JP2002132862A - Method for controlling quality of building construction - Google Patents

Method for controlling quality of building construction

Info

Publication number
JP2002132862A
JP2002132862A JP2000326895A JP2000326895A JP2002132862A JP 2002132862 A JP2002132862 A JP 2002132862A JP 2000326895 A JP2000326895 A JP 2000326895A JP 2000326895 A JP2000326895 A JP 2000326895A JP 2002132862 A JP2002132862 A JP 2002132862A
Authority
JP
Japan
Prior art keywords
check
work
construction
check item
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000326895A
Other languages
Japanese (ja)
Inventor
Ryuichi Kobayashi
隆逸 小林
Masatoshi Akiyama
政俊 秋山
Ryusuke Kato
竜介 加藤
Yasushi Takiguchi
裕史 瀧口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PC NETWORK PLAZA KK
Original Assignee
PC NETWORK PLAZA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PC NETWORK PLAZA KK filed Critical PC NETWORK PLAZA KK
Priority to JP2000326895A priority Critical patent/JP2002132862A/en
Priority to CN 01121136 priority patent/CN1351304A/en
Publication of JP2002132862A publication Critical patent/JP2002132862A/en
Pending legal-status Critical Current

Links

Landscapes

  • Stored Programmes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To actualize control and improvement by allowing a constructor which holds multiple construction sites to unify and grasp the qualities of the construction at the respective sites by check items over a network. SOLUTION: The quantities by the check items of building construction are evaluated by the operation sites by using check lists containing the check items and the check lists after the evaluation are registered on a server S from terminal machines A1, A2 and A3 at the operation sites through a communication line; and the server S computes and stores fraction defectives by the check items according to the check lists of the respective operation sites, and the fraction defectives by the check items are browsed through a terminal machine A of the constructor through a communication line and used to improve the construction corresponding to the respective check items.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は複数の作業現場と施
工者とをネットワーク化して、各作業現場における作業
の良否を施工者においてチェック項目毎に把握し、管理
と改善に資するようにした建設工事における工事の品質
管理方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction in which a plurality of work sites and a constructor are connected to a network, and the quality of work at each work site is grasped by the constructor for each check item, thereby contributing to management and improvement. It relates to the quality control method of construction in construction.

【0002】[0002]

【従来の技術】建設工事においては工程表が存在し、且
つ工程に応じた各工種の作業手順書に従い各業者が工事
を行い、各工事の良否は現場毎の判定に留まっている。
2. Description of the Related Art In a construction work, there is a work schedule, and each contractor carries out the work in accordance with a work procedure manual of each work type according to the process, and the quality of each work is determined only at each site.

【0003】[0003]

【発明が解決しようとする課題】本発明は各作業現場に
おいて上記各工事の良否をチェック項目毎に把握できる
ようにすると同時に、複数の現場を掌握している施工者
において各現場における各工事の良否をチェック項目毎
に一元的に把握し、管理と改善に資することができるよ
うにした建設工事における工事の品質管理方法を提供す
るものである。
SUMMARY OF THE INVENTION The present invention makes it possible to grasp the quality of each of the above-mentioned works at each work site for each check item, and at the same time, allows a constructor who is in charge of a plurality of sites to carry out each work at each site. The purpose of the present invention is to provide a quality control method for construction in construction work in which quality can be grasped centrally for each check item and contribute to management and improvement.

【0004】[0004]

【課題を解決するための手段】上記工事の品質管理方法
は、建設工事におけるチェック項目を一覧にしたチェッ
クリストを用い、各作業現場毎に各チェック項目におけ
る良否の評価を行う。
According to the above-mentioned construction quality control method, the quality of each check item is evaluated for each work site using a check list listing check items in the construction work.

【0005】上記評価済みのチェックリストは作業現場
の端末機から通信回線を介してサーバーに登録し、該サ
ーバーにおいて各作業現場のチェックリストに基づきチ
ェック項目毎の不良率を演算して保存する。
[0005] The above-mentioned evaluated check list is registered in a server from a terminal at the work site via a communication line, and the server calculates and stores a defect rate for each check item based on the check list at each work site.

【0006】そしてチェック項目毎の不良率を通信回線
を介して施工者の端末機により閲覧し、その不良率を各
チェック項目に対応する工事の改善に資するものであ
る。
The defect rate for each check item is browsed by the terminal of the constructor via a communication line, and the defect rate contributes to the improvement of the construction corresponding to each check item.

【0007】例えば上記チェックリストは工種毎に区分
してチェック項目を掲げ、上記サーバーは上記各工種に
おけるチェック項目の不良率を演算して保存し、施工者
の閲覧に供する。
[0007] For example, the check list categorizes each type of work and presents check items. The server calculates and stores the defect rate of the check items in each type of work, and provides the same to the installer.

【0008】[0008]

【発明の実施の形態】以下本発明の実施の形態を図1乃
至図4に基づき説明する。図1におけるAは施工者の端
末機、例えば建設会社の端末機であり、A1,A2,A
3は施工者が施工する各作業現場の端末機を意味し、建
設会社の端末機Aと各作業現場の端末機A1,A2,A
3とは通信回線、例えばインターネットを介してサーバ
ーSに接続されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. A in FIG. 1 denotes a terminal of a builder, for example, a terminal of a construction company, and A1, A2, A
Reference numeral 3 denotes a terminal at each work site constructed by the builder, and a terminal A of the construction company and terminals A1, A2, A at each work site.
3 is connected to the server S via a communication line, for example, the Internet.

【0009】図3に示すように、施工者は建設工事にお
ける主要なチェック項目2を選定し、チェックリストC
を用意する。このチェックリストCは一枚又は二枚以上
の用紙に亘り掲載する。
[0009] As shown in FIG. 3, the builder selects the main check item 2 in the construction work and checks the checklist C.
Prepare This checklist C is published on one or more sheets.

【0010】好ましくは配管工事、配線工事、器具取付
工事等の工種1毎にチェック項目2を掲げたチェックリ
ストCを用意する。このチェックリストCは一枚の用紙
に工種1毎に区分して掲載するか、又は図3に示すよう
に、工種1毎に別の用紙に掲載する。
[0010] Preferably, a checklist C listing check items 2 is prepared for each type of work 1 such as plumbing work, wiring work, and fixture mounting work. The checklist C is posted on one sheet separately for each type of construction 1 or, as shown in FIG. 3, posted on another sheet for each type of construction.

【0011】チェックリストCはハードペーパー上に掲
載したリスト又は携帯端末の画面上に電子情報として表
示し得る電子リストである。
The checklist C is a list posted on a hard paper or an electronic list that can be displayed as electronic information on a screen of a portable terminal.

【0012】図4に示すように、各作業現場は上記建設
工事におけるチェック項目2を一覧にしたチェックリス
トCを用いて各作業現場毎に各チェック項目2における
良否の評価を行う。
As shown in FIG. 4, each work site evaluates the acceptability of each check item 2 for each work site using a checklist C listing check items 2 in the construction work.

【0013】そして図1,図2に示すように、上記評価
済みのチェックリストC′を作業現場の端末機A1,A
2,A3から通信回線、例えばインターネットを介して
サーバーSに登録する。
As shown in FIGS. 1 and 2, the evaluated checklist C 'is stored in the terminal A1, A at the work site.
2 and A3 register with the server S via a communication line, for example, the Internet.

【0014】図2に示すように、上記サーバーSにおい
て各作業現場のチェックリストC′に基づきチェック項
目2毎の不良率を演算してデータベースとして保存し、
該チェック項目2毎の不良率を通信回線を介して施工者
の端末機Aにより閲覧し、その不良率を各チェック項目
2に対応する工事の改善に資する。
As shown in FIG. 2, the server S calculates a defect rate for each check item 2 based on the check list C 'of each work site and stores it as a database.
The defect rate for each check item 2 is browsed by the terminal A of the constructor via the communication line, and the defect rate contributes to the improvement of the construction corresponding to each check item 2.

【0015】好ましくはサーバーSにおいて各作業現場
の工種1毎に区分したチェックリストC′に基づき各工
種1におけるチェック項目2の不良率を演算して保存
し、該チェック項目2毎の不良率とその工種1を通信回
線を介して施工者の端末機Aにより閲覧し、その不良率
を各チェック項目2に対応する工事の改善に資する。
Preferably, the server S calculates and stores the defect rate of the check item 2 of each work type 1 based on the check list C 'classified for each work type 1 of each work site, and stores the defect rate of each check item 2 The construction type 1 is browsed by the terminal A of the constructor via the communication line, and the defect rate contributes to the improvement of the construction corresponding to each check item 2.

【0016】図2は施工者の作業現場が6ヶ所であると
仮定し、第1チェック項目の評価結果の集計では良が5
件、不良が1件であることを示し、同様に第2チェック
項目の評価結果の集計では良が6件、不良が0件である
ことを示し、第3チェック項目の評価結果の集計では良
が6件、不良が0件であることを示し、第4チェック項
目の評価結果の集計では良が1件、不良が5件であるこ
とを示し、これら集計16から不良率を演算し、データ
ベースの不良チェック項目の検出記録15として保存す
る。又はこれらチェック項目の検出記録15には上記不
良率を工種1毎に区分して記録保存する。
FIG. 2 assumes that the work site of the installer is six places, and the total of the evaluation results of the first check item is 5 for good.
In the same manner, the total of the evaluation results of the second check item indicates that there are 6 good cases and the defect is 0, and the total of the evaluation results of the third check item indicates that there is a good case. Indicates that there are 6 cases and 0 cases are defective, and the total of the evaluation results of the fourth check item indicates that 1 case is good and 5 cases are defective. Is stored as the detection record 15 of the defect check item of the above. Alternatively, in the detection record 15 of these check items, the above-mentioned failure rate is classified and stored for each work type 1.

【0017】図3,図4に示すように例えば配管工事に
おけるチェック項目2とは、管材が適切か、保管方法が
適切か、数量が充足しているか、付属品が適切か、工具
が適切か、施工が適切か、配管支持が適切か、配管の接
続が適切か等である。
As shown in FIG. 3 and FIG. 4, for example, check item 2 in plumbing work is whether pipe material is appropriate, storage method is appropriate, quantity is sufficient, accessories are appropriate, tools are appropriate. , Proper construction, proper pipe support, proper pipe connection, etc.

【0018】又配線工事におけるチェック項目2とは、
例えば電線が適切か、電線の色別が適切か、配線の損傷
の有無、接続が適切か、余長が適切か等である。
Check item 2 in the wiring work is
For example, whether the electric wire is appropriate, whether the color of the electric wire is appropriate, whether or not the wiring is damaged, whether the connection is appropriate, whether the excess length is appropriate, and the like.

【0019】又器具取付工事におけるチェック項目2と
は、例えば器具が適切か、保管方法が適切か、数量が充
足しているか、取付が適切か、配線の接続が適切か、汚
れの有無等である。
The check item 2 in the fixture installation work includes, for example, whether the fixture is appropriate, the storage method is appropriate, the quantity is sufficient, the installation is appropriate, the connection of the wiring is appropriate, and the presence or absence of dirt. is there.

【0020】これらのチェック項目2を工種1毎に一覧
にしたチェックリストCは、チェック項目2毎に良否を
レ点や○の記号で記入する良否記入欄3を有し、この欄
3に同記号を記入して評価を行う。
The check list C in which the check items 2 are listed for each type of work 1 has a pass / fail entry column 3 in which pass / fail is entered for each check item 2 by a check mark or a symbol. Fill out and evaluate.

【0021】又上記チェックリストCには、工種1の記
入欄4の他、記録者5の記入欄6、作業者7の記入欄
8、作業施工日9の記入欄10,記録日11の記入欄1
2を有し、更に作業現場名13の記入欄14を有する。
In the checklist C, in addition to the entry column 4 for the type of construction 1, the entry column 6 for the recorder 5, the entry column 8 for the worker 7, the entry column 10 for the work execution date 9, and the entry for the recording date 11 Column 1
2 and an entry field 14 for a work site name 13.

【0022】従ってこれら事項1,5,7,9,11,
13等をチェック項目2と共にサーバーSに登録し保存
して置くことにより、施工者は端末機Aを使用して、ど
この作業現場で、何月何日にチェック項目2中のどのチ
ェック項目に不良工事が発生したかを把握でき、又これ
ら不良工事をどの作業者が、何月何日に行ったかをも把
握できる。よって建設工事完工後の責任の所在を的確に
把握し、信頼性確保とユーザーサービスを向上できる。
Therefore, these items 1, 5, 7, 9, 11,
By registering and storing 13 etc. in the server S together with the check item 2, the installer can use the terminal device A to determine which check item in the check item 2 at what work site, in what month and on what date. It is possible to grasp whether defective construction has occurred, and it is also possible to grasp which worker performed these defective constructions in what month and on what day. Therefore, it is possible to accurately grasp the responsibilities after the completion of the construction work, thereby ensuring reliability and improving user service.

【0023】上記各作業現場において各チェック項目2
の良否を評価した後、現場監督者は不良と判断したチェ
ック項目に該当する作業者にその不良の是正を求め、こ
れをチェックリストC′の是正処置欄17に記入する。
At each of the above work sites, each check item 2
After the evaluation, the site supervisor requests the worker corresponding to the check item determined to be defective to correct the defect, and enters this in the corrective action column 17 of the checklist C '.

【0024】同様にこの是正済みの有無を各作業現場の
端末機A1,A2,A3からサーバーSに登録し、施工
者は端末機Aにおいて不良と見倣されたチェック項目2
とその是正処置が取られているかどうかを容易に把握で
きる。
Similarly, the presence / absence of the correction is registered in the server S from the terminals A1, A2, A3 at each work site, and the installer checks the terminal A for the check item 2 which is regarded as defective.
And whether corrective actions have been taken.

【0025】[0025]

【発明の効果】本発明によれば、各作業現場において上
記各工事の良否をチェック項目毎に把握できると同時
に、複数の現場を掌握している施工者において各現場に
おける各工事の良否をチェック項目毎に一元的に把握
し、管理と改善に資することができ、建設工事における
工事の品質を向上し、建設工事における工事の品質管理
方法として有用である。
According to the present invention, at each work site, the quality of each of the above-mentioned works can be grasped for each check item, and at the same time, a worker who controls a plurality of sites checks the quality of each of the works at each site. It is possible to collectively grasp each item, contribute to management and improvement, improve the quality of construction work, and is useful as a quality control method for construction work.

【図面の簡単な説明】[Brief description of the drawings]

【図1】現場作業所と施工者とサーバーのネットワーク
図。
FIG. 1 is a network diagram of a work site, a constructor, and a server.

【図2】サーバー内でチェック項目の良否を集計し演算
する状態を説明する図。
FIG. 2 is a diagram illustrating a state in which the quality of check items is counted and calculated in a server.

【図3】チェックリストを例示する平面図。FIG. 3 is a plan view illustrating a checklist.

【図4】評価済みチェックリストを例示する平面図。FIG. 4 is a plan view illustrating an evaluated check list.

【符号の説明】[Explanation of symbols]

A 施工者の端末機 A1,A2,A3 作業現場の端末機 S サーバー C チェックリスト C′ 評価済みチェックリスト 1 工種 2 チェック項目 3 良否記入欄 4 工種記入欄 5 記録者 6 記録者記入欄 7 作業者 8 作業者記入欄 9 作業施工日 10 作業施工日記入欄 11 記録日 12 記録日記入欄 13 作業現場名 14 作業現場名記入欄 15 不良チェック項目の検出記録 16 不良チェック項目の集計 17 是正処置欄 A Contractor's terminal A1, A2, A3 Work site terminal S Server C Checklist C 'Evaluated checklist 1 Construction type 2 Check item 3 Pass / fail entry field 4 Construction entry field 5 Recorder 6 Recorder entry field 7 Work Person 8 Worker entry field 9 Work construction date 10 Work construction date entry field 11 Record date 12 Record date entry field 13 Work site name 14 Work site name entry field 15 Detection record of defect check items 16 Aggregation of defect check items 17 Corrective action Column

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 5B049 BB05 CC02 CC23 DD01 EE02 FF03 FF04 GG04 GG07 GG09 ──────────────────────────────────────────────────続 き Continued on the front page F term (reference) 5B049 BB05 CC02 CC23 DD01 EE02 FF03 FF04 GG04 GG07 GG09

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】建設工事におけるチェック項目を一覧にし
たチェックリストを用いて各作業現場毎に各チェック項
目における良否の評価を行い、該評価済みのチェックリ
ストを作業現場の端末機から通信回線を介してサーバー
に登録し、該サーバーにおいて各作業現場のチェックリ
ストに基づきチェック項目毎の不良率を演算して保存
し、該チェック項目毎の不良率を通信回線を介して施工
者の端末機により閲覧し、その不良率を各チェック項目
に対応する工事の改善に資することを特徴とする建設工
事における工事の品質管理方法。
An evaluation of pass / fail of each check item is performed for each work site using a check list listing check items in construction work, and the evaluated check list is transmitted from a terminal at the work site to a communication line. Via the server, calculate and save the defect rate for each check item based on the checklist at each work site, and store the defect rate for each check item by the installer's terminal via a communication line. A quality control method for construction work in which construction works are inspected and the defect rate is used to improve the work corresponding to each check item.
【請求項2】建設工事における工種毎のチェック項目を
一覧にしたチェックリストを用いて各作業現場毎に各チ
ェック項目における良否の評価を行い、該評価済みのチ
ェックリストを作業現場の端末機から通信回線を介して
サーバーに登録し、該サーバーにおいて各作業現場のチ
ェックリストに基づき各工種におけるチェック項目の不
良率を演算して保存し、該チェック項目毎の不良率とそ
の工種を通信回線を介して施工者の端末機により閲覧
し、その不良率を各チェック項目に対応する工種の改善
に資することを特徴とする建設工事における工事の品質
管理方法。
2. A pass / fail evaluation of each check item for each work site using a check list that lists check items for each type of construction in construction work, and the evaluated check list is sent from a terminal at the work site. Register to the server via the communication line, calculate and save the defect rate of the check item in each type of work based on the checklist of each work site in the server, and store the defect rate and the type of work for each check item in the communication line. A quality control method for construction in construction work, wherein the defect rate is browsed by a terminal of a constructor through the terminal and the defect rate is contributed to improvement of a construction type corresponding to each check item.
JP2000326895A 2000-10-26 2000-10-26 Method for controlling quality of building construction Pending JP2002132862A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2000326895A JP2002132862A (en) 2000-10-26 2000-10-26 Method for controlling quality of building construction
CN 01121136 CN1351304A (en) 2000-10-26 2001-06-05 QC control for constructioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000326895A JP2002132862A (en) 2000-10-26 2000-10-26 Method for controlling quality of building construction

Publications (1)

Publication Number Publication Date
JP2002132862A true JP2002132862A (en) 2002-05-10

Family

ID=18804011

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000326895A Pending JP2002132862A (en) 2000-10-26 2000-10-26 Method for controlling quality of building construction

Country Status (2)

Country Link
JP (1) JP2002132862A (en)
CN (1) CN1351304A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013109740A (en) * 2011-11-21 2013-06-06 Anabuki College Service:Kk Remote quality control system
JP2014157609A (en) * 2014-03-11 2014-08-28 Anabuki College Service:Kk Remote quality control system
JP7309103B1 (en) * 2023-02-28 2023-07-14 スパイダープラス株式会社 Pass/Fail Judgment System, Pass/Fail Judgment Method and Program
JP7316483B1 (en) * 2023-03-01 2023-07-27 スパイダープラス株式会社 Judgment result output system, judgment result output method and program
JP7320693B1 (en) * 2023-03-01 2023-08-03 スパイダープラス株式会社 ELECTRONIC SMALL BOARD OUTPUT SYSTEM, JUDGMENT RESULT OUTPUT METHOD AND PROGRAM

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626B (en) * 2011-11-29 2016-08-03 北京建龙重工集团有限公司 The online management method of engineering project
CN103136619B (en) * 2011-11-29 2016-01-27 北京建龙重工集团有限公司 The online management method of acceptance of engineering quality form
CN105590153A (en) * 2014-10-29 2016-05-18 张英杰 Building engineering quality examination system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002448U (en) * 1994-03-28 1994-09-27 ミサワホーム株式会社 Architectural check sheet
JPH08183273A (en) * 1994-12-28 1996-07-16 Misawa Homes Co Ltd Progress-managing book
JPH117473A (en) * 1997-06-16 1999-01-12 Shimizu Corp Construction execution management system
JP2000001986A (en) * 1998-06-15 2000-01-07 Fujita Corp Construction control system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3002448U (en) * 1994-03-28 1994-09-27 ミサワホーム株式会社 Architectural check sheet
JPH08183273A (en) * 1994-12-28 1996-07-16 Misawa Homes Co Ltd Progress-managing book
JPH117473A (en) * 1997-06-16 1999-01-12 Shimizu Corp Construction execution management system
JP2000001986A (en) * 1998-06-15 2000-01-07 Fujita Corp Construction control system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013109740A (en) * 2011-11-21 2013-06-06 Anabuki College Service:Kk Remote quality control system
JP2014157609A (en) * 2014-03-11 2014-08-28 Anabuki College Service:Kk Remote quality control system
JP7309103B1 (en) * 2023-02-28 2023-07-14 スパイダープラス株式会社 Pass/Fail Judgment System, Pass/Fail Judgment Method and Program
JP7316483B1 (en) * 2023-03-01 2023-07-27 スパイダープラス株式会社 Judgment result output system, judgment result output method and program
JP7320693B1 (en) * 2023-03-01 2023-08-03 スパイダープラス株式会社 ELECTRONIC SMALL BOARD OUTPUT SYSTEM, JUDGMENT RESULT OUTPUT METHOD AND PROGRAM

Also Published As

Publication number Publication date
CN1351304A (en) 2002-05-29

Similar Documents

Publication Publication Date Title
US7069333B1 (en) Method and systems for wireless communication for a field service system
US8473365B2 (en) Multiple-platform estimating and automatic quoting for network-based parts resale with transferable reports
US20030033260A1 (en) Method and apparatus for facilitating the repair of malfunctioning or inoperable products
CA2445942C (en) Account opening facilitation system, method and computer program product
US20110112943A1 (en) Location-based mobile workforce management system
US7702078B2 (en) Method, system and computer program product for facilitating the analysis of automatic line insulation testing data
US20040267577A1 (en) Method and apparatus for managing risk of disaster
US20080082515A1 (en) Methods and systems for initiating phone calls using a predictive dialer
US20080103958A1 (en) Construction bidding system and method
AU4064102A (en) End-to-end service delivery (post-sale) process
US20020107749A1 (en) Networked based paralleling switchgear equipment configuration process
BR112013007832A2 (en) automated printer control panel
JP2002132862A (en) Method for controlling quality of building construction
JP4539973B2 (en) Maintenance management method and maintenance management program
JP2006313492A (en) System and program for maintenance cost valuation of fishing tackle
CN113393167A (en) Maintenance order management method, device, equipment and storage medium
US20020091540A1 (en) Method and system for emergency assistance management
CN108876533A (en) Based on user's stroke vehicle annual test method, server-side, client and network-side
JP4034498B2 (en) Power reception plan creation support method
WO2001020491A2 (en) System and method for brokering rated services
Jordan Maintenance management
CN115222553A (en) System and method for guiding vehicle owner to access rescue service page and binding information
KR20010078817A (en) Method for remotely controlling car repair information and apparatus therefore