JP2002242162A - United scaffold type mobile formwork equipment - Google Patents

United scaffold type mobile formwork equipment

Info

Publication number
JP2002242162A
JP2002242162A JP2001044556A JP2001044556A JP2002242162A JP 2002242162 A JP2002242162 A JP 2002242162A JP 2001044556 A JP2001044556 A JP 2001044556A JP 2001044556 A JP2001044556 A JP 2001044556A JP 2002242162 A JP2002242162 A JP 2002242162A
Authority
JP
Japan
Prior art keywords
concrete
bracket
wall
frame body
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001044556A
Other languages
Japanese (ja)
Other versions
JP4570063B2 (en
Inventor
Masato Tate
眞人 舘
Kimio Tanida
公夫 谷田
Toru Yamazaki
徹 山崎
Shigenao Hotta
重尚 堀田
Shinya Kataoka
眞冶 片岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAGA KOGYO KK
Maeda Corp
Sato Kogyo Co Ltd
Dai Nippon Construction
Original Assignee
SAGA KOGYO KK
Maeda Corp
Sato Kogyo Co Ltd
Dai Nippon Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAGA KOGYO KK, Maeda Corp, Sato Kogyo Co Ltd, Dai Nippon Construction filed Critical SAGA KOGYO KK
Priority to JP2001044556A priority Critical patent/JP4570063B2/en
Publication of JP2002242162A publication Critical patent/JP2002242162A/en
Application granted granted Critical
Publication of JP4570063B2 publication Critical patent/JP4570063B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To perform work without scaffold supports for a concrete top wall portion having an overhung portion at the upper portion of an existing concrete. SOLUTION: This equipment comprises plural brackets 21 to 28 which are installed to the wall surface at the overhung portion of already poured concrete 30, travel rails 3A and 3B which are constructed between bracket groups 22 to 28 and made dividable for each of brackets 2n and 2n+1 between brackets, travel support facilities for overhung portion 4 made freely traveling along the travel rails 3A and 3B, and a frame body 5 supported in a movable manner along the travel direction relative to the wall surface at non-overhung portion side of the poured concrete 30, supported by the travel support facilities for overhung portion 4 at the wall surface of the overhung portion of already poured concrete 30, and also equipped with formworks 6A to 6E, scaffold 7A to 7C, and timbering replacing facilities 8 for bracket 2 and travel rails 3A and 3B or the like.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、張出部を有するコ
ンクリート頂壁部を、基盤面等から組み立てた足場支保
工無しに施工可能とした足場一体型移動型枠装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold-integrated movable formwork apparatus capable of constructing a concrete top wall having an overhang without a scaffolding support assembled from a base surface or the like.

【0002】[0002]

【従来の技術】例えば、図10に示されるように、ダム
の左岸側および右岸側に施工される堤趾導流壁では、導
流壁の頂部に内側に逆L字状に張り出した波返し部52
が設けられる(図11(B)参照)。
2. Description of the Related Art For example, as shown in FIG. 10, in a dike guiding wall constructed on a left bank and a right bank of a dam, an inverted L-shaped bulge is formed on the top of the guiding wall. Part 52
Is provided (see FIG. 11B).

【0003】この波返し部52の施工は、図11に示さ
れるように、既設コンクリート53の両側にそれぞれ基
盤面から組立・設置された足場支保工54、55を利用
してパイプ支保工56を組み、1回のコンクリート打設
作業区間毎に、波返し部下面がわ型枠57を設けるとと
もに、側面型枠等の型枠58、59を設け、これら型枠
57〜59内部にコンクリートを流し込み、その後コン
クリートの硬化を待って脱型を行い前記型枠57〜59
を横移動させる繰り返しによって施工を行っていた。
[0003] As shown in FIG. 11, the construction of the undulating portion 52 is performed by using a pipe support 56 using scaffold supports 54 and 55 assembled and installed from both sides of the existing concrete 53 from the base surface, respectively. In each assembly work section, a wavy formwork 57 is provided on the lower surface of the wave-returning part, and formwork forms 58 and 59 such as side formwork are provided, and concrete is poured into the formwork work 57-59. Then, after the concrete is hardened, the mold is released and the molds 57 to 59 are removed.
The construction was performed by repeating the lateral movement.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来方法(足場支保工)の場合には、足場支保工の容積が
大きくなるとともに、設置期間も長期間となる。すなわ
ち、図11に示されるように、波返し部52側では、非
張出部側には1列の足場支保工で足りるのに対して、張
出部側には複数列、図示例では3列の足場支保工が必要
となる。
However, in the case of the above-mentioned conventional method (scaffolding support), the volume of the scaffolding support becomes large and the installation period becomes long. That is, as shown in FIG. 11, one row of scaffolding support is sufficient on the non-overhanging portion side on the wave returning portion 52 side, whereas a plurality of rows on the overhanging portion side, 3 Column scaffolding support is required.

【0005】また、型枠転用時の横移動が非常に煩雑で
ある。さらには、型枠、足場および支保工の組立・解体
作業が人力による高所作業となるため、多くの人手と作
業日数を要し、また危険作業が多くなる、などの問題が
あった。
[0005] In addition, the lateral movement at the time of converting the mold is very complicated. Furthermore, since the assembling / disassembling work of the formwork, scaffolding and the shoring work is performed at a high place by manpower, there is a problem that many man-hours and work days are required and dangerous work is increased.

【0006】そこで本発明の主たる課題は、既設コンク
リートの上部に連続して、張出部を有するコンクリート
頂壁部を施工するに当たり、足場工、型枠支保工、型枠
工、鉄筋工およびコンクリート打設工などの一連の施工
工程を、基盤面等から組み立てた足場支保工無しで施工
できるようにした足場一体型移動型枠装置を提供するこ
とにある。
Accordingly, a main object of the present invention is to construct a concrete top wall having an overhanging portion continuously on the upper part of the existing concrete, in which a scaffolding work, a formwork support, a formwork work, a reinforced work and a concrete work are carried out. It is an object of the present invention to provide a scaffolding-integrated movable form device capable of performing a series of construction steps such as a casting work without a scaffolding support work assembled from a base surface or the like.

【0007】[0007]

【課題を解決するための手段】前記課題を解決するため
の本第1発明は、打設済みコンクリート壁の上面に連続
して、壁面の一方側に張出部を有するコンクリート頂壁
部を順次移動しながら施工するための足場一体型移動型
枠装置であって、前記打設済みコンクリート壁の張出部
がわ壁面に対して、前記移動方向に所定の間隔でかつ所
定区間に亘って設置される複数のブラケットと、これら
ブラケット群の内、所定数のブラケット群間に移動方向
に沿って架け渡されるとともに、分割可能とされる走行
レールと、この走行レールに沿って走行自在とされる張
出部移動支保設備と、前記打設済みコンクリートの非張
出部がわ壁面に対して、前記移動方向に沿って移動可能
に支持されるとともに、打設済みコンクリート壁の張出
部がわ壁面において前記張出部移動支保設備によって支
持されるフレーム体と、前記フレーム体に設備される、
側面型枠および前記張出部移動支保設備によって支持さ
れる張出部下面がわ型枠と、前記フレーム体および/ま
たはブラケットに取り付けられる足場と、前記フレーム
体に設けられる、移動方向後方側のブラケットおよび分
割された走行レール部分を移動方向前方側に順次盛替え
するための盛替え設備と、からなることを特徴とするも
のである。
According to the first aspect of the present invention, a concrete top wall having an overhang on one side of a wall is successively provided on an upper surface of a cast concrete wall. What is claimed is: 1. A scaffold-integrated movable formwork apparatus for performing construction while moving, wherein said movable formwork apparatus is installed at a predetermined interval and in a predetermined section in said moving direction with respect to an overhang portion of said cast concrete wall. A plurality of brackets, a predetermined number of the bracket groups, and a traveling rail that is bridged along a moving direction between the bracket groups and that can be divided, and is free to travel along the traveling rail. The overhanging portion moving support equipment and the non-overhanging portion of the poured concrete are supported so as to be movable along the moving direction on the wall surface, and the overhanging portion of the poured concrete wall is supported by the overhanging portion. On the wall A frame body which is supported by the projecting portion moving 支保 equipment is equipment to the frame body,
The underside of the overhanging portion supported by the side formwork and the overhanging portion moving support equipment has a wavy frame, a scaffold attached to the frame body and / or a bracket, and a moving direction rear side provided on the frame body. And a rearrangement facility for sequentially rearranging the bracket and the divided traveling rail portions forward in the moving direction.

【0008】また、本第2発明は、打設済みコンクリー
ト壁の上面に連続して、壁面の両側にそれぞれ張出部を
有するコンクリート頂壁部を順次移動しながら施工する
ための足場一体型移動型枠装置であって、前記打設済み
コンクリート壁の両側にそれぞれ、前記移動方向に所定
の間隔でかつ所定区間に亘って設置される複数のブラケ
ットと、これらブラケット群の内、所定数のブラケット
群間に移動方向に沿って架け渡されるとともに、分割可
能とされる走行レールと、この走行レールに沿って走行
自在とされる張出部移動支保設備と、を設け、前記打設
コンクリート壁の両側にそれぞれ配設された張出部移動
支保設備によって支持されるフレーム体を設けるととも
に、このフレーム体に側面型枠および前記張出部移動支
保設備によって支持される張出部下面がわ型枠を設け、
かつ前記フレーム体および/またはブラケットに足場を
取り付けるとともに、前記フレーム体に移動方向後方側
のブラケットおよび分割された走行レール部分を移動方
向前方側に順次盛替えするための盛替え設備を設けたこ
とを特徴とするものである。
Further, the second invention is a scaffolding-integrated movement for moving a concrete top wall having an overhanging portion on both sides of the wall successively on the upper surface of the cast concrete wall. A formwork apparatus, comprising: a plurality of brackets installed on both sides of the poured concrete wall at predetermined intervals and in predetermined sections in the moving direction; and a predetermined number of brackets of the bracket group. A traveling rail is provided between the groups along the moving direction, and is provided with a traveling rail that can be divided, and an overhanging portion moving support facility that is freely movable along the traveling rail. A frame body is provided which is supported by the overhang portion moving support equipment provided on each side, and the frame body is supported by the side form and the overhang portion movement support equipment. Overhanging lower surface is I mold arranged to be,
And a scaffold is attached to the frame body and / or the bracket, and the frame body is provided with a bracket on the rear side in the movement direction and a rearrangement facility for sequentially rearranging the divided traveling rail portions forward in the movement direction. It is characterized by the following.

【0009】これら第1発明および第2発明において、
既設コンクリート壁の天端が傾斜しているような場合に
は、前記フレーム体にコンクリート打設部分の上面を塞
ぐ上型枠を設けることが望ましい。また、コンクリート
硬化後の脱型を容易化するために、前記型枠の内、少な
くとも一部の型枠には該型枠をコンクリート面から剥離
させる脱型機構を備えていることが望ましい。
[0009] In these first invention and second invention,
In the case where the top end of the existing concrete wall is inclined, it is desirable to provide an upper formwork for closing the upper surface of the concrete casting portion on the frame body. In addition, in order to facilitate the removal of the mold after the concrete is hardened, it is preferable that at least a part of the molds has a removal mechanism for peeling the form from the concrete surface.

【0010】本発明装置は、打設済みコンクリート壁の
頂部に、側方に張り出した張出部を含むコンクリート頂
壁部を効率的に施工可能とするために、施工に必要な型
枠、足場等の設備を一体的に備えるフレーム体と共に、
張出部下面がわ型枠を支持するための張出部移動支保設
備を順次、ブラケットおよびブラケット間レール部分の
盛替えと共に移動可能としたものであり、本装置によれ
ば、足場工、型枠支保工、型枠工、鉄筋工およびコンク
リート打設工などの一連の施工工程を基盤面等から組み
立てた足場支保工無しで施工できるようになる。
[0010] The apparatus of the present invention provides a formwork and a scaffold necessary for construction in order to efficiently construct a concrete top wall including a laterally overhanging portion on the top of a cast concrete wall. Along with a frame body that is equipped with equipment such as
According to the present apparatus, the overhanging portion moving support equipment for supporting the underside of the overhanging portion can be sequentially moved together with the rearrangement of the bracket and the rail portion between the brackets. A series of construction steps such as frame support, formwork, rebar work, and concrete placing work can be performed without a scaffold support constructed from a base surface or the like.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照しながら詳述する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0012】〔第1形態例〕図1は本発明に係る足場一
体型移動型枠装置1の側面図、図2はその平面図、図3
及び図4はその横断面図である。
[First Embodiment] FIG. 1 is a side view of a scaffold-integrated mobile form device 1 according to the present invention, FIG. 2 is a plan view thereof, and FIG.
4 and FIG. 4 are cross-sectional views thereof.

【0013】足場一体型移動型枠装置1は、図3に示さ
れるように、打設済みコンクリート壁30の上面に連続
して、逆L字状に側方に張り出した張出部31aを含む
コンクリート頂壁部31を順次移動しながら施工するた
めの装置であって、足場工、型枠支保工、型枠工、鉄筋
工およびコンクリート打設工などの一連の施工工程を、
基盤面等から組み立てた足場支保工無しで施工できるよ
うにしたものである。
As shown in FIG. 3, the scaffold-integrated movable form device 1 includes an overhanging portion 31a which is continuous with the upper surface of the cast concrete wall 30 and which protrudes laterally in an inverted L-shape. It is a device for performing while moving the concrete top wall portion 31 sequentially, a series of construction steps such as scaffolding, formwork support, formwork, rebar work and concrete placing work,
It can be constructed without scaffolding support assembled from the base surface.

【0014】以下、具体的に詳述すると、前記足場一体
型移動型枠装置1(以下、単に移動型枠という。)は、
前記打設済みコンクリート壁30の張出部がわ壁面に対
して、移動方向に所定の間隔でかつ所定区間に亘って設
置される複数のブラケット群2〜2と、これらブラ
ケット群2〜2間に移動方向に沿って架け渡される
とともに、各ブラケット間2、2n+1毎に分割可能
とされる走行レール3A、3Bと、この走行レール3
A、3Bに沿って走行自在とされる張出部移動支保設備
4と、前記打設済みコンクリート30の非張出部がわ壁
面に対して、前記移動方向に沿って移動可能に支持され
るとともに、打設済みコンクリート壁30の張出部がわ
壁面において前記張出部移動支保設備4によって支持さ
れる、型枠6A〜6E、足場7A〜7C、ブラケット2
および走行レール3A、3Bの盛替え設備8などを備
えるフレーム体5と、から主に構成される装置である。
In the following, specifically, the scaffold-integrated movable form device 1 (hereinafter, simply referred to as a movable form) will be described.
Against the punching an already installed concrete wall 30 projecting portion Kanagawa wall of, a plurality of bracket groups 2 1 to 2 8 installed over a and predetermined section predetermined intervals in the moving direction, these bracket series 2 1 together we are bridged along the movement direction between to 2 8, each bracket between 2 n, 2 n + 1 traveling rail 3A is dividable for each, and 3B, the travel rail 3
A overhang portion movement support facility 4 that can run freely along A and 3B, and the non-overhang portion of the poured concrete 30 is supported movably along the moving direction on the wall surface. At the same time, the formwork 6A to 6E, the scaffolds 7A to 7C, and the bracket 2 are supported by the overhanging portion moving support equipment 4 on the overhanging portion of the cast concrete wall 30.
n and a frame body 5 including a rearrangement facility 8 for traveling rails 3A and 3B.

【0015】前記ブラケット2〜2は、図3に示さ
れるように、既設コンクリート壁30に対してアンカー
などの固定具によって支持された骨組構造のブラケット
であり、移動方向、具体的には既設コンクリート壁30
の天端に沿う方向に所定の間隔で、かつ前記フレーム体
5内にほぼ収まる区間に亘って設けられている。このブ
ラケット群2〜2の内、ブラケット2〜2間に
は、移動型枠装置1の移動方向に沿って2条の走行レー
ル3A、3Bが架け渡されているとともに、足場7Aが
架け渡されている。なお、前記走行レール3A、3B
は、各ブラケット間2、2n+1毎に分割可能となっ
ている。なお、前記走行レール3A、3Bは各ブラケッ
ト支間毎ではなく、任意長さ毎に分割可能となっていて
もよい。
[0015] The bracket 2 1 to 2 8, as shown in FIG. 3, a bracket supported framework by fasteners such as anchors against existing concrete wall 30, the moving direction, specifically, Existing concrete wall 30
Are provided at predetermined intervals in a direction along the top end of the frame member 5 and over a section substantially accommodated in the frame body 5. Of the bracket series 2 1 to 2 8, between the bracket 2 2-2 8, Article 2 of the running rails 3A along the moving direction of the moving mold apparatus 1, together with 3B are bridged, the scaffold 7A Is spanned. The running rails 3A, 3B
Can be divided every 2 n and 2 n + 1 between brackets. The traveling rails 3A and 3B may be dividable not at each bracket span but at an arbitrary length.

【0016】前記走行レール3A、3Bには、該走行レ
ール3A、3Bに沿って走行自在とされる張出部移動支
保設備4が設けられている。この張出部移動支保設備4
は、2条のH桁16A、16Bからなる支持桁16の前
部側位置および後部側位置にそれぞれ、下端にローラ1
0a(10b)を有するとともに、伸縮自在の走行脚1
0A、10Bを備えるとともに、これら走行脚10A、
10Bの間に、複数の、図示例では3本の支持脚11、
11…を備えている。これら各支持脚11、11…は、
昇降操作ハンドル11aの回転操作により昇降自在とさ
れる接地板12を備え、前記張出部移動支保設備4が移
動する場合には、前記支持脚11、11…を走行レール
3A、3Bから離間させ、前記張出部移動支保設備4が
所定位置に定位する場合には、前記支持脚11、11…
が下降操作され、前記接地板12が走行レール3A、3
Bに接地して張出部下面がわ型枠6Cを支持するように
なっている。なお、前記張出部移動支保設備4の移動操
作は、前記走行脚10A、10B間に架け渡された側枠
13、13側に一端が連結されるとともに、所定のブラ
ケット2(同図ではブラケット2)に連結された推
進ジャッキ14の伸縮操作により成される。また、前記
支持桁16の上面はフレーム体5と連結されており、張
出部移動支保設備4を移動させることにより、移動型枠
1が移動可能となっている。
The traveling rails 3A, 3B are provided with an overhanging portion moving support equipment 4 which can run along the traveling rails 3A, 3B. This overhang part moving support equipment 4
The roller 1 has a roller 1 at the lower end thereof at the front side position and at the rear side position of the support girder 16 composed of two H beams 16A and 16B.
0a (10b) and extendable telescopic running leg 1
0A, 10B, and these running legs 10A,
Between 10B, a plurality of, in the illustrated example, three support legs 11,
11 ... are provided. Each of these support legs 11, 11 ...
A grounding plate 12 that can be raised and lowered by rotating the lifting operation handle 11a is provided. When the overhang portion moving support equipment 4 moves, the support legs 11, 11 are separated from the traveling rails 3A, 3B. When the overhang portion moving support equipment 4 is located at a predetermined position, the support legs 11, 11,.
Is lowered, and the grounding plate 12 is moved to the traveling rails 3A, 3A.
The lower surface of the overhanging portion is grounded to B and supports the frame 6C. In addition, the moving operation of the overhang portion moving support equipment 4 is performed by connecting one end to the side frames 13, 13 bridged between the running legs 10A, 10B and a predetermined bracket 2 n (in FIG. made by the expansion and contraction operation of the propulsion jacks 14 connected to the bracket 2 4). The upper surface of the support girder 16 is connected to the frame body 5, and the movable form 1 can be moved by moving the overhang portion moving support equipment 4.

【0017】前記フレーム体5は、前記打設済みコンク
リート壁30の非張出部がわ壁面に移動方向に沿って設
けられたスライドガイドレール17を支持部材として移
動可能に支持されるとともに、打設済みコンクリート壁
30の張出部がわ壁面において前記張出部移動支保設備
4によって支持されている。このフレーム体5は、構築
されるコンクリート頂壁部31の一方側側面から他方が
わ側面に至る周囲をカバーする上部フレーム体5Aと、
この上部フレーム体5Aに連続するとともに、コンクリ
ート張出部31aの底面及びL字コーナー部をカバーす
る下部フレーム体5Bとからなるフレーム枠であり、前
記非張出部がわ壁面に上下方向に3段からなる足場を有
するステップ足場7Bが一体的に設けられているととも
に、張出部がわ壁面にステップ足場7Cが一体的に設け
られている。
The frame body 5 is movably supported by a slide guide rail 17 provided along the direction of movement of the non-extended portion of the cast concrete wall 30 along the moving direction. The overhanging portion of the installed concrete wall 30 is supported by the overhanging portion moving support equipment 4 on the waist wall surface. The frame body 5 includes an upper frame body 5A that covers the periphery from one side surface to the other side surface of the concrete top wall portion 31 to be constructed,
A frame frame which is continuous with the upper frame body 5A and comprises a lower frame body 5B which covers the bottom surface of the concrete overhang portion 31a and the L-shaped corner portion. A step scaffold 7B having a stepped scaffold is integrally provided, and a step scaffold 7C is integrally provided on the overhanging wall surface.

【0018】また、前記フレーム体5には、側面型枠6
A、6B、張出部下面型枠6C、前記張出部下面型枠6
Cから連続するL字コーナー部型枠6Dを備えるととも
に、コンクリート打設部分の上面を塞ぐ上型枠6Eを備
えている。これら各型枠6A〜6Eは、コンクリート硬
化後にコンクリート面からの剥離が容易に行えるよう脱
型機構を備えている。すなわち、前記側面型枠6Aは、
取付けボルト18、18…の回転操作によってコンクリ
ート面から剥離可能となっているとともに、上型枠6E
はフレーム体5側に一端が連結されるとともに、他端が
上型枠6Eに連結された脱型用ジャッキ19によってコ
ンクリート面から剥離可能とされ、前記L字コーナー部
型枠6Dは前記張出部移動支保設備4に一端が連結され
た脱型用ジャッキ20によってコンクリート面から剥離
可能となっている。なお、前記側面型枠6Bおよび前記
張出部下面型枠6Cは張出部移動支保設備4の走行脚1
0A、10Bを収縮させ、フレーム体5全体を下降させ
ることによって脱型が容易に行えるようになっている。
この場合、フレーム体5のスライドガイドレール17側
には、フレーム体5が上下移動できるように、縦フレー
ムの途中に伸縮ジャッキ29を介在させている。
The frame body 5 has a side frame 6
A, 6B, overhang lower surface form 6C, overhang lower surface form 6
It has an L-shaped corner portion formwork 6D continuous from C and an upper formwork 6E for closing the upper surface of the concrete casting portion. Each of these molds 6A to 6E is provided with a demolding mechanism so that the concrete can be easily separated from the concrete surface after hardening. That is, the side mold 6A is
.. Can be separated from the concrete surface by rotating the mounting bolts 18, 18,.
Is connected to the frame body 5 at one end, and is detachable from the concrete surface by a release jack 19 connected at the other end to the upper mold frame 6E. The L-shaped corner mold 6D is A detachable jack 20 having one end connected to the section moving support equipment 4 can be separated from the concrete surface. In addition, the side surface form 6B and the overhang portion lower surface form frame 6C are mounted on the traveling leg 1 of the overhang portion moving support equipment 4.
The mold can be easily removed by contracting 0A and 10B and lowering the entire frame body 5.
In this case, a telescopic jack 29 is interposed on the slide guide rail 17 side of the frame body 5 in the middle of the vertical frame so that the frame body 5 can move up and down.

【0019】なお、前記側面型枠6Bに横送り機構(図
示せず)を付加し、前記側面型枠6Bをコンクリート面
から離間方向に移動できるようにすれば、脱型が容易に
なるとともに、フレーム体5の移動が容易に行えるよう
になる。また曲線施工にも柔軟に対応できるようにな
る。前記上型枠6Eについては、張出部31aの上面が
フラットな場合は省略可能である。
If a lateral feed mechanism (not shown) is added to the side frame 6B so that the side frame 6B can be moved away from the concrete surface, the mold can be easily removed. The frame body 5 can be easily moved. Also, it can flexibly cope with curved construction. The upper mold frame 6E can be omitted when the upper surface of the overhang portion 31a is flat.

【0020】また、前記下部フレーム体5Bには、移動
方向後方側のブラケット2およびブラケット間走行レ
ール3を移動方向前方側に盛替えするための盛替え設
備8が設けられている。この盛替え設備8は、図2に示
されるように、最後部のブラケット28を最前部まで移
送可能なように平面視でコ字状を成す移送レール21
と、この移送レール21に沿って走行自在のフック付き
走行体22と、このフック付き走行体22に吊持される
チェーンブロック等の揚重器具(図示せず)と、からな
る移送設備で、移動型枠1の移動に伴って最後部に位置
するブラケット2 が移動方向前方側に盛替えられると
ともに、最後部に位置するブラケット間走行レール部分
が移動方向前方側に盛り替えられる。なお、フレー
ム体5には、前記各種油圧ジャッキ14、19、20を
駆動するための油圧ポンプ駆動用発電装置24が搭載さ
れている。
The lower frame 5B is moved
Bracket 2 on the rear side in the direction8And travel between brackets
Rule 38Setting for changing the
Equipment 8 is provided. This rearrangement equipment 8 is shown in FIG.
The rearmost bracket 28 to the front
The transfer rail 21 has a U-shape in plan view so that it can be sent.
With a hook that can travel along this transfer rail 21
The traveling body 22 is suspended from the traveling body 22 with hooks.
Lifting equipment (not shown) such as a chain block;
Is located at the rearmost position as the movable form 1 moves.
Bracket 2 8Is repositioned forward in the direction of movement
Both are the rails between the brackets located at the rearmost position
38Is moved forward in the moving direction. In addition,
The various hydraulic jacks 14, 19, 20 are
Equipped with a hydraulic pump drive generator 24 for driving
Have been.

【0021】次いで、前述した移動型枠1を用いてコン
クリート頂壁部を施工する手順について図5のフロー図
に基づいて詳述する。
Next, a procedure for constructing a concrete top wall portion using the movable form 1 described above will be described in detail with reference to the flowchart of FIG.

【0022】先ず、コンクリート頂壁部31へのコンク
リート打設が完了し各型枠6A〜6Eの脱型を終えたな
らば、移動型枠1の移動を行う。移動型枠1の移動は、
最後部に位置するブラケット2およびブラケット間走
行レール3部分を前記ブラケット盛替え設備8によっ
て移動方向前方側に盛替えたならば、ブラケット2、2
の1スパン距離分だけ移動型枠1と共に張出部移動支保
設備4を前方側に移動させる。この作業を複数回、本例
では5回繰り返して移動型枠1を次のコンクリート頂壁
部31の施工位置まで移動させる。なお、この際、前記
推進ジャッキ14も適時盛替えが行われる。
First, when the concrete placement on the concrete top wall 31 is completed and the molds 6A to 6E have been removed from the concrete, the movable mold 1 is moved. The movement of the movable form 1
If the bracket 2 8 and the bracket between the running rails 3 8 portion located at the end portion was replaced Sheng moving forward side by the bracket Sakarigae equipment 8, the bracket 2,2
The overhang portion moving support equipment 4 is moved forward together with the movable formwork 1 by the distance of 1 span. This operation is repeated a plurality of times, in this example, five times, to move the movable formwork 1 to the next construction position of the concrete top wall portion 31. At this time, the propulsion jack 14 is also rearranged as appropriate.

【0023】移動型枠1を次施工場所まで移動させたな
らば、支持脚11、11…を伸長させて張出部移動支保
設備4を固定し張出部下面がわ型枠6Cを支持するとと
もに、脱型用ジャッキ20を伸長させてL字コーナー部
型枠6Dを正規の状態に固定保持する。さらに、側面型
枠6Aを所定の位置に固定するとともに、側面型枠6B
とセパレータ23、23によって連結し固定を図る。
When the movable form 1 is moved to the next construction site, the support legs 11, 11,... Are extended to fix the overhang moving support equipment 4, and the underside of the overhang supports the frame 6C. At the same time, the releasing jack 20 is extended to fix and hold the L-shaped corner portion formwork 6D in a normal state. Further, the side mold 6A is fixed at a predetermined position, and the side mold 6B is fixed.
And the separators 23 and 23 for connection and fixation.

【0024】次いで、型枠内部で鉄筋の組立を行った
後、上型枠6Eにより上面を塞ぐとともに、前記上型枠
6Eにコンクリート打設のために形成した開口からコン
クリートを流し込み、その後コンクリートの硬化を待っ
て脱型を行う。
Next, after assembling the rebar inside the formwork, the upper surface is closed with the upper formwork 6E, and concrete is poured into the upper formwork 6E through an opening formed for placing concrete. Demold after waiting for curing.

【0025】以上の施工工程を順に繰り返すことによ
り、既設コンクリート壁30の上面に連続して、張出部
31aを有するコンクリート頂壁部31を足場支保工無
しに効率的に構築することが可能となる。。
By repeating the above construction steps in sequence, it is possible to efficiently construct the concrete top wall 31 having the overhang portion 31a without scaffolding support, continuously on the upper surface of the existing concrete wall 30. Become. .

【0026】ところで、上記移動型枠1は、既設コンク
リート壁30の天端が水平の場合の構造例を示したもの
であるが、前記既設コンクリート壁30の天端に傾斜が
あるような場合には、図6に示されるように、一部に変
更を加えた移動型枠1Bが好適に使用される。この移動
型枠1Bでは、傾斜に対応するようにフレーム体5の形
状に変更を加えるとともに、張出部移動支保設備4の逸
走防止のための側枠13の後端部と走行レール3A、3
B間に逸走防止ジャッキ26を介在させている。この逸
走防止ジャッキ26は、側枠13側に一端が連結される
とともに、他端側に係合部26aを有する部材で、走行
レール3A、3Bを連結している連結バー27に対して
前記係合部26aを係合させることにより、張出部移動
支保設備4の逸走を防止するようにしてある。また、前
記張出部移動支保設備4の支持脚11、11…の接地板
12、12…は、それぞれレール傾斜面に対して均等に
接地するように側面視で三角形状となっている。これ以
外の構造については、前述の移動型枠1と同様であるた
め、同符号を付して説明は省略する。
By the way, the movable formwork 1 is an example of a structure in which the top end of the existing concrete wall 30 is horizontal. However, when the top end of the existing concrete wall 30 is inclined, As shown in FIG. 6, a movable mold 1B partially modified is preferably used. In the movable form 1B, the shape of the frame body 5 is changed to correspond to the inclination, and the rear end of the side frame 13 and the running rails 3A, 3
An escape prevention jack 26 is interposed between B. The escape prevention jack 26 is a member having one end connected to the side frame 13 and having an engagement portion 26a at the other end, and is connected to a connection bar 27 connecting the traveling rails 3A and 3B. The engagement of the joint portion 26a prevents the overhang portion moving support equipment 4 from running away. Also, the grounding plates 12, 12,... Of the support legs 11, 11,... Of the overhang portion moving support equipment 4 have a triangular shape in a side view so as to be uniformly grounded on the rail inclined surfaces. The other structure is the same as that of the movable mold 1 described above, so the same reference numerals are given and the description is omitted.

【0027】〔第2形態例〕本第2形態例では、逆T字
状に両側に張出部31a、31aを有するコンクリート
頂壁部31を施工するための移動型枠1Cについて、図
7〜図9に基づいて詳述する。
[Second Embodiment] In the second embodiment, a movable formwork 1C for constructing a concrete top wall portion 31 having projecting portions 31a on both sides in an inverted T-shape is shown in FIGS. This will be described in detail with reference to FIG.

【0028】打設済みコンクリート壁30の両側にそれ
ぞれ、移動方向に所定の間隔でかつ所定区間に亘って設
置される複数のブラケット群2〜2と、ブラケット
間2 〜2に移動方向に沿って架け渡されるととも
に、各ブラケット間2、2 +1毎に分割可能とされ
る走行レール3A、3Bと、この走行レール3A、3B
に沿って走行自在とされる張出部移動支保設備4とを設
け、前記既設コンクリート壁30の両側に配置される前
記張出部移動支保設備4、4によって支持される、型枠
6B〜6D、6E、足場7A・7C、ブラケット2
よび走行レール3A、3Bの盛替え設備8などを備える
フレーム体5と、から主に構成される型枠装置である。
すなわち、前記第1形態例における張出部31a側部分
の構造を左右対称配置で設けた構造となっている。
On both sides of the cast concrete wall 30
Each is set at a predetermined interval in the movement direction and over a predetermined section.
A plurality of bracket groups 2 to be placed1~ 28And the bracket
Interval 2 2~ 28Along the direction of travel
2 between each bracketn, 2n +1Can be divided by each
Traveling rails 3A and 3B and the traveling rails 3A and 3B
The overhanging part moving support equipment 4 that can run freely along
Before being placed on both sides of the existing concrete wall 30
Formwork supported by the overhang moving support equipment 4, 4
6B-6D, 6E, scaffolding 7A, 7C, bracket 2nYou
And a rearrangement facility 8 for traveling rails 3A and 3B, etc.
And a frame device mainly composed of a frame body 5.
That is, the portion on the side of the overhang portion 31a in the first embodiment.
Is provided in a symmetrical arrangement.

【0029】それぞれの構造については、第1形態例で
説明済みであるため同符号を付して省略するが、移動型
枠1Cの移動に際しては、左右両側で併行してブラケッ
ト2 およびブラケット間走行レール3の盛替えを行
い、フレーム体5の移動も推進ジャッキ14、14を同
調的に連動操作して移動させる必要がある。
Each structure is described in the first embodiment.
Since the explanation has already been made, the same reference numerals are given and the explanation is omitted.
When moving the frame 1C, bracket the
To 2 8And rail 3 between brackets8Row
Also, the movement of the frame body 5 is the same as that of the propulsion jacks 14, 14.
It is necessary to move in a coordinated manner.

【0030】以上、本発明移動型枠1〜1Cについて詳
述したが、施工対象は前述のダム導流壁の波返し部以外
に、足場の据え付けが困難な箇所、例えば海工事、山間
工事、高架橋、建築物などの張出構造部分を持つコンク
リート壁の施工、リニューアル工事における架空足場を
必要とする場合などにおいても同様に適用することが可
能である。
The movable molds 1 to 1C according to the present invention have been described in detail above. The present invention can be similarly applied to the construction of a concrete wall having an overhanging structure portion such as a viaduct or a building, or a case where an imaginary scaffold is required in a renewal work.

【0031】[0031]

【発明の効果】以上詳説のとおり本発明によれば、既設
コンクリートの上部に、張出部を有するコンクリート頂
壁部を施工するに当たり、足場工、型枠支保工、型枠
工、鉄筋工およびコンクリート打設工などの一連の施工
工程を、基盤面等から組み立てた足場支保工無しで施工
できるようになる。
As described above in detail, according to the present invention, when constructing a concrete top wall having an overhang on an existing concrete, a scaffolding, formwork support, formwork, reinforcing steel, A series of construction steps such as concrete placing work can be performed without scaffolding support work assembled from the base surface or the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】第1形態例に係る本発明の足場一体型移動型枠
装置1の側面図である。
FIG. 1 is a side view of a scaffold-integrated mobile form device 1 according to a first embodiment of the present invention.

【図2】その平面図である。FIG. 2 is a plan view thereof.

【図3】その横断面図(図1のIII−III線矢視図)であ
る。
FIG. 3 is a cross-sectional view thereof (a view taken along line III-III in FIG. 1).

【図4】その横断面図(図1のIV−IV線矢視図)であ
る。
FIG. 4 is a cross-sectional view thereof (a view taken along the line IV-IV in FIG. 1).

【図5】コンクリート頂壁部の施工フロー図である。FIG. 5 is a construction flowchart of a concrete top wall portion.

【図6】傾斜方向に沿ってコンクリート頂壁部を施工す
る場合の移動型枠1Bの側面図である。
FIG. 6 is a side view of a movable formwork 1B when a concrete top wall portion is constructed along an inclined direction.

【図7】両側に張出部を有する場合の移動型枠1Cの平
面図である。
FIG. 7 is a plan view of a movable mold 1C having overhangs on both sides.

【図8】その横断面図(その1)である。FIG. 8 is a cross-sectional view thereof (No. 1).

【図9】その横断面図(その2)である。FIG. 9 is a cross-sectional view thereof (No. 2).

【図10】導流壁51を有するダムの縦断面図である。10 is a longitudinal sectional view of a dam having a flow guiding wall 51. FIG.

【図11】導流壁51の波返し部52を足場支保工によ
って施工する場合の(A)は側面図、(B)は断面図である。
11 (A) is a side view and FIG. 11 (B) is a cross-sectional view in the case where the wave returning portion 52 of the flow guide wall 51 is constructed by scaffolding support.

【符号の説明】[Explanation of symbols]

1・1B・1C…移動型枠、2〜2…ブラケット、
3A・3B…走行レール、4…張出部移動支保設備、5
…フレーム体、5A…上部フレーム体、5B…下部フレ
ーム体、6A〜6E…型枠、7A〜7C…足場、8…盛
替え設備
1 · 1B · 1C ... mobile frame, 2 1 to 2 8 ... bracket,
3A, 3B: running rail, 4: overhanging part moving support equipment, 5
... frame body, 5A ... upper frame body, 5B ... lower frame body, 6A-6E ... formwork, 7A-7C ... scaffolding, 8 ... rearrangement equipment

───────────────────────────────────────────────────── フロントページの続き (71)出願人 000171757 佐賀工業株式会社 富山県高岡市荻布209 (72)発明者 舘 眞人 愛知県名古屋市中区丸の内3−21−25 佐 藤工業株式会社名古屋支店内 (72)発明者 谷田 公夫 愛知県名古屋市中区丸の内3−21−25 佐 藤工業株式会社名古屋支店内 (72)発明者 山崎 徹 東京都千代田区富士見二丁目10番26号 前 田建設工業株式会社内 (72)発明者 堀田 重尚 東京都新宿区市谷田町2丁目35番 大日本 土木株式会社東京本社工務技術本部内 (72)発明者 片岡 眞冶 富山県高岡市萩布209 佐賀工業株式会社 内 ──────────────────────────────────────────────────の Continuing from the front page (71) Applicant 000171757 Saga Industry Co., Ltd. (72) Inventor Kimio Yata 3-21-25 Marunouchi, Naka-ku, Nagoya-shi, Aichi Sato Industry Co., Ltd.Nagoya Branch In-house (72) Inventor Shigehisa Hotta 2-35, Yata-cho, Shinjuku-ku, Tokyo Dainippon Civil Engineering Co., Ltd. Inside

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】打設済みコンクリート壁の上面に連続し
て、壁面の一方側に張出部を有するコンクリート頂壁部
を順次移動しながら施工するための足場一体型移動型枠
装置であって、 前記打設済みコンクリート壁の張出部がわ壁面に対し
て、前記移動方向に所定の間隔でかつ所定区間に亘って
設置される複数のブラケットと、 これらブラケット群の内、所定数のブラケット群間に移
動方向に沿って架け渡されるとともに、分割可能とされ
る走行レールと、 この走行レールに沿って走行自在とされる張出部移動支
保設備と、 前記打設済みコンクリートの非張出部がわ壁面に対し
て、前記移動方向に沿って移動可能に支持されるととも
に、打設済みコンクリート壁の張出部がわ壁面において
前記張出部移動支保設備によって支持されるフレーム体
と、 前記フレーム体に設備される、側面型枠および前記張出
部移動支保設備によって支持される張出部下面がわ型枠
と、 前記フレーム体および/またはブラケットに取り付けら
れる足場と、 前記フレーム体に設けられる、移動方向後方側のブラケ
ットおよび分割された走行レール部分を移動方向前方側
に順次盛替えするための盛替え設備と、からなることを
特徴とする足場一体型移動型枠装置。
1. A scaffold-integrated movable formwork apparatus for continuously moving a concrete top wall portion having an overhang on one side of a wall surface while continuously moving the concrete top wall portion on an upper surface of a cast concrete wall. A plurality of brackets installed at predetermined intervals and in a predetermined section in the moving direction with respect to the overhanging wall of the cast concrete wall, and a predetermined number of brackets of the bracket group A traveling rail that is bridged between the groups along the moving direction and is dividable, an overhang portion moving support facility that is freely movable along the traveling rail, and a non-extending of the poured concrete. A frame body which is supported movably along the moving direction with respect to the wall surface, and in which the overhang portion of the cast concrete wall is supported by the overhang portion moving support facility on the wall surface A frame formed on the frame body, a lower surface of the overhang portion supported by the side frame and the overhang portion moving support equipment, a scaffold attached to the frame body and / or a bracket, and the frame. A scaffolding-integrated mobile formwork device, comprising: a bracket provided on a body for rearranging a bracket on a rear side in a moving direction and a divided traveling rail portion sequentially on a front side in a moving direction.
【請求項2】打設済みコンクリート壁の上面に連続し
て、壁面の両側にそれぞれ張出部を有するコンクリート
頂壁部を順次移動しながら施工するための足場一体型移
動型枠装置であって、 前記打設済みコンクリート壁の両側にそれぞれ、前記移
動方向に所定の間隔でかつ所定区間に亘って設置される
複数のブラケットと、これらブラケット群の内、所定数
のブラケット群間に移動方向に沿って架け渡されるとと
もに、分割可能とされる走行レールと、この走行レール
に沿って走行自在とされる張出部移動支保設備と、を設
け、 前記打設コンクリート壁の両側にそれぞれ配設された張
出部移動支保設備によって支持されるフレーム体を設け
るとともに、このフレーム体に側面型枠および前記張出
部移動支保設備によって支持される張出部下面がわ型枠
を設け、 かつ前記フレーム体および/またはブラケットに足場を
取り付けるとともに、前記フレーム体に移動方向後方側
のブラケットおよび分割された走行レール部分を移動方
向前方側に順次盛替えするための盛替え設備を設けたこ
とを特徴とする足場一体型移動型枠装置。
2. A scaffold-integrated movable formwork apparatus for constructing a concrete top wall portion having an overhang portion on each side of a wall surface while continuously moving the concrete top wall portion on an upper surface of a cast concrete wall. A plurality of brackets installed on both sides of the cast concrete wall at predetermined intervals in the movement direction and over predetermined sections, and in a movement direction between a predetermined number of bracket groups among these bracket groups. A traveling rail that is bridged along and is dividable, and an overhanging portion moving support facility that is free to travel along the traveling rail, provided on both sides of the cast concrete wall, respectively. A frame body supported by the overhang portion moving support equipment is provided, and a side frame and an overhanging lower surface supported by the overhang portion movement support equipment are provided on the frame body. A sculpture for providing a frame and attaching a scaffold to the frame body and / or the bracket, and for sequentially rearranging the bracket on the rear side in the moving direction and the divided traveling rail portion to the front side in the moving direction on the frame body. A scaffolding-integrated mobile formwork device provided with replacement equipment.
【請求項3】前記フレーム体は、コンクリート打設部分
の上面を塞ぐ上型枠を備える請求項1、2いずれか記載
の足場一体型移動型枠装置。
3. The scaffold-integrated movable form device according to claim 1, wherein said frame body includes an upper formwork for closing an upper surface of a concrete casting portion.
【請求項4】前記型枠の内、少なくとも一部の型枠には
型枠板をコンクリート面から剥離させる脱型機構を備え
ている請求項1〜3いずれかに記載の足場一体型移動型
枠装置。
4. The scaffold-integrated movable mold according to claim 1, wherein at least a part of the molds has a mold releasing mechanism for separating the mold plate from a concrete surface. Frame device.
JP2001044556A 2001-02-21 2001-02-21 Scaffold integrated moving formwork device Expired - Fee Related JP4570063B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001044556A JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001044556A JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Publications (2)

Publication Number Publication Date
JP2002242162A true JP2002242162A (en) 2002-08-28
JP4570063B2 JP4570063B2 (en) 2010-10-27

Family

ID=18906529

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001044556A Expired - Fee Related JP4570063B2 (en) 2001-02-21 2001-02-21 Scaffold integrated moving formwork device

Country Status (1)

Country Link
JP (1) JP4570063B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010126977A (en) * 2008-11-27 2010-06-10 Fujita Corp Precast concrete member for parapet part of training wall of dam and method of manufacturing the same
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56150217U (en) * 1981-02-17 1981-11-11
JPS5789005A (en) * 1980-11-25 1982-06-03 Okabe Co Ltd Device for moving form for wall
JPS5934364A (en) * 1982-08-23 1984-02-24 岡部株式会社 Construction of moving type concrete molding frame
JPS60112910A (en) * 1983-11-21 1985-06-19 Sumitomo Kensetsu Kk Construction of slant concrete structure
JPS62206161A (en) * 1986-03-06 1987-09-10 岡部株式会社 Moving type mold frame construction method of high bridge slab
JPH09195228A (en) * 1996-01-17 1997-07-29 Kawatetsu Kizai Kogyo Kk Build-up trestle for bridge pier reinforcing work and its using method
JPH108710A (en) * 1996-06-20 1998-01-13 Oriental Constr Co Ltd Scaffolding member
JPH10114914A (en) * 1996-10-14 1998-05-06 Kawada Kensetsu Kk Floor system shuttering moving equipment
JPH11293628A (en) * 1998-04-08 1999-10-26 Ps Corp Hung scaffold assembling method for bridge

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5789005A (en) * 1980-11-25 1982-06-03 Okabe Co Ltd Device for moving form for wall
JPS56150217U (en) * 1981-02-17 1981-11-11
JPS5934364A (en) * 1982-08-23 1984-02-24 岡部株式会社 Construction of moving type concrete molding frame
JPS60112910A (en) * 1983-11-21 1985-06-19 Sumitomo Kensetsu Kk Construction of slant concrete structure
JPS62206161A (en) * 1986-03-06 1987-09-10 岡部株式会社 Moving type mold frame construction method of high bridge slab
JPH09195228A (en) * 1996-01-17 1997-07-29 Kawatetsu Kizai Kogyo Kk Build-up trestle for bridge pier reinforcing work and its using method
JPH108710A (en) * 1996-06-20 1998-01-13 Oriental Constr Co Ltd Scaffolding member
JPH10114914A (en) * 1996-10-14 1998-05-06 Kawada Kensetsu Kk Floor system shuttering moving equipment
JPH11293628A (en) * 1998-04-08 1999-10-26 Ps Corp Hung scaffold assembling method for bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010126977A (en) * 2008-11-27 2010-06-10 Fujita Corp Precast concrete member for parapet part of training wall of dam and method of manufacturing the same
CN111305166A (en) * 2020-03-25 2020-06-19 中铁二十局集团第六工程有限公司 Construction method for support frame of bracket template for arc door hinge of overflow gate dam

Also Published As

Publication number Publication date
JP4570063B2 (en) 2010-10-27

Similar Documents

Publication Publication Date Title
JP3804883B2 (en) Concrete high structure construction apparatus and concrete oblique column construction method
KR100454406B1 (en) Method and apparatus for changing steel bridge of supporting rail into concrete bridge using temporary bent
CN109778700B (en) Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road
JP2002242162A (en) United scaffold type mobile formwork equipment
CN115405759A (en) Pile foundation rotary digging pore-forming underground gas pipeline in-situ isolation protection system and construction method
KR20100105174A (en) Mold apparatus for forming concrete slab of bridge
JP6449637B2 (en) Building construction method
CN216765625U (en) Integral hydraulic creeping formwork structure for double-column pier construction
JP2001098559A (en) Total lift-up form device
CN218031749U (en) Pile foundation rotary digging pore-forming underground gas pipeline in-situ isolation protection system
JP2000087314A (en) Method and device for construction of floor slab
JP2874539B2 (en) Method for constructing concrete structure and weir plate used in this method
JP2000087315A (en) Method and device for construction of floor slab
RU46300U1 (en) COMPLEX FOR ESTABLISHING A ROADWAY PLATE PLATE SECTION TWO-LEVEL TUNNEL
JP3873101B2 (en) Equipment for placing slabs
KR100582984B1 (en) Arch-shaped movable supporting post apparatus for installing archtype structures and method for constructing arch-shaped structures using the apparatus
KR101800107B1 (en) Beam form with work platform
JP2000160834A (en) Step-up construction of concrete caisson
KR960002379B1 (en) A form-less style working method and a structure apparatus for underground constructions
JPH0813454A (en) Application method for box culvert
JPH05132959A (en) Form for application of retaining wall
KR200321094Y1 (en) Arch-shaped movable supporting post apparatus for installing archtype structures
CN115450128A (en) Cover plate pouring platform, equipment and construction method
CN117188472A (en) Portable pouring system of super-high breakwater and breakwater construction method
JPH0745773B2 (en) Mobile formwork method for multiple viaducts in parallel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080118

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20080118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080609

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090819

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091013

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20091020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100709

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100806

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees