CN208235564U - A kind of blower foundation bolt assembly with T-nut - Google Patents

A kind of blower foundation bolt assembly with T-nut Download PDF

Info

Publication number
CN208235564U
CN208235564U CN201820492712.3U CN201820492712U CN208235564U CN 208235564 U CN208235564 U CN 208235564U CN 201820492712 U CN201820492712 U CN 201820492712U CN 208235564 U CN208235564 U CN 208235564U
Authority
CN
China
Prior art keywords
anchor
bolt
nut
slab
anchor slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820492712.3U
Other languages
Chinese (zh)
Inventor
黄春林
冯卫江
汤群益
俞琨
李久伟
程磊
徐良华
吴迪
吴芳和
吴孝清
周露
李维
瞿潮涌
路建华
谭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201820492712.3U priority Critical patent/CN208235564U/en
Application granted granted Critical
Publication of CN208235564U publication Critical patent/CN208235564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of blower foundation bolt assembly with T-nut, the lower anchor slab of upper anchor slab, annular including annular, multiple anchor bolts, multiple bottoms adjust bolt, the multiple anchor bolt include it is multipair can serve as leveling position upper anchor slab anchor bolt and it is multipair will be by the anchor bolt of tensioning;The anchor bolt that can serve as the upper anchor slab of leveling positioning is additionally provided with adjusting bolt, the levelness for adjusting bolt and being used to adjust anchor slab on casing;The upper end of the anchor pole is also connected with T-nut;Multiple anchor holes are arranged in the upper anchor slab, and the anchor pole of the anchor bolt passes through anchor hole one by one, and the lower part intussusceptum of the T-nut is inserted into the anchor pole of the anchor hole positioning anchor bolt on upper anchor slab.The utility model anchor bolt cage overall stiffness is big, and Ability of Resisting Disturbance is strong during foundation construction, avoids the trouble leveled repeatedly, not only accelerates the speed of application of blower foundation, but also improves the construction quality of foundation anchor bolt.

Description

A kind of blower foundation bolt assembly with T-nut
Technical field
The utility model belongs to wind-driven generator auxiliary device technical field, in particular to a kind of blower with T-nut Foundation anchor bolt sub-assembly.
Background technique
Wind-driven generator anchor bolt basis is since its mechanical characteristic is good, durability and antifatigue weight bearing power are preferable, in recent years It is widely used in all types of blower foundation designs.Foundation anchor bolt sub-assembly is also referred to as anchor bolt cage, including bottom adjust bolt, on Anchor slab, lower anchor slab, anchor pole, PVC sheath and nut etc..When blower foundation is constructed, entire anchor component is embedded in basis in advance In, it after basis pours completion, removes and positions upper anchor slab, blower upper component is close by tower bottom flange and anchor pole and basis It is connected.However, in the actual construction process, since the overall stiffness of bolt assembly is on the weak side, being easy to appear anchor bolt cage It situations such as overall offset, torsion, generally requires to level repeatedly, and using additional reinforcement measure etc., constructs cumbersome.In addition, because For field erected needs, top positions the diameter of bolt hole at least 3mm bigger than normal than bolt diameter of anchor slab, levels in anchor bolt cage In the process, each anchor pole can move freely in anchor hole, then in construction operations such as reinforcing bar binding, concretings Under disturbance, the case where top anchor pole often offsets to one side, cause anchor pole not vertical, influence stress performance, it is serious very To causing tower bottom flange and foundation anchor to misplace, can not install.
Utility model content
The purpose of the utility model is to provide the blower foundation bolt assemblies with T-nut, and anchor bolt positioning accuracy is high, anchor Bolt cage overall stiffness is big.For this purpose, the utility model uses following technical scheme:
Blower foundation bolt assembly with T-nut, it is characterised in that: upper anchor slab, annular including annular cast anchor Plate, multiple anchor bolts, multiple bottoms adjust bolt,
The multiple anchor bolt include it is multipair can serve as leveling position upper anchor slab anchor bolt and it is multipair will be by the anchor of tensioning Bolt;
The anchor bolt includes anchor pole, and screw thread is arranged in the upper and lower part of anchor pole, and upper anchor slab is arranged from top to bottom and adjusts for anchor pole Nut, anchor pole casing, locking nut, gasket and bottom attaching nut;
The anchor bolt that can serve as the upper anchor slab of leveling positioning is additionally provided with adjusting bolt, the adjusting bolt on casing For adjusting the levelness of upper anchor slab;
The upper end of the anchor pole is also connected with T-nut;
Multiple anchor holes are arranged in the upper anchor slab, and the anchor pole of the anchor bolt passes through anchor hole one by one, the T-nut Lower part intussusceptum is inserted into the anchor pole of the anchor hole positioning anchor bolt on upper anchor slab.
Further, the upper anchor slab is matched using T-nut with adjusting nut, realizes that height and levelness are adjusted, And realize the fixation to upper anchor slab and the fixation of the anchor bolt cage constituted to entire bolt assembly.
Further, the anchor hole of T-nut lower insert portion and upper anchor slab is in clearance fit shape, and maximal clearance is 1mm, minimum clearance 0.5mm, and T-nut and the anchor hole of corresponding upper anchor slab are concentric.
Due to using the technical solution of the utility model, the processing is simple for the sub-assembly of the utility model, easy for construction, and anchor Bolt positioning accuracy is high, and anchor bolt cage overall stiffness is big, and Ability of Resisting Disturbance is strong during foundation construction, avoids the fiber crops leveled repeatedly It is tired, not only accelerate the speed of application of blower foundation, but also improve the construction quality of foundation anchor bolt, be it is a kind of it is safe and reliable, It constructs convenient and fast novel wind generator foundation anchor bolt sub-assembly.
Detailed description of the invention
The above-mentioned and other feature of the utility model can be more clearly understood that by following detailed descriptions in conjunction with attached drawing And advantage, in which:
Fig. 1 is the structure overall schematic of the utility model embodiment.
Fig. 2 is the anchor component schematic diagram of the utility model embodiment.
Fig. 3 is the connection enlarged diagram of the upper anchor slab T shape locking nut of the utility model embodiment.
Fig. 3 a is the enlarged diagram of the upper anchor slab T shape locking nut of the utility model embodiment.
Fig. 4 is the upper anchor slab and T-nut assembling schematic diagram of the utility model embodiment.
Fig. 5 is the anchor component integral installation schematic diagram of the utility model embodiment.
Fig. 6 is that the anchor component integral installation of the utility model embodiment waits the schematic diagram poured after the completion.
Specific embodiment
As shown in Figure 1, blower foundation cast-in fixing bolt sub-assembly (calling anchor bolt cage in the following text) used by the present embodiment, including annular Upper anchor slab 1, annular lower anchor slab 3, multiple anchor bolts, bottom adjust bolt 4.
Anchor bolt includes anchor pole 2, and the upper and lower part of anchor pole is provided with screw thread, is equipped with anchor sleeve from top to bottom outside anchor pole 2 Pipe 7, locking nut 8, gasket 9 and bottom connect big nut 10.Locking nut 8 connects big nut 10 with bottom and is respectively at annular Lower anchor slab 3 two sides up and down.
Having part in multiple anchor bolts is the anchor bolt that can serve as leveling and position upper anchor slab, and the anchor pole top of these anchor bolts also covers There is upper anchor slab nylon adjusting nut 6.
T-nut 5 is additionally provided with outside the anchor pole of anchor bolt.
Upper anchor slab 1 has anchor hole 11, and passes through for anchor pole 2.
Anchor bolt cage adjusts bolt 4 by 6 pairs of bottoms to control whole levelness, while can be to the embedding of entire anchor bolt cage Depth is finely adjusted;Anchor pole 2 realizes the anchoring to wind-driven generator tower by lower anchor slab 3, utilizes 8 He of locking nut of upper end Anchor pole 2 is fixed on lower anchor slab 3 by the gasket 9 and big nut 10 of lower end;Upper anchor slab 1 is temporary fastening device, is poured to basis It removes after the completion, the purpose is to position to all anchor poles 2, guarantees relative position and the blower fan tower barrel bottom flange of anchor pole 2 Eyelet match, while guaranteeing that anchor pole 2 is vertical, it is ensured that after tower is in place, stress condition when carrying out 2 tensioning of anchor pole with set Meter condition is consistent.Upper anchor slab T-nut 5 is matched with upper anchor slab nylon nut 6, realizes height and level to upper anchor slab 1 Degree is adjusted, and realizes the fixation to the fixation of upper anchor slab 1 and to entire anchor bolt cage, prevents it from integral inclined and torsion occurs.
Above-mentioned T-nut 5 includes nut portions and intussusceptum 50, and intussusceptum 50 and upper anchor slab 1 are in clearance fit shape, described T-nut 5 be used as male member, upper anchor slab 1 be used as female members, maximal clearance 1mm, minimum clearance 0.5mm, and T-nut 5 and The eyelet of anchor slab 1 is concentric in correspondence, as shown in Figure 4.
Above-mentioned wind driven generator base bolt assembly installation method is as shown in figure 5, details are as follows:
One, lower anchor slab installation and leveling
Lower anchor slab 3 is mounted on 11 bottom of foundation pit by adjusting bolt 4 relative to 3 centrosymmetric six pairs of bottoms of lower anchor slab On bed course built-in fitting 12 on.Lower anchor slab is adjusted in same level by adjusting bolt 4, passes through up and down adjustment tune It saves bolt 4 and is locked with the nut adjusted on bolt, so that entirely lower anchor slab 3 is in same level, this is that the first step is thick It adjusts.The center of lower anchor slab corresponds to base center, and permission maximum deviation is 5mm.Measurement meet the requirements after will adjust 4 bottom of bolt with Corresponding 12 firm welding of built-in fitting, foot welding height are not less than 6mm.The nut on bolt 4 is adjusted later, and up and down adjustment adjusts spiral shell Bolt 4 so that entirely lower anchor slab is in same level, and is adjusted to design altitude, this is second step accurate adjustment, reaches lower anchor slab To layout design absolute altitude, and the levelness deviation of lower anchor slab is no more than 3mm.
Two, upper anchor slab installation leveling and anchor bolt installation
Before the installation of upper anchor slab 1, the positioning adjustment for first lifting six pairs of anchor bolts for installation is used.Every anchor component in addition to Outside anchor pole 2, on sequence from top to bottom are as follows: nylon adjusting nut 6, anchor pole casing 7, locking nut 8.By the rotation of nylon nut 6 to setting The installation site of the installation site of meter drawing requirement, anchor pole casing 7 and locking nut 8 determines naturally.Six pairs of positioning are adjusted Anchor pole 2 penetrates in the bolt hole of corresponding lower anchor slab 3, and connection big nut in bottom is tightened after shell tool 9 below lower anchor slab 3 10.Then upper anchor slab 1 is slowly sling with crane, is slowly moved to above six pairs of positioning adjustment anchor bolts, and put down anchor Plate 1.Take human assistance mode that upper anchor slab 1 is slowly fallen on to 6 top of nylon nut at the top of six pairs of positioning adjustment anchor bolts.Upper anchor Plate 1 install it is in place after, the T-nuts 5 at the top of six pairs of positioning adjustment anchor bolts are installed, using nylon attaching nut 6 to upper anchor slab 1 into T-nut 5 is tightened after the preliminary leveling of row.
Three, the installation and adjustment of anchor component
After the completion of upper anchor slab 1 is in place, the mode of being symmetrically installed is taken to carry out the installation of remaining anchor component.Wherein, it selects Another six pairs of anchor poles of circumference are uniformly distributed in as tie down screw, they adjust spiral shell by the anchor pole of tensioning, will not to install nylon Mother 6, is mounted directly upper end T-nut 5.Upper anchor slab 1 is adjusted using the dilatory rope of auxiliary, keeps anchor slab 1, lower anchor slab 3 same The heart (the above anchor slab 1,3 bolt hole of lower anchor slab center line on the basis of, every 60 ° of points, altogether survey 6 points, make anchor slab 1, under With one heart, concentricity tolerance should meet≤3mm to anchor slab 3).
After concentricity is adjusted, the levelness of upper anchor slab 1 is adjusted using nylon adjusting nut 6: measurement adjusts upper anchor slab 1 Anchor bolt middle levelness inside and outside upper plane, adjusting nylon adjusting nut 6 makes plane on cope plate reach layout design absolute altitude, mould Plate ring levelness should meet≤1.5mm(concreting before).Upper 1 length of anchor slab is exposed in 2 upper end of anchor pole should meet drawing requirement. After adjustment, big nut 10, screw-down torque 300Nm are further tightened, while tightening T-nut 5.
Finally, carrying out tensioning using moment method to aforementioned six pairs of tie down screws, tensioning torque is 200 Nm, to reinforce anchor The overall stiffness and stability of bolt cage have stronger anti-construction disturbance ability in the case where not by volume external fixer.
After anchor bolt cage is installed, after reinforcing bar binding, formwork, the levelness of anchor slab should be checked before concreting, After reaching requirement, concrete can be poured.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of skill in the art that its according to It can so modify to technical solution documented by previous embodiment, or part of technical characteristic is equally replaced It changes;And these are modified or replaceed, various embodiments of the utility model technical solution that it does not separate the essence of the corresponding technical solution Spirit and scope.

Claims (3)

1. the blower foundation bolt assembly with T-nut, it is characterised in that: upper anchor slab (1), annular including annular cast anchor Plate (3), multiple anchor bolts, multiple bottoms adjust bolt (4),
The multiple anchor bolt include it is multipair can serve as leveling position upper anchor slab anchor bolt and it is multipair will be by the anchor bolt of tensioning;
The anchor bolt includes anchor pole (2), and screw thread is arranged in the upper and lower part of anchor pole, and upper anchor slab is arranged from top to bottom and adjusts spiral shell for anchor pole Female (6), anchor pole casing (7), locking nut (8), gasket (9) and bottom attaching nut (10);
The anchor bolt that can serve as the upper anchor slab of leveling positioning is additionally provided with adjusting bolt on casing, and the adjusting bolt is used for The levelness of anchor slab in adjusting;
The upper end of the anchor pole is also connected with T-nut;
Multiple anchor holes are arranged in the upper anchor slab (1), and the anchor pole of the anchor bolt passes through anchor hole one by one, the T-nut Lower part intussusceptum is inserted into the anchor pole of the anchor hole positioning anchor bolt on upper anchor slab.
2. the blower foundation bolt assembly according to claim 1 with T-nut, it is characterised in that: the upper anchor slab It is matched using T-nut with adjusting nut, realizes that height and levelness are adjusted, and realize to the fixation of upper anchor slab and to whole The fixation for the anchor bolt cage that a bolt assembly is constituted.
3. the blower foundation bolt assembly according to claim 1 with T-nut, it is characterised in that: T-nut lower part The anchor hole of insertion section and upper anchor slab is in clearance fit shape, maximal clearance 1mm, minimum clearance 0.5mm, and T-nut It is concentric with the anchor hole of corresponding upper anchor slab.
CN201820492712.3U 2018-04-09 2018-04-09 A kind of blower foundation bolt assembly with T-nut Active CN208235564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820492712.3U CN208235564U (en) 2018-04-09 2018-04-09 A kind of blower foundation bolt assembly with T-nut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820492712.3U CN208235564U (en) 2018-04-09 2018-04-09 A kind of blower foundation bolt assembly with T-nut

Publications (1)

Publication Number Publication Date
CN208235564U true CN208235564U (en) 2018-12-14

Family

ID=64586095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820492712.3U Active CN208235564U (en) 2018-04-09 2018-04-09 A kind of blower foundation bolt assembly with T-nut

Country Status (1)

Country Link
CN (1) CN208235564U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442400A (en) * 2018-04-09 2018-08-24 中国电建集团华东勘测设计研究院有限公司 A kind of construction method of blower foundation bolt assembly and blower foundation with T-nut
CN111661746A (en) * 2019-03-07 2020-09-15 江苏金风科技有限公司 Lifting appliance
CN113404008A (en) * 2021-07-19 2021-09-17 中国建筑第八工程局有限公司 Pneumatic shield gate embedded part and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442400A (en) * 2018-04-09 2018-08-24 中国电建集团华东勘测设计研究院有限公司 A kind of construction method of blower foundation bolt assembly and blower foundation with T-nut
CN111661746A (en) * 2019-03-07 2020-09-15 江苏金风科技有限公司 Lifting appliance
CN113404008A (en) * 2021-07-19 2021-09-17 中国建筑第八工程局有限公司 Pneumatic shield gate embedded part and construction method thereof

Similar Documents

Publication Publication Date Title
CN208235564U (en) A kind of blower foundation bolt assembly with T-nut
KR101780537B1 (en) Foundation for a wind turbine
US9243418B2 (en) Tower comprising an adapter piece and method for producing a tower comprising an adapter piece
US7374369B2 (en) Method for the earthwork of a foundation sunk for a wind energy facility
US10954686B2 (en) System and method for installing a tensioning tendon in a wind turbine tower
RU2640462C2 (en) Method for wind turbine operation
CN108442400A (en) A kind of construction method of blower foundation bolt assembly and blower foundation with T-nut
BR112021000523A2 (en) FOUNDATION FOR A WINDMILL, WINDMILL WITH A WINDMILL TOWER AND MODULAR SYSTEM
US5819487A (en) Prestressed concrete poles with internal bolting and leveling structures
BR112020002183A2 (en) foundation for a structure
BR112016022360B1 (en) SYSTEM COMPRISING A WIND TURBINE, METHOD FOR ASSEMBLING THE UNDERWATER ANCHORING OF AN MARITIME WIND TURBINE AND METHOD FOR ASSEMBLING A WIND TURBINE
US10538935B2 (en) Guy wire anchor securement system
KR101421212B1 (en) Basement Structure for power mono rail
CN202099880U (en) Foundation bolt
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN111424658A (en) Anchor rod construction device for constructional engineering
CN211080288U (en) Adjusting device for mounting anchor bolt cage of wind driven generator
US20240084781A1 (en) Wind-turbine tower facility and method of assembling same
CN211873074U (en) Steel structure reinforced foundation ring of mountain land wind driven generator foundation
KR20160060431A (en) Foundation for Wind Generator and Construction Method Thereof
CN110700306A (en) Adjusting device for mounting anchor bolt cage of wind driven generator and construction method thereof
CN219862917U (en) Offset connecting mechanism for pile foundation bearing platform of factory building
CN215211506U (en) Building structure design wall column base quick connecting device
CN219364694U (en) Detachable concrete rag bolt positioner
CN220848135U (en) Pre-buried sleeve connection structure of latus rectum mound thick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant