JP2002269305A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2002269305A5 JP2002269305A5 JP2001071182A JP2001071182A JP2002269305A5 JP 2002269305 A5 JP2002269305 A5 JP 2002269305A5 JP 2001071182 A JP2001071182 A JP 2001071182A JP 2001071182 A JP2001071182 A JP 2001071182A JP 2002269305 A5 JP2002269305 A5 JP 2002269305A5
- Authority
- JP
- Japan
- Prior art keywords
- work
- business process
- workflow
- automatic monitoring
- process definition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001071182A JP2002269305A (ja) | 2001-03-13 | 2001-03-13 | ワークフロー自動監視制御方法、装置、及びプログラム |
| US09/987,851 US6651033B2 (en) | 2001-03-13 | 2001-11-16 | Automatic workflow monitoring/control method and apparatus |
| EP01127284A EP1241605A3 (en) | 2001-03-13 | 2001-11-16 | Automatic workflow monitoring/control method and apparatus |
| US10/075,274 US6654708B2 (en) | 2001-03-13 | 2002-02-15 | Automatic workflow monitoring/control method and apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001071182A JP2002269305A (ja) | 2001-03-13 | 2001-03-13 | ワークフロー自動監視制御方法、装置、及びプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002269305A JP2002269305A (ja) | 2002-09-20 |
| JP2002269305A5 true JP2002269305A5 (enExample) | 2005-07-07 |
Family
ID=18928942
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001071182A Pending JP2002269305A (ja) | 2001-03-13 | 2001-03-13 | ワークフロー自動監視制御方法、装置、及びプログラム |
Country Status (3)
| Country | Link |
|---|---|
| US (2) | US6651033B2 (enExample) |
| EP (1) | EP1241605A3 (enExample) |
| JP (1) | JP2002269305A (enExample) |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6728947B1 (en) * | 1998-06-05 | 2004-04-27 | R. R. Donnelley & Sons Company | Workflow distributing apparatus and method |
| US6970810B1 (en) * | 2000-07-31 | 2005-11-29 | Ncr Corporation | Method and apparatus for storing retail performance metrics |
| US7346532B2 (en) * | 2001-05-10 | 2008-03-18 | Hitachi, Ltd. | Workflow system |
| US8140691B2 (en) * | 2003-12-12 | 2012-03-20 | International Business Machines Corporation | Role-based views access to a workflow weblog |
| US8417682B2 (en) * | 2003-12-12 | 2013-04-09 | International Business Machines Corporation | Visualization of attributes of workflow weblogs |
| US8423394B2 (en) * | 2003-12-12 | 2013-04-16 | International Business Machines Corporation | Method for tracking the status of a workflow using weblogs |
| JP4172478B2 (ja) * | 2005-08-25 | 2008-10-29 | コニカミノルタビジネステクノロジーズ株式会社 | 文書管理装置及び文書管理方法 |
| JP2007058622A (ja) * | 2005-08-25 | 2007-03-08 | Konica Minolta Business Technologies Inc | 文書管理装置及び文書管理方法 |
| US8874525B2 (en) * | 2011-04-19 | 2014-10-28 | Autodesk, Inc. | Hierarchical display and navigation of document revision histories |
| US10521601B2 (en) | 2014-04-30 | 2019-12-31 | Sailpoint Technologies, Israel Ltd. | System and method for data governance |
| JP6857989B2 (ja) * | 2016-09-27 | 2021-04-14 | 三菱重工航空エンジン株式会社 | 処理フロー管理システム及び処理フロー管理方法 |
| US11461677B2 (en) | 2020-03-10 | 2022-10-04 | Sailpoint Technologies, Inc. | Systems and methods for data correlation and artifact matching in identity management artificial intelligence systems |
| US11308186B1 (en) | 2021-03-19 | 2022-04-19 | Sailpoint Technologies, Inc. | Systems and methods for data correlation and artifact matching in identity management artificial intelligence systems |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3703725A (en) * | 1970-11-02 | 1972-11-21 | Texas Instruments Inc | Method for operating a manufacturing line |
| US5093794A (en) * | 1989-08-22 | 1992-03-03 | United Technologies Corporation | Job scheduling system |
| US5751580A (en) * | 1996-07-26 | 1998-05-12 | Chartered Semiconductor Manufacturing, Ltd. | Fuzzy logic method and system for adjustment of priority rating of work in process in a production line |
| JPH11213082A (ja) | 1997-11-19 | 1999-08-06 | Fujitsu Ltd | ワークフロー管理装置及びワークフロー管理システム並びにこれらのプログラムを記憶したコンピュータ読み取り可能な記憶媒体 |
| US6415259B1 (en) * | 1999-07-15 | 2002-07-02 | American Management Systems, Inc. | Automatic work progress tracking and optimizing engine for a telecommunications customer care and billing system |
-
2001
- 2001-03-13 JP JP2001071182A patent/JP2002269305A/ja active Pending
- 2001-11-16 EP EP01127284A patent/EP1241605A3/en not_active Ceased
- 2001-11-16 US US09/987,851 patent/US6651033B2/en not_active Expired - Fee Related
-
2002
- 2002-02-15 US US10/075,274 patent/US6654708B2/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6816815B2 (en) | Preventive maintenance system of industrial machine | |
| CN105824304A (zh) | 一种考虑机加工设备可用性的柔性作业车间动态调度方法 | |
| WO2017045622A1 (zh) | 一种设备请求协助、响应设备协助请求的方法及设备 | |
| CN103294533A (zh) | 任务流控制方法及系统 | |
| WO2006010128A3 (en) | Maintenance, diagnosis and optimization of processes | |
| JP2007215005A5 (enExample) | ||
| CN107146372A (zh) | 一种通过视频识别生产线工作状态的方法和系统 | |
| CN1858727A (zh) | 生产设备监控系统及方法 | |
| CN113138895A (zh) | 云桌面设备的监控方法及装置 | |
| CN103678090A (zh) | 数据处理的监控方法和装置 | |
| JPWO2022091720A5 (enExample) | ||
| CN106271260B (zh) | 一种机器人点焊中智能控制方法 | |
| CN115222181B (zh) | 机器人运营状态监控系统及方法 | |
| DE102016002129A1 (de) | Numerische Steuervorrichtung, die eine Überhitzung der Spindel verhindern kann | |
| JP2006163889A (ja) | 作業管理指示システム | |
| EP1241605A3 (en) | Automatic workflow monitoring/control method and apparatus | |
| CN120407656B (zh) | 一种日志埋点采集方法及系统 | |
| CN107247649A (zh) | 检测系统健康状况的方法、装置及网关 | |
| CN112526953A (zh) | 一种装配生产线脆性时间窗度量方法与弹性控制系统 | |
| US6418351B1 (en) | Determining the capacity components of tools/toolsets in a manufacturing line | |
| JPWO2021038780A5 (ja) | バックドア検査装置、バックドア検査方法、及びプログラム | |
| CN111443263B (zh) | 基于环网柜的电缆分析装置及其检测方法 | |
| JP2022060237A5 (enExample) | ||
| CN107085410B (zh) | 数值控制装置 | |
| CN103473638A (zh) | 一种网络化外协加工质量信息实时管控方法 |