JP2002317452A - Erection structure for steel column, and method for erection thereof - Google Patents

Erection structure for steel column, and method for erection thereof

Info

Publication number
JP2002317452A
JP2002317452A JP2001121091A JP2001121091A JP2002317452A JP 2002317452 A JP2002317452 A JP 2002317452A JP 2001121091 A JP2001121091 A JP 2001121091A JP 2001121091 A JP2001121091 A JP 2001121091A JP 2002317452 A JP2002317452 A JP 2002317452A
Authority
JP
Japan
Prior art keywords
steel column
slide plate
pile
erection
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001121091A
Other languages
Japanese (ja)
Inventor
Nobuyoshi Haga
延好 羽賀
Seiji Iwashita
静司 岩下
Akihiro Miwa
明広 三輪
Seiichi Suzuki
誠一 鈴木
Yasunori Nakamura
保則 中村
Kenji Kimura
賢治 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2001121091A priority Critical patent/JP2002317452A/en
Publication of JP2002317452A publication Critical patent/JP2002317452A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide erection structure for a steel column, and a method for erection thereof in which stages of work till erection of a steel column for a first node are reduced to shorten time till start of erection. SOLUTION: In this erection structure 1 for a steel column, a lower slide plate 3 provided with a level adjusting device 11 is installed on an end plate 7 of a pile head 2, and an upper slide plate 4 is provided on the level adjusting device 11. The steel column 5 is installed on the upper slide plate 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鉄骨柱の建方構造お
よびその建方工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel column construction method and a construction method thereof.

【0002】[0002]

【従来の技術】従来、杭の施工から第一節の鉄骨柱の建
方までの工法は、図8に示すような方法で行われてい
る。まず、杭20を打設した後に、根切りをして杭頭処
理を行う。次に、基礎躯体工事、すなわちフーチング基
礎21、地中梁22、アンカーボルト23の設置および
最下階床24の構築工事を行う。次に、前記フーチング
基礎21の周囲の埋め戻しを行って第一節の鉄骨柱25
を建て込む。
2. Description of the Related Art Conventionally, a construction method from the construction of a pile to the construction of a steel column in the first section is performed by a method as shown in FIG. First, after placing the pile 20, the root is cut off and the pile head is processed. Next, foundation frame construction, that is, installation of the footing foundation 21, underground beam 22, anchor bolt 23, and construction of the lowest floor 24 are performed. Next, back-filling around the footing foundation 21 is performed to make the steel column 25 of the first section.
Build.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記の建方工
法は、第一節の鉄骨柱の建方の開始までの工程が多く、
建方の開始までに時間がかかるという問題があった。
However, the above-mentioned construction method involves many steps up to the start of the construction of the steel column in the first section.
There was a problem that it took time to start the construction.

【0004】本発明はこれらの問題に鑑みてなされたも
のであり、その目的は、第一節の鉄骨柱の建方の開始ま
での工程を少なくして、建方の開始までの時間を短縮す
る鉄骨柱の建方構造およびその建方工法を提供すること
である。
The present invention has been made in view of these problems, and an object of the present invention is to reduce the number of steps required to start the construction of a steel column in the first section, thereby shortening the time required to start the construction. It is an object of the present invention to provide a steel column construction method and a construction method for the same.

【0005】[0005]

【課題を解決するための手段】以上の課題を解決するた
めの手段は、請求項1の発明の鉄骨柱の建方構造が、レ
ベル調整装置を備えた下部スライド板が杭頭の端板に設
置され、前記レベル調整装置に上部スライド板が設置さ
れ、該上部スライド板に鉄骨柱が設置されたことを特徴
とし、また請求項2の発明の鉄骨柱の建方工法が、地盤
に打設された杭頭の端板に、レベル調整装置を備えた下
部スライド板を設置して杭芯のズレおよび杭頭のレベル
を調整するとともに、前記レベル調整装置に上部スライ
ド板を設置し、該上部スライド板に柱を設置して杭芯の
ズレを調整をすることを特徴とする。
Means for solving the above-mentioned problems are as follows. The construction of the steel column according to the first aspect of the present invention is characterized in that a lower slide plate provided with a level adjusting device is attached to an end plate of a pile head. An upper slide plate is installed on the level adjustment device, and a steel column is installed on the upper slide plate. At the end plate of the pile head, a lower slide plate with a level adjustment device is installed to adjust the displacement of the pile center and the level of the pile head, and an upper slide plate is installed at the level adjustment device, It is characterized by adjusting the displacement of the pile core by installing a pillar on the slide plate.

【0006】鉄骨柱が杭頭にフーチング基礎を介さずに
直接設置されているため、上部荷重を杭にスムーズに伝
達させることができる。第一節の鉄骨柱の建方開始まで
の工程を省略することができ、建方開始までの時間を短
縮することができる。杭の打設後に、第一節の鉄骨柱を
すぐ建てることができるので、上部構造物を通常の工法
よりも早く建てることができる。
[0006] Since the steel column is directly installed on the pile head without using the footing foundation, the upper load can be smoothly transmitted to the pile. The steps up to the start of the construction of the steel column in the first section can be omitted, and the time until the start of the construction can be shortened. After the piles have been set, the steel column of the first section can be built immediately, so that the superstructure can be built faster than usual.

【0007】[0007]

【発明の実施の形態】以下、本発明の鉄骨柱の建方構造
および鉄骨柱の建方工法の実施の形態を図面に基づいて
詳細に説明する。はじめに鉄骨柱の建方構造の実施の形
態を説明し、その後に鉄骨柱の建方工法の実施の形態を
説明するが、各実施の形態において同じ構成は同じ符号
を付して説明し、異なる構成にのみ異なった符号を付し
て説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the steel column construction method and the steel column construction method of the present invention will be described below in detail with reference to the drawings. First, an embodiment of the construction method of a steel column will be described, and then an embodiment of a construction method of a steel column will be described. Only the configuration will be described with different reference numerals.

【0008】図1および2は、鉄骨柱の建方構造を示し
たものである。この鉄骨柱の建方構造1は、杭頭2に設
置された、下部スライド板3および上部スライド板4を
介して鉄骨柱5が設置されて構成されている。杭6はP
HC杭、すなわち高強度の遠心力プレストレストコンク
リート杭であり、杭頭2には端板7が設置されている。
そして、この端板7のヘッド定着孔8を利用して下部ス
ライド板3がボルト止めされ、このボルト9が、一方に
向いた長孔10に挿入されて、下部スライド板3が一方
向、すなわちX方向にスライドできるようになってい
る。また、この下部スライド板3のレベル調整装置11
に上部スライド板4が設置されている。このレベル調整
装置11は4本の調整ボルトであり、この調整ボルトの
下部ナット12で上部スライド板4を上下動させて、杭
頭のレベル調整が行われる。また上部スライド板4には
鉄骨柱5が固定され、この鉄骨柱5を固定するボルト1
3が前記長孔10と直交方向、すなわちY方向の長孔1
4に挿入されて、この方向に鉄骨柱5がスライドできる
ようになっている。
FIGS. 1 and 2 show the construction of a steel column. The steel column construction structure 1 is configured such that a steel column 5 is installed via a lower slide plate 3 and an upper slide plate 4 installed on a pile head 2. Pile 6 is P
The pile is an HC pile, that is, a high-strength centrifugal prestressed concrete pile, and an end plate 7 is provided on the pile head 2.
Then, the lower slide plate 3 is bolted using the head fixing hole 8 of the end plate 7, and the bolt 9 is inserted into the elongated hole 10 facing one side, so that the lower slide plate 3 is moved in one direction, that is, It can slide in the X direction. Also, the level adjusting device 11 of the lower slide plate 3
The upper slide plate 4 is installed at the bottom. The level adjustment device 11 is composed of four adjustment bolts, and the lower nut 12 of the adjustment bolt moves the upper slide plate 4 up and down to adjust the level of the pile head. A steel column 5 is fixed to the upper slide plate 4, and a bolt 1 for fixing the steel column 5 is provided.
3 is a direction perpendicular to the long hole 10, that is, a long hole 1 in the Y direction.
4 so that the steel column 5 can slide in this direction.

【0009】次に、図3〜7に基づいて鉄骨柱の建方工
法の実施の形態を説明する。はじめに、図3に示すよう
に、PHC杭6を所定の間隔をもって打設する。このP
HC杭6の杭頭2には、図4に示すように端板7が設置
され、この端板7のヘッド定着孔8にボルト9をねじ込
んで下部スライド板3を設置する。この下部スライド板
3を固定するボルト9は、図5に示すように、X方向を
向いた長孔10に挿入されているため、この方向に下部
スライド板3をスライドさせた後に、上記ボルト9で下
部スライド板3を端板7に固定する。
Next, an embodiment of a steel column construction method will be described with reference to FIGS. First, as shown in FIG. 3, PHC piles 6 are cast at predetermined intervals. This P
An end plate 7 is installed on the pile head 2 of the HC pile 6 as shown in FIG. 4, and a bolt 9 is screwed into a head fixing hole 8 of the end plate 7 to install the lower slide plate 3. Since the bolt 9 for fixing the lower slide plate 3 is inserted into the elongated hole 10 oriented in the X direction as shown in FIG. 5, after sliding the lower slide plate 3 in this direction, the bolt 9 Then, the lower slide plate 3 is fixed to the end plate 7.

【0010】次に、図6に示すように、下部スライド板
3の調整ボルトに上部スライド板4を設置し、該上部ス
ライド板4を下部ナット12で上下動させて杭頭2のレ
ベルを調整する。そして、このレベル調整が完了した後
に、上部ナット15で上部スライド板4を固定する。こ
の時点で、杭芯のX方向のズレの調整と、杭頭2のレベ
ル調整が完了している。
Next, as shown in FIG. 6, the upper slide plate 4 is installed on the adjustment bolt of the lower slide plate 3, and the upper slide plate 4 is moved up and down by the lower nut 12 to adjust the level of the pile head 2. I do. After the level adjustment is completed, the upper slide plate 4 is fixed with the upper nut 15. At this point, the adjustment of the displacement of the pile core in the X direction and the level adjustment of the pile head 2 have been completed.

【0011】次に、図7に示すように、上部スライド板
4に第一節の鉄骨柱5を設置する。この上部スライド板
4を固定するボルト13は、前記長孔10と直交する方
向、すなわちY方向を向いた長孔14に挿入されている
ため、この方向に鉄骨柱5をスライドさせて、上記ボル
ト13で鉄骨柱5を固定する。これにより杭芯のY方向
のズレを調整することができるので、杭芯のXY方向の
ズレの調整、および杭頭のレベル調整を行うことができ
る。
Next, as shown in FIG. 7, the steel column 5 of the first section is installed on the upper slide plate 4. Since the bolt 13 for fixing the upper slide plate 4 is inserted into a long hole 14 oriented in a direction orthogonal to the long hole 10, that is, in the Y direction, the steel column 5 is slid in this direction to At 13, the steel column 5 is fixed. Thereby, the displacement of the pile core in the Y direction can be adjusted, so that the displacement of the pile core in the XY directions and the level of the pile head can be adjusted.

【0012】そして、上記の鉄骨柱5の設置と平行し
て、基礎躯体の構築を行い、その周囲を埋め戻す(図示
せず)。このように本実施の形態においては、第一節の
鉄骨柱の建方にいたるまでの工程を省略することができ
るので、建方開始までの時間を短縮することができる。
Then, in parallel with the installation of the steel column 5, the foundation frame is constructed, and the periphery thereof is backfilled (not shown). As described above, in the present embodiment, since the steps up to the construction of the steel column in the first section can be omitted, the time until the start of the construction can be shortened.

【0013】[0013]

【発明の効果】鉄骨柱が杭頭にフーチング基礎を介さず
に直接設置されているため、上部荷重を杭にスムーズに
伝達させることができる。
According to the present invention, since the steel column is directly installed on the pile head without using the footing foundation, the upper load can be smoothly transmitted to the pile.

【0014】第一節の鉄骨柱の建方開始までの工程を省
略することができ、建方開始までの時間を短縮すること
ができる。
The steps up to the start of the construction of the steel column in the first section can be omitted, and the time until the start of the construction can be shortened.

【0015】杭の打設後に、第一節の鉄骨柱をすぐに建
てることができるので、上部構造物を通常の工法よりも
早く建てることができる。
[0015] Since the steel column of the first section can be erected immediately after the pile has been driven, the superstructure can be erected earlier than a normal construction method.

【0016】下部スライド板、レベル調整装置および上
部スライド板によって、杭芯のズレの調整および杭頭の
レベル調整を行うことができる。
By using the lower slide plate, the level adjusting device and the upper slide plate, it is possible to adjust the deviation of the pile core and the level of the pile head.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(1)は鉄骨柱の建方構造の平面図、(2)は
同正面図である。
FIG. 1A is a plan view of a steel column construction structure, and FIG. 1B is a front view of the same.

【図2】鉄骨柱の建方構造の分解斜視図である。FIG. 2 is an exploded perspective view of a steel column construction structure.

【図3】地盤に打設した杭の平面図である。FIG. 3 is a plan view of a pile driven into the ground.

【図4】(1)は地盤に打設した杭の平面図、(2)は
杭の上部切欠断面図である。
FIG. 4 is a plan view of a pile driven into the ground, and FIG. 4B is an upper cutaway sectional view of the pile.

【図5】(1)は端体に下部スライド板を設置した平面
図、(2)は同断面図である。
5A is a plan view in which a lower slide plate is provided on an end body, and FIG. 5B is a cross-sectional view of FIG.

【図6】(1)はレベル調整ボルトに上部スライド板を
設置した平面図、(2)は同断面図である。
FIG. 6A is a plan view in which an upper slide plate is installed on a level adjustment bolt, and FIG. 6B is a sectional view of the same.

【図7】(1)は鉄骨柱を上部スライド板に設置した平
面図、(2)は同断面図である。
FIG. 7A is a plan view showing a steel column installed on an upper slide plate, and FIG. 7B is a sectional view of the same.

【図8】従来の鉄骨柱の建方工法を示した断面図であ
る。
FIG. 8 is a sectional view showing a conventional steel column construction method.

【符号の説明】[Explanation of symbols]

1 建方構造 2 杭頭 3 下部スライド板 4 上部スライド板 5 鉄骨柱 6 杭 7 端板 8 ヘッド定着孔 9、13 ボルト 10、14 長孔 11 レベル調整装置 12 下部ナット 15 上部ナット DESCRIPTION OF SYMBOLS 1 Construction structure 2 Pile head 3 Lower slide plate 4 Upper slide plate 5 Steel column 6 Pile 7 End plate 8 Head fixing hole 9, 13 Bolt 10, 14 Long hole 11 Level adjuster 12 Lower nut 15 Upper nut

───────────────────────────────────────────────────── フロントページの続き (72)発明者 三輪 明広 東京都中央区京橋1−7−1 戸田建設株 式会社内 (72)発明者 鈴木 誠一 東京都中央区京橋1−7−1 戸田建設株 式会社内 (72)発明者 中村 保則 神奈川県横浜市西区北幸1−11−15 戸田 建設株式会社横浜支店内 (72)発明者 木村 賢治 東京都中央区京橋1−7−1 戸田建設株 式会社内 Fターム(参考) 2D046 AA14 CA08 2E174 AA01 BA03 DA12 DA38 DA63 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Akihiro Miwa 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Seiichi Suzuki 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. (72) Inventor Yasunori Nakamura 1-11-15 Kitako, Nishi-ku, Yokohama-shi, Kanagawa Toda Construction Co., Ltd. Yokohama Branch (72) Inventor Kenji Kimura 1-7-1 Kyobashi, Chuo-ku, Tokyo Toda Construction Co., Ltd. F term (reference) 2D046 AA14 CA08 2E174 AA01 BA03 DA12 DA38 DA63

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 レベル調整装置を備えた下部スライド板
が杭頭の端板に設置され、前記レベル調整装置に上部ス
ライド板が設置され、該上部スライド板に鉄骨柱が設置
されたことを特徴とする鉄骨柱の建方構造。
1. A lower slide plate having a level adjusting device is installed on an end plate of a pile head, an upper slide plate is installed on the level adjusting device, and a steel column is installed on the upper slide plate. The construction structure of the steel column.
【請求項2】 地盤に打設された杭頭の端板に、レベル
調整装置を備えた下部スライド板を設置して杭芯のズレ
および杭頭のレベルを調整するとともに、前記レベル調
整装置に上部スライド板を設置し、該上部スライド板に
柱を設置して杭芯のズレを調整をすることを特徴とする
鉄骨柱の建方工法。
2. A lower slide plate provided with a level adjusting device is installed on an end plate of a pile head cast on the ground to adjust a displacement of a pile core and a level of a pile head. A method for constructing a steel column, wherein an upper slide plate is installed, and a column is installed on the upper slide plate to adjust a deviation of a pile core.
JP2001121091A 2001-04-19 2001-04-19 Erection structure for steel column, and method for erection thereof Pending JP2002317452A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001121091A JP2002317452A (en) 2001-04-19 2001-04-19 Erection structure for steel column, and method for erection thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001121091A JP2002317452A (en) 2001-04-19 2001-04-19 Erection structure for steel column, and method for erection thereof

Publications (1)

Publication Number Publication Date
JP2002317452A true JP2002317452A (en) 2002-10-31

Family

ID=18971026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001121091A Pending JP2002317452A (en) 2001-04-19 2001-04-19 Erection structure for steel column, and method for erection thereof

Country Status (1)

Country Link
JP (1) JP2002317452A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2422629A (en) * 2005-01-26 2006-08-02 Screwfast Foundations Ltd Adjustable Pile Cap
JP2008261189A (en) * 2007-04-16 2008-10-30 Sumori Kogyo Kk Fixing device for pile foundation
JP2012057433A (en) * 2010-09-13 2012-03-22 Sumitomo Mitsui Construction Co Ltd Structure and method for connecting pile and steel column
CN102409865A (en) * 2011-08-17 2012-04-11 安徽富煌钢构股份有限公司 Mounting and measurement-correcting structure for multi-storey steel structured column
JP2013067948A (en) * 2011-09-20 2013-04-18 Chiyoda Geotech Co Ltd Foundation structure for solar cell module or solar cell array frame
CN104912048A (en) * 2015-05-26 2015-09-16 浙江海洋学院 Ocean platform with detachable pile legs
JP2020176380A (en) * 2019-04-15 2020-10-29 株式会社竹中工務店 Foundation structure of building
JP2020180518A (en) * 2019-04-26 2020-11-05 ジェコス株式会社 Pile head structure and pile head cap of working platform pile

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2422629A (en) * 2005-01-26 2006-08-02 Screwfast Foundations Ltd Adjustable Pile Cap
JP2008261189A (en) * 2007-04-16 2008-10-30 Sumori Kogyo Kk Fixing device for pile foundation
JP4696091B2 (en) * 2007-04-16 2011-06-08 スモリ工業株式会社 Pile foundation fixing device
JP2012057433A (en) * 2010-09-13 2012-03-22 Sumitomo Mitsui Construction Co Ltd Structure and method for connecting pile and steel column
CN102409865A (en) * 2011-08-17 2012-04-11 安徽富煌钢构股份有限公司 Mounting and measurement-correcting structure for multi-storey steel structured column
JP2013067948A (en) * 2011-09-20 2013-04-18 Chiyoda Geotech Co Ltd Foundation structure for solar cell module or solar cell array frame
CN104912048A (en) * 2015-05-26 2015-09-16 浙江海洋学院 Ocean platform with detachable pile legs
JP2020176380A (en) * 2019-04-15 2020-10-29 株式会社竹中工務店 Foundation structure of building
JP7284621B2 (en) 2019-04-15 2023-05-31 株式会社竹中工務店 Building foundation structure
JP2020180518A (en) * 2019-04-26 2020-11-05 ジェコス株式会社 Pile head structure and pile head cap of working platform pile
JP7289218B2 (en) 2019-04-26 2023-06-09 ジェコス株式会社 Gambling pile head structure and pile head cap

Similar Documents

Publication Publication Date Title
JP2002317452A (en) Erection structure for steel column, and method for erection thereof
JP2003090052A (en) Foundation constructing method, footing foundation, and foundation structure of elevated highway
JP3375296B2 (en) Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure
JPH02164931A (en) Foundation construction method for building
JP2000179161A (en) Vibration-isolation construction method for existing building
JP2002138497A (en) Seismic base isolation building construction of existing building
JP2567631Y2 (en) Level adjuster for steel foundation beams
JPH05179647A (en) Supporting structure for earth retaining wall
JPH09189132A (en) Fixing method of column base for steel frame column
JP2000282695A (en) Bas isolation construction method for existing building
JP3118207B2 (en) Construction method of pile column top level adjustment structure in building structure using pile as pillar
JP2000320010A (en) Column base structure and building unit
JP2605484B2 (en) Steel construction method in building construction
JP2002105973A (en) Construction method for column
JP2989337B2 (en) Pre-assembly method of beam in steel reinforced concrete structure
JPH11336092A (en) Execution method of embedded column base
JPH041328A (en) Construction of strut base for cable way
SU1038422A1 (en) Pillar foundation
JP3792276B2 (en) Building foundations and construction methods
JP2003293610A (en) Earthquake control member, and construction method of earthquake control structure
JPH1018304A (en) Mat foundation structure and its construction method
JP2000257163A (en) Building unit
JPH0711773A (en) Column erection method and column base supporting device
JP2002115324A (en) Column base unit, column integrated column base fixing foundation structure using the column base unit, and construction method therefor
JPH0718681A (en) Connecting method for precast concrete pillar and foundation section

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050810

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20051205