CN202280074U - Foundation bolt positioning sleeve - Google Patents

Foundation bolt positioning sleeve Download PDF

Info

Publication number
CN202280074U
CN202280074U CN201120444535XU CN201120444535U CN202280074U CN 202280074 U CN202280074 U CN 202280074U CN 201120444535X U CN201120444535X U CN 201120444535XU CN 201120444535 U CN201120444535 U CN 201120444535U CN 202280074 U CN202280074 U CN 202280074U
Authority
CN
China
Prior art keywords
positioning sleeve
foundation bolt
equipment
bolt
stone bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120444535XU
Other languages
Chinese (zh)
Inventor
张志疆
李亚霖
孙继春
朱建国
杨恩顺
蒋晓川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Xinjiang Industry Equipment Installation Co Ltd
Original Assignee
CSCEC Xinjiang Industry Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Xinjiang Industry Equipment Installation Co Ltd filed Critical CSCEC Xinjiang Industry Equipment Installation Co Ltd
Priority to CN201120444535XU priority Critical patent/CN202280074U/en
Application granted granted Critical
Publication of CN202280074U publication Critical patent/CN202280074U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to the field of engineering equipment installation and in particular to a foundation bolt positioning sleeve. The foundation bolt positioning sleeve is in a round tube shape; the inner diameter of the positioning sleeve is in movable fit with a foundation bolt; the outer diameter of the positioning sleeve is matched with a foundation bolt hole; and block platforms protruding outward are arranged at the periphery of the upper end of the positioning sleeve. By adopting the foundation bolt positioning sleeve to install the foundation bolt, the foundation bolt can be effectively ensured to be located at the middle of a base bolt hole of equipment after grouting is carried out, thereby providing beneficial conditions for the accurate alignment of the equipment; and since the installation quality of the foundation bolt is improved, the operation stability of the equipment is ensured, and the service life of the equipment is prolonged.

Description

The stone bolt positioning sleeve
Technical field
The utility model belongs to the engineering equipment installing area, particularly relates to a kind of stone bolt positioning sleeve.
Background technology
In the equipment installation.The installation of stone bolt is a critical process, and it involves the operating stable and accurate location of equipment." plant equipment installing engineering construction and examination general specification " GB50231-2009 has concrete regulation to verticality, absolute altitude and mutual position deviation after the stone bolt installation.In the equipment installation process, what take is that the method for clogging L shaped tagger between stone bolt and the plant bottom case bolt hole is controlled position and the verticality of stone bolt in bolt hole at present.But there is very big defective in this method.At first, do not have the iron plate of suitable thickness to adapt to the gap between stone bolt and the bolt hole, cause residual gap excessive.Stone bolt is when grouting, and concrete is pushed stone bolt because of making firm by ramming, causes the crooked of stone bolt.Secondly, the iron plate of filling is easy to generate displacement and the position of departing from setting, causes stone bolt crooked upper bolt hole wall that leans under the effect of external force.
Summary of the invention
The utility model technical problem to be solved is: a kind of advantages of simplicity and high efficiency equipment is provided, solves the deviation that occurs in the installation process of stone bolt, improve the installation quality of stone bolt, guarantee the centering precision of equipment.
It is following that the utility model solves the problems of the technologies described above the technical scheme that is adopted: preparation stone bolt positioning sleeve; This positioning sleeve is tubular; Its internal diameter and stone bolt are movingly; External diameter matches with anchor (bolt) hole, and end periphery is provided with outwards outstanding retaining platform on the positioning sleeve, and retaining platform purpose is from anchor (bolt) hole, to extract after the foot bolt installation easily.This positioning sleeve is made up of steel.
In the practice, can when equipment is in place, stone bolt be penetrated in the plant bottom case bolt hole; Be inserted in the described positioning sleeve of the utility model then; The nut of on stone bolt, screwing on again, and make the stone bolt screw thread expose nut three to buckle to five.After stone bolt grouting, treat concrete strength reach design load 75% after, take out positioning sleeve; The nut of screwing on has again just been accomplished the installation of stone bolt.
The beneficial effect of the utility model: use the stone bolt positioning sleeve that stone bolt is installed; Can guarantee effectively that stone bolt is in the centre of plant bottom case bolt hole after grouting; For the accurate centering of equipment provides advantage; Because the raising of stone bolt installation quality, the stability that equipment is in operation also is guaranteed, and has improved the running life of equipment.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the sketch map that the assembling of the utility model is used;
Fig. 2 is the main TV structure sketch map of the utility model positioning sleeve.
The specific embodiment
The stone bolt positioning sleeve, like Fig. 1, shown in Figure 2, be tubular positioning sleeve 1 internal diameter and stone bolt 3 movingly, the external diameter of positioning sleeve 1 matches with anchor (bolt) hole, end periphery is provided with outwards outstanding retaining platform 2 on the positioning sleeve 1.Said positioning sleeve 1 is made up of steel.
In the practice, can when equipment is in place, stone bolt be penetrated in the plant bottom case bolt hole; Be inserted in the described positioning sleeve of the utility model then; The nut of on stone bolt, screwing on again, and make the stone bolt screw thread expose nut three to buckle to five.After stone bolt grouting, treat concrete strength reach design load 75% after, take out positioning sleeve; The nut of screwing on has again just been accomplished the installation of stone bolt.

Claims (2)

1. stone bolt positioning sleeve is characterized in that: be tubular positioning sleeve (1) internal diameter and stone bolt (3) movingly, the external diameter of positioning sleeve (1) matches with anchor (bolt) hole, positioning sleeve (1) is gone up end periphery and is provided with outwards outstanding retaining platform (2).
2. stone bolt positioning sleeve according to claim 1 is characterized in that: positioning sleeve (1) is made up of steel.
CN201120444535XU 2011-11-11 2011-11-11 Foundation bolt positioning sleeve Expired - Fee Related CN202280074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120444535XU CN202280074U (en) 2011-11-11 2011-11-11 Foundation bolt positioning sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120444535XU CN202280074U (en) 2011-11-11 2011-11-11 Foundation bolt positioning sleeve

Publications (1)

Publication Number Publication Date
CN202280074U true CN202280074U (en) 2012-06-20

Family

ID=46226248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120444535XU Expired - Fee Related CN202280074U (en) 2011-11-11 2011-11-11 Foundation bolt positioning sleeve

Country Status (1)

Country Link
CN (1) CN202280074U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105084211A (en) * 2015-09-11 2015-11-25 中船第九设计研究院工程有限公司 Connecting assembly for base plates of anchor blocks and stop devices of crane and ground foundation
US9909329B2 (en) 2015-09-10 2018-03-06 Gerald A. LaLiberte, JR. Anchor device positioning and plumbing tool and methods related thereto
CN107806110A (en) * 2017-10-31 2018-03-16 天津华电北宸分布式能源有限公司 A kind of adjustable for height foundation bolt positioning device
CN111975689A (en) * 2020-07-24 2020-11-24 中国航空工业集团公司济南特种结构研究所 Device and method for improving perpendicularity of embedded screw

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9909329B2 (en) 2015-09-10 2018-03-06 Gerald A. LaLiberte, JR. Anchor device positioning and plumbing tool and methods related thereto
CN105084211A (en) * 2015-09-11 2015-11-25 中船第九设计研究院工程有限公司 Connecting assembly for base plates of anchor blocks and stop devices of crane and ground foundation
CN107806110A (en) * 2017-10-31 2018-03-16 天津华电北宸分布式能源有限公司 A kind of adjustable for height foundation bolt positioning device
CN111975689A (en) * 2020-07-24 2020-11-24 中国航空工业集团公司济南特种结构研究所 Device and method for improving perpendicularity of embedded screw

Similar Documents

Publication Publication Date Title
CN201649690U (en) Height adjustable support of steel-tube back shore
CN103422512B (en) Replaceable pre-embedded bolt formula wind generation set concrete foundation and construction method thereof
CN202047421U (en) Foundation transition section for offshore wind power tower
CN203270599U (en) Foundation bolt pre-buried die
CN204174786U (en) Adjustable height prefabricated reinforced concrete shear wall panels
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN108019702A (en) Rapid installation method of solar street lamp
CN204663030U (en) Assembled-type house precast floor slab installation sectional shelf-unit
CN203924103U (en) The outdoor GIS post-install of a kind of assembled height-adjustable
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN203639934U (en) Pre-buried positioning device for equipment foundation bolt
CN204435337U (en) Workbench and single-pile foundation and offshore work platform
CN201713940U (en) Steel column base structure
CN203834507U (en) Large tower locating device
CN202100018U (en) High-precision positioning fixture for large-scale pre-buried bolts
CN207277355U (en) A kind of pre-embedded bolt pours positioner
CN206815366U (en) A kind of prefabricated assembled basis
CN206220114U (en) A kind of eight High-Rise Pile Cap Foundations
CN205444228U (en) Framework column base rag bolt of transformer substation
CN201801882U (en) Positioning and anchoring construction of foundation bolt in foundation concrete
CN203730920U (en) Sill anchor used in tunnel and used for fixing petroleum and natural gas pipelines
CN105064681B (en) Installing method of steel structure foundation screw bolt
CN104088293B (en) The outdoor GIS post-install of a kind of assembled height-adjustable and construction method thereof
CN204530670U (en) A kind of prefabricated tubular pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120620

Termination date: 20141111

EXPY Termination of patent right or utility model