JP2003316415A - Production plan change support method and its system - Google Patents

Production plan change support method and its system

Info

Publication number
JP2003316415A
JP2003316415A JP2002118248A JP2002118248A JP2003316415A JP 2003316415 A JP2003316415 A JP 2003316415A JP 2002118248 A JP2002118248 A JP 2002118248A JP 2002118248 A JP2002118248 A JP 2002118248A JP 2003316415 A JP2003316415 A JP 2003316415A
Authority
JP
Japan
Prior art keywords
production
manufacturing
lot
plan
lots
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2002118248A
Other languages
Japanese (ja)
Inventor
Satoshi Fujii
聡 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2002118248A priority Critical patent/JP2003316415A/en
Publication of JP2003316415A publication Critical patent/JP2003316415A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a production plan change support method and its system which can cope with change of a plan at occurrence of abnormality and trouble and also can prepare a replan automatically. <P>SOLUTION: The system 10 which supports change of a production plan in case where a part of production facilities halt due to the occurrence of trouble or abnormality when a production line is automatically running based on the schedule data of the production plan prepared, in accordance with the demand for production of various kinds of products, is provided with a production lot classification means 6 to classify producible production lots based on a given evaluation conditions, a production lot display means 7 for displaying the classified production lots indicating the bases of the evaluation by every class, a production lot selection/edit means 8 for selecting the production lot desired to be incorporated in the replan from the production lots classified by evaluation conditions and for editing the production lot when the change of components in the production lot given in advance, and a schedule preparation means 9 for preparing the replan thereby. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、多品種の製造物を
複数の製造工程を経て自動的に生産している際に、生産
ラインや製造物にトラブルや異常が発生した場合に、ト
ラブルまたは異常発生時の製造物変更を施し、製造スケ
ジュールを再計画するための生産計画変更支援方法およ
びそのシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a trouble or abnormality occurring in a production line or a product during the automatic production of products of various kinds through a plurality of manufacturing processes. The present invention relates to a production plan change support method and system for changing a product when an abnormality occurs and replanning a production schedule.

【0002】[0002]

【従来の技術】製鋼生産計画は、生産性向上、製造コス
ト低減、高品質製品製造を実現するために、製造ロット
の納期、各プロセスでの処理の制約、製造ロットの鋼種
の成分・成分量に依存したプロセスの制約に基づいて、
熟練者が試行錯誤しながら処理のタイミングを決定す
る。すなわち、従来の生産計画では、計画策定の熟練者
が、計画策定上の制約条件を守りながら、納期を満足す
るように製造の順番を決定している。ところが、客先の
ニーズや高品質な製品の増加に伴い製造鋼種の種類が増
加し計画作成者の負荷が増大している。このため、計画
を策定する際に、様々な制約条件を満たすようにするこ
とに主に注意が向けられがちになることから、作成され
た計画の最適性が必ずしも十分であるとはいえなかっ
た。そこで、スケジュールデータに基づいて自動的に計
画を策定し、しかもその最適性を実現しようとする手法
が提案されている。
2. Description of the Related Art A steelmaking production plan is designed to improve productivity, reduce manufacturing costs, and manufacture high-quality products in order to achieve delivery of production lots, restrictions on processing in each process, and composition and amount of steel types in production lots. Based on process constraints that depend on
An expert determines the timing of processing by trial and error. That is, in the conventional production planning, a skilled person in planning determines the order of manufacturing so as to satisfy the delivery date while observing the constraint condition in planning. However, as the needs of customers and the number of high-quality products increase, the types of steel types manufactured increase, and the load on planners also increases. For this reason, it is not always possible to say that the optimality of the prepared plan is sufficient, because it is often the case that attention is paid to satisfying various constraints when formulating the plan. . Therefore, a method has been proposed in which a plan is automatically created based on schedule data and the optimality thereof is realized.

【0003】例えば、特開2000−315109号公
報では、製造設備、製造ロットの制約条件を満たすよう
に連々鋳セットの時刻情報を決定する製造スケジュール
が提案されている。また、他の例では、特開2000−
317777号公報において、製造上の制約条件ごとに
製造ロットをグループに分類し、製造上の制約条件を満
たしたグループの中から製造ロットを抽出して製造順序
を決定する製造スケジュールが提案されている。
For example, Japanese Unexamined Patent Publication No. 2000-315109 proposes a manufacturing schedule in which time information of casting sets is determined in succession so as to satisfy the constraint conditions of manufacturing equipment and manufacturing lot. In another example, Japanese Patent Laid-Open No. 2000-
In Japanese Patent No. 317777, a manufacturing schedule is proposed in which manufacturing lots are classified into groups according to manufacturing constraints, and manufacturing lots are extracted from groups satisfying the manufacturing constraints to determine a manufacturing order. .

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記の
従来技術は、通常の設備にトラブルがない状況下での操
業状態における自動的な計画策定の方法を提案している
ものである。したがって、計画された製造スケジュール
に基づいて操業している途中で、設備あるいは製造物の
異常やトラブル等が発生し、計画通りに操業できない状
況が発生した場合には、上記従来技術の方法では製造計
画変更に対処することはできず、異常やトラブル発生以
降の製造計画を自動的に策定することは不可能である。
すなわち、上記従来技術の方法では、一旦計画したスケ
ジュール内容を途中から変更して、それまでの実績と仕
掛材の計画修正後から連続して再度自動的に計画を作成
する機能は備わっていない。
However, the above-mentioned prior art proposes a method of automatic planning in an operating state under the condition that there is no trouble in normal equipment. Therefore, in the middle of operating according to the planned manufacturing schedule, if an abnormality or trouble of the equipment or the product occurs, and the situation that the operation cannot be performed as planned occurs, the manufacturing method according to the above-mentioned conventional technique is used. It is impossible to deal with the plan change, and it is impossible to automatically formulate the manufacturing plan after the occurrence of an abnormality or trouble.
In other words, the above-mentioned conventional method does not have a function of changing the contents of a schedule once planned from the middle, and automatically and continuously creating a plan again after the past results and the work-in-process plan are revised.

【0005】したがって、本発明の目的は、異常やトラ
ブル発生時の計画変更に対処するとともに、再計画を自
動的に作成することが可能な生産計画変更支援方法およ
びそのシステムを提供することを目的とする。
Therefore, an object of the present invention is to provide a production plan change support method and system capable of coping with a plan change when an abnormality or trouble occurs and automatically preparing a re-plan. And

【0006】[0006]

【課題を解決するための手段】本発明に係る生産計画変
更支援方法は、多品種の製造物の生産要望に応じて作成
された生産計画のスケジュールデータに基づいて生産ラ
インを自動的に稼働させている際に、トラブルまたは異
常の発生によって一部の製造設備が休止した場合の生産
計画の変更を支援する方法であって、与えられた評価条
件に基づいて製造可能な製造ロットを分類し、評価条件
ごとに分類された製造ロットの中から再計画に組み込み
たい製造ロットを選択し、また予め与えられた製造ロッ
ト内の構成要素の変更が必要な場合には製造ロットを編
集し、それによって再計画を作成することをコンピュー
タに実行させることを特徴とするものである。
A production plan change support method according to the present invention automatically operates a production line on the basis of schedule data of a production plan created in response to a production request of a wide variety of products. Is a method to support the change of production plan when some manufacturing equipment is shut down due to trouble or abnormality, and classifies the manufacturable lots based on the given evaluation conditions, From the production lots classified according to the evaluation conditions, select the production lot that you want to include in the re-planning, and edit the production lot if you need to change the components in the given production lot. It is characterized by causing a computer to execute a replan.

【0007】また、本発明の生産計画変更支援方法は、
分類された製造ロットを分類ごとに評価の根拠を示して
表示することを特徴とするものである。
The production plan change support method of the present invention is
The feature is that the classified production lots are displayed by showing the basis of evaluation for each classification.

【0008】また、上記生産計画変更支援方法を実施す
るための本発明の生産計画変更支援システムは、多品種
の製造物の生産要望に応じて作成された生産計画のスケ
ジュールデータに基づいて生産ラインを自動的に稼働さ
せている際に、トラブルまたは異常の発生によって一部
の製造設備が休止した場合の生産計画の変更を支援する
システムであって、与えられた評価条件に基づいて製造
可能な製造ロットを分類する製造ロット分類手段と、分
類された製造ロットを分類ごとに評価の根拠を示して表
示する製造ロット表示手段と、評価条件ごとに分類され
た製造ロットの中から再計画に組み込みたい製造ロット
を選択し、また予め与えられた製造ロット内の構成要素
の変更が必要な場合には製造ロットを編集する製造ロッ
ト選択・編集手段と、それによって再計画を作成するス
ケジュール作成手段と、を備えたことを特徴とするもの
である。
Further, the production plan change support system of the present invention for carrying out the above-mentioned production plan change support method is a production line based on the schedule data of the production plan created in response to the production demand of a wide variety of products. It is a system that supports the change of the production plan when some of the manufacturing equipment is stopped due to trouble or abnormalities when operating automatically, and can be manufactured based on the given evaluation conditions. Manufacturing lot classification means for classifying manufacturing lots, manufacturing lot display means for displaying classified manufacturing lots by showing the basis of evaluation for each classification, and incorporating into re-planning from manufacturing lots classified for each evaluation condition Manufacturing lot selection / editing means for selecting a desired manufacturing lot, and editing the manufacturing lot when it is necessary to change the components in the manufacturing lot given in advance And it is characterized by comprising: a schedule creating means for creating a re-planning thereby.

【0009】本発明における各手段は以下のような作用
を有する。
Each means in the present invention has the following actions.

【0010】(1)製造ロット分類手段 異常やトラブルのために処理できない設備が発生した場
合には、使用不可の設備の情報をもとに、評価条件によ
って、トラブル中でも他の設備で製造可能な製造ロッ
ト、および、トラブルによる生産量減を防ぐための製
造ロットを評価する。そして、使用不可設備の処理が必
須の製造ロットと、稼働している設備で処理できる製造
ロットを分類する。また、使用不可設備が発生すること
によって生産量が減らないように、稼働設備で製造でき
る製造ロットの中から、生産量を維持するために有利な
製造ロットとそうでないものを評価する。
(1) Manufacturing lot classification means If an equipment that cannot be processed occurs due to an abnormality or trouble, it can be manufactured by other equipment even during trouble depending on the evaluation conditions based on the information of the equipment that cannot be used. Evaluate manufacturing lots and manufacturing lots to prevent production volume reduction due to troubles. Then, the production lots that must be processed by the unusable equipment and the production lots that can be processed by the operating equipment are classified. Also, in order to prevent the production volume from decreasing due to the generation of unusable equipment, we evaluate the production lots that can be produced with the operating equipment and the production lots that are advantageous for maintaining the production volume and those that are not.

【0011】(2)製造ロット表示手段 トラブル発生以降の再スケジュール作成を円滑に進める
ために、評価条件によって分類された製造ロットを、分
類ごとに評価の根拠を示して表示する。
(2) Manufacturing lot display means In order to facilitate rescheduling after trouble has occurred, manufacturing lots classified according to the evaluation conditions are displayed with the grounds for evaluation shown for each classification.

【0012】(3)製造ロット選択・編集手段 評価条件ごとに分類された製造ロットの中から、再スケ
ジュール策定に組み込みたい製造ロットを選択する。ま
た、評価条件上で分類できない評価項目(例えば、納
期、下工程需給など)で製造ロットを選択したい場合に
は、スケジュールを策定するオペレータが評価し、再ス
ケジュール策定に組み込みたい製造ロットの選択を行
う。また、生産量を維持するため、あるいは納期や下工
程の需給関係から、予め与えられた製造ロットの中の構
成要素を変更できるように編集する。
(3) Manufacturing lot selection / editing means A manufacturing lot to be incorporated in the rescheduling is selected from the manufacturing lots classified according to the evaluation conditions. Also, if you want to select a production lot based on evaluation items that cannot be classified under the evaluation conditions (for example, delivery date, downstream process supply and demand), the operator who formulates the schedule evaluates and selects the production lot that you want to incorporate into the reschedule formulation. To do. Further, in order to maintain the production amount, or due to the delivery date and the supply-demand relationship of the lower process, the editing is performed so that the constituent elements in the given manufacturing lot can be changed.

【0013】(4)スケジュール作成手段 分類された製造ロットをもとにして、製造済み以降、も
しくは、トラブルにより仕掛材の設定以降を再スケジュ
ール用の製造ロットを用いて、操業上の制約条件を満足
した計画を自動的に作成する。
(4) Schedule creating means Based on the classified manufacturing lots, the manufacturing lots for re-scheduling after manufacturing or after the setting of work-in-process due to a trouble are used to set operational constraint conditions. Automatically create a satisfying plan.

【0014】[0014]

【発明の実施の形態】以下、本発明の実施の形態を図面
により説明する。図1は本発明の実施形態の一例を示す
生産計画変更支援システムの構成図である。本システム
10は、生産工場1と、生産ライン管理部2と、製造順
計画部3とに連携されるもので、製造材源・設備稼働状
況記憶手段4、仕掛ロット処理手段5、製造ロット分類
手段6、製造ロット表示手段7、製造ロット選択・編集
手段8、およびスケジュール作成手段9を具備する構成
となっている。具体的には、コンピュータどうしを結ぶ
ネットワークで構成される。図中、11は入力部、12
は表示部である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a configuration diagram of a production plan change support system showing an example of an embodiment of the present invention. The system 10 is linked to the production plant 1, the production line management unit 2, and the manufacturing order planning unit 3, and is composed of a manufacturing material source / equipment operation status storage unit 4, an in-process lot processing unit 5, and a manufacturing lot classification. It comprises a means 6, a manufacturing lot display means 7, a manufacturing lot selecting / editing means 8 and a schedule creating means 9. Specifically, it is composed of a network connecting computers. In the figure, 11 is an input unit, 12
Is a display unit.

【0015】要求に応じて製造すべき各種の製造物(例
えば、連々鋳セット)の製造順番は、予め与えられた材
源(例えば、鋼種および転炉での製造量)に基づいて製
造順計画部3で作成される。製造順計画部3で作成され
る生産計画は、例えば、翌日1日分の計画を前日に策定
する。製造順計画部3で作成された計画情報には、製造
順に必要な設備の稼働・休止情報、製造時刻を指定して
いる材源もしくは、製造予定材源で、製造時刻情報が付
加されていない材源などの情報も同時に備えている。そ
して、製造順計画部3で作成された計画情報は、生産ラ
イン管理部2に送られる。生産工場1では、生産ライン
管理部2から送られてくる生産ライン管理情報に基づい
て、製造順通りに生産ラインを稼働する。このようにし
て、製造順通りに通常の自動生産が実施される。また、
製造順計画部3で作成されたスケジュールデータは、製
造材源・設備稼働状況記憶手段4に送られ記憶される。
The production order of various products (for example, continuous casting set) to be produced according to requirements is planned based on a given material source (for example, steel type and production amount in converter). Created in Part 3. For the production plan created by the manufacturing sequence planning unit 3, for example, a plan for one day the following day is prepared on the previous day. The planning information created by the manufacturing order planning unit 3 does not include the operating time / inactivity information of the equipment required in the manufacturing order, the material that specifies the manufacturing time, or the planned material source, and the manufacturing time information is not added. It also has information such as the source of the material. Then, the plan information created by the manufacturing order planning unit 3 is sent to the production line management unit 2. In the production factory 1, the production lines are operated in the manufacturing order based on the production line management information sent from the production line management unit 2. In this way, normal automatic production is carried out according to the manufacturing order. Also,
The schedule data created by the manufacturing order planning unit 3 is sent to and stored in the manufacturing material source / facility operating status storage unit 4.

【0016】前述した稼働中の生産ラインにおいて、何
らかのトラブルが発生した場合、トラブルの程度によっ
ては、既に前日に製造順計画部3で策定されたスケジュ
ールを見直し、トラブルが発生した箇所からそれ以降の
生産計画を、再度、生産ラインにおける製造条件を考慮
しながら策定する必要が生じてくる。ここで、生産ライ
ンにおいて、生産ラインのトラブルや製造物の異常が発
生したことが原因で、例えば、製造途中もしくは製造予
定の製造物の仕掛かり処理や他の製造物で代替え処理を
する必要が生じた場合には、以下のように処理される。
If any trouble occurs in the above-mentioned production line in operation, depending on the degree of the trouble, the schedule established by the manufacturing sequence planning unit 3 on the previous day is reviewed, and the trouble occurs from the point where the trouble occurs to the subsequent time. It becomes necessary to formulate the production plan again while considering the production conditions on the production line. Here, in the production line, due to a trouble of the production line or an abnormality of the product, for example, it is necessary to perform in-process processing of the product in the middle of production or scheduled to be produced or substitute processing with another product. When it occurs, it is processed as follows.

【0017】図2は既に策定された生産計画を変更する
際の手順を示すフローチャートであり、以下図1および
図2に基づいて処理手順を説明する。
FIG. 2 is a flow chart showing the procedure for changing the already established production plan. The processing procedure will be described below with reference to FIGS. 1 and 2.

【0018】(ステップS1):生産ラインのトラブル
や異常が発生した場合、そのトラブルや異常の対象とな
る製造物の情報は、生産工場1より生産ライン管理部2
へ伝えられ、さらに生産ライン管理部2から製造順管理
部3へ伝えられる。また、生産計画変更支援システム1
0にも入力部11からそのトラブル情報が仕掛ロット処
理手段5に入力される。トラブル情報より、トラブルや
異常の対象となる製造物(以下、トラブル製造物とい
う)の状況(ロット番号、製造進行状況等)、もしくは
同時に並行して製造している製造物がある場合にはその
製造物(仕掛材)の状況(ロット番号、製造進行状況
等)を生産ライン管理部2が確認し、その仕掛材情報は
製造順管理部3に送られる。
(Step S1): When a trouble or abnormality of the production line occurs, information on the product subject to the trouble or abnormality can be obtained from the production factory 1 by the production line management unit 2
Then, the production line management section 2 transfers it to the manufacturing order management section 3. Also, the production plan change support system 1
In 0, the trouble information is input from the input unit 11 to the in-process lot processing means 5. From the trouble information, the situation (lot number, manufacturing progress status, etc.) of the product (hereinafter referred to as trouble product) that is the subject of the trouble or abnormality, or if there are products that are being manufactured in parallel at the same time, The production line management unit 2 confirms the status (lot number, manufacturing progress status, etc.) of the product (work-in-process), and the work-in-process information is sent to the manufacturing order management unit 3.

【0019】(ステップS2):製造順管理部3では、
代替え製造物の材源の準備やトラブル製造物の製造進行
状況から仕掛材の処理方法をオペレータが判断し、仕掛
材の処理工程を決定する。仕掛材処理工程に必要なデー
タ(仕掛材ロット番号、仕掛製造設備番号等)は図1の
入力部11および製造材源・設備稼働状況記憶手段4か
ら仕掛材処理手段5に入力される。なお、図1の各手段
に対する入力の指示や、設定条件の確認などは表示部1
2にて確認する。
(Step S2): In the manufacturing order management unit 3,
The operator determines the processing method of the in-process material from the preparation of the material source of the substitute product and the progress of manufacturing the troubled product, and determines the processing step of the in-process material. Data necessary for the work-in-process processing process (work-in-process lot number, work-in-process manufacturing equipment number, etc.) are input to the work-in-process material processing unit 5 from the input unit 11 and the manufacturing material source / facility operating status storage unit 4 in FIG. It should be noted that the display unit 1 is used for input instructions to each means in FIG. 1 and confirmation of setting conditions.
Check in 2.

【0020】(ステップS3):ステップS3以降の手
順は自動的に行われ、自動的に再計画が策定される。す
なわち、トラブルや異常の発生に伴い、製造が継続不能
になった製造設備の休止情報や仕掛材情報等は入力部1
1および製造材源・設備稼働状況記憶手段4から製造ロ
ット分類手段6に送られる。そこで、ステップS3にお
いては、製造ロット分類手段6によって、再スケジュー
ルに必要な材源とそうでないものを、与えられた評価条
件に基づいて分類する。トラブルや異常発生時における
未製造の製造ロットは、評価条件に基づき、再スケジュ
ールで製造するとき、以下の優先順位で選択される。 1)生産量を維持するために有利な製造ロットを最優先
に選択する。例えば、製造上通過工程が簡単かつ短時間
で同一ロットを多数製造することが可能な製造ロット 2)次に、単位時間あたりの製造数が少ない製造ロッ
ト、あるいは稼働中の設備で代替え製造が可能で通過工
程が少ない製造ロット 3)その次は、製造可能であるが製造上の通過工程が多
岐にわたり複雑な製造ロット 4)選択不可、すなわち、休止の設備で処理しなければ
ならない製造ロットは選択の対象から除外する。
(Step S3): The procedure after step S3 is automatically performed, and the re-plan is automatically formulated. In other words, due to troubles or abnormalities, the input unit 1 stores information such as suspension information and work-in-progress information of manufacturing equipment whose manufacturing has been disabled.
1 and the manufacturing material source / facility operating status storage means 4 to the manufacturing lot classification means 6. Therefore, in step S3, the production lot classification means 6 classifies the materials necessary for reschedule and those not, based on the given evaluation conditions. Unmanufactured manufacturing lots when troubles or abnormalities occur are selected in the following priority order when manufacturing by rescheduling based on the evaluation conditions. 1) Priority is given to the production lot advantageous for maintaining the production amount. For example, a manufacturing lot that can easily manufacture many same lots in a short time with a passing process in manufacturing. 2) Next, a manufacturing lot with a small number of products per unit time, or an alternative manufacturing facility can be used. 3) Manufacturing lots with few passing steps in 3) The next is manufacturing possible but complicated manufacturing lots with various passing steps in manufacturing 4) Not selectable, that is, manufacturing lots that have to be processed in a suspended facility are selected Excluded from the target.

【0021】(ステップS4):トラブル発生以降の再
スケジュール作成を円滑に進めるために、評価条件によ
って分類された製造ロットを、製造ロット表示手段7に
より評価の根拠(上記の選択基準1)〜4))を示して
表示部12に表示する。
(Step S4): In order to facilitate the preparation of the re-schedule after the occurrence of trouble, the production lots classified by the evaluation conditions are evaluated by the production lot display means 7 (the above selection criteria 1) to 4 )) Is displayed on the display unit 12.

【0022】(ステップS5):製造ロット選択・編集
手段8では、評価条件ごとに分類された製造ロットの中
から、再スケジュール策定に組み込みたい製造ロットを
選択する。また、評価条件上で分類できない評価項目
(例えば、納期、下工程需給など)で製造ロットを選択
したい場合には、スケジュールを策定するオペレータが
評価し、再スケジュール策定に組み込みたい製造ロット
の選択を行う。また、生産量の維持、納期や下工程の需
給関係から、予め与えられた製造ロット内の構成要素の
変更が必要な場合には製造ロットを編集する。
(Step S5): The production lot selecting / editing means 8 selects a production lot to be incorporated in the re-schedule formulation from the production lots classified according to the evaluation conditions. Also, if you want to select a production lot based on evaluation items that cannot be classified under the evaluation conditions (for example, delivery date, downstream process supply and demand), the operator who formulates the schedule evaluates and selects the production lot that you want to incorporate into the reschedule formulation. To do. In addition, the production lot is edited when it is necessary to change the components in the production lot given in advance in view of the maintenance of the production amount, the delivery date and the supply and demand relationship of the lower process.

【0023】(ステップS6):スケジュール作成手段
9では、既に製造済みの製造物、トラブル発生時の仕掛
材が他の製造物と入れ替わり製造時刻が変更されないよ
うに、仕掛材が配置されている以降の休止していない稼
働可能な設備に製造物の工程を割り付ける計画を自動的
に策定する。
(Step S6): In the schedule creating means 9, the work-in-process materials are arranged so that the already-manufactured products and the work-in-process materials in case of trouble are not replaced with other products and the manufacturing time is not changed. Automatically develop a plan for allocating product processes to non-disruptive and operational equipment.

【0024】[0024]

【実施例】図3は、1日分の製造物の生産計画の一例を
表している。横軸は時刻であり、縦軸には製造設備が並
べてある。LDは転炉設備、RE1〜RE8は二次製錬
設備、CC1〜CC4は連続鋳造設備を示している。図
3に示すように、転炉設備(LD)から出鋼された溶銑
は、複数の二次製錬設備(RE1〜RE8)の中から製
造物に応じて、通過する二次製錬設備があらかじめ決め
られており、決められた二次製錬設備で処理された後
に、製造物の形状や断面形状に応じて、連続鋳造設備
(CC1〜CC4)のいずれかで鋳造する。また、各製
造物(ここでは、連々鋳セット)の鋳造開始部分に付さ
れた番号は連々鋳セットの製造番号を表している。例え
ば、CC3で鋳造される連々鋳セットの製造番号はM0
1である。
EXAMPLE FIG. 3 shows an example of a production plan for a product for one day. The horizontal axis represents time, and the vertical axis represents manufacturing equipment. LD indicates a converter equipment, RE1 to RE8 indicate secondary smelting equipment, and CC1 to CC4 indicate continuous casting equipment. As shown in FIG. 3, the hot metal tapped from the converter equipment (LD) has a secondary smelting equipment which passes from among a plurality of secondary smelting equipment (RE1 to RE8) depending on the product. After being processed in a predetermined secondary smelting facility, it is cast in any of continuous casting facilities (CC1 to CC4) depending on the shape and cross-sectional shape of the product. Moreover, the number attached to the casting start portion of each product (here, the continuous casting set) represents the serial number of the continuous casting set. For example, the serial number set for CC3 is M0.
It is 1.

【0025】図3の計画では、転炉の出鋼タイミングと
二次製錬の開始時間を調整することで連続鋳造を維持し
ている。連続鋳造設備において各製造物の鋳造終了時に
次の製造物の鋳造が開始されるように計画が策定されて
いる。そしてまた、図3は、各製造物の製造が午後12
時30分まで進捗したところでCC2の連続鋳造設備が
トラブルを発生し(丸印)、CC2での製造ができなく
なった場合の例を示している。このとき、各製造物のう
ち製造終了済みの製造物と、トラブル発生前に製造が開
始され製造途中の製造物(仕掛材)は図4のようにな
る。これらの製造物は、トラブルは節制の前後で変更で
きない製造物であり、また、トラブル発生により、CC
2の設備が使用不可の状態となる。
In the plan of FIG. 3, continuous casting is maintained by adjusting the tapping timing of the converter and the start time of secondary smelting. A plan is established so that the casting of the next product starts at the end of casting of each product in the continuous casting facility. And again, Figure 3 shows that each product is manufactured at 12 pm
The example shows a case where CC2 continuous casting equipment has a trouble (circle mark) after the progress to 30 minutes, and CC2 cannot be manufactured. At this time, the finished products among the products and the products (work-in-process) which are started before the trouble occurs and are in the middle of manufacturing are as shown in FIG. These products are products whose troubles cannot be changed before and after the suppression, and when troubles occur, CC
The equipment of No. 2 becomes unusable.

【0026】ここでの手順は、仕掛ロット処理手段5
(ステップS2)にて、CC3設備のM01の連々鋳セ
ット(製造部)の先頭は、既に製造途中であり、トラブ
ル発生以降も製造可能なため、計画通りに製造する。C
C2の設備はトラブルのため、稼働できないことから、
CC1とCC3および、CC4で製造できる連々鋳セッ
トを、与えられた評価条件に基づいて製造ロット分類手
段6(ステップS3)で選択する。また、製造ロット選
択・編集手段7(ステップS4)によって、CC1設備
のK02の連々鋳セット(製造ロット)の構成要素を4
チャージから6チャージに変更するよう編集する。ま
た、当初の計画における製造ロットのK03(CC
1)、K04(CC1)については、翌日以降の製造予
定の中からほぼ同種の製造ロットを取り入れて、K10
(CC1)、K11(CC1)、M02(CC3)に変
更する。図5は、上記の結果に基づき、図4の仕掛材以
降の再計画を自動的に作成した場合の変更計画例を示
す。
The procedure here is the in-process lot processing means 5
In (step S2), the head of the M01 continuous casting set (manufacturing department) of the CC3 facility is already in the process of being manufactured, and it can be manufactured even after the trouble has occurred, so the manufacturing is performed as planned. C
Because the equipment of C2 cannot operate because of trouble,
Successive casting sets that can be manufactured by CC1 and CC3 and CC4 are selected by the manufacturing lot classification means 6 (step S3) based on the given evaluation conditions. Further, the production lot selection / editing means 7 (step S4) is used to change the components of the K02 continuous casting set (production lot) of the CC1 equipment to four.
Edit to change from 6 charges to 6 charges. In addition, the production lot K03 (CC
For 1) and K04 (CC1), a production lot of almost the same type was introduced from the production schedule of the next day or later,
Change to (CC1), K11 (CC1), M02 (CC3). FIG. 5 shows an example of a change plan in the case where the re-plan after the work-in-process material of FIG. 4 is automatically created based on the above result.

【0027】本実施形態では、トラブルや異常が発生し
たときの再計画の作成について説明したが、緊急の製造
物の割り込み要求があった場合にも本発明を適用するこ
とができる。
In the present embodiment, the preparation of a re-plan when a trouble or abnormality occurs has been described, but the present invention can be applied even when there is an urgent interrupt request for a product.

【0028】[0028]

【発明の効果】以上のように、本発明によれば、自動的
に稼働している生産ラインにおいて、トラブルや異常が
発生したことによって予定していた製造ができなくなっ
た場合に、トラブルや異常発生時の製造物変更を施し、
製造スケジュールの再計画を自動的に作成することがで
きる。
As described above, according to the present invention, in a production line that is operating automatically, when a trouble or abnormality occurs, the planned production cannot be performed, so that the trouble or abnormality occurs. We changed the product when it occurred,
Manufacturing schedule re-planning can be created automatically.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施形態を示す生産計画変更支援シス
テムの概略ブロック構成図である。
FIG. 1 is a schematic block configuration diagram of a production plan change support system showing an embodiment of the present invention.

【図2】生産計画変更支援方法の手順を示すフローチャ
ートである。
FIG. 2 is a flowchart showing a procedure of a production plan change support method.

【図3】トラブル発生前の1日分の生産計画例を示す図
である。
FIG. 3 is a diagram showing an example of a production plan for one day before a trouble occurs.

【図4】図3の生産計画において、トラブル発生時の実
績製造物と仕掛材、設備休止の設定結果を示す図であ
る。
FIG. 4 is a diagram showing a setting result of actual products, work-in-process materials, and equipment suspension when a trouble occurs in the production plan of FIG.

【図5】トラブル発生後の再計画を自動的に作成した場
合の変更計画例を示す図である。
FIG. 5 is a diagram showing an example of a change plan when a re-plan after a trouble occurs is automatically created.

【符号の説明】[Explanation of symbols]

1 生産工場 2 生産ライン管理部 3 製造順計画部 4 製造材源・設備稼働状況記憶手段 5 仕掛ロット処理手段 6 製造ロット分類手段 7 製造ロット表示手段 8 製造ロット選択・編集手段 9 スケジュール作成手段 10 生産計画変更支援システム 11 入力部 12 表示部 1 production plant 2 Production line management department 3 Manufacturing Order Planning Department 4 Manufacturing material source / equipment operation status storage means 5 In-process lot processing means 6 Manufacturing lot classification means 7 Manufacturing lot display means 8 Manufacturing lot selection / editing means 9 Schedule creation means 10 Production plan change support system 11 Input section 12 Display

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 多品種の製造物の生産要望に応じて作成
された生産計画のスケジュールデータに基づいて生産ラ
インを自動的に稼働させている際に、トラブルまたは異
常の発生によって一部の製造設備が休止した場合の生産
計画の変更を支援する方法であって、 与えられた評価条件に基づいて製造可能な製造ロットを
分類し、評価条件ごとに分類された製造ロットの中から
再計画に組み込みたい製造ロットを選択し、また予め与
えられた製造ロット内の構成要素の変更が必要な場合に
は製造ロットを編集し、それによって再計画を作成する
ことをコンピュータに実行させることを特徴とする生産
計画変更支援方法。
1. When a production line is automatically operated on the basis of schedule data of a production plan created in response to a production request of a wide variety of products, a part of the production is caused by trouble or abnormality. This is a method to support the change of the production plan when the equipment is stopped, and classifies the manufacturable lots that can be manufactured based on the given evaluation conditions, and re-plans from the production lots classified according to the evaluation conditions. It is characterized by selecting a manufacturing lot to be incorporated and, when it is necessary to change a component in a given manufacturing lot, editing the manufacturing lot, thereby causing a computer to execute a replan. Production plan change support method.
【請求項2】 分類された製造ロットを分類ごとに評価
の根拠を示して表示することを特徴とする請求項1記載
の生産計画変更支援方法。
2. The production plan change support method according to claim 1, wherein the classified production lots are displayed by showing the basis of evaluation for each classification.
【請求項3】 多品種の製造物の生産要望に応じて作成
された生産計画のスケジュールデータに基づいて生産ラ
インを自動的に稼働させている際に、トラブルまたは異
常の発生によって一部の製造設備が休止した場合の生産
計画の変更を支援するシステムであって、 与えられた評価条件に基づいて製造可能な製造ロットを
分類する製造ロット分類手段と、分類された製造ロット
を分類ごとに評価の根拠を示して表示する製造ロット表
示手段と、評価条件ごとに分類された製造ロットの中か
ら再計画に組み込みたい製造ロットを選択し、また予め
与えられた製造ロット内の構成要素の変更が必要な場合
には製造ロットを編集する製造ロット選択・編集手段
と、それによって再計画を作成するスケジュール作成手
段と、を備えたことを特徴とする生産計画変更支援シス
テム。
3. Partial production due to occurrence of trouble or abnormality when the production line is automatically operated based on the schedule data of the production plan created in response to the production request of a wide variety of products. This is a system that supports changes in production plans when equipment is shut down.Manufacturing lot classification means that classifies manufacturing lots that can be manufactured based on given evaluation conditions, and the classified manufacturing lots are evaluated for each classification. The production lot display means that shows and displays the basis of the above, and the production lot to be incorporated into the re-plan is selected from the production lots classified according to the evaluation conditions. A production lot selecting / editing means for editing a production lot when necessary, and a schedule creating means for creating a re-plan by that are provided. Production plan change support system.
JP2002118248A 2002-04-19 2002-04-19 Production plan change support method and its system Withdrawn JP2003316415A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002118248A JP2003316415A (en) 2002-04-19 2002-04-19 Production plan change support method and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002118248A JP2003316415A (en) 2002-04-19 2002-04-19 Production plan change support method and its system

Publications (1)

Publication Number Publication Date
JP2003316415A true JP2003316415A (en) 2003-11-07

Family

ID=29535197

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002118248A Withdrawn JP2003316415A (en) 2002-04-19 2002-04-19 Production plan change support method and its system

Country Status (1)

Country Link
JP (1) JP2003316415A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111047205A (en) * 2019-12-18 2020-04-21 北京机科国创轻量化科学研究院有限公司 Multi-station cooperative processing method and device for assembly line, storage medium and processor
US11067971B2 (en) 2017-06-28 2021-07-20 Hitachi, Ltd. Production line configuration change system and production line configuration change method
CN117047870A (en) * 2023-10-12 2023-11-14 四川省致链数字科技有限公司 Furniture punching procedure flexible matching system and method based on industrial Internet

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11067971B2 (en) 2017-06-28 2021-07-20 Hitachi, Ltd. Production line configuration change system and production line configuration change method
CN111047205A (en) * 2019-12-18 2020-04-21 北京机科国创轻量化科学研究院有限公司 Multi-station cooperative processing method and device for assembly line, storage medium and processor
CN117047870A (en) * 2023-10-12 2023-11-14 四川省致链数字科技有限公司 Furniture punching procedure flexible matching system and method based on industrial Internet
CN117047870B (en) * 2023-10-12 2023-12-22 四川省致链数字科技有限公司 Furniture punching procedure flexible matching system and method based on industrial Internet

Similar Documents

Publication Publication Date Title
US6876895B2 (en) Order assembly production system and method
JP2000176799A (en) Production planning and manufacturing planning system
JPH10118896A (en) Schedule preparation support system
JP2003316415A (en) Production plan change support method and its system
JPH11120248A (en) System and method for scheduling production
JP2003256020A (en) Production plan preparing method for intermediate steel product and steel product, its device, program for realizing method and device, and manufacturing method of intermediate steel product and steel product
CN113780771A (en) Intelligent scheduling method for factory staff
JP2003058228A (en) Product progress management method and device
JP3614591B2 (en) Periodic maintenance scheduling system and periodic maintenance scheduling apparatus used therefor
EP0420476A2 (en) Dynamic scheduling
JP4318162B2 (en) Production schedule planning management method and production schedule planning management program
JPH04347769A (en) Process management device
JP2006155011A (en) Production schedule planning device, and production schedule planning method
JP4232386B2 (en) Production plan creation system and production plan creation method
JP3106027B2 (en) Production plan creation method
JP2003256021A (en) Production plan changing method and its device
JP2721561B2 (en) Production progress prediction method and production progress prediction simulator
JP2004145591A (en) System and method for distributing production capacity
JPH0691495A (en) Manufacturing process load display device and manufacturing process load calculating method
JP2000343388A (en) Production plan planning method, production plan planning device and recording medium
TWI784311B (en) Management device, management system, and management program
JP3412382B2 (en) Production planning method and system, and steel product production planning method and system
Sunday et al. Impact of problems associated with scheduling and capacity planning of a production process–an overview
JPH05290053A (en) Providing method for flowing information in production management system of small scale many kinds
JPH06266725A (en) Production control method and system for machining material