores a task display program and project management data 16. By reading the task display program into the central processing control device 101, the task display device 1 having the functions of the previous task search unit 11, the subsequent task search unit 12, the display control unit 13, the storage processing unit 14, and the reading unit 15 is configured. Is done.

前タスク検索部11は、記憶装置107に記憶されるプロジェクト管理データ16から、所定のタスクの前タスクを検索する。「前タスク」とは、所定のタスクの実行前に終了することを要するタスクである。例えば、タスク2が「データの生成」である場合、その前タスクであるタスク1は、タスク2を実行するために用いるデータを作成する等の作業内容である。前タスク検索部11は、検索された前タスクについて、さらにその前タスクを検索する処理を繰り返し、所定のタスクの実行前に実行されなければならない全ての前タスクを抽出する。   The previous task retrieval unit 11 retrieves a previous task of a predetermined task from the project management data 16 stored in the storage device 107. The “previous task” is a task that needs to be completed before execution of a predetermined task. For example, when the task 2 is “data generation”, the task 1 that is the previous task is the work content such as creating data used for executing the task 2. The previous task search unit 11 repeats the process of searching for the previous task for the searched previous task, and extracts all previous tasks that must be executed before the execution of the predetermined task.

後タスク検索部12は、記憶装置107に記憶されるプロジェクト管理データ16から、所定のタスクの後タスクを検索する。「後タスク」とは、所定のタスクの実行後に開始することを要するタスクである。例えば、タスク1が「データの生成」である場合、その後タスクであるタスク2は、タスク1の実行で生成されたデータを用いてデータの作成する等の作業内容である。後タスク検索部12は、検索された後タスクについて、さらにその後タスクを検索する処理を繰り返し、所定のタスクの実行後に実行されなければならない全ての後タスクを抽出する。   The post-task search unit 12 searches for post-tasks of a predetermined task from the project management data 16 stored in the storage device 107. A “post-task” is a task that needs to be started after execution of a predetermined task. For example, when the task 1 is “data generation”, the task 2 which is a task after that is the work content such as creation of data using the data generated by the execution of the task 1. The post-task search unit 12 further repeats the process of searching for the post-task after the search, and extracts all post-tasks that must be executed after execution of the predetermined task.

表示制御部13は、検索された前タスクを所定のタスクに関連付けるとともに、検索された後タスクを所定のタスクに関連付けて表示する。
読出部15は、記憶装置107に記憶されるプロジェクト管理データ16を読み出して、RAM103などに記憶する。
The display control unit 13 associates the searched previous task with a predetermined task, and displays the searched post-task in association with the predetermined task.
The reading unit 15 reads the project management data 16 stored in the storage device 107 and stores it in the RAM 103 or the like.

プロジェクト管理データ16は、図3に示すように、タスク名と、前タスク名と、タスクの属性であるリソース名、開始予定日及び終了予定日とが関連付けられるレコードを有している。「タスク名」は、プロジェクトの作業項目であるタスクを識別する。「リソース名」は、タスクを作業するリソースの識別子である。以下の説明において、リソースは、タスクの担当者を表すものとして説明する。「開始予定日」は、タスクが開始する予定日である。「終了予定日」は、タスクが終了する予定日である。「前タスク名」は、前タスクの識別子である。プロジェクト管理データ16は、プロジェクトの工程管理に関するデータであり、例えば入力装置104を介して入力される。プロジェクト管理データ16は、中央処理制御装置101に実装される記憶処理部14によって、記憶装置107に記憶される。   As shown in FIG. 3, the project management data 16 has a record in which a task name, a previous task name, a resource name that is a task attribute, a scheduled start date, and a scheduled end date are associated. “Task name” identifies a task that is a work item of a project. The “resource name” is an identifier of a resource that operates the task. In the following description, a resource is described as representing a person in charge of a task. “Scheduled start date” is a scheduled date on which the task starts. The “scheduled end date” is a scheduled date when the task ends. “Previous task name” is an identifier of the previous task. The project management data 16 is data relating to project process management, and is input via the input device 104, for example. The project management data 16 is stored in the storage device 107 by the storage processing unit 14 installed in the central processing control device 101.

図3では、「タスク1」は、担当者Aにより2005年4月1日に開始され、2005年4月2日に終了する予定を示している。この「タスク1」の前タスクは「NULL」であり、「タスク1」には前タスクが存在しないことを意味している。このように、前タスクが「NULL」である場合、そのタスクには前タスクが存在しない。また、図3では、「タスク3」は、担当者Cにより2005年4月4日に開始され、2005年4月6日に終了する予定を示している。この「タスク3」の前タスクは「タスク1」であり、「タスク3」は、「タスク1」が終了した後に開始することを示している。図3に示す例では、各タスクに関するレコードは1つずつであるが、所定のタスクに関するレコードが複数存在する場合、複数の前タスクが存在していることを示す。すなわち、所定のタスクを実行する前には、複数のタスクが終了されていることを要件とすることを示している。   In FIG. 3, “Task 1” indicates that the person in charge A starts on April 1, 2005 and ends on April 2, 2005. The previous task of “task 1” is “NULL”, meaning that there is no previous task in “task 1”. Thus, when the previous task is “NULL”, there is no previous task in the task. In FIG. 3, “task 3” indicates that the person in charge C starts on April 4, 2005 and ends on April 6, 2005. The previous task of “task 3” is “task 1”, and “task 3” indicates that “task 1” starts after “task 1” ends. In the example shown in FIG. 3, there is one record for each task. However, when there are a plurality of records for a predetermined task, it indicates that a plurality of previous tasks exist. That is, it indicates that it is a requirement that a plurality of tasks be completed before a predetermined task is executed.

図4は、図3のプロジェクト管理データ16で示したプロジェクトの工程計画を表示するガントチャートである。この図4に示すガントチャートでは、横方向に時間を表し、縦方向にタスクの種類を表し、矢印を利用して各タスクの相関関係を表している。また、各タスク名にはリソース名としてタスクを担当する担当者名が関連付けられている。この図4に示すガントチャートでは、プロジェクトに含まれる全てのタスクを含んでおり、特定のタスクの相関関係を理解するためには、ユーザが前後のタスクをたどる手間が必要である。   FIG. 4 is a Gantt chart that displays the project process plan shown by the project management data 16 in FIG. In the Gantt chart shown in FIG. 4, the time is shown in the horizontal direction, the type of task is shown in the vertical direction, and the correlation of each task is shown using arrows. Each task name is associated with the name of a person in charge of the task as a resource name. The Gantt chart shown in FIG. 4 includes all the tasks included in the project. In order to understand the correlation between specific tasks, it is necessary for the user to follow the previous and subsequent tasks.

(タスク表示処理)
図5に、第1の実施の形態におけるタスク表示装置1のタスク表示処理を説明するフローチャートを示す。このタスク表示処理によって、タスク表示装置1は、選択されたタスクの依存関係を表示する。この表示処理で表示される依存関係には、選択されたタスクを基点のタスクとして検索された1次前タスク及び1次後タスクに加えて、1次前タスクを基点のタスクとして検索された2次前タスクや、1次後タスクを基点のタスクとして検索された2次後タスクを含む。また、依存関係には、2次前タスクを基点のタスクとして検索された3次前タスク、3次前タスクを基点のタスクとして検索された4次前タスク、2次後タスクを基点のタスクとして検索された3次後タスク、3次後タスクを基点のタスクとして検索された4次後タスク等、選択されたタスクに関連ある全ての前タスク及び後タスクを含む。
(Task display process)
FIG. 5 is a flowchart illustrating task display processing of the task display device 1 according to the first embodiment. By this task display process, the task display device 1 displays the dependency relationship of the selected task. The dependency displayed in this display process includes 2 searched for the primary previous task as the base task in addition to the primary previous task and the primary post task searched for the selected task as the base task. The secondary post-task searched using the next pre-task and the primary post-task as the base task is included. In addition, in the dependency relationship, the third previous task searched using the secondary previous task as the base task, the fourth previous task searched using the third previous task as the base task, and the second post task as the base task. It includes all previous tasks and subsequent tasks related to the selected task, such as a retrieved fourth post task and a fourth post task retrieved using the third post task as a base task.

まず、ユーザは、入力装置104を介して表示リクエストが入力されることに基づいてタスク表示処理が開始されると、依存関係を表示するための所定のタスクを選択する(S001)。ステップS001で所定のタスクが選択されると、読出部15は、記憶装置107からプロジェクト管理データ16を読み出す(S002)。   First, when the task display process is started based on a display request input via the input device 104, the user selects a predetermined task for displaying the dependency relationship (S001). When a predetermined task is selected in step S001, the reading unit 15 reads the project management data 16 from the storage device 107 (S002).

その後、前タスク検索部11は、プロジェクト管理データ16からステップS001で選択された所定のタスクを基点のタスクとして前タスクを検索し、検索した前タスクをRAM103などのワークメモリに記憶する(S004)。   Thereafter, the previous task retrieval unit 11 retrieves the previous task from the project management data 16 using the predetermined task selected in step S001 as a base task, and stores the retrieved previous task in a work memory such as the RAM 103 (S004). .

ステップS001で選択された所定のタスクを基点のタスクとして前タスクを検索すると、前タスク検索部11は、前タスクの検索処理を繰り返して検索した前タスクを基点のタスクとしてさらに前タスクを検索し、検索した前タスクを同様にメモリに記憶する(S004)。前タスク検索部11は、検索される全ての前タスクを基点のタスクとして前タスクの検索が終了するまで、前タスクの検索と検索結果のメモリへの記憶の処理を繰り返す(S003)。前タスクの検索が終了するまでとは、検索した前タスクが「NULL」になるまでである。   When the previous task is searched using the predetermined task selected in step S001 as a base task, the previous task search unit 11 further searches the previous task using the previous task searched by repeating the search process of the previous task as a base task. Similarly, the retrieved previous task is stored in the memory (S004). The previous task search unit 11 repeats the process of searching for the previous task and storing the search result in the memory until all previous tasks to be searched are set as the base task and the search for the previous task is completed (S003). The term “until the previous task search is completed” means that the searched previous task becomes “NULL”.

例えば図3に示すようなタスクと当該タスクの前タスクとが関連付けられるプロジェクト管理データ16を利用する場合、前タスク検索部11は、プロジェクト管理データ16から、タスク名に関連付けられる前タスク名を検索することによって、所定のタスクの前タスクを検索する。   For example, when using the project management data 16 in which the task shown in FIG. 3 is associated with the previous task of the task, the previous task search unit 11 searches the project management data 16 for the previous task name associated with the task name. By doing so, the previous task of the predetermined task is searched.

具体的に、ステップS001で「タスク3」が所定のタスクとして選択された場合、前タスク検索部11は、プロジェクト管理データ16のタスク名が「タスク3」であるレコードを抽出するとともに、抽出したレコードの前タスク名である「タスク1」を1次前タスクとする。図3に示す例で「タスク3」の前タスクは「タスク1」のみであるが、タスクの前タスクは、複数存在することもある。   Specifically, when “task 3” is selected as the predetermined task in step S001, the previous task search unit 11 extracts and extracts a record whose task name is “task 3” in the project management data 16 “Task 1”, which is the name of the previous task in the record, is set as the primary previous task. In the example shown in FIG. 3, only “task 1” is the task before “task 3”, but there may be a plurality of tasks before the task.

続いて、前タスク検索部11は、1次前タスクとして検索した「タスク1」の前タスク(2次前タスク)を検索するが、タスク名が「タスク1」のレコードの前タスク名は「NULL」である。これにより、「タスク1」には前タスクは存在せず、「タスク3」には2次前タスクは存在しないとして、前タスク検索部11における前タスクの検索処理(S003,S004)は終了する。   Subsequently, the previous task search unit 11 searches for the previous task (secondary previous task) of “task 1” searched as the primary previous task, but the previous task name of the record whose task name is “task 1” is “ "NULL". As a result, the previous task search process (S003, S004) in the previous task search unit 11 ends, assuming that there is no previous task in “task 1” and no secondary previous task in “task 3”. .

前タスク検索部11がステップS001で選択されたタスクに関連する前タスクの検索と検索結果のメモリへの記憶の処理を終了すると、後タスク検索部12は、プロジェクト管理データ16からステップS001で選択されたタスクを基点のタスクとして後タスクを検索し、検索した後タスクをメモリに記憶する(S006)。   When the previous task search unit 11 finishes searching for the previous task related to the task selected in step S001 and storing the search result in the memory, the subsequent task search unit 12 selects the project management data 16 in step S001. The post-task is searched using the determined task as a base task, and the post-search task is stored in the memory (S006).

ステップS001で選択された所定のタスクを基点のタスクとして後タスクを検索すると、後タスク検索部12は、後タスクの検索処理を繰り返して検索した後タスクを基点のタスクとしてさらに後タスクを検索し、検索した後タスクを同様にメモリに記憶する(S006)。後タスク検索部12は、検索される全ての後タスクを基点のタスクとして後タスクの検索が終了するまで、後タスクの検索と検索結果のメモリへの記憶の処理を繰り返す(S005)。後タスクの検索が終了するまでとは、検索した前タスクが「NULL」になるまでである。   When the post task is searched using the predetermined task selected in step S001 as a base task, the post task search unit 12 repeats the post task search process and searches the post task using the post task as a base task. After the search, the task is similarly stored in the memory (S006). The post-task search unit 12 repeats the search for the post-task and the storage of the search result in the memory until the post-task search is completed with all post-tasks to be searched as a base task (S005). The term “until the search for the subsequent task is completed” means that the searched previous task becomes “NULL”.

例えば図3に示すようなプロジェクト管理データ16を利用する場合、後タスク検索部12は、プロジェクト管理データ16から、所定の前タスク名に関連付けられるタスク名を検索することによって、タスクの後タスクを検索する。   For example, when the project management data 16 as shown in FIG. 3 is used, the post-task search unit 12 searches the task management data 16 for a task name associated with a predetermined previous task name, thereby determining the post-task of the task. Search for.

具体的に、ステップS001で「タスク3」が所定のタスクとして選択された場合、後タスク検索部12は、「タスク3」がプロジェクト管理データ16の前タスク名が「タスク3」であるレコードを抽出するとともに、抽出したレコードのタスク名である「タスク7」を1次後タスクとする。図3に示す例で「タスク3」の後タスクは「タスク7」のみであるが、タスクの後タスクは、複数存在することもある。   Specifically, when “task 3” is selected as the predetermined task in step S001, the post-task search unit 12 selects a record in which “task 3” has the previous task name “task 3” in the project management data 16. In addition to extraction, “task 7”, which is the task name of the extracted record, is set as the primary post-task. In the example illustrated in FIG. 3, only the “task 7” is the task after “task 3”, but there may be a plurality of tasks after the task.

続いて、1次後タスクとして検索した「タスク7」の後タスク(2次後タスク)を検索するが、前タスク名が「タスク7」のレコードのタスク名は「NULL」である。これにより、「タスク7」には後タスクは存在せず、「タスク3」には2次後タスクが存在しないとして、後タスク検索部12における後タスクの検索処理(S005,S006)は終了する。   Subsequently, a subsequent task (secondary post task) searched for as the primary post task is searched, and the task name of the record having the previous task name “task 7” is “NULL”. As a result, the post-task search process (S005, S006) in the post-task search unit 12 ends, assuming that there is no post-task in “task 7” and no secondary post-task in “task 3”. .

ステップS003乃至S006において基点となるタスクに関連する全ての前タスク及び後タスクの検索と検索結果のメモリへの記憶が終了すると、表示制御部13は、これらのメモリに記憶されたタスクを関連付けた情報及びタスクの属性を含む表示画面200を生成する(S007)。
その後、表示制御部13は、ステップS007で生成した表示画面200を表示装置105に表示する(S008)。
When the search of all previous tasks and subsequent tasks related to the task as the base point in steps S003 to S006 and storage of the search results in the memory are completed, the display control unit 13 associates the tasks stored in these memories. A display screen 200 including information and task attributes is generated (S007).
Thereafter, the display control unit 13 displays the display screen 200 generated in step S007 on the display device 105 (S008).

図6に、タスク表示処理で表示する表示画面200の一例を示す。図6に示す表示画面200は、「タスク3」の依存関係を表示している。具体的に表示画面200は、「タスク3」に前タスクである「タスク1」及び後タスクである「タスク7」がリンクされて表示される。表示画面200は、図6に示すようにタスクにタスクの依存関係とともに関する属性であるリソース名、タスクの開始予定日及びタスクの終了予定日等を含む例に限られず、入力装置104を介して選択されたタスクの依存関係や属性をポップアップ等で表示してもよい。   FIG. 6 shows an example of the display screen 200 displayed in the task display process. The display screen 200 illustrated in FIG. 6 displays the dependency relationship of “task 3”. Specifically, the display screen 200 displays “task 1”, which is the previous task, and “task 7,” which is the subsequent task, linked to “task 3”. As shown in FIG. 6, the display screen 200 is not limited to the example including the resource name, the scheduled start date of the task, the scheduled end date of the task, etc. The dependency relationship or attribute of the selected task may be displayed in a pop-up or the like.

上述したように、本発明の第1の実施の形態によれば、指定したタスクに関連する前タスク及び後タスクを検索して抽出し、抽出した前タスク及び後タスクをタスクと関連付けて表示する。また、各タスクに関する属性についても同時に表示する。   As described above, according to the first embodiment of the present invention, the previous task and the subsequent task related to the specified task are searched and extracted, and the extracted previous task and the subsequent task are displayed in association with the task. . In addition, attributes related to each task are displayed at the same time.

このように、指定されたタスクと依存関係を有するタスクが時系列で表示されることで、工程管理者であるプロジェクトの管理者は各タスクの関連を容易に把握することが出来る。具体的に、プロジェクトに関するすべてのタスクの依存関係ではなく、指定されたタスクに関連するタスクがフィルタリングされて表示されることにより、管理者は、把握したいタスクの依存関係を一目で理解することができる。また、各タスクの依存関係とともに各タスクの担当者や実行の予定日等のタスクの属性情報等が表示されることにより、管理者は、担当者等に対する指示などの管理が容易になる。   In this way, tasks having a dependency relationship with the designated task are displayed in time series, so that the project manager who is the process manager can easily grasp the relationship between the tasks. Specifically, by displaying the tasks related to the specified task instead of the dependencies of all tasks related to the project, the administrator can understand the dependencies of the task to be grasped at a glance. it can. Further, by displaying the task attribute information and the like such as the person in charge of each task and the scheduled execution date together with the dependency relationship of each task, the manager can easily manage the instructions to the person in charge.

加えて、担当者は、担当するタスクの前後関係を把握して前後のタスクの担当者と連携をとりながら作業を進めることができる。また、自己が担当するタスクのプロジェクトにおける位置付けを把握することにより、プロジェクトの実行に対するモチベーションを向上することが出来る。   In addition, the person in charge can grasp the context of the task in charge and proceed with the work in cooperation with the person in charge of the previous and subsequent tasks. In addition, it is possible to improve the motivation for the execution of the project by grasping the position of the task in charge of the project in the project.

また、プロジェクト管理データは図3に示したように、所定のタスク(タスク識別子)と所定のタスクの前タスク(前タスク識別子)とを関連付けるレコードを有している。図3に示すプロジェクト管理データは、所定のタスクの後タスクは関連付けていないが、前タスク識別子で特定されるタスクを「所定のタスク」と考えれば、タスク識別子で特定されるタスクを「所定のタスクの後タスク」として把握することが出来る。したがって、所定のタスクに前タスク及び後タスクの両方を関連付けることなく、所定のタスクに前タスクを関連付けるのみで、プロジェクトに含まれる全てのタスクの前後関係を把握することができる。   Further, as shown in FIG. 3, the project management data includes a record that associates a predetermined task (task identifier) with a previous task (previous task identifier) of the predetermined task. The project management data shown in FIG. 3 does not associate the task specified by the previous task identifier with the task identifier specified by the task identifier. It can be understood as “task after task”. Therefore, it is possible to grasp the context of all tasks included in the project only by associating the previous task with the predetermined task without associating both the previous task and the subsequent task with the predetermined task.

なお、本発明の最良の実施の形態に係るタスク表示装置1は、図1に示すように1台のコンピュータにおいて実行されても良いし、互いに通信可能な複数のコンピュータにおいて実行されても良い。例えば、タスク表示装置1は、記憶装置107を外部に設ける構成や、記憶装置107の一部のデータのみを外部に設ける構成であっても良い。   The task display device 1 according to the preferred embodiment of the present invention may be executed by one computer as shown in FIG. 1 or may be executed by a plurality of computers that can communicate with each other. For example, the task display device 1 may have a configuration in which the storage device 107 is provided outside or a configuration in which only a part of the data in the storage device 107 is provided outside.

また、上述した説明においては、プロジェクト計画を対象として説明するが、本発明の実施の形態のタスク表示装置1で対象とするプロジェクトとは、計画業務の対象を広くとらえ、プロジェクト計画の他に生産計画や運用計画などのあらゆる工程管理が含められる。そのため、リソースをタスクの実行を担当する担当者の他に、タスクを実行する機器等とした場合にも利用することが出来る。   In the above description, the project plan is described as an object. However, the project that is the object of the task display device 1 according to the embodiment of the present invention broadly covers the object of the planning work, and is produced in addition to the project plan. All process management such as planning and operation planning are included. For this reason, the resource can be used not only for the person in charge of executing the task but also for a device that executes the task.

(第1の実施の形態の変形例1)
第1の実施の形態の変形例1に係るタスク表示装置として、図3に示したプロジェクト管理データ16に替えて、図7に示す形式のプロジェクト管理データ16aを記憶しても良い。図7に示すプロジェクト管理データ16aは、タスク名にタスクの属性及び後タスク名が関連付けられるプロジェクト管理データ16aの一例であり、タスク名、リソース名、開始予定日、終了予定日及び後タスク名が関連付けられるレコードを有している。「後タスク名」は、後タスクを識別する。「タスク名」、「リソース名」、「開始予定日」及び「終了予定日」は上述した図3の場合と同様であるため説明を省略する。図7に示すプロジェクト管理データ16aは、図3に示すプロジェクト管理データ16と比較して「前タスク名」に替えて「後タスク名」を関連付けているが、プロジェクトに関するタスクの依存関係については同一である。
(Modification 1 of the first embodiment)
As a task display device according to the first modification of the first embodiment, project management data 16a in the format shown in FIG. 7 may be stored instead of the project management data 16 shown in FIG. The project management data 16a shown in FIG. 7 is an example of the project management data 16a in which a task attribute and a subsequent task name are associated with a task name. The task name, resource name, scheduled start date, scheduled end date, and subsequent task name are Has an associated record. The “post task name” identifies the post task. Since “task name”, “resource name”, “scheduled start date”, and “scheduled end date” are the same as those in FIG. The project management data 16a shown in FIG. 7 is associated with the “following task name” in place of the “previous task name” as compared with the project management data 16 shown in FIG. It is.

図7では、「タスク1」は、担当者Aにより2005年4月1日に開始され、2005年4月2日に終了する予定を示している。この「タスク1」の後タスクは「タスク3」であり、「タスク3」は、「タスク1」が終了した後に開始することを示している。また図7では、「タスク6」は、担当者Cにより2005年4月8日に開始され、2005年4月9日に終了する予定を示している。この「タスク6」の後タスクは「NULL」であり、「タスク6」には後タスクが存在しないことを意味している。   In FIG. 7, “Task 1” indicates that the person in charge A starts on April 1, 2005 and ends on April 2, 2005. The post-task of “task 1” is “task 3”, and “task 3” indicates that “task 1” starts after “task 1” ends. In FIG. 7, “task 6” is scheduled to start on April 8, 2005 by the person in charge C and end on April 9, 2005. The subsequent task of “task 6” is “NULL”, which means that there is no subsequent task in “task 6”.

図7に示すようなタスクと当該タスクの後タスクが関連付けられるプロジェクト管理データ16aを利用する場合、前タスク検索部11は、プロジェクト管理データ16aから、後タスク名に関連付けられるタスク名を検索することによって、所定のタスクの前タスクを検索する。例えば、前タスク検索部11は、ステップS001で「タスク3」が選択されるとプロジェクト管理データ16aの後タスク名が「タスク3」であるレコードを抽出するとともに、抽出したレコードのタスク名である「タスク1」を前タスクとする。   When using the project management data 16a in which the task and the subsequent task of the task are associated as shown in FIG. 7, the previous task search unit 11 searches the project management data 16a for the task name associated with the subsequent task name. The previous task of a predetermined task is searched by. For example, when “task 3” is selected in step S001, the previous task search unit 11 extracts a record whose task name is “task 3” after the project management data 16a, and the task name of the extracted record. “Task 1” is the previous task.

また、後タスク検索部12は、プロジェクト管理データ16aから、所定の後タスク名に関連付けられるタスク名を検索することによって、所定のタスクの前タスクを検索する。例えばステップS001で「タスク3」が選択されると、プロジェクト管理データ16aのタスク名が「タスク3」であるレコードを検索し、検索されたレコードの後タスク名である「タスク7」を後タスクとする。   Further, the post-task search unit 12 searches the task management data 16a for a task before the predetermined task by searching for a task name associated with the predetermined post-task name. For example, when “task 3” is selected in step S001, a record whose task name is “task 3” in the project management data 16a is searched, and “task 7” which is a task name after the searched record is searched as a post task. And

この第1の実施の形態の変形例1に係るタスク表示装置によっても、上述した第1の実施の形態に係るタスク表示装置と同様の効果を得ることができる。   Also by the task display device according to the first modification of the first embodiment, the same effect as that of the task display device according to the first embodiment described above can be obtained.

(第1の実施の形態の変形例2)
第1の実施の形態の変形例2に係るタスク表示装置として、図3に示したプロジェクト管理データ16に替えて、図8に示す形式のプロジェクト管理データ16bを記憶しても良い。具体的に、図8に示すプロジェクト管理データ16bは、図8(a)に示すタスクの属性に関するレコードを有するタスクデータ16b1と図8(b)に示すタスクの依存関係に関するレコードを有する依存データ16b2とにより構成される。図8(a)に示す例においてタスクデータ16b1は、タスク名、リソース名、開始予定日及び終了予定日が関連付けられるレコードを有している。また、図8(b)に示す例において依存データ16b2は、タスク名に後タスク名が関連付けられるレコードを有している。「タスク名」、「リソース名」、「開始予定日」、「終了予定日」及び「後タスク名」は上述した図3の場合と同様であるため説明を省略する。また、図8に示すプロジェクト管理データ16bで記憶しているプロジェクトに関するタスクの依存関係については、図3に示した例と同一である。
(Modification 2 of the first embodiment)
As a task display device according to the second modification of the first embodiment, project management data 16b in the format shown in FIG. 8 may be stored instead of the project management data 16 shown in FIG. Specifically, project management data 16b shown in FIG. 8, dependent data having a record about the task dependencies shown in task data 16b 1 and FIG. 8 (b) with a record relating to attributes of the tasks shown in FIG. 8 (a) 16b 2 and the constructed. In the example shown in FIG. 8A, the task data 16b 1 has a record in which a task name, resource name, scheduled start date, and scheduled end date are associated. In the example shown in FIG. 8B, the dependency data 16b 2 has a record in which the task name is associated with the task name. The “task name”, “resource name”, “scheduled start date”, “scheduled end date”, and “subsequent task name” are the same as those in FIG. Further, the dependency relationship of the tasks related to the project stored in the project management data 16b shown in FIG. 8 is the same as the example shown in FIG.

図8に示すプロジェクト管理データ16bを利用する場合、前タスク検索部11は、ステップS001で選択されたタスクが依存データ16b2の後タスク名であるレコードを抽出するとともに、抽出したレコードのタスク名を前タスクとする。 When the project management data 16b shown in FIG. 8 is used, the pre-task search unit 11 extracts a record in which the task selected in step S001 is the post-task name of the dependency data 16b 2 and the task name of the extracted record Is the previous task.

また、後タスク検索部12は、ステップS001で選択されたタスクが依存データ16b2のタスク名であるレコードを抽出するとともに、抽出したレコードの後タスク名を後タスクとする。 The rear task searching unit 12, the task selected in step S001 extracts a the task name of the dependent data 16b 2 records, the task name after the extracted record and latter task.

なお、図8(b)に示す依存データ16b2では「タスク名」に「後タスク名」を関連付けているが、「後タスク名」に替えて「前タスク名」を関連付けても同様にタスクの依存関係を把握することが出来る。 In the dependency data 16b 2 shown in FIG. 8B, “task name” is associated with “following task name”. However, if “previous task name” is associated instead of “following task name”, the task is similarly performed. It is possible to grasp the dependency relationship.

この第1の実施の形態の変形例2に係るタスク表示装置によっても、上述した第1の実施の形態に係るタスク表示装置と同様の効果を得ることができる。   Also by the task display device according to the second modification of the first embodiment, the same effect as that of the task display device according to the first embodiment described above can be obtained.

(第2の実施の形態)
続いて、本発明の第2の実施の形態に係るタスク表示装置について説明する。第2の実施の形態に係るタスク表示装置1では、第1の実施の形態で上述したタスク表示装置1と比較して、複数のプロジェクトが関わるタスクについて検索することが出来る点で異なる。そのため、第2の実施の形態に係るタスク表示装置1の記憶装置107に記憶するプロジェクト管理データ16cは、図9に示すように、プロジェクト名、タスク名、リソース名、開始予定日、終了予定日、前プロジェクト名及び前タスク名が関連付けられるレコードを有している。「プロジェクト名」はタスクを作業工程として含むプロジェクトを識別する。また、「前プロジェクト名」は、前タスクを作業工程として含むプロジェクトを識別する。「タスク名」、「リソース名」、「開始予定日」、「終了予定日」及び「前プロジェクト名」については、第1の実施の形態と同様であるため、説明を省略する。
(Second Embodiment)
Subsequently, a task display device according to a second embodiment of the present invention will be described. The task display device 1 according to the second embodiment is different from the task display device 1 described in the first embodiment in that a task related to a plurality of projects can be searched. Therefore, the project management data 16c stored in the storage device 107 of the task display device 1 according to the second embodiment includes a project name, task name, resource name, scheduled start date, scheduled end date, as shown in FIG. , And a record in which the previous project name and the previous task name are associated with each other. “Project name” identifies a project including a task as a work process. The “previous project name” identifies a project including the previous task as a work process. Since “task name”, “resource name”, “scheduled start date”, “scheduled end date”, and “previous project name” are the same as those in the first embodiment, description thereof will be omitted.

また、その他において、第2の実施の形態に係るタスク表示装置の構成は、第1の実施の形態で上述したタスク表示装置と同一の構成であるため、説明を省略する。   In addition, since the configuration of the task display device according to the second embodiment is the same as that of the task display device described above in the first embodiment, description thereof is omitted.

図9では、「プロジェクト1」の「タスク3」は、担当者Cにより2005年4月6日に開始され、2005年4月8日に終了する予定を示している。この「プロジェクト1」の「タスク3」の前タスクは「プロジェクト1」の「タスク2」であり、プロジェクト1のタスク3は、プロジェクト1のタスク2が終了した後に開始することを示している。また、図9では、「プロジェクト1」の「タスク4」の前プロジェクトは「NULL」であって、前タスクは「NULL」であり、「タスク1」には前プロジェクト及び前タスクが存在しないことを意味している。このように、前プロジェクト及び前タスクが「NULL」である場合、タスクには前タスクが存在しない。さらに、図9に示す例において、「プロジェク1」の「タスク6」に関するレコードは、複数存在するが、これは「プロジェクト1」の「タスク1」は複数の前タスクが存在していることを示す。すなわち、「プロジェクト1」の「タスク6」を実行する前には、複数のタスクが終了されていることを要件とすることを示している。   FIG. 9 shows that “task 3” of “project 1” is scheduled to start on April 6, 2005 by the person in charge C and finish on April 8, 2005. The previous task of “task 3” of “project 1” is “task 2” of “project 1”, and task 3 of project 1 starts after task 2 of project 1 ends. In FIG. 9, the project before “task 4” of “project 1” is “NULL”, the previous task is “NULL”, and “task 1” has no previous project and no previous task. Means. Thus, when the previous project and the previous task are “NULL”, the task has no previous task. Furthermore, in the example shown in FIG. 9, there are a plurality of records related to “task 6” of “project 1”. This means that “task 1” of “project 1” has a plurality of previous tasks. Show. In other words, it indicates that it is a requirement that a plurality of tasks be completed before executing “task 6” of “project 1”.

図9に示すようなプロジェクト管理データ16cを利用する場合、前タスク検索部11は、プロジェクト管理データ16cからプロジェクト名及びタスク名が、ステップS001で選択されたプロジェクト及びタスクであるレコードを抽出するとともに、抽出した前プロジェクト名及び前タスク名を前プロジェクト及び前タスクとする。   When the project management data 16c as shown in FIG. 9 is used, the previous task search unit 11 extracts a record whose project name and task name are the project and task selected in step S001 from the project management data 16c. The extracted previous project name and previous task name are used as the previous project and previous task.

また、後タスク検索部12は、プロジェクト管理データ16cから前プロジェクト名及び前タスク名が、ステップS001で選択されたプロジェクト及びタスクであるレコードを抽出するとともに、抽出したレコードに含まれるプロジェクト名及びタスク名を後プロジェクト及び後タスクとする。   Further, the post-task search unit 12 extracts a record in which the previous project name and the previous task name are the project and task selected in step S001 from the project management data 16c, and the project name and task included in the extracted record. Name the post-project and post-task.

図10は、図9のプロジェクト管理データ16cで示したプロジェクトの工程計画を表示するガントチャートである。この図10に示すガントチャートでは、横方向に時間を表し、縦方向にプロジェクトとタスクの種類を表し、矢印を利用して各タスクの相関関係を表している。また、各タスク名にはリソース名としてタスクの担当者名が関連付けられている。この図10に示す従来から用いられるガントチャートでは、対象とするプロジェクトに含まれる全てのタスクを含んでおり、特定のタスクの相関関係を理解するためには、ユーザが前後のタスクをたどる手間が必要である。   FIG. 10 is a Gantt chart that displays the project process plan indicated by the project management data 16c of FIG. In the Gantt chart shown in FIG. 10, time is represented in the horizontal direction, project and task types are represented in the vertical direction, and correlations between the tasks are represented using arrows. Each task name is associated with the name of the person in charge of the task as a resource name. The conventional Gantt chart shown in FIG. 10 includes all the tasks included in the target project. In order to understand the correlation between specific tasks, the user has to follow the previous and subsequent tasks. is necessary.

図11に、第2の実施の形態における表示処理を説明するフローチャートを示す。図11に示すフローチャートは、図5に上述したフローチャートと比較してステップS004の前タスクの検索処理をS104に替え、さらに、ステップS006の後タスク検索処理をS106に替えた点で異なる。   FIG. 11 shows a flowchart for explaining display processing in the second embodiment. The flowchart shown in FIG. 11 is different from the flowchart shown in FIG. 5 in that the search process for the previous task in step S004 is changed to S104, and the post-task search process in step S006 is changed to S106.

第2の実施の形態に係るタスク表示装置では、基点となるプロジェクト及びタスクが選択され(S001)、読出部15がプロジェクト管理データ16cを読み出す(S002)。その後、前タスク検索部11は、前タスクの検索処理において、プロジェクト管理データ16cを参照しながらタスクが属するプロジェクトについても検索する。また検索したプロジェクトを前プロジェクトとして前タスクとともにメモリに記憶する(S104)。   In the task display device according to the second embodiment, a project and task as a base point are selected (S001), and the reading unit 15 reads the project management data 16c (S002). Thereafter, in the previous task search process, the previous task search unit 11 also searches for the project to which the task belongs while referring to the project management data 16c. The retrieved project is stored in the memory as a previous project together with the previous task (S104).

例えば、図9に示すプロジェクト管理データ16cを利用して、ステップS001で「プロジェクト2」の「タスク7」が選択された場合を例にして説明する。この場合、前タスク検索部11は、プロジェクト管理データ16cからプロジェクト名が「プロジェクト2」であり、タスク名が「タスク7」であるレコードを抽出するとともに、抽出したレコードの「前プロジェクト名」である「プロジェクト1」を1次前プロジェクトとし、「前タスク名」である「タスク4」を1次前タスクとする。また、前タスク検索部11は、同様に「プロジェクト1」及び「タスク5」を1次前プロジェクト及び1次前タスクとする。   For example, a case where “task 7” of “project 2” is selected in step S001 using the project management data 16c shown in FIG. 9 will be described as an example. In this case, the previous task search unit 11 extracts a record having the project name “project 2” and the task name “task 7” from the project management data 16c, and uses the “previous project name” of the extracted record. A certain “project 1” is a primary previous project, and “previous task name” “task 4” is a primary previous task. Similarly, the previous task search unit 11 sets “project 1” and “task 5” as the primary previous project and the primary previous task.

続いて、前タスク検索部11は、「プロジェクト1」の「タスク4」を基点として前プロジェクト及び前タスクを検索する。また、前タスク検索部11は、「プロジェクト1」の「タスク5」の前プロジェクト及び前タスクを検索する。しかし、図9に示すプロジェクト管理データ16cでは「プロジェクト1」の「タスク4」、及び、「プロジェクト1」の「タスク5」の前プロジェクト及び前タスクは存在しないため、「プロジェクト2」及び「タスク7」の2次前プロジェクト及び2次前タスクは存在しないとして、前タスク検索部11は、タスクの検索処理を終了する(S003,S104)。   Subsequently, the previous task search unit 11 searches the previous project and the previous task based on “task 4” of “project 1”. Further, the previous task search unit 11 searches for the previous project and the previous task of “task 5” of “project 1”. However, in the project management data 16c shown in FIG. 9, there is no previous project and previous task of “task 4” of “project 1” and “task 5” of “project 1”, so “project 2” and “task 7 ”, the previous task search unit 11 ends the task search process (S003, S104).

また、第2の実施の形態に係るタスク表示装置では、後タスク検索部12は、後タスクの検索処理において、プロジェクト管理データ16cを参照しながらタスクが属するプロジェクトについても検索する。また、検索したプロジェクトを後プロジェクトとして後タスクとともにメモリに記憶する(S106)。   In the task display device according to the second embodiment, the post-task search unit 12 also searches for a project to which the task belongs while referring to the project management data 16c in the post-task search process. Further, the retrieved project is stored in the memory together with the post task as a post project (S106).

例えば、図9に示すプロジェクト管理データ16cを利用して、ステップS001で「プロジェクト2」の「タスク7」が選択された場合について説明する。この場合、後タスク検索部12は、プロジェクト管理データ16cから前プロジェクト名が「プロジェクト2」であり前タスク名が「タスク7」であるレコードを抽出するとともに、抽出したレコードのプロジェクト名である「プロジェクト2」を1次後プロジェクトとし、このレコードのタスク名である「タスク8」を1次後タスクとする。また、後タスク検索部12は、「プロジェクト3」の「タスク10」についても、「プロジェクト2」の「タスク7」に続くタスクであり、1次後プロジェクト及び1次後タスクとする。   For example, a case where “task 7” of “project 2” is selected in step S001 using the project management data 16c shown in FIG. 9 will be described. In this case, the post-task search unit 12 extracts a record in which the previous project name is “project 2” and the previous task name is “task 7” from the project management data 16c, and is the project name of the extracted record “ “Project 2” is the primary post-project, and “task 8” which is the task name of this record is the primary post-task. Further, the post-task search unit 12 also sets “task 10” of “project 3” as a task following “task 7” of “project 2”, and designates a primary post-project and a primary post-task.

続いて、後タスク検索部12は、「プロジェクト2」の「タスク8」の後プロジェクト(2次後プロジェクト)及び後タスク(2次後タスク)として「プロジェクト2」の「タスク9」を検索する。また、「プロジェクト2」の「タスク9」の後プロジェクト(2次後プロジェクト)及び後タスク(2次後タスク)は検索されない。2次後プロジェクト及び2次後タスクである「プロジェクト2」の「タスク9」の後プロジェクト及び後タスクは存在しないため、後タスク検索部12は、「プロジェクト2」及び「タスク7」の3次後プロジェクト及び第3次後タスクは存在しないとして、後タスクの検索処理は終了する(S005,S106)。   Subsequently, the post-task search unit 12 searches for “task 9” of “project 2” as the post-project (secondary post-project) and post-task (secondary post-task) of “task 8” of “project 2”. . Also, the post-project (secondary post-project) and post-task (secondary post-task) of “task 9” of “project 2” are not searched. Since the post-project and the post-task of “task 9” of “project 2” which is the secondary post-project and secondary post-task do not exist, the post-task search unit 12 performs the tertiary of “project 2” and “task 7”. The post-task search processing ends (S005, S106), assuming that there are no post-projects and tertiary post-tasks.

その後、表示制御部13は、検索されてメモリに記憶された前プロジェクト及び前タスクと、後プロジェクト及び後タスクとを関連付けて表示画面を生成し(S007)、生成した表示画面を表示装置105に表示する(S008)。   Thereafter, the display control unit 13 generates a display screen by associating the previous project and the previous task, which are retrieved and stored in the memory, with the subsequent project and the subsequent task (S007), and displays the generated display screen on the display device 105. Displayed (S008).

図12に、第2の実施の形態において表示処理で表示される表示画面200aの一例を示す。図7に示す表示画面200aは、「プロジェクト2」の「タスク7」の依存関係を表示している。具体的に「タスク7」に前タスクである「タスク4」及び「タスク5」がリンクされるとともに、後タスクである「タスク8」及び「タスク9」がリンクされる。表示画面200aは、図12に示すようにタスクの依存関係とともにタスクに関する属性であるプロジェクト名やタスクを担当するリソース名、タスクの開始予定日及び終了予定日等を含む例に限られず、入力装置104を介して選択されたタスクの依存関係や属性をポップアップ等で表示してもよい。   FIG. 12 shows an example of a display screen 200a displayed in the display process in the second embodiment. The display screen 200a illustrated in FIG. 7 displays the dependency relationship of “task 7” of “project 2”. Specifically, “task 4” and “task 5” as previous tasks are linked to “task 7”, and “task 8” and “task 9” as subsequent tasks are linked. The display screen 200a is not limited to an example including a task name, a resource name in charge of a task, a scheduled task start date, a scheduled task end date, and the like, as well as task dependency relationships, as shown in FIG. The dependency relationship or attribute of the task selected via 104 may be displayed in a pop-up or the like.

なお、図9で上述したプロジェクト管理データ16cではプロジェクト名及びタスク名に「前プロジェクト名」及び「前タスク名」を関連付けているが、「前プロジェクト名」及び「前タスク名」に替えて、「後プロジェクト名」及び「後タスク名」を関連付けていても同様にタスクの依存関係を把握することが出来る。   In the project management data 16c described above with reference to FIG. 9, the “previous project name” and “previous task name” are associated with the project name and task name, but instead of the “previous project name” and “previous task name”, Even if “post project name” and “post task name” are associated with each other, it is possible to grasp the dependency relationship between tasks.

上述したように、本発明の第2の実施の形態によれば、指定された所定のタスクに関連する複数のプロジェクト間にわたる前タスク及び後タスクを検索して抽出し、抽出した前タスク及び後タスクを指定された所定のタスクと関連付けて表示する。また、複数のプロジェクト間にわたる各タスクに関する属性についても同時に表示する。このように、指定されたタスクと依存関係を有するタスクについて、複数のプロジェクトにわたる場合であっても時系列で表示されることで、プロジェクトの管理者は複数のプロジェクトが複雑に関連する場合であっても、複数のプロジェクト間にわたる各タスクの関連について容易に把握することが出来る。また、担当者は、担当するタスクの前後関係を複数のプロジェクト間にわたり把握して前後のタスクの担当者と連携をとることが出来るとともにプロジェクトの遂行へのモチベーションを向上することが出来る。   As described above, according to the second embodiment of the present invention, the previous task and the subsequent task across a plurality of projects related to the specified predetermined task are searched and extracted, and the extracted previous task and the subsequent task are extracted. Display a task in association with a specified task. In addition, attributes for each task across multiple projects are also displayed. In this way, tasks that have a dependency relationship with the specified task are displayed in chronological order even when they span multiple projects, allowing the project administrator to manage multiple projects in a complex manner. However, it is possible to easily grasp the relationship between tasks across multiple projects. In addition, the person in charge can grasp the context of the task in charge over a plurality of projects and can coordinate with the person in charge of the previous and subsequent tasks, and can improve the motivation for executing the project.

また、プロジェクト管理データは図9に示したように、所定のプロジェクト(プロジェクト識別子)及び所定のタスク(タスク識別子)と前プロジェクト(前プロジェクト識別子)及び前タスク(前タスク識別子)とを関連付けるレコードを有している。このように、図9に示すプロジェクト管理データでは、所定のタスクの後プロジェクト及び後タスクは関連付けていない。しかし、前プロジェクト識別子で特定されるプロジェクトを「所定のプロジェクト」とし、前タスク識別子で特定されるタスクを「所定のタスク」と考えれば、プロジェクト識別子で特定されるプロジェクトを「所定のプロジェクトの後プロジェクト」とし、タスク識別子で特定されるタスクを「所定のタスクの後タスク」と把握することが出来る。したがって、所定のタスクに前プロジェクト及び後プロジェクトと、前タスク及び後タスクの両方を関連付けることなく、前プロジェクト及び前タスクを関連付けるのみで、全てのプロジェクト及びタスクの前後関係を把握することができる。   Further, as shown in FIG. 9, the project management data includes a record that associates a predetermined project (project identifier) and a predetermined task (task identifier) with a previous project (previous project identifier) and a previous task (previous task identifier). Have. As described above, the project management data shown in FIG. 9 does not relate the post-project and the post-task of the predetermined task. However, assuming that the project specified by the previous project identifier is “predetermined project” and the task specified by the previous task identifier is “predetermined task”, the project specified by the project identifier is “after the predetermined project”. The task specified by the task identifier can be grasped as “the task after the predetermined task”. Therefore, it is possible to grasp the context of all projects and tasks only by associating the previous project and the previous task without associating both the previous project and the subsequent task with the predetermined task.

(第2の実施の形態の変形例)
第2の実施の形態の変形例に係るタスク表示装置として、図9に示したプロジェクト管理データ16cに替えて、図13に示すプロジェクト管理データ16dを記憶してもよい。具体的に、図13に示すプロジェクト管理データ16dは、図13(a)に示すタスクの属性に関するレコードを有するタスクデータ16d1と図13(b)に示すタスクの依存関係に関するレコードを有する依存データ16d2とにより構成される。図13(a)に示すタスクデータ16d1は、プロジェクト名、タスク名、リソース名、開始予定日及び終了予定日が関連付けられたレコードを有している。また、図13(b)に示す依存データ16d2は、プロジェクト名、タスク名、前プロジェクト名及び前タスク名を有している。「プロジェクト名」、「タスク名」、「リソース名」、「開始予定日」、「終了予定日」、「前プロジェクト名」及び「前タスク名」は上述した図9の場合と同様であるため説明を省略する。また、図13に示すプロジェクト管理データ16dで記憶しているプロジェクトに関するタスクの依存関係については、図9に示した例と同一である。
(Modification of the second embodiment)
As a task display device according to a modification of the second embodiment, project management data 16d shown in FIG. 13 may be stored instead of the project management data 16c shown in FIG. Specifically, project management data 16d shown in FIG. 13, dependent data having a record about the task dependencies shown in task data 16d 1 and FIG. 13 (b) with a record relating to attributes of the task shown in FIG. 13 (a) 16d 2 and the constructed. The task data 16d 1 shown in FIG. 13A has a record in which a project name, task name, resource name, scheduled start date, and scheduled end date are associated. The dependency data 16d 2 shown in FIG. 13B has a project name, a task name, a previous project name, and a previous task name. Since “project name”, “task name”, “resource name”, “scheduled start date”, “scheduled end date”, “previous project name” and “previous task name” are the same as those in FIG. Description is omitted. Further, the dependency relation of the tasks related to the project stored in the project management data 16d shown in FIG. 13 is the same as the example shown in FIG.

図13に示すプロジェクト管理データ16bを利用する場合、前タスク検索部11は、ステップS001で選択したタスクが依存データ16b2のタスク名であるレコードを抽出するとともに、抽出したレコードの前プロジェクト名及び前タスク名を前プロジェクト及び前タスクとする。 When using the project management data 16b shown in FIG. 13, prior to the task retrieval unit 11, together with the selected task extracts records the task name of dependent data 16b 2 at step S001, before the project name of the extracted record and The previous task name is the previous project and the previous task.

また、図13に示すプロジェクト管理データ16bを利用する場合、後タスク検索部12は、ステップS001で選択されたタスクが依存データ16b2の前タスク名であるレコードを抽出するとともに、抽出したレコードのプロジェクト名及びタスク名を後プロジェクト及び後タスクとする。 When the project management data 16b shown in FIG. 13 is used, the post-task search unit 12 extracts a record in which the task selected in step S001 is the previous task name of the dependency data 16b 2 and the extracted record Let the project name and task name be the post-project and post-task.

なお、図13に示す依存データ16d2ではプロジェクト名及びタスク名に「前プロジェクト名」及び「前タスク名」を関連付けているが、「前プロジェクト名」及び「前タスク名」に替えて、「後プロジェクト名」及び「後タスク名」を関連付けても同様にタスクの依存関係を把握することが出来る。 In the dependency data 16d 2 shown in FIG. 13, “previous project name” and “previous task name” are associated with the project name and task name, but instead of “previous project name” and “previous task name”, “ The task dependency can be grasped in the same manner by associating the “post project name” and the “post task name”.

この第2の実施の形態の変形例に係るタスク表示装置によっても、上述した第2の実施の形態に係るタスク表示装置と同様の効果を得ることができる。   Also by the task display device according to the modification of the second embodiment, the same effect as that of the task display device according to the second embodiment described above can be obtained.

(第3の実施の形態)
続いて、第3の実施の形態に係るタスク表示装置について説明する。
図14は、第3の実施の形態に係るタスク表示装置1aを説明するブロック図である。第3の実施の形態に係るタスク表示装置1aは、図1を用いて上述した第1の実施の形態のタスク表示装置1と比較して、検索回数設定部17を有している点で異なる。検索回数設定部17は、前タスク検索部11で検索する前タスクの数及び後タスク検索部12で検索する後タスクの数を制限する。その他において、第3の実施の形態に係るタスク表示装置の構成は、第1の実施の形態で上述したタスク表示装置1と同一の構成であるため、各構成についての説明を省略する。
(Third embodiment)
Next, a task display device according to the third embodiment will be described.
FIG. 14 is a block diagram illustrating a task display device 1a according to the third embodiment. The task display device 1a according to the third embodiment is different from the task display device 1 according to the first embodiment described above with reference to FIG. 1 in that a search number setting unit 17 is provided. . The search count setting unit 17 limits the number of previous tasks searched by the previous task search unit 11 and the number of subsequent tasks searched by the subsequent task search unit 12. In other respects, the configuration of the task display device according to the third embodiment is the same as that of the task display device 1 described above in the first embodiment, and thus the description of each configuration is omitted.

図15に、第3の実施の形態に係るタスク表示装置における表示処理を説明するフローチャートを示す。
図15に示すフローチャートは、図6に上述したフローチャートと比較してステップS003をS203に替え、ステップS005をS205に替えた点で異なる。
FIG. 15 is a flowchart for explaining display processing in the task display device according to the third embodiment.
The flowchart shown in FIG. 15 differs from the flowchart shown in FIG. 6 in that step S003 is replaced with S203 and step S005 is replaced with S205.

第3の実施の形態に係るタスク表示装置1aの検索回数設定部17は、前タスク検索部11が前タスクを検索する際、前のタスクを検索する場合の検索回数を任意に設定する。また、検索回数設定部17は、後タスク検索部12が後タスクを検索する際、後のタスクを検索する場合の検索回数を任意に設定する。ここで、前タスクと後タスクを検索させる際に設定する数は異なる数で設定することも可能である。また、検索するタスクの数の設定は、例えば、入力装置104を介した入力により、ユーザにより設定される。   The search count setting unit 17 of the task display device 1a according to the third embodiment arbitrarily sets the search count when searching for the previous task when the previous task search unit 11 searches for the previous task. The search count setting unit 17 arbitrarily sets the search count when searching for a subsequent task when the post task search unit 12 searches for the post task. Here, it is possible to set different numbers for searching the previous task and the subsequent task. Further, the setting of the number of tasks to be searched is set by the user, for example, by an input via the input device 104.

したがって、前タスク検索部11は、前タスクの検索の処理を指定された回数繰り返す。例えば、検索回数設定部17に3世代前のタスク(3次前タスク)まで検索するように設定した場合、前タスク検索部11で3世代前のタスク(3次前タスク)が検索されるとステップS004の前タスクの検索の処理は終了する。   Therefore, the previous task search unit 11 repeats the previous task search process a specified number of times. For example, if the search count setting unit 17 is set to search for tasks up to three generations before (third previous task), the previous task search unit 11 searches for a task three generations before (third previous task). The previous task search process in step S004 ends.

また、後タスク検索部12は、後タスクの検索の処理を指定された回数繰り返す。例えば、検索回数設定部17に4世代後のタスク(4次後タスク)までを検索するように設定した場合、後タスク検索部12で4世代後のタスク(4次後タスク)が検索されるとステップS006の後タスクの検索の処理は終了する。   Further, the post-task search unit 12 repeats the post-task search process a specified number of times. For example, if the search count setting unit 17 is set to search up to a task after the fourth generation (fourth post task), the post task generation unit 12 searches for a task after the fourth generation (fourth post task). After step S006, the task search process ends.

たとえば、一つのプロジェクトが数年をかけて遂行される場合もある。このような大きなプロジェクトの場合、プロジェクトを構成するタスクの数も膨大なものである。このような膨大なプロジェクトの場合、数年前の前タスクが検索されて抽出されても、すでにタスクが終了して数年も経過していることも考えられる。しかし、このように古い前タスクの情報については、不要であることもある。したがって、この第3の実施の形態に係るタスク表示装置は、所定数前のタスク及び所定数後のタスクのみを検索して抽出することができる。   For example, a project may be carried out over several years. In such a large project, the number of tasks constituting the project is enormous. In the case of such an enormous project, even if a previous task several years ago is searched and extracted, it is considered that the task has already ended and several years have passed. However, information about the old previous task may be unnecessary. Therefore, the task display device according to the third embodiment can search and extract only a predetermined number of previous tasks and a predetermined number of subsequent tasks.

このようにタスクの抽出に数の制限をするにより、膨大な数のタスクにより形成されるプロジェクトの場合、関連する直近の所定の前タスク及び後タスクのみが検索され、関係の遠いタスクまで検索される時間を省くことが可能になる。   In this way, by limiting the number of tasks to be extracted, in the case of a project formed by a huge number of tasks, only the most recent related pre- and post-tasks are searched, and far-related tasks are searched. It is possible to save time.

上記のように、本発明の実施の形態によって記載したが、この開示の一部をなす論述及び図面はこの発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施の形態、実施例及び運用技術が明らかとなる。   As described above, the embodiments of the present invention have been described. However, it should not be understood that the descriptions and drawings constituting a part of this disclosure limit the present invention. From this disclosure, various alternative embodiments, examples, and operational techniques will be apparent to those skilled in the art.

本発明はここでは記載していない様々な実施の形態等を含むことは勿論である。従って、本発明の技術的範囲は上記の説明に記載した事項と自明な特許請求の範囲に係る発明特定事項によってのみ定められるものである。   It goes without saying that the present invention includes various embodiments not described herein. Therefore, the technical scope of the present invention is defined only by the matters described in the above description and the invention specific matters according to the obvious claims.

本発明の第1の実施の形態に係るタスク表示装置のブロック構成図。The block block diagram of the task display apparatus which concerns on the 1st Embodiment of this invention. 本発明の第1の実施の形態に係るタスク表示装置のハードウェア構成図。The hardware block diagram of the task display apparatus which concerns on the 1st Embodiment of this invention. 本発明の第1の実施の形態に係るタスク表示装置に記憶されるプロジェクト管理データの一例。An example of the project management data memorize | stored in the task display apparatus which concerns on the 1st Embodiment of this invention. 図3に示したプロジェクト管理データのプロジェクトについてタスクの状態を示すガントチャートに各タスクの依存関係を矢印で示した図。The figure which showed the dependence of each task with the arrow on the Gantt chart which shows the state of a task about the project of the project management data shown in FIG. 本発明の第1の実施の形態に係るタスク表示装置におけるタスク表示処理を説明するフローチャート。The flowchart explaining the task display process in the task display apparatus which concerns on the 1st Embodiment of this invention. 本発明の第1の実施の形態に係るタスク表示装置で表示される表示画面の一例。An example of the display screen displayed with the task display apparatus which concerns on the 1st Embodiment of this invention. 本発明の第1の実施の形態の変形例に係るタスク表示装置に記憶されるプロジェクト管理データの一例。An example of the project management data memorize | stored in the task display apparatus which concerns on the modification of the 1st Embodiment of this invention. 本発明の第1の実施の形態の変形例に係るタスク表示装置に記憶されるプロジェクト管理データの他の例。The other example of the project management data memorize | stored in the task display apparatus which concerns on the modification of the 1st Embodiment of this invention. 本発明の第2の実施の形態に係るタスク表示装置に記憶されるプロジェクト管理データの一例。An example of the project management data memorize | stored in the task display apparatus which concerns on the 2nd Embodiment of this invention. 図9に示したプロジェクト管理データのプロジェクトについてタスクの状態を示すガントチャートに各タスクの依存関係を矢印で示した図。The figure which showed the dependence of each task with the arrow on the Gantt chart which shows the state of a task about the project of the project management data shown in FIG. 本発明の第2の実施の形態に係るタスク表示処理を説明するフローチャート。The flowchart explaining the task display process which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施の形態に係るタスク表示処理の表示の一例。An example of the display of the task display process which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施の形態の変形例に係るタスク表示装置に記憶されるプロジェクト管理データの一例。An example of the project management data memorize | stored in the task display apparatus which concerns on the modification of the 2nd Embodiment of this invention. 本発明の第3の実施の形態に係るタスク表示装置のブロック構成図。The block block diagram of the task display apparatus which concerns on the 3rd Embodiment of this invention. 本発明の第3の実施の形態に係るタスク表示処理を説明するフローチャート。The flowchart explaining the task display process which concerns on the 3rd Embodiment of this invention. 従来のタスク表示処理の表示の一例。An example of the display of the conventional task display process.

符号の説明Explanation of symbols

1…タスク表示装置
11…前タスク検索部
12…後タスク検索部
13…表示制御部
14…プロジェクト管理データ記憶処理部
15…読出部
16〜16d…プロジェクト管理データ
16b1,16d1…タスクデータ
16b2,16d2…依存データ
17…検索回数設定部
101…中央処理制御装置
102…ROM
103…RAM
104…入力装置
105…表示装置
106…通信制御装置
107…記憶装置
108…リムーバブルディスク
109…入出力インタフェース
110…バス
200…表示画面
1 ... task display device 11 ... Previous task search unit 12 ... rear task search unit 13 ... display control unit 14 ... project management data storage unit 15 ... reading unit 16~16D ... project management data 16b 1, 16d 1 ... task data 16b 2 , 16 d 2, dependent data 17, search frequency setting unit 101, central processing control device 102, ROM
103 ... RAM
104 ... Input device 105 ... Display device 106 ... Communication control device 107 ... Storage device 108 ... Removable disk 109 ... Input / output interface 110 ... Bus 200 ... Display screen

Claims (9)

複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示装置であって、
前記所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理部と、
前記記憶装置から、前記タスク識別子をキーに、当該タスク識別子に関連づけられる前タスク識別子を検索する前タスク検索部と、
前記記憶装置から、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索部と、
前記検索された前タスク及び後タスクを前記所定のタスクに関連付け表示する表示制御部と、
を有することを特徴とするタスク表示装置。
In managing projects that include multiple tasks, a task display that associates and displays a predetermined task, a pre-task that is executed before execution of the predetermined task, and a post-task that is executed after execution of the predetermined task A device,
A project management data storage processing unit for storing, in a storage device, a task identifier for identifying the predetermined task and the previous task, respectively, and project management data associated with the previous task identifier;
A previous task search unit for searching for a previous task identifier associated with the task identifier from the storage device, using the task identifier as a key;
A post-task search unit for searching a task identifier associated with the previous task identifier as a post-task of the predetermined task from the storage device, using a pre-task identifier for identifying the predetermined task as a key;
A display control unit for displaying the retrieved previous task and subsequent task in association with the predetermined task;
A task display device comprising:
複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示装置であって、
プロジェクトを識別するプロジェクト識別子、前記プロジェクトを構成するタスクを識別するタスク識別子、当該前タスクを識別する前タスク識別子及び当該前タスクを含むプロジェクトを識別する前プロジェクト識別子が関連付けられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理部と、
前記記憶装置から、前記プロジェクト識別子及びタスク識別子に関連付けられる前プロジェクト識別子及び前タスク識別子を検索する前タスク検索部と、
前記記憶装置から、前プロジェクト識別子及び前タスク識別子に関連付けられるプロジェクト識別子及びタスク識別子を後プロジェクト及び後タスクとして検索する後タスク検索部と、
前記検索された前プロジェクト及び前タスク、並びに前記検索された後プロジェクト及び後タスクを前記所定のタスクに関連付け表示する表示制御部と、
を有することを特徴とするタスク表示装置。
In managing projects that include multiple tasks, a task display that associates and displays a predetermined task, a pre-task that is executed before execution of the predetermined task, and a post-task that is executed after execution of the predetermined task A device,
A project identifier for identifying a project, a task identifier for identifying a task constituting the project, a previous task identifier for identifying the previous task, and project management data associated with the previous project identifier for identifying the project including the previous task are stored. A project management data storage processing unit stored in the apparatus;
A previous task search unit for searching a previous project identifier and a previous task identifier associated with the project identifier and the task identifier from the storage device;
A post-task search unit that searches the storage device for a project identifier and a task identifier associated with the previous project identifier and the previous task identifier as a post-project and a post-task,
A display control unit for displaying the searched previous project and previous task, and the searched post project and subsequent task in association with the predetermined task;
A task display device comprising:
前記前タスク検索部は、前記検索された前タスクについて、当該前タスクに対する前タスクを検索することを特徴とする請求項1又は2のいずれか1項記載のタスク表示装置。   The task display device according to claim 1, wherein the previous task search unit searches for a previous task for the previous task with respect to the searched previous task. 前記後タスク検索部は、前記検索された後タスクについて、当該後タスクに対する後タスクを検索することを特徴とする請求項1又は2のいずれか1項記載のタスク表示装置。   The task display device according to claim 1, wherein the post-task search unit searches for a post-task for the post-task with respect to the searched post-task. 前記前タスク検索部による検索回数を設定する前検索回数設定部を有することを特徴とする請求項3記載のタスク表示装置。   The task display device according to claim 3, further comprising a previous search number setting unit configured to set the number of searches performed by the previous task search unit. 前記後タスク検索部による検索回数を設定する後検索回数設定部を有することを特徴とする請求項4記載のタスク表示装置。   5. The task display device according to claim 4, further comprising a post-search number setting unit for setting the number of searches by the post-task search unit. 前記プロジェクト管理データは、前記タスク識別子に前記タスクの属性情報を関連付け、
前記表示制御部は、前記タスクに前記タスクの属性情報を関連付けて表示することを特徴とする請求項1乃至6のいずれか1項記載のタスク表示装置。
The project management data associates attribute information of the task with the task identifier,
The task display device according to claim 1, wherein the display control unit displays attribute information of the task in association with the task.
複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示方法であって、
前記所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理ステップと、
前記記憶装置から、前記タスク識別子をキーに、当該タスク識別子に関連づけられる前記前タスク識別子を検索する前タスク検索ステップと、
前記記憶装置から、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索ステップと、
前記検索された前タスク及び後タスクを前記所定のタスクに関連付けて表示する表示制御ステップと、
を有することを特徴とするタスク表示方法。
In managing projects that include multiple tasks, a task display that associates and displays a predetermined task, a pre-task that is executed before execution of the predetermined task, and a post-task that is executed after execution of the predetermined task A method,
A project management data storage processing step for storing, in a storage device, a task identifier for identifying the predetermined task and the previous task, and project management data associated with the previous task identifier;
A previous task search step for searching the previous task identifier associated with the task identifier from the storage device using the task identifier as a key;
A post-task search step of searching the storage device for a task identifier associated with the pre-task identifier as a post-task of the predetermined task, using the pre-task identifier for identifying the pre-determined task as a key from the storage device;
A display control step of displaying the retrieved previous task and subsequent task in association with the predetermined task;
A task display method characterized by comprising:
複数のタスクを含むプロジェクトの管理において、所定のタスクと、当該所定のタスクの実行前に実行される前タスクと、当該所定のタスクの実行後に実行される後タスクとを関連付けて表示するタスク表示プログラムであって、
前記所定のタスク及び当該前タスクをそれぞれ識別するタスク識別子及び当該前タスク識別子が関連づけられたプロジェクト管理データを記憶装置に記憶するプロジェクト管理データ記憶処理ステップと、
前記記憶装置から、前記タスク識別子をキーに、当該タスク識別子に関連づけられる前記前タスク識別子を検索する前タスク検索ステップと、
前記記憶装置から、所定のタスクを識別する前タスク識別子をキーに、当該前タスク識別子に関連付けられるタスク識別子を当該所定のタスクの後タスクとして検索する後タスク検索ステップと、
前記検索された前タスク及び後タスクを前記所定のタスクに関連付けて表示させる表示制御ステップと、
をコンピュータに実行させることを特徴とするタスク表示プログラム。


In managing projects that include multiple tasks, a task display that associates and displays a predetermined task, a pre-task that is executed before execution of the predetermined task, and a post-task that is executed after execution of the predetermined task A program,
A project management data storage processing step for storing, in a storage device, a task identifier for identifying the predetermined task and the previous task, and project management data associated with the previous task identifier;
A previous task search step for searching the previous task identifier associated with the task identifier from the storage device using the task identifier as a key;
A post-task search step of searching the storage device for a task identifier associated with the pre-task identifier as a post-task of the predetermined task, using the pre-task identifier for identifying the pre-determined task as a key from the storage device;
A display control step for displaying the retrieved previous task and subsequent task in association with the predetermined task;
A task display program for causing a computer to execute.


JP2005360861A 2005-12-14 2005-12-14 Task display device, task display method, and task display program Pending JP2007164532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005360861A JP2007164532A (en) 2005-12-14 2005-12-14 Task display device, task display method, and task display program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005360861A JP2007164532A (en) 2005-12-14 2005-12-14 Task display device, task display method, and task display program

Publications (1)

Publication Number Publication Date
JP2007164532A true JP2007164532A (en) 2007-06-28

Family

ID=38247341

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005360861A Pending JP2007164532A (en) 2005-12-14 2005-12-14 Task display device, task display method, and task display program

Country Status (1)

Country Link
JP (1) JP2007164532A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016042245A (en) * 2014-08-14 2016-03-31 インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation System, method, and program for managing projects
JP2017058981A (en) * 2015-09-17 2017-03-23 カシオ計算機株式会社 Work management system and program
JP2017072927A (en) * 2015-10-06 2017-04-13 株式会社神戸製鋼所 Schedule correction support device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001309404A (en) * 2000-04-17 2001-11-02 Sony Corp Maintenance aid system for video processing unit
JP2003223486A (en) * 2002-01-30 2003-08-08 Fujitsu Ltd Process control system
JP2003288220A (en) * 2002-03-27 2003-10-10 Hitachi Software Eng Co Ltd Deriving jobnet related and adjacent to jobnet and method of displaying it
JP2004213447A (en) * 2003-01-07 2004-07-29 Mitsubishi Electric Corp Support device, support method and support program
JP2004287693A (en) * 2003-03-20 2004-10-14 Hitachi Ltd Core management process full-expansion type integrated production management method and system using management process matrix table

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001309404A (en) * 2000-04-17 2001-11-02 Sony Corp Maintenance aid system for video processing unit
JP2003223486A (en) * 2002-01-30 2003-08-08 Fujitsu Ltd Process control system
JP2003288220A (en) * 2002-03-27 2003-10-10 Hitachi Software Eng Co Ltd Deriving jobnet related and adjacent to jobnet and method of displaying it
JP2004213447A (en) * 2003-01-07 2004-07-29 Mitsubishi Electric Corp Support device, support method and support program
JP2004287693A (en) * 2003-03-20 2004-10-14 Hitachi Ltd Core management process full-expansion type integrated production management method and system using management process matrix table

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016042245A (en) * 2014-08-14 2016-03-31 インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation System, method, and program for managing projects
JP2017058981A (en) * 2015-09-17 2017-03-23 カシオ計算機株式会社 Work management system and program
JP2017072927A (en) * 2015-10-06 2017-04-13 株式会社神戸製鋼所 Schedule correction support device and method

Similar Documents

Publication Publication Date Title
US20080275850A1 (en) Image tag designating apparatus, image search apparatus, methods of controlling operation of same, and programs for controlling computers of same
US8548967B1 (en) System for visual query and manipulation of configuration management records
JPWO2002046921A1 (en) Sequence analysis method and sequence analysis device
CN100589063C (en) Accessible system event mechanism and method
JPH11232338A (en) Device and method for preparing process flow and computer readable recording medium for recording process flow preparation program
JPH0895767A (en) Program generating method using program component
US20130263143A1 (en) Information processing method and system
JP2007164532A (en) Task display device, task display method, and task display program
JPH11305998A (en) Computer system
JP5884925B2 (en) Management support apparatus, management support method, and management support program
JP4846736B2 (en) Parallel processing support device
JP2007026391A (en) Operation management rule diversion device, operation management rule diversion method and program
JP2006268334A (en) Project management system
JP3898485B2 (en) Drawing drawing display device, drawing drawing display method, and recording medium
JP5682452B2 (en) CHANGE MANAGEMENT SUPPORT DEVICE, CHANGE MANAGEMENT SUPPORT METHOD, AND CHANGE MANAGEMENT SUPPORT PROGRAM
JPH07141137A (en) Method for selecting menu
JP5074818B2 (en) Conference record management apparatus and method
JP2006344245A (en) Program recording medium and data processor
JP2008009966A (en) Device and method for setting business process
JP2005327023A (en) Retrieval system of full-text search using hit number expectancy
JP4207491B2 (en) Data file group management method and management system
JP2007080205A (en) Retrieval apparatus and retrieval method
JP2002073235A (en) Data processor and program recording medium
JP4185347B2 (en) Graphic information processing system, graphic information processing method, and program
WO2007072566A1 (en) Metadata retriever

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081002

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20110906