JP2002356857A - Foundation constructing method - Google Patents

Foundation constructing method

Info

Publication number
JP2002356857A
JP2002356857A JP2001163514A JP2001163514A JP2002356857A JP 2002356857 A JP2002356857 A JP 2002356857A JP 2001163514 A JP2001163514 A JP 2001163514A JP 2001163514 A JP2001163514 A JP 2001163514A JP 2002356857 A JP2002356857 A JP 2002356857A
Authority
JP
Japan
Prior art keywords
foundation
constructing
concrete
discarded
root cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001163514A
Other languages
Japanese (ja)
Inventor
Takao Takamoto
孝夫 高本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2001163514A priority Critical patent/JP2002356857A/en
Publication of JP2002356857A publication Critical patent/JP2002356857A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a foundation constructing method which allows setting of a permanent form in an excavated groove without pouring oversite concrete, to thereby dispense with overbreak of the excavated groove. SOLUTION: The foundation constructing method is carried out by setting the assembled permanent form in the excavated groove in a manner lifting it down from above. According to the method, a plurality of base plates for partially bearing the permanent form, are set on crushed stones laid in the excavated groove, and then the permanent form is set on the base plates.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】 本発明は、捨型枠を使用す
る基礎の施工方法に係る技術分野に属する。
TECHNICAL FIELD The present invention belongs to the technical field related to a method of constructing a foundation using a discarded formwork.

【0002】[0002]

【従来の技術】 一般に、地下室等の地下空間を構築し
ない(基礎が地盤に埋設される)大規模建屋の基礎の施
工では、施工期間の短縮等を図るために、コンクリート
の打設後に脱型しないで埋殺しとする金属製等の捨型枠
を使用することが行われている。
2. Description of the Related Art Generally, in the construction of a large-scale building foundation in which an underground space such as a basement is not constructed (the foundation is buried in the ground), in order to shorten the construction period, etc., the mold is removed after the concrete is cast. It has been practiced to use a discarded frame made of metal or the like that is not to be buried.

【0003】従来、捨型枠を使用する基礎の施工方法と
しては、例えば、図8〜図10に示すものが知られてい
る。
Conventionally, as a method of constructing a foundation using a discarded formwork, for example, the method shown in FIGS. 8 to 10 is known.

【0004】この従来の基礎の施工方法は、図8(A)
に示すように地表から根切溝1を掘削し、図8(B)に
示すように根切溝1の底部に砕石2を敷詰め転圧して敷
設し、図8(C)に示すように砕石2の上に捨コンクリ
ート3を打設し、捨コンクリート3を養生し墨出しを行
ってから、図8(D)に示すように捨コンクリート3の
上に捨型枠4を設置する。捨コンクリート3は、捨型枠
4の設置のための水平な設置面として形成される。捨型
枠4は、根切溝1の外部で組立てられ、根切溝1の上方
から落込まれる。
FIG. 8A shows a conventional construction method of a foundation.
As shown in FIG. 8 (C), a root kerf 1 is excavated from the surface of the ground, and as shown in FIG. After the concrete 3 is cast on the crushed stone 2 and the concrete 3 is cured and ink-marked, the mold 4 is placed on the concrete 3 as shown in FIG. The waste concrete 3 is formed as a horizontal installation surface for installation of the waste form 4. The discarded formwork 4 is assembled outside the root groove 1 and dropped from above the root groove 1.

【0005】この後、根切溝1の捨型枠4の周囲に土砂
を埋戻し、捨型枠4の内部に鉄筋を配筋してからコンク
リートを打設することになる。
[0005] After that, earth and sand are buried around the scraping frame 4 of the root cutting groove 1 and reinforcing steel is arranged inside the scraping frame 4 and then concrete is poured.

【0006】この従来の基礎の施工方法では、図9に示
すように、養生期間中の捨コンクリート3の上に土砂
(特に、表土)が崩落しても捨型枠4が設置される位置
まで土砂が堆積することがないように、根切溝1を掘削
する際に余堀Sが確保される。この余堀Sは、図10に
示すように、捨型枠4の落込み設置の際に根切溝1の内
部に配置される作業員5の作業スペースとしても機能す
る。
In this conventional method for constructing a foundation, as shown in FIG. 9, even if earth and sand (especially, topsoil) collapses on the discarded concrete 3 during the curing period, up to the position where the discarded formwork 4 is installed. An excavation S is secured when excavating the root cutting groove 1 so that sediment does not accumulate. As shown in FIG. 10, the surplus moat S also functions as a work space for the worker 5 arranged inside the root cutting groove 1 at the time of dropping and setting the discarded frame 4.

【0007】[0007]

【発明が解決しようとする課題】 前述の従来の基礎の
施工方法では、捨コンクリート3の養生期間を経ないと
根切溝1に捨型枠4を設置することができないため、捨
型枠4の設置に後続する各工程が順に遅れてしまい、施
工期間が長くなるという問題点がある。また、根切溝1
に余堀Sを設けるため、土砂の掘削,埋戻し等の量的な
取扱いが増大してしまい、施工コストが高くなるという
問題点がある。
According to the above-mentioned conventional method of constructing a foundation, since the sculpture form 4 cannot be installed in the root cutting groove 1 without the curing period of the slab concrete 3, the sculpture form 4 There is a problem that each process subsequent to the installation of the above is sequentially delayed, and the construction period becomes longer. In addition, root cutting groove 1
In order to increase the handling cost, such as excavation and backfilling of earth and sand, the construction cost increases.

【0008】本発明は、このような問題点を考慮してな
されたもので、根切溝に捨コンクリートを打設すること
なく捨型枠を設置することができ、根切溝の余堀を不要
にすることができる基礎の施工方法を提供することを課
題とする。
The present invention has been made in consideration of the above problems, and allows a scrapping form to be installed without casting concrete in the trench, thereby making it possible to remove an overhang of the trench. It is an object to provide a method of constructing a foundation that can be made unnecessary.

【0009】[0009]

【課題を解決するための手段】 前述の課題を解決する
ため、本発明に係る基礎の施工方法は、次のような手段
を採用する。
Means for Solving the Problems In order to solve the above-mentioned problems, a method for constructing a foundation according to the present invention employs the following means.

【0010】即ち、請求項1では、掘削された根切溝に
組立てられた捨型枠を上方から落込んで設置する基礎の
施工方法において、根切溝に敷設された砕石の上に捨型
枠を部分的に受ける複数枚の台板を設置し、台板の上に
捨型枠を設置することを特徴とする。
That is, according to the first aspect of the present invention, in a method of constructing a foundation in which a cut-out form assembled in an excavated root-cut is dropped from above and installed, a cast-out form is placed on crushed stone laid in the root-cut. A plurality of baseplates that partially receive the frame, and a discarding frame is set on the baseplate.

【0011】この手段では、根切溝に敷設された砕石の
上に設置された台板が捨型枠の設置のための水平な設置
面を形成する。また、捨コンクリートの打設前に設置さ
れる捨型枠が崩落する土砂に対する土止めとなる。
[0011] In this means, the base plate installed on the crushed stone laid in the root cutting groove forms a horizontal installation surface for installation of the scrap frame. In addition, the formwork installed before the casting of concrete will serve as a stop for the collapsed earth and sand.

【0012】また、請求項2では、請求項1の基礎の施
工方法において、台板は捨型枠の隅部に対応する位置に
設置されることを特徴とする。
According to a second aspect of the present invention, in the method of constructing the foundation according to the first aspect, the base plate is installed at a position corresponding to a corner of the discarded formwork.

【0013】この手段では、台板が捨型枠の設置の目印
(墨入)にもなる。
[0013] In this means, the base plate also serves as a mark (inking) for setting the discarded frame.

【0014】また、請求項3では、請求項1または2の
基礎の施工方法において、捨型枠を設置した後、捨型枠
で囲まれた砕石の上にのみ捨コンクリートを打設するこ
とを特徴とする。
According to a third aspect of the present invention, in the method for constructing a foundation according to the first or second aspect, after the disposing form is set, the disposing concrete is cast only on the crushed stone surrounded by the disposing form. Features.

【0015】この手段では、鉄筋の配筋等のための捨コ
ンクリートが捨型枠で囲まれた砕石の上にのみ打設され
る。
[0015] In this method, concrete for arranging reinforcing bars or the like is cast only on crushed stone surrounded by a mold.

【0016】また、請求項4では、請求項3の基礎の施
工方法において、施工区域内の全ての根切溝に捨型枠を
設置した後、各捨型枠で囲まれた砕石の上に捨コンクリ
ートを同時的にまたは連続的に打設することを特徴とす
る。
According to a fourth aspect of the present invention, in the method for constructing a foundation according to the third aspect, after setting up the crushed stones in all of the root cutting grooves in the construction area, the crushed stone is surrounded by the crushed stones. The method is characterized in that concrete is poured simultaneously or continuously.

【0017】この手段では、捨コンクリートが施工区域
内の全ての根切溝で同時的にまたは連続的に打設され
る。
[0017] In this means, the waste concrete is poured simultaneously or continuously in all the kerfs in the construction area.

【0018】また、請求項5では、請求項1〜4のいず
れかの基礎の施工方法において、施工区域内の1つの根
切溝を掘削した土砂はそのまま施工区域内の既に捨型枠
が設置された他の根切溝に埋戻されることを特徴とす
る。
According to a fifth aspect of the present invention, in the method for constructing a foundation according to any one of the first to fourth aspects, the earth and sand excavated in one root cutting groove in the construction area is already installed in the construction area as it is. It is characterized in that it is buried in another root kerf.

【0019】この手段では、根切り溝を掘削した土砂が
滞溜されることなく他の根切り溝の埋戻しに使用され
る。
In this means, the earth and sand excavated from the root cutting groove are used for backfilling another root cutting groove without being accumulated.

【0020】[0020]

【発明の実施の形態】 以下、本発明に係る基礎の施工
方法の実施の形態を図1〜図7に基づいて説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, an embodiment of a method for constructing a foundation according to the present invention will be described with reference to FIGS.

【0021】この実施の形態は、方体形の独立基礎から
なる基礎を構築するものを示してある。
This embodiment shows the construction of a foundation consisting of rectangular independent foundations.

【0022】この実施の形態は、まず、地表から根切溝
1を掘削し根切溝1の底部に砕石2を敷詰め転圧して敷
設する(前述の従来例の図8(A),(B)に相当)。
In this embodiment, first, a root cutting groove 1 is excavated from the surface of the ground, and crushed stone 2 is laid and rolled at the bottom of the root cutting groove 1 (see FIG. 8 (A) and FIG. B)).

【0023】根切溝1は、図2に示すように、バックホ
ー等の掘削作業機6を使用して、前述の従来例の余堀S
に相当する部分を除去した容積に掘削される。従って、
根切溝1の掘削される土砂7の量が前述の従来例に比し
て削減されるため、土砂7の量的な取扱いが減少して施
工コストが低減される。掘削された土砂7は、掘削作業
機6を転回させる等して、そのまま施工区域内の先に掘
削された他の根切溝1の既に設置されている捨型枠4の
周囲へ埋戻される。従って、掘削された土砂7を施工区
域外へ大量に搬出したり施工区域内で大量に集積したり
することが不要になる(土砂の一部については、搬出,
集積が必要である。)ため、土砂7の煩雑な取扱いが減
少して施工コストが低減される。
As shown in FIG. 2, an excavation work machine 6 such as a backhoe is used to cut the root kerf 1 in the above-mentioned conventional moat S.
Is excavated to the volume where the part corresponding to is removed. Therefore,
Since the amount of excavated earth 7 excavated in the root cutting groove 1 is reduced as compared with the above-described conventional example, the quantity of the excavated earth 7 is reduced and the construction cost is reduced. The excavated earth and sand 7 is buried back around the already-discarded formwork 4 of another excavated groove 1 previously excavated in the construction area by turning the excavator 6 or the like. . Therefore, it is not necessary to carry out a large amount of excavated earth and sand 7 outside the construction area or to accumulate a large amount within the construction area.
Accumulation is required. ) Therefore, complicated handling of the earth and sand 7 is reduced, and the construction cost is reduced.

【0024】次ぎに、図1(A)に示すように、砕石2
の上に捨型枠4を部分的に受ける台板8を設置する。
Next, as shown in FIG.
A base plate 8 that partially receives the scrap frame 4 is placed on the base plate.

【0025】台板8は、養生が不要な平板なコンクリー
ト板等からなるもので、底部が4角形の捨型枠4に対応
して4枚が設置される。これ等の4枚の台板8は、図3
に示すように、レーザ光等を利用したトランシット9a
及びレベル9bの測定によって捨型枠4の隅部又は捨型
枠4の外周部に対応する位置に互いに同一面で水平に設
置され、捨型枠4が設置される水平な設置面を形成す
る。即ち、前述の従来例の捨コンクリート3が台板8が
代替えされる。
The base plate 8 is made of a flat concrete plate or the like which does not need to be cured, and four base plates 8 are provided corresponding to the discarded frame 4 having a square bottom. These four base plates 8 are shown in FIG.
As shown in the figure, a transit 9a using a laser beam or the like.
And by measuring the level 9b, they are horizontally installed on the same plane horizontally at positions corresponding to the corners of the discarded frame 4 or the outer peripheral portions of the discarded frame 4, and form a horizontal installation surface on which the discarded frame 4 is placed. . That is, the base plate 8 is substituted for the above-mentioned conventional waste concrete 3.

【0026】次ぎに、図1(B)に示すように、台板8
の上に組立てられた捨型枠4をクレーン10で吊持し上
方から落込んで設置する。
Next, as shown in FIG.
The disposable form frame 4 assembled above is suspended by a crane 10 and dropped from above to be installed.

【0027】捨型枠4の設置は、台板8に養生が不要な
ことから、台板8の設置後に直ちに実施される。従っ
て、前述の従来例のように捨型枠4の設置前に捨コンク
リート3の養生期間を確保する必要がないため、捨型枠
4の設置に後続する各工程が順に遅れてしまうことがな
く施工期間が短くなる。捨型枠4の根切溝1への落込み
では、図4に示すように、必要以上に拡開されずに台板
8と余堀Sのない根切溝1の縁辺とが降下位置の目印M
として機能する。従って、根切溝1の内部に作業員5を
配置しなくても捨型枠4を正確に落込むことができるた
め、施工の安全性が確保される。設置された捨型枠4
は、崩落する土砂7に対する土止めとなって、内部に崩
落した土砂7が堆積するのを阻止する。従って、根切溝
1に余堀Sがなくても何等不都合はない。
The setting of the scrap frame 4 is carried out immediately after the setting of the base plate 8 because no curing is required for the base plate 8. Accordingly, since it is not necessary to secure a curing period for the waste concrete 3 before the installation of the waste mold frame 4 as in the above-described conventional example, each process subsequent to the installation of the waste mold frame 4 is not sequentially delayed. The construction period is shortened. As shown in FIG. 4, when the discarded formwork 4 is dropped into the root cutting groove 1, the base plate 8 and the edge of the root cutting groove 1 having no surplus S are not expanded unnecessarily. Mark M
Function as Therefore, the disposal frame 4 can be accurately dropped without arranging the worker 5 inside the root cutting groove 1, and the safety of construction is ensured. Destroyed formwork 4 installed
Serves as a barrier to the collapsing earth and sand 7 and prevents the collapsing earth and sand 7 from accumulating inside. Therefore, there is no inconvenience even if there is no surplus S in the root cutting groove 1.

【0028】また、図5に示すように、台板8に捨型枠
4をクレーン10で吊持し上方から落込んで設置した
後、台板8に設置された捨型枠4のトランシット9c及
びレベル9dの測定をおこなう。これは捨型枠4が設置
された後、捨型枠4の自重による影響や捨型枠4の設置
位置にズレが生じていないかを確認し,根切溝1及び台
板8と捨型枠4の設置位置をより精密にするためであ
る。
Further, as shown in FIG. 5, after the scrap frame 4 is hung on the base plate 8 by the crane 10 and set down from above, the transit 9c of the scrap frame 4 installed on the base plate 8 and The measurement of level 9d is performed. This is because after the disposable formwork 4 is installed, the influence of the weight of the disposable formwork 4 and the installation position of the disposable formwork 4 are checked for deviations. This is for making the installation position of the frame 4 more precise.

【0029】次ぎに、図1(C)に示すように、根切溝
1の捨型枠4の周囲に土砂7が埋戻される。
Next, as shown in FIG. 1 (C), earth and sand 7 are buried around the cut-out form 4 of the root cutting groove 1.

【0030】土砂7の埋戻しは、前述のように後で根切
溝1を掘削した土砂7をそのまま利用する。土砂7が埋
戻されると、捨型枠4の周囲の無用な溝が消失するた
め、施工区域内を移動する作業員5の転落を防止するこ
とができ、施工の安全性が確保される。埋戻された土砂
7は、コンクリートが打設充填される捨型枠4の耐圧性
を高める。
The backfill of the earth and sand 7 uses the earth and sand 7 from which the root cutting groove 1 has been excavated as described above. When the earth and sand 7 are buried back, unnecessary grooves around the disposal form 4 disappear, so that the worker 5 moving in the construction area can be prevented from falling down, and the safety of construction can be secured. The backfilled earth and sand 7 enhances the pressure resistance of the scrap frame 4 into which concrete is cast and filled.

【0031】次ぎに、図1(D)に示すように、捨型枠
4で囲まれた砕石2の上にのみ捨コンクリート3が打設
される。
Next, as shown in FIG. 1 (D), the concrete 3 is cast only on the crushed stone 2 surrounded by the mold 4.

【0032】捨コンクリート3は、鉄筋の配筋等のため
の設置面を形成する。捨コンクリート3を打設する作業
員5は、図6に示すように、捨型枠4によって囲まれて
土砂7の崩壊から保護される。従って、施工の安全性が
確保される。なお、捨コンクリート3を打設するには、
図7に示すように、共通のまたは複数の供給源11から
ホース12で捨コンクリート材料を供給して、施工区域
内の全ての根切溝1で同時的にまたは連続的に実施する
のが好ましい。捨コンクリート3の打設の同時的,連続
的な実施は、漏出した捨コンクリート材料の清掃作業や
供給源11,ホース12等の後片付作業を容易にする。
The waste concrete 3 forms an installation surface for arranging reinforcing bars and the like. As shown in FIG. 6, the worker 5 placing the waste concrete 3 is surrounded by the waste mold frame 4 and protected from the collapse of the earth and sand 7. Therefore, safety of construction is ensured. In addition, in order to cast discarded concrete 3,
As shown in FIG. 7, it is preferable to supply the waste concrete material with a hose 12 from a common or plural sources 11 and to carry out simultaneously or continuously in all the root cuts 1 in the construction area. . Simultaneous and continuous execution of the dumping concrete 3 facilitates the work of cleaning the leaked concrete material and the work of clearing the supply source 11, the hose 12, and the like.

【0033】この後、捨コンクリート3を養生してか
ら、捨型枠4の内部に鉄筋を配筋してからコンクリート
を打設することになる。
After that, after the concrete 3 is cured, reinforcing steel is arranged inside the mold 4 and then concrete is poured.

【0034】この捨コンクリート3の養生は、掘削作業
機6,クレーン10等の大型機による作業の終了後に実
施されるため、全体の施工に遅れをもたらすことはな
い。
The curing of the discarded concrete 3 is performed after the completion of the work by the large-sized machine such as the excavator 6 and the crane 10, so that there is no delay in the entire construction.

【0035】以上、図示した実施の形態の外に、独立基
礎の間に構築される地中梁からなる基礎の施工に適用す
ることも可能である。
As described above, in addition to the illustrated embodiment, the present invention can be applied to the construction of a foundation composed of underground beams constructed between independent foundations.

【0036】さらに、台板8を砕石2に打込み固定する
ことも可能である。
Further, the base plate 8 can be driven into the crushed stone 2 and fixed.

【0037】[0037]

【発明の効果】 以上のように、本発明に係る基礎の施
工方法は、根切溝に敷設された砕石の上に設置された台
板が捨型枠の設置のための水平な設置面を形成するた
め、根切溝に捨コンクリートを打設することなく捨型枠
を設置することができる効果がある。また、この効果に
より、捨型枠の設置に後続する各工程が順に遅れること
がなくなり、施工期間が短くなる効果が生ずる。
As described above, in the method for constructing a foundation according to the present invention, the base plate set on the crushed stone laid in the root cutting groove is used for the horizontal setting surface for setting the discarded formwork. Since it is formed, there is an effect that it is possible to install a waste formwork without placing concrete in a root cutting groove. In addition, by this effect, each step subsequent to the installation of the scrap frame is not delayed in order, and the effect of shortening the construction period is produced.

【0038】さらに、捨コンクリートの打設前に設置さ
れる捨型枠が崩落する土砂に対する土止めとなるため、
根切溝の余堀を不要にすることができる効果がある。ま
た、この効果により、土砂の掘削,埋戻し等の量的な取
扱いが減少して、施工コストが低減される効果が生ず
る。
Further, since the waste form set before placing the waste concrete serves as a stop for the collapsing earth and sand,
This has the effect of eliminating the need for a trench in the root groove. In addition, due to this effect, the amount of handling such as excavation and backfilling of earth and sand is reduced, so that there is an effect that the construction cost is reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る基礎の施工方法の実施の形態を
示す工程図であり、(A)〜(D)の順に工程順が示さ
れている。
FIG. 1 is a process diagram showing an embodiment of a foundation construction method according to the present invention, in which the order of steps is shown in the order of (A) to (D).

【図2】 図1に先行する工程と図1(C)の工程との
連係を示す断面図である。
FIG. 2 is a cross-sectional view showing a link between a step preceding FIG. 1 and a step shown in FIG.

【図3】 図1(A)の工程の詳細図であり、(A)に
平面図が示され、(B)に断面図が示されている。
FIG. 3 is a detailed view of the process of FIG. 1A, wherein FIG. 3A is a plan view and FIG. 3B is a cross-sectional view.

【図4】 図1(B)の工程の詳細図である。FIG. 4 is a detailed view of the step of FIG. 1 (B).

【図5】 図1(B)の工程の詳細図であり、(A)に
平面図が示され、(B)に断面図が示されている。
FIG. 5 is a detailed view of the step of FIG. 1B, wherein FIG. 5A is a plan view and FIG. 5B is a cross-sectional view.

【図6】 図1(D)の工程の詳細図である。FIG. 6 is a detailed view of the step of FIG. 1 (D).

【図7】 図1(D)の工程の連係を示す詳細図であ
る。
FIG. 7 is a detailed view showing a link between the steps in FIG. 1 (D).

【図8】 従来例を示す工程図であり、(A)〜(D)
の順に工程順が示されている。
FIGS. 8A to 8D are process diagrams showing a conventional example, and FIGS.
Are shown in the order of steps.

【図9】 図7(C)の工程の詳細図である。FIG. 9 is a detailed view of the step of FIG. 7 (C).

【図10】 図7(D)の工程の詳細図である。FIG. 10 is a detailed view of the step in FIG. 7 (D).

【符号の説明】[Explanation of symbols]

1 根切溝 2 砕石 3 捨コンクリート 4 捨型枠 7 土砂 8 台板 DESCRIPTION OF SYMBOLS 1 Root ditches 2 Crushed stone 3 Discarded concrete 4 Discarded formwork 7 Earth and sand 8 Base plate

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成13年6月8日(2001.6.8)[Submission date] June 8, 2001 (2001.6.8)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】全図[Correction target item name] All figures

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図1】 FIG.

【図2】 FIG. 2

【図3】 FIG. 3

【図7】 FIG. 7

【図4】 FIG. 4

【図5】 FIG. 5

【図6】 FIG. 6

【図9】 FIG. 9

【図10】 FIG. 10

【図8】 FIG. 8

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 掘削された根切溝に組立てられた捨型枠
を上方から落込んで設置する基礎の施工方法において、
根切溝に敷設された砕石の上に捨型枠を部分的に受ける
複数枚の台板を設置し、台板の上に捨型枠を設置するこ
とを特徴とする基礎の施工方法。
1. A method for constructing a foundation in which a discarded form frame assembled in an excavated root kerf is dropped from above and installed.
A method for constructing a foundation, comprising installing a plurality of base plates partially receiving a discarded formwork on crushed stone laid in a root cutting groove, and installing the discarded formwork on the baseplate.
【請求項2】 請求項1の基礎の施工方法において、台
板は捨型枠の隅部に対応する位置に設置されることを特
徴とする基礎の施工方法。
2. The method according to claim 1, wherein the base plate is installed at a position corresponding to a corner of the scrap frame.
【請求項3】 請求項1または2の基礎の施工方法にお
いて、捨型枠を設置した後、捨型枠で囲まれた砕石の上
にのみ捨コンクリートを打設することを特徴とする基礎
の施工方法。
3. A method for constructing a foundation according to claim 1 or 2, wherein after the disposing form is set, the concrete is cast only on the crushed stone surrounded by the disposing form. Construction method.
【請求項4】 請求項3の基礎の施工方法において、施
工区域内の全ての根切溝に捨型枠を設置した後、各捨型
枠で囲まれた砕石の上に捨コンクリートを同時的にまた
は連続的に打設することを特徴とする基礎の施工方法。
4. The method for constructing a foundation according to claim 3, wherein after setting a scrapping form in all the root cutting grooves in the construction area, simultaneously discarding concrete on the crushed stone surrounded by the scrapping forms. Or a continuous casting method.
【請求項5】 請求項1〜4のいずれかの基礎の施工方
法において、施工区域内の1つの根切溝を掘削した土砂
はそのまま施工区域内の既に捨型枠が設置された他の根
切溝に埋戻されることを特徴とする基礎の施工方法。
5. The method for constructing a foundation according to any one of claims 1 to 4, wherein the earth and sand excavated from one of the root cutting grooves in the construction area is directly used as the other roots in the construction area, on which the cut-off forms have already been installed. A method for constructing a foundation characterized by being buried in a kerf.
JP2001163514A 2001-05-30 2001-05-30 Foundation constructing method Pending JP2002356857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001163514A JP2002356857A (en) 2001-05-30 2001-05-30 Foundation constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001163514A JP2002356857A (en) 2001-05-30 2001-05-30 Foundation constructing method

Publications (1)

Publication Number Publication Date
JP2002356857A true JP2002356857A (en) 2002-12-13

Family

ID=19006466

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001163514A Pending JP2002356857A (en) 2001-05-30 2001-05-30 Foundation constructing method

Country Status (1)

Country Link
JP (1) JP2002356857A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485452A (en) * 2019-08-20 2019-11-22 中国建筑第八工程局有限公司 Isolated footing and its construction method constructed in supporting course

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273877A (en) * 1999-03-25 2000-10-03 Shimizu Corp Foundation construction method and placing form

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273877A (en) * 1999-03-25 2000-10-03 Shimizu Corp Foundation construction method and placing form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485452A (en) * 2019-08-20 2019-11-22 中国建筑第八工程局有限公司 Isolated footing and its construction method constructed in supporting course

Similar Documents

Publication Publication Date Title
JP2000154553A (en) Construction of tunnel
JP3893056B2 (en) Construction method of underground structure
JP2012112162A (en) Earth retaining wall and construction method of earth retaining wall
JP2008144529A (en) Pile head treating tool of cast-in-place concrete pile
JP2002356857A (en) Foundation constructing method
EP1090189B1 (en) Improved formation of capping beams for piles
JP2017206882A (en) Method of constructing underground structure
JPH09256396A (en) Vertical pile positioning method of earth retaining wall
JP6255607B2 (en) Foundation construction method
JPH0414518A (en) Method for constructing new retaining wall at old retaining wall position on neighboring line
JP3245262B2 (en) Underground beam construction method
JP3335593B2 (en) Underground structure construction structure
CN115288191B (en) Reverse construction method
JP6378873B2 (en) Artificial ground and construction method of artificial ground
JPH06346465A (en) Foundation structure and its construction
JP2804422B2 (en) Foundation construction method
JP2007039948A (en) Foundation construction method and foundation
JP3245259B2 (en) Foundation construction method
JP2003278173A (en) Construction method of underground structure
JP2001323485A (en) Method of constructing underground structure
JPH02104823A (en) Constructing method for retaining wall using artificial lightweight soil
JPH07331871A (en) Method for constructing concrete foundation
JPH1088567A (en) Improving method for ground for building and construction method for foundation for building
JPH11280060A (en) Work execution method for continuous underground wall
JP2000064300A (en) Continuous footing execution method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20071122

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080422

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080529

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100805

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100810

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20101207