JP3375296B2 - Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure - Google Patents

Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure

Info

Publication number
JP3375296B2
JP3375296B2 JP06843799A JP6843799A JP3375296B2 JP 3375296 B2 JP3375296 B2 JP 3375296B2 JP 06843799 A JP06843799 A JP 06843799A JP 6843799 A JP6843799 A JP 6843799A JP 3375296 B2 JP3375296 B2 JP 3375296B2
Authority
JP
Japan
Prior art keywords
column
reinforced concrete
assembling
steel
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP06843799A
Other languages
Japanese (ja)
Other versions
JP2000265555A (en
Inventor
明広 三輪
利夫 鳥谷
静司 岩下
秀仁 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP06843799A priority Critical patent/JP3375296B2/en
Publication of JP2000265555A publication Critical patent/JP2000265555A/en
Application granted granted Critical
Publication of JP3375296B2 publication Critical patent/JP3375296B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は鉄筋コンクリート柱
柱梁接合部材との組み付け方法およびその組み付け構
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for assembling a reinforced concrete column and a beam-column joining member and the assembling structure thereof.
It is about construction .

【0002】[0002]

【従来の技術】柱を鉄筋コンクリート、梁を鉄骨とした
構造物の接合部は異種の構造部材が取り付くため、図6
の(1)に示すような柱梁接合部材13が用いられてい
る。この柱梁接合部材13は鉄骨梁部材14が交差した
上下各フランジ15に、平板16からなる鉄骨枠17を
リブ18で固結していた。この鉄骨枠17は、同図の
(2)に示すように、柱19に矢印Dの回転モーメント
が作用すると矢印Eの方向への支圧抵抗となって、梁と
の接合部における靱性を向上させるという役割を果たし
ていた。
2. Description of the Related Art Since different types of structural members are attached to the joint portion of a structure in which columns are reinforced concrete and beams are steel frames, FIG.
The beam-column joining member 13 as shown in (1) is used. In this beam-column joining member 13, a steel frame 17 made of a flat plate 16 is fixed to the upper and lower flanges 15 intersecting with the steel beam member 14 by ribs 18. As shown in (2) of the figure, when the rotating moment of the arrow D acts on the column 19, the steel frame 17 serves as a bearing resistance in the direction of the arrow E and improves the toughness at the joint with the beam. It played the role of letting.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記のような
柱梁接合部材は実際の施工に際して、プレキャスト鉄筋
コンクリート柱の上に載せてレベル調整するか、あるい
は図7に示すようなサポート20を建ててレベル調整す
る必要があった。
However, in the actual construction, the above-mentioned beam-column joint member is placed on a precast reinforced concrete column to adjust the level, or a support 20 as shown in FIG. 7 is built. It was necessary to adjust the level.

【0004】本発明は、このような問題に鑑みてなされ
たものであり、その目的は、柱主筋が組み立てられた段
階から柱梁接合部材のレベル調整を可能とするか、ある
いは組み立てた後であってもサポートを使用せずに柱梁
接合部材のレベル調整が可能な鉄筋コンクリート柱と
梁接合部材との組み付け方法およびその組み付け構造
提供することである。
The present invention has been made in view of the above problems, and an object thereof is to make it possible to adjust the level of a beam-column joint member after the column main bar is assembled, or after it is assembled. Reinforced concrete columns and columns that can adjust the level of beam-column joint members without using supports
An object of the present invention is to provide an assembling method with a beam joining member and an assembling structure thereof .

【0005】[0005]

【課題を解決するための手段】以上の課題を解決するた
めの手段は、請求項1の発明が、上下フランジを備えた
鉄骨梁部材を交差させて形成した柱梁接合部材を、組立
配筋されたねじ鉄筋を含む柱主筋の梁接合箇所に組み付
け、L形鋼からなる平面方形の鉄骨枠を、その四隅にお
ける孔または切欠溝に上記柱主筋を貫通させて上記の上
下フランジに設置し、上記ねじ鉄筋にねじ込んだ調整ナ
ットの操作で柱梁接合部材の位置調整をすることを特徴
とする
[Means for Solving the Problems] As means for solving the above problems, the invention of claim 1 is provided with upper and lower flanges.
Assemble column-beam joint members formed by intersecting steel beam members
Assembled to beam joints of column main bars including screwed reinforcing bars
K, the flat rectangular steel frame made of L-shaped steel is attached to the four corners.
Above the above by inserting the column main bar into the hole or notch
Installed on the lower flange and screwed into the above-mentioned screw rebar
The feature is that the position of the beam-column joint member is adjusted by operating the
And

【0006】請求項1の発明によれば、柱主筋にねじ込
んだ調整ナットを操作することより柱主筋が組み立てら
れた段階から、あるいは組み立てた後であってもサポー
トを使用せずに柱梁接合部材の位置調整がそれぞれ可能
となる。
According to the first aspect of the present invention, the column-beam connection is performed without using the support from the stage where the column main bar is assembled by operating the adjustment nut screwed into the column main bar or after the column main bar is assembled. The position of each member can be adjusted.

【0007】また請求項2の発明が、ねじ鉄筋を含む柱
主筋の梁接合箇所に、上下フランジを備えた鉄骨梁部材
を交差させて形成した柱梁接合部材が設置され、該柱梁
接合部材の上下フランジにL形鋼からなる平面方形の鉄
骨枠が、その四隅における嵌合部に上記柱主筋を貫通さ
せて設置され、該柱主筋におけるねじ鉄筋には調整ナッ
トがねじ込まれたことを特徴とする
The invention according to claim 2 is a column including a screw reinforcing bar.
Steel beam members with upper and lower flanges at the main beam joints
A beam-column joining member formed by intersecting
Plane rectangular iron made of L-shaped steel for the upper and lower flanges of the joining member
The bone frame penetrates the column main bars at the fitting parts at the four corners.
Installed on the column main body, and the adjustment bars are
Is characterized by being screwed in .

【0008】また請求項2の発明によれば、L形鋼から
なる鉄骨枠で柱のコンクリートを拘束するとともに、鉄
骨枠がフランジに面接触していることにより水平方向お
よび垂直方向の抵抗が生じて接合部における耐力と靱性
を向上させる。
According to the second aspect of the invention, the concrete of the column is restrained by the steel frame made of L-shaped steel, and the steel frame is in surface contact with the flange, so that horizontal and vertical resistance is generated. Improve the yield strength and toughness of the joint.

【0009】また請求項3は、請求項2において、嵌合
部は孔または切欠溝であることを特徴とする。
A third aspect of the present invention is characterized in that, in the second aspect, the fitting portion is a hole or a notch groove.

【0010】また請求項3の発明によれば、孔または切
欠溝により柱主筋を確実に固定することができるのでそ
の組立配筋が容易に行えるとともに、柱主筋の外側への
はらみ出しを防ぐ。また切欠溝の場合は、鉄骨枠の主筋
への取り付けが簡単に行える。
According to the third aspect of the present invention, since the column main bar can be reliably fixed by the hole or the notch groove, the assembling bar arrangement can be easily performed, and the column main bar is prevented from protruding outside. Further, in the case of the notch groove, the steel frame can be easily attached to the main bar.

【0011】[0011]

【発明の実施の形態】以下、本発明の鉄筋コンクリート
柱と柱梁接合部材との組み付け方法およびその組み付け
構造の実施の形態を図面に基づいて説明する。はじめに
鉄筋コンクリート柱と柱梁接合部材との組み付け構造
ついて説明し、その後に鉄筋コンクリート柱と柱梁接合
部材との組み付け方法について説明する。図1の(1)
は鉄筋コンクリート柱と柱梁接合部材との組み付け構造
を示す斜視図、(2)は切欠溝の斜視図、図2は同断面
図である。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, a method for assembling a reinforced concrete column and a beam-column joining member according to the present invention and the assembling thereof
It is described with reference to the embodiment of the structure in the drawings. First, we will explain the assembly structure of reinforced concrete columns and beam-column joint members, and then we will explain reinforced concrete columns and beam-column joints.
A method of assembling the member will be described. Figure 1 (1)
Is a perspective view showing an assembly structure of a reinforced concrete column and a beam-column joining member , (2) is a perspective view of a notch groove, and FIG. 2 is a sectional view of the same.

【0012】鉄筋コンクリート柱と鉄骨梁の接合には、
図1に示すような柱梁接合部材1が使用される。この柱
梁接合部材1は交差した鉄骨梁部材2の上下各フランジ
3に、L形鋼4からなる平面方形の鉄骨枠5が設置さ
れ、該鉄骨枠5の四隅における孔6に3本の主筋7が貫
通している。この主筋7の数は3本に限らず、構造設計
上必要な本数となる。これらの柱主筋7は前記孔6を貫
通することにより外側にはらみ出ないように拘束されて
いる。
For joining reinforced concrete columns and steel beams,
A beam-column joining member 1 as shown in FIG. 1 is used. In this beam-column joint member 1, a planar rectangular steel frame 5 made of L-shaped steel 4 is installed on each upper and lower flange 3 of an intersecting steel beam member 2, and three main bars are provided in holes 6 at four corners of the steel frame 5. 7 penetrates. The number of main bars 7 is not limited to three, but may be any number necessary for structural design. The column main bars 7 are constrained by penetrating the holes 6 so as not to stick out to the outside.

【0013】また、前記柱主筋7のうちの一本がねじ鉄
筋9となっており、これに調整ナット10が螺合されて
上下の鉄骨枠5に当接して支持することにより、該鉄骨
枠5を必ずしも上下各フランジ3に溶接する必要はな
い。そして、この調整ナット10を操作することによっ
て柱梁接合部材1が自由に移動できるようになってい
る。これは調整ナット10によって柱梁接合部材1が位
置調整、すなわち高さ調整ができるということである。
Further, one of the main pillar rebars 7 is a screw rebar 9, and an adjusting nut 10 is screwed into the rebar 9 to abut against and support the upper and lower steel frame 5, thereby supporting the steel frame. It is not always necessary to weld 5 to the upper and lower flanges 3. By operating the adjusting nut 10, the beam-column joining member 1 can be freely moved. This means that the beam-column joint member 1 can be adjusted in position, that is, its height can be adjusted by the adjusting nut 10.

【0014】このように鉄骨枠5がフランジ3と面接触
しているため、図3に示すような、矢印Aの回転モーメ
ントが柱8に作用すると矢印Bの方向の他に、矢印Cの
方向の支圧抵抗が生じて梁との接合部における耐力を向
上させる。すなわち、L形鋼4からなる鉄骨枠5で柱8
のコンクリートを拘束するとともに、梁との接合部にお
ける靱性を向上させる。なお、鉄骨枠5は所定の耐力を
必要とするときに鉄骨梁部材2に溶接するようにする。
さらに、鉄骨枠5は孔6に代わって切欠溝6aを設ける
こともできる。
Since the steel frame 5 is in surface contact with the flange 3 in this way, when the rotation moment of arrow A acts on the column 8 as shown in FIG. 3, in addition to the direction of arrow B, the direction of arrow C is shown. Bearing pressure resistance is generated to improve the proof stress at the joint with the beam. That is, the steel frame 5 made of L-shaped steel 4 and the pillar 8
Restrains the concrete and improves the toughness at the joint with the beam. The steel frame 5 is welded to the steel beam member 2 when a predetermined proof stress is required.
Further, the steel frame 5 may be provided with notches 6a instead of the holes 6.

【0015】以下に鉄筋コンクリート柱と柱梁接合部材
との組み付け方法について説明する。図4は、地組した
柱主筋7に柱梁接合部材1を組み付けたものであり、柱
主筋における四隅にはねじ鉄筋が配筋されている。この
ように地組した柱主筋の3箇所の柱梁接合箇所に柱梁接
合部材を組み付ける。これは3箇所に限らず必要に応じ
て多くするしたり、あるいは少なくしたりすることがで
きる。
Below, reinforced concrete columns and beam-column joint members
The assembling method with and will be described. In FIG. 4, the column-beam joint member 1 is assembled to the column main bar 7 which is grounded, and screw reinforcing bars are arranged at the four corners of the column main bar. The beam-column joining members are assembled to the beam-column joining points at three points of the column main bars thus assembled. The number is not limited to three, but can be increased or decreased as necessary.

【0016】このとき、鉄骨梁部材2の上下各フランジ
3の鉄骨枠5には3本の主筋7が貫通し、これらの柱主
筋7うちの一本のねじ鉄筋9には調整ナット10がねじ
込まれて鉄骨枠5を押さえている。すなわち、この調整
ナット10により柱梁接合部材1が自由に移動できるよ
うになっているため、この調整ナット10を操作して柱
梁接合部材1の位置調整、すなわち高さ調整を行う(図
1参照)。
At this time, the three main bars 7 penetrate through the steel frame 5 of the upper and lower flanges 3 of the steel beam member 2, and the adjusting nut 10 is screwed into one of the screw bars 9 of the pillar main bars 7. Is holding the steel frame 5. That is, since the column-beam joining member 1 can be freely moved by the adjusting nut 10, the position of the column-beam joining member 1, that is, the height is adjusted by operating the adjusting nut 10 (see FIG. 1). reference).

【0017】そして、この高さ調整を行った後に、図5
に示すように、柱梁接合部材1を組み付けた鉄筋11を
クレーンで吊り上げての建て込むものである。このよう
にサポートを必要とせずに、しかも一度に複数の柱梁接
合部材1を組み付けた鉄筋11を簡単に建て込むことが
できるようになる。
After performing this height adjustment, as shown in FIG.
As shown in (1), the reinforcing bar 11 assembled with the beam-column joining member 1 is lifted by a crane to be built. In this way, it becomes possible to easily build up the reinforcing bar 11 assembled with a plurality of column-beam joining members 1 at one time without requiring a support.

【0018】[0018]

【発明の効果】L形鋼からなる鉄骨枠で柱のコンクリー
トを拘束するとともに、フランジに面接触した鉄骨枠に
水平方向および垂直方向の抵抗が生じるので接合部にお
ける靱性を向上させることができる。
As described above, the concrete of the column is restrained by the steel frame made of L-shaped steel, and the resistance in the horizontal direction and the vertical direction is generated in the steel frame which is in surface contact with the flange, so that the toughness at the joint can be improved.

【0019】ねじ鉄筋にねじ込んだナットを操作するこ
とより柱梁接合部材の位置調整、すなわち高さ調整が可
能となる。
It is possible to adjust the position of the beam-column joining member, that is, the height, by operating the nut screwed into the screw reinforcing bar.

【0020】サポートを必要とせずに柱梁接合部材の位
置調整、すなわち高さ調整が可能となる。
It is possible to adjust the position of the beam-column joining member, that is, adjust the height without the need for a support.

【0021】一度に複数の柱梁接合部材を柱主筋に組み
付けることができる。
A plurality of column-beam joining members can be assembled to the column main bar at one time.

【0022】一度に複数の柱梁接合部材を組み付けた鉄
筋を簡単に建て込むことができる。
It is possible to easily build a reinforcing bar in which a plurality of column-beam joining members are assembled at once.

【図面の簡単な説明】[Brief description of drawings]

【図1】(1)は鉄筋コンクリート柱と柱梁接合部材と
の組み付け構造を示す斜視図、(2)は切欠溝の斜視図
である。
[Fig. 1] (1) shows reinforced concrete columns and beam-column joint members
FIG. 3 is a perspective view showing the assembling structure of (1), and (2) is a perspective view of a notch groove.

【図2】鉄筋コンクリート柱と柱梁接合部材との組み付
構造を示す断面図である。
[Fig. 2] Assembly of reinforced concrete columns and beam-column joint members
It is sectional drawing which shows a cage structure.

【図3】柱梁接合部材に生じる抵抗力を示した概念図で
ある。
FIG. 3 is a conceptual diagram showing a resistance force generated in a beam-column joining member.

【図4】地組により柱梁接合部材を柱主筋に組み付けた
正面図である。
FIG. 4 is a front view in which a beam-column joining member is assembled to a column main bar by an assembly.

【図5】柱梁接合部材を組み付けた柱主筋の建て方法を
示す正面図である。
FIG. 5 is a front view showing a method of constructing a column main bar in which a beam-column joining member is assembled.

【図6】(1)は従来の柱梁接合部材の斜視図、(2)
は従来の柱梁接合部材に生じる抵抗力を示した概念図で
ある。
FIG. 6A is a perspective view of a conventional beam-column joint member, and FIG.
FIG. 4 is a conceptual diagram showing a resistance force generated in a conventional beam-column joint member.

【図7】鉄筋コンクリート柱と柱梁接合部材との組み付
け方法を示す断面図である。
[Fig. 7] Assembly of reinforced concrete columns and beam-column joint members
It is a cross-sectional view showing the only way.

【符号の説明】[Explanation of symbols]

1、13 柱梁接合部材 2、14 鉄骨梁部材 3、15 フランジ 4 L形鋼 4a 底面 5、17 鉄骨枠 6 孔 6a 切欠溝 7 柱主筋 8、19 柱 9 ねじ鉄筋 10 調整ナット 11 鉄筋 16 平板 18 リブ 20 サポート 1,13 Beam-column joint members 2,14 Steel beam members 3,15 flange 4 L-shaped steel 4a bottom 5,17 Steel frame 6 holes 6a Notch groove 7 pillars 8, 19 pillars 9 screw rebar 10 Adjustment nut 11 rebar 16 flat plate 18 ribs 20 Support

───────────────────────────────────────────────────── フロントページの続き (72)発明者 渡辺 秀仁 東京都中央区京橋1−7−1 戸田建設 株式会社内 (58)調査した分野(Int.Cl.7,DB名) E04B 1/30 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Hidehito Watanabe Toda Construction Co., Ltd. 1-7-1 Kyobashi, Chuo-ku, Tokyo (58) Fields investigated (Int.Cl. 7 , DB name) E04B 1/30

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上下フランジを備えた鉄骨梁部材を交差
させて形成した柱梁接合部材を、組立配筋されたねじ鉄
筋を含む柱主筋の梁接合箇所に組み付け、L形鋼からな
る平面方形の鉄骨枠を、その四隅における孔または切欠
溝に上記柱主筋を貫通させて上記の上下フランジに設置
し、上記ねじ鉄筋にねじ込んだ調整ナットの操作で柱梁
接合部材の位置調整をすることを特徴とする鉄筋コンク
リート柱と柱梁接合部材との組み付け方法。
1. Crossing steel beam members having upper and lower flanges
The column-beam joint member formed by
Assembled to the beam joints of the column main reinforcement including the reinforcement and made of L-shaped steel.
A square steel frame with a hole or notch at its four corners.
Installed on the above-mentioned upper and lower flanges by penetrating the pillar main bar through the groove
Then, by operating the adjustment nut screwed into the above-mentioned screw reinforcement,
Reinforcing bar concrete characterized by adjusting the position of joining members
A method for assembling a reed column and a beam-column joining member.
【請求項2】 ねじ鉄筋を含む柱主筋の梁接合箇所に、
上下フランジを備えた鉄骨梁部材を交差させて形成した
柱梁接合部材が設置され、該柱梁接合部材の上下フラン
ジにL形鋼からなる平面方形の鉄骨枠が、その四隅にお
ける嵌合部に上記柱主筋を貫通させて設置され、該柱主
筋におけるねじ鉄筋には調整ナットがねじ込まれたこと
を特徴とする鉄筋コンクリート柱と柱梁接合部材との組
み付け構造。
2. A beam joint portion of a column main bar including a screw reinforcing bar,
Formed by crossing steel beam members with upper and lower flanges
A column-beam joint member is installed, and the upper and lower flanks of the column-beam joint member are installed.
A square steel frame made of L-shaped steel is attached to the four corners.
Is installed by penetrating the column main bar in the fitting part.
The adjustment nut was screwed into the rebar.
Of reinforced concrete columns and beam-column joints characterized by
Find structure.
【請求項3】 嵌合部は孔または切欠溝であることを特
徴とする請求項2に記載の鉄筋コンクリート柱と柱梁接
合部材との組み付け構造
3. The assembly structure of a reinforced concrete column and a beam-column joining member according to claim 2, wherein the fitting portion is a hole or a notch groove.
JP06843799A 1999-03-15 1999-03-15 Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure Expired - Fee Related JP3375296B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06843799A JP3375296B2 (en) 1999-03-15 1999-03-15 Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06843799A JP3375296B2 (en) 1999-03-15 1999-03-15 Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure

Publications (2)

Publication Number Publication Date
JP2000265555A JP2000265555A (en) 2000-09-26
JP3375296B2 true JP3375296B2 (en) 2003-02-10

Family

ID=13373695

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06843799A Expired - Fee Related JP3375296B2 (en) 1999-03-15 1999-03-15 Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure

Country Status (1)

Country Link
JP (1) JP3375296B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020060429A (en) * 2001-01-11 2002-07-18 유인균 Joint of reinforced concrete column and steel beam and a method of the same
JP4996370B2 (en) * 2007-06-29 2012-08-08 大成建設株式会社 Frame assembly method and building frame
CN103255841B (en) * 2013-05-31 2015-08-19 江苏科技大学 A kind of assembly concrete post-girder steel overhanging end template nodal connection device
CN103334497A (en) * 2013-06-17 2013-10-02 南京长江都市建筑设计股份有限公司 Connection method of scope system frame column steel bar
JP2015101890A (en) * 2013-11-25 2015-06-04 大成建設株式会社 Support structure and construction method
CN104196152B (en) * 2014-08-22 2017-02-08 同济大学 Connecting structure for steel coupling beam and concrete wall
JP6442314B2 (en) * 2015-02-06 2018-12-19 鹿島建設株式会社 Joint structure of reinforced concrete column and steel beam
CN106948489A (en) * 2017-05-09 2017-07-14 南京工业大学 A kind of assembled steel reinforced concrete column steel reinforced concrete girder connection
CN108316478A (en) * 2018-04-27 2018-07-24 重庆市公安消防总队 A kind of novel steel tube concrete joint
CN109235640B (en) * 2018-06-05 2023-10-27 北京交通大学 Pin type connecting structure between modularized steel structural members for building
CN109057009B (en) * 2018-07-03 2020-02-07 重庆大学 Prefabricated assembled concrete frame dry type node

Also Published As

Publication number Publication date
JP2000265555A (en) 2000-09-26

Similar Documents

Publication Publication Date Title
JP3375296B2 (en) Method of assembling reinforced concrete column and beam-to-column connection member and its assembling structure
JPH07217226A (en) Reinforcing method for reinforced concrete floor slab
KR102522487B1 (en) Prefabricated steel frame seismic reinforcement structure by slab joint H-beam bracing
JP2928942B2 (en) Column beam connection and construction method
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
KR102398605B1 (en) Construction method of seismic retrofit system using pc panel
JP2001303583A (en) Foundation structure for building and its execution method
JPH0633043Y2 (en) Support structure for pillar
JPH11343667A (en) Structure for fixing column base with underground beam made of reinforced concrete
JP2006241892A (en) Aseismatic structure of house and its construction method
JPH07268880A (en) Base footing and footing beam structure
JP3109038B2 (en) Underground skeleton structure and construction method
JP3245952U (en) wooden pillar support fittings
JPH01290844A (en) Structure of connection part of column with beam
JP2972962B2 (en) Connection structure
JP4072274B2 (en) Building unit
JP3043938B2 (en) Joint structure between reinforced concrete columns and steel beams
JP4095481B2 (en) Building structure
JP3455864B2 (en) Building and its construction method
JP3072284B2 (en) Architectural metal frame panel body and its construction method
JPH07207991A (en) Wall construction method and framing
JP2784450B2 (en) Reinforced concrete foundation
JP3138981B2 (en) Construction method of reinforced concrete building
JPH0823148B2 (en) Drop-in steel column base
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081129

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091129

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091129

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101129

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111129

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131129

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees