JP2001329531A - Impervious wall and construction method therefor - Google Patents

Impervious wall and construction method therefor

Info

Publication number
JP2001329531A
JP2001329531A JP2000152285A JP2000152285A JP2001329531A JP 2001329531 A JP2001329531 A JP 2001329531A JP 2000152285 A JP2000152285 A JP 2000152285A JP 2000152285 A JP2000152285 A JP 2000152285A JP 2001329531 A JP2001329531 A JP 2001329531A
Authority
JP
Japan
Prior art keywords
groove
sheet
constructing
water
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000152285A
Other languages
Japanese (ja)
Other versions
JP4429479B2 (en
Inventor
Shigeru Suzuki
鈴木  茂
Masashi Nagatomi
政司 永富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2000152285A priority Critical patent/JP4429479B2/en
Publication of JP2001329531A publication Critical patent/JP2001329531A/en
Application granted granted Critical
Publication of JP4429479B2 publication Critical patent/JP4429479B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an impervious wall (soil sealing wall body) capable of reducing construction cost and having high cut-off property and a construction method therefor. SOLUTION: A sheet pile 3 is constructed in the ground 1 so that it reaches an aquiclude 7, the vicinity of a ground surface of the sheet pile 3 is digged to construct a liquid pouring ditch 11, and bentonite slurry 13 is filled therein. Next, the sheet pile 3 is pulled out, and bentonite slurry 13 is filled into a sheet pile pulled out ditch 17. An impervious sheet 21 is constructed in the sheet pile pulled out ditch 17 using a guide jig 19 for hanging the impervious sheet. Grout or mortar 31 is poured in it, and bentonite slurry 13 is discharged. This process is repeated at a fixed interval.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は地下水を遮水する遮
水壁及びその構築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an impermeable wall for impermeable groundwater and a method for constructing the same.

【0002】[0002]

【従来の技術】従来、汚染土壌を地中に封じ込める方法
としては、側壁を構築して、その内側に汚染土を封じ込
める方法がある。そして、仮置き保管のための汚染土封
じ込めの側壁としては、側壁で封じ込められた内側の汚
染物質が外側に漏液、漏洩、排出されない必要がある。
このため、地盤を薄く切り裂き、そこに極薄の壁を構築
することが考えられ、一般的に、ワイヤーソウ、チェイ
ンソウ等のノコギリを用いて地盤を切り、そこに薄い板
材を差し込む方法が提案されている。
2. Description of the Related Art Conventionally, as a method of contaminating contaminated soil in the ground, there is a method of constructing a side wall and confining the contaminated soil inside the side wall. And, as the side wall of the contaminated soil containment for temporary storage, it is necessary that the inside contaminant contained in the side wall is not leaked, leaked, or discharged to the outside.
For this reason, it is conceivable to cut the ground thinly and build an ultra-thin wall there.In general, a method of cutting the ground using a saw such as a wire saw or a chain saw and inserting a thin plate material there is proposed. Have been.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、このよ
うな方法では、コストが割高になったり、シート間の遮
水性確保の問題が残り、実用化にはいたっていないのが
現状である。
However, in such a method, the cost is high and the problem of securing the water barrier between the sheets remains, and the method has not yet been put to practical use.

【0004】本発明はこのような問題を鑑みてなされた
ものでその目的とするところは、工費が低廉で、止水性
の高い遮水壁及びその構築方法を提供することにある。
[0004] The present invention has been made in view of such problems, and an object of the present invention is to provide a water impermeable wall which is inexpensive, has high water blocking properties, and a method of constructing the same.

【0005】[0005]

【課題を解決するための手段】前述した問題を解決する
ための第1の発明は、地盤に溝が形成され、前記溝の内
部に、遮水シートが設けられ、前記溝にグラウトまたは
モルタルが設けられることを特徴とする遮水壁である。
According to a first aspect of the present invention for solving the above-mentioned problems, a groove is formed in the ground, a water-blocking sheet is provided inside the groove, and grout or mortar is provided in the groove. It is a water impermeable wall characterized by being provided.

【0006】第2の発明は、汚染土の周囲に、溝を構築
する工程と、前記溝の内部に、遮水シートを設ける工程
と、前記溝の内部に、グラウトまたはモルタルを充填す
る工程と、を具備することを特徴とする遮水壁の構築方
法である。
According to a second aspect of the present invention, a step of constructing a groove around the contaminated soil, a step of providing a water-impervious sheet inside the groove, and a step of filling the inside of the groove with grout or mortar are provided. The construction method of the impermeable wall characterized by comprising:

【0007】[0007]

【発明の実施の形態】以下、図面に基づいて本発明の実
施の形態を詳細に説明する。図1から図9は、土壌封じ
込め壁体(遮水壁)の構築方法の説明図であり、図5
は、図4の斜視図、図7は、図6のA−A断面図、図9
は、全体斜視図である。図1に示すように、汚染土9の
周囲の地面1に汚染土9を囲むように土壌封じ込め壁体
を構築する場合、例えば長さが約5mの板部材であるシ
ートパイル3を難透水層7まで到達するように、打設装
置5によって地面1に打設する。
Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 9 are explanatory diagrams of a method for constructing a soil containment wall (water impermeable wall).
9 is a perspective view of FIG. 4, FIG. 7 is a sectional view taken along line AA of FIG.
Is an overall perspective view. As shown in FIG. 1, when a soil containment wall is constructed on the ground 1 around the contaminated soil 9 so as to surround the contaminated soil 9, for example, the sheet pile 3, which is a plate member having a length of about 5 m, is made of a poorly permeable layer. 7 and is driven into the ground 1 by the driving device 5.

【0008】次に、図2に示すように、シートパイル3
の地表面付近の両側を掘削して、注液溝11を構築し、
注液溝11に、ベントナイト液13を充填する。図3に
示すように、打設したシートパイル3をクレーン15に
より抜き取る。その際、抜き取りと同時に、注入溝11
から、シートパイル3を抜き取った隙間であるシートパ
イル抜取溝17にベントナイト液13が進入する。この
ベントナイト液は、シートパイル抜取溝17の側壁崩壊
を防ぐ役割をする。
Next, as shown in FIG.
Excavation on both sides near the ground surface to construct an injection groove 11,
The injection groove 11 is filled with a bentonite liquid 13. As shown in FIG. 3, the sheet pile 3 that has been cast is extracted by the crane 15. At this time, the injection groove 11
Then, the bentonite liquid 13 enters the sheet pile extraction groove 17 which is a gap from which the sheet pile 3 is extracted. The bentonite liquid serves to prevent the side wall of the sheet pile removal groove 17 from collapsing.

【0009】次に、図4、図5に示すように、注液溝1
1と地面1とに脚部22を有する遮水シート垂込用ガイ
ド治具19を設置する。この遮水シート垂込用ガイド治
具19上に、ガイド棒20を載置する。遮水シート垂込
用ガイド治具19の形状は、シートパイル抜取溝17の
断面形状に応じた形状となる。遮水シート21の先端に
は、ウェイト(重り)23を設ける。この遮水シート2
1をガイド棒20上に載置し、遮水シート21の端部を
作業員が握る。ウェイト23の重みにより、遮水シート
21は、ガイド棒20を介して、ベントナイト液13が
充填されたシートパイル抜取溝17に挿入され建て込ま
れる。
Next, as shown in FIG. 4 and FIG.
A guide jig 19 for dropping a seepage control sheet having legs 22 is provided on the ground 1 and the ground 1. The guide rod 20 is placed on the guide jig 19 for dropping the impermeable sheet. The shape of the water-impervious sheet drop-in guide jig 19 is a shape corresponding to the cross-sectional shape of the sheet pile extraction groove 17. A weight (weight) 23 is provided at the tip of the water-impervious sheet 21. This impermeable sheet 2
1 is placed on the guide rod 20, and an operator grips the end of the impermeable sheet 21. Due to the weight of the weight 23, the impermeable sheet 21 is inserted through the guide rod 20 into the sheet pile withdrawal groove 17 filled with the bentonite liquid 13 and built therein.

【0010】図6は、シートパイル抜取溝17内のベン
トナイト液13中に、遮水シート21が建て込まれた状
態を示し、図7は、遮水シート21の合せ部における図
6のA−A断面図である。図6、図7に示すように、遮
水シート重ね合わせ部29は、シートパイル抜取溝17
内のベントナイト液13中に、遮水シート21aと遮水
シート21bとを重ねて建て込む。この遮水シート21
aと遮水シート21bとの重ね代の両端部のシートパイ
ル抜取溝17に差し矢板25を差し込み、遮水シート2
1aと遮水シート21bとを仮固定する。遮水シート2
1aと遮水シート21bとで挟まれた部分に、無収縮モ
ルタル27を注入することにより、遮水シート重ね合わ
せ部29の遮水性を確保する。
FIG. 6 shows a state in which the impermeable sheet 21 is erected in the bentonite liquid 13 in the sheet pile extracting groove 17. FIG. It is A sectional drawing. As shown in FIGS. 6 and 7, the impermeable sheet overlapping portion 29 is provided with the sheet pile removal groove 17.
The water impermeable sheet 21a and the water impermeable sheet 21b are built up in the bentonite liquid 13 inside. This impermeable sheet 21
a and the water impermeable sheet 21b are inserted into the sheet pile extraction grooves 17 at both ends of the overlap margin, and the water impermeable sheet 2 is inserted.
1a and the impermeable sheet 21b are temporarily fixed. Impermeable sheet 2
By injecting the non-shrink mortar 27 into the portion sandwiched between 1a and the water-blocking sheet 21b, water-blocking of the water-blocking sheet overlapping portion 29 is ensured.

【0011】次に、図8に示すように、シートパイル抜
取溝17内の遮水シート21の両側に、グラウトまたは
モルタル31を注入して、ベントナイト液13を排出
し、注液溝11を埋め戻す。更に、図9に示すように、
一定の幅で、前述の土壌封じ込め壁体の構築方法を繰り
返すことにより、汚染土9の周囲に、極薄の遮水壁であ
る土壌封じ込め壁体を構築する。この場合、2組のシー
トパイル3を用いて、この2組のシートパイル3を繰り
返し交互に利用する。汚染土9の周囲への土壌封じ込め
壁体の構築を完了した後、アスフアルト舗装等のトップ
カバー(図示せず)を施工して、汚染土9の封じ込めを
完了する。
Next, as shown in FIG. 8, grout or mortar 31 is injected into both sides of the impermeable sheet 21 in the sheet pile extracting groove 17, the bentonite liquid 13 is discharged, and the filling groove 11 is filled. return. Further, as shown in FIG.
By repeating the above-described method for constructing the soil containment wall at a constant width, a soil containment wall which is an extremely thin impermeable wall is constructed around the contaminated soil 9. In this case, two sets of sheet piles 3 are used, and these two sets of sheet piles 3 are used alternately and alternately. After the construction of the soil containment wall around the contaminated soil 9 is completed, a top cover (not shown) such as asphalt pavement is installed to complete the containment of the contaminated soil 9.

【0012】この土壌封じ込め壁体の深さ分に渡って横
方向へ、汚染土9の周囲に汚染物質の流入、または、流
出等の移動を防止できる。尚、汚染土9の底部に遮水工
が必要な場合には、地盤改良工法により、シートパイル
3の打設に先だち、汚染土9の底部に遮水工の構築をす
る。このように、本実施の形態によれば、遮水シート2
1を用いるため、遮水性が良好で、工費も安い、遮水壁
(土壌封じ込め壁体)及びその構築方法を提供すること
ができる。
The inflow or outflow of contaminants around the contaminated soil 9 can be prevented in the lateral direction over the depth of the soil containment wall. In the case where a water impervious work is required at the bottom of the contaminated soil 9, a water impervious work is constructed at the bottom of the contaminated soil 9 by the ground improvement method prior to the placement of the sheet pile 3. Thus, according to the present embodiment, the impermeable sheet 2
The use of 1 makes it possible to provide a water-impervious wall (soil-contained wall) having good water-impermeability and low construction cost, and a method of constructing the same.

【0013】図10から図12は、別のウエイト33を
用いた場合に関するもので、図10は、遮水シート21
を建て込む場合の斜視図、図11は、ウエイト33の斜
視図、図12は、図11のB−Bによる断面図に相当す
る図である。図10から図12に示すように、ウエイト
33は、前述のウエイト23と同様に、遮水シート21
をシートパイル抜取溝17内に建て込む際に、重りの役
割をする。
FIGS. 10 to 12 relate to the case where another weight 33 is used, and FIG.
11 is a perspective view of the weight 33, and FIG. 12 is a view corresponding to a cross-sectional view taken along line BB of FIG. As shown in FIGS. 10 to 12, the weight 33 is similar to the weight 23 described above,
Serves as a weight when it is built into the sheet pile removal groove 17.

【0014】図12に示すように、ウエイト33の断面
形状は、シートパイル3の断面形状に応じたものであ
り、ボルト35により、建て込む遮水シート21の幅に
あわせて、必要数をつなぎ合わせる。このウエイト33
を設けた遮水シート21は、遮水シート垂込用ガイド治
具19に設けられたガイド棒20を介して、シートパイ
ル抜取溝17に建て込まれる。
As shown in FIG. 12, the cross-sectional shape of the weight 33 is in accordance with the cross-sectional shape of the sheet pile 3, and the necessary number is connected by bolts 35 in accordance with the width of the impermeable sheet 21 to be built. Match. This weight 33
Is imbedded in the sheet pile removal groove 17 via the guide rod 20 provided on the guide jig 19 for dropping the water-impervious sheet.

【0015】次に、本発明の別の実施の形態であり、施
工実現性を確保するために、シートパイル抜取り時の負
圧対策を兼用したモルタル壁築造について説明する。図
13から図19は、別の実施の形態の土壌封じ込め壁体
の構築方法の説明図であり、図14は、圧入治具67を
有するシートパイル53の斜視図であり、図15は、図
14のC−C断面図、図19は、図18のD部拡大図で
ある。
Next, a description will be given of another embodiment of the present invention, in which a mortar wall construction is provided which also serves as a countermeasure against negative pressure when removing a sheet pile in order to secure workability. 13 to 19 are explanatory diagrams of a method for constructing a soil containment wall according to another embodiment. FIG. 14 is a perspective view of a sheet pile 53 having a press-fitting jig 67, and FIG. 14 is a sectional view taken along line CC, and FIG. 19 is an enlarged view of a portion D in FIG.

【0016】前述した土壌封じ込め壁体を構築する際、
シートパイル3を抜き取る時に、地面1の土質によりベ
ントナイト液13を注入してもシートパイル抜取溝17
の側壁が崩壊を起こす場合がある。図13から図18に
示す別の実施の形態は、シートパイル53を抜き取る作
業中に打設溝71内に負圧が働き打設溝71壁の崩壊を
防ぐために、打設溝71の厚さを大きくする圧入治具6
7を考案し、モルタル圧入管72を圧入してモルタル7
4を送りながら、シートパイル53を抜取り、モルタル
74壁を築造する土壌封じ込め壁体の構築方法である。
When constructing the aforementioned soil containment wall,
When the sheet pile 3 is extracted, even if the bentonite liquid 13 is injected depending on the soil quality of the ground 1, the sheet pile extraction groove 17 is formed.
May collapse. Another embodiment shown in FIG. 13 to FIG. 18 is to reduce the thickness of the driving groove 71 in order to prevent the collapse of the wall of the driving groove 71 due to the negative pressure acting in the driving groove 71 during the work of extracting the sheet pile 53. Jig 6 to increase the size
Mortar 7, and press-fit mortar press-fit pipe 72 to mortar 7
This is a method for constructing a soil containment wall in which the sheet pile 53 is withdrawn while feeding 4 and a mortar 74 wall is constructed.

【0017】図13に示すように、汚染土59の周囲の
地面51に汚染土59を囲むように土壌封じ込め壁体を
構築する場合、土壌封じ込め壁体の構築位置の地面51
に注液溝61を掘削し、注液溝61内にベントナイト液
63を充填する。57は難透水層を示す。
As shown in FIG. 13, when a soil-contained wall is constructed on the ground 51 surrounding the contaminated soil 59 so as to surround the contaminated soil 59, the ground 51 at the construction position of the soil-contained wall is constructed.
The filling groove 61 is excavated, and the bentonite liquid 63 is filled in the filling groove 61. Reference numeral 57 denotes a poorly permeable layer.

【0018】次に、図14、図15に示すように、シー
トパイル53の先端に、アングル66が設けられ、断面
がV字形の圧入治具67の支持部68をガムテープ69
等で仮に取り付ける。そして図16に示すように、この
圧入治具67が仮固定されたシートパイル53から圧入
直前にガムテープ69をはがして、打設装置55によ
り、注液溝61の下方に打設する。尚、図14は、圧入
治具67とシートパイル53との位置関係を概念的に理
解するために書かれた斜視図であり、施工時では、aは
ゼロとなるように圧入治具67がシートパイル53に取
付けられる。
Next, as shown in FIGS. 14 and 15, an angle 66 is provided at the tip of the sheet pile 53, and the support portion 68 of the press-fitting jig 67 having a V-shaped cross section is attached to the gum tape 69.
Temporarily attach with etc. Then, as shown in FIG. 16, immediately before the press-fitting jig 67 is press-fitted from the temporarily fixed sheet pile 53, the gum tape 69 is peeled off, and the pouring device 55 is used to drive down the liquid injection groove 61. FIG. 14 is a perspective view written to conceptually understand the positional relationship between the press-fitting jig 67 and the sheet pile 53. At the time of construction, the press-fitting jig 67 is set so that a becomes zero. It is attached to the sheet pile 53.

【0019】図17に示すように、シートパイル53
は、難透水層57まで到達するように打設する。圧入治
具67の断面は、V字形であり、シートパイル53の打
設時にはシートパイル53の厚みより厚く打設溝71が
構築される。この打設溝71内にモルタル圧入管72を
別途に挿入し、モルタル74を打設溝71の溝内底面か
ら充填することにより、モルタル74で壁体を構築す
る。
As shown in FIG. 17, the sheet pile 53
Is cast so as to reach the poorly permeable layer 57. The cross section of the press-fitting jig 67 is V-shaped, and when the sheet pile 53 is driven, a driving groove 71 thicker than the thickness of the sheet pile 53 is formed. A mortar press-fitting pipe 72 is separately inserted into the casting groove 71, and the mortar 74 is filled from the inner bottom surface of the casting groove 71 to form a wall body with the mortar 74.

【0020】次に図18、図19に示すように、打設し
たシートパイル53をクレーン65により抜き取る。圧
入治具67は、シートパイル53の抜き取りと同時に、
シートパイル53からはずれ、打設溝71の底部にのこ
る。この打設溝71は、シートパイル3の厚みより厚い
ため、シートパイル53の抜取り時に、シートパイル5
3は、打設溝71の側壁に接触せず、またモルタル注入
管72からのモルタル74を圧送することにより負圧が
発生することがなく、打設溝71の側壁の崩壊を防止し
ながら、モルタル74を充填してモルタル74による壁
体が構築される。尚、このモルタル74による壁体中に
遮水シートが設けられる。その後の工程は、前述の実施
の形態と同様である。
Next, as shown in FIGS. 18 and 19, the driven sheet pile 53 is removed by a crane 65. The press-fitting jig 67 simultaneously removes the sheet pile 53,
It is separated from the sheet pile 53 and stands at the bottom of the driving groove 71. Since the driving groove 71 is thicker than the thickness of the sheet pile 3, when the sheet pile 53 is extracted, the sheet pile 5
3 does not contact the side wall of the casting groove 71, and does not generate a negative pressure by pumping the mortar 74 from the mortar injection pipe 72. The mortar 74 is filled to form a wall made of the mortar 74. A waterproof sheet is provided in the wall of the mortar 74. Subsequent steps are the same as in the above-described embodiment.

【0021】[0021]

【発明の効果】以上、詳細に説明したように本発明によ
れば、鋼矢板の代わりに遮水シートを用いるため、工費
が低廉で、止水性の高い遮水壁(土壌封じ込め壁体)及
びその構築方法を提供することができる。また、従来か
らの工法では、ライフサイクルコスト(LCC)の観点
から、将来的に壁体撤去を余儀なくされた場合に、コン
クリート壁体の撤去処分に莫大なコストがかかり、また
シートパイル等においては、腐食鋼材の処分等の問題が
発生する。本発明による遮水シートの将来的な撤去の工
費については、通常の掘削工事によって、掘り出した部
分を切断除去して、産業廃棄物処分するコストだけにな
る。
As described above in detail, according to the present invention, since a water impervious sheet is used in place of a steel sheet pile, the construction cost is low, the water impervious wall (soil containment wall) having high water stoppage and The construction method can be provided. In addition, in the conventional method, from the viewpoint of life cycle cost (LCC), if the removal of the wall is required in the future, the removal and disposal of the concrete wall will require enormous costs. In addition, problems such as disposal of corroded steel material occur. The cost of the future removal of the water-impervious sheet according to the present invention is only the cost of cutting and removing the excavated portion by ordinary excavation work and disposing of industrial waste.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 土壌封じ込め壁体の構築方法の説明図FIG. 1 is an illustration of a method for constructing a soil containment wall.

【図2】 土壌封じ込め壁体の構築方法の説明図FIG. 2 is an explanatory view of a method for constructing a soil containment wall.

【図3】 土壌封じ込め壁体の構築方法の説明図FIG. 3 is an illustration of a method for constructing a soil containment wall.

【図4】 土壌封じ込め壁体の構築方法の説明図FIG. 4 is an illustration of a method for constructing a soil containment wall.

【図5】 図4の斜視図FIG. 5 is a perspective view of FIG. 4;

【図6】 土壌封じ込め壁体の構築方法の説明図FIG. 6 is an explanatory view of a method for constructing a soil containment wall.

【図7】 図6のA−A断面図FIG. 7 is a sectional view taken along line AA of FIG. 6;

【図8】 土壌封じ込め壁体の構築方法の説明図FIG. 8 is an explanatory view of a method for constructing a soil containment wall.

【図9】 土壌封じ込め壁体の構築方法の全体斜視図FIG. 9 is an overall perspective view of a method for constructing a soil containment wall.

【図10】遮水シート21を建て込む場合の斜視図FIG. 10 is a perspective view when the impermeable sheet 21 is installed.

【図11】ウエイト33の斜視図11 is a perspective view of a weight 33. FIG.

【図12】図11のB−B断面図FIG. 12 is a sectional view taken along line BB of FIG. 11;

【図13】土壌封じ込め壁体の構築方法の説明図FIG. 13 is an explanatory diagram of a method for constructing a soil containment wall.

【図14】圧入治具67を有するシートパイル53の斜
視図
FIG. 14 is a perspective view of a sheet pile 53 having a press-fitting jig 67.

【図15】図14のC−C断面図15 is a sectional view taken along the line CC in FIG.

【図16】土壌封じ込め壁体の構築方法の説明図FIG. 16 is an explanatory diagram of a method for constructing a soil containment wall.

【図17】土壌封じ込め壁体の構築方法の説明図FIG. 17 is an explanatory view of a method for constructing a soil containment wall.

【図18】土壌封じ込め壁体の構築方法の説明図FIG. 18 is an explanatory view of a method for constructing a soil containment wall.

【図19】図18のD部拡大図19 is an enlarged view of a portion D in FIG. 18;

【符号の説明】[Explanation of symbols]

1、51…地面 3、53…シートパイル 9、59…汚染土 11、61…注液溝 13、63…ベントナイト液 19…遮水シート垂込用ガイド治具 21…遮水シート 23、33…ウエイト 67…圧入治具 72…モルタル圧入管 74…モルタル 1, 51: Ground 3, 53: Sheet pile 9, 59: Contaminated soil 11, 61: Injection groove 13, 63: Bentonite liquid 19: Guide jig for dropping of water-blocking sheet 21: Water-blocking sheet 23, 33 ... Weight 67 ... Press-fitting jig 72 ... Mortar press-fit pipe 74 ... Mortar

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 地盤に溝が形成され、前記溝の内部に、
遮水シートが設けられ、 前記溝にグラウトまたはモルタルが設けられることを特
徴とする遮水壁。
A groove is formed in the ground, and inside the groove,
A water impermeable wall, provided with a water impermeable sheet, and grout or mortar provided in the groove.
【請求項2】 前記遮水シートは、一部が重ね合わさ
れ、重ね合わされた部分の2枚の遮水シートの内側に充
填された無収縮モルタルを有することを特徴とする請求
項1記載の遮水壁。
2. The shielding sheet according to claim 1, wherein the waterproof sheet has a non-shrinkable mortar partially overlapped and filled inside the two waterproof sheets in the overlapped portion. Water wall.
【請求項3】 汚染土の周囲に、溝を構築する工程と、
前記溝の内部に、遮水シートを設ける工程と、 前記溝の内部に、グラウトまたはモルタルを充填する工
程と、を具備することを特徴とする遮水壁の構築方法。
3. building a ditch around the contaminated soil;
A method of constructing a water impermeable wall, comprising: providing a water impermeable sheet inside the groove; and filling grout or mortar inside the groove.
【請求項4】 前記溝を構築する工程は、板部材を打設
する工程と、前記板部材の地表面付近の周囲を掘削し、
注液溝を構築する工程と、前記注液溝に、ベントナイト
液を注入する工程と、前記板部材を抜き取り、前記板部
材により構築された前記溝に、前記注液溝より前記ベン
トナイト液が注入される工程と、を具備することを特徴
とする請求項3記載の遮水壁の構築方法。
4. The step of constructing the groove includes a step of placing a plate member, and excavating around a ground surface of the plate member,
A step of constructing an injection groove, a step of injecting a bentonite liquid into the injection groove, and extracting the plate member, and injecting the bentonite liquid from the injection groove into the groove formed by the plate member. The method according to claim 3, further comprising the steps of:
【請求項5】 前記遮水シートを設ける工程は、前記溝
の上部の地表面に竿状のガイド棒を設置する工程と、前
記ガイド棒に沿わせるように、前記遮水シートを前記溝
の内部に設ける工程と、を具備することを特徴とする請
求項3記載の遮水壁の構築方法。
5. The step of providing the water-impervious sheet includes the steps of: installing a rod-shaped guide rod on the ground surface above the groove; and attaching the water-impervious sheet to the groove so as to be along the guide rod. The method for constructing a water impermeable wall according to claim 3, comprising a step of providing the inside.
【請求項6】 前記遮水シートは、一部が重ね合わさ
れ、重ね合わされた部分の2枚の遮水シートの内側に充
填された無収縮モルタルを有することを特徴とする請求
項3記載の遮水壁の構築方法。
6. The shielding material according to claim 3, wherein the waterproofing sheet has a non-shrinkable mortar that is partially overlapped and filled inside the two waterproofing sheets in the overlapping portion. How to build a water wall.
【請求項7】 前記遮水シートを設ける工程は、前記遮
水シートの端部に重りを設けて、前記溝の内部に前記遮
水シートを挿入していくことを特徴とする請求項3記載
の遮水壁の構築方法。
7. The step of providing the water impermeable sheet, wherein a weight is provided at an end of the water impermeable sheet, and the water impermeable sheet is inserted into the groove. Construction method of the impermeable wall.
【請求項8】 前記溝を構築する工程は、汚染土の周囲
に注液溝を構築する工程と、前記注液溝にベントナイト
液を注入する工程と、前記注液溝から下方に向かって先
端に圧入治具を有する板部材を打設する工程と、前記板
部材を抜き取り、板部材により構築された溝にモルタル
圧入管を挿入してモルタルが注入される工程と、を具備
することを特徴とする請求項3記載の遮水壁の構築方
法。
8. The step of constructing the groove includes the steps of: constructing an injection groove around contaminated soil; injecting a bentonite liquid into the injection groove; A step of casting a plate member having a press-fitting jig into it, and a step of extracting the plate member, inserting a mortar press-fitting pipe into a groove constructed by the plate member, and injecting mortar. The method for constructing a water impermeable wall according to claim 3.
【請求項9】 前記圧入治具の端部の断面は、V字形で
あることを特徴とする請求項8記載の遮水壁の構築方
法。
9. The method according to claim 8, wherein an end of the press-fitting jig has a V-shaped cross section.
JP2000152285A 2000-05-24 2000-05-24 Construction method of impermeable wall Expired - Fee Related JP4429479B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000152285A JP4429479B2 (en) 2000-05-24 2000-05-24 Construction method of impermeable wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000152285A JP4429479B2 (en) 2000-05-24 2000-05-24 Construction method of impermeable wall

Publications (2)

Publication Number Publication Date
JP2001329531A true JP2001329531A (en) 2001-11-30
JP4429479B2 JP4429479B2 (en) 2010-03-10

Family

ID=18657723

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000152285A Expired - Fee Related JP4429479B2 (en) 2000-05-24 2000-05-24 Construction method of impermeable wall

Country Status (1)

Country Link
JP (1) JP4429479B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002583A (en) * 2003-06-10 2005-01-06 Kajima Corp Construction method of underground impervious wall
JP2013159960A (en) * 2012-02-06 2013-08-19 Takenaka Komuten Co Ltd Sheet pile pulled-out part filling method
JP2020125613A (en) * 2019-02-04 2020-08-20 大地 山下 Earth retention member removal method and, encapsulation method of contaminated soil

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005002583A (en) * 2003-06-10 2005-01-06 Kajima Corp Construction method of underground impervious wall
JP2013159960A (en) * 2012-02-06 2013-08-19 Takenaka Komuten Co Ltd Sheet pile pulled-out part filling method
JP2020125613A (en) * 2019-02-04 2020-08-20 大地 山下 Earth retention member removal method and, encapsulation method of contaminated soil
JP7277157B2 (en) 2019-02-04 2023-05-18 大地 山下 Method for removing earth retaining members and method for containing contaminated soil

Also Published As

Publication number Publication date
JP4429479B2 (en) 2010-03-10

Similar Documents

Publication Publication Date Title
EP0810327B1 (en) Method and device for laying underground continuous walls
JP2006204965A (en) Method of constructing impervious layer
JP2001329531A (en) Impervious wall and construction method therefor
JP5099709B2 (en) Construction method of managed revetment
KR200363400Y1 (en) Frame to draw out H beam
JP2000130065A (en) Construction method for vertical shaft
JPH10165916A (en) Water sealing equipment in civil engineering construction enclosing outside
JP2002201623A (en) Double sheet pile bulkhead and method of constructing the bulkhead
JPH10219680A (en) Work execution method of cast-in-place concrete pile
JP2981165B2 (en) Underground impermeable wall and method of forming the same
JP7074655B2 (en) How to build a retaining wall on a slope and how to build a waste disposal site on a slope
JP4336828B2 (en) Substructure
JP5147616B2 (en) Construction method of underground wall
JP2001032265A (en) Steel pipe sheet pile continuous wall construction method
JP3144289B2 (en) Underground installation method of bottom impermeable structure and bottom impermeable structure
JP2005105688A (en) Construction method of foundation pile in waste disposal site vacant lot
JP4322629B2 (en) Waste disposal site
JPS62236914A (en) Formation of underground cut-off wall
JP3923482B2 (en) Underground conduit construction method
JP2004211527A (en) Construction method for original position impervious structure of polluted soil
JP2005180018A (en) Method of reinforcing pier
JPH0381421A (en) Shaft construction method
JP2003096766A (en) Construction method of cut-off wall
JP2000319872A (en) Underground intercepting-plate construction method
JP2005290870A (en) Foundation structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081022

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081104

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091215

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091216

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121225

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees