JP2002109003A - Rationalization supporting system in physical distribution center - Google Patents

Rationalization supporting system in physical distribution center

Info

Publication number
JP2002109003A
JP2002109003A JP2000303321A JP2000303321A JP2002109003A JP 2002109003 A JP2002109003 A JP 2002109003A JP 2000303321 A JP2000303321 A JP 2000303321A JP 2000303321 A JP2000303321 A JP 2000303321A JP 2002109003 A JP2002109003 A JP 2002109003A
Authority
JP
Japan
Prior art keywords
work
time
cost
product
distribution center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000303321A
Other languages
Japanese (ja)
Inventor
Takahiro Hoshino
孝寛 星野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Solvex Co
Original Assignee
Solvex Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Solvex Co filed Critical Solvex Co
Priority to JP2000303321A priority Critical patent/JP2002109003A/en
Publication of JP2002109003A publication Critical patent/JP2002109003A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a supporting system for suppressing or dissolving the stock of an inappropriate quantity to be the waste of costs and reducing and minimizing the costs of a physical distribution center from the ordering and arrival to shipping and delivery of merchandise in the physical distribution center. SOLUTION: In the physical distribution center, on the basis of the total costs required for the operation management, the cost per unit volume time of all merchandise storage parts in the center is calculated. A stock cost for each merchandise is obtained by multiplying with average stock time for each merchandise stocked in the physical distribution center and the volume of the storage part occupied by an average stock amount by the unit volume time cost. By simulation based on average total time required from the arrival to storage of each merchandise and the average stock time from the arrival to shipping calculated on the basis of the actual shipping result of each merchandise, the stock cost is minimized. Also, an ordering timing and an ordering quantity for which lead time for not generating merchandise shortage is taken into consideration are predicted and the merchandise is ordered to individual merchandise suppliers on the basis of the predicted values.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、物流センターにお
ける商品の発注,入荷,棚格納,保管などから商品の受
注とその出荷,配送までに行われる一連の物流作業を、
コスト面並びに作業効率面から合理化するための支援シ
ステムに関する。
BACKGROUND OF THE INVENTION The present invention relates to a series of logistics operations from ordering, receiving, storing on a shelf, and storing goods in a distribution center to receiving and receiving and shipping goods.
The present invention relates to a support system for rationalizing costs and work efficiency.

【0002】[0002]

【従来の技術】一例として、カート式ピッキング作業な
ど人手による作業を主体に運営される物流センターでの
すべての作業を考察すると、商品の発注,入荷,格納,
商品出荷の受注,仕分(ピッキング)、出荷,荷合せ検
品,出荷,配送,納品といった作業形態を経て、各商品
を取扱う物流作業が流れ、その間に、商品の補充格納や
棚卸、或は、在庫管理といった管理面の作業がある。
2. Description of the Related Art As an example, consider all operations in a distribution center mainly operated by manual operations such as cart-type picking operations.
The logistics work dealing with each product flows through work forms such as order receipt of goods, sorting (picking), shipping, assortment inspection, shipping, delivery, and delivery. During that time, product replenishment storage, stocktaking, or inventory There are administrative tasks such as management.

【0003】そして、上記の各作業に当っては、作業前
に作業データを作成してこのデータを仕分けし、作業中
には欠品があればそのデータを作成し、作業後には作業
結果データに基づく基礎データを修正するための入力や
その入力データの読合せ照合などを行っている。上記に
おける各作業のデータの作成,修正やその入力は各作業
員の端末(パソコン等)から行い、図示しない管理コン
ピュータ、又は、ホストコンピュータに送られる。この
点は、以下における各データについても同様である。ま
た、作業結果データは、次の作業の基礎データになるの
で、データの入力ミスや入力遅れがあると、次の作業開
始が遅れたり、次の作業ミスの原因になったり、各作業
区分に対する作業者配置と時間に粗齬を来たすと各作業
区分に荷溜りを起して、大きなコストロスを招くおそれ
が多い。このような各作業について、より詳しく考察し
てみる。
[0003] In each of the above-mentioned operations, work data is created before the work, the data is sorted, and if there is a missing item during the work, the data is created. It performs input for correcting basic data based on XML and performs collation and collation of the input data. The creation, correction, and input of the data of each operation in the above are performed from each worker's terminal (a personal computer or the like) and sent to a management computer or a host computer (not shown). This applies to the following data. Also, since the work result data is the basic data for the next work, if there is a data input error or input delay, the next work start will be delayed, the next work error will be caused, If there is a rough discrepancy between the worker arrangement and the time, a load is generated in each work section, which often leads to a large cost loss. Let us consider each of these tasks in more detail.

【0004】まず、発注した商品が入荷すると、発注デ
ータと入荷商品を照合する検品を行い、その結果を入荷
商品データとして、基礎データが格納されている管理コ
ンピュータ或はホストコンピュータなどに入力する。
First, when an ordered product is received, an inspection is performed to compare the order data with the received product, and the result is input as received product data to a management computer or a host computer that stores basic data.

【0005】入荷商品の棚や台への格納については、個
々の商品とその指定格納位置を照合し、データの紐付け
を行うことにより格納検品とそのデータ入力を行う。仕
分(ピッキング)については、ピッキングと同時に検品
を行い、同時にそのデータ入力を行う。また、補充格納
に関しては、補充用商品格納部から補充すべき商品とそ
の数量をピッキング検品し、指定補充先へ補充するため
の補充検品とそのデータ入力を行う。出荷においては、
仕向先ごとに出荷数とその内容の検品、並びにそのデー
タ入力を行う。このように物流センターでは各作業ごと
に、その作業時の検品とデータ入力が不可欠である。
[0005] When storing the received goods on shelves or tables, the stored goods are checked and their data input by collating the individual goods with their designated storage positions and linking the data. For sorting (picking), inspection is performed at the same time as picking, and data is input at the same time. As for replenishment storage, picking inspection is performed on the commodities to be replenished and their quantity from the replenishment commodities storage unit, and replenishment inspection for replenishment to a designated replenishment destination and data input are performed. In shipping,
The number of shipments and their contents are inspected for each destination, and their data are input. Thus, in the distribution center, inspection and data input at the time of each operation are indispensable for each operation.

【0006】一方、在庫管理については、入荷から出荷
までの間において当該物流センターにおける各商品とそ
の在庫数量が基本データになるが、在庫している商品の
数量がユーザーからの出荷受注に対して欠品のない出荷
を可能にすると共に、デッドストックを最小限に止どめ
ることが可能な商品発注のタイミング,発注数量、並び
に在庫数量を保持する必要がある。
[0006] On the other hand, in the case of inventory management, during the period from arrival to shipment, each commodity in the distribution center and its stock quantity become basic data. It is necessary to maintain the timing of ordering goods, the quantity ordered, and the stock quantity, which enable shipping without shortage and minimize dead stock.

【0007】他方、棚卸に関しては、在庫管理における
最新の商品データ(商品名、その数量等)と棚卸時点の
商品データが一致するはずであるが、実際には一致しな
いことが多く、また、決算棚卸では、出荷作業等を一日
以上休止し、多数の作業員を動員して相当な時間をかけ
て行われているため、凡そ合理的とはいえない現状があ
る。
On the other hand, with regard to inventory, the latest product data (product name, quantity thereof, etc.) in inventory management should match the product data at the time of stocktaking. In stocktaking, shipping operations and the like are suspended for one day or more, and a large number of workers are mobilized to take a considerable amount of time.

【0008】上記のような物流センターでの作業実状の
下において、その物流センターに商品出荷を求めてくる
顧客のうち、コンビニエンスストアや一部のスーパーマ
ーケットでは、年中無休かつ24時間営業といった営業
形態をとっているため、従来にはなかった時間帯での出
荷注文がなされることも生じて来たが、上記のように出
荷作業を休止して棚卸しを行うような物流センターでの
作業実態下においては、年中無休のユーザーからの出荷
注文には事実上対応することができないか、又は、お座
なりな棚卸をして対応するしかない。
[0008] Under the above-mentioned actual situation of the work at the distribution center, of the customers who request the distribution center to ship products, convenience stores and some supermarkets are open 24 hours a day, 7 days a week. As a result, shipping orders may be placed at times that were not possible in the past. In the above, it is virtually impossible to respond to a shipping order from a user who is open all year round, or there is no other way but to respond by taking a lazy inventory.

【0009】このような物流センターにおける作業状況
の現状を要約すると、在庫のための商品発注から顧客か
らの受注,出荷,配送までの各作業において、作業括り
ごとの連繋が取れていないため、例えば発注商品の入
荷,格納、或は、出荷,検品,仕向先配送などの作業括
り毎における作業開始位置に取扱い商品が山積された滞
貨状態になるという問題があり、また、配送トラックが
荷積み,待機を行う出荷ヤードは、出荷が一時に集中す
るため広大なスペースを取っているが、出荷作業が終わ
るとその広大なヤードは遊休状態になり、それが無駄な
コストを生む要因にもなっている。
[0009] Summarizing the current state of work in such a distribution center, in each work from ordering goods for inventory to receiving orders from customers, shipping and delivery, there is no coordination for each work group. There is a problem that the handling products are piled up at the work start position in each work consolidation, such as receiving, storing, or shipping, inspection, and destination delivery of the ordered products. , Shipment yards that take a stand-by take a large space because shipments are concentrated at one time, but when the shipment work is completed, the vast yards become idle, which causes unnecessary costs. ing.

【0010】[0010]

【発明が解決しようとする課題】本発明は上記のような
物流センターにおける商品の発注入荷から出荷配送まで
において、無駄なコストになる不適切な数量の在庫状況
を抑制乃至は解消し、また、適正在庫量や合理的な出荷
タイミングを実現する上での要件となる各商品の発注タ
イミングや発注数量、或は、各作業区分の合理的連繋を
実現し、当該物流センターのコスト低減化並びに最小化
するための支援システムを提供することを、その課題と
するものである。
SUMMARY OF THE INVENTION The present invention suppresses or eliminates the situation of inadequate quantities of inventory that results in wasteful costs from the inflow of goods to the delivery of goods in the distribution center as described above. The ordering timing and order quantity of each product, which is a requirement for realizing the appropriate inventory amount and reasonable shipping timing, or the rational linking of each work section, realizes the cost reduction and minimum It is an object of the present invention to provide a support system for realizing the system.

【0011】[0011]

【課題を解決するための手段】上記課題を解決すること
を目的としてなされた本発明支援システムの構成は、物
流センターにおいてその運用経営に要するすべてのコス
トに基づいて、当該センターにおける全ての商品格納部
の単位容積時間当りのコストを算出し、この物流センタ
ーに在庫する各商品について平均在庫時間と平均在庫量
が占める格納部の容積に前記単位容積時間コストを掛け
て各商品ごとの在庫コストを求め、各商品の入荷から格
納に要した平均延べ時間と、各商品の出荷実績に基づき
算出される入荷から出荷までの平均在庫時間に基づくシ
ミュレーションによって、前記在庫コストを最小にし、
かつ、欠品を生じさせないリードタイムを考慮した発注
タイミングと発注数量を予測し、この予測値に基づいて
各商品仕入先に商品の発注をすることを、第一の特徴と
するものである。
SUMMARY OF THE INVENTION The purpose of the present invention is to solve the above-mentioned problems, and the configuration of the support system of the present invention is based on all costs required for the operation and management of a distribution center. The cost per unit volume time of each product is calculated, and the inventory cost for each product is obtained by multiplying the storage volume occupied by the average stock time and the average stock amount for each product stocked in this distribution center by the unit volume time cost. Calculated, the average total time required for storage from the arrival of each product, and the simulation based on the average inventory time from arrival to shipment calculated based on the shipping performance of each product, to minimize the inventory cost,
The first feature is to predict the order timing and order quantity in consideration of a lead time that does not cause a shortage, and to order a product to each product supplier based on the predicted value. .

【0012】また、上記課題を解決できる本発明支援シ
ステムの他の構成は、物流センターにおける商品の発
注,入荷から受注,出荷までの一連の物流作業を、(イ)
発注,(ロ)入荷,(ハ)格納,(ニ)受注,(ホ)ピッキン
グ,(ヘ)出荷,(ト)配送,(チ)補充格納をそれぞれ一括
りとする作業区分に分け、各作業区分(イ)〜(チ)の夫々
において取扱う数量の商品について、その商品データの
照合,検品,格納,ピッキング,作業結果データの入力
などの各作業を平均的能力の作業員1人が行った場合の
予測作業時間、又は、各作業員ごとの予測作業時間を、
各作業について過去の実績データに基づきシミュレーシ
ョンを実行して形成し、実際の商品の発注,入荷から出
荷,配送までの前記(イ)〜(チ)の作業区分における各作
業に当り、取扱う商品数量と前記のシミュレーションし
た予測作業時間に基づいて、各作業に携わる作業者及び
/又は作業員数を設定すると共に予定作業時間を設定
し、各作業の重複を回避しつつ各作業の荷溜まりのない
連繋を可能にすることを、第二の特徴とするものであ
る。
Another configuration of the support system according to the present invention which can solve the above-mentioned problem is that a series of logistics work from ordering and receiving goods to receiving and shipping in a distribution center is performed by (a).
Orders, (b) receiving, (c) storing, (d) receiving orders, (e) picking, (f) shipping, (g) delivery, and (h) replenishing storing are all divided into work categories, and each work For each product of the quantity handled in each of the categories (a) to (h), one worker of average ability performed each work such as verification of product data, inspection, storage, picking, and input of work result data. The estimated work time, or the estimated work time for each worker,
For each operation, a simulation is performed based on the past performance data, and it is formed. The number of products handled in each of the operations in (a) to (h) above from actual product ordering, receiving to shipping, and delivery. Based on the simulated estimated work time, the number of workers and / or the number of workers involved in each work are set and the scheduled work time is set. Is a second feature.

【0013】更に、本発明支援システムでは、適宜数量
の商品を取扱う各作業区分(イ)〜(チ)が物流センター内
で占有する面積で当該センターの構築に要した費用を割
った占有面積当りのコスト,使用機器類のコスト,作業
者及び/又は作業員数と作業時間による人件費など、各
作業に要するすべてのコストに基づいて、各作業区分
(イ)〜(チ)の単位数量商品当りの作業コストを算出し、
この単位作業コストに基づくシミュレーションを行っ
て、実際の商品を取扱う各作業の作業コストを最小化し
つつ各作業区分(イ)〜(チ)の作業が重複しないように作
業者及び/又は作業員数と作業時間の予測及びスケジュ
ールを行い、作業者及び/又は作業員数と作業時間を設
定することを、第三の特徴とするものである。
Further, in the support system of the present invention, each work division (a) to (h) handling an appropriate number of commodities occupies an area occupied in a distribution center, and occupies an area occupied by dividing the cost required for building the center. Each work category is based on all costs required for each work, such as the cost of equipment, the cost of equipment to be used, and the labor cost based on the number of workers and / or workers and work time.
Calculate the work cost per unit quantity product (a) to (h),
A simulation based on this unit work cost is performed, and the number of workers and / or workers is set so that the work of each work category (a) to (h) is not duplicated while minimizing the work cost of each work handling actual products. The third feature is that the work time is predicted and scheduled, and the number of workers and / or workers and the work time are set.

【0014】[0014]

【発明の実施の形態】次に本発明支援システムの実施形
態の例について説明する。物流センターにおける商品発
注,入荷から受注,出荷まで、並びに、これらに付帯す
る諸々の業務コストは、当該センターの運営,経営の基
礎となる土地代、建屋代、設備機器等の購入又は賃借
費、種々の機器等のリース料、営繕補修費などを含む物
流センターの維持,管理に要する諸々の一切の費用や人
件費などにより構成されるので、この業務コストは、そ
の物流センターにおける商品格納部の全容積に対応させ
ると、格納部の単位容積当りのコストとして算出でき
る。また、前記業務コストは、当該センターの例えば稼
働時間/月に対応させると、この例では一ヶ月の期間に
おける単位稼動時間当りのコストとして算出することが
できる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an example of an embodiment of the support system of the present invention will be described. From the ordering and receipt of goods at the distribution center to the order receipt and shipping, and the various business costs incidental to these, the costs of purchasing or renting land, building, equipment, etc., which are the basis of operation and management of the center, This business cost is composed of all expenses required for the maintenance and management of the distribution center, including leasing fees for various equipment, maintenance and repair costs, etc., and personnel costs. If it corresponds to the total volume, it can be calculated as the cost per unit volume of the storage unit. Further, if the business cost is made to correspond to, for example, the operating hours / month of the center, in this example, it can be calculated as the cost per unit operating time in a one-month period.

【0015】このことから、物流センターに在庫してい
る各商品について、それらの商品が占有している格納部
の容積と平均在庫時間により、各商品ごとの在庫コスト
が算出できる。そして、商品の入荷、その格納からその
商品を受注して出荷するまでが長時間(長期間)になる
と、その商品の在庫コストは大きくなるので、在庫時間
(期間)は短い方が望ましい。しかし、在庫期間(時
間)が短かいと、商品発注,その入荷,格納と、ピッキ
ング,出荷の作業が頻繁になったり、欠品が生じるなど
のリスクが生じ易くなる。
[0015] From this, for each product in stock at the distribution center, the inventory cost of each product can be calculated from the volume of the storage unit occupied by those products and the average stock time. If the time from receiving and storing the product to receiving the product and receiving the product for a long time (long time) increases the inventory cost of the product, the inventory time (period) is preferably shorter. However, if the stock period (time) is short, risks such as frequent work of ordering the goods, receiving and storing the goods, picking and shipping, and occurrence of shortage are likely to occur.

【0016】本発明では、このような点に鑑み、各商品
についての過去の例えば一定期間における平均在庫時
間、並びに、入荷,出荷の回数(頻度)に基づいてシミ
ュレーションを行い、リードタイムを考慮して欠品が生
じない発注タイミングと発注数量を求め、この発注形態
を実行することにより、物流センターの運営コストがミ
ニマムとなるようにする。
In the present invention, in view of such a point, a simulation is performed on the basis of the past average stock time of each product, for example, in a certain period, and the number of times of receiving and shipping (frequency), and the lead time is taken into consideration. By determining the order timing and the order quantity at which no shortage occurs, and by executing this order form, the operating cost of the distribution center is minimized.

【0017】物流センターでは、複数の顧客からランダ
ムなタイミングで寄せられる商品特性が様々に異なる多
種多様な商品の出荷注文(受注,出荷)に、常時過不足
なく応じることができるようにするため、当該センター
内の商品格納部には、その物流センターに在庫するすべ
ての商品について、各商品の出荷特性又は受注特性や商
品特性、例えば、季節商品、大形商品、箱詰商品、バラ
商品、高頻度出荷商品などに合わせた適正な在庫量を確
保しなければならないが、前記のシミュレーションを行
うことにより、これが可能になる。
In the distribution center, in order to be able to always respond to shipping orders (orders, shipments) of various kinds of goods with variously different merchandise characteristics received from a plurality of customers at random timing, without any excess or shortage. The merchandise storage unit in the center stores, for all the merchandise in stock at the distribution center, the shipping characteristics or order receiving characteristics and merchandise characteristics of each merchandise, such as seasonal products, large-sized products, boxed products, loose products, and high-quality products. Although it is necessary to secure an appropriate inventory amount according to frequently-shipped products, this can be achieved by performing the above-described simulation.

【0018】従って、上記物流センターでは、メーカー
等の商品を供給する仕入先に、当該センターの適正在庫
量,在庫期間を実現できるリードタイムを考慮した適切
なタイミングで商品の発注を行い、入荷した商品を所定
の格納部に格納するという、前記作業区分(イ)〜(ハ)の
発注,入荷,格納の各作業を行えばよい。
Therefore, in the above-mentioned distribution center, an order is placed at the appropriate timing in consideration of a lead time for realizing an appropriate stock amount and a stock period of the center to a supplier who supplies a product such as a maker. The operations of ordering, receiving, and storing in the work categories (a) to (c), that is, storing the product in a predetermined storage unit, may be performed.

【0019】上記の作業区分(イ) 〜(ハ)の作業では、
まず商品発注に先立ち作業データを発注先別に仕分け、
作業中に欠品が見出されれば欠品データを作成しこれも
加えて発注を行う。発注後は発注結果のデータを発注デ
ータとしてホストコンピュータ等の管理コンピュータに
入力しておく。
In the above-mentioned work categories (a) to (c),
First of all, the work data is sorted by supplier before ordering the goods.
If a missing item is found during the operation, missing item data is created, and an order is also made. After the order, the data of the order result is input to a management computer such as a host computer as order data.

【0020】次に、発注商品の入荷があると、発注デー
タと入荷した現品を逐一照合する入荷検品を行ってその
結果データを入力し、入荷商品の格納作業においては、
各商品とそれらの指定された格納位置との照合を行って
商品データと格納位置データの紐付けを行い、格納検品
と紐付けデータの入力を行う。このようにして発注商品
の格納が行われる。
Next, when an ordered product is received, an incoming inspection is performed to sequentially compare the order data with the received actual product, and the result data is input. In the storing operation of the received product,
The merchandise data and the storage position data are linked by comparing each product with the designated storage position, and the stored inspection and the link data are input. In this way, the ordered products are stored.

【0021】上記の商品発注から棚格納までの、作業区
分(イ) 〜(ハ)の各作業は、先にシミュレートして設定
した発注タイミングで商品発注がなされ、また、設定し
た作業者及び/又は作業員数によって入荷検品や格納の
各作業が、設定した作業時間を目標に実行される。
In each of the work categories (a) to (c) from the ordering of the goods to the storage of the goods, the ordering of the goods is made at the ordering timing set in advance by simulation. Each work of receiving inspection and storage is performed with a set work time as a target depending on the number of workers.

【0022】一方、前記の棚格納作業が終了すると、作
業区分(ニ),(ホ)のユーザー等からの出荷受注とこの受
注に応じるためにピッキング作業が行われる。この
(ニ),(ホ)の区分作業においても作業前に受注データか
らピッキングデータが形成され、それらのデータはそれ
ぞれコンピュータに入力される。そして、カートなどを
使用したピッキング作業と該ピッキング作業と同時に検
品を行いそのデータの入力も行われる。この区分(ニ),
(ホ)の各作業も、先に行われたシミュレーションに基づ
いて、受注に基づいた取扱い商品数量に鑑み設定される
作業者及び/又は作業員数と予定作業時間において行わ
れるものである。なお、上記の格納作業とピッキング作
業を、同時に行う場合もある。
On the other hand, when the above-mentioned shelf storage operation is completed, a shipping order from a user or the like in the operation categories (d) and (e) and a picking operation are performed to meet the order. this
In the sorting operations (d) and (e), picking data is formed from the order data before the operation, and these data are input to the computer. Then, a picking operation using a cart or the like and an inspection at the same time as the picking operation are performed, and the data is input. This category (d),
Each of the operations (e) is also performed based on the simulation performed earlier, with the number of workers and / or workers set in consideration of the number of products handled based on the order and the scheduled work time. Note that the storing operation and the picking operation may be performed simultaneously.

【0023】上記のピッキング作業が終ると、原則とし
て作業区分(チ)の商品の補充格納が行われる。この補充
作業は、例えば、ピッキング棚とは別に形成された補充
商品のストック部から補充すべき在庫商品を抽出し、そ
の商品をピッキング用の指定格納位置に収めるものであ
るから、正確に補充すべき商品とその数量とが指定位置
に補充されなければならない。これを検証するため補充
検品と補充データの入力とが行われる。この作業も予め
行われたシミュレーションに基づいて取扱う商品数量と
作業に許される時間から充当する作業者及び/又は作業
員数を設定し、予定作業時間内の終了を目指して行われ
る。
When the above picking operation is completed, in principle, replenishment and storage of commodities in the operation category (h) are performed. This replenishment work involves, for example, extracting stock items to be replenished from a stock part of replenished products formed separately from the picking shelf and storing the products in a designated storage position for picking, so that replenishment is performed accurately. The goods to be delivered and their quantity must be replenished to the designated location. In order to verify this, replenishment inspection and input of replenishment data are performed. This work is also performed with the aim of ending within the scheduled work time by setting the number of workers and / or workers to be allocated based on the quantity of goods handled and the time allowed for the work based on a simulation performed in advance.

【0024】上記のピッキング作業で格納部から取出さ
れた商品は、作業区分(ヘ),(ト)の出荷作業と配送作業
において仕向先ごとに出荷する商品の数量とその検品が
行われて出荷データの入力が行われ、配送順位の逆順に
各仕向先のトラックに積込まれ配送される。この区分
(ヘ),(ト)の作業も予めシミュレートされたデータに基
づいて作業者及び/又は作業員数が設定され、予定時間
内に終了するように作業が進められる。
The goods taken out of the storage unit by the picking operation are shipped after the quantity of the goods to be shipped for each destination in the shipping work and the delivery work in the work categories (f) and (g) and the inspection is performed. Data is input, loaded into trucks of each destination in the reverse order of delivery order, and delivered. This category
In the operations (f) and (g), the number of workers and / or the number of workers are set based on data simulated in advance, and the work is performed so as to be completed within a scheduled time.

【0025】上述のように、物流センターで行われる各
作業区分(イ)〜(チ)の各作業は、各作業区分(イ)〜(チ)
の作業がすべて、或は、この中のいくつかの区分の作業
が、一日のうちに何度も行われるので、本発明では行わ
れる作業区分(イ)〜(チ)の各作業で取扱う商品数量と各
作業に携さわる作業者及び/又は作業員数とその人達に
より作業して予定される作業時間とを、各作業ごとに過
去の実績データに基づくシミュレーションにより、作業
者及び/又は作業員数の違いと夫々の作業者及び/又は
作業員数による作業時間を予測し、このシミュレーショ
ンの結果に基づいて、各作業区分(イ)〜(チ)の重複作業
がない、或は、作業員の不足又は余剰(待機)がないよ
うに、各作業区分(イ)〜(チ)の各作業を担当する作業者
及び/又は作業員の人数を設定し、各作業時間を設定す
るのである。
As described above, each work in each of the work divisions (a) to (h) performed in the distribution center corresponds to each of the work divisions (a) to (h).
All of the above operations or some of these operations are performed many times a day, so the present invention deals with each of the operations (a) to (h) performed. The number of workers and / or workers involved in each work and the number of workers and / or the number of workers to be worked on by each worker are calculated by simulation based on past performance data for each work. And the work time of each worker and / or the number of workers is predicted, and based on the result of this simulation, there is no overlapping work in each of the work sections (a) to (h), or there is a shortage of workers. Alternatively, the number of workers and / or the number of workers in charge of each work in each of the work categories (a) to (h) is set so that there is no surplus (standby), and each work time is set.

【0026】[0026]

【発明の効果】上記の本発明手法によれば、過去の実績
データに基づいて各作業区分(イ)〜(チ)の夫々の作業に
当る作業者及び/又は作業員の人数を設定し、スケデュ
ーリングすることにより作業時間を適切に予測できるこ
とになるから、従来物流センターで行われていた各作業
区分(イ)〜(チ)の各作業は、殆んど連繋することのない
区々の作業態様であったが、各作業において担当する作
業員が不適当であったり、或は、作業員数が過剰であっ
たり不足することにより生じていた人的無駄や作業渋滞
など不合理な現象を解消することができる。
According to the method of the present invention described above, the number of workers and / or the number of workers in each of the work categories (a) to (h) is set based on the past performance data, The work time can be appropriately predicted by scheduling, so the work in each of the work categories (a) to (h) conventionally performed in the distribution center is divided into sections that are hardly linked. However, unreasonable phenomena such as human waste and work congestion caused by the inadequate number of workers in each work, or the excessive or insufficient number of workers. Can be eliminated.

【0027】また、本発明支援システムでは、商品の発
注から受注出荷までの各作業区分(イ)〜(チ)の各作業ご
とに、作業結果となる取扱い商品数量などの商品デー
タ、携わった作業者と人数、その作業時間などのデータ
を実績データとして管理コンピュータに入力することに
より、次のシミュレーション精度を高くすることができ
ると共に、その物流センターにおけるすべての商品の在
庫数を、常時、各作業の進行に伴いリアルタイムで更新
しつつ補正できるから、いつでも任意のタイミングで各
商品について現在の在庫数を補捉することができること
となり、従って、棚卸作業の大幅な合理化を図ることも
可能になる。
Further, in the support system of the present invention, for each operation in each of the work categories (a) to (h) from the ordering of the product to the shipment of the order, the product data such as the number of handled products which is the work result, the work involved The following simulation accuracy can be improved by inputting data such as the number of workers, the number of people, and the work time to the management computer as actual data, and the number of stocks of all products in the distribution center can be constantly calculated for each work. Can be corrected while updating in real time with the progress of the process, the current stock quantity of each product can be captured at any time at any time, and therefore, it is also possible to significantly streamline the inventory work.

【0028】この結果、本発明支援システムを採用した
物流センターでは、当該センター内での各作業を連繋し
て行うことが可能になるので、人件費や作業コストの無
駄を抑制できて運営コストの大幅な低減化を享受でき
る。
As a result, in the logistics center employing the support system of the present invention, it becomes possible to perform each work in the center in a linked manner, so that it is possible to suppress the waste of the labor cost and the work cost and to reduce the operation cost. A significant reduction can be enjoyed.

【0029】また、常時、各作業時にリアルタイムで在
庫する商品名、その数量などの商品データが管理コンピ
ュータ内で更新されるから、在庫管理の合理化は勿論、
期末棚卸業務も迅速な対応が可能になり、従って、年中
無休、24時間営業態勢の顧客からのランダムを受注に
も対応可能になるというメリットが得られる。
In addition, since the product data such as the product name and the quantity of the product to be stocked in real time at each work is constantly updated in the management computer, the inventory management can be streamlined.
The stocktaking operation at the end of the term can be promptly dealt with, and therefore, there is an advantage that it is possible to respond to random orders from customers who are open 24 hours a day, 7 days a week.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 物流センターにおいてその運用経営に要
するすべてのコストに基づいて、当該センターにおける
全ての商品格納部の単位容積時間当りのコストを算出
し、この物流センターに在庫する各商品について平均在
庫時間と平均在庫量が占める格納部の容積に前記単位容
積時間コストを掛けて各商品ごとの在庫コストを求め、
各商品の入荷から格納に要した平均延べ時間と、各商品
の出荷実績に基づき算出される入荷から出荷までの平均
在庫時間に基づくシミュレーションによって、前記在庫
コストを最小にし、かつ、欠品を生じさせないリードタ
イムを考慮した発注タイミングと発注数量を予測し、こ
の予測値に基づいて各商品仕入先に商品の発注をするこ
とを特徴とする、物流センターにおける合理化支援シス
テム。
1. A cost per unit volume time of all merchandise storage units in a distribution center is calculated based on all costs required for operation and management in the distribution center. Multiplying the storage volume occupied by the time and the average inventory amount by the unit volume time cost to obtain an inventory cost for each product,
The simulation based on the average total time required for storing each product from receipt to storage and the average inventory time from receipt to shipment calculated based on the actual shipment results of each product minimizes the inventory cost and causes a shortage. A rationalization support system in a distribution center, wherein an order timing and an order quantity are predicted in consideration of a lead time that is not allowed to be performed, and a product order is placed to each product supplier based on the predicted value.
【請求項2】 物流センターにおける商品の発注,入荷
から受注,出荷までの一連の物流作業を、(イ)発注,
(ロ)入荷,(ハ)格納,(ニ)受注,(ホ)ピッキング,(ヘ)
出荷,(ト)配送,(チ)補充格納をそれぞれ一括りとする
作業区分に分け、各作業区分(イ)〜(チ)の夫々において
取扱う数量の商品について、その商品データの照合,検
品,格納,ピッキング,作業結果データの入力などの各
作業を平均的能力の作業員1人が行った場合の予測作業
時間、又は、各作業員ごとの予測作業時間を、各作業に
ついて過去の実績データに基づきシミュレーションを実
行して形成し、実際の商品の発注,入荷から出荷,配送
までの前記(イ)〜(チ)の作業区分における各作業に当
り、取扱う商品数量と前記のシミュレーションした予測
作業時間に基づいて、各作業に携わる作業者及び/又は
作業員数を設定すると共に予定作業時間を設定し、各作
業の重複を回避しつつ各作業の荷溜まりのない連繋を可
能にすることを特徴とする、物流センターにおける合理
化支援システム。
2. A series of logistics work from ordering and receiving goods to receiving and shipping at a distribution center is performed by (a) ordering,
(B) Receiving, (c) storing, (d) receiving orders, (e) picking, (f)
The shipping, (g) delivery, and (h) replenishment and storage are divided into work categories, and the number of products handled in each of the work categories (a) to (h) is checked for product data collation, inspection, Estimated work time when one worker of average ability performed each work such as storage, picking, and input of work result data, or the estimated work time for each worker, and past actual data for each work Based on the above, the simulation is performed to form the actual product, and in each of the operations in (a) to (h) above, from ordering, receiving to shipping, and delivery of the actual product, the number of products to be handled and the simulated predicted work described above. Based on the time, the number of workers and / or the number of workers involved in each work is set and the scheduled work time is set, so that duplication of each work can be avoided and connection of each work without accumulation is enabled. Toss , Rationalization support system in distribution centers.
【請求項3】 適宜数量の商品を取扱う各作業区分(イ)
〜(チ)が物流センター内で占有する面積で当該センター
の構築に要した費用を割った占有面積当りのコスト,使
用機器類のコスト,作業者及び/又は作業員数と作業時
間による人件費など、各作業に要するすべてのコストに
基づいて、各作業区分(イ)〜(チ)の単位数量商品当りの
作業コストを算出し、この単位作業コストに基づくシミ
ュレーションを行って、実際の商品を取扱う各作業の作
業コストを最小化しつつ各作業区分(イ)〜(チ)の作業が
重複しないように作業者及び/又は作業員数と作業時間
の予測及びスケジューリングを行い、作業者及び/又は
作業員数と作業時間を設定することを特徴とする、物流
センターにおける合理化支援システム。
3. Each work category that handles an appropriate number of products
The cost per occupied area obtained by dividing the cost required for building the center by the area occupied by (h) in the distribution center, the cost of the equipment used, the labor cost due to the number of workers and / or workers and the work time, etc. Based on all costs required for each work, calculate the work cost per unit quantity product of each work category (a) to (h), handle the actual product by performing a simulation based on this unit work cost Predict and schedule the number of workers and / or the number of workers and the work time so as to minimize the work cost of each work and avoid duplication of the work in each of the work categories (a) to (h). Rationalization support system in a distribution center, characterized by setting work hours.
JP2000303321A 2000-10-03 2000-10-03 Rationalization supporting system in physical distribution center Pending JP2002109003A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000303321A JP2002109003A (en) 2000-10-03 2000-10-03 Rationalization supporting system in physical distribution center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000303321A JP2002109003A (en) 2000-10-03 2000-10-03 Rationalization supporting system in physical distribution center

Publications (1)

Publication Number Publication Date
JP2002109003A true JP2002109003A (en) 2002-04-12

Family

ID=18784535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000303321A Pending JP2002109003A (en) 2000-10-03 2000-10-03 Rationalization supporting system in physical distribution center

Country Status (1)

Country Link
JP (1) JP2002109003A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007257272A (en) * 2006-03-23 2007-10-04 Fujitsu Ltd Cost information providing program
JP2007276935A (en) * 2006-04-04 2007-10-25 Susumu Iida System for supporting inspection of delivered articles and inventory during article inspection by using computer in distributor such as supermarket
JPWO2007060985A1 (en) * 2005-11-24 2009-05-07 新日鉄ソリューションズ株式会社 Production resource management system, evaluation value calculation method and program
JP2013164645A (en) * 2012-02-09 2013-08-22 Mitsubishi Electric Corp Information output device, information output method, and program
JP2017199282A (en) * 2016-04-28 2017-11-02 三菱重工業株式会社 Arrangement manner selection system, arrangement manner selection method and program
JPWO2016148027A1 (en) * 2015-03-18 2017-12-28 日本電気株式会社 Information processing apparatus, ordering support method, and support method
CN111401619A (en) * 2020-03-10 2020-07-10 杭州网易再顾科技有限公司 Purchase order processing method and device, electronic equipment and storage medium
CN112669099A (en) * 2019-10-15 2021-04-16 北京京东乾石科技有限公司 Method and device for processing orders
CN113298451A (en) * 2020-04-30 2021-08-24 阿里巴巴集团控股有限公司 Distribution method, distribution device, distribution equipment and storage medium
WO2023204336A1 (en) * 2022-04-21 2023-10-26 쿠팡 주식회사 Operating method of electronic device for providing information, and electronic device supporting same

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2007060985A1 (en) * 2005-11-24 2009-05-07 新日鉄ソリューションズ株式会社 Production resource management system, evaluation value calculation method and program
JP2007257272A (en) * 2006-03-23 2007-10-04 Fujitsu Ltd Cost information providing program
JP2007276935A (en) * 2006-04-04 2007-10-25 Susumu Iida System for supporting inspection of delivered articles and inventory during article inspection by using computer in distributor such as supermarket
JP4555795B2 (en) * 2006-04-04 2010-10-06 勧 飯田 A system that supports the inspection of delivered products and inventory at the time of inspection in the distribution industry such as supermarkets using computers.
JP2013164645A (en) * 2012-02-09 2013-08-22 Mitsubishi Electric Corp Information output device, information output method, and program
JPWO2016148027A1 (en) * 2015-03-18 2017-12-28 日本電気株式会社 Information processing apparatus, ordering support method, and support method
JP2017199282A (en) * 2016-04-28 2017-11-02 三菱重工業株式会社 Arrangement manner selection system, arrangement manner selection method and program
CN112669099A (en) * 2019-10-15 2021-04-16 北京京东乾石科技有限公司 Method and device for processing orders
CN111401619A (en) * 2020-03-10 2020-07-10 杭州网易再顾科技有限公司 Purchase order processing method and device, electronic equipment and storage medium
CN111401619B (en) * 2020-03-10 2023-06-27 杭州网易再顾科技有限公司 Purchasing order processing method and device, electronic equipment and storage medium
CN113298451A (en) * 2020-04-30 2021-08-24 阿里巴巴集团控股有限公司 Distribution method, distribution device, distribution equipment and storage medium
WO2023204336A1 (en) * 2022-04-21 2023-10-26 쿠팡 주식회사 Operating method of electronic device for providing information, and electronic device supporting same

Similar Documents

Publication Publication Date Title
US11403585B2 (en) Gateway balancing
Ramaa et al. Impact of warehouse management system in a supply chain
Zhang et al. Returnable packaging management in automotive parts logistics: Dedicated mode and shared mode
AU2008282178B2 (en) Transportation management system
US20090048987A1 (en) System and Method for Optimizing the Loading of Shipping Containers
JP2002109003A (en) Rationalization supporting system in physical distribution center
CN116308670A (en) Method and system for supplementing goods based on appointed delivery time
US8131584B2 (en) Gateway balancing
CN116011934B (en) Commodity replenishment method and system based on target inventory
JP2019034806A (en) Picking system, picking cart and program
WO2023131989A1 (en) Cargo tracking system, cargo tracking method, and program
Zeng et al. Designing an efficient warehouse layout to facilitate the order-filling process: An industrial distributor's experience
US11488100B2 (en) Load tracking computing platform and user interface
JP2003137439A (en) Commodity home delivery method for order shopping at home
Ortiz The kanban playbook: a step-by-step guideline for the lean practitioner
Ghomi Cross-Docking: A Proven LTL Technique to Help Suppliers Minimize Products' Unit Costs Delivered to the Final Customers
Tofan et al. STUDY ON THE APPLICATION OF KANBAN METHODS IN A PRODUCTION FLOW.
JP2017120476A (en) Packaging planning apparatus, packaging planning system, packaging planning method and program
Siregar et al. Analysis of Service Delivery Improvement of Manufactured Products with Lean Method Management
Stadtler Purchasing and material requirements planning
CN115983767B (en) Goods supplementing method and system based on multiple goods
JP4087358B2 (en) Merchandise distribution management device and merchandise distribution management program
Soesilo Supply Chain Performance Improvement Strategy in the Packaging Industry
JPH0934955A (en) Stock management diagnosis supporting method and device therefor
JP2002123762A (en) Method for delivering commodity for mass sales store