CN107882056A - A kind of foundation bolt positioning device and installation method - Google Patents

A kind of foundation bolt positioning device and installation method Download PDF

Info

Publication number
CN107882056A
CN107882056A CN201711209351.3A CN201711209351A CN107882056A CN 107882056 A CN107882056 A CN 107882056A CN 201711209351 A CN201711209351 A CN 201711209351A CN 107882056 A CN107882056 A CN 107882056A
Authority
CN
China
Prior art keywords
plate
location
bolt
foundation bolt
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711209351.3A
Other languages
Chinese (zh)
Inventor
花泽燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711209351.3A priority Critical patent/CN107882056A/en
Publication of CN107882056A publication Critical patent/CN107882056A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention provides a kind of foundation bolt positioning device and installation method, including, foundation bolt, it is provided with the location-plate of bolt hole, is characterized in that:Independent positioning element is additionally provided with below location-plate on each bolt hole, positioning element is connected on described location-plate, and the positioner for limiting foundation bolt vertical direction is formed with described foundation bolt and described location-plate.The each bolt hole of anchor bolt positioning plate of the present invention is designed with independent positioning element, so that every foundation bolt is guaranteed in the position of location-plate and perpendicularity, it is accurate fixed, in-site installation work progress is simple, without being adjusted correction repeatedly again, time saving and energy saving less manpower, can be achieved accurately and fast, efficiently mounting foot bolt.

Description

A kind of foundation bolt positioning device and installation method
Technical field
In particular it is a kind of foundation bolt positioning device and peace the present invention relates to the technical field of foundation bolt installation Dress method.
Background technology
During power transmission tower is constructed, tower body is fixed on the column foot of bottom by foundation bolt.Because foundation bolt is For the part of fixed tower, and it carries whole tower body weight and other many unexpected loads, and quantity is various, applies Work required precision is higher, so, the absolute altitude of mounting foot bolt and the vertical service life and peace whether offset etc. to equipment It is complete extremely important.In the prior art, mounting foot bolt generally use spirit level and tape measure adjust pre-embedded anchoring bolts Absolute altitude and levelness, and vertical degrees of offset, wherein, between the center of the spacing of adjacent foundation bolt by plant bottom case bolt hole Away from determining.The foot bolt to each group of this kind of fixed form is required for tape measure, not only wastes substantial amounts of manpower, Er Qiean Dress precision cannot guarantee that.Before column foot is poured, foundation bolt is required for artificial according to pouring shape and technological requirement enters pedestrian Work disposes, and carries out manual synchronizing after foundation bolt is disposed, so as to cause foundation bolt formula cast in situ concrete foundation bolt Installation difficulty, waste time and energy, foundation bolt is also needed to repeatedly after manual placement according to pouring shape and technological requirement correction The installation position of foot bolt, shape and technological requirement are poured to meet.
Chinese utility model patent 201320190545.4,201320399645.8,201420176124.0, A kind of bearing calibration of foundation bolt is proposed in 201420411679.9 and China Patent Publication No. CN105133634A, its Thinking is respectively to set one piece of location-plate up and down in foundation bolt, and foundation bolt runs through upper and lower location-plate, tries to make one of Location-plate keep level and fixation, foundation bolt is set integrally to be adjusted to plumbness by adjusting another piece of location-plate.This side Method needs to process 2 pieces of same location-plates, and in-site installation correction fully relies on artificial progress, and process is cumbersome, time and effort consuming, also not Positive calibration accuracy can be protected.
The content of the invention
Defect present in prior art is directed to, the present invention proposes a kind of new foundation bolt positioning device and installation Method.
It is an object of the invention to simplify the installation positioning action of foundation bolt so that the peace of foundation bolt at the construction field (site) It is simple to set position, time saving and energy saving less manpower, rapidly and efficiently.
Above-mentioned purpose is realized by following technical scheme:
1st, a kind of foundation bolt positioning device, including, foundation bolt, the location-plate for being provided with bolt hole, it is characterised in that:Location-plate Independent positioning element is additionally provided with below each bolt hole, positioning element is connected on described location-plate, with described ground Foot bolt and described location-plate are construed as limiting the 90 ° of vertical positioning of foundation bolt central axis and location-plate horizontal plane and holding Device.
2nd, a kind of specific foundation bolt positioning device designed according to the principle of technical scheme 1, it is characterized in that, it is described Positioning element is one section of pipe part being connected on described location-plate bolt hole, on the external diameter and location-plate of pipe part Bolt hole internal diameter matches, and its through hole central axis keeps 90 ° of vertical, internal diameters of pipe part with described location-plate horizontal plane Match with described foundation bolt external diameter.
3rd, a kind of details of foundation bolt positioning device described in technical scheme 2 is:Described pipe part with it is described Location-plate is by welding or being connected through a screw thread.
4th, another foundation bolt positioning device designed according to the principle of technical scheme 1, it is characterized in that, described positioning Part is formed by being welded on multiple spacers separated each other around described location-plate bolt hole, and described spacer uniformly divides It is distributed in by the bolt hole circumference on described location-plate, each spacer extends downwardly direction closely along bolt hole center's axis Foot bolt bar, the positioning element being made up of spacer are construed as limiting foundation bolt with described foundation bolt and described location-plate Central axis keeps 90 ° of vertical positioners with location-plate horizontal plane.
5th, a kind of foundation bolt positioning device described in technical scheme 4, it is characterized in that, described spacer is inverted l shape Or triangle, each bolt hole at least 3 spacers, it is evenly distributed along bolt hole circumference.
6th, a kind of installation method of foundation bolt:
(1) pre-buried foundation bolt distribution map as needed makes location-plate and holds corresponding bolt hole successfully;
(2) the positioning element described in one of above-mentioned technical scheme 1~5 is made, and on location-plate;
(3) described foundation bolt is loaded into location-plate, nut is loaded onto from above and adjusts foundation bolt on location-plate with nut The height in portion is reached to predetermined value;
(4), with the foundation bolt bar portion after the levelling of stirrup welding location-plate bottom, whole foundation bolt group is further fixed;
(5) the location-plate for installing foundation bolt is put into pre-buried hole, adjusting positioning plate face with level meter makes its keep level, and Control positioning plate face is in predetermined height;
(6) mixed concrete is poured into pre-buried hole, remove nut and location-plate.
So far, foundation bolt just installs.
Beneficial effects of the present invention:
Because power transmission tower is mostly in wilderness mountain region etc., transport, construction environment, operating condition are all poor, therefore, existing installation Construction, is all more likely in the prefabricated accurate part of workshop, and reduces the correction of adjustment repeatedly in installation at the scene Process.The each bolt hole of anchor bolt positioning plate of the present invention is designed with independent positioning element so that every foundation bolt exists The position of location-plate and perpendicularity are guaranteed, and accurate fixed, in-site installation work progress is simple, without being adjusted repeatedly again Whole correction, time saving and energy saving less manpower, accurately and fast, efficient mounting foot bolt, it is achieved thereby that lifting foundation bolt installation The technique effect of correction accuracy, solve the problems, such as that manual placement's foundation bolt trimming process is complicated cumbersome.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is another structural representation of the present invention, and wherein Fig. 2-A are front view, and Fig. 2-B are bottom view.
Fig. 3 is the design sketch of Fig. 1 structures.
Fig. 4 is the design sketch of Fig. 2 structures.
In diagram:1 is foundation bolt, and 2 be location-plate, and 3 be positioning element, and 4 be fastening foundation bolt nut.
Embodiment
The inventive method is further described below, description is only used for explaining the present invention, and is not considered as to this The limitation of invention.
The foundation bolt positioning device of the present invention, including, foundation bolt 1, the location-plate 2 for being provided with bolt hole, its feature exist In:Independent positioning element 3 is additionally provided with below location-plate on each bolt hole, positioning element 3 is connected to described location-plate 2 On.It is the orientation that can not accurately fix foundation bolt onboard vertical direction to depend merely on location-plate, sets the purpose of positioning element It is that the positioner for limiting foundation bolt vertical direction is formed together with described foundation bolt and described location-plate.
Described positioning element can be one section of pipe part being connected on described location-plate, and pipe part is arranged on Below location-plate.The external diameter of pipe part matches with the bolt hole internal diameter on the location-plate, its internal diameter and described ground Foot bolt matches, and foundation bolt can penetrate the endoporus of pipe part on location-plate, the central axis of pipe part through hole with Described location-plate horizontal plane keeps vertical.After straighttube part is fixed on location-plate, foundation bolt hangs down with location-plate horizontal plane Nogata position will be accurately fixed up, and position, horizontal plane and the absolute altitude of location-plate need to be only aligned during in-site installation, and foundation bolt hangs down Nogata position will autobalance without carrying out levelling repeatedly again, this just enormously simplify the positioning and levelling of foundation bolt Process.Straighttube part can be fixed on location-plate with described location-plate by way of welding or being connected through a screw thread, Fig. 1 For the foundation bolt positioning device structure chart of this mode, Fig. 3 is the design sketch of this foundation bolt positioning device.
Fig. 2 show another structural representation of the present invention, and wherein Fig. 2-A are front view, and Fig. 2-B are bottom view, should Positioning element 3 is formed by being welded on the described multiple spacers separated each other of location-plate bolt hole circumference, described spacer Uniformly by described location-plate bolt hole circumference, each spacer extends downwardly direction along bolt hole center's axis and is close to lower margin Shank of bolt, the positioning element being made up of spacer are construed as limiting in foundation bolt with described foundation bolt and described location-plate The 90 ° of vertical positioning of mandrel line and location-plate horizontal plane and holding.The bolt hole of location-plate and the vertical part structure of positioning element Central axis into cavity is vertical with described location-plate horizontal plane holding, thus can accurately fix the Vertical Square of foundation bolt Position, described spacer are inverted l shape or triangle, each bolt hole at least 3 spacers, are in uniform along bolt hole circumference Distribution.
The installation method of foundation bolt:
2 pre-buried foundation bolt distribution maps as needed make location-plate and hold corresponding bolt hole successfully;
(2) the positioning element described in one of above-mentioned technical scheme 1~5 is made, and on location-plate;
(3) described foundation bolt is loaded into location-plate, nut is loaded onto from above and adjusts foundation bolt on location-plate with nut The height in portion is reached to predetermined value;
(4), with the foundation bolt bar portion after the levelling of stirrup welding location-plate bottom, whole foundation bolt group is further fixed;
(5) the location-plate for installing foundation bolt is put into pre-buried hole, adjusting positioning plate face with level meter makes its keep level, and Control positioning plate face is in predetermined height;
(6) mixed concrete is poured into pre-buried hole, remove nut and location-plate.
Embodiment 1
A kind of column foot of angle steel tower, each column foot need to install 4 foundation bolts.One piece of square fixing steel plate is first cut, by figure Spiro keyhole position is set in paper requirement, intercepts one section of steel pipe, the internal diameter of pipe and the external diameter of foundation bolt match.In location-plate On drill through bolt hole, the diameter of bolt hole is engaged with the external diameter of pipe, and for pipe below the location-plate, pipe top should not The plane on location-plate, by the regulation of pipe through hole central axis and location-plate horizontal plane keep 90 ° it is vertical after be welded and fixed circle Pipe, make the positioning plate device for just turning into angle steel tower column foot foundation bolt after 4 pipe positioning elements successively on location-plate.
Embodiment 2
A kind of column foot of steel tube tower, the column foot of circle is surrounded by 24 foundation bolts.First cut the suitable circle of a block size Fixing steel plate, spiro keyhole position is set by drawing, intercept one section of steel pipe, the internal diameter of pipe and the external diameter phase of foundation bolt Matching, the screw thread over one end of pipe.Bolt hole is drilled through on location-plate and opens internal thread, the internal thread and pipe of bolt hole External screw thread match, pipe is provided with externally threaded one end and is screwed into from the bolt hole below location-plate, and the top of pipe should not be convex Go out plane on location-plate, pipe through hole central axis is in 90 ° vertical with location-plate horizontal plane, makes 24 successively on location-plate Just turn into the positioning plate device of steel tube tower column foot foundation bolt after individual pipe positioning element.
Embodiment 3
A kind of pedestal of large power generating equipment, the column foot being made up of 180 foundation bolts.Need to be segmented because column foot area is excessive Location-plate is made, then pieces together integrated locating device.The suitable fixing steel plate of size and shape is cut, sets spiral shell by drawing Keyhole position, bolt hole is drilled through on every piece of location-plate, bolt aperture matches with foundation bolt diameter, cuts the suitable L of polylith Spacer is placed on bolt hole below fixing steel plate by shape or triangular steel plate as spacer in inverted L or del It is welded and fixed on circumference, each 4 symmetrical spacers of bolt hole circumference soldering.Every spacer is along bolt hole center's axle Line extends downwardly direction and is close to foundation bolt bar, is construed as limiting by the positioning element that spacer is formed and foundation bolt and location-plate Foundation bolt central axis is vertical with 90 ° of location-plate horizontal plane holding, turns into the anchor bolt positioning plate device of the pedestal of equipment.
Embodiment 4
The installation method of foundation bolt(By taking embodiment 2 as an example):
Pre-buried foundation bolt distribution map makes location-plate and holds corresponding bolt hole successfully as needed;Make in embodiment 2 Described positioning element, and on location-plate;Described foundation bolt is loaded into location-plate, nut is loaded onto from above and uses spiral shell Height of mother's regulation foundation bolt on location-plate top is reached to predetermined value;After being aligned with stirrup welding location-plate bottom Foundation bolt bar portion, further fix whole foundation bolt group;The location-plate for installing foundation bolt is put into pre-buried hole, uses water Level adjustment positioning plate face makes its keep level, and controls positioning plate face in predetermined height;Mixed concrete is poured into pre- Bury in hole, remove nut and location-plate.After concrete completely solidification, foundation bolt base is just carried out.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure or equivalent transformation that bright description is made, or other related technical fields are directly or indirectly used in, together Reason is included in the scope of patent protection of the present invention.

Claims (6)

1. a kind of foundation bolt positioning device, including, foundation bolt, the location-plate for being provided with bolt hole, it is characterised in that:Location-plate Independent positioning element is additionally provided with below each bolt hole, positioning element is connected on described location-plate, with described ground Foot bolt and described location-plate are construed as limiting the 90 ° of vertical positioning of foundation bolt central axis and location-plate horizontal plane and holding Device.
2. a kind of foundation bolt positioning device according to claim 1, it is characterized in that, described positioning element is to be connected to One section of pipe part on described location-plate bolt hole, the external diameter of pipe part and the bolt hole internal diameter phase on location-plate Match somebody with somebody, its through hole central axis keeps 90 ° of vertical, the internal diameter of pipe part and described lower margin spiral shells with described location-plate horizontal plane Bolt external diameter matches.
3. a kind of foundation bolt positioning device according to claim 2, it is characterized in that, described pipe part with it is described Location-plate by welding or being threadedly coupled.
4. a kind of foundation bolt positioning device according to claim 1, it is characterized in that, described positioning element is by being welded on Multiple spacers for separating each other are formed around described location-plate bolt hole, and described spacer, which is uniformly distributed in, described to be determined By bolt hole circumference on the plate of position, each spacer extends downwardly direction along bolt hole center's axis and is close to foundation bolt bar, by Positioning element and the described foundation bolt and described location-plate that spacer is formed be construed as limiting foundation bolt central axis with Location-plate horizontal plane simultaneously keeps 90 ° of vertical positioners.
5. a kind of foundation bolt positioning device according to claim 4, it is characterized in that, described spacer is inverted l shape Or triangle, each bolt hole at least 3 spacers, it is evenly distributed along bolt hole circumference.
A kind of 6. installation method of foundation bolt:
(1) pre-buried foundation bolt distribution map as needed makes location-plate and holds corresponding bolt hole successfully;
(2) the positioning element described in one of Claims 1 to 5 is made, and on location-plate;
(3) described foundation bolt is loaded into location-plate, nut is loaded onto from above and adjusts foundation bolt on location-plate with nut The height in portion is reached to predetermined value;
(4), with the foundation bolt bar portion after the levelling of stirrup welding location-plate bottom, whole foundation bolt group is further fixed;
(5) the location-plate for installing foundation bolt is put into pre-buried hole, adjusting positioning plate face with level meter makes its keep level, and Control positioning plate face is in predetermined height;
(6) mixed concrete is poured into pre-buried hole, remove nut and location-plate.
CN201711209351.3A 2017-11-27 2017-11-27 A kind of foundation bolt positioning device and installation method Withdrawn CN107882056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711209351.3A CN107882056A (en) 2017-11-27 2017-11-27 A kind of foundation bolt positioning device and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711209351.3A CN107882056A (en) 2017-11-27 2017-11-27 A kind of foundation bolt positioning device and installation method

Publications (1)

Publication Number Publication Date
CN107882056A true CN107882056A (en) 2018-04-06

Family

ID=61775529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711209351.3A Withdrawn CN107882056A (en) 2017-11-27 2017-11-27 A kind of foundation bolt positioning device and installation method

Country Status (1)

Country Link
CN (1) CN107882056A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109171302A (en) * 2018-08-30 2019-01-11 张凯程 A kind of disjunctor student's bed being fixed on mounting foot
CN109680711A (en) * 2019-01-25 2019-04-26 中国一冶集团有限公司 Annulus arranges di rect-buried bolt preburied positioning device and construction method
CN115771597A (en) * 2022-11-25 2023-03-10 沪东中华造船(集团)有限公司 Adjusting method and adjusting tool for perpendicularity between foundation bolt hole of equipment and plane of rack

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201794088U (en) * 2010-08-12 2011-04-13 中冶成工上海五冶建设有限公司 Foundation bolt positioner
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201794088U (en) * 2010-08-12 2011-04-13 中冶成工上海五冶建设有限公司 Foundation bolt positioner
CN103352475A (en) * 2013-07-08 2013-10-16 中铁二十一局集团电务电化工程有限公司 Electrified railway strong wind area contact net steel pipe support foundation bolt positioning mold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109171302A (en) * 2018-08-30 2019-01-11 张凯程 A kind of disjunctor student's bed being fixed on mounting foot
CN109680711A (en) * 2019-01-25 2019-04-26 中国一冶集团有限公司 Annulus arranges di rect-buried bolt preburied positioning device and construction method
CN115771597A (en) * 2022-11-25 2023-03-10 沪东中华造船(集团)有限公司 Adjusting method and adjusting tool for perpendicularity between foundation bolt hole of equipment and plane of rack
CN115771597B (en) * 2022-11-25 2024-06-11 沪东中华造船(集团)有限公司 Method and tool for adjusting perpendicularity between equipment foundation bolt hole and frame plane

Similar Documents

Publication Publication Date Title
CN203603586U (en) Equipment support regulating device
CN105040717B (en) Foundation bolt fixing support and mounting method
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN203583512U (en) Tower type foundation-adjustable positioning anchor cage
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN207392771U (en) A kind of guide type steel column locator
CN215669648U (en) Upright post lattice column direction control device
CN208965548U (en) A kind of adjustable composite splint poured pile construction package
CN208235564U (en) A kind of blower foundation bolt assembly with T-nut
CN109179222A (en) A kind of pre-buried section gradient of derrick crane and levelness control construction method
CN203924103U (en) The outdoor GIS post-install of a kind of assembled height-adjustable
CN206457859U (en) A kind of detachable apparatus for facilitating open caisson to observe skew and absolute altitude
CN202280074U (en) Foundation bolt positioning sleeve
CN210049616U (en) Vertical pre-buried device of reservation entrance to a cave
CN203834507U (en) Large tower locating device
CN108131042B (en) Concurrent, production method, construction tool and construction method
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN203429195U (en) Measuring auxiliary fixed device of blast furnace shell
CN202370247U (en) Auxiliary adjusting device for hydraulic climbing formwork
CN205933000U (en) Super high-rise external hanging movable arm tower crane climbing supporting device
CN212897513U (en) Novel vertical rod for erecting full scaffold
CN209162880U (en) A kind of photovoltaic bracket basis for heavy grade landform
CN211080288U (en) Adjusting device for mounting anchor bolt cage of wind driven generator
CN203868611U (en) Fixing device of high vibration apparatus
CN206737445U (en) The vertical dual-purpose adjuster of Simple horizontal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180406

WW01 Invention patent application withdrawn after publication