CN102409865A - Mounting and measurement-correcting structure for multi-storey steel structured column - Google Patents

Mounting and measurement-correcting structure for multi-storey steel structured column Download PDF

Info

Publication number
CN102409865A
CN102409865A CN2011102367257A CN201110236725A CN102409865A CN 102409865 A CN102409865 A CN 102409865A CN 2011102367257 A CN2011102367257 A CN 2011102367257A CN 201110236725 A CN201110236725 A CN 201110236725A CN 102409865 A CN102409865 A CN 102409865A
Authority
CN
China
Prior art keywords
column
plate
location
screw rod
locating plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102367257A
Other languages
Chinese (zh)
Inventor
沈万玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fuhuang Steel Structure Co Ltd
Original Assignee
Anhui Fuhuang Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fuhuang Steel Structure Co Ltd filed Critical Anhui Fuhuang Steel Structure Co Ltd
Priority to CN2011102367257A priority Critical patent/CN102409865A/en
Publication of CN102409865A publication Critical patent/CN102409865A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a mounting and measurement-correcting structure for a multi-storey steel structured column. In the steel structured column, an upper sectional column and a lower sectional column are butt-jointed. The mounting and measurement-correcting structure is characterized in that a screw rod adjusting unit is arranged; an upper locating plate is horizontally arranged on the upper sectional column; a lower locating plate is horizontally arranged on the lower sectional column; the upper locating plate and the lower locating plate are located in a same upright line; an adjusting screw rod is arranged between the upper locating plate and the lower locating plate; nuts at two ends of the adjusting screw rod are respectively and fixedly connected to the upper locating plate and the lower locating plate; and the nuts are in thread fit with the adjusting screw rod. The problem of measurement correcting during a mounting process of the multi-storey steel structured column is efficiently solved by the mounting and measurement-correcting structure provided by the invention, thereby ensuring the mounting quality of the multi-storey steel structured column.

Description

A kind of many high-rise steel structure post installs and measures correcting structure
Technical field
The present invention relates to the measurement update structure in a kind of installation process that is applied in many high-rise steel structure post, more specifically say so and in many high-rise steel structure post installation process, carry out the structure of post absolute altitude, verticality adjustment and calibration.
Background technology
Many high-rise steel structure buildings are the history in existing more than 110 year abroad; 1883 the earliest a building steel work highrise building rise sheer from level ground at Chicago,U.S; Arrived after the World War II because the rise and the explosive growth of population of land price; And to the research of the structural system of high level and super highrise building be gradually improved, the development of computing technique and improving constantly of construction technology level, make high-rise and super highrise building fast development.Many high-rise steel structure constructions are made and have been solved each item technical barrier at present, still are a difficult problem up to now but many high-rise steel structure install and measure control.Traditional how high-rise post is installed; When last segmented column and following segmented column are turned round the shape dislocation; Pillar needs to proofread and correct by the numerical value of regulation and stipulation, and the mode that the calibration steps of traditional pillar adopts the cable wind rope of regulating pillar and the interim otic placode place of segmented column and following segmented column installs backing plate additional on connecting is carried out.This mode not only is awkward, and degree of regulation can not get guaranteeing.
Summary of the invention
The present invention is for avoiding above-mentioned existing in prior technology weak point; Provide a kind of many high-rise steel structure post to install and measure correcting structure; Install and measure the problem of proofreading and correct difficulty in the hope of solving many high-rise steel structure post, eliminate the problem that cumulative errors cause on-the-spot installation accuracy to guarantee in invar structure fabrication and the installation process again.
Technical solution problem of the present invention adopts following technical scheme
Many high-rise steel structure of the present invention post installs and measures correcting structure; Its steel structure column is between last segmented column and following segmented column, to form butt joint; Its design feature is the screw rod regulon to be set be: be on the segmented column on said and be horizontally disposed with location-plate, on said segmented column down, be and be horizontally disposed with location-plate down; The said location-plate of going up is on the same vertical curve with following location-plate; Between location-plate and the following location-plate adjusting screw(rod) is set on said, said adjusting screw(rod) is to be fixedly connected with following location-plate with last location-plate respectively with the two ends nut, is threaded engagement between said nut and the adjusting screw(rod).
The design feature that many high-rise steel structure of the present invention post installs and measures correcting structure also is: said screw rod regulon is set to four groups; Four groups of screw rod regulon branches are in the both sides of the symmetry of steel structure column, and two groups of screw rod regulon branches that are positioned on the same side stand on the position, both sides of place one side.
Compared with present technology, beneficial effect body of the present invention exists:
1, the present invention is provided with the screw rod regulon between last segmented column and following segmented column; Can change the bearing height that between last segmented column and following segmented column, forms by adjusting screw(rod) through the adjustment nut; The on-the-spot measurement update that obtains to install absolute altitude and verticality for many high-rise steel structure post; Eliminate the cumulative errors in invar structure fabrication and the installation process, guarantee installation accuracy.
2, the present invention adopts the screw rod regulon, and it is simple in structure, easy to adjust, the adjustment precision is high.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the A-A view of Fig. 1;
Fig. 3 is screw rod adjustment unit structural representation among the present invention;
Label among the figure: location-plate, 6a upper ear plate under segmented column, 2 clamping plate, 3 nuts, 4 adjusting screw(rod)s, the last location-plate of 5a, the 5b on 1,6b lower ear plate, 7 times segmented columns.
The specific embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3; Many high-rise steel structure of present embodiment post installs and measures in the correcting structure; Steel structure column is between last segmented column 1 and following segmented column 7, to form butt joint; The screw rod regulon is set is: be horizontally disposed with location-plate 5a5a, on following segmented column 7, be and be horizontally disposed with location-plate 5b down being on the last segmented column 1, last location-plate 5a and following location-plate 5b are on the same vertical curve, and adjusting screw(rod) 4 is set between last location-plate and following location-plate; Adjusting screw(rod) 4 is that the nut 3 with two ends is fixedly connected with following location-plate with last location-plate respectively, is threaded engagement between nut 3 and the adjusting screw(rod) 4.
Fig. 1 and shown in Figure 3; For cross section in the present embodiment is the steel structure column of rectangle; The screw rod regulon is set to four groups; Four groups of screw rod regulon branches are in the both sides of the symmetry of steel structure column, and are positioned on the position, both sides that two groups of screw rod regulon branches on the same side stand in place one side, and this distribution form helps realizing rapid adjustment.
The temporary fastening device that is arranged between segmented column 1 and the following segmented column 7 illustrated in figures 1 and 2 is existing form of structure; Be that upper ear plate 6a is set on last segmented column,, between upper ear plate 6a and lower ear plate 6b, fixedly install clamping plate 2 on the segmented column lower ear plate 6b being set down; Constitute the clamping plate fixed cell; Disturb for fear of forming with the screw rod regulon four groups of same both sides of dividing the symmetry that is in steel structure column of clamping plate fixed cell, and the clamping plate fixed cell is to be in different sidepieces with the screw rod regulon.
In the installation process of many high-rise steel structure post; Top with segmented column 7 under last segmented column 1 lifting extremely; It is temporary fixed to utilize clamping plate 2 between upper ear plate 6a and lower ear plate 6b, to be connected to form; Between last segmented column 1 and following segmented column 7, carry out the assembling of each screw rod regulon, adjust the nut 3 in each screw rod regulon, the absolute altitude and the verticality precision that reach setting until steel structure column can implement to be fixedly connected installation between last segmented column and the following segmented column.

Claims (2)

1. the high-rise steel structure post installs and measures correcting structure more than one kind; Said steel structure column is between last segmented column (1) and following segmented column (7), to form butt joint; It is characterized in that being provided with the screw rod regulon is: be on the segmented column (1) on said and be horizontally disposed with location-plate (5a), on said segmented column (7) down, be and be horizontally disposed with location-plate (5b) down; Said upward location-plate (5a) and following location-plate (5b) are on the same vertical curve; Between location-plate (5a) and the following location-plate (5b) adjusting screw(rod) (4) is set on said; Said adjusting screw(rod) (4) is that the nut (3) with two ends is fixedly connected threaded engagement between said nut (3) and the adjusting screw(rod) (4) respectively with following location-plate (5b) with last location-plate (5a).
2. many high-rise steel structure post according to claim 1 installs and measures correcting structure; It is characterized in that said screw rod regulon is set to four groups; Four groups of screw rod regulon branches are in the both sides of the symmetry of steel structure column, and two groups of screw rod regulon branches that are positioned on the same side stand on the position, both sides of place one side.
CN2011102367257A 2011-08-17 2011-08-17 Mounting and measurement-correcting structure for multi-storey steel structured column Pending CN102409865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102367257A CN102409865A (en) 2011-08-17 2011-08-17 Mounting and measurement-correcting structure for multi-storey steel structured column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102367257A CN102409865A (en) 2011-08-17 2011-08-17 Mounting and measurement-correcting structure for multi-storey steel structured column

Publications (1)

Publication Number Publication Date
CN102409865A true CN102409865A (en) 2012-04-11

Family

ID=45912170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102367257A Pending CN102409865A (en) 2011-08-17 2011-08-17 Mounting and measurement-correcting structure for multi-storey steel structured column

Country Status (1)

Country Link
CN (1) CN102409865A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102756441A (en) * 2012-06-21 2012-10-31 南京甬博数控科技有限公司 Horizontal adjustment device of wind turbine blade mould
CN103967042A (en) * 2013-01-30 2014-08-06 五冶集团上海有限公司 Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device
CN109386135A (en) * 2017-08-04 2019-02-26 北京华商陆海科技有限公司 Apparatus for building and house
CN109403643A (en) * 2018-12-19 2019-03-01 浙江中南建设集团钢结构有限公司 A kind of steel structure column mounting device and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002317452A (en) * 2001-04-19 2002-10-31 Toda Constr Co Ltd Erection structure for steel column, and method for erection thereof
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
CN201381650Y (en) * 2009-04-10 2010-01-13 江苏顺通建设工程有限公司 Steel column adjusting device
CN201486156U (en) * 2009-05-15 2010-05-26 中国十七冶建设有限公司 Accurate adjustment device for adjusting gap between large-sized steel members
CN202170647U (en) * 2011-08-17 2012-03-21 安徽富煌钢构股份有限公司 Installation measurement and correction structure for column of multi-story and tall steel structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002317452A (en) * 2001-04-19 2002-10-31 Toda Constr Co Ltd Erection structure for steel column, and method for erection thereof
JP2007186923A (en) * 2006-01-13 2007-07-26 Kayaba System Machinery Kk Plumbing adjusting device
CN201381650Y (en) * 2009-04-10 2010-01-13 江苏顺通建设工程有限公司 Steel column adjusting device
CN201486156U (en) * 2009-05-15 2010-05-26 中国十七冶建设有限公司 Accurate adjustment device for adjusting gap between large-sized steel members
CN202170647U (en) * 2011-08-17 2012-03-21 安徽富煌钢构股份有限公司 Installation measurement and correction structure for column of multi-story and tall steel structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102756441A (en) * 2012-06-21 2012-10-31 南京甬博数控科技有限公司 Horizontal adjustment device of wind turbine blade mould
CN103967042A (en) * 2013-01-30 2014-08-06 五冶集团上海有限公司 Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN103967042B (en) * 2013-01-30 2017-02-15 五冶集团上海有限公司 Mounting correction tool for protection corner angle of frame column and manufacturing method thereof
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device
CN109386135A (en) * 2017-08-04 2019-02-26 北京华商陆海科技有限公司 Apparatus for building and house
CN109386135B (en) * 2017-08-04 2019-11-08 北京华商陆海科技有限公司 Apparatus for building and house
CN109403643A (en) * 2018-12-19 2019-03-01 浙江中南建设集团钢结构有限公司 A kind of steel structure column mounting device and construction method
CN109403643B (en) * 2018-12-19 2024-05-03 浙江中南绿建科技集团有限公司 Steel structure column installation device and construction method

Similar Documents

Publication Publication Date Title
CN102409865A (en) Mounting and measurement-correcting structure for multi-storey steel structured column
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN203654313U (en) Embedded anchor bolt positioning mold
CN204690596U (en) Viaduct bent cap sizing bed die support
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN103643637A (en) Long-span concrete filled steel tube arch bridge construction method achieved through integral lifting on site after vertical turning
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
CN203247565U (en) Auxiliary riveting stud second-phase embedding part mounting device for vertical ship lift
CN104912191B (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN209493891U (en) A kind of cast-in-place guardrail reinforcing bar binding limiter of movable type
CN204899252U (en) Built -in fitting accuracy control regulator
CN210561726U (en) Accurate positioning construction device for anchor cable guide pipe of ground anchor type suspension bridge
CN102605960B (en) Method for finely adjusting, locating and lifting hollow warehouse roof platform
CN104878695A (en) Viaduct cover beam shaping bottom die support and application method thereof
CN202170647U (en) Installation measurement and correction structure for column of multi-story and tall steel structure
CN203513056U (en) Retractable staircase lower truss
CN209837767U (en) Assembled horizontal prefabricated component supports support body
CN211922298U (en) Recyclable tunnel anchor cable strand embedded pipe fine adjustment device
CN202627370U (en) Angle regulation fixing base for stair handrail
CN204702442U (en) A kind of leveling equipment of tower crane base
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN213297202U (en) Concrete floor elevation control module
CN104047228A (en) Preformed hole die of foundation bolt of bridge
CN210482011U (en) Pre-buried positioner of cable-stay bridge cable steel pipe
CN202372196U (en) Adjustable sensor installation support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120411