JP2003027591A - Connection structure between column and bottom plate - Google Patents
Connection structure between column and bottom plateInfo
- Publication number
- JP2003027591A JP2003027591A JP2001212053A JP2001212053A JP2003027591A JP 2003027591 A JP2003027591 A JP 2003027591A JP 2001212053 A JP2001212053 A JP 2001212053A JP 2001212053 A JP2001212053 A JP 2001212053A JP 2003027591 A JP2003027591 A JP 2003027591A
- Authority
- JP
- Japan
- Prior art keywords
- existing
- column
- new
- bottom plate
- shear head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Foundations (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、既存構造物を解体
してその跡地に新設構造物を構築するに際して、既存構
造物の基礎底盤を利用して新設柱を立設する際に適用す
る柱と底盤との接合構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pillar to be applied when a new structure is dismantled and a new structure is built on the site of the existing structure by using the foundation bottom of the existing structure to erect a new structure pillar. It relates to the joint structure between the bottom plate and the bottom plate.
【0002】[0002]
【従来の技術】建物等の既存構造物を解体してその跡地
に新設構造物を構築する場合、従来一般には既存構造物
を完全に解体撤去して更地化したうえで新設構造物の施
工に着手することが通常であったが、最近においては既
存構造物の一部を利用できる場合には可及的に利用しよ
うという気運があり、たとえば既存建物の地下外壁を解
体せずに残置してそれを新設建物の地下外壁やそのその
一部として利用することが行われるようになってきてい
る。2. Description of the Related Art Conventionally, when an existing structure such as a building is dismantled and a new structure is constructed on the site, generally, the existing structure is completely dismantled and vacated, and then the new structure is constructed. However, recently there is a tendency to use some of existing structures as much as possible, for example, leaving underground walls of existing buildings without dismantling them. It is becoming more and more popular to use it as an underground wall of a new building or a part of it.
【0003】ところで、構造物の基礎、特に底盤はかな
りの厚さを有する頑強なコンクリート構造体であるか
ら、それを解体するのは容易ではないし、解体後には同
様の底盤を手間とコストをかけて新設することが通常で
あるから、既存底盤を解体せずに残置してそれをそのま
ま新設構造物の底盤あるいはその一部として利用できれ
ば無駄がなく合理的である。By the way, it is not easy to dismantle the foundation of the structure, especially the bottom plate, since it is a sturdy concrete structure having a considerable thickness, and after dismantling, the same bottom plate is troublesome and costly. Since it is usual to build a new base structure, it is rational without waste if the existing base plate is left without being dismantled and can be used as it is as the base plate of the new structure or a part thereof.
【0004】[0004]
【発明が解決しようとする課題】しかし、既存構造物の
底盤を残置してそれを新設底盤として利用する場合には
既存底盤上に新設柱を立設することになるから、それが
可能であるためには、新設柱にかかる荷重に対して既存
底盤が十分な耐力を有しかつ既存底盤下の地盤が十分な
地耐力を有していることが前提となり、そのような条件
を満たせない場合には既存底盤の有効利用は望めないも
のであった。However, when the bottom plate of the existing structure is left and used as a new bottom plate, a new column is erected on the existing bottom plate, which is possible. In order to achieve this, it is premised that the existing base has sufficient bearing capacity against the load applied to the new pillar and the ground below the existing base has sufficient bearing capacity. It was not possible to use the existing bottom plate effectively.
【0005】上記事情に鑑み、本発明は、既存底盤の耐
力や地盤の地耐力が十分に確保できない場合であって
も、その有効利用を可能とする手段を提供することを目
的とする。In view of the above circumstances, it is an object of the present invention to provide means for enabling effective use of the existing bottom plate and the ground even when the ground strength cannot be sufficiently secured.
【0006】[0006]
【課題を解決するための手段】請求項1の発明は、既存
構造物を解体してその跡地に新設構造物を構築するに際
して、既存構造物の底盤を解体せずに残置してその既存
底盤上に新設柱を立設する際に適用される柱と底盤との
接合構造であって、新設柱にかかる荷重を分散して既存
底盤に伝達するためのシアーヘッドを介して既存底盤と
新設柱の柱脚とが接合され、既存底盤上にコンクリート
が打設されて形成された新設底盤中にシアーヘッドおよ
び新設柱の柱脚部が埋設されていることを特徴とする。According to the invention of claim 1, when the existing structure is dismantled and a new structure is constructed on the site, the bottom plate of the existing structure is left without being dismantled and the existing base plate is left. It is a joint structure of a pillar and a bottom board that is applied when a new pillar is erected on the top, and the existing bottom board and the new pillar through a shear head that distributes the load applied to the new pillar to the existing bottom board. It is characterized in that the shear head and the column base of the new column are buried in the new bottom plate which is joined to the column base of the above and the concrete is cast on the existing bottom plate.
【0007】請求項2の発明は、請求項1の発明におい
て、シアーヘッドは鋼材が十字形に組まれたものとさ
れ、そのシアーヘッドが既存底盤に対してアンカーによ
り固定され、シアーヘッドの上面中心部に新設柱の柱脚
が締結されていることを特徴とする。According to a second aspect of the present invention, in the first aspect of the invention, the shear head is a steel material assembled in a cross shape, and the shear head is fixed to an existing bottom plate by an anchor, and the upper surface of the shear head is fixed. It is characterized in that a column base of a new column is fastened at the center.
【0008】請求項3の発明は、請求項1または2の発
明において、シアーヘッドには、新設底盤中に配筋され
る鉄筋を通すための貫通孔が設けられていることを特徴
とする。The invention of claim 3 is characterized in that, in the invention of claim 1 or 2, the shear head is provided with a through hole for passing a reinforcing bar arranged in a new bottom plate.
【0009】[0009]
【発明の実施の形態】図1に本発明の実施形態を示す。
図中符号1は既存構造物を解体した際に残置した既存底
盤、2はこの既存底盤1上に立設された新設柱、3は既
存底盤1と鉄骨柱2の柱脚との間に介装されたシアーヘ
ッド、4は既存底盤1上に形成される新設底盤である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an embodiment of the present invention.
In the figure, reference numeral 1 is an existing bottom plate left when the existing structure is dismantled, 2 is a new column standing on the existing bottom plate 1, and 3 is interposed between the existing bottom plate 1 and the column base of the steel column 2. The installed shear heads 4 are new bottom plates formed on the existing bottom plate 1.
【0010】本実施形態における新設柱2はH形鋼等か
らなる鉄骨柱であるが、これは新設構造物の本設柱であ
りかつ地下躯体施工時に仮設支柱として機能するいわゆ
る構真柱とされ、この新設柱2の柱脚はシアーヘッド3
を介して既存底盤1に接合されることで、この新設柱2
にかかる荷重(施工時の荷重および完成後の荷重)はシ
アーヘッド3を介して既存底盤1およびその下の地盤5
に対して分散されて伝達され、図中の矢印で示すように
広範囲の地盤5により安定に支持されるようになってい
る。なお、新設柱2は必ずしも構真柱とすることはなく
単なる本設柱として設けても良いし、鉄骨柱に限らず鉄
骨鉄筋コンクリート柱とすることも可能である。The new pillar 2 in this embodiment is a steel frame pillar made of H-shaped steel or the like, which is a main pillar of a new structure and is a so-called true pillar that functions as a temporary pillar during construction of an underground structure. The pillar base of the new pillar 2 is the shear head 3
By connecting to the existing bottom plate 1 via the
The load (load at the time of construction and load after completion) applied to the existing bottom plate 1 and the ground 5 therebelow via the shear head 3.
Is dispersed and transmitted to the ground 5, and is stably supported by the ground 5 in a wide range as shown by an arrow in the figure. The new column 2 is not necessarily a true column, and may be a simple column, or may be a steel reinforced concrete column instead of a steel frame column.
【0011】本実施形態におけるシアーヘッド3は、
(b)に示すように鋼材3aを十字形に組んだもので、
敷きモルタル6を介して既存底盤1上に水平に設置され
てアンカー7により固定され、そのシアーヘッド3の上
面中心部に、ベースプレート2aがボルト8により締結
されることで新設柱2が立設されるようになっている。
シアーヘッド3の各鋼材3aには、新設底盤4の施工時
に配筋される基礎鉄筋(図示せず)を通すための貫通孔
9が設けられている。シアーヘッド3を構成する鋼材3
aとしてはたとえばH形鋼が好適に採用可能であり、そ
の断面寸法は300×300mmないし400×400
mm程度で良く、平面的な大きさは所望範囲に荷重を分
散できるように適宜設定すれば良い。なお、シアーヘッ
ド3の平面形状や寸法は、新設柱2の断面、それにかか
る荷重、既存底盤1の耐力、地盤5の地耐力等を考慮し
て、荷重を有効に分散できるものとする限りにおいて任
意である。The shear head 3 in this embodiment is
As shown in (b), the steel material 3a is assembled in a cross shape,
It is installed horizontally on the existing bottom plate 1 via the mortar 6 and fixed by the anchor 7, and the base plate 2a is fastened with the bolt 8 at the center of the upper surface of the shear head 3 so that the new pillar 2 is erected. It has become so.
Each steel material 3a of the shear head 3 is provided with a through hole 9 for passing a basic reinforcing bar (not shown) arranged when the new bottom plate 4 is constructed. Steel material 3 that constitutes the shear head 3
For example, H-section steel can be preferably used as a, and the cross-sectional dimension thereof is 300 × 300 mm to 400 × 400.
It may be about mm, and the planar size may be appropriately set so that the load can be dispersed in a desired range. The plane shape and dimensions of the shear head 3 are so long as the load can be effectively dispersed in consideration of the cross section of the new column 2, the load applied to it, the proof stress of the existing bottom plate 1, the proof stress of the ground 5, and the like. It is optional.
【0012】上記の新設柱2の施工手順は、既存構造物
の解体の際に残置した既存基礎1上にシアーヘッド3を
位置決めしてアンカー7により固定し、そのシアーヘッ
ド3上に新設柱2を位置決めしてボルト8により締結し
て立設する。また、既存底盤1上に基礎鉄筋を配筋し、
その際には柱脚部に配筋する鉄筋をシアーヘッド3に設
けた貫通孔9に通す。そして、既存底盤1上にコンクリ
ートを打設して新設底盤4を形成し、その新設底盤4中
にシアーヘッド3と新設柱2の柱脚部を所定高さまで埋
設する。なお、新設柱2がSRC柱の場合には上記のよ
うにして立設した鉄骨の周囲に柱鉄筋を配筋しコンクリ
ートを打設する。The procedure for constructing the new column 2 is as follows. The shear head 3 is positioned on the existing foundation 1 left when the existing structure is dismantled and fixed by the anchor 7, and the new column 2 is mounted on the shear head 3. Are positioned and fastened by bolts 8 to stand. Also, by arranging the basic rebar on the existing bottom plate 1,
At that time, the reinforcing bars arranged on the column bases are passed through the through holes 9 provided in the shear head 3. Then, concrete is cast on the existing bottom plate 1 to form a new bottom plate 4, and the shear head 3 and the column bases of the new column 2 are buried in the new bottom plate 4 to a predetermined height. When the new column 2 is an SRC column, the column reinforcing bars are laid around the steel frame erected as described above and concrete is placed.
【0013】以上のように、既存底盤1上にシアーヘッ
ド3を介して新設柱2を接合することにより、その新設
柱2にかかる荷重が広範囲に分散されて既存底盤1およ
びその下の地盤5に伝達され、したがって既存底盤1お
よび地盤5の応力が緩和され、そのため既存底盤1の耐
力や地盤5の地耐力が十分でない場合であっても既存底
盤1上に新設柱2を支障なく設置することが可能とな
り、その結果、耐力が十分でない既存底盤1であっても
それを解体撤去することなく有効に利用することが可能
である。As described above, by joining the new post 2 to the existing bottom plate 1 via the shear head 3, the load applied to the new post 2 is widely dispersed, and the existing bottom plate 1 and the ground 5 below it. Therefore, the stress of the existing bottom 1 and the ground 5 is relieved. Therefore, even if the strength of the existing bottom 1 or the ground 5 is not sufficient, the new pillar 2 is installed on the existing bottom 1 without any trouble. As a result, even the existing bottom plate 1 having insufficient proof stress can be effectively used without dismantling and removing it.
【0014】特に、シアーヘッド3としてH形鋼等の鋼
材3aを十字形に組んだものを採用し、新設柱2の建方
に際してはそのシアーヘッド3をアンカー7により既存
底盤1に固定し、そのシアーヘッド3上に新設柱2とし
ての鉄骨をボルト8により締結するだけなので、その施
工は何等面倒ではないし、シアーヘッド3には貫通孔9
を設けているので基礎鉄筋の配筋作業に支障を来すこと
もない。In particular, as the shear head 3, a steel material 3a such as an H-shaped steel is assembled in a cross shape, and when the new column 2 is constructed, the shear head 3 is fixed to the existing bottom plate 1 by the anchor 7. Since the steel frame as the new post 2 is simply fastened on the shear head 3 by the bolts 8, the construction is not troublesome and the shear head 3 has a through hole 9
Since it is provided, it does not interfere with the work of arranging the basic rebar.
【0015】なお、上記実施形態のように新設柱2をシ
アーヘッド3に対してボルト締結することで立設するこ
とが最も施工性に優れるので現実的であるが、本発明は
それに限るものではなく、新設柱2をシアーヘッド3に
対して現場溶接することでも良いし、また新設柱2を工
場製作する段階でシアーヘッド3を溶接あるいはボルト
締結により先付けしてしまうことも考えられる。It should be noted that it is realistic that the newly installed column 2 is erected by bolting it to the shear head 3 as in the above-mentioned embodiment because the workability is the most excellent, but the present invention is not limited to this. Alternatively, the new column 2 may be welded to the shear head 3 in the field, or the shear head 3 may be pre-welded by welding or bolting at the stage of factory manufacturing the new column 2.
【0016】[0016]
【発明の効果】請求項1の発明の柱と底盤との接合構造
によれば、シアーヘッドを介して既存底盤と新設柱の柱
脚とが接合され、既存底盤上にコンクリートが打設され
て形成された新設底盤中にシアーヘッドおよび新設柱の
柱脚部が埋設されているので、新設柱を既存底盤に対し
て確実強固に接合できることはもとより、新設柱にかか
る荷重がシアーヘッドにより分散されて既存底盤および
その下の現状地盤に伝達され、したがって既存底盤の耐
力や地盤の地耐力が十分でない場合であっても既存底盤
上に新設柱を支障なく設置することができ、その結果、
耐力が十分でない既存底盤であってもそれを解体撤去す
ることなく有効に利用することが可能である。According to the joint structure of the pillar and the bottom board of the invention of claim 1, the existing bottom board and the column base of the new pillar are joined through the shear head, and the concrete is placed on the existing bottom board. Since the shear head and the column base of the new column are embedded in the newly formed bottom plate, not only can the new column be firmly and firmly joined to the existing bottom plate, but the load applied to the new column is dispersed by the shear head. Therefore, even if the existing bottom and the existing ground below it are transmitted to the existing bottom, and even if the bearing capacity of the existing bottom or the ground bearing capacity of the ground is not sufficient, it is possible to install new columns on the existing bottom without any problems, and as a result,
Even the existing base plate with insufficient proof stress can be effectively used without dismantling and removing it.
【0017】請求項2の発明によれば、請求項1の発明
におけるシアーヘッドとして鋼材を十字形に組んだ形態
のものを採用し、そのシアーヘッドを既存底盤に対して
アンカーにより固定し、シアーヘッドの上面中心部に新
設柱の柱脚を締結しているので、その施工を容易にかつ
十分に低廉なコストで実施し得る。According to the invention of claim 2, as the shear head in the invention of claim 1, a steel head in a cross shape is adopted, and the shear head is fixed to the existing bottom plate by an anchor, Since the column base of the new column is fastened to the center of the upper surface of the head, the construction can be performed easily and at a sufficiently low cost.
【0018】請求項3の発明によれば、請求項1または
2の発明におけるシアーヘッドに新設底盤中に配筋され
る鉄筋を通すための貫通孔を設けているので、基礎配筋
作業に支障を来すことがない。According to the third aspect of the present invention, the shear head in the first or second aspect of the present invention is provided with the through hole for passing the reinforcing bar to be laid in the new bottom plate, which hinders the basic reinforcing work. Never come.
【図1】 本発明の実施形態を示す柱脚部の断面図であ
る。FIG. 1 is a cross-sectional view of a column base portion showing an embodiment of the present invention.
1 既存底盤 2 新設柱 2a ベースプレート 3 シアーヘッド 3a 鋼材 4 新設底盤 5 地盤 6 敷きモルタル 7 アンカー 8 ボルト 9 貫通孔 1 Existing base 2 new columns 2a Base plate 3 sheer head 3a steel 4 New base 5 ground 6 spread mortar 7 anchor 8 volt 9 through holes
───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 2D046 AA15 AA16 2E125 AA04 AA45 AB01 AC15 AG12 AG13 AG41 BA12 BA22 BA32 BB08 BB22 BD01 BE08 BF06 BF08 CA03 2E176 AA01 BB34 ─────────────────────────────────────────────────── ─── Continued front page F term (reference) 2D046 AA15 AA16 2E125 AA04 AA45 AB01 AC15 AG12 AG13 AG41 BA12 BA22 BA32 BB08 BB22 BD01 BE08 BF06 BF08 CA03 2E176 AA01 BB34
Claims (3)
造物を構築するに際して、既存構造物の底盤を解体せず
に残置してその既存底盤上に新設柱を立設する際に適用
される柱と底盤との接合構造であって、新設柱にかかる
荷重を分散して既存底盤に伝達するためのシアーヘッド
を介して既存底盤と新設柱の柱脚とが接合され、既存底
盤上にコンクリートが打設されて形成された新設底盤中
にシアーヘッドおよび新設柱の柱脚部が埋設されている
ことを特徴とする柱と底盤との接合構造。1. When dismantling an existing structure and constructing a new structure on the site, it is applied when the bottom plate of the existing structure is left undisassembled and a new column is erected on the existing base plate. It is a joint structure of the pillar and the bottom plate, and the existing bottom plate and the column base of the new column are joined via the shear head for distributing the load applied to the new column to the existing bottom plate, A joint structure between a column and a bottom plate, in which a shear head and a column base of a new column are buried in a new bottom plate formed by concrete being cast into the ground.
ものとされ、そのシアーヘッドが既存底盤に対してアン
カーにより固定され、シアーヘッドの上面中心部に新設
柱の柱脚が締結されていることを特徴とする請求項1記
載の柱と底盤との接合構造。2. The shear head is made of steel material assembled in a cross shape, the shear head is fixed to an existing bottom plate by an anchor, and a column base of a new column is fastened to the center of the upper surface of the shear head. The column-bottom joint structure according to claim 1, wherein
れる鉄筋を通すための貫通孔が設けられていることを特
徴とする請求項1または2記載の柱と底盤との接合構
造。3. The column-bottom joint structure according to claim 1, wherein the shear head is provided with a through hole for passing a reinforcing bar arranged in a new bottom plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001212053A JP2003027591A (en) | 2001-07-12 | 2001-07-12 | Connection structure between column and bottom plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001212053A JP2003027591A (en) | 2001-07-12 | 2001-07-12 | Connection structure between column and bottom plate |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003027591A true JP2003027591A (en) | 2003-01-29 |
Family
ID=19047276
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001212053A Withdrawn JP2003027591A (en) | 2001-07-12 | 2001-07-12 | Connection structure between column and bottom plate |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003027591A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012017597A (en) * | 2010-07-07 | 2012-01-26 | K&E Corp | Building reconstruction method and building structure |
JP7554720B2 (en) | 2021-08-09 | 2024-09-20 | 大成建設株式会社 | How to rebuild a building |
-
2001
- 2001-07-12 JP JP2001212053A patent/JP2003027591A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012017597A (en) * | 2010-07-07 | 2012-01-26 | K&E Corp | Building reconstruction method and building structure |
JP7554720B2 (en) | 2021-08-09 | 2024-09-20 | 大成建設株式会社 | How to rebuild a building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20090102599A (en) | Reinforcement | |
JP2003027591A (en) | Connection structure between column and bottom plate | |
JPH11343667A (en) | Structure for fixing column base with underground beam made of reinforced concrete | |
JP2002021096A (en) | Building and constructing method therefor | |
JP2003034997A (en) | Earthquake-resistant steel plate wall and its construction method | |
JPS61233131A (en) | Foundation structure of pole | |
JP2002332691A (en) | Joint construction between column and beam | |
JP2000160687A (en) | Construction method for composite structure and precast concrete column | |
JP3586121B2 (en) | Mixed structure of reinforced concrete column and steel beam and its construction method | |
JP3169887B2 (en) | Column base structure of steel pipe column and its construction method | |
JP2600531B2 (en) | Foundation structure for steel column and its construction method | |
JPH05156654A (en) | Top-down construction method | |
JPH07103620B2 (en) | Construction method for steel structure | |
JP2578671B2 (en) | Column and beam construction method | |
JPH0261238A (en) | Steel plate concrete method | |
JPH05112947A (en) | Execution method of foundation | |
JP2893406B2 (en) | Precast concrete beam-column joining method | |
JPH02167937A (en) | Connecting work of steel plate-concrete structure | |
JP2611917B2 (en) | Pillar formwork equipment | |
JPS62121251A (en) | Building ramen | |
JPH05202525A (en) | Method for constructing foundation structure | |
JPH11172689A (en) | Anchoring method of leg section of steel-framed column | |
JP2002115324A (en) | Column base unit, column integrated column base fixing foundation structure using the column base unit, and construction method therefor | |
JPH0427018A (en) | Construction of concrete assembly-type basement | |
JP3002026B2 (en) | Structure of residential continuous foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20081007 |