JP2804422B2 - Foundation construction method - Google Patents

Foundation construction method

Info

Publication number
JP2804422B2
JP2804422B2 JP5133505A JP13350593A JP2804422B2 JP 2804422 B2 JP2804422 B2 JP 2804422B2 JP 5133505 A JP5133505 A JP 5133505A JP 13350593 A JP13350593 A JP 13350593A JP 2804422 B2 JP2804422 B2 JP 2804422B2
Authority
JP
Japan
Prior art keywords
section
formwork
foundation
root
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5133505A
Other languages
Japanese (ja)
Other versions
JPH06346464A (en
Inventor
孝夫 高本
Original Assignee
高伸建設 株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高伸建設 株式会社 filed Critical 高伸建設 株式会社
Priority to JP5133505A priority Critical patent/JP2804422B2/en
Publication of JPH06346464A publication Critical patent/JPH06346464A/en
Application granted granted Critical
Publication of JP2804422B2 publication Critical patent/JP2804422B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、コンクリートを一体成
型するための捨型枠を用いた大規模建屋の基礎の施工方
法に関する。さらに詳しくは、地盤に堀溝した根切り溝
に地下室を有しない建屋の基礎を構築する施工方法にお
いて、その安全性と根切り溝を堀溝した削土処理に係る
改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a foundation for a large-scale building using a dies for integrally molding concrete. More specifically, the present invention relates to a safety method and an improvement relating to a soil cutting process in which a root trench is dug in a construction method for constructing a foundation without a basement in a root trench ditched in the ground.

【0002】[0002]

【従来の技術】従来、地下室を有しない大規模建屋の基
礎の施工方法としては、例えば、施工区域の全範囲にお
いて地盤に根切り溝を堀溝し、根切り溝の底部に割栗石
を敷設し転圧してその上に捨コンクリートを打設した
後、根切り溝に基礎の型枠を建込み、型枠の内部に配筋
を行ってコンクリートを一体に打設することが知られて
いる。なお、打設したコンクリートが硬化した後には、
型枠を解体除去してコンクリートにより構築された基礎
の周囲を埋戻すことになる。
2. Description of the Related Art Conventionally, as a method for constructing a foundation of a large-scale building having no basement, for example, a trench is dug in the ground in the entire construction area, and a split stone is laid at the bottom of the trench. It is known that a concrete form is built in a root cutting groove after a concrete is compacted by rolling the concrete, and then concrete is integrally cast by arranging a reinforcement inside the formwork. After the cast concrete has hardened,
The formwork will be dismantled and backfilled around the concrete foundation.

【0003】この従来の基礎の施工方法では、施工区域
の全範囲において根切り溝が堀溝されて削土が多量にな
ることから、削土を施工区域内に保留せずに施工区域外
へ搬出してしまい、基礎の周囲を埋戻す土砂については
新たに施工区域内に搬入することが行われている。この
削土の量は、根切り溝深さ×根切り溝巾×建坪で算出さ
れる。
In this conventional method for constructing a foundation, since a root cutting groove is dug in the entire area of the construction area and a large amount of soil is removed, the soil is removed from the construction area without being held in the construction area. As a result, the earth and sand that bury the surroundings of the foundation is newly transported into the construction area. The amount of soil removal is calculated as root cutting groove depth x root cutting groove width x floor area.

【0004】[0004]

【発明が解決しようとする課題】前述の従来の基礎の施
工方法では、施工区域の全範囲において堀溝された根切
り溝が型枠が解体除去されるまで埋戻されずに開口され
た状態となっている。従って、型枠,配筋作業員等の転
落を防止するための作業足場,作業通路等を根切り溝に
架設しなければならず、作業足場,作業通路等の架設に
より施工コストが嵩み施工期間が長くなるというという
問題点がある。さらに、作業足場,作業通路等が架設さ
れても根切り溝が開口された状態には変化がないため、
作業の危険性は依然として残ってしまうという問題点が
ある。さらに、多量の削土の搬出,埋戻し土砂の搬入に
よっても、施工コストが嵩み施工期間が長くなるという
という問題点がある。
In the above-mentioned conventional method for constructing a foundation, in the entire area of the construction area, the excavated root cutting grooves are opened without being backfilled until the formwork is dismantled and removed. ing. Therefore, work scaffolds, work passages, etc. for preventing fall of the formwork, rebar arrangement workers, etc., must be erected in the root cutting grooves, and construction costs are increased by erection of the work scaffolds, work passages, etc. There is a problem that the period is long. Furthermore, even if a work scaffold, a work passage, or the like is erected, the state in which the root groove is opened does not change.
There is a problem that the danger of work still remains. Furthermore, there is a problem that the construction cost is increased and the construction period is lengthened even by carrying out a large amount of excavated soil and carrying backfilled earth and sand.

【0005】ところで、特開平5−17955号公報に
は、施工区域の全範囲において根切り溝を掘溝し、この
根切り溝に捨型枠の建込み、捨型枠の周囲を埋め戻す施
工法が開示されている。この施工法では、施工区域の全
範囲で捨型枠を建込むまでは依然として捨型枠とその周
囲では開口した状態となっており、依然として作業の危
険性が解消されていなかった。
Japanese Patent Application Laid-Open No. Hei 5-17955 discloses that a trench is dug in a whole area of a construction area, a mold is formed in the trench, and the periphery of the mold is backfilled. A law is disclosed. According to this construction method, until the disposable formwork is built in the entire area of the construction area, the disposable formwork and the surrounding area are still open, and the danger of work has not been solved yet.

【0006】また、特開平4−272319号公報に
は、堀溝した根切り溝に基礎を設置して削土を埋戻し、
これを順次繰り返す基礎施工法が開示されている。しか
しながら、この基礎施工法は、予め成型されてT字部分
を有するプレキャストコンクリートそのものを基礎石と
して建込みするものであって、コンクリートを打設する
型枠自体の建込みを何ら開示していないばかりか、捨型
枠に関しての建込みを一切示唆をしていない。換言すれ
ば、基礎となるプレキャストコンクリートは建築現場以
外で予め全て成形済であるので、コンクリート打設のた
めに建築現場へと型枠や鉄筋等を搬入してくる必要性が
なく、むしろ建築現場では型枠や鉄筋等が邪魔となるも
のであって、型枠の組立てや建込み或いは配筋の時期等
について考慮する余地が全くないものである。
[0006] In Japanese Patent Application Laid-Open No. 4-272319, a foundation is installed in a digging trench and backfilling is performed.
A basic construction method which repeats this one by one is disclosed. However, this foundation construction method is to build a precast concrete itself having a T-shaped portion as a foundation stone as a foundation stone, and does not disclose any construction of a formwork for casting concrete. No suggestion is made regarding the construction of abandoned formwork. In other words, the base precast concrete has already been molded outside the construction site, so there is no need to bring the formwork, reinforcing steel, etc. to the construction site for concrete casting. In this case, a formwork, a reinforcing bar, or the like is in the way, and there is no room for considering the timing of assembling, building, or arranging the formwork.

【0007】また、根切り溝の掘溝については、プレキ
ャストコンクリートの基礎石としての寸法に応じて設計
されるのであって、型枠の組立てと建込み等の寸法が考
慮されている訳ではない。従って、根切り溝の順次掘溝
を繰り返す際には、プレキャストコンクリートの基礎石
自体として行われているに過ぎず、型枠用としての掘溝
とその順次繰り返しは一切行われていない。さらに、根
切り溝の順次埋戻しについても、プレキャストコンクリ
ートの基礎石自体に対して直接に行われるものであっ
て、型枠に対して削土を順次埋戻すことは一切開示され
ていない。
[0007] Further, the digging groove of the root cutting groove is designed according to the size of the foundation stone of the precast concrete, and does not take into account the dimensions of assembling and building the formwork. . Therefore, when the digging groove of the root cutting groove is repeated, it is merely performed as the foundation stone itself of the precast concrete, and the digging groove for the formwork and the sequential repetition thereof are not performed at all. Furthermore, the backfilling of root cutting grooves is also performed directly on the foundation stone itself of precast concrete, and there is no disclosure of backfilling the shavings sequentially on the formwork.

【0008】実際にも、プレキャストコンクリートは荷
重等に弱いために基礎石としては不適当であるが、基礎
石として小規模住宅向けに適用するとすれば、基礎寸法
として掘溝すれば良いので、極めて浅く且つ幅狭の溝寸
法で足りる。一般的には、最大で幅80cm×深さ50
cm×施工区域程度で足りるので、削土は多量とならず
に現場に積置くことができるものであって、この種の小
規模住宅ではコンクリートを一度に打設して基礎を形成
する場合にも削土を運搬してはいなかった。
[0008] In fact, precast concrete is not suitable as a foundation stone because of its weakness against loads and the like. However, if it is applied to a small house as a foundation stone, it is only necessary to dig a groove as the foundation dimension. A shallow and narrow groove size is sufficient. Generally, the maximum width is 80 cm and the depth is 50
cm × construction area is enough, so it can be piled up on site without a large amount of soil removal.In this kind of small house, when concrete is cast at once to form a foundation Did not carry the excavated soil.

【0009】さらにまた、特開平4−272319号公
報の基礎施工法では、各プレキャストコンクリートが接
続隙間部分の外側に型枠を固定してコンクリート打設に
より接続されるので、大荷重に耐えられるように連続し
た配筋を行ってコンクリートを一体に打設するための型
枠を用いる技術とは無関係である。この基礎施工法で
は、大規模の建屋に使用できないものと認められる。
Furthermore, in the basic construction method disclosed in Japanese Patent Application Laid-Open No. 4-272319, each precast concrete is connected by concrete casting with a formwork fixed to the outside of the connection gap, so that it can withstand a large load. It is irrelevant to the technique of using a formwork for arranging concrete in one by continuously arranging reinforcing bars. It is recognized that this foundation construction method cannot be used for large-scale buildings.

【0010】本発明は、このような問題点を考慮してな
されたもので、削土を有効利用して根切り溝の開口され
ている状態を短縮した基礎の施工方法を提供することを
課題とする。
[0010] The present invention has been made in view of such problems, and an object of the present invention is to provide a method of constructing a foundation in which the state in which a root groove is opened is shortened by effectively using earth removal. And

【0011】[0011]

【課題を解決するための手段】前述の課題を解決するた
め、本発明に係る基礎の施工方法は、次のような手段を
採用する。
In order to solve the above-mentioned problems, a method for constructing a foundation according to the present invention employs the following means.

【0012】即ち、施工区域の一区画の地盤に複数の独
立基礎部と独立基礎部の間に独立基礎部に連通して配設
される地中梁部とから構成されている根切り溝を堀溝し
て、その一区画の根切り溝に埋め殺しとなる独立基礎用
と地中梁用の捨型枠を建込み、建込んだ捨型枠の内部に
配筋工事を行うことなく、続いて隣接または近接した別
の区画に同様に根切り溝の堀溝と捨型枠の建込みとを行
い、その別の区画の根切り溝の堀溝の際の削土を堀溝し
ながら先の区画の捨型枠の周囲に埋戻して場内処理し、
このような根切り溝の堀溝と捨型枠の建込みと削土の先
の区画の捨型枠の周囲への埋戻しによる場内処理とを各
区画に次々に実施していき、施工区域の最後に残った区
画の捨型枠の周囲には削土の残土を埋戻して場内処理す
る。
That is, a root cutting groove formed of a plurality of independent foundation portions and an underground beam portion disposed between the independent foundation portions and communicating with the independent foundation portion is provided on the ground of one section of the construction area. The trench was dug and built into the root trench of one section, and the built-in formwork for the independent foundation and the underground beam was buried. In the same way, another trench adjacent to or adjacent to the other section shall be buried in the trench of the root groove, and the formwork shall be erected. Backfilled around the discarded formwork and processed in the yard,
The construction of such trenches and digging forms of the root ditches and the in-plant treatment by backfilling the digging form around the digging form of the section before the excavation will be carried out for each section one after another. The remaining soil from the excavation will be buried around the scrapping frame of the last remaining section and processed in the plant.

【0013】[0013]

【作用】前述の手段によると、施工区域において隣接ま
たは近接する一区画づつ独立基礎部と地中梁部とからな
る根切り溝が開口され、先の区画でに開口された捨型枠
の周囲の根切り溝が後の区画の根切り溝の削土によっ
て、後の区画の根切り溝の掘溝と同時進行して埋戻され
る。このため、削土を隣接または近接する距離だけ運搬
し、各区画において有効利用して根切り溝の開口されて
いる状態が短縮されることになる。一区画の根切り溝、
捨型枠の工事の後には、配筋工事等を行わないため、直
ちに次に根切り溝、捨型枠の工事が行われる。
According to the above-mentioned means, in the construction area, a root cutting groove formed of an independent foundation portion and an underground beam portion which is adjacent to or adjacent to each other is opened, and the periphery of the discarded form opened in the previous section is opened. The grooving of the root kerf of the later section is simultaneously back-filled with the excavation groove of the kerf of the later section. For this reason, the excavated soil is transported by an adjacent distance or an approaching distance, and the state where the root cutting groove is opened is shortened by effectively utilizing the soil in each section. A section of root kerfs,
After the construction of the discarded formwork, no rebar construction work will be performed, so the construction of the root cutting groove and the discarded formwork will be performed immediately.

【0014】[0014]

【実施例】以下、本発明に係る基礎の施工方法の実施例
を図面に基いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a method for constructing a foundation according to the present invention will be described below with reference to the drawings.

【0015】この実施例では、施工区域Gを方形の多数
の区画に分けて施工するものを示してある。
In this embodiment, the construction area G is constructed by dividing the construction area into a number of rectangular sections.

【0016】まず、図1,図2に示すように、施工区域
Gの一区画Aのみに根切り溝1を堀溝する。即ち、施工
区域Gの地盤の一部分にのみ根切り溝1が開口されるよ
うにする。
First, as shown in FIGS. 1 and 2, a root cutting groove 1 is dug only in one section A of a construction area G. That is, the root cutting groove 1 is opened only in a part of the ground in the construction area G.

【0017】この根切り溝1は、一定間隔を介して配置
された複数の方形の独立基礎部10と、独立基礎部10
の間に独立基礎部10に連通して配設された長方形の地
中梁部11とからなる。根切り溝1には、必要に応じて
土留め処理等が施されて、底部に割栗石を敷設し転圧し
てその上に捨コンクリート12を打設する根切り底工事
が行われる。ただし、地中梁部11については、後述の
地中梁用捨型枠4の構造から、少なくとも捨コンクリー
ト12の打設は不要である。また、この根切り溝1を堀
溝した削土は、施工区域Gから搬出される。
The root cutting groove 1 includes a plurality of square independent foundations 10 arranged at regular intervals, and an independent foundation 10
And a rectangular underground beam portion 11 disposed in communication with the independent foundation portion 10. An earth retaining process or the like is applied to the root cutting groove 1 if necessary, and a root cutting work is performed in which a split stone is laid at the bottom, compacted, and discarded concrete 12 is poured thereon. However, regarding the underground beam portion 11, at least the casting of the discarded concrete 12 is unnecessary because of the structure of the discarded frame 4 for the underground beam described later. The excavated soil obtained by digging the root cutting groove 1 is carried out from the construction area G.

【0018】そして、図3,図4に示すように、根切り
底工事が行われた根切り溝1に基礎を構築するためのコ
ンクリートを打設する捨型枠2を建込む。
Then, as shown in FIG. 3 and FIG. 4, a dump frame 2 for placing concrete for constructing a foundation is installed in the root cutting groove 1 where the root cutting work has been performed.

【0019】この捨型枠2は、根切り溝1の内部に埋め
殺されるもので、解体除去する必要がないものである。
従って、捨型枠2の構造をかなり簡素化することができ
る。また、この捨型枠2は、独立基礎部10に建込まれ
る独立基礎用捨型枠3と地中梁部11に建込まれる地中
梁用捨型枠4とがユニット化されてなるもので、独立基
礎用捨型枠3を独立基礎部10に据え付けた後に地中梁
用捨型枠4を地中梁部11に据え付けて、独立基礎用捨
型枠3,地中梁用捨型枠4を適当な手段で接続連結する
ようになっている。従って、独立基礎用捨型枠3,地中
梁用捨型枠4をそれぞれ根切り溝1の外部で予め組立て
て根切り溝1の内部に落込んで据え付けるような建込み
工法を採ることができ、根切り溝1の余掘り量を少なく
することができる。
The discarded frame 2 is buried inside the root cutting groove 1 and does not need to be dismantled and removed.
Accordingly, the structure of the scrap frame 2 can be considerably simplified. In addition, the discarded formwork 2 is formed by uniting a discarded formwork 3 for an independent foundation built in the independent foundation section 10 and a discarded formwork 4 for an underground beam built in the underground beam section 11. Then, after the dismountable formwork 3 for the independent foundation is installed on the independent foundation portion 10, the disposable formwork 4 for the underground beam is installed on the underground beam portion 11, and the disposable formwork 3 for the independent foundation is dismantled. The frame 4 is connected and connected by an appropriate means. Therefore, it is possible to adopt a construction method in which the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam are respectively pre-assembled outside the root cutting groove 1 and dropped into the root cutting groove 1 for installation. In addition, the amount of surplus digging of the root groove 1 can be reduced.

【0020】次に、図5,図6に示すように、隣接する
区画Bにも根切り溝1を連通して堀溝する。そして、こ
の堀溝の削土B’を先の区画Aの捨型枠2の周囲に埋戻
して場内処理する。このとき、削土B’を一時堆積する
ことなく、区画Bの根切り溝1の堀溝と同時進行して削
土B’による先の区画Aの捨型枠2の周囲の埋戻しが行
われる。即ち、施工区域Gの先の一区画Aに代わって隣
接する一区画Bにのみ根切り溝1が開口されるようにす
る。
Next, as shown in FIGS. 5 and 6, the root cutting groove 1 is also connected to the adjacent section B to form a trench. Then, the excavated soil B 'of the trench is buried around the discarded frame 2 of the section A, and the in-plant processing is performed. At this time, the excavation of the surrounding area of the shaving frame 2 of the previous section A is performed by the excavation B 'simultaneously with the excavation groove of the root cutting groove 1 of the section B without temporarily depositing the excavation B'. . That is, the root cutting groove 1 is opened only in the adjacent one section B instead of the one section A ahead of the construction area G.

【0021】この根切り溝1を堀溝した削土B’の残土
は、その区画Bの近くまたは施工区域Gの適当な場所に
堆積させて留保しておく。
The remaining soil of the excavated soil B 'obtained by digging the root trench 1 is deposited near the section B or in an appropriate place in the construction area G and reserved.

【0022】さらに、先の区画Aと同様にこの区画Bに
も捨型枠2を建込む。そして、さらに次の区画Cの根切
り溝1の堀溝とその先の区画Bの捨型枠2の周囲の埋戻
しによる場内処理とを行う。なお、この埋戻しは、区画
Bに近くに留保しておいた削土B’の残土と区画Cの削
土とによって行われる。
Further, as in the case of the section A, the discarded formwork 2 is erected in the section B. Then, in-situ processing is performed by backfilling the moat of the root cutting groove 1 of the next section C and the periphery of the scrapping frame 2 of the section B ahead of it. This backfilling is performed by the remaining soil of the excavated soil B ′ reserved near the section B and the excavated soil of the section C.

【0023】このようにして最後の区画の捨型枠2の周
囲の埋戻しによる場内処理は、その区画の近くに留保し
ておいた削土の残土によって行われる。
In this way, the in-plant processing by backfilling around the disposal form 2 of the last section is performed by the remaining soil of the excavated soil reserved near the section.

【0024】なお、最後の区画の捨型枠2の周囲の埋戻
しによる場内処理が行われた後には、捨型枠2の内部に
配筋等してコンクリートを打設することになる。このと
き、独立基礎部10では内部で配筋作業が行われるが、
地中梁用捨型枠4では連続した長さで地上組付けした鉄
筋を作業足場,作業通路等のない地中梁用捨型枠4へ落
とし込んで配筋される。なお、コンクリートの打設の後
の捨型枠2の解体除去は、不要となる。
After the in-plant treatment by backfilling around the discarded frame 2 of the last section, concrete is placed inside the discarded frame 2 by arranging reinforcing bars or the like. At this time, reinforcing work is performed internally in the independent foundation 10,
In the underground girder formwork 4, the reinforcing bars assembled on the ground with a continuous length are dropped into the underground girder formwork 4 having no work scaffolds, work passages and the like, and are arranged. It is not necessary to dismantle and remove the scrap frame 2 after the concrete is cast.

【0025】このような実施例によると、施工中におい
ては根切り溝1が施工区域Gの1つの区画A,B,C・
・においてのみ開口されているのみであることから、型
枠,配筋作業者等が誤って根切り溝1に転落する危険性
が極めて低くなる。従って、作業足場,作業通路等の架
設も不要となり、施工コストが低減され施工期間が短く
なる。
According to such an embodiment, during the construction, the root cutting groove 1 forms one of the sections A, B, C,.
Since only the openings are provided at the holes, there is a very low risk that the formwork, the reinforcement arranging worker, etc. may fall down to the root cutting groove 1 by mistake. Therefore, it is not necessary to install a work scaffold, a work passage, and the like, and the construction cost is reduced and the construction period is shortened.

【0026】さらに、根切り溝1の削土については、最
初の一区画Aのみの削土を施工区域G外へ搬出すればよ
く、その後の区画B,C・・の削土を捨型枠2の周囲へ
の埋戻して有効利用して場内処理し施工区域G外へ搬出
する必要がなくなる。また、捨型枠2の周囲への埋戻し
土砂を施工区域G内へ搬入する必要もなくなる。また、
捨型枠2のユニット化,落とし込み工法の採用により、
根切り溝1の余掘り量が従来の片側500〜1200m
mから350mmに半減させることができた。従って、
この点からも施工コストが低減され施工期間が短くな
る。また、このような搬出,搬入が不要となることによ
り、搬出,搬入用車両の往来がなくなって交通量の緩
和,環境汚染の低減に寄与することができる。
Further, as for the excavation of the root cutting groove 1, the excavation of only the first section A may be carried out of the construction area G, and the excavation of the subsequent sections B, C,. It is no longer necessary to bury the material in the area 2 and use it effectively to process it inside the site and carry it out of the construction area G. In addition, there is no need to carry backfilled earth and sand around the disposal form 2 into the construction area G. Also,
By the unitization of the discarding formwork 2 and adopting the dropping method,
Excavation amount of root cutting groove 1 is 500 to 1200 m on one side.
from 50 m to 350 mm. Therefore,
From this point, the construction cost is reduced and the construction period is shortened. In addition, since the carrying-out and carrying-in become unnecessary, the traffic of the carrying-out and carrying-in vehicles can be eliminated, thereby contributing to a reduction in traffic volume and a reduction in environmental pollution.

【0027】[0027]

【発明の効果】以上のように本発明に係る基礎の施工方
法は、施工区域の一区画づつ開口される根切り溝に捨型
枠が建込みされ、後の根切り溝の削土が次々に隣接また
は近接する距離を運搬して先の区画の捨型枠周囲で埋戻
されて場内処理されることから、根切り溝の開口されて
いる状態を短縮することができた。その結果、根切り
溝への作業員の転落の危険性が低下して施工の安全性が
高くなるうえに、作業足場,作業通路等を架設する必
要がなくなり、削土の有効利用と施工全区域の一括配
筋作業等によって施工期間を短くすることができ、さ
らに削土等の搬出,搬入用車両の往来がなくなるために
交通量の緩和,環境汚染の低減に寄与することができる
効果がある。
As described above, according to the method of constructing a foundation according to the present invention, a waste form is erected in a root cutting groove which is opened in each section of the working area, and the soil removal of the subsequent root cutting groove is performed one after another. Since it was conveyed a distance adjacent to or close to and was buried around the discarded formwork of the previous section and processed in the field, the state in which the root groove was opened could be shortened. As a result, the danger of workers falling into the grooving ditches is reduced and the safety of construction is increased. In addition, there is no need to construct work scaffolds, work passages, etc. The construction period can be shortened by collective bar arrangement work in the area, and the effect of contributing to alleviation of traffic volume and reduction of environmental pollution is eliminated because there is no need to carry out excavated soil and carry-in vehicles. is there.

【0028】また、本発明に係る基礎の施工方法は、独
立基礎部と地中梁部の根切り溝に独立基礎用と地中梁用
の捨型枠を建込み、これに隣接または近接する後の根切
り溝の削土を次々に先の捨型枠周囲に埋戻することがで
き、これによって捨型枠の連続埋戻施工を実現すること
ができた。特に、連続埋戻施工による捨型枠の内部には
連続配筋して一体にコンクリート打設を行えるので、強
固な大型基礎を提供することができ、大規模な建屋の基
礎に最適に実施可能である。
Further, according to the method of constructing a foundation according to the present invention, discarded frames for the independent foundation and the underground beam are erected in the root trenches of the independent foundation and the underground beam, and are adjacent to or adjacent to this. The excavated soil of the later root cuts could be buried one after another around the former formwork, thereby realizing the continuous backfilling of the formwork. In particular, since concrete can be cast integrally by continuously arranging the inside of the formwork by continuous backfilling, a solid large foundation can be provided, and it can be optimally applied to the foundation of a large building It is.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る基礎の施工方法の実施例の最初の
工程を示す平面図である。
FIG. 1 is a plan view showing a first step of an embodiment of a foundation construction method according to the present invention.

【図2】図1に続く工程を示す図1の断面図である。FIG. 2 is a cross-sectional view of FIG. 1 showing a step that follows the step of FIG. 1;

【図3】図2に続く工程を示す図1の断面図である。FIG. 3 is a sectional view of FIG. 1 showing a step following FIG. 2;

【図4】図3に続く工程を示す図1の断面図である。FIG. 4 is a cross-sectional view of FIG. 1 showing a step subsequent to FIG. 3;

【図5】図4に続く工程を示す図1の断面図である。FIG. 5 is a sectional view of FIG. 1 showing a step following FIG. 4;

【図6】図5の平面図である。FIG. 6 is a plan view of FIG. 5;

【符号の説明】[Explanation of symbols]

1 根切り溝 10 独立基礎部 11 地中梁部 2 捨型枠 3 独立基礎用捨型枠 4 地中梁用捨型枠 A,B,C 区画 G 施工区域 DESCRIPTION OF SYMBOLS 1 Root ditches 10 Independent foundation part 11 Underground beam part 2 Disposable formwork 3 Disposable formwork for independent foundation 4 Disposable formwork for underground beams A, B, C Section G Construction area

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 施工区域の一区画の地盤に複数の独立基
礎部と独立基礎部の間に独立基礎部に連通して配設され
る地中梁部とから構成される根切り溝を堀溝して、その
一区画の根切り溝に埋め殺しとなる独立基礎用と地中梁
用の捨型枠を建込み、建込んだ捨型枠の内部に配筋工事
を行うことなく、続いて隣接または近接した別の区画に
同様に根切り溝の堀溝と捨型枠の建込みとを行い、その
別の区画の根切り溝の堀溝の際の削土を堀溝しながら先
の区画の捨型枠の周囲に埋戻して場内処理し、このよう
な根切り溝の堀溝と捨型枠の建込みと削土の先の区画の
捨型枠の周囲への埋戻しによる場内処理とを各区画に次
々に実施していき、施工区域の最後に残った区画の捨型
枠の周囲には削土の残土を埋戻して場内処理する基礎の
施工方法。
1. An underground trench formed by a plurality of independent foundation portions and an underground beam portion disposed between the independent foundation portions in communication with the independent foundation portion on the ground of one section of the construction area. Then, in one section of the root trench, a built-in form for the independent foundation and an underground beam that will be buried and buried is built, and no rebar work is performed inside the built-in form. In the same manner, dig trenches and digging forms for root cuts in another adjacent or adjacent section, and cut off the previous section while digging the soil from the trenches for root cuts in another section. It is buried around the formwork and treated in the yard. This is a method of constructing a foundation that is implemented one after another on a parcel and reclaims the remaining soil from the excavated soil around the discarded formwork of the parcel left at the end of the construction area.
JP5133505A 1993-06-03 1993-06-03 Foundation construction method Expired - Lifetime JP2804422B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5133505A JP2804422B2 (en) 1993-06-03 1993-06-03 Foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5133505A JP2804422B2 (en) 1993-06-03 1993-06-03 Foundation construction method

Publications (2)

Publication Number Publication Date
JPH06346464A JPH06346464A (en) 1994-12-20
JP2804422B2 true JP2804422B2 (en) 1998-09-24

Family

ID=15106345

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5133505A Expired - Lifetime JP2804422B2 (en) 1993-06-03 1993-06-03 Foundation construction method

Country Status (1)

Country Link
JP (1) JP2804422B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7232714B2 (en) * 2019-05-31 2023-03-03 株式会社安藤・間 how to build a foundation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5585736A (en) * 1978-12-23 1980-06-28 Natl House Ind Co Ltd Foundation work
JPS5883759A (en) * 1981-11-11 1983-05-19 株式会社巴組「鉄」工所 Construction of foundation by disposable mold frame made of metal
JPH0699938B2 (en) * 1990-12-18 1994-12-12 株式会社鳥居建設 Reinforcement frame and underground beam construction method
JPH04272319A (en) * 1990-12-28 1992-09-29 Misawa Homes Co Ltd Construction of foundation
JPH0517955A (en) * 1991-01-28 1993-01-26 Kyoto Supeesaa:Kk Execution method for direct foundation and form panel for direct foundation

Also Published As

Publication number Publication date
JPH06346464A (en) 1994-12-20

Similar Documents

Publication Publication Date Title
JP3893056B2 (en) Construction method of underground structure
JP2804422B2 (en) Foundation construction method
JPH05230845A (en) L-shaped block retaining wall structure and construction method thereof
JP3245259B2 (en) Foundation construction method
JPH0654016B2 (en) Underground space construction method
JP2656892B2 (en) Underground structure construction method and continuous underground wall construction method
JP3245262B2 (en) Underground beam construction method
JP3245260B2 (en) Foundation structure and construction method
JPS61186623A (en) Method of building foundation of building
JPH04309694A (en) Underground space construction method
JPH0768858B2 (en) Construction method of large-section shield tunnel
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
CN117738065A (en) Construction method for seamless connection of steel-concrete trestle and earthwork ramp
JP3249636B2 (en) Foundation structure and construction method
JPH0754351Y2 (en) Abandoned formwork used in the temporary construction method
JPH06137084A (en) Contruction method of tunnel opening
JP2001336164A (en) Working platform for constructing underground structure and constructing method thereof
CN112523259A (en) Civil air defense dismantling method and foundation pit construction method
JPH11280060A (en) Work execution method for continuous underground wall
JP2022074648A (en) Construction method of underground beam
JPH06193084A (en) Construction method for undeground structure
CN117780141A (en) Underground space development method based on pre-grooving and load underpinning system and structure thereof
JP2003193496A (en) Underground structure constructing method and earth retaining structure
JPS62111028A (en) Construction of underground structure
JP2001323485A (en) Method of constructing underground structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

S201 Request for registration of exclusive licence

Free format text: JAPANESE INTERMEDIATE CODE: R314201

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S804 Written request for registration of cancellation of exclusive licence

Free format text: JAPANESE INTERMEDIATE CODE: R314805

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080717

Year of fee payment: 10

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090717

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090717

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100717

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110717

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120717

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 15

EXPY Cancellation because of completion of term