Mat foundation structure and its construction method

Info

Publication number
JPH1018304A
JPH1018304A JP17330496A JP17330496A JPH1018304A JP H1018304 A JPH1018304 A JP H1018304A JP 17330496 A JP17330496 A JP 17330496A JP 17330496 A JP17330496 A JP 17330496A JP H1018304 A JPH1018304 A JP H1018304A
Authority
JP
Japan
Prior art keywords
pole
concrete
girder
steel
poles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP17330496A
Other languages
Japanese (ja)
Inventor
Isamu Aoki
勇 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Chemical Industry Co Ltd
Original Assignee
Asahi Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Chemical Industry Co Ltd filed Critical Asahi Chemical Industry Co Ltd
Priority to JP17330496A priority Critical patent/JPH1018304A/en
Publication of JPH1018304A publication Critical patent/JPH1018304A/en
Withdrawn legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To highly precisely and easily form a mat foundation for a prefabricated housing without the need for deep excavation and integrally form steel beams and concretes to obtain highly rigid composite beams. SOLUTION: Foundation work is applied on a ground surface constituting a mat foundation corresponding to the strength and nature of the ground, self- leveling material 22 is placed into the ground surface to form a horizontal reference plane 23 and a PC sill plate A is arranged on the reference plane 23 to fix poles B. The upper face levels of the poles B are adjusted to connect the poles B together with a girder C. A lower end bar 8b is arranged at the lower side of the girder C and the previously bent end of an upper end bar 8a is inserted into a hole 9 provided in the lower flange 7a of the beam C to form an embedded reinforcing bar E. Concrete 25 is placed to embed parts of the lower flange 7a and the web 7c of the girder C in a plane defined by a form 24. An upper building body is built up on the poles B, the girder C and beams before the concrete 25 is placed, thus to shorten a construction period.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、主としてプレハブ住宅
の基礎構造とその施工方法に関し、特に、鋼製梁とコン
クリートの一体化をはかることが出来る基礎構造及びそ
の施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation structure of a prefabricated house and a construction method thereof, and more particularly to a foundation structure capable of integrating steel beams and concrete and a construction method thereof.

【0002】[0002]

【従来の技術】プレハブ住宅の基礎構造として、ベタ基
礎構造を採用する場合がある。その中で、特開平3−19
9529号公報に開示された技術がある。この技術は、鉄骨
を用いたべた基礎に関するものであり、基礎梁が鋼製の
梁,鉄筋,コンクリートからなる鉄骨鉄筋コンクリート
造(SRC造)として構成され、鋼製の梁を構成するH
形鋼のウエブに多数の取付穴を形成し、この取付穴にネ
ジ加工した鉄筋の端部を挿通してナットを螺合すること
で固定している。この基礎梁は地盤面に埋め込むように
して設置され、鋼製の梁と鋼製の梁とを接続して基礎を
構成している。この技術ではアンカーボルトの位置精度
を向上させることが出来るため有利である。
2. Description of the Related Art A solid foundation structure is sometimes used as a foundation structure of a prefabricated house. Among them, Japanese Patent Laid-Open No.
There is a technique disclosed in Japanese Patent No. 9529. This technology relates to a solid foundation using a steel frame, and a foundation beam is configured as a steel-framed reinforced concrete structure (SRC structure) made of steel beams, reinforcing bars, and concrete.
A large number of mounting holes are formed in the web of the shaped steel, and the ends of the threaded rebar are inserted into the mounting holes, and the nuts are screwed and fixed. This foundation beam is installed so as to be embedded in the ground surface, and a steel beam is connected to a steel beam to form a foundation. This technique is advantageous because the positional accuracy of the anchor bolt can be improved.

【0003】一方、床梁の上部にコンクリートを打設し
て床スラブを構成することがある。この場合、図8に示
すように、H形鋼からなる床梁51の上フランジ51aに所
定のピッチでスタッド52を溶接し、このスタッド52に対
するコンクリート53の付着力によって応力を伝達して床
梁51の剛性を高めるように構成している。このように鋼
製梁と床スラブを一体化させることによって、鋼製梁の
剛性の評価に床スラブの剛性を付加したものを合成梁と
呼ぶことがある。
[0003] On the other hand, there is a case where a floor slab is formed by casting concrete on an upper part of a floor beam. In this case, as shown in FIG. 8, studs 52 are welded to the upper flange 51a of the floor beam 51 made of H-section steel at a predetermined pitch, and stress is transmitted by the adhesive force of the concrete 53 to the stud 52 to transmit the stress. It is configured to increase the rigidity of 51. In this way, a steel beam and a floor slab integrated with each other to add the rigidity of the floor slab to the evaluation of the rigidity of the steel beam may be referred to as a composite beam.

【0004】[0004]

【発明が解決しようとする課題】上記特開平3−199529
号公報に開示された技術では、鋼製の梁と鋼製の梁を直
接接続して構成している。このため、直交して配置され
る梁の何れかが勝つ納まりとなり、梁の長さのバリエー
ションが増加する虞がある。またRC造の基礎に比べれ
ばアンカーボルトの位置精度が向上するが、高さ方向の
レベル精度或いは水平方向の精度を確保するために、梁
と梁を接合した後で接合された梁を持ち上げてスペーサ
ーを挟んだり、位置の調整を行うのは容易な作業ではな
いという問題が生じる虞がある。
SUMMARY OF THE INVENTION The above-mentioned Japanese Patent Application Laid-Open No. 3-199529.
In the technique disclosed in Japanese Patent Laid-Open No. H10-207, a steel beam is directly connected to a steel beam. For this reason, any one of the beams arranged orthogonally fits in the win, and there is a possibility that the variation in the length of the beams increases. In addition, the position accuracy of the anchor bolt is improved compared to the RC foundation, but in order to secure the level accuracy in the height direction or the accuracy in the horizontal direction, after joining the beams, the joined beams are lifted. There is a possibility that there is a problem that it is not an easy task to sandwich the spacer or adjust the position.

【0005】また基礎梁を地盤面下に埋設するため、地
盤を深く掘削し且つ鋼製の梁を被覆するためのコンクリ
ート,鉄筋が必要となり、配筋作業やコンクリート打設
作業に要する工期が掛かりコストアップ要因になる虞が
あるという問題、或いはコンクリートを打設した後で上
部の構造躯体の建て方を行うこととなり工期が長くなる
という問題が生じる虞がある。
In addition, since the foundation beam is buried below the ground surface, concrete and steel bars are required to excavate the ground deeply and cover the steel beam, which takes a period of time required for rebar arrangement work and concrete placing work. There may be a problem that the cost may increase, or a problem that the construction period of the upper structural body is performed after the concrete is cast and the construction period is prolonged.

【0006】特に、鋼製の梁のウエブに形成した多数の
取付穴に鉄筋の端部を挿通してナットにより固定するた
め、個々の鉄筋にネジ切り加工を行う手間や、個々の鉄
筋にナットを螺合する手間が掛かるという問題がある。
更に、鋼製の梁のウエブに直接該ウエブ面に対し直交す
る方向の力を作用させるような使い方をするのは、形鋼
本来の使用法とは言えず、強度的に劣るという問題があ
る。
In particular, since the ends of the reinforcing bars are inserted into a large number of mounting holes formed in the web of steel beams and fixed by nuts, the work of threading each reinforcing bar and the nuts on each reinforcing bar are required. There is a problem that it takes time and effort to screw together.
Further, the method of directly applying a force in a direction perpendicular to the web surface on the web of the steel beam is not the original usage of the shaped steel, and has a problem of poor strength. .

【0007】本件出願人は、上記各問題を解決したべた
基礎構造及びその施工方法を開発して既に特許出願して
いる(特願平7-1089号)。この技術では、鋼製梁を接続
する際にポールを介在させるため、鋼製梁の長さは全て
ポール間の内法寸法となり、長さのバリエーションを少
なくすることが出来る。
The applicant of the present application has developed a solid foundation structure that solves the above-mentioned problems and a construction method thereof, and has already applied for a patent (Japanese Patent Application No. 7-1089). In this technique, since a pole is interposed when connecting a steel beam, the length of the steel beam is all the internal dimension between the poles, and variations in length can be reduced.

【0008】しかし、建物外周上の鋼製梁で囲まれた地
盤面上にコンクリートを打設したとき、打設されたコン
クリートと鋼製梁を一体化させる手段が開示されておら
ず、改良すべき点がある。
[0008] However, when concrete is cast on the ground surface surrounded by steel beams on the outer periphery of the building, means for integrating the cast concrete and the steel beams is not disclosed. There is a point to be.

【0009】またべた基礎に於ける鋼製梁とコンクリー
トを一体化させる際に従来技術の如く鋼製梁のフランジ
にスタッドを溶接する場合、溶接作業は品質管理が重要
であり、溶接技能の有資格者が作業を実施する必要があ
る。従って、溶接技能者を確保するために工程管理を厳
密に行う必要が生じる。また鋼製梁の運搬等を考慮する
と、スタッド溶接は現場施工することが好ましい。しか
し、基礎工事の段階では溶接作業が天候に左右されるこ
とがあり、工程管理上、及び品質管理上の問題が生じる
虞がある。
When the stud is welded to the flange of the steel beam as in the prior art when the steel beam and the concrete in the solid foundation are integrated, quality control is important for the welding operation, and welding skills are required. A qualified person needs to carry out the work. Therefore, it is necessary to strictly control the process in order to secure welding technicians. Considering the transportation of steel beams, it is preferable to perform stud welding on site. However, at the stage of foundation work, the welding operation may be affected by the weather, which may cause problems in process management and quality control.

【0010】本発明の目的は、上記発明を更に発展させ
て鋼製梁とコンクリートの一体化をはかり且つ容易な作
業で位置精度良く、部品点数も少なく構成することが出
来るべた基礎構造と、工期が短くなる施工方法を提供す
ることにある。
[0010] An object of the present invention is to further develop the above-mentioned invention by integrating a steel beam and concrete, and to achieve a solid foundation structure that can be constructed with good work accuracy and a small number of parts by easy work. It is an object of the present invention to provide a construction method in which the length is shortened.

【0011】[0011]

【課題を解決するための手段】上記課題を解決するため
に本発明に係るべた基礎構造は、基礎を構成する地盤面
に設置されるポールと、前記ポール間を連結する鋼製梁
と、建物の外周上の鋼製梁で囲まれた地盤面上に打設さ
れたコンクリートとからなり、前記鋼製梁の下フランジ
に設けられた孔に埋設鉄筋の端部が折り曲げられて差し
込まれていることを特徴とするものである。
In order to solve the above problems, a solid foundation structure according to the present invention comprises a pole installed on a ground surface constituting a foundation, a steel beam connecting the poles, and a building. Made of concrete cast on the ground surface surrounded by steel beams on the outer periphery of the steel beam, and the end of the buried reinforcing bar is bent and inserted into a hole provided in the lower flange of the steel beam. It is characterized by the following.

【0012】上記べた基礎構造では、地盤面を掘削する
と共に掘削した地盤面を転圧して該地盤面に対し所定の
間隔で複数のポールを設置し、このポール間を鋼製梁に
よって連結し、更に建物の外周上であって鋼製梁で囲ま
れた地盤面上にコンクリートを打設して構成される。特
に、鋼製梁の下フランジに設けた孔に埋設鉄筋の端部を
折り曲げて差し込むことで、該埋設鉄筋を介して鋼製梁
とコンクリートを一体化して合成梁を構成することが出
来る。このため、溶接作業を要しない簡単な作業で高い
剛性を持ったべた基礎(以下単に「基礎」という)を構
成することが出来る。特に、上記べた基礎構造に於い
て、鋼製梁の下フランジに設けられた孔は予め設定され
たピッチを有することが好ましい。
In the solid foundation structure described above, a ground surface is excavated, and a plurality of poles are installed at predetermined intervals with respect to the ground surface by rolling the excavated ground surface, and the poles are connected by steel beams. It is also constructed by casting concrete on the outer periphery of the building and on the ground surface surrounded by steel beams. In particular, by bending and inserting the end of the buried reinforcing bar into the hole provided in the lower flange of the steel beam, the steel beam and concrete can be integrated through the buried reinforcing bar to form a composite beam. For this reason, a solid foundation having high rigidity (hereinafter simply referred to as “foundation”) can be configured by a simple operation that does not require a welding operation. In particular, in the solid foundation structure described above, it is preferable that the holes provided in the lower flange of the steel beam have a preset pitch.

【0013】上記基礎構造に於いて、ポールを設置する
地盤面にセルフレベリング材を打設して水平な基準面を
形成し、該基準面上にプレキャストコンクリート製土台
板を設置し、その上にポールを設置することが好まし
い。
In the above basic structure, a self-leveling material is cast on a ground surface on which a pole is to be installed to form a horizontal reference surface, and a precast concrete base plate is installed on the reference surface, and It is preferable to install a pole.

【0014】上記基礎構造では、基礎を構成する地盤面
上にセルフレベリング材を打設して該面を水平な基準面
として形成し、この基準面上にプレキャストコンクリー
ト製土台板(PC土台板)を設置してこのPC土台板上
にポールを設置した場合には、基準面の水平度を保証す
ることが可能となり、容易にポールのレベルを保証する
ことが出来る。
In the above-mentioned foundation structure, a self-leveling material is cast on the ground surface constituting the foundation to form the surface as a horizontal reference surface, and a precast concrete base plate (PC base plate) is formed on the reference surface. When the pole is installed on the PC base plate, the horizontality of the reference plane can be guaranteed, and the level of the pole can be easily guaranteed.

【0015】またポールはPC土台板に固定されるのみ
であり地盤面には接続されることがない。このため、ポ
ールをPC土台板と共にセルフレベリング材が打設され
た基準面上を水平方向へ移動させることが可能であり、
ポールに鋼製梁を接続する際に該ポールの水平方向の位
置を調整する必要がある場合、PC土台板を容易に移動
させて正確な位置に設置することが出来る。
The pole is only fixed to the PC base plate and is not connected to the ground surface. For this reason, it is possible to move the pole in the horizontal direction on the reference plane on which the self-leveling material is cast together with the PC base plate,
If it is necessary to adjust the horizontal position of the pole when connecting the steel beam to the pole, the PC base plate can be easily moved and installed at an accurate position.

【0016】また本発明に係る基礎構造の施工方法は、
基礎を構成する地盤面にポールを設置し、ポール間を鋼
製梁で連結し、該ポール若しくは鋼製梁に上部構造躯体
を設置すると共に、前記鋼製梁の下フランジに設けられ
た孔に折り曲げられた端部を差し込んで鉄筋を配置し、
建物外周上の鋼製梁で囲まれた地盤面上にコンクリート
を打設してべた基礎を構成することを特徴とするもので
ある。
[0016] Further, a method for constructing a foundation structure according to the present invention comprises:
A pole is installed on the ground surface constituting the foundation, the poles are connected by a steel beam, the upper structural body is installed on the pole or the steel beam, and a hole provided in a lower flange of the steel beam is provided. Insert the bent end and place the rebar,
It is characterized in that concrete is cast on the ground surface surrounded by steel beams on the outer periphery of the building to form a solid foundation.

【0017】上記施工方法では、基礎を構成する地盤面
に設置されたポール、或いは該ポール間を連結する鋼製
梁に上部構造躯体を設置すると共に鋼製梁で囲まれた地
盤面上にコンクリートを打設することで、上部構造躯体
の建て方を先行して或いは同時進行させることが可能と
なり、工期の短縮化をはかることが出来る。
In the above construction method, the upper structure skeleton is installed on a pole installed on the ground surface constituting the foundation or a steel beam connecting the poles, and concrete is placed on the ground surface surrounded by the steel beam. It is possible to advance the construction method of the superstructure body at the same time or simultaneously with the construction of the superstructure body, thereby shortening the construction period.

【0018】[0018]

【発明の実施の形態】以下、上記基礎構造及び施工方法
の実施例について図を用いて説明する。図1は基礎構造
を説明する要部断面図、図2は本実施例に係る基礎構造
の配筋状態を説明する斜視図、図3は鋼製梁と基礎鉄筋
の関係を説明する模式図、図4は地盤面に設置されたポ
ールを説明する図、図5は基礎伏図、図6は他のポール
の例を説明する図、図7は更に他のポールの例を説明す
る図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the above-mentioned foundation structure and construction method will be described below with reference to the drawings. FIG. 1 is a cross-sectional view of a main part illustrating a foundation structure, FIG. 2 is a perspective view illustrating a reinforcing arrangement of the foundation structure according to the present embodiment, FIG. 3 is a schematic diagram illustrating a relationship between a steel beam and a foundation bar, FIG. 4 is a diagram illustrating a pole installed on the ground surface, FIG. 5 is a foundation plan, FIG. 6 is a diagram illustrating an example of another pole, and FIG. 7 is a diagram illustrating still another example of a pole. .

【0019】本発明に係る基礎構造は、上部建物に応じ
て図5の基礎伏図に示すように予め設定された複数の位
置にPC土台板Aを設置し、このPC土台板Aにポール
Bを固定すると共に隣接するポールB間に鋼製の大梁C
を接続し、更に、大梁Cの下フランジに形成した孔に埋
設鉄筋Eの折り曲げた端部を差し込んだ後、PC土台板
A,ポールB,大梁Cによって規定された平面内であっ
て大梁Cの下フランジ及びウエブの一部を含む高さまで
コンクリートを打設して構成されたものである。
In the foundation structure according to the present invention, a PC base plate A is installed at a plurality of predetermined positions according to the upper building as shown in a base plan of FIG. And a steel beam C between adjacent poles B
After the bent end of the buried reinforcing bar E is inserted into the hole formed in the lower flange of the girder C, the girder C in the plane defined by the PC base plate A, the pole B, and the girder C It is constructed by casting concrete to a height including the lower flange and a part of the web.

【0020】PC土台板Aは、プレキャストコンクリー
トによって形成されており、予め設定された寸法を有す
る底板1と、ポールBを載置する載置部2とを有して構
成されている。底板1には複数の鉄筋1aが配筋されて
おり、載置部2にはポールBを固定する際にボルト3を
締結する複数のインサートナットが所定のピッチで埋設
されている。
The PC base plate A is made of precast concrete, and has a bottom plate 1 having a predetermined size and a mounting portion 2 on which a pole B is mounted. A plurality of reinforcing bars 1a are arranged on the bottom plate 1, and a plurality of insert nuts for fastening bolts 3 when the pole B is fixed are embedded in the mounting portion 2 at a predetermined pitch.

【0021】尚、ポールBを設置する土台板としては、
必ずしも本実施例に示すプレキャストコンクリートによ
って形成されたPC土台板Aである必要はなく、鋼板或
いは形鋼等を用いて構成しても良い。
As a base plate on which the pole B is installed,
The PC base plate A is not necessarily required to be the PC base plate A formed of the precast concrete shown in the present embodiment, and may be formed using a steel plate or a shape steel.

【0022】本実施例のポールBは圧延鋼板からなるフ
ラットバーを用いて構成されており、上部建物に対応し
て設定された大梁Cの高さと等しい高さを有して形成さ
れ、下端にはPC土台板Aの載置部2に接続されるフラ
ンジ4aが設けられており、上端には上部建物の躯体を
接続するフランジ4bが設けられている。フランジ4
a,4bの間には大梁Cを接続する複数のウエブ5が直
交方向に設けられている。そしてフランジ4a,4b及
びウエブ5の所定位置には複数のボルト穴6が形成され
ている。
The pole B of this embodiment is formed by using a flat bar made of a rolled steel plate, has a height equal to the height of the girder C set corresponding to the upper building, and is formed at the lower end. Is provided with a flange 4a connected to the mounting portion 2 of the PC base plate A, and a flange 4b is provided at an upper end for connecting a frame of an upper building. Flange 4
A plurality of webs 5 connecting the girders C are provided in the orthogonal direction between a and 4b. A plurality of bolt holes 6 are formed at predetermined positions of the flanges 4a, 4b and the web 5.

【0023】大梁Cは、上部建物の重量や床面積等の設
計条件に応じて予め設定された高さを有するH型鋼によ
って構成されている。大梁Cの下フランジ7aには埋設
鉄筋Eを構成する上端筋8aの折り曲げた端部を差し込
む孔9が所定のピッチで形成されており、また上フラン
ジ7b,ウエブ7cにも同様に図示しない間柱や図5に
示す小梁Dの接続位置に対応して複数のボルト穴10が形
成されている。
The girder C is made of H-shaped steel having a height preset according to design conditions such as the weight and floor area of the upper building. In the lower flange 7a of the girder C, holes 9 for inserting bent ends of the upper reinforcing bar 8a constituting the buried reinforcing bar E are formed at a predetermined pitch. Similarly, studs (not shown) are formed in the upper flange 7b and the web 7c. A plurality of bolt holes 10 are formed corresponding to the connection positions of the small beams D shown in FIG.

【0024】また大梁Cの端部にはポールBと接続する
ための接続部材11が取り付けられている。この接続部材
11は大梁Cと接合する接合片11aと、ボルト穴を有しポ
ールBと接合する接合片11bとからなるL字状に形成さ
れ、予め接合片11aを介して大梁Cに接合しておき、接
合片11bをポールBのウエブ5に当接させて接合片11b
のボルト穴とポールBのボルト穴6にボルト12aを挿通
してナット12bを締結することで、大梁Cによってポー
ルB間を接続することが可能である。
A connecting member 11 for connecting to the pole B is attached to the end of the girder C. This connection member
11 is formed in an L-shape including a joining piece 11a joined to the girder C and a joining piece 11b having a bolt hole and joining to the pole B, and is joined to the girder C via the joining piece 11a in advance. The joining piece 11b is brought into contact with the web 5 of the pole B so that the joining piece 11b
The bolts 12a are inserted into the bolt holes 6 of the poles B and the bolt holes 6a of the poles B, and the nuts 12b are fastened.

【0025】次に上記各部材A〜Cによって構成した基
礎構造及び施工手順について説明する。
Next, a description will be given of the foundation structure and the construction procedure constituted by the members A to C.

【0026】先ず、基礎伏図に従ってPC土台板Aの設
置位置を掘削して地業21を行う(図4参照)。前記地業
21は、所定部位の転圧、転圧後砕石敷設、所定部位を掘
削して転圧或いは転圧後砕石敷設、表層地盤を改良した
後,転圧或いは転圧後砕石敷設、杭打設後,転圧或いは
転圧後砕石敷設等の方法があり、これらの方法を地盤の
強度や性状に応じて適宜選択することが可能である。
First, the installation position of the PC base plate A is excavated in accordance with the foundation plan to perform the ground work 21 (see FIG. 4). The local business
21: Rolling of a specified part, laying of crushed stone after rolling, digging of a predetermined part, crushing of crushed stone or laying of crushed stone after rolling, improvement of surface ground, crushing of crushed stone after rolling or laying of pile, , Compaction or crushed stone laying after compaction, and these methods can be appropriately selected according to the strength and properties of the ground.

【0027】従って、地盤の状態が良く強度が充分であ
れば転圧のみで良い。また地盤を掘削する場合には、掘
削深さはPC土台板Aの底板1の上面が地盤面と同レベ
ルになる程度(約150 ミリ程度)であれば良い。その
後、PC土台板Aの設置位置にセルフレベリング材22を
打設し水平な基準面23を形成する。
Therefore, if the condition of the ground is good and the strength is sufficient, only the compaction is sufficient. When excavating the ground, the excavation depth may be such that the upper surface of the bottom plate 1 of the PC base plate A is at the same level as the ground surface (about 150 mm). Thereafter, a self-leveling material 22 is cast at the installation position of the PC base plate A to form a horizontal reference surface 23.

【0028】次に、基準面23上にポールBを取り付ける
PC土台板Aを設置する。尚、PC土台板AはポールB
を設置すべき位置に設置する。そして所定のPC土台板
Aの載置部2にポールBを載置し、ボルト3によって固
定する。個々のPC土台板AにポールBを固定する際
に、該ポールBのフランジ4bのレベル(ポールBの天
端レベル)を予め設定されたレベルに一致させるよう
に、PC土台板Aの載置部2とポールBのフランジ4a
の間に適宜スペーサを配置する。この天端レベル調整作
業は、単にポールBを持ち上げて該ポールBとPC土台
板Aの載置部2の間にスペーサを介在させることで実施
することが可能であり作業も容易である。
Next, a PC base plate A for mounting the pole B on the reference surface 23 is installed. PC base plate A is pole B
Is installed where it should be installed. Then, the pole B is mounted on the mounting portion 2 of the predetermined PC base plate A, and fixed by the bolt 3. When the pole B is fixed to each PC base plate A, the PC base plate A is placed so that the level of the flange 4b of the pole B (the top end level of the pole B) coincides with a preset level. Part 2 and flange 4a of pole B
Spacers are appropriately arranged between the two. The top end level adjustment work can be performed by simply lifting the pole B and interposing a spacer between the pole B and the mounting portion 2 of the PC base plate A, and the work is easy.

【0029】上記状態に於いて、ポールBは地盤面に対
しPC土台板Aを介して設置された状態となり、該ポー
ルBを取り付けたPC土台板Aに水平方向の力を及ぼす
ことで、基準面23上を所望の方向に移動させることが可
能である。
In the above state, the pole B is placed on the ground surface via the PC base plate A, and a horizontal force is applied to the PC base plate A on which the pole B is mounted, so that the reference It is possible to move on the surface 23 in a desired direction.

【0030】次いで、隣接して設置されたポールB間に
大梁Cを接続する。大梁CのポールBに対する接続は、
端部に取り付けた接合部材11を介して行われる。即ち、
予め大梁Cの端部に取り付けた接合部材11をポールBの
ウエブ5に当接させ、ボルト12a,ナット12bを仮締め
することで、大梁CによってポールB間を接続する。大
梁CとポールBを接続した後、大梁Cの所定位置に小梁
Dを接続する。
Next, the girder C is connected between the poles B installed adjacent to each other. The connection of girder C to pole B is
This is performed via the joining member 11 attached to the end. That is,
The joining member 11 previously attached to the end of the girder C is brought into contact with the web 5 of the pole B, and the bolts 12a and the nuts 12b are temporarily tightened to connect the poles B with the girder C. After connecting the girder C and the pole B, the girder D is connected to a predetermined position of the girder C.

【0031】ポールB間を大梁Cによって接続するに際
し、ポールBの水平方向の位置が図示しない基準線から
ズレている場合、この位置ズレは大梁Cの接続に伴って
PC土台板A及びポールBを水平方向に移動させること
で調整される。そして全てのポールBが予め設定された
設置位置に調整された後、ボルト12a,ナット12bを本
締めする。
When the horizontal position of the pole B is displaced from a reference line (not shown) when the poles B are connected by the girder C, this positional deviation is caused by the connection of the girder C to the PC base plate A and the pole B. Is adjusted by moving in the horizontal direction. Then, after all the poles B have been adjusted to the preset installation positions, the bolts 12a and the nuts 12b are fully tightened.

【0032】上記の如くしてポールB間を大梁Cによっ
て接続した後、小梁Dを該小梁Dの上側のフランジが大
梁Cの上フランジ7bと同一レベルになるように調整し
て接続する。その後、ポールB,大梁C,小梁Dの上に
上部躯体を建て込む、即ち、前記ポールB,大梁C,小
梁Dの上側のフランジ上に躯体柱を取り付け、順次上階
の梁や耐震要素を取り付ける。
After the poles B are connected by the large beams C as described above, the small beams D are connected so that the upper flange of the small beams D is at the same level as the upper flange 7b of the large beams C. . Thereafter, the upper skeleton is built on the poles B, the girders C, and the small beams D. That is, the skeleton columns are attached on the upper flanges of the poles B, girders C, and the small beams D, and the upper floor beams and the seismic resistance are sequentially mounted. Attach elements.

【0033】上記躯体の建て込みと並行して、埋設鉄筋
Eの配筋を行う。この配筋は、複数の下端筋8bを大梁
Cの下フランジ7aの下側を通して所定のピッチで格子
状に配列し、更に、複数の上端筋8aをフランジ7aの
上側に配置すると共に夫々格子状に配列し、各上端筋8
aの折り曲げた端部を大梁Cの下フランジ7aに形成さ
れた穴9に差し込むことで行われる(図2参照)。
The reinforcing bars E are laid out in parallel with the building. In this arrangement, a plurality of lower streaks 8b are arranged in a lattice at a predetermined pitch through a lower side of the lower flange 7a of the girder C, and a plurality of upper streaks 8a are arranged on the upper side of the flange 7a. Are arranged in the upper end muscles 8
This is performed by inserting the bent end of a into the hole 9 formed in the lower flange 7a of the girder C (see FIG. 2).

【0034】埋設鉄筋Eを構成する上端筋8aを配筋す
るに際し、大梁Cの下フランジ7aに予め所定のピッチ
で穴9が形成されているため、折り曲げた端部を穴9に
差し込むことで上端筋8aの配列ピッチを設定すること
が可能となり、該上端筋8aを配筋するための墨だし作
業を省略することが可能である。
When arranging the upper reinforcing bar 8a constituting the buried reinforcing bar E, holes 9 are formed in the lower flange 7a of the large beam C at a predetermined pitch in advance, so that the bent ends are inserted into the holes 9. It is possible to set the arrangement pitch of the upper streaks 8a, and it is possible to omit an inking operation for arranging the upper streaks 8a.

【0035】埋設鉄筋Eの配筋が終了した後、建物外周
に型枠24を取り付ける(図1参照)。基礎の周囲を型枠
24によって規定した後、該型枠24の内部にコンクリート
25を打設する。このとき、コンクリート25は大梁Cの下
フランジ7a及びウエブ7cの下側所定部分を被覆する
深さであって且つ大梁Cよりも梁成の小さい小梁Dを被
覆することのない深さに打設される。そして打設された
コンクリート25が硬化したとき目的の基礎が構成され
る。
After the reinforcing bars E are laid out, the formwork 24 is attached to the outer periphery of the building (see FIG. 1). Formwork around the foundation
After stipulating by 24, concrete inside the formwork 24
Place 25. At this time, the concrete 25 is pressed to a depth that covers the lower flange 7a of the girder C and a predetermined lower portion of the web 7c and does not cover the small girder D that is smaller than the girder C. Is established. Then, when the poured concrete 25 has hardened, the target foundation is constructed.

【0036】上記基礎構造では、大梁Cの下フランジ7
aに形成した穴9に埋設鉄筋Eを構成する上端筋8aの
折り曲げた端部を差し込んだ状態で、該下フランジ7a
及びウエブ7bの下側所定部分を被覆する深さに打設す
ることで、コンクリート25と大梁Cを上端筋8a(埋設
鉄筋E)を介して強固に一体化することにより、鋼製梁
である大梁Cを合成梁として評価することが可能とな
り、高い剛性をもった基礎を構成することが可能であ
る。このため、硬化したコンクリートにより大梁Cの座
屈を拘束することが可能であり、大梁Cの断面性能を落
として軽量化をはかることが可能となる。
In the above basic structure, the lower flange 7 of the girders C
The lower flange 7a is inserted in a state in which the bent end of the upper reinforcing bar 8a constituting the embedded reinforcing bar E is inserted into the hole 9 formed in the lower flange 7a.
The concrete 25 and the girder C are firmly integrated with each other via the upper reinforcing bar 8a (buried reinforcing bar E) by being cast into a depth covering a predetermined lower portion of the web 7b, thereby forming a steel beam. The girder C can be evaluated as a composite beam, and a foundation having high rigidity can be formed. For this reason, the buckling of the girder C can be restrained by the hardened concrete, and the cross-sectional performance of the girder C can be reduced to reduce the weight.

【0037】またコンクリートを打設する以前に上部構
造躯体の建て込みを先行させることが可能となり、従来
のようにコンクリートを打設して基礎を構成した後、上
部躯体を建て込む工法と比較して配筋作業及びコンクリ
ート打設作業,養生に必要な工期を短縮することが可能
である。
In addition, it is possible to precede the construction of the upper structure before casting the concrete, which is compared with the conventional method of constructing the foundation by placing concrete and then constructing the upper structure. Thus, it is possible to shorten the construction period required for the reinforcing work, concrete placing work, and curing.

【0038】尚、前述の実施例では、ポールBとして圧
延鋼板から切断した板或いは規格品のフラットバーを材
料として構成した鋼製ポールを用いた場合について説明
した。しかし、ポールBは大梁Cを接続する機能を有す
るものであれば良く、鋼製のみに限定するものではな
い。
In the above-described embodiment, a case has been described in which a plate cut from a rolled steel plate or a steel pole made of a standard flat bar is used as the pole B. However, the pole B only needs to have a function of connecting the girder C, and is not limited to steel.

【0039】図6はプレキャストコンクリート製のPC
ポール31の構成を説明する斜視図である。このPCポー
ル31は大梁Cの高さよりも大きい長さを持った角棒状に
形成されている。またPC土台板32は、基本的な構成は
前述のPC土台板Aと同様であるが、載置部2の代わり
にPCポール31の下端部31aを嵌入させる凹部32aが形
成されている。またPCポール31の上端面31bには複数
の柱脚アンカーボルト33が所定のピッチで埋設され、各
側面31cには複数のインサートナットが所定のピッチで
埋設されて夫々のナットによってボルト孔34が形成され
ている。
FIG. 6 shows a PC made of precast concrete.
FIG. 3 is a perspective view illustrating a configuration of a pole 31. The PC pole 31 is formed in a rectangular rod shape having a length greater than the height of the girder C. The PC base plate 32 has the same basic configuration as that of the PC base plate A described above, except that a concave portion 32a into which the lower end portion 31a of the PC pole 31 is fitted instead of the mounting portion 2 is formed. A plurality of column base anchor bolts 33 are embedded at a predetermined pitch in the upper end surface 31b of the PC pole 31, and a plurality of insert nuts are embedded at a predetermined pitch in each side surface 31c. Is formed.

【0040】上記の如く構成されたPCポール31をポー
ルBとして用いた場合であっても、下端部31aをPC土
台板32の凹部32aに嵌入させてレベル調整すると共に、
調整されたPCポール31に大梁Cを接続することが可能
である。
Even when the PC pole 31 configured as described above is used as the pole B, the lower end 31a is fitted into the recess 32a of the PC base plate 32 to adjust the level, and
The girder C can be connected to the adjusted PC pole 31.

【0041】また図7は鋳鋼製の鋳鋼ポール35の構成を
説明する斜視図である。この鋳鋼ポール35は、同図
(b)に示すように、四角筒の一端を蓋によって閉鎖し
た形状に形成されており、下端部には開口35aが形成さ
れている。即ち、鋳鋼ポール34は外形がPCポール31と
同様に角棒状に形成されている。また同図(a)に示す
ように、鋳鋼ポール35の上端面35bには柱脚を固定する
ボルト36を締結するタップ孔37が形成され、各面35cに
は大梁Cを固定するボルト36を締結する複数のタップ孔
37がPCポール31と同様のピッチで形成されている。
FIG. 7 is a perspective view for explaining the structure of a cast steel pole 35 made of cast steel. The cast steel pole 35 is formed in a shape in which one end of a square tube is closed by a lid, and an opening 35a is formed at a lower end portion, as shown in FIG. That is, the outer shape of the cast steel pole 34 is formed in the shape of a square bar like the PC pole 31. Further, as shown in FIG. 3A, a tap hole 37 for fastening a bolt 36 for fixing a column base is formed in an upper end surface 35b of the cast steel pole 35, and a bolt 36 for fixing a girder C is formed on each surface 35c. Multiple tap holes to fasten
37 are formed at the same pitch as the PC pole 31.

【0042】鋳鋼ポール35の長さは特に限定するもので
はない。例えば、鋳鋼ポール35をPCポール31と等しい
長さを持って形成した場合、該ポール31用のPC土台板
32を用いることが可能である。しかし、製造コストの軽
減をはかるためには鋳鋼ポール35の長さを短くすること
が好ましい。この場合、中央に鋳鋼ポール35の開口部35
aに嵌合する突起38aを形成したPC土台板38を用いる
ことが好ましい。
The length of the cast steel pole 35 is not particularly limited. For example, when the cast steel pole 35 is formed to have the same length as the PC pole 31, a PC base plate for the pole 31 is used.
It is possible to use 32. However, it is preferable to reduce the length of the cast steel pole 35 in order to reduce the manufacturing cost. In this case, the opening 35 of the cast steel pole 35
It is preferable to use a PC base plate 38 formed with a projection 38a that fits into a.

【0043】上記の如く構成された鋳鋼ポール35であっ
ても、前述のポールBと同様の基礎構造を構成すること
が可能である。
Even with the cast steel pole 35 configured as described above, it is possible to configure the same basic structure as the pole B described above.

【0044】また上記基礎の施工法に於いて、コンクリ
ート25を打設した後、該コンクリート25が硬化したとき
に型枠24は取り外さなくとも良い。従って、打設された
コンクリートの養生期間中に1階の床を構成するALC
パネル等のパネルの敷き込みを実施することも可能とな
り、全体の工期を短縮することが可能となる。
Further, in the above-described method for constructing the foundation, after the concrete 25 is cast, the formwork 24 does not have to be removed when the concrete 25 hardens. Therefore, the ALC which constitutes the floor of the first floor during the curing period of the poured concrete
It is also possible to lay panels such as panels, thereby shortening the entire construction period.

【0045】尚、コンクリート25を打設した後、上部躯
体の建て込みを行うことも可能であるが、この場合、コ
ンクリート打設前に上部躯体の建て込みを行うのと比較
してコンクリートの養生期間に相当する期間のみ工期短
縮日数が減ずる。
It is also possible to build the upper frame after the concrete 25 is cast. In this case, however, the curing of the concrete is performed in comparison with the case where the upper frame is built before the concrete is cast. Only in the period corresponding to the period, the number of days for shortening the construction period is reduced.

【0046】[0046]

【発明の効果】以上詳細に説明したように本発明に係る
基礎構造では鋼製梁を接続する際にポールを介在させ、
且つ鋼製梁の下フランジに設けた孔に埋設鉄筋の端部を
折り曲げて差し込み、その後、コンクリートを打設する
ため、鋼製梁とポールの接続作業が容易であり、且つ鋼
製梁の構造、特に長さはポール間距離に統一されること
となり、長さのバリエーションを少なくし、更に、鋼製
梁とコンクリートとを強固に一体化して合成梁を構成す
ることが出来る。このため、部品の点数を増加させるこ
となく、高い剛性を持った基礎を構築することが出来
る。
As explained in detail above, in the foundation structure according to the present invention, a pole is interposed when connecting steel beams,
In addition, since the end of the buried reinforcing bar is bent and inserted into the hole provided in the lower flange of the steel beam, and then concrete is poured, the connection work between the steel beam and the pole is easy, and the structure of the steel beam. In particular, the length is unified to the distance between the poles, the variation in length can be reduced, and the composite beam can be formed by firmly integrating the steel beam and concrete. Therefore, a foundation having high rigidity can be constructed without increasing the number of parts.

【0047】鋼製梁の下フランジに設けた孔に通した埋
設鉄筋によって、従来のスタッドとしての機能を発揮さ
せることが出来る。このため、溶接作業を実施すること
なく、高い剛性を持った合成梁を構成することが出来
る。特に、溶接作業が不要となることから、溶接資格を
保持しない作業員であっても進行させることが出来、且
つ天候に左右されることなく作業を実施することが出来
る。従って、工程管理の精度を向上させることが出来
る。
The function as a conventional stud can be exhibited by the buried reinforcing bar passed through the hole provided in the lower flange of the steel beam. Therefore, a composite beam having high rigidity can be formed without performing welding work. In particular, since welding work is not required, even a worker who does not hold the welding qualification can proceed and can carry out the work without being affected by the weather. Therefore, the accuracy of the process control can be improved.

【0048】また埋設鉄筋を配筋するに際し、鋼製梁の
下フランジに予め所定のピッチで穴が形成されているた
め、埋設鉄筋の折り曲げた端部を穴に差し込むことで該
鉄筋の配列ピッチを設定することが可能となり、埋設鉄
筋を配筋するための墨だし作業を省略することが出来、
且つナットを螺合して固定する場合と比較して配筋作業
を極めて容易に実施することが出来る。
In arranging the reinforcing bars, holes are formed in the lower flange of the steel beam at a predetermined pitch in advance. By inserting the bent ends of the reinforcing bars into the holes, the arrangement pitch of the reinforcing bars is increased. Can be set, and the inking work for arranging the buried reinforcing bars can be omitted.
In addition, the rebar arrangement work can be performed extremely easily as compared with the case where the nut is screwed and fixed.

【0049】またポール間を鋼製梁によって接続する際
に、ポールを設置する地盤面にセルフレベリング材を打
設し水平な基準面を形成しているため、該ポールの天端
レベルの精度を容易に確保することが出来、且つ該ポー
ルを水平方向に移動させることが可能であるため水平方
向の位置精度を容易に確保することが出来る。このた
め、精度の高い基礎を構築することが可能となり、上部
構造躯体の建て方精度を大幅に向上させて1階床レベル
の精度を向上させることが出来る。
When connecting the poles with steel beams, a self-leveling material is cast on the ground surface on which the poles are installed to form a horizontal reference plane. Since the pole can be easily secured and the pole can be moved in the horizontal direction, the positional accuracy in the horizontal direction can be easily secured. For this reason, it is possible to construct a high-precision foundation, and it is possible to greatly improve the accuracy of the construction of the upper structural body, thereby improving the accuracy of the first floor level.

【0050】また地盤を深く掘削する必要がないため、
残土処理が少なくなり、工期の短縮やコストダウンをは
かることが出来る。
Since there is no need to excavate the ground deeply,
Remaining soil treatment is reduced, and the construction period can be shortened and costs can be reduced.

【0051】またコンクリート打設後、その養生中に1
階の床板を敷くことで上部の工事を行うスペースとする
ことが可能であり、作業性を向上させると共に安全性を
向上させることが出来る。
After the concrete has been cast, 1
By laying floor plates on the floor, it is possible to provide a space for the construction of the upper part, and it is possible to improve workability and safety.

【0052】また基礎を構成する鋼製梁は、2階以上の
上部構造に用いるものを兼用することが出来る。このた
め、部品の品種を削減することが出来、且つ1階の床板
の固定方法を2階以上の床板の固定方法と共通化するこ
とが出来る。
The steel beam constituting the foundation can be used for the upper structure of the second floor or more. Therefore, the number of types of parts can be reduced, and the method of fixing the floor plate on the first floor can be shared with the method of fixing the floor plate on the second floor or more.

【0053】またコンクリートによって鋼製梁の下フラ
ンジ及びウエブの一部を被覆することで下フランジの孔
に端部を差し込んだ埋設鉄筋を一体化した場合には、鉄
筋をウエブに固定する場合と比較して、鋼製梁とコンク
リートの強固な一体化を実現し、鋼製梁とコンクリート
スラブとの間の曲げ応力の伝達性能の向上をはかると共
に剛性を高くして鋼製梁の座屈を拘束することが可能で
あり、相乗的に梁の断面性能を落として軽量化をはかる
ことが出来る。
When the lower flange and a part of the web are covered with concrete and the buried reinforcing bar whose end is inserted into the hole of the lower flange is integrated, the reinforcing bar is fixed to the web. In comparison, steel beams and concrete are strongly integrated, improving the performance of transmitting bending stress between steel beams and concrete slabs and increasing rigidity to reduce buckling of steel beams. The beam can be restrained, and the cross-sectional performance of the beam can be reduced synergistically to reduce the weight.

【0054】また鋼製梁全体をコンクリートで被覆しな
いため、コンクリートの打設量を軽減することが出来
る。この場合、特に、鉄筋を鋼製梁のウエブに固定する
よりも下フランジに固定する方が該梁とコンクリートと
を強固に一体化することが出来る。
Further, since the entire steel beam is not covered with concrete, the amount of concrete to be cast can be reduced. In this case, fixing the reinforcing bar to the lower flange rather than fixing the reinforcing bar to the web of the steel beam enables the beam to be concretely integrated with the concrete.

【0055】また本発明に係る施工方法に於いて、ポー
ル若しくは鋼製梁に上部躯体を設置した後、コンクリー
トを打設した場合には、上部構造躯体の建て方を先行し
て進行させることが可能となり、工期の短縮化をはかる
ことが出来る等の特徴を有するものである。
Further, in the construction method according to the present invention, when concrete is cast after the upper frame is installed on the pole or the steel beam, the method of building the upper frame can be advanced in advance. This makes it possible to shorten the construction period and has other features.

【図面の簡単な説明】[Brief description of the drawings]

【図1】基礎構造を説明する要部断面図である。FIG. 1 is a sectional view of an essential part for explaining a basic structure.

【図2】本実施例に係る基礎構造の配筋状態を説明する
斜視図である。
FIG. 2 is a perspective view illustrating a reinforcement arrangement state of the foundation structure according to the embodiment.

【図3】鋼製梁と基礎鉄筋の関係を説明する模式図であ
る。
FIG. 3 is a schematic diagram illustrating a relationship between a steel beam and a foundation reinforcing bar.

【図4】地盤面に設置されたポールを説明する図であ
る。
FIG. 4 is a diagram illustrating a pole installed on the ground surface.

【図5】基礎伏図である。FIG. 5 is a basic plan view.

【図6】他のポールの例を説明する図である。FIG. 6 is a diagram illustrating an example of another pole.

【図7】更に他のポールの例を説明する図である。FIG. 7 is a diagram illustrating still another example of a pole.

【図8】従来の合成梁の例を説明する図である。FIG. 8 is a diagram illustrating an example of a conventional composite beam.

【符号の説明】[Explanation of symbols]

A PC土台板 B ポール C 大梁 D 小梁 E 埋設鉄筋 1 底板 1a 鉄筋 2 載置部 3 ボルト 4a 下フランジ 4b 上フランジ 5 ウエブ 6 ボルト孔 7a 下フランジ 7b 上フランジ 7c ウエブ 8a 上端筋 8b 下端筋 9 孔 11 接続部材 11a,11b 接合片 11c ボルト穴 12a ボルト 12b ナット 21 地業 22 セルフレベリング材 23 基準面 24 型枠 25 コンクリート 31 PCポール 32,38 PC土台板 35 鋳鋼ポール A PC base plate B Pole C Large beam D Small beam E Buried reinforcing bar 1 Bottom plate 1a Reinforcing bar 2 Placement part 3 Bolt 4a Lower flange 4b Upper flange 5 Web 6 Bolt hole 7a Lower flange 7b Upper flange 7c Web 8a Upper bar 8b Lower bar 9 Hole 11 Connection member 11a, 11b Joint piece 11c Bolt hole 12a Bolt 12b Nut 21 Ground work 22 Self-leveling material 23 Reference surface 24 Formwork 25 Concrete 31 PC pole 32, 38 PC base plate 35 Cast steel pole

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 基礎を構成する地盤面に設置されるポー
ルと、前記ポール間を連結する鋼製梁と、建物の外周上
の鋼製梁で囲まれた地盤面上に打設されたコンクリート
とからなり、前記鋼製梁の下フランジに設けられた孔に
埋設鉄筋の端部が折り曲げられて差し込まれていること
を特徴としたべた基礎構造。
1. A pole installed on a ground surface constituting a foundation, a steel beam connecting between the poles, and concrete cast on a ground surface surrounded by steel beams on the outer periphery of the building. Wherein the end of a buried reinforcing bar is bent and inserted into a hole provided in a lower flange of the steel beam.
【請求項2】 前記鋼製梁の下フランジに設けられた孔
は予め設定されたピッチを有することを特徴とする請求
項1記載のべた基礎構造。
2. The solid foundation structure according to claim 1, wherein the holes provided in the lower flange of the steel beam have a preset pitch.
【請求項3】 ポールを設置する地盤面にセルフレベリ
ング材を打設して水平な基準面を形成し、該基準面上に
プレキャストコンクリート製土台板を設置し、その上に
ポールを設置したことを特徴とした請求項1又は2記載
のべた基礎構造。
3. A horizontal reference surface is formed by casting self-leveling material on the ground surface on which the pole is to be installed, a precast concrete base plate is installed on the reference surface, and the pole is installed thereon. The solid foundation structure according to claim 1 or 2, wherein:
【請求項4】 基礎を構成する地盤面にポールを設置
し、ポール間を鋼製梁で連結し、該ポール若しくは鋼製
梁に上部構造躯体を設置すると共に、前記鋼製梁の下フ
ランジに設けられた孔に折り曲げられた端部を差し込ん
で鉄筋を配置し、建物外周上の鋼製梁で囲まれた地盤面
上にコンクリートを打設してべた基礎を構成することを
特徴としたべた基礎の施工方法。
4. A pole is installed on the ground surface constituting the foundation, the poles are connected by a steel beam, an upper structural body is installed on the pole or the steel beam, and a lower flange is provided on the lower flange of the steel beam. Inserting the bent end into the hole provided, arranging rebar, and placing concrete on the ground surface surrounded by steel beams on the outer periphery of the building to constitute a solid foundation Foundation construction method.
JP17330496A 1996-07-03 1996-07-03 Mat foundation structure and its construction method Withdrawn JPH1018304A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17330496A JPH1018304A (en) 1996-07-03 1996-07-03 Mat foundation structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17330496A JPH1018304A (en) 1996-07-03 1996-07-03 Mat foundation structure and its construction method

Publications (1)

Publication Number Publication Date
JPH1018304A true JPH1018304A (en) 1998-01-20

Family

ID=15957970

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17330496A Withdrawn JPH1018304A (en) 1996-07-03 1996-07-03 Mat foundation structure and its construction method

Country Status (1)

Country Link
JP (1) JPH1018304A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019108664A (en) * 2017-12-15 2019-07-04 日本製鉄株式会社 Foundation structure
CN114045855A (en) * 2021-09-30 2022-02-15 珠海十字门中央商务区建设控股有限公司 Soft soil foundation large-span reinforced concrete beam construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019108664A (en) * 2017-12-15 2019-07-04 日本製鉄株式会社 Foundation structure
CN114045855A (en) * 2021-09-30 2022-02-15 珠海十字门中央商务区建设控股有限公司 Soft soil foundation large-span reinforced concrete beam construction method

Similar Documents

Publication Publication Date Title
JP4472726B2 (en) Base-isolated building structure
KR102398605B1 (en) Construction method of seismic retrofit system using pc panel
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP2001262586A (en) Foundation structure of dwelling house
JPH1018304A (en) Mat foundation structure and its construction method
JP3084654B2 (en) Construction foundation, foundation structure using the same, and construction method thereof
JPH09151463A (en) Column-integrated column base anchoring foundation structire and work execution method therefor
JP2004263507A (en) Building foundation construction method and building foundation structure
KR20010090294A (en) Precast concrete structure for variable plan of apartment house
JP3636754B2 (en) Solid foundation structure and its construction method
JP3586121B2 (en) Mixed structure of reinforced concrete column and steel beam and its construction method
JP2000345719A (en) Reinforcing method of through opening in existing bearing wall
JP2860501B2 (en) Concrete foundation
JP2000328664A (en) Building unit and unit type building
JP3678695B2 (en) Fixing method of column to concrete foundation
JP2002285562A (en) Foundation construction for building
JP2784450B2 (en) Reinforced concrete foundation
JP3086384B2 (en) Foundation structure and foundation construction method
JP2900840B2 (en) How to build underground structures
JP2002115324A (en) Column base unit, column integrated column base fixing foundation structure using the column base unit, and construction method therefor
JP3108112B2 (en) Foundation structure
JPH03199529A (en) Mat foundation using steel structure
JP2959436B2 (en) How to build underground structures
JP2579944Y2 (en) Load-bearing wall assembly structure
JP2536250Y2 (en) Steel foundation beam