CN202370247U - Auxiliary adjusting device for hydraulic climbing formwork - Google Patents

Auxiliary adjusting device for hydraulic climbing formwork Download PDF

Info

Publication number
CN202370247U
CN202370247U CN2011205367907U CN201120536790U CN202370247U CN 202370247 U CN202370247 U CN 202370247U CN 2011205367907 U CN2011205367907 U CN 2011205367907U CN 201120536790 U CN201120536790 U CN 201120536790U CN 202370247 U CN202370247 U CN 202370247U
Authority
CN
China
Prior art keywords
adjusting device
auxiliary adjusting
climbing
hydraulic climbing
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205367907U
Other languages
Chinese (zh)
Inventor
周厚贵
戴志清
詹剑霞
刘晓华
马少甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2011205367907U priority Critical patent/CN202370247U/en
Application granted granted Critical
Publication of CN202370247U publication Critical patent/CN202370247U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to an auxiliary adjusting device for a hydraulic climbing formwork, which comprises the hydraulic climbing formwork, wherein a bottom plate is installed on a climbing frame steel beam and positioned below a bolt base of the climbing formwork, a sleeve is arranged on the bottom plate and is in threaded fit with a screw, and one end of the screw is in contact with the bolt base. According to the auxiliary adjusting device and the auxiliary adjusting method for the hydraulic climbing formwork, through the adoption of the auxiliary adjusting device arranged below the bolt base, the climbing formwork moves up and down by rotating the screw by an operator, so that the purpose of accurate adjustment and positioning is achieved. The auxiliary adjusting device has a simple structure, is low in cost and simple and convenient to operate, and not only reduces the labor intensity, shortens the construction time of adjusting the formwork, but also is favorable for safety construction.

Description

The hydraulic climbing shuttering auxiliary adjusting device
Technical field
The utility model relates to a kind of auxiliary adjusting device of concrete blinding, particularly a kind of hydraulic climbing shuttering auxiliary adjusting device and method.
Background technology
In certain engineering king-post tubular construction concrete construction, adopted hydraulic climbing shuttering to carry out the formwork erection construction.This cover template is mainly formed (seeing accompanying drawing 1) by climbing scaffold system and template system; Wherein that to be the M30 locating cone be connected with pouring concrete metope climbing scaffold system is fixing through anchor device, and jumping formwork then adopts the climbing frame girder steel of special bolt and climbing scaffold system to be slidingly connected.Because after former jumping formwork adopts hydraulic-driven preliminary in place; Need take the method for artificial adjustment that it is accurately adjusted the location; But a whole set of template weight is big; Therefore the time of wanting the manpower of labor and growing is the control template height accurately, reaches pinpoint purpose, has also strengthened the security risk of work high above the ground simultaneously.
Summary of the invention
The utility model technical problem to be solved provides a kind of hydraulic climbing shuttering auxiliary adjusting device; Can solve and need the manpower of labor and long time control template height accurately in the original template system adjustment construction; Reach pinpoint purpose, also reduced the security risk of work high above the ground simultaneously.
For solving the problems of the technologies described above; The technical scheme that the utility model adopted is: a kind of hydraulic climbing shuttering auxiliary adjusting device, comprise hydraulic climbing shuttering, and base plate is installed on the climbing frame girder steel; Be positioned at the below of jumping formwork bolt base; Base plate is provided with sleeve, and sleeve cooperates with screw flight, and described screw rod one end contacts with the bolt base.
Described screw rod is provided with at least one place clamping head.
Described base plate is provided with a plurality of bolts hole.
A kind of hydraulic climbing shuttering is assisted method of adjustment, may further comprise the steps:
One, on the climbing frame girder steel of climbing scaffold system, the processing bolt hole, below of bolt base;
Two, make base plate, the bolt hole that the bolt hole size of preprocessing is complementary on processing and climbing frame girder steel on the base plate;
Three, the sleeve of welding band entire body internal thread on base plate is installed the screw rod that cooperates with bush whorl in the sleeve;
Four, behind the climbing scaffold system installation in position, the hydraulic-driven jumping formwork is tentatively in place, base plate is installed to the climbing frame girder steel, the screw rod jacking bolt base in the turnbarrel;
Realize accurate adjustment through above-mentioned steps to jumping formwork.
In the scheme of optimizing, in the step 4, the driving jumping formwork is tentatively in place when being lower than design attitude 0-20cm.
Described screw rod is provided with the clamping head that is used for the tool using rotary screw, and the external diameter of clamping head circumscribed circle is less than or equal to circular diameter at the bottom of the screw flight.
A kind of hydraulic climbing shuttering auxiliary adjusting device that the utility model provides, through the auxiliary adjusting device that below the bolt base, is provided with, the operating personnel moves up and down jumping formwork through rotary screw, thereby reaches the purpose of accurate adjustment location.The apparatus structure of the utility model is simple, and cost is easy and simple to handle, has not only alleviated labour intensity, has shortened the engineering time of adjustment template, and has helped safe construction.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further:
Fig. 1 is the overall structure sketch map of the utility model.
Fig. 2 is the main TV structure sketch map of auxiliary adjusting device in the utility model.
Fig. 3 is the plan structure sketch map of auxiliary adjusting device in the utility model.
The specific embodiment
In Fig. 1-Fig. 3; Comprise hydraulic climbing shuttering; The climbing frame girder steel 2 of climbing scaffold system 5 is that locating cone is installed on the concrete surface through a plurality of anchor devices 4, and jumping formwork 6 is connected with climbing frame girder steel 2 through bolt base 3, can be up and down along climbing frame girder steel 2 by hydraulically powered jumping formwork 6.Base plate 11 is installed on the climbing frame girder steel 2, is positioned at the below of jumping formwork 6 bolt bases 3, and base plate 11 is provided with sleeve 12, sleeve 12 and screw rod 13 threaded engagement, and described screw rod 13 1 ends contact with bolt base 3.
Described screw rod 13 is provided with at least one place clamping head 14.This clamping head 14 is used for tool using clamping rotary screw 13, is arranged on the two ends of screw rod 13 usually.
Described base plate 11 is provided with a plurality of bolts hole.
A kind of hydraulic climbing shuttering is assisted method of adjustment, may further comprise the steps:
One, on the climbing frame girder steel 2 of climbing scaffold system 5, the processing bolt hole, below of bolt base 3;
Two, make base plate 11, the bolt hole that the bolt hole size of preprocessing is complementary on processing and climbing frame girder steel 2 on the base plate; The hydraulic climbing shuttering auxiliary adjusting device is made in processing factory.The steel plate that base plate 11 adopts thickness to be not less than 1cm is processed, and on base plate 11, bolt hole is set, and the bolt hole size of reserving on the climbing frame girder steel 2 of the size of bolt hole and climbing scaffold system 5 is complementary;
Three, the sleeve 12 of welding band entire body internal thread on base plate 11 is installed the screw rod 13 with sleeve 12 threaded engagement in the sleeve 12; Sleeve 12 is processed by 1.5 cun thick walled steel tubes, in establish the entire body screw thread, sleeve of machine-shaping 12 and base plate 11 firm welding.The screw rod 13 that is used to support adopts φ 36 round steel to process, and the outside is the entire body screw thread, and two ends is established square clamping head.Described screw rod 13 is provided with the clamping head 14 that is used for tool using rotary screw 13, and the external diameter of clamping head 14 circumscribed circles is less than or equal to circular diameter at the bottom of screw rod 13 screw threads.
Four, as shown in Figure 1, climbing scaffold system 5 is that anchor device 4 is fixed on the concrete wall surface of having built through a plurality of M30 locating cones, is slidingly fitted with the special bolt base 3 of a plurality of connection jumping formworks 6 on the climbing frame girder steel 2 of climbing scaffold system 5.When hydraulic climbing shuttering 6 under the hydraulic-driven preliminary in place after, drive be when jumping formwork 6 is lower than design attitude 0-20cm tentatively in place.
Whole auxiliary adjusting device is installed in the bottom of each special bolt base 3; Adopt instrument rotation studdle 13 jacking special bolt bases 3 such as spanner; Hydraulic climbing shuttering 6 is moved up and down; Thereby reach the accurate adjustment to climbing scaffold system 5, it is fixing after meeting the requirements, to adopt a plurality of special bolts that jumping formwork 6 is connected with climbing frame girder steel 2.
Realize accurate adjustment through above-mentioned steps to jumping formwork 6.

Claims (3)

1. hydraulic climbing shuttering auxiliary adjusting device; Comprise hydraulic climbing shuttering; It is characterized in that: base plate (11) is installed on the climbing frame girder steel (2), is positioned at the below of jumping formwork (6) bolt base (3), and base plate (11) is provided with sleeve (12); Sleeve (12) and screw rod (13) threaded engagement, described screw rod (13) one ends contact with bolt base (3).
2. a kind of hydraulic climbing shuttering auxiliary adjusting device according to claim 1 is characterized in that: described screw rod (13) is provided with at least one place clamping head (14).
3. a kind of hydraulic climbing shuttering auxiliary adjusting device according to claim 1 is characterized in that: described base plate (11) is provided with a plurality of bolts hole.
CN2011205367907U 2011-12-20 2011-12-20 Auxiliary adjusting device for hydraulic climbing formwork Expired - Fee Related CN202370247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205367907U CN202370247U (en) 2011-12-20 2011-12-20 Auxiliary adjusting device for hydraulic climbing formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205367907U CN202370247U (en) 2011-12-20 2011-12-20 Auxiliary adjusting device for hydraulic climbing formwork

Publications (1)

Publication Number Publication Date
CN202370247U true CN202370247U (en) 2012-08-08

Family

ID=46593954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205367907U Expired - Fee Related CN202370247U (en) 2011-12-20 2011-12-20 Auxiliary adjusting device for hydraulic climbing formwork

Country Status (1)

Country Link
CN (1) CN202370247U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444276A (en) * 2011-12-20 2012-05-09 中国葛洲坝集团股份有限公司 Auxiliary adjusting device and method for hydraulic climbing template
CN106049857A (en) * 2016-06-28 2016-10-26 上海建工集团股份有限公司 Turbine screw type continuous-adjustment supporting device for hydraulic climbing formwork system
CN112031401A (en) * 2020-08-05 2020-12-04 上海建工集团股份有限公司 Two-way adjustable automatic template opening and closing system of climbing formwork and use method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444276A (en) * 2011-12-20 2012-05-09 中国葛洲坝集团股份有限公司 Auxiliary adjusting device and method for hydraulic climbing template
CN102444276B (en) * 2011-12-20 2014-03-05 中国葛洲坝集团股份有限公司 Auxiliary adjusting method for hydraulic climbing template
CN106049857A (en) * 2016-06-28 2016-10-26 上海建工集团股份有限公司 Turbine screw type continuous-adjustment supporting device for hydraulic climbing formwork system
CN106049857B (en) * 2016-06-28 2018-10-09 上海建工集团股份有限公司 The support device of turbine screw continuously adjustable for hydraulic climbing die block system
CN112031401A (en) * 2020-08-05 2020-12-04 上海建工集团股份有限公司 Two-way adjustable automatic template opening and closing system of climbing formwork and use method thereof

Similar Documents

Publication Publication Date Title
CN203603586U (en) Equipment support regulating device
CN101892812B (en) Reciprocating drill or electric drill support
CN104141318B (en) A kind of Large-diameter Steel tubing string suspension column construction method of installation
CN210830741U (en) Machine head guide rail device for adjusting axis deviation between pipe jacking machine and hole
CN203794498U (en) Built-in self-elevating tower crane device
CN202370247U (en) Auxiliary adjusting device for hydraulic climbing formwork
CN202370104U (en) Butted installing device for steel lattice column
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN102496771B (en) Method and device for installing large-sized steel structural antenna
KR20140147642A (en) A support for construction
CN102444276B (en) Auxiliary adjusting method for hydraulic climbing template
CN202227365U (en) Form traveler for guide wall of underground continuous wall
CN210684499U (en) Hydraulic jacking device for pier column
CN102392540B (en) High-precision method and structure for positioning high-precision precast beam
CN214994011U (en) Municipal construction is with supporting location bed-jig
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN202100018U (en) High-precision positioning fixture for large-scale pre-buried bolts
CN211666301U (en) Steel constructs straightness control stop device that hangs down of post
CN113309085A (en) Building foundation construction pouring construction method
CN107740583B (en) Beam bottom bar planting and feeding device and using method thereof
CN210224904U (en) Tunnel cable trench template mounting support
CN202323896U (en) Accurate positioning device for embedded anchor cone
CN212027098U (en) Portal system with leveling device
CN218493144U (en) Steel construction stand pre-buried clamping screw positioner
CN113385795B (en) Positioning device for cutting elliptical groove of cable guide pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808

Termination date: 20191220