JP2017120476A - Packaging planning apparatus, packaging planning system, packaging planning method and program - Google Patents

Packaging planning apparatus, packaging planning system, packaging planning method and program Download PDF

Info

Publication number
JP2017120476A
JP2017120476A JP2015255795A JP2015255795A JP2017120476A JP 2017120476 A JP2017120476 A JP 2017120476A JP 2015255795 A JP2015255795 A JP 2015255795A JP 2015255795 A JP2015255795 A JP 2015255795A JP 2017120476 A JP2017120476 A JP 2017120476A
Authority
JP
Japan
Prior art keywords
packing
product
packaging
information
information indicating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2015255795A
Other languages
Japanese (ja)
Inventor
貴博 市毛
Takahiro ICHIGE
貴博 市毛
仁基 島谷
Jinki Shimatani
仁基 島谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2015255795A priority Critical patent/JP2017120476A/en
Publication of JP2017120476A publication Critical patent/JP2017120476A/en
Pending legal-status Critical Current

Links

Images

Abstract

PROBLEM TO BE SOLVED: To prevent the completion time limit of packaging work from not being kept and packaging work cost from being increased by overtime work.SOLUTION: A packaging instruction part 11 of a packaging planning device 1 determines a packaging-scheduled product to be a packaging object among products whose orders have been received. A collectively packaging box setting part 12 sets a collectively packaging box for packaging the packaging-scheduled product. A packaging work time setting part 13 sets a packaging work time to be required for packaging work for packaging the packaging-scheduled product in the collectively packaging box set by the collectively packaging box setting part 12. A packaging candidate date setting part 14 sets a data which is before a date obtained by tracing back from a requested delivery period by the number of transportation days or more and when a packaging work time can be secured as a packaging candidate date on the basis of information indicating the packaging work time set by the packaging work time setting part 13, information indicating a workable time when daily packaging work is possible at a packaging work site, information indicating the requested delivery period of the packaging-scheduled product, and information indicating the number of transportation days to a destination of the packaging-scheduled product.SELECTED DRAWING: Figure 1

Description

本発明は、出荷元から出荷先へ製品を梱包出荷する際の梱包候補日を設定する梱包計画立案装置、梱包計画立案システム、梱包計画立案方法およびプログラムに関する。   The present invention relates to a packing plan planning apparatus, a packing plan planning system, a packing plan planning method, and a program for setting a packing candidate date when packing and shipping a product from a shipping source to a shipping destination.

荷物がバラバラになる荷割れの防止策として、梱包作業現場では製品の個装箱を集梱箱と呼ばれるより大きな箱へまとめて包装する。これを以下、梱包という。梱包の対象となる梱包予定製品は、梱包前の製品の個装箱の荷姿やサイズ(長さ、幅、高さ)、出荷先といった条件によって決定される。   As a measure for preventing cracking of packages, the individual packaging boxes of products are packed together in a larger box called a collection box at the packing work site. This is hereinafter referred to as packaging. The product to be packed to be packed is determined by conditions such as the packing form and size (length, width, height) of the individual packaging box of the product before packing, and the shipping destination.

特許文献1には、出荷先の出荷要求と、出荷元の供給可能計画と、出荷に使用する各集梱箱に梱包可能な製品と台数の組み合わせを示す梱包形態の情報と、梱包形態毎の物流コストとを格納する記憶装置を有し、出荷要求と、供給可能計画と、梱包形態の情報と、梱包形態毎の物流コストから、出荷可能な、出荷日、出荷台数、梱包形態の組み合わせの中で、物流コストが最小となる、出荷日、出荷台数、梱包形態の組み合わせを求め、出荷指示として決定する出荷指示決定システムが開示されている。   In Patent Document 1, the shipping request of the shipping destination, the supply availability plan of the shipping source, the information on the packing form indicating the combination of products and the number of products that can be packed in each shipping box used for shipping, It has a storage device that stores the distribution cost, and it can be shipped from the shipping request, supply plan, packing form information, and distribution cost for each packing form. In particular, a shipping instruction determination system is disclosed in which a combination of the shipping date, the number of units shipped, and the packing form that minimizes the distribution cost is determined as a shipping instruction.

特許文献2には、出荷対象となる物品に対して最適な梱包仕様を決定する梱包仕様決定装置が開示されている。特許文献3には、部材のオーダが発生する度に設定される梱包予定日に基づいて所定期間内に梱包すべき部材の数量と梱包に必要な外装ケースの仕様形態と外装ケースの所要量とが算出され、コンテナへのバンニングレイアウトの結果に基づいて、コンテナへの詰込み順に外装ケースを製造し、順次製造された外装ケースに部品を梱包する包装順位計画システムが開示されている。特許文献4には、複数種類の複数製品を構成する各種部品を、効率良く梱包すると共に、輸送先で一部の部品が滞留在庫となる可能性を極小化する梱包計画立案方法が開示されている。   Patent Document 2 discloses a packing specification determination apparatus that determines an optimal packing specification for an article to be shipped. In Patent Document 3, the number of members to be packed within a predetermined period based on the scheduled packing date each time a member order occurs, the specification form of the outer case necessary for packing, the required amount of the outer case, Is calculated, and based on the result of the vanning layout in the container, the packaging case planning system is disclosed in which the exterior cases are manufactured in the order of filling into the container, and the parts are packed in the sequentially manufactured exterior cases. Patent Document 4 discloses a packaging planning method that efficiently packs various parts constituting a plurality of types of products, and minimizes the possibility that some parts will become a stagnant stock at the transportation destination. Yes.

特開2012−25564号公報JP 2012-25564 A 特開2005−284996号公報JP 2005-284996 A 特開平7−25474号公報JP 7-25474 A 特開2003−271708号公報JP 2003-271708 A

しかし、特許文献1から4に記載の技術では、梱包作業現場で梱包作業をすることが可能な作業可能時間を考慮していないため、梱包予定製品の作業負荷が、梱包作業現場の作業可能時間を超える場合があり、梱包作業の完了期限を守れなかったり、時間外勤務によって梱包作業費が増加したりすることがある。   However, since the techniques described in Patent Documents 1 to 4 do not consider the workable time during which the packing work can be performed at the packing work site, the work load of the product to be packed is the workable time at the packing work site. May not be able to meet the deadline for completing the packing work, or the packing work cost may increase due to overtime.

本発明は、上記のような問題点に鑑みてなされたものであり、梱包作業の完了期限を守れなかったり、時間外勤務によって梱包作業費が増加したりすることを防ぐことを目的とする。   The present invention has been made in view of the above-described problems, and an object of the present invention is to prevent the completion of the packing operation from being completed or prevent the packing operation cost from increasing due to overtime.

上記目的を達成するため、本発明に係る梱包計画立案装置は、梱包指示部と、集梱箱設定部と、梱包作業時間設定部と、梱包候補日設定部と、梱包計画立案部とを備える。梱包指示部は、受注した製品の中から、梱包の対象となる梱包予定製品を決定する。集梱箱設定部は、梱包予定製品を梱包する集梱箱を設定する。梱包作業時間設定部は、集梱箱設定部が設定した集梱箱に梱包予定製品を梱包する梱包作業にかかる梱包作業時間を設定する。梱包候補日設定部は、梱包作業時間設定部が設定した梱包作業時間を示す情報と、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報と、梱包予定製品の要求された納期を示す情報と、梱包予定製品の送り先までの輸送日数を示す情報とに基づいて、要求された納期から輸送日数以上遡った日付よりも前であって、梱包作業時間を確保できる日を梱包候補日として設定する。梱包計画立案部は、梱包候補日設定部が設定した梱包予定製品ごとの梱包候補日を示す梱包計画情報を生成する。   To achieve the above object, a packing plan planning apparatus according to the present invention includes a packing instruction unit, a packing box setting unit, a packing work time setting unit, a packing candidate date setting unit, and a packing plan planning unit. . The packing instruction unit determines a product to be packed to be packed from among the ordered products. The collection box setting unit sets a collection box for packing the products to be packed. The packing work time setting unit sets a packing work time required for packing work for packing the product to be packed in the packing box set by the packing box setting unit. The packing candidate date setting part includes information indicating the packing work time set by the packing work time setting part, information indicating the workable time during which the packing work can be performed on a daily basis at the packing work site, and Based on the information indicating the requested delivery date and the information indicating the transportation days to the destination of the product to be packed, it is possible to secure the packaging work time before the date that is more than the transportation days from the requested delivery date. Set the day as a packing candidate date. The packing plan planning unit generates packing plan information indicating a packing candidate date for each packing scheduled product set by the packing candidate date setting unit.

本発明によれば、梱包作業現場で梱包作業をすることが可能な作業可能時間を考慮して、梱包作業日を設定することで、梱包作業の完了期限を守れなかったり、時間外勤務によって梱包作業費が増加したりすることを防ぐことができる。   According to the present invention, considering the possible work time that can be packed at the packing work site, by setting the packing work date, it is not possible to meet the deadline for packing work or packing by overtime It is possible to prevent the work cost from increasing.

本発明の実施の形態1に係る梱包計画立案システムの構成例を示す図である。It is a figure which shows the structural example of the packing plan planning system which concerns on Embodiment 1 of this invention. 実施の形態1に係るオーダ情報の一例を示す図である。6 is a diagram illustrating an example of order information according to Embodiment 1. FIG. 実施の形態1に係る製品情報の一例を示す図である。6 is a diagram illustrating an example of product information according to Embodiment 1. FIG. 実施の形態1に係る集梱箱情報の一例を示す図である。It is a figure which shows an example of the packaging box information which concerns on Embodiment 1. FIG. 実施の形態1に係る作業時間マスタの一例を示す図である。It is a figure which shows an example of the working time master which concerns on Embodiment 1. FIG. 実施の形態1に係る輸送手段情報の一例を示す図である。It is a figure which shows an example of the transportation means information which concerns on Embodiment 1. FIG. 実施の形態1に係る現場作業量情報の一例を示す図である。6 is a diagram illustrating an example of on-site work amount information according to Embodiment 1. FIG. 実施の形態1に係る梱包計画立案処理の動作の一例を示すフローチャートである。6 is a flowchart illustrating an example of an operation of a packing plan planning process according to the first embodiment. 本発明の実施の形態2に係る梱包計画立案システムの構成例を示す図である。It is a figure which shows the structural example of the packing plan planning system which concerns on Embodiment 2 of this invention. 本発明の実施の形態に係る梱包計画立案装置のハードウェア構成の一例を示す図である。It is a figure which shows an example of the hardware constitutions of the packing plan planning apparatus which concerns on embodiment of this invention.

以下に、本発明を実施するための形態について図面を参照して詳細に説明する。なお、図中同一または相当する部分には同じ符号を付す。   EMBODIMENT OF THE INVENTION Below, the form for implementing this invention is demonstrated in detail with reference to drawings. In addition, the same code | symbol is attached | subjected to the part which is the same or it corresponds in a figure.

(実施の形態1)
図1は、本発明の実施の形態1に係る梱包計画立案システムの構成例を示す図である。梱包計画立案システム100は、梱包計画立案装置1と、オーダ情報データベース(以下、DBと略す)2と、製品情報DB3と、集梱箱情報DB4と、作業時間マスタDB5と、輸送手段情報DB6と、現場作業量情報DB7とで構成される。梱包計画立案装置1は、機能構成として、梱包指示部11、集梱箱設定部12、梱包作業時間設定部13、梱包候補日設定部14および梱包計画立案部15を備える。客先から製品を受注すると、オーダ情報DB2にオーダ情報が記憶される。オーダ情報DB2にオーダ情報が記憶されるタイミングは、定期的なタイミングであってもよいし、受注したときでもよい。オーダ情報は、受注した製品を識別する情報と、受注した製品の数量を示す情報と、受注した製品の送り先を示す情報と、要求された納期を示す情報とを含む。なお、オーダ情報は、受注した日付を示す情報や指定された輸送手段を示す情報を含んでもよい。
(Embodiment 1)
FIG. 1 is a diagram showing a configuration example of a packing plan planning system according to Embodiment 1 of the present invention. The packaging planning system 100 includes a packaging planning apparatus 1, an order information database (hereinafter abbreviated as DB) 2, a product information DB 3, a packaging box information DB 4, a work time master DB 5, and a transportation means information DB 6. And the site work amount information DB 7. The packing plan planning apparatus 1 includes a packing instruction unit 11, a collection box setting unit 12, a packing work time setting unit 13, a packing candidate date setting unit 14, and a packing plan planning unit 15 as functional configurations. When a product is ordered from a customer, the order information is stored in the order information DB2. The timing at which the order information is stored in the order information DB 2 may be a regular timing or when an order is received. The order information includes information for identifying the ordered product, information indicating the quantity of the ordered product, information indicating the destination of the ordered product, and information indicating the requested delivery date. Note that the order information may include information indicating a date of receiving an order and information indicating a designated transportation means.

製品情報DB3は、製品を識別する情報と、製品の個装箱を識別する情報と、製品の個装箱のサイズを示す情報と、製品の重量を示す情報と、梱包指示をするか否かの基準となる出荷数量を示す情報とを含む製品情報を記憶する。梱包指示部11は、オーダ情報DB2に新たに記憶されたオーダ情報を読み出す。梱包指示部11は、読み出したオーダ情報に含まれる受注した製品を識別する情報を参照し、受注した製品の製品情報を製品情報DB3から読み出す。梱包指示部11は、読み出した製品情報に含まれる梱包指示をするか否かの基準となる出荷数量を示す情報とオーダ情報に含まれる受注した製品の数量を示す情報とを参照し、受注した製品の数量が梱包指示をするか否かの基準となる出荷数量を超えるか否かを判定する。梱包指示部11は、受注した製品の数量が製品の梱包指示をするか否かの基準となる出荷数量を超える製品を、梱包の対象となる梱包予定製品として決定する。梱包指示部11は、梱包予定製品のオーダ情報および製品情報を集梱箱設定部12に送る。   The product information DB 3 is information for identifying the product, information for identifying the individual packaging box of the product, information indicating the size of the individual packaging box of the product, information indicating the weight of the product, and whether to give a packing instruction. And product information including information indicating the shipment quantity serving as a reference for the above. The packing instruction unit 11 reads the order information newly stored in the order information DB2. The packing instruction unit 11 refers to information for identifying the ordered product included in the read order information, and reads the product information of the ordered product from the product information DB 3. The packing instruction unit 11 refers to the information indicating the shipment quantity, which is a criterion for whether or not to perform the packing instruction included in the read product information, and the information indicating the quantity of the ordered product included in the order information. It is determined whether or not the product quantity exceeds the shipment quantity that is a criterion for whether or not to instruct packing. The packing instruction unit 11 determines a product that exceeds the shipment quantity, which is a criterion for determining whether or not the product is instructed to be packed, as a packing scheduled product to be packed. The packing instruction unit 11 sends the order information and product information of the product to be packed to the collection box setting unit 12.

集梱箱情報DB4は、集梱箱を識別する情報と、集梱箱のサイズを示す情報と、集梱箱で梱包可能な最大重量を示す情報と、を含む集梱箱情報を記憶する。集梱箱設定部12は、集梱箱情報に含まれる集梱箱で梱包可能な最大重量を示す情報および集梱箱のサイズを示す情報と、梱包予定製品の製品情報に含まれる製品の重量を示す情報および製品の個装箱のサイズを示す情報とを参照し、各集梱箱に梱包可能な製品の最大数である製品入数を算出する。集梱箱設定部12は、梱包予定製品のオーダ情報に含まれる受注した製品の数量を示す情報を参照し、梱包予定製品を梱包したときに集梱箱数が一番小さくなる集梱箱を梱包予定製品の集梱箱として設定する。なお、梱包したときの集梱箱数が同じ場合には、容積が小さい方を設定する。集梱箱設定部12は、梱包予定製品のオーダ情報および製品情報と、設定した梱包予定製品の集梱箱とその数を示す設定集梱箱情報を梱包作業時間設定部13に送る。   The packaging box information DB 4 stores packaging box information including information for identifying the packaging box, information indicating the size of the packaging box, and information indicating the maximum weight that can be packed in the packaging box. The packaging box setting unit 12 includes information indicating the maximum weight that can be packed in the packaging box included in the packaging box information, information indicating the size of the packaging box, and the weight of the product included in the product information of the product to be packed. The product quantity, which is the maximum number of products that can be packed in each packaging box, is calculated with reference to the information indicating the size of the individual packaging box. The packaging box setting unit 12 refers to the information indicating the quantity of the ordered product included in the order information of the product to be packed, and selects the packaging box having the smallest number of packaging boxes when the product to be packed is packed. Set as a shipping box for the product to be packed. If the number of packaging boxes is the same when packed, the smaller volume is set. The packaging box setting unit 12 sends order information and product information of the product to be packed, and set packaging box information indicating the set packaging boxes and the number of the packaging products to be packed to the packaging work time setting unit 13.

作業時間マスタDB5は、集梱箱毎に設定された、集梱箱の組み立て時間および封緘作業時間の合計である梱包基本時間情報と、個装箱毎に設定された、個装箱の荷姿、個装箱のサイズおよび個装される製品の重量の少なくともいずれかに応じて決まる梱包変動時間を示す梱包変動時間情報とからなる作業時間マスタを記憶する。梱包作業時間設定部13は、梱包予定製品のオーダ情報に含まれる受注した製品の数量を示す情報と、梱包予定製品の製品情報に含まれる製品の個装箱を識別する情報と、設定集梱箱情報と、作業時間マスタとを参照し、梱包予定製品の梱包作業にかかる梱包作業時間を設定する。梱包作業時間設定部13は、梱包予定製品のオーダ情報と、設定した梱包予定製品の梱包作業時間を示す梱包作業時間情報とを梱包候補日設定部14に送る。   The work time master DB 5 includes the basic packing time information that is the sum of the assembly time and the sealing work time of the packaging box set for each packaging box, and the packaging of the packaging box that is set for each packaging box. An operation time master is stored that includes packing variation time information indicating the package variation time determined according to at least one of the size of the individual packaging box and the weight of the individually packaged product. The packing work time setting unit 13 includes information indicating the quantity of the ordered product included in the order information of the product to be packed, information for identifying the individual packaging box of the product included in the product information of the product to be packed, and setting and packing With reference to the box information and the work time master, the packing work time required for packing the product to be packed is set. The packing work time setting unit 13 sends the order information of the packing scheduled product and the packing work time information indicating the set packing work time of the packing scheduled product to the packing candidate date setting unit 14.

輸送手段情報DB6は、送り先を示す情報と、輸送手段の納期余裕日数を示す情報とを含む輸送手段情報を記憶する。輸送手段情報は、輸送手段を識別する情報を含んでもよい。納期余裕日数とは、納期からその日数前までに梱包が完了していれば納期に間に合うことを意味する日数であって、輸送手段の送り先までの輸送日数以上の日数である。梱包候補日設定部14は、まず、梱包予定製品のオーダ情報に含まれる受注した製品の送り先を示す情報を参照し、梱包予定製品の送り先に対応する輸送手段情報を輸送手段情報DB6から読み出す。オーダ情報に指定された輸送手段を示す情報を含み、輸送手段情報に輸送手段を識別する情報を含む場合には、梱包候補日設定部14は、梱包予定製品のオーダ情報に含まれる指定された輸送手段を示す情報を参照し、指定された輸送手段に対応する輸送手段情報を輸送手段情報DB6から読み出してもよい。あるいは、梱包候補日設定部14が梱包予定製品の送り先、数量、重量、設定された梱包予定製品の集梱箱などの要素から輸送手段を決定し、決定した輸送手段に対応する輸送手段情報を輸送手段情報DB6から読み出してもよい。   The transportation means information DB 6 stores transportation means information including information indicating the destination and information indicating the number of days for delivery of the transportation means. The transportation means information may include information for identifying the transportation means. The surplus delivery days is the number of days that means that if the packaging has been completed by the number of days before the delivery date, it will be in time for the delivery date, and is the number of days more than the number of transportation days to the destination of the transportation means. First, the packing candidate date setting unit 14 refers to the information indicating the destination of the ordered product included in the order information of the planned product to be packed, and reads out the transport information corresponding to the destination of the planned product from the transport means information DB 6. If the order information includes information indicating the means of transportation, and the means of transportation includes information identifying the means of transportation, the packing candidate date setting unit 14 specifies the information included in the order information of the product to be packed. With reference to the information indicating the transportation means, the transportation means information corresponding to the designated transportation means may be read from the transportation means information DB 6. Alternatively, the packing candidate date setting unit 14 determines a transportation means from factors such as the destination, quantity, and weight of the product to be packed, the collection box of the set product to be packed, and the transportation means information corresponding to the determined transportation means. You may read from transport means information DB6.

現場作業量情報DB7は、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報を含む現場作業量情報を記憶する。梱包候補日設定部14は、読み出した輸送手段情報に含まれる輸送手段の納期余裕日数を示す情報と、梱包予定製品のオーダ情報に含まれる要求された納期を示す情報と、現場作業量情報と、梱包作業時間情報とを参照し、要求された納期から納期余裕日数遡った日付よりも前であって、梱包予定製品の梱包作業時間を確保できる梱包候補日を設定する。オーダ情報DB2に新たに記憶されたオーダ情報が複数ある場合、梱包候補日設定部14は、オーダ情報に受注した日付を示す情報が含まれる場合にはこれを参照し、受注した日付の順に梱包候補日を設定する。   The on-site work amount information DB 7 stores on-site work amount information including information indicating a workable time during which the packing work site can be packed by day. The packing candidate date setting unit 14 includes information indicating the number of days for delivery deadline of the transportation means included in the read transportation means information, information indicating the requested delivery date included in the order information of the product to be packed, field work amount information, Referring to the packing work time information, a packing candidate date that sets a packing work time for the product to be packed that is before the date that is earlier than the requested delivery date and by the number of days before the delivery date is set. When there are a plurality of pieces of order information newly stored in the order information DB 2, the packing candidate date setting unit 14 refers to the order information when the order information includes the date when the order is received, and packs in order of the received order date. Set the candidate date.

梱包候補日設定部14は、梱包予定製品のオーダ情報と、設定した梱包予定製品の梱包候補日を示す梱包候補日情報を梱包計画立案部15に送る。なお、受注した製品の送り先を示す情報から輸送手段を自動的に決定し、要求された納期から納期余裕日数遡った日付を受注した製品の梱包を完了する期限として算出し、受注した製品の梱包を完了する期限を示す梱包完了期限情報をあらかじめオーダ情報に含むようにしてもよい。この場合、梱包候補日設定部14は、梱包予定製品のオーダ情報に含まれる梱包完了期限情報と、現場作業量情報と、梱包作業時間情報とを参照し、受注した製品の梱包を完了する期限よりも前であって、梱包予定製品の梱包作業時間を確保できる梱包候補日を設定する。この構成では、梱包計画立案システム100は、輸送手段情報DB6を備えなくてもよい。   The packing candidate date setting unit 14 sends the order information of the packing planned product and the packing candidate date information indicating the packing candidate date of the set packing planned product to the packing planning unit 15. In addition, the means of transportation is automatically determined from the information indicating the destination of the ordered product, the date backed from the requested delivery date is calculated as the deadline for completing the packaging of the ordered product, and the packaging of the ordered product is calculated. Packing completion deadline information indicating a deadline for completing the order may be included in the order information in advance. In this case, the packing candidate date setting unit 14 refers to the packing completion time limit information, the on-site work amount information, and the packing work time information included in the order information of the product to be packed, and the time limit for completing the packing of the ordered product. The candidate date for packing that can secure the packing work time for the product to be packed is set before the previous date. In this configuration, the packaging planning system 100 may not include the transportation means information DB 6.

梱包計画立案部15は、梱包予定製品のオーダ情報と、梱包候補日情報とに基づいて、梱包予定製品ごとの梱包候補日を示す梱包計画情報を生成し、出力する。梱包計画情報の出力は、画面表示してもよいし、外部に出力してもよい。続いて、オーダ情報DB2、製品情報DB3、集梱箱情報DB4、作業時間マスタDB5、輸送手段情報DB6および現場作業量情報DB7が記憶する各種情報について説明する。   The packing plan planning unit 15 generates and outputs packing plan information indicating a packing candidate date for each packing planned product based on the order information of the packing scheduled product and the packing candidate date information. The packing plan information may be output on a screen or output to the outside. Subsequently, various information stored in the order information DB2, the product information DB3, the packaging box information DB4, the work time master DB5, the transport means information DB6, and the on-site work amount information DB7 will be described.

図2は、実施の形態1に係るオーダ情報の一例を示す図である。オーダ情報DB2が記憶するオーダ情報は、注文を識別する「注文番号」、受注した製品を識別する「製品コード」、受注した製品の名称を示す「製品名称」、受注した製品の数量を示す「数量」、受注した製品の送り先の名称を示す「送り先名称」、受注した製品の送り先の住所を示す「送り先住所」、受注日を示す「受注日」、受注した製品の要求された納期を示す「要求納期」、および、受注した製品の送り先が国内であるか海外であるかを示す「国内海外区分」の項目で構成される。「国内海外区分」の項目は、国内のみまたは海外のみに出荷する場合はなくてもよい。オーダ情報は、図2の例に限らず、受注した製品を識別する情報と、受注した製品の数量を示す情報と、受注した製品の送り先を示す情報と、要求された納期を示す情報とを含んでいればよい。   FIG. 2 is a diagram illustrating an example of order information according to the first embodiment. The order information stored in the order information DB 2 includes an “order number” for identifying an order, a “product code” for identifying the ordered product, a “product name” indicating the name of the ordered product, and a “quantity of the ordered product”. “Quantity”, “Destination Name” indicating the name of the destination of the ordered product, “Destination Address” indicating the address of the destination of the ordered product, “Order Date” indicating the order date, and the requested delivery date of the ordered product It consists of the items of “Requested delivery date” and “Domestic / Overseas division” indicating whether the order is sent to the domestic or overseas destination. The item “Domestic Overseas Category” does not have to be shipped only in Japan or overseas. The order information is not limited to the example of FIG. 2, but includes information for identifying the ordered product, information indicating the quantity of the ordered product, information indicating the destination of the ordered product, and information indicating the requested delivery date. It only has to be included.

図3は、実施の形態1に係る製品情報の一例を示す図である。製品情報DB3が記憶する製品情報は、製品を識別する「製品コード」、製品の名称を示す「製品名称」、製品の個装箱を識別する「個装箱コード」、個装箱の荷姿を示す「荷姿」、個装箱の長さを示す「長さ」、個装箱の幅を示す「幅」、個装箱の高さを示す「高さ」、製品の重量を示す「製品重量」、国内へ出荷する製品の梱包指示をするか否かの基準となる出荷数量である「国内梱包指示数量」、海外へ出荷する製品の梱包指示をするか否かの基準となる出荷数量である「海外梱包指示数量」、および、梱包指示対象外の製品であるか否かを示す「個装出荷区分」の項目で構成される。   FIG. 3 is a diagram illustrating an example of product information according to the first embodiment. The product information stored in the product information DB 3 includes a “product code” for identifying the product, a “product name” indicating the name of the product, an “individual packaging code” for identifying the individual packaging box of the product, and the packaging of the individual packaging box "Package" indicating the length of the individual packaging box, "Length" indicating the width of the individual packaging box, "Width" indicating the width of the individual packaging box, "Height" indicating the height of the individual packaging box, " "Product weight", "Domestic packing instruction quantity", which is the standard quantity of whether or not to instruct packing of products to be shipped in Japan, and shipping that is the standard of whether or not to instruct packing of products to be shipped overseas “Overseas packing instruction quantity”, which is a quantity, and “Individual shipment classification” indicating whether the product is not a packing instruction target.

国内向けの製品であれば、個装箱のサイズが小さく、かつ、出荷数量が多い場合に、複数個にまとまった荷物がバラバラになる荷割れの可能性が高くなると判断され、梱包指示される。海外向けの製品についても国内向け製品と同様に、衝撃緩和のためや、複数個にまとまった荷物がバラバラになる荷割れ防止策として、出荷数量が多い場合は梱包指示される。このように、個装箱の荷姿やサイズによって製品ごとに設定された梱包指示をするか否かの基準となる出荷数量が、製品情報の「国内梱包指示数量」および「海外梱包指示数量」に登録されている。一部製品によっては、製品サイズが大きく、かつ、個装段階で衝撃緩和策が施されているものがある。図3の例では、このような製品については、製品情報の「個装出荷区分」の値が1となっており、梱包指示対象外となる。「国内梱包指示数量」および「海外梱包指示数量」の項目は、国内のみまたは海外のみに出荷する場合は、「国内梱包指示数量」のみまたは「海外梱包指示数量」のみでよい。製品情報は、図3の例に限らず、製品を識別する情報と、製品の個装箱を識別する情報と、製品の個装箱のサイズを示す情報と、製品の重量を示す情報と、梱包指示をするか否かの基準となる出荷数量を示す情報とを含んでいればよい。   For domestic products, if the size of the individual packaging box is small and the shipment quantity is large, it is judged that there is a high possibility that the package will be broken apart and packing is instructed. . As with domestic products, packaging for overseas products is instructed when there are many shipments in order to mitigate impacts and as a measure to prevent cracks that would break apart multiple packages. In this way, the shipment quantity, which is the basis for whether or not to give the packing instruction set for each product according to the packing form and size of the individual packaging box, is the `` Domestic packing instruction quantity '' and `` Overseas packing instruction quantity '' in the product information It is registered in. Some products have a large product size and are provided with impact mitigation measures at the individual packaging stage. In the example of FIG. 3, for such a product, the “individual shipment classification” value of the product information is 1, and the product is not subject to packing instruction. The items of “domestic packing instruction quantity” and “overseas packing instruction quantity” need only be “domestic packing instruction quantity” or “overseas packing instruction quantity” when shipping only in Japan or overseas. The product information is not limited to the example of FIG. 3, information identifying the product, information identifying the individual packaging box of the product, information indicating the size of the individual packaging box of the product, information indicating the weight of the product, It is only necessary to include information indicating the shipment quantity as a reference for whether or not to instruct packing.

梱包指示部11は、図2および図3に示すようなオーダ情報および製品情報に基づいて、受注した製品のうち、梱包の対象となる梱包予定製品を決定する。例えば、梱包指示部11は、「注文番号」が100001のオーダ情報の「製品コード」a−002001と同じ「製品コード」の製品情報を製品情報DB3から読み出す。梱包指示部11は、読み出した製品情報の「個装出荷区分」が1なので、梱包指示対象外の製品であると判定する。   Based on the order information and product information as shown in FIGS. 2 and 3, the packing instruction unit 11 determines a product to be packed, which is a target of packing, among the ordered products. For example, the packing instruction unit 11 reads the product information of the “product code” that is the same as the “product code” a-002001 of the order information whose “order number” is 100001 from the product information DB 3. Since the “individual shipment classification” of the read product information is 1, the packing instruction unit 11 determines that the product is not a packing instruction target.

梱包指示部11は、「注文番号」が100002のオーダ情報の「製品コード」b−002002と同じ「製品コード」の製品情報を製品情報DB3から読み出す。梱包指示部11は、読み出した製品情報の「個装出荷区分」が0なので、梱包指示対象外の製品ではないと判定する。梱包指示部11は、オーダ情報の「数量」が200、「国内海外区分」が国内であって、読み出した製品情報の「国内梱包指示数量」が30であるので、「注文番号」100002のオーダ情報の製品の梱包が必要であると判定し、梱包予定製品として決定する。   The packing instruction unit 11 reads the product information of the same “product code” as the “product code” b-002002 of the order information whose “order number” is 100002 from the product information DB 3. Since the “individual shipment classification” of the read product information is 0, the packing instruction unit 11 determines that the product is not a packing instruction target product. Since the “quantity” of the order information is 200, the “domestic / overseas classification” is domestic, and the “domestic packing instruction quantity” of the read product information is 30, the packing instruction unit 11 orders “order number” 100002. It is determined that the information product needs to be packed, and is determined as a product to be packed.

梱包指示部11は、「注文番号」が100003のオーダ情報の「製品コード」c−002003と同じ「製品コード」の製品情報を製品情報DB3から読み出す。梱包指示部11は、読み出した製品情報の「個装出荷区分」が0なので、梱包指示対象外の製品ではないと判定する。梱包指示部11は、オーダ情報の「数量」が10、「国内海外区分」が海外であって、読み出した製品情報の「海外梱包指示数量」が30であるので、「注文番号」100003のオーダ情報の製品の梱包は不要であると判定する。なお、梱包予定製品の決定方法はこれに限らず、例えば、受注した製品の数量が一定数以上である場合には自動的に梱包予定製品として決定したり、海外に送る製品はすべて梱包予定製品として決定したりしてもよい。あるいは、梱包指示部11は、あらかじめ決定された梱包予定製品のオーダ情報を取得してもよい。   The packing instruction unit 11 reads the product information of the “product code” that is the same as the “product code” c-002003 of the order information whose “order number” is 100003 from the product information DB 3. Since the “individual shipment classification” of the read product information is 0, the packing instruction unit 11 determines that the product is not a packing instruction target product. Since the “quantity” of the order information is 10, the “domestic / overseas classification” is overseas, and the “overseas packaging instruction quantity” of the read product information is 30, the packing instruction unit 11 has the order of “order number” 100003. It is determined that packaging of the information product is unnecessary. Note that the method for determining the product to be packed is not limited to this. For example, if the quantity of ordered products exceeds a certain number, it is automatically determined as a product to be packed, or all products to be sent overseas are to be packed. Or may be determined as Or the packing instruction | indication part 11 may acquire the order information of the packing scheduled product determined beforehand.

図4は、実施の形態1に係る集梱箱情報の一例を示す図である。集梱箱情報DB4が記憶する集梱箱情報は、集梱箱を識別する「集梱箱コード」、集梱箱の名称を示す「集梱箱名称」、集梱箱の荷姿を示す「荷姿」、集梱箱の長さを示す「長さ」、集梱箱の幅を示す「幅」、集梱箱の高さを示す「高さ」、集梱箱で梱包可能な製品の最大重量である最大梱包重量を示す「最大梱包重量」、および、集梱箱の荷役方法を示す「荷役方法」の項目で構成される。集梱箱情報は、図4の例に限らず、集梱箱を識別する情報と、集梱箱のサイズを示す情報と、集梱箱で梱包可能な最大重量を示す情報と、を含んでいればよい。集梱箱設定部12は、図4に示すような集梱箱情報に基づいて、梱包予定製品の集梱箱を設定する。   FIG. 4 is a diagram illustrating an example of the packaging box information according to the first embodiment. The packing box information stored in the packing box information DB 4 includes a “boxing box code” for identifying the packing box, a “boxing box name” indicating the name of the packing box, and a packing form of the packing box “ `` Package '', `` Length '' indicating the length of the packaging box, `` Width '' indicating the width of the packaging box, `` Height '' indicating the height of the packaging box, Product that can be packed in the packaging box It consists of items of “maximum packing weight” indicating the maximum packing weight, which is the maximum weight, and “loading method” indicating the loading method of the collection box. The packaging box information is not limited to the example of FIG. 4 and includes information for identifying the packaging box, information indicating the size of the packaging box, and information indicating the maximum weight that can be packed in the packaging box. It only has to be. The packaging box setting unit 12 sets a packaging box for products to be packed based on the packaging box information as shown in FIG.

例えば、「注文番号」100002の梱包予定製品の集梱箱を設定する場合、集梱箱設定部12は、まず、各集梱箱の集梱箱情報の「最大梱包重量」の値を「製品コード」b−002002の製品情報の「製品重量」の値で割り、重量的に梱包可能な数量を求める。これを重量単位最大梱包数と定義する。「集梱箱コード」DB00001の集梱箱の重量単位最大梱包数は、200÷5=40である。「集梱箱コード」DB00002の集梱箱の重量単位最大梱包数は、500÷5=100である。「集梱箱コード」DB00003の集梱箱の重量単位最大梱包数は、20÷5=4である。   For example, when setting the packing box of the product to be packed with “order number” 100002, the packing box setting unit 12 first sets the value of “maximum packing weight” of the packing box information of each packing box to “product”. Divide by the value of “product weight” in the product information of code “b-002002” to obtain the quantity that can be packed by weight. This is defined as the maximum number of packages in weight unit. The maximum number of weight units of the collection box in the “collection box code” DB00001 is 200 ÷ 5 = 40. The maximum number of weight units of the collection box of the “collection box code” DB00002 is 500 ÷ 5 = 100. The maximum number of weight units of the collection box in the “collection box code” DB00003 is 20 ÷ 5 = 4.

集梱箱設定部12は、次に、各集梱箱の集梱箱情報の集梱箱のサイズを示す「長さ」、「幅」および「高さ」の値をそれぞれ、「製品コード」b−002002の製品情報の個装箱のサイズを示す「長さ」、「幅」および「高さ」の値で割った値を乗算して、容量的に梱包可能な数量を求める。これをサイズ単位最大梱包数と定義する。「集梱箱コード」DB00001の集梱箱のサイズ単位最大梱包数は、90÷15×90÷15×40÷20=72である。「集梱箱コード」DB00002の集梱箱のサイズ単位最大梱包数は、90÷15×90÷15×60÷20=108である。「集梱箱コード」DB00003の集梱箱のサイズ単位最大梱包数は、長さと幅が足りないので0である。   Next, the packaging box setting unit 12 sets values of “length”, “width”, and “height” indicating the size of the packaging box of the packaging box information of each packaging box to “product code”. The quantity divided by the values of “length”, “width”, and “height” indicating the size of the individual packaging box of the product information of b-002002 is multiplied to obtain the quantity that can be packed in capacity. This is defined as the maximum number of packages in size units. The maximum number of packing units in the size of the packing box of the “boxing box code” DB00001 is 90 ÷ 15 × 90 ÷ 15 × 40 ÷ 20 = 72. The maximum number of packing units in a packing box size in the “packing box code” DB00002 is 90 ÷ 15 × 90 ÷ 15 × 60 ÷ 20 = 108. The maximum number of packing units in the size unit of the packing box of the “packing box code” DB00003 is 0 because the length and width are insufficient.

集梱箱設定部12は、重量単位最大梱包数とサイズ単位最大梱包数を比較して小さい方の値を、その集梱箱に対する製品入数とする。集梱箱設定部12は、「注文番号」100002のオーダ情報の「数量」の値を各集梱箱の製品入数の値で割って、梱包予定製品を梱包した場合の各集梱箱の集梱箱数を算出する。「集梱箱コード」DB00001の集梱箱の製品入数は40、集梱箱数は200÷40=5である。「集梱箱コード」DB00002の集梱箱の製品入数は100、集梱箱数は200÷100=2である。「集梱箱コード」DB00003の集梱箱は、「製品コード」b−002002の製品には使用できない。集梱箱設定部12は、算出した結果から、集梱箱数が一番小さくなる集梱箱を梱包予定製品の集梱箱として設定する。ここでは、「注文番号」100002の梱包予定製品の集梱箱は、「集梱箱コード」DB00002の集梱箱×2個に設定される。なお、集梱箱数が同じ場合には、容積が小さい方の集梱箱を設定する。また、個装箱の荷姿と集梱箱の荷姿との組み合わせを限定してもよいし、送り先や製品によって特定の集梱箱を使用する場合があってもよい。   The packaging box setting unit 12 compares the maximum number of packages in weight unit and the maximum number of packages in size unit, and sets the smaller value as the number of products in the packaging box. The packaging box setting unit 12 divides the value of “quantity” in the order information of “order number” 100002 by the value of the number of products in each packaging box, and stores each packaging box when the product to be packed is packed. Calculate the number of boxes. “Packing box code” DB00001 has 40 packing boxes, and the number of packing boxes is 200 ÷ 40 = 5. The number of products in the collection box of the “collection box code” DB00002 is 100, and the number of collection boxes is 200 ÷ 100 = 2. The collection box of the “collection box code” DB00003 cannot be used for the product of “product code” b-002002. The packaging box setting unit 12 sets the packaging box having the smallest number of packaging boxes as the packaging box of the product to be packed from the calculated result. Here, the packing boxes of the products to be packed having the “order number” 100002 are set to 2 packing boxes of the “packing box code” DB00002. If the number of packaging boxes is the same, the smaller packaging box is set. Moreover, the combination of the packing form of the individual packaging box and the packing form of the collection box may be limited, or a specific collection box may be used depending on the destination or the product.

図5は、実施の形態1に係る作業時間マスタの一例を示す図である。作業時間マスタDB5が記憶する作業時間マスタは、図5(a)に示す梱包基本時間情報と、図5(b)に梱包変動時間情報とからなる。梱包基本時間情報は、集梱箱を識別する「集梱箱コード」と、集梱箱の組み立て時間および封緘作業時間の合計である「梱包基本時間」との項目で構成される。梱包変動時間情報は、個装箱を識別する「個装箱コード」と、個装箱の荷姿や個装箱のサイズ、個装される製品の数量、個装される製品の重量に応じて予め決められている梱包変動時間を示す「梱包変動時間」との項目で構成される。ここでは、「梱包基本時間」および「梱包変動時間」の単位は秒である。梱包作業時間設定部13は、図5に示すような作業時間マスタに基づいて、梱包予定製品の梱包作業時間を設定する。梱包作業時間は、集梱箱設定部12が設定した集梱箱の梱包基本時間×集梱箱の数+梱包変動時間×製品の数量の式で計算される。   FIG. 5 is a diagram illustrating an example of a work time master according to the first embodiment. The work time master stored in the work time master DB 5 includes basic packing time information shown in FIG. 5A and packing fluctuation time information shown in FIG. The basic packing time information includes items of a “shipping box code” for identifying a packing box, and a “packing basic time” that is the total of the assembly time and the sealing work time of the packing box. The packaging fluctuation time information depends on the “individual box code” that identifies the individual box, the packing state of the individual box, the size of the individual box, the quantity of the individual package, and the weight of the individual package. The “packing fluctuation time” indicating the predetermined packing fluctuation time. Here, the unit of “basic packing time” and “packing fluctuation time” is seconds. The packing work time setting unit 13 sets the packing work time of the product to be packed based on the work time master as shown in FIG. The packing work time is calculated by the following formula: packing basic time of the packing box set by the packing box setting unit 12 × number of packing boxes + packing fluctuation time × product quantity.

例えば、「注文番号」100002の梱包予定製品の梱包作業時間を設定する場合、梱包作業時間設定部13は、まず、集梱箱設定部12が設定した「集梱箱コード」DB00002の集梱箱の梱包基本時間情報と、「製品コード」b−002002の製品情報の「個装箱コード」AABの個装箱の梱包変動時間情報とを作業時間マスタDB5から読み出す。梱包作業時間設定部13は、読み出した梱包基本時間情報の「梱包基本時間」480に集梱箱の個数2を乗算した値と、読み出した梱包変動時間情報の「梱包変動時間」20に「注文番号」100002のオーダ情報の「数量」200を乗算した値を足して、梱包予定製品の梱包作業時間を算出する。ここでは、「注文番号」100002の梱包予定製品の梱包作業時間は、480×2+20×200=4960(秒)であるので、1時間23分に設定される。梱包作業時間の設定方法はこれに限らず、例えば、集梱箱設定部12が設定した集梱箱の梱包基本時間に集梱箱の数を乗算した値に、あらかじめ決められた追加時間に梱包予定製品の数量を乗算した値を足して、梱包予定製品の梱包作業時間を算出してもよい。   For example, when setting the packing work time of the product to be packed having the “order number” 100002, the packing work time setting unit 13 first sets the packing box of the “packing box code” DB00002 set by the packing box setting unit 12. And the package variation time information of the individual packaging of the “individual box code” AAB of the product information “product code” b-002002 are read from the work time master DB 5. The packing work time setting unit 13 sets “order” to the value obtained by multiplying the “packing basic time” 480 of the read packing basic time information by the number 2 of the collection boxes and the “packing fluctuation time” 20 of the read packing fluctuation time information. The packing work time of the product to be packed is calculated by adding the value obtained by multiplying the “quantity” 200 of the order information of the number “100002”. Here, since the packing work time of the product to be packed having the “order number” 100002 is 480 × 2 + 20 × 200 = 4960 (seconds), it is set to 1 hour and 23 minutes. The method of setting the packing work time is not limited to this. For example, the packing basic time set by the packing box setting unit 12 is multiplied by the number of packing boxes and the packing time is set at a predetermined additional time. The packing work time of the product to be packed may be calculated by adding a value obtained by multiplying the number of the product to be scheduled.

図6は、実施の形態1に係る輸送手段情報の一例を示す図である。輸送手段情報DB6が記憶する輸送手段情報は、送り先の名称を示す「送り先名称」、送り先への製品の輸送手段を識別する「輸送手段コード」、送り先への製品の輸送手段の名称を示す「輸送手段名称」、輸送手段の納期余裕日数を示す「納期余裕日数」、輸送手段の代替輸送手段を識別する「代替輸送手段コード」、代替輸送手段の名称を示す「代替輸送手段名称」、および、代替輸送手段の納期余裕日数を示す「代替納期余裕日数」の項目で構成される。代替輸送手段がない場合には、「代替輸送手段コード」、「代替輸送手段名称」および「代替納期余裕日数」の項目はなくてもよい。輸送手段情報は、図6の例に限らず、送り先を示す情報と、輸送手段の納期余裕日数を示す情報とを含んでいればよい。   FIG. 6 is a diagram showing an example of transportation means information according to the first embodiment. The transport means information stored in the transport means information DB 6 includes a “destination name” indicating the name of the destination, a “transport means code” identifying the means of transport of the product to the destination, and a name of the means of transport of the product to the destination “ `` Transportation means name '', `` delivery margin days '' indicating the number of days for delivery of the transportation means, `` alternative transportation means code '' identifying the alternative transportation means of the transportation means, `` alternative transportation means name '' indicating the name of the alternative transportation means, and The item is composed of an item of “Alternative delivery deadline days” indicating the spare delivery deadlines days. When there is no alternative transportation means, the items of “alternative transportation means code”, “alternative transportation means name”, and “alternative delivery deadline days” may be omitted. The transportation means information is not limited to the example of FIG. 6, and it is sufficient that the transportation means information includes information indicating the destination and information indicating the number of days for delivery of the transportation means.

図7は、実施の形態1に係る現場作業量情報の一例を示す図である。現場作業量情報DB7が記憶する現場作業量情報は、作業者を識別する「作業者コード」、作業者名を示す「作業者名」、作業者の出勤日を示す「出勤日」、作業者の出社予定時刻を示す「出社予定時刻」、作業者の退社予定時刻を示す「退社予定時刻」、作業者が出勤日に勤務することが可能な時間外勤務時間を示す「時間外勤務可能時間」、および、作業者が出勤日に梱包作業をすることが可能な作業可能時間を示す「作業可能時間」の項目で構成される。   FIG. 7 is a diagram illustrating an example of on-site work amount information according to the first embodiment. The on-site work amount information stored in the on-site work amount information DB 7 includes the “worker code” for identifying the worker, the “worker name” for indicating the worker name, the “attendance date” for indicating the work day of the worker, and the worker. “Scheduled time to work” indicating the scheduled time of leaving the company, “Scheduled time to leave” indicating the scheduled time for the worker to leave the office, and “Overtime available hours” indicating the overtime hours that the worker can work on the working day , And “workable time” indicating the workable time during which the worker can perform packing work on work days.

作業可能時間は、作業者の出社予定時刻および退社予定時刻とすでに設定された梱包作業とによって決まる。作業者は出社予定時刻、退社予定時刻および時間外勤務時間を事前に現場管理者と決定し、現場作業量情報DB7に現場作業量情報を登録する。作業可能時間は、出社予定時刻から退社予定時刻までの勤務時間から、すでに設定された梱包予定製品の梱包作業時間が差し引かれた時間である。例えば、梱包作業台や梱包ラインの数といった梱包作業現場の環境によって、一日に作業できる作業量が制限される場合には、このような制限によって作業可能時間がさらに限定される。図7の例では、作業者ごとに作業可能時間が登録されている。   The available work time is determined by the scheduled time of leaving the office and the scheduled time of leaving the office and the already set packaging work. The worker determines the scheduled work leaving time, the scheduled leaving time, and the overtime hours as a site manager in advance, and registers the on-site work amount information in the on-site work amount information DB 7. The workable time is a time obtained by subtracting the already set packing work time of the product to be packed from the working time from the scheduled work time to the scheduled leaving time. For example, when the amount of work that can be performed in a day is limited by the environment of the packing work site such as the number of packing work tables and the number of packing lines, the available work time is further limited by such restrictions. In the example of FIG. 7, a workable time is registered for each worker.

なお、基本的に時間外勤務時間は作業可能時間に含まず、受注した製品の梱包を完了する期限よりも前に梱包予定製品の梱包作業時間を確保できない場合のみ、時間外勤務時間を作業可能時間に含むように構成するのが好ましい。梱包予定製品の梱包作業時間が設定される前の作業可能時間は、梱包候補日設定部14が「出社予定時刻」および「退社予定時刻」から算出して「作業可能時間」に登録する。現場作業量情報は、図7の例に限らず、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報を含んでいればよい。梱包候補日設定部14は、図6および図7に示すような輸送手段情報および現場作業量情報に基づいて、梱包予定製品の梱包候補日を設定する。   Basically, overtime hours are not included in the available work hours, and overtime hours can be worked only if the packing work time for the products scheduled for packing cannot be secured before the deadline for completing the packing of the ordered product. It is preferable that the time is included. The possible work time before the packing work time of the product to be packed is set is calculated from the “scheduled work time” and the “scheduled leaving time” by the packing candidate date setting unit 14 and registered in the “workable time”. The on-site work amount information is not limited to the example in FIG. 7, and may include information indicating a workable time during which the daily packing work at the packing work site can be performed. The packing candidate date setting unit 14 sets the packing candidate date of the product to be packed based on the transportation means information and the field work amount information as shown in FIGS. 6 and 7.

例えば、「注文番号」100002の梱包予定製品の梱包候補日を設定する場合、梱包候補日設定部14は、まず、「注文番号」100002のオーダ情報の「送り先名称」送り先Bと同じ「送り先名称」の輸送手段情報を輸送手段情報DB6から読み出す。梱包候補日設定部14は、「注文番号」100002のオーダ情報の「要求納期」2015/4/2の、読み出した輸送手段情報の「納期余裕日数」が示す1日前の2015/4/1を受注した製品の梱包を完了する期限として設定する。なんらかの理由で「輸送手段コード」および「輸送手段名称」が示す輸送手段が使用できない場合や輸送手段を変更する場合は、梱包候補日設定部14は、「代替輸送手段コード」および「代替輸送手段名称」が示す代替輸送手段の「代替納期余裕日数」に基づいて、受注した製品の梱包を完了する期限を設定する。   For example, when setting the packing candidate date of the product to be packed having the “order number” 100002, the packing candidate date setting unit 14 first sets the “shipping name” same as the “shipping name” destination B in the order information of the “order number” 100002. ”Is read from the transport means information DB 6. The packing candidate date setting unit 14 sets 2015/4/1 one day before indicated by the “reserved delivery date” 2015/4/2 in the order information “order number” 100002 and the “delivery allowance days” in the read transportation means information. Set the deadline for completing the packing of the ordered product. When the transportation means indicated by the "transportation means code" and the "transportation means name" cannot be used for some reason or when the transportation means is changed, the packing candidate date setting unit 14 displays the "alternative transportation means code" and "alternative transportation means". Based on the “alternative delivery allowance days” of the alternative transportation means indicated by the “name”, a deadline for completing packing of the ordered product is set.

梱包候補日設定部14は、次に、現場作業量情報を参照し、2015/4/1よりも前であって、「注文番号」100002の梱包予定製品の梱包作業時間である1時間23分を確保できる梱包候補日を設定する。例えば、「注文番号」100002の梱包予定日を2015/3/18に設定する。ここでは「作業者コード」100001の作業者が「注文番号」100002の梱包予定製品の梱包作業を行うものとする。このとき、梱包候補日設定部14は、「作業者コード」100001の作業者の「出勤日」2015/3/18の現場作業量情報の「作業可能時間」の梱包作業をすることが可能な作業可能時間から「注文番号」100002の梱包予定製品の梱包作業時間である1時間23分を差し引く。   Next, the packing candidate date setting unit 14 refers to the on-site work amount information, and is 1 hour and 23 minutes before 2015/4/1 and is the packing work time of the product to be packed with the “order number” 100002. Set the packing candidate date that can secure the package. For example, the scheduled packing date of “order number” 100002 is set to 2015/3/18. Here, it is assumed that the worker with “worker code” 100001 performs the packing work of the product to be packed with “order number” 100002. At this time, the packing candidate date setting unit 14 can perform the packing work of “workable time” in the field work amount information of “working date” 2015/3/18 of the worker of “worker code” 100001. From the available work time, 1 hour and 23 minutes, which is the packing work time of the product scheduled for packing of “order number” 100002, is subtracted.

複数の作業者で梱包予定製品の梱包作業を行う場合には、梱包候補日設定部14は、1時間23分を作業者の数で割った時間を各作業者の現場作業量情報の「作業可能時間」の値から差し引いてもよいし、各作業者が担当する梱包作業にかかる時間の違いによって重みづけをしてから、各作業者の現場作業量情報の「作業可能時間」の値から差し引いてもよい。あるいは、「作業可能時間」を各作業者が梱包作業をすることが可能な時間帯としてもよい。この場合、梱包候補日設定部14は、梱包予定製品の梱包作業を行う梱包候補日と梱包作業時間帯を設定する。このとき、梱包候補日設定部14は、梱包候補日の梱包作業を行う作業者の現場作業量情報の「作業可能時間」の梱包作業をすることが可能な時間帯から、設定した梱包作業時間帯を差し引く。さらに梱包候補日設定部14は、梱包候補日や梱包作業時間帯だけでなく、梱包予定製品の梱包作業を行う作業順序を設定してもよい。   In the case where a plurality of workers perform packing work on the product to be packed, the packing candidate date setting unit 14 divides 1 hour and 23 minutes by the number of workers, It may be subtracted from the “Available time” value, or after weighting by the difference in the time required for the packing work each worker is in charge of, the “Workable time” value in the field work amount information of each worker is used. You may deduct. Alternatively, the “workable time” may be a time zone in which each worker can perform the packing work. In this case, the packing candidate date setting unit 14 sets a packing candidate date and a packing work time zone for packing the product to be packed. At this time, the packing candidate date setting unit 14 sets the packing work time from the time zone in which the packing work of “workable time” in the field work amount information of the worker who performs the packing work on the packing candidate date can be performed. Subtract the belt. Furthermore, the packing candidate date setting unit 14 may set not only the packing candidate date and the packing work time zone, but also a work order for packing the products to be packed.

梱包計画立案部15は、梱包予定製品ごとの梱包候補日を示す梱包計画情報を生成し、出力する。梱包計画情報は、梱包作業を行う作業者を示す情報や梱包作業を行う梱包作業時間帯を示す情報、梱包作業を行う作業順序を示す情報を含んでもよい。例えば、梱包計画立案部15は、各作業者が各梱包予定製品の梱包作業を行うスケジュールを表示画面に表示してもよいし、梱包計画立案部15は、梱包候補日に、作業者が使用する端末へ梱包予定製品の梱包作業を行う梱包作業時間帯を示す梱包計画情報を送信してもよい。   The packing plan planning unit 15 generates and outputs packing plan information indicating a packing candidate date for each packing planned product. The packing plan information may include information indicating an operator who performs a packing operation, information indicating a packing operation time zone in which the packing operation is performed, and information indicating a work order in which the packing operation is performed. For example, the packing plan planning unit 15 may display a schedule for each worker to pack each product scheduled for packing on the display screen, and the packing plan planning unit 15 may be used by the worker on the packing candidate date. The packing plan information indicating the packing work time zone for packing the product to be packed may be transmitted to the terminal to be packed.

図8は、実施の形態1に係る梱包計画立案処理の動作の一例を示すフローチャートである。梱包計画立案処理は、梱包計画立案装置1の起動中は繰り返し実行される。例えば、定期的に、あるいはオーダ情報DB2に新たにオーダ情報が記録される度に実行する。梱包計画立案装置1の梱包指示部11は、オーダ情報DB2に新たに記憶されたオーダ情報を読み出す(ステップS11)。梱包指示部11は、受注した製品の製品情報を製品情報DB3から読み出す(ステップS12)。梱包指示部11は、読み出したオーダ情報および製品情報に基づいて、受注した製品の数量が梱包指示をするか否かの基準となる出荷数量を超えるか否かを判定する(ステップS13)。基準となる出荷数量を超えない場合(ステップS13;NO)、処理を終了する。基準となる出荷数量を超える場合(ステップS13;YES)、梱包指示部11は、当該製品を梱包予定製品として決定する(ステップS14)。梱包指示部11は、梱包予定製品のオーダ情報および製品情報を集梱箱設定部12に送る。   FIG. 8 is a flowchart showing an example of the operation of the packing plan planning process according to the first embodiment. The packaging planning process is repeatedly executed while the packaging planning apparatus 1 is activated. For example, it is executed periodically or whenever new order information is recorded in the order information DB 2. The packing instruction unit 11 of the packing plan planning apparatus 1 reads the order information newly stored in the order information DB 2 (step S11). The packing instruction unit 11 reads the product information of the ordered product from the product information DB 3 (step S12). Based on the read order information and product information, the packing instruction unit 11 determines whether or not the quantity of the ordered product exceeds the shipping quantity that is a reference for whether or not to give the packing instruction (step S13). If the standard shipment quantity is not exceeded (step S13; NO), the process is terminated. When exceeding the standard shipment quantity (step S13; YES), the packing instruction unit 11 determines the product as a product to be packed (step S14). The packing instruction unit 11 sends the order information and product information of the product to be packed to the collection box setting unit 12.

集梱箱設定部12は、梱包予定製品のオーダ情報および製品情報と、集梱箱情報とに基づいて、梱包予定製品を梱包したときに集梱箱数が一番小さくなる集梱箱を梱包予定製品の集梱箱として設定する(ステップS15)。集梱箱設定部12は、梱包予定製品のオーダ情報および製品情報と、設定した梱包予定製品の集梱箱とその数を示す設定集梱箱情報を梱包作業時間設定部13に送る。梱包作業時間設定部13は、梱包予定製品のオーダ情報および製品情報と、設定集梱箱情報と、作業時間マスタとに基づいて、梱包予定製品の梱包作業にかかる梱包作業時間を設定する(ステップS16)。梱包作業時間設定部13は、梱包予定製品のオーダ情報と、設定した梱包予定製品の梱包作業時間を示す梱包作業時間情報とを梱包候補日設定部14に送る。   The packaging box setting unit 12 packs the packaging box with the smallest number of packaging boxes when the packaging product is packed based on the order information and product information of the product to be packed and the packaging box information. It is set as a packaging box for the planned product (step S15). The packaging box setting unit 12 sends order information and product information of the product to be packed, and set packaging box information indicating the set packaging boxes and the number of the packaging products to be packed to the packaging work time setting unit 13. The packing work time setting unit 13 sets the packing work time for the packing work of the product to be packed based on the order information and product information of the product to be packed, the set collection box information, and the work time master (step S16). The packing work time setting unit 13 sends the order information of the packing scheduled product and the packing work time information indicating the set packing work time of the packing scheduled product to the packing candidate date setting unit 14.

梱包候補日設定部14は、梱包予定製品の送り先に対応する輸送手段情報を輸送手段情報DB6から読み出す(ステップS17)。梱包候補日設定部14は、読み出した輸送手段情報と、梱包予定製品のオーダ情報と、現場作業量情報と、梱包作業時間情報とに基づいて、梱包予定製品の梱包候補日を設定する(ステップS18)。梱包候補日設定部14は、梱包予定製品のオーダ情報と、設定した梱包予定製品の梱包候補日を示す梱包候補日情報を梱包計画立案部15に送る。梱包計画立案部15は、梱包予定製品のオーダ情報と、梱包候補日情報とに基づいて、梱包予定製品ごとの梱包候補日を示す梱包計画情報を生成して出力し(ステップS19)、処理を終了する。   The packing candidate date setting unit 14 reads the transportation means information corresponding to the destination of the product to be packed from the transportation means information DB 6 (step S17). The packing candidate date setting unit 14 sets the packing candidate date of the packing scheduled product based on the read transportation means information, order information of the packing scheduled product, field work amount information, and packing work time information (step) S18). The packing candidate date setting unit 14 sends the order information of the packing planned product and the packing candidate date information indicating the packing candidate date of the set packing planned product to the packing planning unit 15. The packing plan planning unit 15 generates and outputs packing plan information indicating a packing candidate date for each packing planned product based on the order information of the packing scheduled product and the packing candidate date information (step S19), and performs processing. finish.

以上説明したように実施の形態1の梱包計画立案装置1によれば、梱包作業現場で梱包作業をすることが可能な作業可能時間を考慮した梱包作業日を設定することで、梱包作業の完了期限を守れなかったり、時間外勤務によって梱包作業費が増加したりすることを防ぐことができる。   As described above, according to the packing plan planning apparatus 1 of the first embodiment, the packing work is completed by setting the packing work date in consideration of the workable time during which the packing work can be performed at the packing work site. It is possible to prevent the deadline from being met or the packaging work cost from increasing due to overtime.

(実施の形態2)
梱包が完了した製品は一時保管され、例えば、送り先や要求された納期、同一注文の製品が入っている集梱箱を示す情報、同一注文の製品が入っている集梱箱の数、梱包が完了した製品の重量、輸送会社、輸送手段を示す出荷指示によって出荷先へ出荷される。出荷時の輸送手段は、コンテナによる海上輸送、航空輸送、トラック輸送といった多種多様な輸送手段が存在し、出荷可能日、出荷可能時間、輸送日数および輸送費がそれぞれ異なる。また、出荷までに日数を要する際には、梱包完了品倉庫に保管するための保管費が発生する。実施の形態2では、梱包予定製品の物流費を算出する。物流費は、輸送費、保管費、梱包作業費、荷役費および手配費の和である。
(Embodiment 2)
Products that have been packaged are temporarily stored.For example, the destination and requested delivery date, information indicating the packaging box containing the same order product, the number of packaging boxes containing the same order product, The product is shipped to the shipping destination according to a shipping instruction indicating the weight of the completed product, the transportation company, and the transportation means. There are various types of transportation means such as sea transportation by container, air transportation, truck transportation, etc., and the shipping date, shipping time, transportation days, and transportation cost are different. In addition, when it takes days to ship, a storage cost is required for storing in the finished product warehouse. In the second embodiment, the distribution cost of the product to be packed is calculated. The logistics cost is the sum of transportation cost, storage cost, packing work cost, cargo handling cost and arrangement cost.

図9は、本発明の実施の形態2に係る梱包計画立案システムの構成例を示す図である。実施の形態2に係る梱包計画立案システム200は、実施の形態1に係る梱包計画立案システム100の構成に加え、物流費情報DB8を備える。実施の形態2の梱包計画立案装置1は、実施の形態1の梱包計画立案装置1の機能構成に加え、出荷計画立案部16を備える。集梱箱設定部12は、設定した梱包予定製品の集梱箱の集梱箱情報を出荷計画立案部16に送る。梱包候補日設定部14は、梱包予定製品の梱包作業を行う梱包候補日と梱包作業時間帯を設定する。また、梱包候補日設定部14は、梱包予定製品の送り先に対応する輸送手段情報を出荷計画立案部16に送る。梱包計画立案部15は、梱包予定製品ごとの梱包作業を行う梱包候補日と梱包作業時間帯とを示す梱包計画情報を生成する。梱包計画立案部15は、梱包予定製品のオーダ情報と、生成した梱包計画情報とを出荷計画立案部16に送る。   FIG. 9 is a diagram showing a configuration example of a packing plan planning system according to Embodiment 2 of the present invention. The packaging planning system 200 according to the second embodiment includes a logistics cost information DB 8 in addition to the configuration of the packaging planning system 100 according to the first embodiment. The packaging plan planning apparatus 1 according to the second embodiment includes a shipping plan planning unit 16 in addition to the functional configuration of the packaging plan planning apparatus 1 according to the first embodiment. The packaging box setting unit 12 sends the packaging box information of the packaging box of the set product to be packed to the shipping plan planning unit 16. The packing candidate date setting unit 14 sets a packing candidate date and a packing work time zone for packing the product to be packed. Further, the packing candidate date setting unit 14 sends the transportation means information corresponding to the destination of the product to be packed to the shipping plan planning unit 16. The packing plan planning unit 15 generates packing plan information indicating a packing candidate date for performing packing work for each packing scheduled product and a packing work time zone. The packing plan planning unit 15 sends the order information of the packing planned product and the generated packing plan information to the shipping plan planning unit 16.

出荷計画立案部16は、少なくとも梱包計画情報に基づいて、出荷候補日を設定する。例えば、出荷計画立案部16は、梱包候補日の翌日を出荷候補日とする。または、出荷計画立案部16は、梱包候補日の後の、決められた輸送手段の直近の出荷可能日に、出荷候補日を設定する。なお、出荷作業が完了した日に出荷作業を行うことが可能な場合には、梱包候補日を出荷候補日としてもよい。出荷計画立案部16は出荷候補日だけでなく、梱包予定製品の送り先に対応する輸送手段の出荷可能時間に出荷作業を行う出荷作業時間帯を設定してもよいし、出荷作業を行う作業順序を設定してもよい。   The shipping plan planning unit 16 sets a shipping candidate date based at least on the packing plan information. For example, the shipment planning unit 16 sets the next day of the packing candidate date as the shipping candidate date. Alternatively, the shipping plan planning unit 16 sets the shipping candidate date on the date that can be shipped immediately after the determined shipping means after the packing candidate date. Note that if the shipping operation can be performed on the day when the shipping operation is completed, the packing candidate date may be set as the shipping candidate date. The shipment planning unit 16 may set not only the candidate shipping date but also a shipping work time zone in which the shipping work is performed in the shipping available time of the transportation means corresponding to the destination of the product to be packed, and the work order in which the shipping work is performed. May be set.

物流費情報DB8は、輸送手段ごとの輸送費を示す情報と、保管日数ごとの保管費を示す情報と、作業時間ごとの梱包作業費を示す情報と、荷役ごとの荷役費を示す情報と、トラックやコンテナなどの運搬設備および運搬資材の手配ごとの手配費を示す情報とを含む物流費情報を記憶する。出荷計画立案部16は、梱包予定製品のオーダ情報と、梱包予定製品の送り先に対応する輸送手段情報と、物流費情報に含まれる輸送手段ごとの輸送費を示す情報とを参照し、梱包予定製品の輸送費を算出する。輸送費を示す情報は、例えば各輸送手段の運賃表である。梱包予定製品の輸送費は、決定した輸送手段の運賃表を元に、出荷元から送り先までの距離と、梱包が完了した製品の重量または容積によって決定される。また、輸送費が時期によって変わる場合などは、出荷候補日が属する時期の運賃表を元に、梱包予定製品の輸送費を算出する。   The logistics cost information DB 8 includes information indicating the transportation cost for each means of transportation, information indicating the storage cost for each storage day, information indicating the packaging work cost for each work time, information indicating the handling cost for each cargo handling, Logistics cost information including information indicating the arrangement cost for each arrangement of conveyance equipment such as trucks and containers and conveyance materials is stored. The shipping plan planning unit 16 refers to the order information of the product to be packed, the transportation information corresponding to the destination of the product to be packed, and the information indicating the transportation cost for each transportation means included in the distribution cost information, Calculate the transportation cost of the product. The information indicating the transportation cost is, for example, a fare table for each transportation means. The transportation cost of the product to be packed is determined by the distance from the shipping source to the destination and the weight or volume of the product that has been packed, based on the determined fare table of the transportation means. In addition, when the transportation cost changes depending on the time, the transportation cost of the product to be packed is calculated based on the fare table of the time to which the shipping candidate date belongs.

国内向けの主な輸送手段として、トラック輸送があり、輸送手段によって料金体系が異なる。トラック輸送には、路線便、貸切便および宅配便がある。路線便は、同一送り先であれば送り状1枚で複数個の荷物を重量合算した運賃で取扱い可能な輸送手段であり、同一送り先の出荷物を同時に輸送することで輸送費を削減できるため、貸切便に満たない物量の場合は一番選択されやすい輸送手段である。ただし、路線会社が所有する幹線便によって、他の荷主の出荷物と同一トラックで輸送される。また、時間指定ができない場合が多く、指定した場合、追加費用を請求されることもある。貸切便は、出荷元がトラックを用意し、そのトラックに対して運賃が発生する輸送手段である。同一送り先であれば同一トラック積載における輸送費は一定のため、積み合せによって輸送費を抑えることができる。宅配便は、路線便と同様に他荷主の出荷物と同一トラックで輸送される輸送手段である。路線便と異なり、同一送り先であっても送り状一枚で複数個の荷物を重量合算できず、輸送費が割高になりがちだが、時間指定できる利点がある。出荷先からの要望がある場合や路線便が使えない場合に路線便の代替輸送手段として用いることがある。   There is truck transportation as the main transportation means for the domestic market, and the charge system varies depending on the transportation means. Truck transport includes route, chartered and courier services. A route flight is a means of transportation that can be handled with a fare that is the sum of the weights of a single invoice if the destination is the same destination, and the shipping cost can be reduced by simultaneously transporting shipments from the same destination. It is the most easily selected means of transportation when the quantity is less than the stool. However, it is transported by the same truck as other shipper's shipments by the trunk line owned by the route company. Moreover, there are many cases where the time cannot be specified, and if it is specified, an additional fee may be charged. The charter flight is a transportation means in which a shipping source prepares a truck and a fare is generated for the truck. Since the transportation cost for loading the same truck is constant for the same destination, the transportation cost can be suppressed by stacking. The home delivery service is a transportation means that is transported by the same truck as the shipment of the other shipper like the route service. Unlike route flights, even if the destination is the same destination, it is not possible to add multiple pieces of luggage with a single invoice and the transportation cost tends to be expensive, but there is the advantage that you can specify the time. When there is a request from a shipping destination or when a route flight cannot be used, it may be used as an alternative transportation means for a route flight.

海外向けの主な輸送手段としては、海上輸送または航空輸送があり、輸送手段によって料金体系が異なる。海上輸送には、FCL(Full Container Load)およびLCL(Less than Container Load)がある。FCLは海上用輸送コンテナを出荷元が用意し、コンテナ当たりの輸送費によって費用が決定される輸送手段である。同一コンテナの場合、輸送費は一定であり同一送り先への出荷物を積み合せることによって輸送費を抑制できる。さらに、積み合わせることでコンテナ手配回数が減り、手配費や荷役費の抑制も見込める。なお、手配費や荷役費については後に詳細を記述する。一方、LCLは、海上輸送コンテナを船社が用意し、他の荷主の出荷物と合わせてコンテナに積載する手段であり、出荷物の重量や容積と送り先までの距離に応じて輸送費が決定される。航空輸送の場合は、航空会社が指定した1梱包あたりの重量と送り先の運賃表に基づいて輸送費が決定される。   Main transportation means for overseas are sea transportation or air transportation, and the charge system varies depending on the transportation means. Marine transportation includes FCL (Full Container Load) and LCL (Less than Container Load). FCL is a transportation means in which a shipping source prepares a marine transportation container, and the cost is determined by the transportation cost per container. In the case of the same container, the transportation cost is constant, and the transportation cost can be suppressed by stacking the shipments to the same destination. In addition, the number of container arrangements can be reduced by stacking, and the arrangement and cargo handling costs can be reduced. Details of arrangement costs and handling costs will be described later. On the other hand, LCL is a means to prepare a marine transport container by a shipping company and load it on the container together with other shippers' shipments. The transportation cost is determined according to the weight and volume of the shipment and the distance to the destination. Is done. In the case of air transportation, the transportation cost is determined based on the weight per package specified by the airline and the fare table of the destination.

出荷計画立案部16は、梱包予定製品のオーダ情報と、梱包計画情報と、物流費情報に含まれる保管日数ごとの保管費を示す情報とを参照し、梱包予定製品の保管費を算出する。保管費を示す情報は、例えば保管倉庫での1日あたりの保管費と梱包完了品倉庫での1日あたりの保管費である。保管費は、保管費は梱包前の保管倉庫での保管期間にかかる保管費、梱包後の梱包完了品倉庫での保管期間にかかる保管費の和によって決定される。   The shipping plan planning unit 16 refers to the order information of the product to be packed, the packing plan information, and the information indicating the storage cost for each storage day included in the distribution cost information, and calculates the storage cost of the product to be packed. The information indicating the storage cost is, for example, the storage cost per day in the storage warehouse and the storage cost per day in the packaged product warehouse. The storage cost is determined by the sum of the storage cost for the storage period in the storage warehouse before packing and the storage cost for the storage period in the packed product warehouse after packing.

出荷計画立案部16は、梱包予定製品のオーダ情報と、梱包計画情報と、物流費情報に含まれる作業時間ごとの梱包作業費を示す情報とを参照し、梱包予定製品の梱包作業費を算出する。梱包作業費を示す情報は、例えば定時時間内の作業単価と定時時間内の作業単価および定時時間外の作業単価である。梱包作業費は、定時時間内の作業単価に梱包作業時間帯のうちの定時時間内の作業時間をかけた値と、定時時間外の作業単価に梱包作業時間帯のうちの定時時間外の作業時間をかけた値との和によって決定される。   The shipping planning unit 16 refers to the order information of the product to be packed, the packing plan information, and the information indicating the packing work cost for each work time included in the distribution cost information, and calculates the packing work cost of the product to be packed. To do. The information indicating the packing work cost is, for example, a work unit price within a fixed time period, a work unit price within a fixed time period, and a work unit price outside the fixed time period. The packing work cost is the value obtained by multiplying the unit price within the regular time by the work time within the regular time in the regular package time, and the work unit outside the regular time and the work outside the regular time within the regular work period. It is determined by the sum of the value over time.

出荷計画立案部16は、梱包予定製品のオーダ情報と、梱包予定製品の送り先に対応する輸送手段情報と、物流費情報に含まれる荷役ごとの荷役費を示す情報とを参照し、梱包予定製品の荷役費を算出する。梱包作業費を示す情報は、例えば梱包が完了した製品を梱包完了品倉庫へ運ぶ際の作業費や、貸切便のトラックへの積み込み費用、海上輸送コンテナへのバンニング費用などの各種荷役に対する費用である。荷役費は、決定した輸送手段と送り先によって決まる出荷に必要な各種荷役の費用の合計によって決定される。   The shipping plan planning unit 16 refers to the order information of the product to be packed, the transportation means information corresponding to the destination of the product to be packed, and the information indicating the handling cost for each cargo handling included in the distribution cost information, and the product to be packed Calculate the cargo handling cost. The information indicating the packing work cost is the cost for various cargo handling, such as the work cost when transporting the packed product to the packed product warehouse, the cost of loading the chartered flights into the truck, the vanning cost to the maritime shipping container, etc. is there. The handling cost is determined by the total cost of various types of handling required for shipment determined by the determined means of transportation and destination.

出荷計画立案部16は、梱包予定製品のオーダ情報と、梱包予定製品の送り先に対応する輸送手段情報と、物流費情報に含まれる運搬設備および運搬資材の手配ごとの手配費を示す情報とを参照し、梱包予定製品の手配費を算出する。手配費を示す情報は、例えば貸切便のトラックの手配費用や、海外用輸送コンテナの手配費用などの各種手配に対する費用である。手配費は、決定した輸送手段と送り先によって決まる出荷に必要な各種手配の費用の合計によって決定される。   The shipping plan planning unit 16 includes order information of the products scheduled for packing, transportation means information corresponding to the destination of the products scheduled for packing, and information indicating the arrangement cost for each arrangement of the transportation equipment and the transportation material included in the distribution cost information. Refer to it and calculate the arrangement cost for the product to be packed. The information indicating the arrangement cost is, for example, expenses for various arrangements such as arrangement costs for chartered trucks and arrangement costs for overseas shipping containers. The arrangement cost is determined by the total cost of various arrangements necessary for shipment determined by the determined transportation means and destination.

出荷計画立案部16は、算出した輸送費、保管費、梱包作業費、荷役費および手配費を合計して梱包予定製品の物流費を算出する。出荷計画立案部16は、梱包予定製品ごとの出荷候補日を示す出荷計画情報と、算出した梱包予定製品の物流費を示す出荷物流費情報と、梱包計画情報とを出力する。出荷計画情報、出荷物流費情報および梱包計画情報の出力は、画面表示してもよいし、外部に出力してもよい。出荷物流費情報は、輸送費、保管費、梱包作業費、荷役費および手配費を合計した物流費ではなく、それぞれの費用を示す情報であってもよい。梱包計画立案装置1のその他の機能構成は実施の形態1と同様である。   The shipment planning unit 16 calculates the distribution cost of the product to be packed by adding the calculated transportation cost, storage cost, packing work cost, cargo handling cost, and arrangement cost. The shipping plan planning unit 16 outputs shipping plan information indicating a shipping candidate date for each product to be packed, shipping logistics cost information indicating the calculated logistics cost of the product to be packed, and packing plan information. The output of the shipping plan information, the shipping logistics cost information and the packing plan information may be displayed on the screen or may be output to the outside. The shipping logistics cost information may be information indicating each cost, not a logistics cost that is a sum of transportation cost, storage cost, packing work cost, cargo handling cost, and arrangement cost. Other functional configurations of the packing plan planning apparatus 1 are the same as those in the first embodiment.

以上説明したように実施の形態2の梱包計画立案装置1によれば、梱包計画立案装置1が生成した梱包計画情報どおりに梱包作業を行って出荷計画情報どおりに作業を行った場合にかかる物流費を現場管理者が把握できる。これによって、例えば現場管理者が梱包作業日や出荷候補日を修正することが容易になる。   As described above, according to the packing plan planning apparatus 1 of the second embodiment, the distribution when the packing work is performed according to the packing plan information generated by the packing plan planning apparatus 1 and the work is performed according to the shipping plan information. The site manager can grasp the cost. This facilitates, for example, the site manager to correct the packing work date and the shipping candidate date.

(実施の形態3)
実施の形態3の梱包計画立案システムの構成および梱包計画立案装置1の機能構成は実施の形態2と同様である。実施の形態3では、出荷計画立案部16は、物流費が最小となるように梱包計画情報および出荷計画情報を更新する。なお、出荷計画立案部16は、すべての出荷について要求された納期を守る範囲で梱包計画情報および出荷計画情報を更新する。例えば、国内の輸送手段として路線便を使用する時は、同一送り先の荷物が同一日にまとまるほど輸送費が小さくなる。国内の輸送手段として貸切便を使用する時は、同一送り先の荷物が同一日にまとまり、かつ、トラックの積載率が高くなるほど輸送費が小さくなる。出荷計画立案部16は、このような物流費が小さくなる条件を記憶しており、国内のすべての輸送手段を使用した場合の輸送費、手配費および荷役費のシミュレーションを行い、輸送費、手配費および荷役費の合計が最小となる輸送手段を採用する。
(Embodiment 3)
The configuration of the packing plan planning system of the third embodiment and the functional configuration of the packing plan planning device 1 are the same as those of the second embodiment. In the third embodiment, the shipping plan planning unit 16 updates the packing plan information and the shipping plan information so that the distribution cost is minimized. In addition, the shipping plan planning unit 16 updates the packing plan information and the shipping plan information within a range that keeps the requested delivery date for all shipments. For example, when a route flight is used as a domestic transportation means, the transportation cost becomes smaller as packages of the same destination are collected on the same day. When using a chartered flight as a domestic means of transportation, the transportation cost decreases as the packages of the same destination are grouped on the same day and the loading ratio of the truck increases. The shipping plan planning unit 16 stores the conditions for reducing such logistics costs, and simulates transportation costs, arrangement costs and cargo handling costs when all domestic transportation methods are used. Adopt a means of transportation that minimizes the sum of costs and handling costs.

なお、貸切便のトラックを超える端数の梱包が完了した製品がある場合は、すべて路線便にしてもよいし、貸切便のトラックを複数手配してもよいし、路線便および貸切便の両方を使用してもよいが、物流費が小さくなる方の輸送手段を採用する。国内の輸送費は、路線便および貸切便のどちらの輸送手段を使用した場合においても、同一送り先の出荷物を同一日に梱包し、出荷することによって最小となる。そのため、出荷計画立案部16は、要求された納期を守れる範囲で同一送り先の出荷物を同一日に梱包するように梱包候補日および出荷候補日を変更する。   If there are products that have been packed more than the number of chartered trucks, all of them may be routed, multiple chartered trucks may be arranged, and both routed and chartered flights Although it may be used, a transportation means with a lower logistics cost is adopted. Domestic transportation costs are minimized by packing and shipping shipments from the same destination on the same day, regardless of whether the route or charter is used. Therefore, the shipment planning unit 16 changes the packing candidate date and the shipping candidate date so as to pack the shipments of the same destination on the same day as long as the requested delivery date can be observed.

定時時間内の作業単価に比べて定時時間外の作業単価の方が高いため、実施の形態1では、基本的に時間外勤務時間は作業可能時間に含まず、受注した製品の梱包を完了する期限よりも前に梱包予定製品の梱包作業時間を確保できない場合のみ、時間外勤務時間を作業可能時間に含むように構成するのが好ましいと述べた。しかし、国内の輸送費は、同一送り先の出荷物を同一日に梱包し、出荷することによって最小となるため、出荷計画立案部16は、定時時間外に梱包作業をしても全体の物流費が小さくなる場合には、定時時間外作業が必要となる梱包候補日および出荷候補日に変更する。   Since the unit price of work outside the fixed hours is higher than the unit price of work during the fixed hours, in Embodiment 1, the overtime hours are basically not included in the available work hours, and the packaging of the ordered product is completed. It has been stated that it is preferable to configure so that the overtime hours are included in the available work hours only when the packing work time of the product to be packed cannot be secured before the deadline. However, domestic transportation costs are minimized by packing and shipping shipments from the same destination on the same day. When becomes smaller, it is changed to a packing candidate date and a shipping candidate date that require work outside the scheduled time.

海外向けの輸送手段である海上輸送については、FCLとLCLによって異なる。FCLの場合は、国内の貸切便と同様に、コンテナの数によって輸送費が決定されるため、そのコンテナの積載率が高いほど輸送費が最小となる。梱包予定製品の集梱箱のサイズ、荷姿および梱包が完了した製品の重量は既に決定しているため、出荷計画立案部16は、積載シミュレータを使用して、コンテナ積載率が一番高い場合を想定し、要求された納期を守れる範囲でコンテナ積載率が一番高くなるように梱包候補日および出荷候補日を変更する。この場合、出荷計画立案部16は、集梱箱設定部12から梱包予定製品の集梱箱のサイズおよび荷姿を示す情報を含む設定集梱箱情報を取得する。国内での出荷と同様に、出荷計画立案部16は、定時時間外に梱包作業をしても全体の物流費が小さくなる場合には、定時時間外作業が必要となる梱包候補日および出荷候補日に変更する。出荷数量が多く、コンテナの最大積載物量を超える場合には、FCLのコンテナを複数手配してもよいし、一部をLCLで輸送してもよいが、物流費が小さくなる方の輸送手段を採用する。   Sea transportation, which is a means of transportation for overseas, differs depending on FCL and LCL. In the case of FCL, the transportation cost is determined by the number of containers as in the case of domestic chartered flights. Therefore, the higher the loading rate of the container, the smaller the transportation cost. Since the size of the packaging box of the product to be packed, the packaging, and the weight of the finished product have already been determined, the shipping planning unit 16 uses the loading simulator and the container loading rate is the highest. As a result, the packing candidate date and the shipping candidate date are changed so that the container loading rate is the highest within the range that can meet the requested delivery date. In this case, the shipping plan planning unit 16 acquires set packaging box information including information indicating the size and packaging shape of the packaging box of the product to be packed from the packaging box setting unit 12. Similar to domestic shipment, the shipping plan planning unit 16 determines the packing candidate date and shipping candidate that require overtime work if the overall logistics cost is reduced even if the packing work is done outside of the scheduled time. Change the day. If the shipment quantity is large and exceeds the maximum load capacity of the container, multiple FCL containers may be arranged, or some of them may be transported by LCL. adopt.

LCLの場合には、FCLの場合とは異なり、集梱箱毎に輸送費が発生するため、梱包作業計画の変更優先度は低く、現場の作業負荷が少なく、かつ、定時時間内に梱包作業を行うことによって物流費を最小にできる。なお、作業可能時間は日によって限りがあるため、全体の物流費が小さくなる場合に限り、LCLの出荷物の一部の梱包作業日時を遅らせ、航空輸送へ切り替えることで全体の物流費が最小になる場合には出荷計画立案部16は、航空輸送へ変更し、梱包候補日および出荷候補日に変更する。   In the case of LCL, unlike the case of FCL, transportation costs are incurred for each packing box, so the priority of changing the packing work plan is low, the work load on the site is low, and the packing work is performed within a fixed time. Logistics costs can be minimized. Since the available work hours are limited depending on the day, the total logistics cost is minimized by delaying the packing work date and time of part of the shipment of LCL and switching to air transportation only when the overall logistics cost is small. In this case, the shipment planning unit 16 changes to air transportation and changes the packing candidate date and the shipping candidate date.

保管費は、梱包前の保管費と梱包後の保管費の和で決まる。梱包材や緩衝剤によって、梱包前と梱包後の体積、または底面積は、梱包後の方が大きくなることが多い。契約方法によって異なるが、保管費は体積、または底面積によって決定されることが多い。そのため、梱包日時をできるだけ後ろ倒しすることによって保管時の体積、または底面積が小さくなるので、保管費が小さくなる。ただし、例えば保管費を決められた期間ごとに算出している場合には、決められた期間を跨いだ直後にまとめて梱包することによって保管費は最小となる。保管費と作業可能時間を考慮し、梱包候補日を変更することで全体の物流費が最小となる場合には、出荷計画立案部16は、梱包候補日および出荷候補日を変更する。なお、倉庫を一棟借りる場合など変動要因がない場合、つまり、倉庫内の物量に保管費が依存しない場合にはこの限りではない。   The storage cost is determined by the sum of the storage cost before packing and the storage cost after packing. Depending on the packing material and the buffer, the volume or the bottom area before packing and after packing often becomes larger after packing. Depending on the contract method, storage costs are often determined by volume or bottom area. Therefore, since the volume or bottom area at the time of storage is reduced by moving the packing date back as far as possible, the storage cost is reduced. However, for example, when the storage cost is calculated for each determined period, the storage cost is minimized by packing together immediately after the determined period is exceeded. In consideration of the storage cost and the workable time, if the overall logistics cost is minimized by changing the packing candidate date, the shipping plan planning unit 16 changes the packing candidate date and the shipping candidate date. Note that this does not apply when there are no fluctuation factors, such as when renting a warehouse, that is, when the storage cost does not depend on the quantity in the warehouse.

梱包作業費は、定時時間内の作業時間を大きくし、定時時間外の作業時間を小さくすることで最小となる。梱包予定製品の数が多く、全体の梱包作業時間が多い場合には、臨時の作業者を雇うことで、定時時間外の作業時間を減らす。この場合、出荷計画立案部16は、定時時間外の作業時間が決められた閾値を超える場合には、臨時の作業者を雇う指示を示す指示情報を出力する。指示情報の出力は、画面表示してもよいし、外部に出力してもよい。   The packing work cost is minimized by increasing the work time within the fixed time and reducing the work time outside the fixed time. If the number of products to be packed is large and the entire packing work time is large, the work hours outside the regular hours are reduced by hiring temporary workers. In this case, the shipping plan making unit 16 outputs instruction information indicating an instruction to hire a temporary worker when the working time outside the regular time exceeds a predetermined threshold. The instruction information may be output on the screen or output to the outside.

荷役費は貸切便のトラックへの積み込みやコンテナへのバンニング時の作業費である。料金体系によって異なるが、トラックやコンテナ一台当たりによって費用が決まる場合には、輸送費と同様に積載率を上げることで荷役費を最小にできる。集梱箱の荷役回数によって荷役費が決まる場合には、出荷計画立案部16は、輸送費と荷役費の合計が最小となる輸送手段を採用する。   The cargo handling cost is the work cost when loading a chartered flight into a truck or vanning a container. Although it depends on the fee structure, if the cost is determined by the truck or container, the cargo handling cost can be minimized by increasing the loading rate as well as the transportation cost. When the cargo handling cost is determined by the number of times the cargo is handled in the packaging box, the shipping plan planning unit 16 employs a transportation means that minimizes the sum of the transportation cost and the cargo handling cost.

手配費は、貸切便のトラック手配時やコンテナ手配時に発生する。料金体系によって異なるが、一台当たりの手配費用によって算出される場合には、輸送費と同様に積載率を上げ、手配台数を減らすことで手配費を最小にできる。一度に手配する台数によっては変わらず、手配回数によって変わる場合には、同一日の手配回数が少なくなるように手配をかけることで手配費が最小となる。   Arrangement costs are incurred when allocating a chartered truck or a container. Although it varies depending on the fee structure, if it is calculated based on the arrangement cost per vehicle, the arrangement cost can be minimized by increasing the loading rate and reducing the number of arrangements in the same way as the transportation cost. If the number of arrangements does not change at the same time but changes depending on the number of arrangements, the arrangement cost can be minimized by making arrangements so that the number of arrangements on the same day is reduced.

出荷計画立案部16は、物流費である輸送費、保管費、梱包作業費、荷役費および手配費の合計が最小となるまで、全てのパターンにおける輸送手段、梱包候補日および出荷候補日の変更を実施し、物流費が最小となった梱包候補日および出荷候補日を示す梱包計画情報および出荷計画情報に更新する。出荷計画立案部16は、更新した梱包計画情報および出荷計画情報を出力する。なお、梱包計画情報が梱包作業を行う梱包作業時間帯や梱包作業を行う作業順序を示す情報を含む場合には、梱包作業時間帯や作業順序も加味して、上記のような物流費最小化処理を行う。同様に出荷計画情報が出荷作業を行う出荷作業時間帯や出荷作業を行う作業順序を示す情報を含む場合には、出荷作業時間帯や作業順序も加味して、上記のような物流費最小化処理を行う。   The shipping plan planning unit 16 changes the transportation means, the packing candidate date, and the shipping candidate date in all patterns until the total of the transportation cost, which is the distribution cost, the storage cost, the packing work cost, the handling cost, and the arrangement cost is minimized. To update the packing plan information and the shipping plan information indicating the packing candidate date and shipping candidate date at which the logistics cost is minimized. The shipping plan planning unit 16 outputs the updated packing plan information and shipping plan information. In addition, when the packing plan information includes information indicating the packing work time zone in which the packing work is performed and the work order in which the packing work is performed, the logistics cost as described above is minimized in consideration of the packing work time zone and the work order. Process. Similarly, when the shipping plan information includes information indicating the shipping work time zone in which the shipping work is performed and the work order in which the shipping work is performed, the logistics cost as described above is minimized in consideration of the shipping work time zone and the work order. Process.

出荷計画立案部16は、物流費最小化処理を梱包計画立案処理のタイミングに合わせて実行してもよいし、定期的に実行してもよい。例えば、毎日作業者の出社時刻の前に物流費最小化処理を行えば、その日の梱包計画情報および出荷計画情報が確定する。新しく増えた梱包予定製品を加味して、物流費最小化処理を行い、梱包計画情報および出荷計画情報を更新することで、常に物流費の最小化を図ることができる。梱包計画立案装置1のその他の機能構成は実施の形態2と同様である。   The shipping plan planning unit 16 may execute the distribution cost minimizing process in accordance with the timing of the packing plan planning process, or may execute it periodically. For example, if distribution cost minimization processing is performed before the worker's departure time every day, the packing plan information and shipping plan information for that day are fixed. Taking into account the newly increased packing planned products, the distribution cost minimization process is performed, and the packing plan information and the shipping plan information are updated, so that the distribution cost can always be minimized. Other functional configurations of the packing plan planning apparatus 1 are the same as those in the second embodiment.

以上説明したように実施の形態3の梱包計画立案装置1によれば、現場管理者が梱包作業日や出荷候補日を修正しなくても、梱包作業情報や出荷候補情報を自動で更新し、物流費の最小化を図ることができる。   As described above, according to the packing plan planning apparatus 1 of the third embodiment, even if the site manager does not correct the packing work date and the shipping candidate date, the packing work information and the shipping candidate information are automatically updated, Logistics costs can be minimized.

実施の形態1から3では、オーダ情報DB2、製品情報DB3、集梱箱情報DB4、作業時間マスタDB5、輸送手段情報DB6、現場作業量情報DB7および物流費情報DB8を梱包計画立案装置1とは別に備えたが、これに限らず、オーダ情報DB2、製品情報DB3、集梱箱情報DB4、作業時間マスタDB5、輸送手段情報DB6、現場作業量情報DB7および物流費情報DB8は梱包計画立案装置1に内蔵されてもよい。   In the first to third embodiments, the order information DB2, the product information DB3, the packing box information DB4, the work time master DB5, the transportation means information DB6, the on-site work amount information DB7, and the logistics cost information DB8 are defined as the packing plan planning apparatus 1. Although not provided separately, the order information DB2, the product information DB3, the packing box information DB4, the work time master DB5, the transport means information DB6, the on-site work amount information DB7 and the logistics cost information DB8 are not limited to this. It may be built in.

図10は、本発明の実施の形態に係る梱包計画立案装置のハードウェア構成の一例を示す図である。梱包計画立案装置1は、図10に示すように、一時記憶部101、記憶部102、計算部103、入力部104、外部出力部105および表示部106を備える。一時記憶部101、記憶部102、入力部104、外部出力部105および表示部106はいずれもBUSを介して計算部103に接続されている。   FIG. 10 is a diagram illustrating an example of a hardware configuration of the packing plan planning apparatus according to the embodiment of the present invention. As shown in FIG. 10, the packaging planning apparatus 1 includes a temporary storage unit 101, a storage unit 102, a calculation unit 103, an input unit 104, an external output unit 105, and a display unit 106. Temporary storage unit 101, storage unit 102, input unit 104, external output unit 105, and display unit 106 are all connected to calculation unit 103 via a BUS.

計算部103、はCPU(Central Processing Unit)などから構成され、記憶部102に記憶されている制御プログラムに従って、梱包計画立案装置1の梱包指示部11、集梱箱設定部12、梱包作業時間設定部13、梱包候補日設定部14、梱包計画立案部15および出荷計画立案部16の各処理を実行する。   The calculation unit 103 includes a CPU (Central Processing Unit) and the like, and in accordance with a control program stored in the storage unit 102, the packing instruction unit 11, the packing box setting unit 12, and the packing work time setting of the packing plan planning apparatus 1 The respective processes of the unit 13, the packing candidate date setting unit 14, the packing plan planning unit 15, and the shipping plan planning unit 16 are executed.

一時記憶部101はRAM(Random-Access Memory)などから構成され、記憶部102に記憶されている制御プログラムをロードし、計算部103の作業領域として用いられる。   The temporary storage unit 101 includes a RAM (Random-Access Memory) or the like, loads a control program stored in the storage unit 102, and is used as a work area of the calculation unit 103.

記憶部102は、フラッシュメモリ、ハードディスク、DVD−RAM、DVD−RWなどの不揮発性メモリから構成され、梱包計画立案装置1の処理を計算部103に行わせるためのプログラムをあらかじめ記憶し、また、計算部103の指示に従って、このプログラムが記憶するデータを計算部103に供給し、計算部103から供給されたデータを記憶する。   The storage unit 102 includes a nonvolatile memory such as a flash memory, a hard disk, a DVD-RAM, and a DVD-RW, and stores in advance a program for causing the calculation unit 103 to perform the processing of the packing plan planning apparatus 1, In accordance with an instruction from the calculation unit 103, the data stored in the program is supplied to the calculation unit 103, and the data supplied from the calculation unit 103 is stored.

入力部104は、キーボードおよびマウスなどのポインティングデバイスなどと、キーボードおよびポインティングデバイスなどをBUSに接続するインタフェース装置から構成されている。ユーザが梱包計画立案装置1に情報を入力する場合は、入力部104を介して、入力された情報が計算部103に供給される。   The input unit 104 includes a pointing device such as a keyboard and a mouse, and an interface device that connects the keyboard and the pointing device to the BUS. When the user inputs information to the packing plan planning apparatus 1, the input information is supplied to the calculation unit 103 via the input unit 104.

外部出力部105は、ネットワークに接続する網終端装置または無線通信装置、およびそれらと接続するシリアルインタフェースまたはLAN(Local Area Network)インタフェースから構成されている。梱包計画立案部15が梱包計画情報を外部に出力する場合には、外部出力部105を介して梱包計画情報が外部に出力される。出荷計画立案部16が梱包計画情報および出荷計画情報を外部に出力する場合には、外部出力部105を介して梱包計画情報および出荷計画情報が外部に出力される。   The external output unit 105 includes a network termination device or a wireless communication device connected to a network, and a serial interface or a LAN (Local Area Network) interface connected to them. When the packing plan planning unit 15 outputs the packing plan information to the outside, the packing plan information is output to the outside via the external output unit 105. When the shipping plan planning unit 16 outputs the packing plan information and the shipping plan information to the outside, the packing plan information and the shipping plan information are output to the outside via the external output unit 105.

表示部106は、CRT(Cathode Ray Tube)またはLCD(Liquid Crystal Display)などから構成されている。表示部106は、ユーザが梱包計画立案装置1に情報を入力する場合は、操作画面を表示する。梱包計画立案部15が梱包計画情報を画面表示する場合には、表示部106に梱包計画情報が表示される。出荷計画立案部16が梱包計画情報および出荷計画情報を画面表示する場合には、表示部106に梱包計画情報および出荷計画情報が表示される。   The display unit 106 includes a CRT (Cathode Ray Tube) or an LCD (Liquid Crystal Display). The display unit 106 displays an operation screen when the user inputs information to the packing plan planning apparatus 1. When the packing plan planning unit 15 displays the packing plan information on the screen, the packing plan information is displayed on the display unit 106. When the shipping plan planning unit 16 displays the packing plan information and the shipping plan information on the screen, the packing plan information and the shipping plan information are displayed on the display unit 106.

図10に示す梱包計画立案装置1の梱包指示部11、集梱箱設定部12、梱包作業時間設定部13、梱包候補日設定部14、梱包計画立案部15、および、出荷計画立案部16の処理は、制御プログラムが、一時記憶部101、計算部103、記憶部102、入力部104、外部出力部105および表示部106などを資源として用いて処理することによって実行する。   The packing instruction unit 11, the packing box setting unit 12, the packing work time setting unit 13, the packing candidate date setting unit 14, the packing plan planning unit 15, and the shipping plan planning unit 16 of the packing plan planning apparatus 1 shown in FIG. The processing is executed by the control program using the temporary storage unit 101, the calculation unit 103, the storage unit 102, the input unit 104, the external output unit 105, the display unit 106, and the like as resources.

その他、前記のハードウェア構成やフローチャートは一例であり、任意に変更および修正が可能である。   In addition, the hardware configuration and the flowchart described above are merely examples, and can be arbitrarily changed and modified.

計算部103、一時記憶部101、記憶部102、入力部104、外部出力部105および表示部106などから構成される梱包計画立案装置1の処理を行う中心となる部分は、専用のシステムによらず、通常のコンピュータシステムを用いて実現可能である。例えば、前記の動作を実行するためのコンピュータプログラムを、コンピュータが読み取り可能な記録媒体(フレキシブルディスク、CD−ROM、DVD−ROMなど)に格納して配布し、当該コンピュータプログラムをコンピュータにインストールすることにより、前記の処理を実行する梱包計画立案装置1を構成してもよい。また、インターネットなどの通信ネットワーク上のサーバ装置が有する記憶装置に当該コンピュータプログラムを格納しておき、通常のコンピュータシステムがダウンロードなどすることで梱包計画立案装置1を構成してもよい。   The central part of processing of the packaging planning apparatus 1 including the calculation unit 103, the temporary storage unit 101, the storage unit 102, the input unit 104, the external output unit 105, the display unit 106, and the like is based on a dedicated system. Instead, it can be realized using a normal computer system. For example, a computer program for executing the above operation is stored and distributed on a computer-readable recording medium (flexible disk, CD-ROM, DVD-ROM, etc.), and the computer program is installed in the computer. Thus, the packaging planning device 1 that executes the above-described processing may be configured. Alternatively, the packaging program planning apparatus 1 may be configured by storing the computer program in a storage device included in a server device on a communication network such as the Internet and downloading it by a normal computer system.

また、梱包計画立案装置1の機能を、OS(オペレーティングシステム)とアプリケーションプログラムの分担、またはOSとアプリケーションプログラムとの協働により実現する場合などには、アプリケーションプログラム部分のみを記録媒体や記憶装置に格納してもよい。   Further, when the functions of the packaging planning device 1 are realized by sharing of an OS (operating system) and an application program, or by cooperation between the OS and the application program, only the application program portion is stored in a recording medium or a storage device. It may be stored.

また、搬送波にコンピュータプログラムを重畳し、通信ネットワークを介して提供することも可能である。例えば、通信ネットワーク上の掲示板(BBS, Bulletin Board System)に前記コンピュータプログラムを掲示し、ネットワークを介して前記コンピュータプログラムを提供してもよい。そして、このコンピュータプログラムを起動し、OSの制御下で、他のアプリケーションプログラムと同様に実行することにより、前記の処理を実行できるように構成してもよい。   It is also possible to superimpose a computer program on a carrier wave and provide it via a communication network. For example, the computer program may be posted on a bulletin board (BBS, Bulletin Board System) on a communication network, and the computer program may be provided via the network. The computer program may be started and executed in the same manner as other application programs under the control of the OS, so that the above-described processing may be executed.

1 梱包計画立案装置、2 オーダ情報データベース、3 製品情報データベース、4 集梱箱情報データベース、5 作業時間マスタデータベース、6 輸送手段情報データベース、7 現場作業量情報データベース、8 物流費情報データベース、11 梱包指示部、12 集梱箱設定部、13 梱包作業時間設定部、14 梱包候補日設定部、15 梱包計画立案部、16 出荷計画立案部、100,200 梱包計画立案システム、101 一時記憶部、102 記憶部、103 計算部、104 入力部、105 外部出力部、106 表示部。   1 Packing planning device, 2 Order information database, 3 Product information database, 4 Packing box information database, 5 Working time master database, 6 Transportation means information database, 7 On-site work volume information database, 8 Logistics cost information database, 11 Packing Instruction unit, 12 Packing box setting unit, 13 Packing work time setting unit, 14 Packing candidate date setting unit, 15 Packing plan planning unit, 16 Shipping plan planning unit, 100, 200 Packing plan planning system, 101 Temporary storage unit, 102 Storage unit, 103 calculation unit, 104 input unit, 105 external output unit, 106 display unit.

Claims (10)

受注した製品の中から、梱包の対象となる梱包予定製品を決定する梱包指示部と、
前記梱包予定製品を梱包する集梱箱を設定する集梱箱設定部と、
前記集梱箱設定部が設定した集梱箱に前記梱包予定製品を梱包する梱包作業にかかる梱包作業時間を設定する梱包作業時間設定部と、
前記梱包作業時間設定部が設定した前記梱包作業時間を示す情報と、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報と、前記梱包予定製品の要求された納期を示す情報と、前記梱包予定製品の送り先までの輸送日数を示す情報とに基づいて、前記要求された納期から前記輸送日数以上遡った日付よりも前であって、前記梱包作業時間を確保できる日を梱包候補日として設定する梱包候補日設定部と、
前記梱包候補日設定部が設定した前記梱包予定製品ごとの前記梱包候補日を示す梱包計画情報を生成する梱包計画立案部と、
を備える梱包計画立案装置。
A packing instruction section for determining a product to be packed from among the ordered products;
A collection box setting unit for setting a collection box for packing the product to be packed;
A packing work time setting unit for setting a packing work time for packing work for packing the product to be packed in the packing box set by the packing box setting unit;
Information indicating the packing work time set by the packing work time setting unit, information indicating a workable time during which the packing work can be performed on a daily basis at the packing work site, and a requested delivery date of the product to be packed And the information indicating the number of shipping days to the destination of the product to be packed can be secured before the date that is more than the number of shipping days from the requested delivery date, and the packing work time can be secured. A packing candidate date setting unit for setting the day as a packing candidate date;
A packing plan planning unit for generating packing plan information indicating the packing candidate date for each of the packing planned products set by the packing candidate date setting unit;
A packaging planning device comprising:
前記梱包指示部は、前記受注した製品の数量を示す情報と、前記受注した製品の梱包指示をするか否かの基準となる出荷数量を示す情報とに基づいて、前記受注した製品の数量が、前記梱包指示をするか否かの基準となる出荷数量を超える製品を前記梱包予定製品として決定する請求項1に記載の梱包計画立案装置。   The packing instruction unit determines whether the quantity of the ordered product is based on information indicating the quantity of the ordered product and information indicating a shipment quantity which is a criterion for determining whether or not to give the packaging instruction for the ordered product. The packing plan planning device according to claim 1, wherein a product exceeding a shipment quantity serving as a reference for whether or not to give the packing instruction is determined as the packing scheduled product. 前記集梱箱設定部は、集梱箱で梱包可能な最大重量を示す情報と、集梱箱のサイズを示す情報と、前記梱包予定製品の数量を示す情報と、前記梱包予定製品の重量を示す情報と、前記梱包予定製品の個装箱のサイズを示す情報とに基づいて、前記梱包予定製品を梱包したときに集梱箱数が一番小さくなる集梱箱を前記梱包予定製品の集梱箱として設定する請求項1または2に記載の梱包計画立案装置。   The packaging box setting unit includes information indicating the maximum weight that can be packed in the packaging box, information indicating the size of the packaging box, information indicating the quantity of the product to be packed, and the weight of the product to be packed. Based on the information to be displayed and the information indicating the size of the individual packaging of the product to be packed, the packaging box having the smallest number of packaging boxes when the product to be packed is packed is collected in the collection of the products to be packed. The packing plan planning apparatus according to claim 1 or 2, which is set as a packing box. 前記梱包作業時間設定部は、前記集梱箱設定部が設定した集梱箱の組み立て時間および封緘作業時間の合計である梱包基本時間を示す情報と、前記集梱箱設定部が設定した集梱箱の数を示す情報と、前記梱包予定製品の個装箱の荷姿、個装箱のサイズおよび個装される製品の重量の少なくともいずれかによって変動する梱包変動時間を示す情報と、前記梱包予定製品の数量を示す情報とに基づいて、前記梱包基本時間に前記集梱箱設定部が設定した集梱箱の数を乗算した値と前記梱包変動時間に前記梱包予定製品の数量を乗算した値との合計を前記梱包予定製品の前記梱包作業時間として設定する請求項1から3のいずれか1項に記載の梱包計画立案装置。   The packing work time setting unit includes information indicating a packing basic time that is a total of the assembly time and the sealing work time of the packing box set by the packing box setting unit, and the packing set by the packing box setting unit. Information indicating the number of boxes, information indicating a packaging variation time that varies depending on at least one of the packing state of the individual packaging box of the product to be packed, the size of the individual packaging box, and the weight of the individual packaging product, and the packaging Based on the information indicating the quantity of the planned product, the value obtained by multiplying the basic packaging time by the number of packaging boxes set by the packaging box setting unit and the packaging variation time are multiplied by the quantity of the planned packaging product. The packing plan planning apparatus according to any one of claims 1 to 3, wherein a total of the values is set as the packing work time of the product to be packed. 前記梱包候補日設定部は、少なくとも、梱包作業を行う作業者の出勤日、出社予定時刻および退社予定時刻を示す情報に基づいて、前記作業者ごとの日別の前記作業可能時間を決定し、前記梱包予定製品の前記梱包候補日を設定するごとに、前記梱包候補日の前記作業可能時間から前記梱包予定製品の前記梱包作業時間を差し引く請求項1から4のいずれか1項に記載の梱包計画立案装置。   The packing candidate date setting unit determines at least the workable time for each worker by day based on information indicating at least the attendance date of the worker who performs the packing work, the scheduled work time, and the scheduled leaving time, The packaging according to any one of claims 1 to 4, wherein each time the packaging candidate date of the product to be packed is set, the packaging work time of the product to be packed is subtracted from the workable time of the packaging candidate date. Planning device. 少なくとも前記梱包計画情報に基づいて、前記梱包予定製品の出荷作業を行う出荷候補日を設定し、前記梱包予定製品ごとの前記出荷候補日を示す出荷計画情報を生成する出荷計画立案部を備え、
前記出荷計画立案部は、前記梱包計画情報および前記出荷計画情報と、輸送手段ごとの輸送費を示す情報、保管日数ごとの保管費を示す情報、作業時間ごとの梱包作業費を示す情報、荷役ごとの荷役費を示す情報、並びに運搬設備および運搬資材の手配ごとの手配費を示す情報の少なくともいずれかを含む物流費情報とに基づいて、前記梱包予定製品の物流費を算出する、
請求項1から5のいずれか1項に記載の梱包計画立案装置。
Based on at least the packing plan information, a shipping plan planning unit is provided that sets a shipping candidate date for shipping the packing planned product and generates shipping plan information indicating the shipping candidate date for each of the packing planned products.
The shipping plan planning unit includes the packing plan information and the shipping plan information, information indicating a transportation cost for each means of transportation, information indicating a storage cost for each storage day, information indicating a packing work cost for each work time, Calculating the logistics cost of the product to be packed based on the information indicating the handling cost for each and the logistics cost information including at least one of the information indicating the arrangement cost for each arrangement of the transportation equipment and the transportation material,
The packing plan planning apparatus according to any one of claims 1 to 5.
前記出荷計画立案部は、前記梱包予定製品の物流費が最小になるように、前記梱包候補日および前記出荷候補日を変更し、前記梱包計画情報および前記出荷計画情報を更新する請求項6に記載の梱包計画立案装置。   The shipping plan planning unit updates the packing plan information and the shipping plan information by changing the packing candidate date and the shipping candidate date so that the distribution cost of the product to be packed is minimized. The packaging planning device described. 受注した製品を識別する情報と、前記受注した製品の数量を示す情報と、前記受注した製品の送り先を示す情報と、要求された納期を示す情報とを含むオーダ情報を記憶するオーダ情報データベースと、
製品を識別する情報と、前記製品の個装箱を識別する情報と、前記製品の個装箱のサイズを示す情報と、前記製品の重量を示す情報と、梱包指示をするか否かの基準となる出荷数量を示す情報とを含む製品情報を記憶する製品情報データベースと、
集梱箱を識別する情報と、前記集梱箱のサイズを示す情報と、前記集梱箱で梱包可能な最大重量を示す情報と、を含む集梱箱情報を記憶する集梱箱情報データベースと、
集梱箱毎に設定された、集梱箱の組み立て時間および封緘作業時間の合計である梱包基本時間情報と、個装箱毎に設定された、個装箱の荷姿、個装箱のサイズおよび個装される製品の重量の少なくともいずれかに応じて決まる梱包変動時間を示す梱包変動時間情報とからなる作業時間マスタを記憶する作業時間マスタデータベースと、
梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報を含む現場作業量情報を記憶する現場作業量情報データベースと、
前記オーダ情報に含まれる前記受注した製品の数量を示す情報と、前記受注した製品に対応する前記製品情報に含まれる前記梱包指示をするか否かの基準となる出荷数量を示す情報とに基づいて、前記受注した製品の数量が前記梱包指示をするか否かの基準となる出荷数量を超える製品を、梱包予定製品として決定する梱包指示部と、
前記集梱箱情報に含まれる前記集梱箱で梱包可能な最大重量を示す情報および前記集梱箱のサイズを示す情報と、前記梱包予定製品に対応する前記製品情報に含まれる前記製品の重量を示す情報および前記個装箱のサイズを示す情報とに基づいて、前記梱包予定製品を梱包したときに集梱箱数が一番小さくなる集梱箱を前記梱包予定製品の集梱箱として設定する集梱箱設定部と、
前記集梱箱設定部が設定した集梱箱の数を示す情報と、前記作業時間マスタの前記梱包基本時間情報および前記梱包変動時間情報と、前記梱包予定製品の前記オーダ情報に含まれる前記受注した製品の数量を示す情報とに基づいて、前記梱包基本時間に前記集梱箱設定部が設定した集梱箱の数を乗算した値と前記梱包変動時間に前記梱包予定製品の数量を乗算した値との合計を前記梱包予定製品の梱包作業時間として設定する梱包作業時間設定部と、
前記梱包作業時間設定部が設定した前記梱包作業時間を示す情報と、前記現場作業量情報に含まれる前記梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報と、前記梱包予定製品の前記オーダ情報に含まれる前記受注した製品の要求された納期を示す情報と、前記梱包予定製品の送り先までの輸送日数を示す情報とに基づいて、前記要求された納期から前記輸送日数以上遡った日付よりも前であって、前記梱包作業時間を確保できる日を梱包候補日として設定する梱包候補日設定部と、
前記梱包候補日設定部が設定した前記梱包予定製品ごとの前記梱包候補日を示す梱包計画情報を生成する梱包計画立案部と、
を備える梱包計画立案システム。
An order information database for storing order information including information for identifying an ordered product, information indicating the quantity of the ordered product, information indicating a destination of the ordered product, and information indicating a requested delivery date; ,
Information for identifying the product, information for identifying the individual packaging box for the product, information for indicating the size of the individual packaging box for the product, information for indicating the weight of the product, and a criterion for whether to give a packing instruction A product information database for storing product information including information indicating a shipping quantity to be
A packaging box information database storing packaging box information including information for identifying the packaging box, information indicating the size of the packaging box, and information indicating a maximum weight that can be packed in the packaging box; ,
Packaging basic time information that is the total of the assembly time and sealing work time of the packaging box set for each packaging box, and the packaging of the packaging box and the size of the packaging box set for each packaging box And a work time master database for storing a work time master consisting of package change time information indicating a package change time determined according to at least one of the weights of the individually packaged products,
On-site work amount information database for storing on-site work amount information including information indicating the workable time during which packing work can be done on a daily basis at the packing work site;
Based on information indicating the quantity of the ordered product included in the order information and information indicating a shipment quantity serving as a reference for whether or not to perform the packing instruction included in the product information corresponding to the ordered product A packing instruction unit for determining, as a product to be packed, a product that exceeds a shipment quantity that is a criterion for determining whether or not to give the packing instruction.
Information indicating the maximum weight that can be packed in the packaging box included in the packaging box information, information indicating the size of the packaging box, and the weight of the product included in the product information corresponding to the product to be packed Based on the information indicating the size of the individual packaging box and the information indicating the size of the individual packaging box, the packaging box having the smallest number of packaging boxes when the product to be packed is packed is set as the packaging box of the product to be packed A shipping box setting section
Information indicating the number of packing boxes set by the packing box setting unit, the basic packing time information and the packing variation time information of the work time master, and the order received in the order information of the product to be packed Based on the information indicating the quantity of the finished product, a value obtained by multiplying the packaging basic time by the number of packaging boxes set by the packaging box setting unit and the packaging variation time is multiplied by the quantity of the product to be packaged. A packing work time setting unit for setting the sum of the values as the packing work time of the product to be packed,
Information indicating the packing work time set by the packing work time setting unit, information indicating the workable time during which it is possible to perform the daily packing work of the packing work site included in the field work amount information, From the requested delivery date based on the information indicating the requested delivery date of the ordered product included in the order information of the packaged product and the information indicating the number of days of transportation to the destination of the packaged product. A packing candidate date setting unit that sets a date before the date that is more than the number of transportation days before the packing work time can be secured as a packing candidate date;
A packing plan planning unit for generating packing plan information indicating the packing candidate date for each of the packing planned products set by the packing candidate date setting unit;
Packing planning system with.
梱包計画立案装置が実行する、
受注した製品の中の梱包の対象となる梱包予定製品を梱包する集梱箱を設定する集梱箱設定ステップと、
前記集梱箱設定ステップで設定した集梱箱に前記梱包予定製品を梱包する梱包作業にかかる梱包作業時間を設定する梱包作業時間設定ステップと、
前記梱包作業時間設定ステップで設定した前記梱包作業時間を示す情報と、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報と、前記梱包予定製品の要求された納期を示す情報と、前記梱包予定製品の送り先までの輸送日数を示す情報とに基づいて、前記要求された納期から前記輸送日数以上遡った日付よりも前であって、前記梱包作業時間を確保できる日を梱包候補日として設定する梱包候補日設定ステップと、
を備える梱包計画立案方法。
The packaging planning device executes,
A collection box setting step for setting a collection box for packing the products to be packed in the ordered product,
A packing work time setting step for setting a packing work time for packing work for packing the product to be packed in the packing box set in the packing box setting step;
Information indicating the packing work time set in the packing work time setting step, information indicating a workable time during which the packing work can be performed on a daily basis at the packing work site, and a requested delivery date of the product to be packed And the information indicating the number of shipping days to the destination of the product to be packed can be secured before the date that is more than the number of shipping days from the requested delivery date, and the packing work time can be secured. A packing candidate date setting step for setting the date as a packing candidate date;
Packing planning method comprising.
コンピュータを、
受注した製品の中の梱包の対象となる梱包予定製品を梱包する集梱箱を設定する集梱箱設定部、
前記集梱箱設定部が設定した集梱箱に前記梱包予定製品を梱包する梱包作業にかかる梱包作業時間を設定する梱包作業時間設定部、および、
前記梱包作業時間設定部が設定した前記梱包作業時間を示す情報と、梱包作業現場の日別の梱包作業をすることが可能な作業可能時間を示す情報と、前記梱包予定製品の要求された納期を示す情報と、前記梱包予定製品の送り先までの輸送日数を示す情報とに基づいて、前記要求された納期から前記輸送日数以上遡った日付よりも前であって、前記梱包作業時間を確保できる日を梱包候補日として設定する梱包候補日設定部、
として機能させるプログラム。
Computer
A collection box setting section for setting a collection box for packing a product to be packed in the ordered product.
A packing work time setting unit for setting a packing work time for packing work to pack the product to be packed in the packing box set by the packing box setting unit; and
Information indicating the packing work time set by the packing work time setting unit, information indicating a workable time during which the packing work can be performed on a daily basis at the packing work site, and a requested delivery date of the product to be packed And the information indicating the number of shipping days to the destination of the product to be packed can be secured before the date that is more than the number of shipping days from the requested delivery date, and the packing work time can be secured. A packing candidate date setting unit for setting the day as a packing candidate date,
Program to function as.
JP2015255795A 2015-12-28 2015-12-28 Packaging planning apparatus, packaging planning system, packaging planning method and program Pending JP2017120476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015255795A JP2017120476A (en) 2015-12-28 2015-12-28 Packaging planning apparatus, packaging planning system, packaging planning method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015255795A JP2017120476A (en) 2015-12-28 2015-12-28 Packaging planning apparatus, packaging planning system, packaging planning method and program

Publications (1)

Publication Number Publication Date
JP2017120476A true JP2017120476A (en) 2017-07-06

Family

ID=59272079

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015255795A Pending JP2017120476A (en) 2015-12-28 2015-12-28 Packaging planning apparatus, packaging planning system, packaging planning method and program

Country Status (1)

Country Link
JP (1) JP2017120476A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210065000A (en) * 2019-11-26 2021-06-03 쿠팡 주식회사 Systems and methods for automatic delivery worker assignment
WO2021116785A1 (en) * 2019-12-13 2021-06-17 Coupang Corp. Systems and methods for automated delivery worker scheduling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210065000A (en) * 2019-11-26 2021-06-03 쿠팡 주식회사 Systems and methods for automatic delivery worker assignment
KR102397913B1 (en) * 2019-11-26 2022-05-16 쿠팡 주식회사 Systems and methods for automatic delivery worker assignment
WO2021116785A1 (en) * 2019-12-13 2021-06-17 Coupang Corp. Systems and methods for automated delivery worker scheduling
KR20210075814A (en) * 2019-12-13 2021-06-23 쿠팡 주식회사 Systems and methods for automated delivery worker scheduling
KR102304196B1 (en) * 2019-12-13 2021-09-23 쿠팡 주식회사 Systems and methods for automated delivery worker scheduling
KR20210118374A (en) * 2019-12-13 2021-09-30 쿠팡 주식회사 Systems and methods for automated delivery worker scheduling
KR102447337B1 (en) * 2019-12-13 2022-09-26 쿠팡 주식회사 Systems and methods for automated delivery worker scheduling

Similar Documents

Publication Publication Date Title
Brandt et al. The air cargo load planning problem-a consolidated problem definition and literature review on related problems
Bortfeldt et al. Packing first, routing second—a heuristic for the vehicle routing and loading problem
Tyan et al. An evaluation of freight consolidation policies in global third party logistics
US8560461B1 (en) Shipment splitting analyzer
Leung et al. Integrated production and distribution with fixed delivery departure dates
US8423391B2 (en) Systems and methods for automated parallelization of transport load builder
JP5980408B2 (en) Supply rule generation device and supply rule generation program
JP2020042354A (en) Stock arrangement designing device and stock arrangement designing method
JP6031184B2 (en) Supply group determination support device and supply group determination support program
JP7086228B2 (en) Warehousing / delivery management device, warehousing / delivery management system, warehousing / delivery management method and program
US20140279660A1 (en) Overnight productivity dashboard
Peirleitner et al. A simulation approach for multi-stage supply chain optimization to analyze real world transportation effects
Vanajakumari et al. Supply chain planning: A case for Hybrid Cross-Docks
Rong et al. Shift designs for freight handling personnel at air cargo terminals
Zhu et al. Optimisation of containerised air cargo forwarding plans considering a hub consolidation process with cargo loading
JP2017120476A (en) Packaging planning apparatus, packaging planning system, packaging planning method and program
WO2021039143A1 (en) Work planning system and work planning method
Nguyen et al. Quantity discount with freight consolidation
US20140279321A1 (en) Method and system of charge distribution in a transportation management component
JP6468235B2 (en) Ship allocation plan creation method, steelworks operation method, and ship allocation plan creation device
Tadumadze et al. Loading and scheduling outbound trucks at a dispatch warehouse
US20160019493A1 (en) Overnight productivity dashboard
CN116228061A (en) Logistics order automatic loading and scheduling method, device, equipment and storage medium
CN115729197A (en) Workshop replenishment method and device, computer equipment and storage medium
Wu Modelling containerisation of air cargo forwarding problems