JP2002063417A - Reform order reception supporting system and reform order reception supporting method - Google Patents

Reform order reception supporting system and reform order reception supporting method

Info

Publication number
JP2002063417A
JP2002063417A JP2000251107A JP2000251107A JP2002063417A JP 2002063417 A JP2002063417 A JP 2002063417A JP 2000251107 A JP2000251107 A JP 2000251107A JP 2000251107 A JP2000251107 A JP 2000251107A JP 2002063417 A JP2002063417 A JP 2002063417A
Authority
JP
Japan
Prior art keywords
request
remodeling
contractor
reform
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000251107A
Other languages
Japanese (ja)
Other versions
JP4584427B2 (en
Inventor
Junji Takashima
準司 高島
Tadaharu Izumisawa
忠晴 和泉沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Realty and Development Co Ltd
Original Assignee
Sumitomo Realty and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Realty and Development Co Ltd filed Critical Sumitomo Realty and Development Co Ltd
Priority to JP2000251107A priority Critical patent/JP4584427B2/en
Publication of JP2002063417A publication Critical patent/JP2002063417A/en
Application granted granted Critical
Publication of JP4584427B2 publication Critical patent/JP4584427B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the costs of a reform provision service. SOLUTION: A reform request input part 12 inputs a reform request based on a list price system reform price standard gathered from many reform requesters. A reform execution request generation part 14 generates a through pass execution request based on a list price system execution price standard to an execution trader corresponding to the request and the request does not include estimations for the respective reform requests. The list price system reform price standard and the list price system execution price standard are set based on the convergence value of a reform execution cost when the number of execution items increases. The reform execution request generation part 14 generates execution requests for the number of an execution cost convergence range capable of obtaining the convergence of the reform execution cost to one execution trader. At the time, the instruction of a reform request distribution part 16 for distributing many reform requests to the plural execution traders is obeyed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、リフォーム依頼主
からリフォーム依頼を受けつけて施工業者に施工を指示
するシステムに関し、特に、低価格でリフォームサービ
スを提供できるシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for receiving a remodeling request from a remodeling client and instructing a contractor to perform the remodeling, and more particularly to a system capable of providing a low-cost remodeling service.

【0002】[0002]

【従来の技術】周知のように家屋は築年数の経過に伴っ
て老朽化する。家が古くなったときの対応としては、新
築とリフォーム(改築)が考えられる。リフォームに
は、新築と比べて費用が安いという利点がある。また、
新築同様のリフォームが可能となり、耐震補強技術も向
上している。しかし、従来のリフォームは、新築に比べ
れば安価であるものの、それでもかなりの費用がかか
る。リフォームの受注を促進するためには、新築との価
格差を増大することが求められる。
2. Description of the Related Art As is well known, houses age with the passage of age. When a house becomes old, new construction and renovation (renovation) can be considered. Renovation has the advantage of lower costs compared to new construction. Also,
Remodeling like new construction is possible, and seismic reinforcement technology is also improving. However, conventional remodeling, although cheaper than new construction, is still quite expensive. In order to promote orders for renovation, it is necessary to increase the price difference with new construction.

【0003】図1は、従来の一般的なリフォーム受注形
式を示している。不動産会社等の受注会社は、リフォー
ム依頼主から依頼を受けると、まずリフォームの設計お
よび見積りを行なう。設計および見積りは依頼主に提示
され、そして依頼主と受注会社で打合せによる調整が行
なわれ、リフォームの施工が決定される。これを受け
て、受注会社は、設計書と見積書を付けた施工依頼(施
工要求)を施工業者に出す。
FIG. 1 shows a conventional general order for remodeling. Upon receiving a request from a reform requester, an order receiving company such as a real estate company first designs and estimates a reform. The design and quotation are presented to the client, and the client and the ordering company make adjustments through a meeting to determine the renovation work. In response to this, the ordering company issues a construction request (construction request) with the design document and the quote to the construction company.

【0004】[0004]

【発明が解決しようとする課題】従来は、依頼主と施工
業者の間にたつ受注会社は、一件一件の依頼に対してリ
フォーム設計を行ない、見積りをつくり、依頼主との調
整を行なう。こうした見積り等の作業は、リフォーム提
供費用を押し上げる要因になっている。
Conventionally, an order-receiving company between a client and a contractor performs a remodeling design for each request, creates an estimate, and coordinates with the client. . The work of estimation and the like is a factor that raises the cost of providing the renovation.

【0005】新築の場合には、同じ仕様の家屋の大量供
給によって、見積り等のコストを削減できる場合があ
る。しかし、リフォームについては、ベースになる家屋
が異なるために、一件一件の専用設計と、それに基づく
見積りの作成が必要とされており、これが上述のように
リフォーム費用を増大させてしまう。
[0005] In the case of a new construction, there is a case where costs such as estimation can be reduced by supplying a large number of houses having the same specifications. However, as for the renovation, since the base houses are different, it is necessary to create a dedicated design for each case and to make an estimate based on the design, which increases the renovation cost as described above.

【0006】本発明は上記背景の下でなされたものであ
り、その目的は、見積り等の作業を大幅に削減または排
除して、低価格でリフォームサービスを提供できるシス
テムを提供することにある。
The present invention has been made under the above background, and an object of the present invention is to provide a system capable of providing a remodeling service at a low price by greatly reducing or eliminating work such as estimation.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するた
め、本発明では、リフォーム依頼主へのリフォーム提供
価格に、例えば坪単価いくらというような定価制を採用
する。また施工業者への施工依頼価格にも定価制を採用
する。定価制の採用により、リフォーム依頼毎に個別の
見積り等を受注段階でつくる作業を大幅に削減または廃
止できる。
In order to achieve the above object, the present invention adopts a fixed price system such as a unit price per tsubo for a renovation offer price to a renovation requester. In addition, a fixed price system will be adopted for the construction request price to the contractor. The adoption of the fixed price system can greatly reduce or abolish the work of creating an individual estimate or the like at the order receiving stage for each reform request.

【0008】ただし、リフォームへの定価制の採用には
一つの問題が生じ得る。すなわち、リフォームのベース
になる家屋が常に異なるので、実際の施工費用のばらつ
きが大きく、実際の施工費用と定価制の施工依頼価格と
のバランスがとれない。
[0008] However, one problem may arise in adopting a fixed price system for renovation. That is, since the homes on which the renovation is based are always different, the actual construction cost varies greatly, and the actual construction cost and the fixed-price construction request price cannot be balanced.

【0009】こうした問題を回避するために、本発明で
は、一件一件の施工費用のばらつきが大きくても、施工
件数を増大すると、施工費用が平均化されて一定の値へ
と収束することに着目する。そして、この収束値に基づ
いて、施工業者の利益が確保される施工依頼価格を設定
し、さらに、施工依頼価格に応じてリフォーム提供価格
を設定する。各施工業者に対しては、上記施工費用の収
束が得られるだけの数の施工要求を発生する。これによ
り、定価制の問題を回避でき、かつ定価制の採用によっ
て見積り等の作業が大幅に削減または廃止され、その結
果、低価格でリフォームサービスを提供できる。
In order to avoid such a problem, according to the present invention, even if the construction cost of each case varies greatly, when the number of construction cases is increased, the construction costs are averaged and converged to a constant value. Pay attention to. Then, based on this convergence value, a construction request price at which the profit of the contractor is secured is set, and further, a reform offer price is set according to the construction request price. For each contractor, construction requests are generated in such a number that the convergence of the construction cost can be achieved. As a result, the problem of the fixed price system can be avoided, and work such as estimation is greatly reduced or abolished by adopting the fixed price system. As a result, a reform service can be provided at a low price.

【0010】元々、新築と異なり、リフォームは、ベー
スになる家屋によって施工費用が大きく異なるので、リ
フォームを定価制にしようとする発想は見られなかっ
た。本発明は、そのような従来の考えにとらわれず、施
工費用の収束を利用して、定価制に伴う問題を回避可能
とし、定価制による見積り等のコスト低減のメリットを
活かして、低価格のリフォームサービスの提供を実現す
る。
Originally, unlike new construction, the cost of renovation differs greatly depending on the house on which it is based, so there was no idea to make the renovation a fixed price system. The present invention is not limited to such conventional ideas, and can use the convergence of construction costs to avoid problems associated with the fixed price system. Provide renovation services.

【0011】本発明によれば、上記の定価制のリフォー
ム受注に有用に用いられるリフォーム受注支援システム
および方法が提供される。
According to the present invention, there is provided a reform order support system and method which are useful for the above-mentioned regular price reform order.

【0012】本発明の一態様はリフォーム受注支援シス
テムである。この支援システムは、多数のリフォーム依
頼主から収集されたリフォーム依頼であって、単位リフ
ォーム規模あたりのリフォーム提供価格が固定された定
価制リフォーム価格基準に基づいたリフォーム依頼の情
報を入力するリフォーム依頼入力部と、リフォーム依頼
に対応して、施工業者に対する施工要求として、単位リ
フォーム規模あたりの施工依頼価格が固定された定価制
施工価格基準に基づいた、各リフォーム依頼毎の個別の
見積りを含まないスルーパス施工要求を生成するリフォ
ーム施工要求生成部と、を含み、前記単位リフォーム規
模あたりのリフォーム提供価格は、前記単位リフォーム
規模あたりの施工依頼価格に応じて設定されており、前
記単位リフォーム規模あたりの施工依頼価格は、施工件
数を増大したときのリフォーム施工費用の収束値に基づ
いて設定されており、前記リフォーム施工要求生成部
は、一の施工業者に対して、リフォーム施工費用の収束
が得られる施工費用収束範囲の数の施工要求を生成す
る。
One embodiment of the present invention is a reform order receiving support system. This support system is a renovation request collected from a number of renovation requesters, and is used to input information on renovation requests based on a fixed price remodeling price standard in which the renovation offer price per unit remodeling scale is fixed. And through-pass that does not include individual quotes for each remodeling request, based on the fixed-price construction price standard where the price of the renovation request per unit remodeling scale is fixed as a request to the contractor in response to the remodeling request A renovation request generation unit that generates an execution request, the renovation offer price per unit remodeling scale is set according to the execution request price per unit remodeling scale, and the installation per unit remodeling scale is performed. The requested price is a renovation when the number of works is increased Is set based on the convergence value for construction costs, the renovation construction request generation unit, to the one contractor, to produce a number of construction requirements construction costs convergence range convergence remodeling construction cost can be obtained.

【0013】好ましくは、本発明のシステムは、多数の
リフォーム依頼主からの多数のリフォーム依頼を複数の
施工業者に振り分けるリフォーム依頼振分部を含み、前
記リフォーム依頼振分部は、前記複数の施工業者のそれ
ぞれに前記施工費用収束範囲の数の施工要求が行き渡る
ように前記多数のリフォーム依頼を振り分ける。本発明
のシステムは、複数の施工業者に施工費用収束範囲の数
の施工要求を分配することができ、定価制のリフォーム
サービスの提供に有用に利用できる。
Preferably, the system of the present invention includes a reform request distribution unit for distributing a large number of reform requests from a large number of reform requesters to a plurality of contractors. The large number of reform requests are distributed so that the number of construction requests within the construction cost convergence range is distributed to each of the contractors. INDUSTRIAL APPLICABILITY The system of the present invention is capable of distributing a number of construction requests within a construction cost convergence range to a plurality of construction contractors, and is useful for providing a fixed-price reform service.

【0014】好ましくは、前記リフォーム依頼振分部
は、前記複数の施工業者のそれぞれに対する現在のリフ
ォーム依頼振分状態を取得する振分状態取得部と、前記
現在のリフォーム依頼振分状態を提示するとともに、入
力されたリフォーム依頼に対応する施工業者の選択を要
求する施工業者選択要求部と、前記施工業者選択要求部
の要求に応答する選択業者の選択を受け付ける施工業者
選択受付部と、を含む。本発明のシステムは、現在のリ
フォーム依頼の振分状態を提示することによって、各施
工業者への施工費用収束範囲の数の施工要求の分配を促
すことができ、定価制のリフォームサービスの提供に有
用に利用できる。
Preferably, the reform request distribution unit presents a distribution state acquisition unit for acquiring a current reform request distribution state for each of the plurality of contractors, and the current reform request distribution state. And a contractor selection request unit for requesting selection of a contractor corresponding to the input reform request, and a contractor selection receiving unit for receiving selection of a contractor responding to the request of the contractor selection request unit. . The system of the present invention, by presenting the distribution status of the current renovation request, can encourage the distribution of the number of construction requests within the range of the convergence of the construction cost to each contractor, to provide a fixed-price reform service Available usefully.

【0015】別の態様では、前記リフォーム依頼振分部
は、前記複数の施工業者のそれぞれに対する現在のリフ
ォーム依頼振分状態を取得する振分状態取得部と、前記
リフォーム依頼振分状態に基づいて、入力されたリフォ
ーム依頼に対応する施工業者を決定する施工業者決定部
と、を含み、前記施工業者決定部は、前記複数の施工業
者のそれぞれが前記施工費用収束範囲の数の施工要求を
確保するように定められた施工業者決定基準に従って施
工業者を決定する。本発明のシステムは、施工業者決定
基準に従った施工業者の自動的な決定により、各施工業
者への施工費用収束範囲の数の施工要求を分配すること
ができ、定価制のリフォームサービスの提供に有用に利
用できる。
[0015] In another aspect, the renovation request distribution unit includes a distribution state acquisition unit for acquiring a current renewal request distribution state for each of the plurality of contractors, and a renewal request distribution state based on the renovation request distribution state. A contractor determining unit that determines a contractor corresponding to the input remodeling request, the contractor determining unit ensures that each of the plurality of contractors has a construction request of the number of the construction cost convergence range. The contractor is determined according to the contractor determination criteria set to perform the contract. The system of the present invention is capable of distributing the number of construction requests within the convergence range of construction costs to each contractor by automatically determining the contractor according to the contractor determination criteria, and providing a fixed-price reform service. Can be usefully used.

【0016】本発明の別の態様は、リフォーム受注支援
方法である。この支援方法は、多数のリフォーム依頼主
から収集されたリフォーム依頼であって、単位リフォー
ム規模あたりのリフォーム提供価格が固定された定価制
リフォーム価格基準に基づいたリフォーム依頼の情報を
入力するリフォーム依頼入力ステップと、リフォーム依
頼に対応して、施工業者に対する施工要求として、単位
リフォーム規模あたりの施工依頼価格が固定された定価
制施工価格基準に基づいた、各リフォーム依頼毎の個別
の見積りを含まないスルーパス施工要求を生成するリフ
ォーム施工要求生成ステップと、を含み、前記単位リフ
ォーム規模あたりのリフォーム提供価格は、前記単位リ
フォーム規模あたりの施工依頼価格に応じて設定されて
おり、前記単位リフォーム規模あたりの施工依頼価格
は、施工件数を増大したときのリフォーム施工費用の収
束値に基づいて設定されており、前記リフォーム施工要
求生成ステップでは、リフォーム施工費用の収束が得ら
れる施工費用収束範囲の数の施工要求を生成する。
Another preferred embodiment according to the present invention relates to a method for supporting a reform order. This support method is a renovation request collected from a number of renovation requesters, and the renovation request input that inputs information of the renovation request based on the fixed price remodeling price standard where the renovation offer price per unit remodeling scale is fixed Through-pass that does not include individual quotes for each remodeling request, based on fixed-price construction price standards where the price of the renovation request per unit remodeling scale is fixed as a construction request to the contractor in response to the step and the remodeling request A renovation construction request generation step of generating a construction request, the renovation offer price per unit remodeling scale is set according to the construction request price per unit remodeling scale, and the construction per unit remodeling scale is performed. The commission price will be Omu is set based on the convergence value of the construction costs, in the renovation construction request generating step, generating a number of construction requirements construction costs convergence range convergence remodeling construction cost can be obtained.

【0017】好ましくは、本発明のリフォーム受注支援
方法は、多数のリフォーム依頼主からの多数のリフォー
ム依頼を複数の施工業者に振り分けるリフォーム依頼振
分ステップを含み、前記リフォーム依頼振分ステップで
は、前記複数の施工業者のそれぞれに前記施工費用収束
範囲の数の施工要求が行き渡るように前記多数のリフォ
ーム依頼を振り分ける。
Preferably, the method for assisting in receiving a reform according to the present invention includes a remodeling request allocating step of allocating a number of remodeling requests from a number of remodeling clients to a plurality of contractors. The plurality of renovation requests are distributed to each of the plurality of contractors so that the number of construction requests within the construction cost convergence range is distributed.

【0018】好ましくは、前記リフォーム依頼振分ステ
ップは、前記複数の施工業者のそれぞれに対する現在の
リフォーム依頼振分状態を取得する振分状態取得ステッ
プと、前記現在のリフォーム依頼振分状態を提示すると
ともに、入力されたリフォーム依頼に対応する施工業者
の選択を要求する施工業者選択要求ステップと、前記施
工業者選択要求部の要求に応答する選択業者の選択を受
け付ける施工業者選択受付ステップと、を含む。
[0018] Preferably, the renovation request distribution step presents a distribution state acquisition step of acquiring a current renovation request distribution state for each of the plurality of contractors, and presents the current renovation request distribution state. And a contractor selection requesting step of requesting selection of a contractor corresponding to the input reform request, and a contractor selection receiving step of receiving selection of a contractor responding to the request of the contractor selection request unit. .

【0019】別の態様では、前記リフォーム依頼振分ス
テップは、前記複数の施工業者のそれぞれに対する現在
のリフォーム依頼振分状態を取得する振分状態取得ステ
ップと、前記リフォーム依頼振分状態に基づいて、入力
されたリフォーム依頼に対応する施工業者を決定する施
工業者決定ステップと、を含み、前記施工業者決定ステ
ップでは、前記複数の施工業者のそれぞれが前記施工費
用収束範囲の数の施工要求を確保するように定められた
施工業者決定基準に従って施工業者を決定する。これら
方法の態様によっても、上述した装置の態様と同様の利
点が得られる。
In another aspect, the reform request distribution step includes a distribution state acquisition step of acquiring a current reform request distribution state for each of the plurality of contractors, and a modification request distribution state based on the reform request distribution state. A contractor determining step of determining a contractor corresponding to the input remodeling request, and in the contractor determining step, each of the plurality of contractors secures a construction request of the number of the construction cost convergence range. The contractor is determined according to the contractor determination criteria set to perform the contract. These method aspects also provide the same advantages as the apparatus aspects described above.

【0020】なお、本発明において、リフォームは、家
屋の全部でもよく、一部でもよい。また、本発明では、
一件一件の家屋に合わせた特別の見積りを不要とするこ
とは意図しているが、上記定価制リフォーム価格基準に
基づいて容易に作成される見積りまで不要とすること
は、意図していない。すなわち、こうした定価制の下で
の見積りは当然につくられてもよい。
In the present invention, the renovation may be the whole or part of the house. In the present invention,
It is intended to eliminate the need for a special estimate for each house, but it is not intended to eliminate the need for quotes that are easily created based on the fixed-price reform standard. . That is, an estimate under such a fixed price system may be naturally made.

【0021】[0021]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。図2は、本発明におけるリフォー
ム提供サービスの全体概要を示している。不動産会社等
のリフォーム受注会社1は、多数のリフォーム依頼主2
からリフォーム依頼を収集する。リフォーム依頼に対す
るリフォーム提供価格には定価制が採用されており、リ
フォーム提供価格は、単位リフォーム規模あたりのリフ
ォーム提供価格が固定された定価制リフォーム価格基準
から算出される。本実施の形態では、単位リフォーム規
模として「坪(3.3平方メートル)を用いる。したが
って、定価制リフォーム価格基準は、坪あたりの価格
(例えば坪単価20万円)である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 2 shows an overall outline of a reform providing service according to the present invention. A renovation ordering company 1 such as a real estate company has many renovation requesters 2
Collect renovation requests from. A fixed-price system is adopted for the renovation offer price for the renovation request, and the renovation offer price is calculated from a fixed-price reform price basis in which the renovation offer price per unit remodeling scale is fixed. In the present embodiment, “tsubo (3.3 square meters) is used as the unit remodeling scale. Therefore, the remodeling price standard based on the fixed price system is a price per tsubo (for example, 200,000 yen per tsubo).

【0022】リフォーム受注会社1は、各リフォーム依
頼を請け負う施工業者3を指定し、指定された施工業者
3に施工要求を送る。本実施の形態では、施工要求につ
いても定価制が採用されている。すなわち、施工依頼価
格は、単位リフォーム規模あたりの施工依頼価格が固定
された定価制施工価格基準にしたがって算出される。施
工依頼価格についても、単位リフォーム規模として
「坪」が用いられる。
The renovation ordering company 1 designates a contractor 3 that undertakes each reform request, and sends a construction request to the designated contractor 3. In the present embodiment, a fixed price system is also adopted for construction requests. That is, the construction request price is calculated in accordance with the fixed price construction price standard in which the construction request price per unit reform scale is fixed. For the construction request price, “tsubo” is used as the unit reform scale.

【0023】リフォーム受注会社1は、リフォーム依頼
を受けたとき、そのリフォーム依頼のための専用の設
計、見積りといった作業はしない。この点に関し、従来
のリフォームサービスであれば、リフォーム対象の家屋
に合わせた設計と見積り、それらに必要な調整が、受注
会社の手によって進められる。本発明では、定価制を採
用する代わりに、従来の専用設計、見積り等の作業が廃
止される。リフォーム受注会社1は、基本的にはリフォ
ーム依頼を請け負う施工業者を指定するだけである。リ
フォーム依頼は、指定された施工業者にそのまま受け渡
される。
When receiving a remodeling request, the reordering company 1 does not perform any work such as exclusive design and estimation for the remodeling request. In this regard, in the case of the conventional remodeling service, the design and estimation according to the house to be remodeled and the necessary adjustments are performed by the ordering company. In the present invention, instead of adopting the price system, the conventional work such as dedicated design and estimation is abolished. The renovation ordering company 1 basically only specifies a contractor who undertakes a renovation request. The reform request is passed to the designated contractor as it is.

【0024】このように、本発明では、リフォーム依頼
がそのまま施工業者に受け渡されることから、施工業者
に対する施工要求を「スルーパス施工要求」と呼ぶ。上
記より明らかなように、スルーパス施工要求には、リフ
ォーム受注会社によってつくられた設計書や見積りは付
されない。施工業者では、スルーパス施工要求を受け取
ると、リフォームの設計を行ない、その設計に従って依
頼対象の家屋を実際にリフォームする。
As described above, in the present invention, since the reform request is passed to the contractor as it is, the request for the contractor is referred to as a "through-pass request". As is evident from the above, the through-pass construction request does not include a design document or quote made by the renovation ordering company. Upon receiving the through-pass construction request, the contractor designs a reform and actually remodels the requested house in accordance with the design.

【0025】定価制の主な利点は、受注段階での設計、
見積りおよび関連作業の削減または廃止によるコスト低
減である。一方で、定価制には以下のような不利な点が
ある。大量生産の新築と異なり、リフォームは、既存の
家屋をベースにして行なわれる。リフォーム対象の家屋
は一件一件異なるので、リフォームに実際にかかる施工
費用(実施工費用)は常に異なる。実施工費用が、定価
制で定まる施工依頼費用に見合わない可能性がある。こ
うした事情により、一件一件が特注扱いされるリフォー
ムは、本来は定価制に向かないと考えられる。
The main advantages of the fixed price system are design at the stage of receiving orders,
Cost reduction by reducing or eliminating estimation and related work. On the other hand, the price list has the following disadvantages. Unlike mass production new construction, renovation is based on existing homes. Since the houses to be renovated differ from one house to another, the actual construction cost (implementation cost) for renovation is always different. There is a possibility that the construction cost will not be equal to the construction request cost determined by the fixed price system. Due to these circumstances, it is considered that reforms that are handled on a case-by-case basis are not originally suitable for the fixed price system.

【0026】本発明は、リフォームに定価制を採用する
時の問題を以下のようにして回避する。
The present invention avoids the problem of adopting a fixed price system for renovation as follows.

【0027】図3において、横軸は、施工件数であり、
縦軸は、一坪当たりの実施工費用の平均値(全施工件数
の総坪数で実施工費用の総計を割った値)である。図中
の曲線は、実施工費用の平均値がとり得る範囲を示して
いる。
In FIG. 3, the horizontal axis is the number of constructions,
The vertical axis is the average value of the execution cost per tsubo (the value obtained by dividing the total of the execution cost by the total number of tsubo of all the construction cases). The curve in the figure indicates the range in which the average value of the implementation costs can be taken.

【0028】施工件数が少ないときは、実施工費用の平
均値のとり得る範囲が広い。そのため、定価制の下では
施工業者が損をする可能性もある。しかし、施工件数が
多くなると、実施工費用の平均値のとり得る範囲が狭ま
り、施工費用が収束する。施工費用の収束値は図中にX
で示されている。また、施工費用の範囲が一定の値以下
になる範囲(施工件数Y以上)を、本発明では施工件数
収束範囲という。
When the number of executions is small, the range of the average value of the execution cost is wide. Therefore, there is a possibility that the contractor may lose under the fixed price system. However, when the number of executions increases, the range in which the average of the execution costs can be narrowed, and the execution costs converge. The convergence value of the construction cost is X in the figure.
Indicated by In the present invention, a range in which the range of the construction cost is equal to or less than a certain value (more than the number of construction cases Y) is referred to as a construction case convergence range.

【0029】そして、施工費用の収束値Xに基づいて、
施工依頼価格の坪単価が設定される。具体的には、施工
費用の収束値Xに施工業者の必要な利益を加えた値であ
る。さらに、施工依頼価格の坪単価に応じて、リフォー
ム提供価格の坪単価が定められる。具体的には、施工依
頼価格の坪単価に対して、リフォーム依頼の収集および
施工業者への安定供給などに要するコスト(広告費など
も含む)が加算される。結果的に、リフォーム提供価格
の坪単価は、例えば20万円に設定される。
Then, based on the convergence value X of the construction cost,
The unit price of the construction request price is set. Specifically, it is a value obtained by adding the profit required by the contractor to the convergence value X of the construction cost. Further, the unit price of the renovation offer price is determined according to the unit price of the construction request price. Specifically, costs (including advertising costs, etc.) required for collecting a renovation request and providing a stable supply to a contractor are added to the unit price of the construction request price. As a result, the unit price of the renovation offer price is set to, for example, 200,000 yen.

【0030】リフォームサービスの提供にあたっては、
リフォーム受注会社1は、上記の価格設定の下で、施工
件数収束範囲(図3参照)の件数の施工要求を各施工業
者に発する。これにより、定価制の下でも適切なリフォ
ームサービスを提供できる。そして受注会社の事前設計
作業等の削減によって、リフォーム提供価格を大幅に削
減できる。
In providing the reform service,
Under the above-mentioned price setting, the reform ordering company 1 issues a construction request to each construction company in the number of construction cases in the convergence range (see FIG. 3). This makes it possible to provide an appropriate reform service even under a fixed price system. By reducing the pre-design work and the like of the ordering company, the renovation offer price can be significantly reduced.

【0031】図4は、本発明の特徴的なリフォーム提供
サービスに好適に用いられるリフォーム受注支援システ
ムを示している。リフォーム受注支援システム10は、
図1のリフォーム受注会社に用いられる。リフォーム受
注支援システム10は、リフォーム依頼を入力して、入
力した依頼に対応する施工要求を出力するために用いら
れる。
FIG. 4 shows a remodeling order support system suitably used for the characteristic remodeling service of the present invention. The reform order support system 10
It is used for the reform order receiving company in FIG. The reform order support system 10 is used to input a reform request and output a construction request corresponding to the input request.

【0032】リフォーム受注支援支援システム10は、
その主用構成として、リフォーム依頼入力部12、リフ
ォーム施工要求生成部14およびリフォーム依頼振分部
16を含む。
The remodeling order support system 10 includes:
The main configuration includes a reform request input unit 12, a reform construction request generation unit 14, and a reform request distribution unit 16.

【0033】リフォーム依頼入力部12には、入力装置
18を用いてリフォーム依頼が入力される。リフォーム
依頼は、依頼主名、住所、リフォーム規模等を含む。入
力装置18は例えばキーボードである。オペレータは、
書類、電話、ファクシミリなどにより入手したリフォー
ム依頼を、キーボードを用いて入力する。入力装置18
はスキャナ等の読取り装置を含んでもよい。また、通信
装置が入力装置18として機能し、外部から通信でリフ
ォーム依頼を取り込んでもよい。リフォーム依頼は、受
注会社の支店から受けとってもよく、依頼主から直接受
け取ってもよい。前述のように、本実施の形態におい
て、リフォーム依頼は、定価制リフォーム価格基準に基
づく依頼である。
The reform request is input to the reform request input section 12 using the input device 18. The reform request includes the name of the client, the address, the scale of the reform, and the like. The input device 18 is, for example, a keyboard. The operator
The user inputs a reform request obtained by a document, telephone, facsimile, or the like using a keyboard. Input device 18
May include a reading device such as a scanner. Further, the communication device may function as the input device 18 and receive a reform request by communication from outside. The reform request may be received from the branch of the order receiving company or directly from the client. As described above, in the present embodiment, a reform request is a request based on a fixed price reform price standard.

【0034】入力されたリフォーム依頼は、リフォーム
依頼記憶部20に記録されるとともに、リフォーム依頼
振分部16に渡される。リフォーム依頼記憶部20は、
施工要求記録部24とともにリフォーム受注データベー
ス26を構成している。
The input reform request is recorded in the reform request storage unit 20 and passed to the reform request distribution unit 16. The reform request storage unit 20
Together with the construction request recording section 24, a reform order database 26 is formed.

【0035】リフォーム施工要求生成部14は、施工業
者に対する施工要求として、本発明のスルーパス施工要
求を生成する。スルーパス施工要求は、上述したよう
に、定価制施工価格基準に基づいた要求であり、各依頼
毎の特別の設計や見積りは添付されない。
The renovation construction request generation unit 14 generates a through-pass construction request of the present invention as a construction request to a construction company. As described above, the through-pass construction request is a request based on the fixed price construction price standard, and a special design or estimate for each request is not attached.

【0036】スルーパス施工要求は出力装置22を用い
て出力される。出力装置22は例えばプリンタであり、
所定の用紙を用いてスルーパス施工要求の書類が印刷さ
れる。出力装置22はディスプレイを含み、オペレータ
がディスプレイを見て手作業で施工要求書類をつくって
もよい。また通信装置が出力装置22として機能し、施
工業者へ直接または間接的に通信でスルーパス施工要求
を送ってもよい。
The through-pass construction request is output using the output device 22. The output device 22 is, for example, a printer,
A through-pass construction request document is printed using a predetermined sheet. The output device 22 includes a display, and an operator may look at the display and manually create the construction request document. Further, the communication device may function as the output device 22, and may directly or indirectly send a through-pass construction request to the construction company by communication.

【0037】複数の施工業者のうちで各リフォーム依頼
を請け負う施工業者は、以下に説明するように、リフォ
ーム依頼振分部16によって決定される。リフォーム施
工要求生成部14は、リフォーム依頼振分部16の決定
に従い、決定された施工業者に対するスルーパス施工要
求を生成する。
The contractor who undertakes each reform request among a plurality of contractors is determined by the reform request distribution unit 16 as described below. The reform construction request generation unit 14 generates a through-pass construction request to the determined contractor in accordance with the decision of the reform request distribution unit 16.

【0038】リフォーム依頼振分部16には、リフォー
ム依頼入力部12に入力された多数のリフォーム依頼の
情報が渡される。一つ一つのリフォーム依頼が入力され
る度に、そのリフォーム依頼を請け負う施工業者が、リ
フォーム依頼振分部16により指定される。これによ
り、順次入力される多数のリフォーム依頼が複数の施工
業者へと振り分けられる。このとき、以下の構成によ
り、各施工業者に対して、図3の施工費用収束範囲に入
る数のリフォーム依頼が割り当てられる。
The information of a large number of reform requests input to the reform request input unit 12 is passed to the reform request distribution unit 16. Each time a remodeling request is input, a contractor who undertakes the remodeling request is designated by the remodeling request distribution unit 16. As a result, a large number of reform requests input sequentially are distributed to a plurality of contractors. At this time, according to the following configuration, the number of reform requests that fall within the construction cost convergence range of FIG.

【0039】リフォーム依頼振分部16は、その主要構
成として、振分状態取得部32、施工業者選択要求部3
4、施工業者選択受付部36および施工業者情報記憶部
38を含む。
The reform request distribution unit 16 includes a distribution state acquisition unit 32 and a contractor selection request unit 3 as its main components.
4, includes a contractor selection receiving unit 36 and a contractor information storage unit 38.

【0040】振分状態取得部32は、施工要求記録部2
4に記録された施工要求の記録を参照して、各施工業者
に対する現在のリフォーム依頼の振分状態を求める。施
工業者選択要求部34は、リフォーム依頼の振分状態を
オペレータに提示して、入力されたリフォーム依頼を請
け負う施工業者の選択をオペレータに要求する。振分状
態の提示と施工業者の選択要求は、ディスプレイ上で行
なわれる。
The distribution state acquisition unit 32 is provided with the construction request recording unit 2
Referring to the record of the construction request recorded in No. 4, the distribution state of the current reform request to each contractor is obtained. The contractor selection requesting unit 34 presents the distribution status of the reform request to the operator, and requests the operator to select a contractor to undertake the input reform request. The presentation of the distribution state and the selection request of the contractor are performed on the display.

【0041】図5は、リフォーム依頼の振分状態を示す
画面の例である。振分目標数は、各施工業者に対する施
工要求の目標数である。振分目標数は、図3に示した施
工費用収束範囲の中に、すなわち収束最低数Y以上の適
当な数に設定される。また振分目標数は、施工業者の規
模に応じて適当に異なって設定されてもよい。振分目標
数は予め設定され、施工業者情報記憶部38に記憶され
ている。施工業者選択要求部34は、各施工業者の振分
目標数を施工業者情報記憶部38から読み出す。
FIG. 5 is an example of a screen showing the distribution state of a reform request. The distribution target number is a target number of construction requests to each contractor. The distribution target number is set to an appropriate number within the construction cost convergence range shown in FIG. Further, the target number of distributions may be set appropriately differently according to the scale of the contractor. The distribution target number is set in advance and stored in the contractor information storage unit 38. The contractor selection request unit 34 reads out the distribution target number of each contractor from the contractor information storage unit 38.

【0042】適当な期間毎の目標数、例えば月別の目標
数を用いてもよい。この場合、各月へと振分目標数が割
り当てられ、それらの合計が上記の振分目標数となる。
好ましくは、年間のリフォーム受注数の一般的な変動を
考慮して、目標数が月によって異なって設定される。
A target number for each appropriate period, for example, a target number for each month may be used. In this case, a target number of distributions is assigned to each month, and the total thereof is the target number of distributions.
Preferably, the target number is set differently for each month, taking into account general fluctuations in the number of renovation orders per year.

【0043】振分数実績は、施工業者へ既に出された施
工要求の数である。この情報が、振分状態取得部32に
よって施工要求記録部24を参照して求められる。目標
達成度は、目標振分数の達成度合いであり、ここでは、
目標振分数に対する振分実績数の比率(%)が用いられ
る。目標達成度は振分状態取得部32または施工業者選
択要求部34により算出される。
The distribution number result is the number of construction requests already issued to the contractor. This information is obtained by the distribution state acquisition unit 32 with reference to the construction request recording unit 24. The goal achievement is the degree of achievement of the target distribution, and here,
The ratio (%) of the actual distribution number to the target distribution number is used. The target achievement degree is calculated by the distribution state acquisition unit 32 or the contractor selection request unit 34.

【0044】さらに、図5に示されるように、振分状態
の画面には、施工業者の所在地およびテリトリーが表示
される。テリトリーは、施工業者が施工を請け負う地域
的範囲であり、一般には施工業者の所在地を中心とした
適当な範囲である。これら情報も、施工業者情報記憶部
38から読み出される。なお、施工業者の数が多い場合
には、リフォーム依頼を参照して、依頼対象がテリトリ
ーに入る施工業者のみが画面に表示されてもよい。
Further, as shown in FIG. 5, the location and territory of the contractor are displayed on the screen in the distribution state. The territory is a regional area where the contractor undertakes construction, and is generally an appropriate area centered on the location of the contractor. These pieces of information are also read from the contractor information storage unit 38. If the number of contractors is large, only the contractor whose request target enters the territory may be displayed on the screen with reference to the reform request.

【0045】図5に示される振分状態は本発明の一例で
ある。図5と異なる画面が用いられてもよいことはもち
ろんである。各施工業者への振分の状況が提示されれば
よい。好ましくは、上記の目標達成度のように、本施工
費用収束範囲の件数に対する振分実績の状況が提示され
る。
The distribution state shown in FIG. 5 is an example of the present invention. It goes without saying that a screen different from that in FIG. 5 may be used. What is necessary is just to show the distribution situation to each contractor. Preferably, the status of the distribution results with respect to the number of cases in the main construction cost convergence range is presented, such as the degree of achievement of the target.

【0046】図4に戻り、オペレータは、施工業者の選
択要求に応えて、リフォーム依頼を受け渡す施工業者を
選択する。本実施の形態では、図5の画面に示される選
択業者の中から一の業者が、キーボードおよびポインテ
ィングデバイスを用いて選択される。オペレータは、目
標達成度が低く、リフォーム依頼の住所がテリトリー内
に入る施工業者を選択する。この選択が、リフォーム依
頼振分部16の施工業者選択受付部36により受けつけ
られる。そして、この選択によって、リフォーム依頼を
請け負う施工業者が決定される。
Returning to FIG. 4, the operator selects a contractor to receive the reform request in response to the contractor's selection request. In the present embodiment, one of the selection companies shown on the screen of FIG. 5 is selected using the keyboard and the pointing device. The operator selects a contractor whose degree of achievement of the target is low and whose address of the reform request falls within the territory. This selection is received by the contractor's selection receiving unit 36 of the reform request distribution unit 16. Then, by this selection, the contractor who undertakes the reform request is determined.

【0047】決定された施工業者は、リフォーム依頼の
情報とともにリフォーム施工要求生成部14に通知され
る。これを受けて、リフォーム施工要求生成部14は、
スルーパス施工要求を生成する。
The determined contractor is notified to the reform request generator 14 together with the information of the reform request. In response, the reform construction request generation unit 14
Generate a through-pass construction request.

【0048】次に、図6は、もう一つの実施形態に係る
リフォーム受注支援システムを示している。本実施の形
態では、リフォーム依頼振分部40の構成が図2と異な
る。図2のシステムでは、リフォーム依頼振分部16
は、オペレータへの問い合わせを利用して、リフォーム
依頼に応じる施工業者の決定をオペレータに委ねてい
る。本実施の形態では、リフォーム依頼振分部40が自
動的に施工業者を決定する。その他の構成は図2と同様
であるので、それら構成の説明は省略する。
FIG. 6 shows a remodeling order support system according to another embodiment. In the present embodiment, the configuration of the reform request distribution unit 40 is different from that of FIG. In the system of FIG. 2, the reform request distribution unit 16
Uses an inquiry to the operator to entrust the decision of the contractor to respond to the reform request to the operator. In the present embodiment, the reform request distribution unit 40 automatically determines a contractor. Other configurations are the same as those in FIG. 2, and the description of those configurations will be omitted.

【0049】リフォーム依頼振分部40は、振分状態取
得部42、施工業者決定部44および施工業者情報記憶
部46を含む。振分状態取得部42は、施工要求記録部
24の記憶している情報を参照して、複数の施工業者の
それぞれに対する現在のリフォーム依頼振分状態、すな
わち現在までの施工要求発生数を取得する。
The reform request distribution unit 40 includes a distribution state acquisition unit 42, a contractor determination unit 44, and a contractor information storage unit 46. The distribution state acquisition unit 42 refers to the information stored in the construction request recording unit 24, and acquires the current reform request distribution state for each of the plurality of contractors, that is, the number of construction request occurrences up to now. .

【0050】施工業者決定部44は、振分状態取得部4
2が取得したリフォーム依頼振分状態に基づいて、入力
されたリフォーム依頼に対応する施工業者を決定する。
施工業者決定部44は、施工業者決定基準に従って施工
業者を決定する。施工業者決定基準は、施工業者情報記
憶部46に記憶されており、以下に例示するように、各
施工業者が上述の施工費用収束範囲の数の施工要求を確
保するように定められている。
The contractor determination unit 44 is a distribution state acquisition unit 4
2 determines the contractor corresponding to the input reform request based on the acquired renovation request distribution state.
The contractor determining unit 44 determines the contractor according to the contractor determination criteria. The contractor determination criteria are stored in the contractor information storage unit 46, and are determined so that each contractor secures the above-mentioned construction request within the above-mentioned construction cost convergence range, as exemplified below.

【0051】図7は、施工業者決定基準の例を示してい
る。複数の施工業者のそれぞれのために図7のテーブル
が設定されている。この例では、施工業者の決定に、振
分目標達成度と、各施工業者のテリトリーが用いられ
る。振分目標達成度は、目標振分数の達成度合いであ
り、ここでは、目標振分数に対する振分実績数の比率
(%)が用いられる。目標振分数は、図5を参照して説
明したように、施工費用収束範囲の中に、すなわち収束
最低数Y以上の適当な数に設定される。月別等のより細
かな目標数が用いられてもよい。テリトリーは、施工業
者が施工を請け負う地域的範囲であり、一般的に施工業
者の所在地を中心とした適当な範囲である。
FIG. 7 shows an example of the contractor determination criteria. The table of FIG. 7 is set for each of a plurality of contractors. In this example, the distribution target achievement degree and the territory of each contractor are used to determine the contractor. The distribution target achievement degree is the degree of achievement of the target distribution number, and here, the ratio (%) of the distribution actual number to the target distribution number is used. As described with reference to FIG. 5, the target distribution number is set to an appropriate number within the construction cost convergence range, that is, the minimum number Y or more. A smaller target number, such as monthly, may be used. The territory is a regional area where the contractor undertakes construction, and is generally an appropriate range centered on the location of the contractor.

【0052】図7に示されるように、振分目標達成度
は、3つのランクに分けられている。それら3つのラン
クにそれぞれ対応して、3種類のテリトリーが設定され
ている。達成度が最も高いAランクには標準テリトリー
が対応し、2番目のBランクには一次拡大テリトリーが
対応し、最も低いCランクには二次拡大テリトリーが設
定されている。標準テリトリー、一次拡大テリトリー、
二次拡大テリトリーの順でテリトリーが大きくなる。
As shown in FIG. 7, the distribution target achievement degree is divided into three ranks. Three types of territories are set corresponding to the three ranks. The standard territory corresponds to the A rank with the highest degree of achievement, the primary expanded territory corresponds to the second B rank, and the secondary expanded territory is set to the lowest C rank. Standard territory, primary expansion territory,
Territory increases in the order of secondary expansion territory.

【0053】リフォーム依頼が入力されると、施工業者
決定部44は、施工業者決定基準に示される振分目標数
と、振分状態取得部42が取得した振分状況情報に基づ
き、各施工業者の振分目標達成度を算出し、振分目標達
成度に対応するテリトリーを求める。例えば、図7を参
照すると、施工業者Nの振分目標達成度がBランクに属
する場合には、一次拡大テリトリーが選択される。な
お、目標達成度は振分状態取得部42で予め算出されて
もよい。
When the renovation request is input, the contractor determining unit 44 determines each contractor based on the distribution target number indicated in the contractor determination standard and the distribution status information acquired by the distribution state acquiring unit 42. Is calculated, and a territory corresponding to the distribution target achievement is calculated. For example, referring to FIG. 7, when the degree of achievement of the distribution target of the contractor N belongs to rank B, the primary expansion territory is selected. Note that the target achievement degree may be calculated in advance by the distribution state acquisition unit 42.

【0054】施工業者決定部44は、各施工業者のテリ
トリー内にリフォーム依頼の住所が含まれるか否かを判
定する。そして、施工業者決定部44は、リフォーム依
頼の住所を含むテリトリーをもつ施工業者を選択し、そ
の施工業者を、リフォーム依頼を請け負う業者として決
定する。
The contractor determining unit 44 determines whether or not the address of the reform request is included in the territory of each contractor. Then, the contractor determining unit 44 selects a contractor having a territory including the address of the reform request, and determines the contractor as a contractor to undertake the reform request.

【0055】複数の施工業者のテリトリーが重なってい
るために、リフォーム依頼の住所が複数の施工業者のテ
リトリーに含まれることがある。この場合は、目標達成
度が最も低い施工業者が選択される。
Since the territories of a plurality of contractors overlap, the address of the reform request may be included in the territories of the plurality of contractors. In this case, the contractor with the lowest degree of achievement of the target is selected.

【0056】このように本実施の形態では、図3に示し
た施工費用収束範囲に基づいた目標の達成度が低い施工
業者に優先してリフォーム依頼を割り当てるように、施
工業者決定基準が設定されている。これにより、施工費
用収束範囲に入る施工要求を各施工業者のために確保す
るようにリフォーム依頼を振り分けていくことができ
る。
As described above, in the present embodiment, the contractor determination criteria are set so that the renovation request is assigned preferentially to the contractor having a low degree of achievement of the target based on the construction cost convergence range shown in FIG. ing. As a result, it is possible to distribute a reform request so as to secure a construction request that falls within the construction cost convergence range for each contractor.

【0057】特に本実施の形態では、目標達成度に応じ
て各施工業者のテリトリーを変更し、すなわち目標達成
度が低い施工業者のテリトリーを拡大しており、これに
より、目標達成度の低い施工業者への施工要求件数の増
大が適切に促進される。各施工業者は、目標達成度が高
いうちは(他の施工業者と比較して相対的に高いうち
は)狭いテリトリーで効率良く仕事をするとともに、目
標達成度が低下したときにはテリトリーを広げて件数を
増やすことができ、こうした利点を自動振分処理により
得ることができる。
In particular, in the present embodiment, the territory of each contractor is changed according to the degree of achievement of the target, that is, the territory of the contractor whose degree of achievement is low is expanded. Increase in the number of construction requests to contractors is appropriately promoted. Each contractor works efficiently in a narrow territory while the target achievement level is high (relatively high compared to other contractors), and expands the territory when the target achievement level decreases, And such an advantage can be obtained by the automatic sorting process.

【0058】なお、図7の施工業者決定基準は一例であ
り、これに限定されない。例えば、目標達成度として
は、比率以外のパラメータが用いられてもよい。また、
目標達成度のランクは3つでなくてもよく、また目標達
成度に応じてテリトリーが連続的に変更されてもよい。
また、目標達成度に応じたテリトリーの大きさの変更は
行なわなくてもよく、この場合には本実施の形態の利点
が部分的に得られる。
The criterion for determining the contractor in FIG. 7 is an example, and the present invention is not limited to this. For example, a parameter other than the ratio may be used as the target achievement degree. Also,
The rank of the goal achievement may not be three, and the territory may be continuously changed according to the goal achievement.
Further, the size of the territory does not need to be changed according to the degree of achievement of the target, and in this case, the advantages of the present embodiment can be partially obtained.

【0059】また、図7のシステムでは、施工業者が自
動的に決定されている。しかし、この自動処理では、シ
ステム側で完全に施工業者を決定しなくてもよい。例え
ば、システム側で決めた施工業者がオペレータに提示さ
れ、オペレータの確認が求められてもよい。こうした半
自動的な処理も、図7で説明した自動処理に含まれる。
In the system shown in FIG. 7, the contractor is automatically determined. However, in this automatic processing, the system need not completely determine the contractor. For example, a contractor determined by the system may be presented to the operator, and confirmation of the operator may be requested. Such semi-automatic processing is also included in the automatic processing described with reference to FIG.

【0060】以上、本発明の好適な実施の形態を説明し
た。本発明によれば、定価制のリフォーム提供サービス
に好適に用いられるリフォーム受注システムおよび受注
方法が提供され、特に、実施工費用のばらつきに関する
定価制の問題を回避できる技術を提供でき、その結果、
受注会社の設計、見積り等のコストの削減により、リフ
ォーム提供価格を低減することができる。
The preferred embodiment of the present invention has been described above. According to the present invention, a reform order receiving system and an order receiving method suitably used for a regular price reform service are provided, and in particular, it is possible to provide a technology capable of avoiding a problem of a fixed price system relating to variation in execution cost, and as a result,
The cost of renovation can be reduced by reducing the cost of designing and estimating the ordering company.

【0061】図2のシステムは、現在のリフォーム依頼
の振分状態を提示することによって、各施工業者への施
工費用収束範囲の数の施工要求の分配を促すことがで
き、定価制のリフォーム提供サービスの運営に有用に利
用できる。
The system shown in FIG. 2 can prompt distribution of the number of construction requests within the range of convergence of construction costs to each contractor by presenting the distribution state of the current reform request, and provide a fixed price reform. It can be usefully used for service operation.

【0062】また図6のシステムは、施工業者決定基準
に従った施工業者の自動的な決定により、各施工業者へ
の施工費用収束範囲の数の施工要求を分配することがで
き、定価制のリフォーム提供サービスの運営に有用に利
用できる。
The system shown in FIG. 6 is capable of distributing the number of construction requests within the range of the convergence of the construction cost to each of the contractors by automatically determining the contractor in accordance with the contractor determination criteria. It can be usefully used for the operation of the reform providing service.

【0063】また図6のシステムでは、施工業者の自動
決定において、施工費用収束範囲に基づいた振分目標の
達成度に応じて施工業者のテリトリーを変更することに
より、さらに適当なリフォーム依頼の振分が実現され
る。
Further, in the system of FIG. 6, in the automatic determination of the contractor, the territory of the contractor is changed in accordance with the degree of achievement of the distribution target based on the convergence range of the construction cost, so that a more appropriate reform request is transmitted. Minutes are realized.

【0064】本実施の形態は、発明の範囲内で当業者に
より変形可能なことはもちろんである。例えば、本実施
の形態では単位リフォーム規模として「坪」を用いてい
るが、それ以外の単位が用いられてもよい。またリフォ
ーム提供価格に用いる単位と施工依頼価格に用いる単位
が異なっていてもよい。また単位リフォーム規模は、1
件、数件、または所定の地域といった大きな規模でもよ
い。
The present embodiment can of course be modified by those skilled in the art within the scope of the invention. For example, in the present embodiment, “tsubo” is used as the unit reform scale, but other units may be used. Further, the unit used for the reform offer price and the unit used for the construction request price may be different. The unit renovation scale is 1
The number may be large, such as the number of cases, several cases, or a predetermined area.

【0065】本発明のリフォーム対象は、家屋全部でな
くてもよく、家屋の一部でもよい。またリフォームに
は、耐震補強を含めることが適当であり、本発明では、
コスト削減によって定価制サービスの下で耐震補強も提
供するように図れる。
The object of the renovation according to the present invention may not be the whole house, but may be a part of the house. Also, it is appropriate to include seismic reinforcement in the renovation.
By reducing costs, seismic reinforcement can be provided under fixed price services.

【0066】またリフォーム依頼価格基準においては、
単位リフォーム規模当たりのリフォーム提供価格は複数
種類でもよい。例えば、複数のリフォームグレードに応
じて複数の坪単価が設定される。これに応じて、坪当た
りの施工依頼価格も複数になる。
In the remodeling request price standard,
A plurality of types of renovation offer prices per unit remodeling scale may be used. For example, a plurality of basic unit prices are set according to a plurality of reform grades. Accordingly, the construction request price per tsubo will be plural.

【0067】また本発明では、リフォーム受注会社によ
る見積り作成は不要と説明した。これは、一件一件の家
屋の仕様に応じた設計に基づく見積りを行なわなくても
よい、という意味である。定価制の下での坪数に応じた
見積り作成等は行なわれてよいことはもちろんである。
Also, according to the present invention, it has been explained that the creation of an estimate by the renovation ordering company is unnecessary. This means that it is not necessary to make an estimate based on a design according to the specifications of each house. It is a matter of course that an estimate can be made in accordance with the number of tsubo under the fixed price system.

【0068】[0068]

【発明の効果】以上に説明したように、本発明によれ
ば、コスト削減により、低価格でリフォームサービスを
提供できる。
As described above, according to the present invention, it is possible to provide a renovation service at a low price by reducing costs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】従来のリフォームサービスを示す図である。FIG. 1 is a diagram showing a conventional reform service.

【図2】本発明によるリフォームサービスの概念を示す
図である。
FIG. 2 is a diagram illustrating the concept of a reform service according to the present invention.

【図3】リフォーム件数の増大に伴う施工費用の収束を
示す図である。
FIG. 3 is a diagram showing convergence of construction costs due to an increase in the number of renovations.

【図4】本実施の形態のリフォーム受注支援システムを
示す図である。
FIG. 4 is a diagram showing a reform order support system according to the embodiment.

【図5】図4のシステムで提示されるリフォーム振分状
態を示す図である。
FIG. 5 is a diagram showing a remodeling distribution state presented by the system of FIG. 4;

【図6】別の実施形態のリフォーム受注支援システムを
示す図である。
FIG. 6 is a diagram illustrating a reform order support system according to another embodiment.

【図7】図6のシステムで用いられる施工業者決定基準
を示す図である。
FIG. 7 is a diagram showing a contractor determination criterion used in the system of FIG. 6;

【符号の説明】[Explanation of symbols]

10 リフォーム受注支援システム 12 リフォーム依頼入力部 14 リフォーム施工要求生成部 16,40 リフォーム依頼振分部 32 振分状態取得部 34 施工業者選択要求部 36 施工業者選択受付部 38 施工業者情報記憶部 42 振分状態取得部 44 施工業者決定部 46 施工業者決定基準記憶部 Reference Signs List 10 Reform order support system 12 Reform request input unit 14 Reform construction request generation unit 16, 40 Reform request distribution unit 32 Distribution state acquisition unit 34 Contractor selection request unit 36 Contractor selection reception unit 38 Contractor information storage unit 42 Vibration Minute state acquisition unit 44 Contractor decision unit 46 Contractor decision reference storage unit

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 多数のリフォーム依頼主から収集された
リフォーム依頼であって、単位リフォーム規模あたりの
リフォーム提供価格が固定された定価制リフォーム価格
基準に基づいたリフォーム依頼の情報を入力するリフォ
ーム依頼入力部と、 リフォーム依頼に対応して、施工業者に対する施工要求
として、単位リフォーム規模あたりの施工依頼価格が固
定された定価制施工価格基準に基づいた、各リフォーム
依頼毎の個別の見積りを含まないスルーパス施工要求を
生成するリフォーム施工要求生成部と、 を含み、 前記単位リフォーム規模あたりのリフォーム提供価格
は、前記単位リフォーム規模あたりの施工依頼価格に応
じて設定されており、 前記単位リフォーム規模あたりの施工依頼価格は、施工
件数を増大したときのリフォーム施工費用の収束値に基
づいて設定されており、 前記リフォーム施工要求生成部は、一の施工業者に対し
て、リフォーム施工費用の収束が得られる施工費用収束
範囲の数の施工要求を生成することを特徴とするリフォ
ーム受注支援システム。
Claims: 1. A reform request input for inputting information of a reform request collected from a large number of reform requesters, based on a fixed-price reform price standard in which a reform offer price per unit reform scale is fixed. And through requests that do not include individual quotes for each remodeling request, based on fixed-price construction price standards in which the price of the remodeling request per unit of remodeling is fixed as a request to the contractor in response to the remodeling request. A renovation construction request generation unit that generates a construction request, wherein the renovation offer price per unit remodeling scale is set according to the construction request price per unit remodeling scale, and the construction per unit remodeling scale is performed. The requested price is for renovation work when the number of works is increased It is set based on the convergence value for, the renovation construction request generation unit, for one contractor, to generate a construction request of the number of construction cost convergence range that convergence of the renovation construction cost is obtained A featured remodeling order support system.
【請求項2】 請求項1に記載のリフォーム受注支援シ
ステムにおいて、 多数のリフォーム依頼主からの多数のリフォーム依頼を
複数の施工業者に振り分けるリフォーム依頼振分部を含
み、 前記リフォーム依頼振分部は、前記複数の施工業者のそ
れぞれに前記施工費用収束範囲の数の施工要求が行き渡
るように前記多数のリフォーム依頼を振り分けることを
特徴とするリフォーム受注支援システム。
2. The renovation order support system according to claim 1, further comprising a renovation request distribution unit for distributing a large number of renovation requests from a large number of renovation requesters to a plurality of contractors, A remodeling order support system, which distributes the large number of remodeling requests so that the number of the remanufacturing requests in the range of the convergence cost is distributed to each of the plurality of contractors.
【請求項3】 請求項2に記載のリフォーム受注支援シ
ステムにおいて、 前記リフォーム依頼振分部は、 前記複数の施工業者のそれぞれに対する現在のリフォー
ム依頼振分状態を取得する振分状態取得部と、 前記現在のリフォーム依頼振分状態を提示するととも
に、入力されたリフォーム依頼に対応する施工業者の選
択を要求する施工業者選択要求部と、 前記施工業者選択要求部の要求に応答する選択業者の選
択を受け付ける施工業者選択受付部と、 を含むことを特徴とするリフォーム受注支援システム。
3. The remodeling order support system according to claim 2, wherein the remodeling request distribution unit acquires a current remodeling request distribution state for each of the plurality of contractors, While presenting the current renovation request distribution state, a contractor selection request unit that requests selection of a contractor corresponding to the input reform request, and selection of a contractor responding to the request of the contractor selection request unit And a contractor's selection receiving unit for receiving the contract.
【請求項4】 請求項2に記載のリフォーム受注支援シ
ステムにおいて、 前記リフォーム依頼振分部は、 前記複数の施工業者のそれぞれに対する現在のリフォー
ム依頼振分状態を取得する振分状態取得部と、 前記リフォーム依頼振分状態に基づいて、入力されたリ
フォーム依頼に対応する施工業者を決定する施工業者決
定部と、 を含み、前記施工業者決定部は、前記複数の施工業者の
それぞれが前記施工費用収束範囲の数の施工要求を確保
するように定められた施工業者決定基準に従って施工業
者を決定することを特徴とするリフォーム受注支援シス
テム。
4. The remodeling order support system according to claim 2, wherein the remodeling request distribution unit acquires a current renewal request distribution state for each of the plurality of contractors, A contractor determining unit that determines a contractor corresponding to the input reform request based on the remodeling request distribution state, and the contractor determining unit determines that each of the plurality of contractors is the construction cost. A remodeling order support system, wherein a contractor is determined in accordance with a contractor determination criterion determined so as to secure the number of construction requests within the convergence range.
【請求項5】 多数のリフォーム依頼主から収集された
リフォーム依頼であって、単位リフォーム規模あたりの
リフォーム提供価格が固定された定価制リフォーム価格
基準に基づいたリフォーム依頼の情報を入力するリフォ
ーム依頼入力ステップと、 リフォーム依頼に対応して、施工業者に対する施工要求
として、単位リフォーム規模あたりの施工依頼価格が固
定された定価制施工価格基準に基づいた、各リフォーム
依頼毎の個別の見積りを含まないスルーパス施工要求を
生成するリフォーム施工要求生成ステップと、 を含み、 前記単位リフォーム規模あたりのリフォーム提供価格
は、前記単位リフォーム規模あたりの施工依頼価格に応
じて設定されており、 前記単位リフォーム規模あたりの施工依頼価格は、施工
件数を増大したときのリフォーム施工費用の収束値に基
づいて設定されており、 前記リフォーム施工要求生成ステップでは、リフォーム
施工費用の収束が得られる施工費用収束範囲の数の施工
要求を生成することを特徴とするリフォーム受注支援方
法。
5. A renovation request input for inputting renovation requests collected from a large number of renovation requesters, based on a fixed-price remodeling price standard in which a remodeling offer price per unit remodeling scale is fixed. Steps and through requests that do not include individual quotes for each remodeling request, based on fixed-price construction price standards in which the price of the remodeling request per unit remodeling is fixed as a request to the contractor in response to the remodeling request A renovation construction request generation step of generating a construction request, and wherein the renovation offer price per unit remodel scale is set according to the construction request price per unit remodel scale, and the construction per unit remodel scale The commission price will be The remodeling request generation step is configured based on a convergence value of the remodeling construction cost. Method.
【請求項6】 請求項5に記載のリフォーム受注支援方
法において、 多数のリフォーム依頼主からの多数のリフォーム依頼を
複数の施工業者に振り分けるリフォーム依頼振分ステッ
プを含み、 前記リフォーム依頼振分ステップでは、前記複数の施工
業者のそれぞれに前記施工費用収束範囲の数の施工要求
が行き渡るように前記多数のリフォーム依頼を振り分け
ることを特徴とするリフォーム受注支援方法。
6. The remodeling order support method according to claim 5, further comprising a remodeling request distribution step of distributing a number of renovation requests from a number of renovation requesters to a plurality of contractors. A remodeling order support method, wherein the plurality of remodeling requests are distributed so that the number of the rebuilding request in the range of the converging cost is distributed to each of the plurality of contractors.
【請求項7】 請求項6に記載のリフォーム受注支援方
法において、 前記リフォーム依頼振分ステップは、 前記複数の施工業者のそれぞれに対する現在のリフォー
ム依頼振分状態を取得する振分状態取得ステップと、 前記現在のリフォーム依頼振分状態を提示するととも
に、入力されたリフォーム依頼に対応する施工業者の選
択を要求する施工業者選択要求ステップと、 前記施工業者選択要求部の要求に応答する選択業者の選
択を受け付ける施工業者選択受付ステップと、 を含むことを特徴とするリフォーム受注支援方法。
7. The remodeling order support method according to claim 6, wherein the remodeling request allocating step is a allocating state obtaining step of obtaining a current remodeling request allocating state for each of the plurality of contractors. A contractor selection requesting step for presenting the current remodeling request distribution state and requesting the selection of a contractor corresponding to the inputted reforming request, and selecting a contractor responding to the request of the contractor selection requesting unit And receiving a contractor's selection.
【請求項8】 請求項6に記載のリフォーム受注支援方
法において、 前記リフォーム依頼振分ステップは、 前記複数の施工業者のそれぞれに対する現在のリフォー
ム依頼振分状態を取得する振分状態取得ステップと、 前記リフォーム依頼振分状態に基づいて、入力されたリ
フォーム依頼に対応する施工業者を決定する施工業者決
定ステップと、 を含み、前記施工業者決定ステップでは、前記複数の施
工業者のそれぞれが前記施工費用収束範囲の数の施工要
求を確保するように定められた施工業者決定基準に従っ
て施工業者を決定することを特徴とするリフォーム受注
支援方法。
8. The remodeling order support method according to claim 6, wherein the remodeling request allocating step is a allocating state acquiring step of acquiring a current remodeling request allocating state for each of the plurality of contractors. A contractor determining step of determining a contractor corresponding to the input reform request based on the remodeling request distribution state, including, in the contractor determining step, each of the plurality of contractors A remodeling order support method, wherein a contractor is determined according to a contractor determination criterion determined so as to secure the number of construction requests within the convergence range.
JP2000251107A 2000-08-22 2000-08-22 Reform order support system and reform order support method Expired - Lifetime JP4584427B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000251107A JP4584427B2 (en) 2000-08-22 2000-08-22 Reform order support system and reform order support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000251107A JP4584427B2 (en) 2000-08-22 2000-08-22 Reform order support system and reform order support method

Publications (2)

Publication Number Publication Date
JP2002063417A true JP2002063417A (en) 2002-02-28
JP4584427B2 JP4584427B2 (en) 2010-11-24

Family

ID=18740566

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000251107A Expired - Lifetime JP4584427B2 (en) 2000-08-22 2000-08-22 Reform order support system and reform order support method

Country Status (1)

Country Link
JP (1) JP4584427B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06348722A (en) * 1993-06-14 1994-12-22 Toda Constr Co Ltd Automatic generation system for facility rough estimate
JPH0791083A (en) * 1993-02-09 1995-04-04 Kazuhiko Horie Data evaluation system
JPH08123861A (en) * 1994-10-24 1996-05-17 Akane Kenchiku Consultant:Kk Building cost calculation supporting device
JPH09170330A (en) * 1995-12-22 1997-06-30 Matsushita Electric Ind Co Ltd Building reform cad cost estimation system
JPH10143571A (en) * 1996-11-15 1998-05-29 Fujitsu Ltd Ordering trader decision system and recording medium storing program for making computer perform processing in the system
JP2000222482A (en) * 1999-02-01 2000-08-11 Teremesse:Kk Electronic transaction support system and readable storage medium recording electronic transaction support program

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791083A (en) * 1993-02-09 1995-04-04 Kazuhiko Horie Data evaluation system
JPH06348722A (en) * 1993-06-14 1994-12-22 Toda Constr Co Ltd Automatic generation system for facility rough estimate
JPH08123861A (en) * 1994-10-24 1996-05-17 Akane Kenchiku Consultant:Kk Building cost calculation supporting device
JPH09170330A (en) * 1995-12-22 1997-06-30 Matsushita Electric Ind Co Ltd Building reform cad cost estimation system
JPH10143571A (en) * 1996-11-15 1998-05-29 Fujitsu Ltd Ordering trader decision system and recording medium storing program for making computer perform processing in the system
JP2000222482A (en) * 1999-02-01 2000-08-11 Teremesse:Kk Electronic transaction support system and readable storage medium recording electronic transaction support program

Also Published As

Publication number Publication date
JP4584427B2 (en) 2010-11-24

Similar Documents

Publication Publication Date Title
US7668725B2 (en) Lead distribution system
JP2007521563A (en) Functional space reservation system
WO2013144787A1 (en) Work and quality management system, device and method
JP2010055360A (en) Device for generating coupon management information, coupon issuing apparatus and coupon distribution system
US20070233577A1 (en) Lead distribution method and system
JP2007323439A (en) Resource allocation system, information processor, resource allocation method, and resource allocation program
JP2014127118A (en) Reservation job support server, reservation job support program, and support method for reservation job
KR20170141563A (en) System and method of managing rental car for price comparison search
JP2010230341A (en) Information processing system, method of control and program, and global cash management system
JP2002063417A (en) Reform order reception supporting system and reform order reception supporting method
KR20140118906A (en) Real estate auctions price information providing method and system thereof
JP2003157316A (en) Temporary staffing mediating system, temporary staffing mediating method, program for making computer execute temporary staffing mediating method and computer- readable recording medium with the program recorded thereon
JP2005284827A (en) Information processing apparatus
JP6990684B2 (en) Analytical equipment and analytical method
GB2521345A (en) Method and system for generating a quote
JP7205863B2 (en) Apparatus, method, and program for supporting advertisement placement
JP7011510B2 (en) Reimbursement request device, reimbursement request method, and reimbursement request program
JP2009187294A (en) Apparatus for supporting specification design of product, support program, and product specification design support system
JP2009003666A (en) Schedule control device, schedule control method and program
JP6680500B2 (en) Fund management support apparatus and fund management support method
JP2011100365A (en) Device, method, and program for estimation and purchase job
KR20110041654A (en) The mediating system for a design and a construction and the mediating method thereof
JP5785350B1 (en) Information processing apparatus, information processing method, program, and storage medium
JP2005332133A (en) Content sales system, sales method and sales program
WO2022185422A1 (en) Information processing system, information processing device, and information processing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070820

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100824

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100902

R150 Certificate of patent or registration of utility model

Ref document number: 4584427

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20200910

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250