JP2001146387A - Structure execution work device and execution work method - Google Patents

Structure execution work device and execution work method

Info

Publication number
JP2001146387A
JP2001146387A JP2000103278A JP2000103278A JP2001146387A JP 2001146387 A JP2001146387 A JP 2001146387A JP 2000103278 A JP2000103278 A JP 2000103278A JP 2000103278 A JP2000103278 A JP 2000103278A JP 2001146387 A JP2001146387 A JP 2001146387A
Authority
JP
Japan
Prior art keywords
construction
driving
state
crane
portal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000103278A
Other languages
Japanese (ja)
Inventor
Hiroshi Yamada
普 山田
Masashi Sugata
方士 菅田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TCM Corp
Original Assignee
TCM Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TCM Corp filed Critical TCM Corp
Priority to JP2000103278A priority Critical patent/JP2001146387A/en
Publication of JP2001146387A publication Critical patent/JP2001146387A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To easily perform execution work of a structure such as a concrete unit in a narrow site. SOLUTION: In a structure execution work device 1 provided to execute structures P1, P2 in a prescribed position by suspending/lowering the suspended/ held structures P1, P2, a gate-shaped frame body is composed of a pair of mutually opposing column members 2 and a beam 3 installed between top parts of these column members 2, a driving wheel 54 and a driven wheel 57 for moving the gate-shaped frame body are arranged under the respective column members 2, and chain blocks 71 for suspending/holding the structures P1, P2 are arranged on the beam 3.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、住宅用のコンクリ
ートユニット等の構造物や大型の各種産業機械を建築現
場や工場の敷地内の所定の位置に敷設するために用いら
れる構造物施工装置および施工方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure construction apparatus used for laying a structure such as a concrete unit for a house or various large-sized industrial machines at a predetermined position in a building site or a factory site. It relates to the construction method.

【0002】[0002]

【従来の技術】従来、住宅用として使用されるプレキャ
ストコンクリート製のコンクリートユニットが知られて
いる。かかるコンクリートユニットは、工場で安価に大
量生産し得るものであるばかりか、現地施工を極力抑え
ることが可能であることから、建築コストの低廉化に寄
与することができ、今後の住宅構築の主流になると考え
られる。ところで、かかるコンクリートユニットは、小
さいもので4畳半、大きいものでは12畳の部屋の空間
に見合うものにする必要があることから、大容量でかつ
大重量(例えば8畳間用のもので略20t)になる。従
って、工場から施工現場まで法規制をクリアした状態で
公道を利用した運搬を行うことは実質上極めて困難であ
り、これがネックになって、コンクリートユニットが普
及し得ない理由になっていた。
2. Description of the Related Art Conventionally, a concrete unit made of precast concrete used for a house is known. Such concrete units can not only be mass-produced at low cost in factories, but also can minimize on-site construction, thus contributing to lower building costs. It is thought to be. By the way, such a concrete unit needs to be adapted to the space of a room of 4.5 tatami mats for a small one and 12 tatami mats for a large one. 20t). Therefore, it is practically extremely difficult to carry out transportation using public roads from the factory to the construction site in a state where laws and regulations have been cleared, and this has become a bottleneck and is a reason why concrete units cannot be spread.

【0003】そこで、出願人は、先に図16に示すよう
なコンクリートユニットの一種である地下室構造体Pを
発明し(特許第2944565号公報)、この地下室構
造体Pを工場生産することによって工場から施工現場ま
での公道を使った搬送が可能になり、地下室構造体Pの
普及に拍車をかけることになった。
[0003] The applicant has previously invented a basement structure P which is a kind of concrete unit as shown in FIG. 16 (Japanese Patent No. 2944565), and manufactures this basement structure P in a factory. Transport from a public road to the construction site became possible, which spurred the spread of the basement structure P.

【0004】この地下室構造体Pは、図16の(イ)に
示すように、工場で大量生産されるプレキャストコンク
リート製の下部構造体P1と、この下部構造体P1上に
積層される同上部構造体P2とからなり、下部構造体P
1の上に上部構造体P2を積み重ねることにより図16
の(ロ)に示すように、地下室構造体Pが形成されるよ
うになっている。このように、地下室構造体Pを上下の
構造体P1,P2に分割することにより、各構造体P
1,P2を90°変位させて(すなわち横転させて)縦
姿勢に設定することにより特殊搬送車両に搭載すること
が可能になったのである。
As shown in FIG. 16A, the basement structure P has a lower structure P1 made of precast concrete mass-produced in a factory and an upper structure laminated on the lower structure P1. And the lower structure P
1 by stacking the superstructure P2 on
(B), a basement structure P is formed. In this way, by dividing the basement structure P into upper and lower structures P1 and P2, each structure P
By displacing 1 and P2 by 90 ° (ie, turning over) and setting them in a vertical posture, it becomes possible to mount the vehicle on a special transport vehicle.

【0005】そして、施工現場にまで搬送された上記構
造体P1,P2は、まず下部構造体P1が予め掘削され
ている縦穴H(図17)に大型のクレーン車Kを用いて
吊り降ろされ、引き続き上部構造体P2が吊り降ろされ
て下部構造体P1上に積層され、これによって地下室構
造体Pが所定の敷地Gの縦穴H内に施工されることにな
る。
[0005] The above-mentioned structures P1 and P2 conveyed to the construction site are first suspended using a large crane truck K in a vertical hole H (FIG. 17) in which the lower structure P1 has been excavated in advance. Subsequently, the upper structure P2 is suspended and stacked on the lower structure P1, whereby the basement structure P is constructed in the vertical hole H of the predetermined site G.

【0006】[0006]

【発明が解決しようとする課題】ところで、図17は、
施工現場におけるクレーン車の配置を例示した平面図で
あるが、この図に示すように、例えば6畳間の地下室構
造体Pを施工するに際しては、若干の余裕を見込んで平
面寸法が略5m×略7mの縦穴Hを予め掘削するととも
に、この縦穴Hに隣接して構造体P1,P2を横転させ
る空地G1を確保し、さらにクレーン車Kが作業するた
めの作業域G2を確保しなければならないため、結局、
6畳間(外寸法で16.5m2)の地下室構造体Pを施
工するのに略17m×略13m(221m2)と、略1
3倍もの広さが必要になる。
By the way, FIG.
FIG. 4 is a plan view illustrating the arrangement of the crane trucks at the construction site. As shown in this figure, for example, when constructing a basement structure P of 6 tatami mats, the plane dimension is approximately 5 m × with some allowance. In addition to excavating a vertical hole H of about 7 m in advance, an open space G1 for rolling over the structures P1 and P2 adjacent to the vertical hole H must be secured, and a work area G2 for the crane K to work must be secured. So, after all,
In order to construct a basement structure P of 6 tatami mats (external dimensions of 16.5 m 2 ), approximately 17 m × approximately 13 m (221 m 2 ) and approximately 1
Three times as large is required.

【0007】従って、たとえ地下室構造体Pを施工現場
にまで運び込むことができたとしても、市街地の狭隘な
敷地内では実質上地下室構造体Pを施工することができ
ないという問題点が存在した。
[0007] Therefore, even if the basement structure P can be carried to the construction site, there is a problem that the basement structure P cannot be practically constructed in a narrow site in an urban area.

【0008】本発明は、上記問題点を解消するためにな
されたものであり、狭隘な敷地内におけるコンクリート
ユニットのような構造物を容易かつ効率的に施工し得る
ようにする構造物施工装置および施工方法を提供するこ
とを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and a structure construction apparatus and a structure construction apparatus capable of easily and efficiently constructing a structure such as a concrete unit in a narrow site. It aims to provide a construction method.

【0009】[0009]

【課題を解決するための手段】請求項1記載の発明は、
吊持した構造物を吊り降ろすことにより構造物を所定の
位置に施工する用に供される構造物施工装置であって、
互いに対向した一対の支柱部材および各支柱部材の頂部
間に架設された梁材からなる門形架構体と、上記梁材に
設けられた上記構造物を吊持するクレーン装置と、上記
各支柱部材当り少なくとも1つの駆動車輪を備えた移動
用の所定個数の車輪と、上記駆動車輪を駆動する駆動手
段と、上記車輪の方向を変える車輪方向変更手段とが備
えられ、上記駆動手段は、上記各駆動車輪を他の駆動車
輪と独立して正逆駆動し得るように構成され、上記車輪
方向変更手段は、車輪の90°の方向変換によって門形
構造体の進行方向を横行と縦行との間で変換し得るよう
に構成されていることを特徴とするものである。
According to the first aspect of the present invention,
A structure construction apparatus provided for constructing a structure at a predetermined position by hanging down the suspended structure,
A gate-shaped frame structure composed of a pair of strut members opposed to each other and a beam material erected between the tops of the strut members, a crane device for suspending the structure provided on the beam material, and each of the strut members A predetermined number of wheels for movement provided with at least one driving wheel, a driving unit for driving the driving wheel, and a wheel direction changing unit for changing a direction of the wheel, wherein the driving unit includes: The drive wheel is configured to be able to drive forward and reverse independently of the other drive wheels, and the wheel direction changing means changes the traveling direction of the portal structure between horizontal and vertical by changing the direction of the wheels by 90 °. It is characterized in that it is configured to be able to convert between.

【0010】この発明によれば、駆動手段の駆動により
門形架構体を移動させ、地面に載置された構造物を一対
の支柱部材間に位置させることにより、構造物は、門形
架構体に跨られた状態になる。この状態で、梁材に設け
られたクレーン装置により構造物を吊り上げ、引き続き
門形架構体を構造物の施工位置まで移動した後、クレー
ン装置の駆動で構造物を吊り降ろすことにより、構造物
が所定の位置に据え付けられる。
According to the present invention, the gate-shaped frame is moved by driving the driving means, and the structure placed on the ground is positioned between the pair of support members. Is straddled. In this state, the structure is lifted by the crane device provided on the beam material, the portal structure is continuously moved to the construction position of the structure, and then the structure is lowered by driving the crane device, whereby the structure is lifted. Installed in place.

【0011】このように、構造物は、門形架構体に跨れ
た状態で常に門形架構体の略中心位置に位置するため、
その吊持状態が常に安定するとともに、クレーン装置の
駆動による構造物の昇降が常に安定した状態で行われ
る。また、支柱には駆動車輪が設けられているため、構
造物を吊持した状態での門形架構体の施工位置までの移
動は駆動手段の駆動により容易に行われる。そして、門
形架構体が施工位置を跨いだ状態で吊持している構造物
を単純に吊り降ろすという熟練を要さない簡単な操作で
構造物が容易に施工される。
As described above, since the structure is always positioned substantially at the center of the portal structure while straddling the portal structure,
The suspended state is always stable, and the lifting and lowering of the structure by driving the crane device is always performed in a stable state. In addition, since the supporting columns are provided with driving wheels, movement of the portal frame structure to the construction position in a state where the structure is suspended can be easily performed by driving the driving means. Then, the structure is easily constructed by a simple operation that does not require skill, such as simply hanging down the structure suspended by the portal frame structure while straddling the construction position.

【0012】従って、大型のクレーン車を用いてそのア
ームで極めて重量の大きい構造物を吊り上げたり吊り降
ろしたりする従来の構造物の据付け工事にあっては、ま
ず、熟練者でないとクレーンの運転操作を行い得ないば
かりか、たとえ熟練者がクレーン操作を行っても、クレ
ーン車の中心位置と構造物の吊持位置とが一致しないた
め、構造物の吊持状態が安定せず、構造物の据え付け作
業が非常に困難であるという問題点を有しているが、本
発明の構造物施工装置を使用することによりこのような
不都合は全く解消され、構造物の施工が極めて容易に行
われる。
[0012] Therefore, in the installation work of a conventional structure in which an extremely heavy structure is lifted or lowered by an arm using a large crane truck, first of all, the operation of the crane must be performed by a skilled person. In addition to the fact that the center position of the crane truck and the suspended position of the structure do not match even if a skilled person operates the crane, the suspended state of the structure is not stable, Although there is a problem that the installation work is very difficult, such inconvenience is completely solved by using the structure construction apparatus of the present invention, and the construction of the structure is extremely easily performed.

【0013】そして、各支柱には駆動車輪を駆動する車
輪駆動手段が設けられていることにより、構造物施工装
置を自走させることができるため、重量物の据付け作業
が効率的に行い得るようになる。
[0013] Since each column is provided with a wheel driving means for driving a driving wheel, the structure construction apparatus can be made to run by itself, so that the work of installing heavy objects can be performed efficiently. become.

【0014】さらに、車輪方向変更手段の操作で構造物
施工装置を直進だけでなく旋回させることも可能にな
り、重量物の据付け作業の効率化に貢献する。特に車輪
方向変更手段の操作で車輪の方向を最大90°変更し得
るように構成することにより、旋回させることなく構造
物施工装置の横行および縦行間の切換えを極めて短時間
で行うことが可能になり、重量物の据付け作業のさらな
る効率化が実現する。
[0014] Further, by operating the wheel direction changing means, it is possible not only to move the structure construction apparatus straight, but also to turn it, which contributes to the efficiency of the installation work of heavy objects. In particular, by configuring so that the direction of the wheel can be changed by a maximum of 90 ° by operating the wheel direction changing means, it is possible to switch between the traverse and the traverse of the structure construction apparatus in a very short time without turning. Thus, the efficiency of the installation work of heavy objects is further improved.

【0015】また、大型のクレーン車で据付け工事を行
うに際しては、クレーン車が占める位置を施工現場の敷
地内に確保する必要がある他、構造物を仮置きする位置
をも確保しなければならず、結局構造物の施工面積に比
べて数倍広い作業域を必要とするのに対し、本発明によ
れば、門形架構体が構造物を跨いだ状態にすることがで
きるため、構造物の仮置き位置と構造物施工装置の作業
域とを共用することが可能になり、これによって作業域
は、従来必要であった作業域の数分の1で済ませること
が可能になる。
Further, when performing the installation work with a large crane truck, it is necessary to secure the position occupied by the crane truck on the site of the construction site, and also to secure the position where the structure is temporarily placed. Instead, a work area that is several times larger than the construction area of the structure is required, whereas according to the present invention, the portal frame can be straddled over the structure. And the work area of the structure construction apparatus can be shared, whereby the work area can be reduced to a fraction of the work area conventionally required.

【0016】従って、本発明によれば、従来、市街地の
狭隘な敷地内での大きな構造物の施工が困難であったと
いう不都合が解消され、狭隘な敷地内であっても構造物
を容易に施工し得るようになる。特に構造物が地下室用
のコンクリートユニットである場合など、市街地の狭い
敷地に快適な居住空間を確保するべくその需要が多いに
も拘らず、施工が困難なために普及しなかったという不
都合が解消され、地下室用コンクリートユニットの普及
に貢献する。
Therefore, according to the present invention, the inconvenience that it has conventionally been difficult to construct a large structure in a narrow site in an urban area is solved, and the structure can be easily installed even in a narrow site. Be able to construct. Eliminates the inconvenience that construction has been difficult but has not been widely spread, especially when the structure is a concrete unit for basement rooms, despite the high demand for securing a comfortable living space on a narrow site in the city. And contribute to the spread of concrete units for basements.

【0017】請求項2記載の発明は、請求項1記載の発
明において、上記クレーン装置は、梁材に沿って正逆移
動可能なクレーン本体と、このクレーン本体に装着さ
れ、かつ、構造物を少なくとも2点で吊持する吊持条
と、各吊持条のクレーン本体からの垂下長を調節する垂
下長調節手段とを備えていることを特徴とするものであ
る。
According to a second aspect of the present invention, in the first aspect of the present invention, the crane device includes a crane body movable forward and backward along a beam, a crane body mounted on the crane body, and a structure. It is characterized by comprising a hanging strip hung at at least two points, and droop length adjusting means for adjusting the droop length of each hanging strip from the crane body.

【0018】この発明において、吊持条とは、ロープや
チェーンや帯状物等の重量物を吊持するために用いられ
る紐状の長尺物のことである。そして、この発明によれ
ば、構造物を垂下長が同一に設定された1壁面当り2本
の吊持条により2点(表裏2壁面であるから合計4点)
で吊持した状態で、垂下長調節手段の駆動で一方の吊持
条の垂下長を順次短くする一方、他方の吊持条の垂下長
を順次長くすることにより、構造物は順次傾いていき、
ついには90°変位した横転状態になる。従って、特殊
搬送車両から運搬の都合上、縦置きで荷降ろしされた重
量物を、重量物の施工姿勢である横置きに容易に横転さ
せることが可能になる。
In the present invention, the hanging strip is a long string-shaped object used for hanging a heavy object such as a rope, a chain, or a band. According to the present invention, the structure is provided at two points (two points on the front and back surfaces in total, four points) by two hanging strips per one wall surface having the same hanging length.
In the state of being suspended in the structure, the droop length adjusting means is driven to sequentially reduce the droop length of one of the hanging strips, while the length of the other hanging strip is sequentially increased, whereby the structure is gradually inclined. ,
Eventually, the rollover state is shifted by 90 °. Therefore, for the convenience of transportation from the special transport vehicle, it is possible to easily turn the heavy object unloaded vertically in the horizontal position, which is the construction posture of the heavy object.

【0019】請求項3記載の発明は、請求項1または2
記載の発明において、上記支柱部材は、下部支柱部材
と、この下部支柱部材に上下動可能に連設された上部支
柱部材とから構成されているとともに、上部支柱部材を
上下動させる支柱上下動手段を有していることを特徴と
するものである。
The third aspect of the present invention is the first or second aspect.
In the invention described above, the support member includes a lower support member and an upper support member connected to the lower support member so as to be vertically movable, and a support vertical movement means for moving the upper support member up and down. It is characterized by having.

【0020】この発明によれば、まず、支柱上下動手段
の駆動による梁材の昇降によって、梁材を、重量物の高
さ寸法に合わせることが可能になる。そして、重量物
を、ロープ等を介して梁材に支持させた状態で、支柱上
下動手段の駆動により上部支柱部材を下部支柱部材から
上方に向けて突出することにより、重量物はロープ等を
介して梁材に吊持された状態になる一方、この状態で構
造物施工装置を施工位置まで移動させてから、上部支柱
部材を下部支柱部材内に収納していくことにより、梁材
に吊持された重量物は下降して所定の位置に据え付けら
れる。このように、上部支柱を昇降させ得るように構成
することで、クレーン装置との併用で重量物の上下動の
範囲を拡大することが可能になるため、特に、重量物が
地下室用のコンクリートユニットである場合、縦穴内へ
のコンクリートユニットの吊り降ろし操作がより円滑に
行われる。
According to the present invention, first, the beam can be adjusted to the height of the heavy object by lifting and lowering the beam by driving the column vertical movement means. Then, in a state in which the heavy object is supported on the beam member via a rope or the like, the upper support member is protruded upward from the lower support member by driving of the support vertical movement means, so that the heavy material is connected to the rope or the like. In this state, the construction equipment is moved to the construction position, and then the upper strut members are stored in the lower strut members. The held heavy object descends and is installed at a predetermined position. In this way, by configuring the upper column to be able to be raised and lowered, it is possible to expand the range of vertical movement of the heavy object in combination with the crane device. In this case, the operation of suspending and lowering the concrete unit into the vertical hole is performed more smoothly.

【0021】請求項4記載の発明は、請求項1乃至3の
いずれかに記載の発明において、上記梁材は、各支柱部
材間の有効長が可変になるように各支柱部材間に架設さ
れていることを特徴とするものである。
According to a fourth aspect of the present invention, in the first aspect of the present invention, the beam member is provided between the support members so that the effective length between the support members is variable. It is characterized by having.

【0022】この発明によれば、重量物の幅寸法に応じ
て梁材の有効長を調節することにより種々の幅寸法の重
量物に対応することが可能になる。
According to the present invention, by adjusting the effective length of the beam in accordance with the width of the heavy object, it is possible to cope with heavy objects having various widths.

【0023】請求項5記載の発明は、請求項1乃至4に
記載の構造物施工装置を用いて構造物を施工する構造物
施行方法であって、据付け姿勢で地面に載置された構造
物を上記門形架構体とは縁切り状態で門形架構体に跨が
せた上で、一方の支柱に設けられた上記駆動手段と、他
方の支柱に設けられた上記駆動手段とをそれぞれ逆駆動
することにより門形架構体をその中心回りに旋回させて
門形架構体の構造物に対する吊持姿勢を施工位置の平面
形状に合うように方向転換させたのち、構造物を吊持し
た門形架構体を、施工位置を跨ぐ位置まで移動して構造
物を吊り降ろすことを特徴とするものである。
According to a fifth aspect of the present invention, there is provided a method for constructing a structure using the structure constructing apparatus according to any one of the first to fourth aspects, wherein the structure is mounted on the ground in an installation posture. And the drive means provided on one support and the drive means provided on the other support are reversely driven, respectively. After turning the portal structure around its center to change the hanging posture of the portal structure to the structure to match the plane shape of the construction position, the portal structure The present invention is characterized in that the frame structure is moved to a position straddling the construction position and the structure is suspended.

【0024】この発明によれば、据付け姿勢で地面に載
置された構造物は、各支柱に設けられた駆動手段を逆駆
動させることによる門形架構体の旋回によって吊持方向
が任意に設定される。従って、この旋回により、構造体
が予め設定されている施工位置に合うように方向転換す
ることが容易に行われるため、従来のように大型クレー
ン車の吊上げアームを操作することによって構造物の方
向を転換する場合に比較し、構造物が門形架構体に跨れ
た状態になっていることから狭い作業域で済ませること
ができる上、転換作業を容易かつ安全に行うことが可能
になる。
According to the present invention, in the structure placed on the ground in the installation posture, the suspension direction can be set arbitrarily by turning the portal frame structure by reversely driving the driving means provided on each column. Is done. Accordingly, since the turning can be easily performed to change the direction of the structure so as to match the preset construction position, the direction of the structure can be changed by operating the lifting arm of the large crane truck as in the related art. As compared with the case of converting, the structure can be completed in a narrow work area since the structure is straddled by the portal frame, and the conversion work can be performed easily and safely.

【0025】そして、一旦構造物の方向転換を行った後
は、門形架構体を施工位置まで移動して施工位置を跨が
せてから構造物を吊り降ろせばよく、全体的に構造物の
据付け作業が効率化する。
Once the direction of the structure has been changed, the portal frame is moved to the construction position, straddled the construction position, and then the structure is hung down. Installation work becomes more efficient.

【0026】本発明の請求項6記載の発明は、請求項1
乃至4に記載の構造物施工装置を用いて構造物を施工す
る構造物施行方法であって、外壁面が接地状態で荷降ろ
しされた構造物を上記門形架構体間でクレーン装置によ
り吊り上げて横転する横転工程と、この横転工程で横転
された構造物を門形架構体間で再度クレーン装置により
吊り上げて構造物の施工位置まで移送する移送工程と、
この移送工程で施工位置まで移送された門形架構体を、
各支柱部材間に施工位置が位置するように位置設定する
位置設定工程と、門形架構体が施工位置で位置設定され
た状態でクレーン装置の駆動により構造物を施工位置に
吊り降ろす構造物吊降ろし工程とからなることを特徴と
するものである。
The invention according to claim 6 of the present invention is characterized by claim 1
A method for constructing a structure by using the structure construction apparatus according to any one of (1) to (4), wherein a structure whose outer wall surface is unloaded in a grounded state is lifted by a crane device between the portal structures. A rollover process of rolling over, and a transfer process of lifting the structure that has been rolled over in the rollover process between the portal frame structures again by a crane device and transferring it to the construction position of the structure,
The portal frame transferred to the construction position in this transfer process,
A position setting step for setting the construction position so that the construction position is located between the strut members, and a structure suspension for hanging the structure to the construction position by driving a crane device in a state where the portal frame is set at the construction position. And a lowering step.

【0027】この発明によれば、横転工程において、外
壁面が接地状態で荷降ろしされた構造物は、門形架構体
間でクレーン装置により吊り上げられて横転され、この
横転された構造物は、移送工程において、門形架構体間
でクレーン装置により吊り上げられて構造物の施工位置
まで移送され、施工位置に移送された門形架構体は、位
置設定工程において各支柱部材間に施工位置が位置する
ように位置設定され、引き続き吊降ろし工程において構
造物は、施工位置に吊り降ろされ、これによって構造物
の施工位置への施工が完了する。構造物施工装置を用い
てかかる各工程を実行することにより、上記請求項1乃
至4に記載の発明の作用効果と同様の作用効果を得るこ
とができる。
According to the present invention, in the rollover process, the structure unloaded with the outer wall surface in contact with the ground is lifted between the portal frames by the crane device and rolled over. In the transfer step, the portal structure lifted by the crane device between the portal structures and transferred to the construction position of the structure is transferred to the construction position. Then, the structure is suspended at the construction position in the suspension process, whereby the construction of the structure at the construction position is completed. By executing each of these steps using the structure construction apparatus, the same functions and effects as those of the first to fourth aspects of the invention can be obtained.

【0028】[0028]

【発明の実施の形態】図1〜図3は、本発明に係る構造
物施工装置の一実施形態を示す斜視図であり、図1は、
上部支柱部材が最下位位置に下降した状態、図2は、上
部支柱部材が最上位位置に上昇した状態をそれぞれ示し
ている。また、図3は、図1に示す構造物施工装置の正
面図である。なお、図1および図2において、X−X方
向を幅方向、Y−Y方向を前後方向といい、特に−X方
向を左方、+X方向を右方、−Y方向を前方、+Y方向
を後方という。
1 to 3 are perspective views showing one embodiment of a structure construction apparatus according to the present invention, and FIG.
FIG. 2 shows a state in which the upper support member is lowered to the lowermost position, and FIG. 2 shows a state in which the upper support member is raised to the uppermost position. FIG. 3 is a front view of the structure construction apparatus shown in FIG. 1 and 2, the XX direction is referred to as the width direction, the YY direction is referred to as the front-back direction, and in particular, the −X direction is leftward, the + X direction is rightward, the −Y direction is forward, and the + Y direction is It is called backward.

【0029】これらの図に示すように、構造物施工装置
1は、幅方向一対の支柱部材2と、これら支柱部材2の
頂部間に架設された角筒状の梁材3と、上記各支柱部材
2の下部に設けられて支柱部材2を支持する前後方向に
長尺の幅方向一対の架台4と、各架台4に設けられた走
行機構5と、上記支柱部材2を伸縮させる支柱伸縮手段
(支柱上下動手段)6と、梁材3に走行自在に付設され
た、構造体P1,P2を昇降可能に吊持する構造体昇降
装置7と、一対の一方(図1および図2では右方)の架
台4に支持された発電機8と、他方(図1および図2で
は左方)の架台4に支持された油圧ユニット9とからな
る基本構成を有している。
As shown in these drawings, the structure construction apparatus 1 comprises a pair of support members 2 in the width direction, a rectangular tubular beam member 3 provided between the tops of the support members 2, A pair of longitudinally elongated frames 4 provided in the lower part of the member 2 and supporting the column members 2, a traveling mechanism 5 provided on each frame 4, and column extending / contracting means for extending / contracting the column members 2 (Strut vertical movement means) 6, a structure lifting device 7 attached to the beam member 3 so as to be able to move freely, and a structure lifting device 7 for suspending the structures P1 and P2 so as to be able to move up and down. 1) and a hydraulic unit 9 supported by the other (the left in FIGS. 1 and 2) gantry 4.

【0030】上記一対の支柱部材2とこれら一対の支柱
部材2に架設される梁材3とで本発明に係る門形架構体
が形成されている。また、上記発電機8は、構造物施工
装置1の各所の電動機器に電力を供給するために設けら
れ、上記油圧ユニット9は、同各所の油圧機器に作動油
を供給するために設けられている。
The portal structure according to the present invention is formed by the pair of support members 2 and the beam members 3 provided on the pair of support members 2. Further, the generator 8 is provided to supply electric power to electric devices at various places of the structure construction apparatus 1, and the hydraulic unit 9 is provided to supply hydraulic oil to hydraulic equipment at the various places. I have.

【0031】上記支柱部材2は、架台4の前後方向の中
央位置に立設された角筒状の下部支柱部材21と、この
下部支柱部材21に上部開口から摺接状態で嵌挿された
上部支柱部材22とからなり、支柱伸縮手段6の正逆駆
動で上部支柱部材22を下部支柱部材21に対して出没
方向に移動させることにより、支柱部材2の高さレベル
を任意に調節し得るようになっている。
The support member 2 has a rectangular column-shaped lower support member 21 erected at the center of the gantry 4 in the front-rear direction, and an upper part which is fitted into the lower support member 21 through an upper opening in a sliding contact state. The height of the support member 2 can be arbitrarily adjusted by moving the upper support member 22 with respect to the lower support member 21 by the forward / reverse drive of the support expansion / contraction means 6. It has become.

【0032】上部支柱部材22は、外寸法が下部支柱部
材21の内寸法より僅かに小さい上部支柱本体23と、
この上部支柱本体23の頂部直上に固定された被嵌挿部
材24とを備えて構成されている。被嵌挿部材24は、
平面寸法が上部支柱本体23の平面寸法より若干大きめ
に寸法設定されているとともに、上記梁材3が摺接状態
で貫通される角孔24aを備えた角筒状に形成されてい
る。上記角孔24aは、上記梁材3が、摺接状態で貫通
されるように孔寸法が設定されている。そして、左右の
各角孔24aに上記梁材3を挿通することによって一対
の支柱部材2間に梁材3が架設された状態になるように
している。
The upper strut member 22 includes an upper strut main body 23 whose outer dimension is slightly smaller than the inner dimension of the lower strut member 21.
The upper support main body 23 is provided with a fitted insertion member 24 fixed immediately above the top portion. The inserted member 24 is
The plane dimension is set slightly larger than the plane dimension of the upper column main body 23, and is formed in a square tubular shape having a square hole 24a through which the beam 3 penetrates in a sliding contact state. The hole size of the square hole 24a is set so that the beam 3 penetrates in a sliding contact state. The beam 3 is inserted between the left and right square holes 24 a so that the beam 3 is laid between the pair of support members 2.

【0033】かかる梁材3の支持構造によれば、一対の
支柱部材2を走行機構5の駆動で対向方向に移動させた
り、互いに反対方向に移動させたりすることによって、
一対の被嵌挿部材24間の梁材3の長さ寸法(有効寸
法)が変化する。従って、構造体P1,P2の大きさに
合わせて梁材3の有効長を設定することができる。
According to the support structure of the beam member 3, the pair of support members 2 are moved in the opposite direction by the driving of the traveling mechanism 5 or in the opposite directions.
The length dimension (effective dimension) of the beam 3 between the pair of inserted members 24 changes. Therefore, the effective length of the beam 3 can be set according to the size of the structures P1 and P2.

【0034】かかる梁材3は、その底板に長手方向の略
全長に亘って切り欠かれて形成した長尺開口31(図
7)を有しているとともに、この長尺開口31の両側部
に互いに対向した一対の走行路32が形成されている。
この走行路32は、後述する構造体横転装置(垂下長調
節手段)72の走行台車73を走行させるためのもので
あり、上記長尺開口31は、後述する構造体横転装置7
2用の横転用チェーン(吊持条)75を垂下させるための
ものである。
The beam member 3 has a long opening 31 (FIG. 7) formed by cutting out the bottom plate over substantially the entire length in the longitudinal direction, and is provided on both sides of the long opening 31. A pair of running paths 32 facing each other are formed.
The traveling path 32 is for running a traveling vehicle 73 of a structure rollover device (a droop length adjusting means) 72 described later, and the long opening 31 is provided with a structure rollover device 7 described later.
The second overturning chain (hanging strip) 75 is used for hanging.

【0035】また、各被嵌挿部材24の頂部には、梁材
3の被嵌挿部材24に対する摺動状態を抑止する油圧ス
トッパー25が設けられている。図4は、油圧ストッパ
ー25の一実施形態を示す断面図である。この図に示す
ように、油圧ストッパー25は、シリンダ25aと、こ
のシリンダ25aから下方に出没可能に突出したピスト
ンロッド25bと、このピストンロッド25bの下端部
に固設された円柱状のブレーキ片25cとからなってい
る。
At the top of each inserted member 24, there is provided a hydraulic stopper 25 for suppressing the sliding state of the beam 3 with respect to the inserted member 24. FIG. 4 is a cross-sectional view illustrating one embodiment of the hydraulic stopper 25. As shown in this figure, a hydraulic stopper 25 includes a cylinder 25a, a piston rod 25b projecting downward and protruding downward from the cylinder 25a, and a cylindrical brake piece 25c fixed to a lower end of the piston rod 25b. It consists of

【0036】一方、被嵌挿部材24は、その頂部に上方
に向かって突設された、上記ブレーキ片25cを摺接状
態で嵌め込む環状のストッパー支持筒体24bを有して
おり、これにブレーキ片25cが嵌め込まれた状態でそ
の頂部にシリンダ25aがボルト止めで固定されること
により、油圧ストッパー25が被嵌挿部材24に装着さ
れた状態になるようにしている。
On the other hand, the to-be-inserted member 24 has an annular stopper support cylinder 24b projecting upward from the top thereof and into which the brake piece 25c is fitted in a sliding contact state. The cylinder 25a is fixed to the top of the brake piece 25c with bolts in a state where the brake piece 25c is fitted, so that the hydraulic stopper 25 is mounted on the fitted insertion member 24.

【0037】従って、油圧ストッパー25は、油圧ユニ
ット9からの油圧の供給を受けてピストンロッド25b
が上昇することによるブレーキ片25cの梁材3からの
離間で、被嵌挿部材24の梁材3に対するロック状態を
解除する一方、同ピストンロッド25bの下降によるブ
レーキ片25cの梁材3への押圧当接で梁材3が被嵌挿
部材24にロックされることになる。
Therefore, the hydraulic stopper 25 receives the hydraulic pressure from the hydraulic unit 9 and
When the brake piece 25c is separated from the beam 3 due to the rise of the lock, the locked state of the fitted member 24 to the beam 3 is released, while the brake piece 25c is moved to the beam 3 by the lowering of the piston rod 25b. The beam member 3 is locked to the inserted member 24 by the pressing contact.

【0038】また、上記上部支柱本体23は、被嵌挿部
材24の直下位置で外方に向かって突設された上部受け
板23aを有しているとともに、上記架台4には、上部
受け板23aに対向して外方に向けて突設された下部受
け板42aが設けられており、これら上部受け板23a
および下部受け板42a間に支柱伸縮手段6が介設され
ている。
The upper column main body 23 has an upper receiving plate 23a projecting outward at a position directly below the inserted member 24, and the pedestal 4 has an upper receiving plate 23a. A lower receiving plate 42a protruding outward is provided opposite to the upper receiving plate 23a.
The column expansion / contraction means 6 is interposed between the lower receiving plate 42a and the lower receiving plate 42a.

【0039】そして、上記支柱伸縮手段6は、前後方向
一対の伸縮シリンダ61と、この伸縮シリンダ61から
出没自在に上方に突設されたピストンロッド62とから
なっている。伸縮シリンダ61は、下部受け板42a上
に立設されているとともに、ピストンロッド62は、そ
の上端部が上部受け板23aに固定されている。これに
よって、上部支柱部材22は、油圧ユニット9からの油
圧によるピストンロッド62の伸縮シリンダ61に対す
る出没で上部受け板23aを介して昇降するようになっ
ている。
The column extending / contracting means 6 comprises a pair of telescopic cylinders 61 in the front-rear direction, and a piston rod 62 projecting upward from and retractable from the telescopic cylinder 61. The telescopic cylinder 61 is erected on the lower receiving plate 42a, and the upper end of the piston rod 62 is fixed to the upper receiving plate 23a. Thus, the upper support member 22 moves up and down via the upper receiving plate 23a when the piston rod 62 comes into and out of the telescopic cylinder 61 by the hydraulic pressure from the hydraulic unit 9.

【0040】図5および図6は、走行機構5の一実施形
態を示す一部切欠き斜視図であり、図5は、車輪が梁材
の延びる方向に直交する方向に向けられた状態、図6
は、車輪が梁材の伸びる方向と同一方向に向けられた状
態をそれぞれ示している。なお、図5および図6では、
図1〜図3における左方の走行機構5を示しているが、
右方のものも同様に構成されている。
FIGS. 5 and 6 are partially cutaway perspective views showing an embodiment of the traveling mechanism 5, and FIG. 5 shows a state in which the wheels are oriented in a direction perpendicular to the direction in which the beams extend. 6
Indicates a state in which the wheel is oriented in the same direction as the direction in which the beam material extends. In FIGS. 5 and 6,
Although the left traveling mechanism 5 in FIGS. 1 to 3 is shown,
The one on the right is similarly configured.

【0041】これらの図に示すように、走行機構5は、
架台4に対して垂直軸51a回りに回動自在に軸支され
た駆動車輪支持板51と、この駆動車輪支持板51に駆
動輪側垂下板52を介して車軸53回りに回転自在に軸
支された、1枚の駆動車輪支持板51当り一対のタイヤ
を備えた駆動輪54と、駆動車輪支持板51上と、車軸
53との間に設けられた走行手段(車輪駆動手段)55
と、架台4上と駆動車輪支持板51との間に設けられた
車輪方向変更手段56とを備えて構成されている。かか
る走行機構5が設けられている位置と反対側の位置(前
方位置)にタイヤを有する従動輪57が設けられてい
る。
As shown in these figures, the traveling mechanism 5
A drive wheel support plate 51 rotatably supported on the gantry 4 about a vertical axis 51 a, and a rotatably supported support for the drive wheel support plate 51 about an axle 53 via a drive wheel side hanging plate 52. A driving wheel 54 provided with a pair of tires per one driving wheel supporting plate 51, and a traveling means (wheel driving means) 55 provided between the driving wheel supporting plate 51 and the axle 53.
And a wheel direction changing means 56 provided between the gantry 4 and the driving wheel support plate 51. A driven wheel 57 having a tire is provided at a position (front position) opposite to a position where the traveling mechanism 5 is provided.

【0042】一方、上記架台4は、かかる走行機構5の
搭載が容易なように側面視でT字形状に設定され、前後
方向に長尺に形成されたデッキ部41と、このデッキ部
41の前後方向の中央部から下方に向けて垂下された垂
下部42とを備えて構成されている。デッキ部41上面
における垂下部42の直上には上記下部支柱部材21が
立設されている。また、垂下部42の側面には上記下部
受け板42aが取り付けられている。
On the other hand, the gantry 4 is formed in a T-shape in a side view so that the traveling mechanism 5 can be easily mounted, and the deck portion 41 is formed to be long in the front-rear direction. And a hanging part 42 hanging downward from the center in the front-rear direction. The lower support member 21 is provided upright on the upper surface of the deck portion 41 immediately above the hanging portion 42. The lower receiving plate 42a is attached to a side surface of the hanging portion 42.

【0043】そして、かかる架台4のデッキ部41の下
部支柱部材21より後方位置に走行機構5が設けられて
いる一方、同前方位置に従動車輪支持板58を介して従
動輪57が装着されている。従動車輪支持板58は、そ
の中央部に上方に向かって突設された垂直軸58aを有
しており、この垂直軸58aがスラストベアリング58
bを介してデッキ部41に貫通されることにより、従動
車輪支持板58は垂直軸58b回りに回動自在にデッキ
部41に装着されている。
The traveling mechanism 5 is provided at a position behind the lower support member 21 of the deck portion 41 of the gantry 4, while a driven wheel 57 is mounted via a driven wheel support plate 58 at the front position. I have. The driven wheel support plate 58 has a vertical shaft 58a protruding upward at the center thereof, and this vertical shaft 58a is connected to the thrust bearing 58.
The driven wheel support plate 58 is attached to the deck portion 41 so as to be rotatable around a vertical axis 58b by being penetrated through the deck portion 41 through the b.

【0044】かかる従動車輪支持板58には、その下面
の幅方向中央位置から下方に向けて突設された従動輪側
垂下板59が設けられている。この従動輪側垂下板59
には従動軸57aが貫設され、この従動軸57aに従動
輪側垂下板59を挟んで一対の従動輪57が従動軸57
a回りに回転自在に軸支されている。
The driven wheel support plate 58 is provided with a driven wheel side hanging plate 59 protruding downward from a widthwise center position of a lower surface thereof. This driven wheel side hanging plate 59
A driven shaft 57a extends through the driven shaft 57a, and a pair of driven wheels 57 is formed on the driven shaft 57a with the driven wheel side hanging plate 59 interposed therebetween.
It is rotatably supported around a.

【0045】上記駆動車輪支持板51は、その前方部分
が後方のデッキ部41に下方位置で対向するように重ね
合わされている。かかる駆動車輪支持板51にはデッキ
部41に積層された部分の中心位置に垂直軸51aが立
設されている一方、デッキ部41には垂直軸51aに対
応した挿通孔41aが穿設され、上記垂直軸51aが挿
通孔41aに挿通されることによって駆動車輪支持板5
1が垂直軸51a回りに正逆回動し得るようになってい
る。そして、駆動車輪支持板51とデッキ部41との間
には、垂直軸51aが貫通したスラストベアリング51
bが介設され、これによって駆動車輪支持板51のデッ
キ部41に対する垂直軸51a回りの回動が円滑に行わ
れるようになっている。
The drive wheel support plate 51 is overlapped so that the front portion thereof faces the rear deck portion 41 at a lower position. On the drive wheel support plate 51, a vertical shaft 51a is erected at the center position of the portion laminated on the deck portion 41, while the deck portion 41 is provided with an insertion hole 41a corresponding to the vertical shaft 51a, When the vertical shaft 51a is inserted into the insertion hole 41a, the driving wheel support plate 5
1 can rotate forward and backward around the vertical axis 51a. And, between the drive wheel support plate 51 and the deck portion 41, a thrust bearing 51 through which a vertical shaft 51a penetrates is provided.
b, whereby the drive wheel support plate 51 is smoothly rotated about the vertical axis 51a with respect to the deck portion 41.

【0046】上記駆動輪側垂下板52は、駆動車輪支持
板51の裏面側の前後方向に延びる中心線上から前後方
向に延びる状態で下方に向けて突設されている。かかる
駆動輪側垂下板52の下部位置に上記車軸53が軸心回
りに回転可能に貫設されている。そして、車軸53の駆
動輪側垂下板52から左右に突出した部分に駆動輪54
が車軸53回りに共回り可能に軸支されている。
The drive wheel side hanging plate 52 projects downward from a center line extending in the front-rear direction on the back side of the drive wheel support plate 51 and extends in the front-rear direction. The axle 53 is provided at a lower position of the drive wheel side hanging plate 52 so as to be rotatable around the axis. A drive wheel 54 is provided on a portion of the axle 53 projecting left and right from the drive wheel side hanging plate 52.
Are rotatably supported around the axle 53.

【0047】上記走行手段55は、駆動車輪支持板51
のデッキ部41より外方に突出した部分の上面に据え付
けられた走行モータ(車輪駆動手段)55aと、この走
行モータ55aの駆動軸に同心で固定された駆動スプロ
ケット55bと、上記車軸53に同心で固定された従動
スプロケット55cと、これら駆動スプロケット55b
および従動スプロケット55c間に張設された動力伝達
チェーン55dとからなっている。
The traveling means 55 includes a drive wheel support plate 51
A traveling motor (wheel driving means) 55a mounted on the upper surface of a portion protruding outward from the deck portion 41, a driving sprocket 55b concentrically fixed to a driving shaft of the traveling motor 55a, and concentric with the axle 53. Driven sprocket 55c fixed by
And a power transmission chain 55d stretched between the driven sprockets 55c.

【0048】そして、走行モータ55aが発電機8から
の電力を得て正逆駆動することにより、その駆動回転が
駆動スプロケット55b、動力伝達チェーン55dおよ
び従動スプロケット55cを介して車軸53に伝達さ
れ、車軸53の回転による駆動輪54の回転によって構
造物施工装置1が走行するようになっている。
When the traveling motor 55a obtains electric power from the generator 8 and performs forward and reverse driving, the driving rotation is transmitted to the axle 53 via the driving sprocket 55b, the power transmission chain 55d and the driven sprocket 55c. The structure construction device 1 runs by the rotation of the drive wheel 54 due to the rotation of the axle 53.

【0049】上記車輪方向変更手段56は、デッキ部4
1内の後方位置上面に据え付けられた方向変換モータ5
6aと、この方向変換モータ56aの駆動軸に同心で固
定されたウォーム56bと、垂直軸51aの上記挿通孔
41aから上方に突出した部分に同心で固定されたウォ
ームギヤ56cとからなっている。上記ウォーム56b
はウォームギヤ56cに噛合されている。
The wheel direction changing means 56 includes a
Direction changing motor 5 installed on the upper surface at the rear position in 1
6a, a worm 56b concentrically fixed to the drive shaft of the direction changing motor 56a, and a worm gear 56c concentrically fixed to a portion of the vertical shaft 51a projecting upward from the insertion hole 41a. Worm 56b
Are meshed with the worm gear 56c.

【0050】従って、発電機8からの電力により正逆駆
動した方向変換モータ56aの駆動回転は、ウォーム5
6bを介して減速状態でウォームギヤ56cに伝達さ
れ、これによるウォームギヤ56cを介した垂直軸51
aの正逆回転で上記駆動車輪支持板51が垂直軸51a
回りに正逆回動し、これによって、駆動輪54は、その
方向が正逆変更されることになる。
Accordingly, the drive rotation of the direction changing motor 56a driven forward and reverse by the electric power from the generator 8 is controlled by the worm 5
6b is transmitted to the worm gear 56c in a decelerated state via the worm gear 56c.
The drive wheel supporting plate 51 is rotated by the forward / reverse rotation of the
The drive wheel 54 is rotated forward and reverse, and thereby, the direction of the drive wheel 54 is changed in the forward and reverse directions.

【0051】このような車輪方向変更手段56は、従動
輪57側のデッキ部41上にも同一構成で設けられてい
る。ただし、従動輪57側に設けられた車輪方向変更手
段56においては、方向変換モータ56aの駆動が、従
動輪57を、駆動輪54の方向変換角度と同一角度だけ
逆方向に垂直軸58a回りに方向変換するように同期設
定されている。
The wheel direction changing means 56 is provided with the same configuration on the deck 41 on the driven wheel 57 side. However, in the wheel direction changing means 56 provided on the driven wheel 57 side, the driving of the direction conversion motor 56a causes the driven wheel 57 to rotate around the vertical axis 58a in the opposite direction by the same angle as the direction conversion angle of the driving wheel 54. Synchronization is set to change direction.

【0052】そして、本実施形態においては、車輪方向
変更手段56は、駆動輪54が前後方向に向いた姿勢を
基準にして左右にそれぞれ90°ずつ変位し得るように
ウォームギヤ56cの回動範囲が設定されている。従っ
て、各駆動輪54および従動輪57がいずれも基準姿勢
に設定されているときは、走行モータ55aの駆動で構
造物施工装置1は前後方向に移動するのに対し、各駆動
輪54および従動輪57を基本姿勢から90°変位させ
ることにより、構造物施工装置1は左右方向に移動する
ことになる。また、左右の車輪54,57をそれぞれ同
一の所定角度だけ梁材3の中心と車輪54,57の中心
とを結ぶ直線に直交するように向きを変えることによ
り、構造物施工装置1を、走行モータ55aの駆動で上
下方向に延びる梁材3の中心線回りに旋回させることが
できる。
In this embodiment, the wheel direction changing means 56 adjusts the rotation range of the worm gear 56c so that the drive wheel 54 can be displaced 90 ° to the left and right, respectively, based on the attitude of the drive wheel 54 in the front-rear direction. Is set. Therefore, when both the driving wheels 54 and the driven wheels 57 are set to the reference posture, the structure construction apparatus 1 moves in the front-rear direction by the driving of the traveling motor 55a, whereas the driving wheels 54 and the driven wheels 57 By displacing the driving wheel 57 by 90 ° from the basic posture, the structure construction apparatus 1 moves in the left-right direction. In addition, the right and left wheels 54 and 57 are turned at right angles to the straight line connecting the center of the beam 3 and the centers of the wheels 54 and 57 by the same predetermined angle, so that the structure construction apparatus 1 can travel. By driving the motor 55a, the beam 3 can be turned around the center line of the beam 3 extending in the vertical direction.

【0053】上記構造体昇降装置7は、本実施形態にお
いては、図1〜図3に示すように、梁材3に吊設される
前後方向で対向した幅方向各一対(合計4台)のチェー
ンブロック71と、梁材3に幅方向に移動可能に付設さ
れた幅方向一対の構造体横転装置72とからなってい
る。
In the present embodiment, as shown in FIGS. 1 to 3, the structure lifting device 7 includes a pair (a total of four units) each of which is suspended in the front-rear direction in the width direction. It comprises a chain block 71 and a pair of widthwise structure rollover devices 72 attached to the beam 3 so as to be movable in the widthwise direction.

【0054】上記チェーンブロック71は、端面が幅方
向に向くように姿勢設定された筒状のケーシング71a
と、このケーシング71aに内装された巻取りドラム7
1bと、この巻取りドラム71bを軸心回りに正逆回動
させるホイストモータ71cとからなっている。ケーシ
ング71aにはその上面にフック掛け71dが突設され
ているとともに、下面側が開口されて巻取りドラム71
bが外部に露出されている。
The chain block 71 has a cylindrical casing 71a whose posture is set so that the end face faces the width direction.
And the winding drum 7 provided inside the casing 71a.
1b and a hoist motor 71c for rotating the winding drum 71b forward and backward around the axis. A hook 71d is projected from the upper surface of the casing 71a, and the lower surface of the casing 71a is opened.
b is exposed to the outside.

【0055】かかる巻取りドラム71bは、その軸がケ
ーシング71aの幅方向に延びる中心線と同心に設定さ
れ、ホイストモータ71cの駆動で軸回りに正逆回転す
ることにより、チェーン(吊持条)Cを巻き取ったり巻
き戻したりし得るようになっている。チェーンCは巻取
りドラム71bから下方に向けて引き出され、その下端
部に設けられたフックC1が構造体P1,P2の被係止
突起P3に係着されることにより、図2に二点鎖線で示
すように、構造体P1,P2を梁材3に吊持することが
できるようになっている。
The shaft of the winding drum 71b is set concentrically with the center line extending in the width direction of the casing 71a, and is rotated forward and reverse around the axis by the driving of the hoist motor 71c, thereby forming a chain (suspension strip). C can be wound up or unwound. The chain C is pulled downward from the winding drum 71b, and the hook C1 provided at the lower end thereof is engaged with the locked projection P3 of the structures P1 and P2. As shown by, the structures P1 and P2 can be suspended from the beam 3.

【0056】図7は、構造体横転装置72の一実施形態
を示す一部切欠き斜視図であり、図8は、そのA線視図
である。なお、図7において、X−X方向を幅方向、Y
−Y方向を前後方向といい、特に−X方向を左方、+X
方向を右方、−Y方向を前方、+Y方向を後方という。
また、図8においては、図示の都合上、構造体横転装置
72の構造体P1,P2に対する大きさを誇張して描い
ている。これらの図に示すように、構造体横転装置72
は、運搬車両から荷降ろしされた縦置き姿勢の構造体P
1,P2(図2、図3)を90°横転させて横置き姿勢
に横転するためのものであり、梁材3内を走行する走行
台車73と、この走行台車73に設けられた横転用スプ
ロケット74と、この横転用スプロケット74に掛け回
された横転用チェーン75と、上記横転用スプロケット
74を支持軸74a回りに正逆回転する横転モータ76
と、走行台車73を走行させる台車走行モータ77とを
備えて構成されている。
FIG. 7 is a partially cutaway perspective view showing an embodiment of the structure rollover device 72, and FIG. In FIG. 7, the XX direction is the width direction, and the Y direction is the Y direction.
The −Y direction is referred to as the front-rear direction, particularly the −X direction is leftward, + X
The direction is rightward, the -Y direction is forward, and the + Y direction is rearward.
In FIG. 8, for convenience of illustration, the size of the structure rollover device 72 with respect to the structures P1 and P2 is exaggerated. As shown in these figures, the structure rollover device 72
Is the structure P in the vertical position unloaded from the transport vehicle
This is for turning the P1, P2 (FIGS. 2 and 3) over by 90 ° to roll over to a horizontal position, and a traveling carriage 73 traveling in the beam 3 and a rollover provided on the traveling carriage 73. A sprocket 74, a side chain 75 wrapped around the side sprocket 74, and a side motor 76 for rotating the side sprocket 74 forward and reverse around a support shaft 74 a.
And a bogie traveling motor 77 for traveling the traveling bogie 73.

【0057】上記走行台車73は、直方体状の箱型に形
成され、前後寸法が梁材3の走行路32間の隙間寸法
(すなわち長尺開口31の前後寸法)と略同一に寸法設
定されている。かかる走行台車73は、幅方向で互いに
対向した一対の第1側板73aと、前後方向で互いに対
向した一対の第2側板73bとを組み合わせて平面視で
矩形状に形成されている。
The traveling carriage 73 is formed in a rectangular parallelepiped box shape, and its front and rear dimensions are set to be substantially the same as the gap between the traveling paths 32 of the beam members 3 (that is, the front and rear dimensions of the long opening 31). I have. The traveling vehicle 73 is formed in a rectangular shape in plan view by combining a pair of first side plates 73a facing each other in the width direction and a pair of second side plates 73b facing each other in the front-rear direction.

【0058】そして、一対の第2側板73bの左右両端
部には、それぞれ前後方向一対の車輪78が台車軸78
a回りに回転可能に軸支されている。左右の各一対の車
輪78は、前後方向の車輪78間の内寸法が長尺開口3
1の前後寸法より大きく寸法設定され、これによって各
車輪78が走行路32上を転動して走行台車73を幅方
向に走行させ得るようになっている。
A pair of wheels 78 in the front-rear direction are respectively provided on both left and right ends of the pair of second side plates 73b.
It is rotatably supported around a. The inner dimension between the wheels 78 in the front-rear direction is a long opening 3
The front and rear dimensions are set to be larger than 1, so that the wheels 78 can roll on the traveling path 32 and cause the traveling carriage 73 to travel in the width direction.

【0059】また、一対の第2側板73b間には、前後
方向に延びる幅方向一対の仕切板73cが架設されてい
る。そして、これら仕切板73c間に軸心回りに回転自
在に支持軸74aが架設され、この支持軸74aに上記
横転用スプロケット74が同心で共回り可能に固定され
ている。かかる横転用スプロケット74に横転用チェー
ン75が掛け回されているため、横転用スプロケット7
4の前後で下方に垂れた各横転用チェーン75は、それ
ぞれの下端部が横転用スプロケット74の支持軸74a
回りの回転によって同一距離だけ昇降することになる
(すなわち、一方の下端部が上昇すれば、他方の下端部
が同一距離だけ下降する)。
Between the pair of second side plates 73b, a pair of width direction partition plates 73c extending in the front-rear direction is provided. A support shaft 74a is provided between the partition plates 73c so as to be rotatable around the axis. The overturn sprocket 74 is concentrically fixed to the support shaft 74a so as to be able to rotate together. Since the rollover chain 75 is wrapped around the rollover sprocket 74, the rollover sprocket 7
The lower end of each of the rollover chains 75 that hangs down before and after step 4 has a support shaft 74 a of the rollover sprocket 74.
The rotation causes the same to be moved up and down by the same distance (that is, if one lower end is raised, the other lower end is lowered by the same distance).

【0060】上記横転モータ76は、その駆動軸が幅方
向に延びるように、一方の第1側板73aの外面側に固
定されている。かかる横転モータ76の駆動回転は、一
方の第1側板73aとこの第1側板73aに対向した仕
切板73cとの間に介設された減速機76aを介して支
持軸74aに伝達され、横転モータ76の駆動で横転用
スプロケット74が支持軸74a回りに回転するように
なっている。
The roll motor 76 is fixed to the outer surface of one of the first side plates 73a so that the drive shaft extends in the width direction. The driving rotation of the roll motor 76 is transmitted to the support shaft 74a via a speed reducer 76a interposed between one first side plate 73a and a partition plate 73c facing the first side plate 73a. By the driving of 76, the roll sprocket 74 rotates around the support shaft 74a.

【0061】上記台車走行モータ77は、他方の第1側
板73aと、これに対向した仕切板73cとの間の空間
に装着されている。この台車走行モータ77の正逆駆動
が台車軸78aを介して車輪78に伝達され、これによ
って走行台車73が梁材3内を走行路32に案内されつ
つ幅方向に正逆移動し得るようになっている。
The bogie traveling motor 77 is mounted in a space between the other first side plate 73a and a partition plate 73c opposed thereto. The forward / reverse drive of the bogie traveling motor 77 is transmitted to the wheels 78 via a bogie shaft 78a, so that the traveling bogie 73 can move forward / reverse in the width direction while being guided in the beam member 3 along the traveling path 32. Has become.

【0062】また、各第1側板73aは、その前後方向
両端部に下方に突出した結着突片731aを有してい
る。この結着突片731aは、チェーンブロック71を
吊持するロープRを結着するためのものであり、その中
央部にロープRを通す結着孔732aが穿孔されてい
る。この結着孔732aにロープRを挿通して結着する
ことによってもチェーンブロック71を走行台車73を
介して梁材3から吊り下げることができる。
Each of the first side plates 73a has binding projections 731a projecting downward at both ends in the front-rear direction. The binding protrusion 731a is for binding a rope R that suspends the chain block 71, and has a binding hole 732a through which the rope R is passed. The chain block 71 can be hung from the beam 3 via the traveling carriage 73 also by inserting the rope R into the binding hole 732a and binding.

【0063】以下、図9〜図12を基に本発明の作用を
説明する。まず、図9は、構造物施工装置1の搬送車両
への搭載方法を説明するための説明図であって、(イ)
は、構造物施工装置1が搬送車両10に搭載される直前
の状態、(ロ)は、構造物施工装置1が搬送車両10に
搭載されつつある状態、(ハ)は、構造物施工装置1が
搬送車両10に搭載された状態をそれぞれ示している。
The operation of the present invention will be described below with reference to FIGS. First, FIG. 9 is an explanatory diagram for explaining a method of mounting the structure construction apparatus 1 on a transport vehicle, and FIG.
Is a state immediately before the structure construction device 1 is mounted on the transport vehicle 10, (b) is a state where the structure construction device 1 is being mounted on the transport vehicle 10, (c) is a state where the structure construction device 1 is mounted on the transport vehicle 10. Indicates a state mounted on the transport vehicle 10, respectively.

【0064】構造物施工装置1を搬送する搬送車両10
としては、図9に示すような車両運搬用の特殊車両が用
いられる。この搬送車両10は、車両本体11と、この
車両本体11の後部フレーム14に水平軸13回りに回
動可能に支持された可傾荷台12とを備えて構成されて
いる。かかる搬送車両10は、走行に際しては、図9の
(ハ)に示すように、可傾荷台12は、後部フレーム1
4に積層された状態にされるが、荷積み時や荷降ろし時
には、図9の(イ)に示すように水平軸13回りに時計
方向に回動され、これによって後端部が接地した傾斜状
態に設定される。こうすることによってクレーン等の作
業機械を用いることなく傾斜を利用して積載物を可傾荷
台12に積載することが可能になる。そして、可傾荷台
12は、通常、傾斜姿勢に設定された状態で傾斜角度α
が略10°に設定されている。
A transport vehicle 10 for transporting the structure construction apparatus 1
For this purpose, a special vehicle for transporting vehicles as shown in FIG. 9 is used. The transport vehicle 10 includes a vehicle main body 11 and a tiltable loading platform 12 supported on a rear frame 14 of the vehicle main body 11 so as to be rotatable around a horizontal axis 13. When the transport vehicle 10 travels, as shown in (c) of FIG.
4 is rotated in a clockwise direction around the horizontal axis 13 during loading and unloading, as shown in FIG. 9 (a). Set to state. This makes it possible to load the load on the tiltable loading platform 12 using the tilt without using a working machine such as a crane. The tiltable loading platform 12 is normally set at the tilt angle α in a state where the tilting attitude is set.
Is set to approximately 10 °.

【0065】そして、構造物施工装置1を搬送するに際
しては、まず、図9の(イ)に示すように、構造物施工
装置1は、各車輪54,57が、車輪方向変更手段56
の駆動で全て梁材3の延びる方向に向いた幅方向移動可
能状態とされ(図6)、この状態での走行手段55(図
5、図6)の駆動で自走しながら、図9の(ロ)に示す
ように、可傾荷台12の坂を登ることにより、可傾荷台
12上に移される。
When the structure construction apparatus 1 is transported, first, as shown in FIG.
9 in a widthwise movable state in which the beam 3 extends in the direction in which the beam 3 extends (FIG. 6). As shown in (b), the vehicle is moved onto the tiltable carrier 12 by climbing the slope of the tiltable carrier 12.

【0066】構造物施工装置1が可傾荷台12上に移動
した後、可傾荷台12が水平軸13回りに反時計方向に
回動され、これによって、図9の(ハ)に示すように、
可傾荷台12が後部フレーム14に積層された状態にな
り、構造物施工装置1の搬送車両10への搭載が完了す
る。ついで、搬送車両10を施工現場まで移動させ、今
度は可傾荷台12を水平軸13回りに時計方向に回動さ
せることにより、図9の(ロ)に示す状態にする。この
状態で構造物施工装置1を逆送させることにより、図9
の(イ)に示すように、構造物施工装置1が搬送車両1
0から荷降ろしされる。
After the structure construction apparatus 1 has been moved onto the tiltable load table 12, the tiltable load table 12 is rotated counterclockwise around the horizontal axis 13, thereby, as shown in FIG. ,
The tiltable loading platform 12 is now stacked on the rear frame 14, and the mounting of the structure construction apparatus 1 on the transport vehicle 10 is completed. Next, the transport vehicle 10 is moved to the construction site, and the tiltable carrier 12 is rotated clockwise about the horizontal axis 13 to obtain the state shown in FIG. In this state, the structure construction device 1 is sent backward to
As shown in (a) of FIG.
Unloaded from zero.

【0067】そして、本実施形態においては、構造物施
工装置1の走行モータ55aの駆動力を、少なくとも1
0°の勾配の傾斜を登り得る登坂能力を備えたものにし
ているため、市販の搬送車両10に対して構造物施工装
置1を自走で搭載させることが可能になり、クレーン等
の作業機械を用いる必要がない分、作業効率が向上する
とともに、作業コストの軽減化が実現する。
In the present embodiment, the driving force of the traveling motor 55a of the structure
Since the vehicle has a climbing ability capable of climbing a slope of 0 °, the structure construction apparatus 1 can be mounted on a commercially available transport vehicle 10 by self-propelled operation, and a work machine such as a crane can be used. Since there is no need to use, work efficiency is improved and work costs are reduced.

【0068】つぎに、施工現場に運び込まれた構造物施
工装置1を用いた構造体P1,P2の施工について説明
する。なお、構造体P1,P2は、別の専用の搬送車両
を用いて別途施工現場に運び込まれている。ただし、施
工現場に運び込まれた構造体P1,P2は、その壁面が
接地した縦置き状態で荷降ろしされているため、まず、
これを90°横転して横置き状態(すなわち、構造体P
1,P2が実際に据え付けられる状態)にしなければな
らない。
Next, construction of the structures P1 and P2 using the structure construction apparatus 1 carried to the construction site will be described. In addition, the structures P1 and P2 are separately carried to the construction site using another dedicated transport vehicle. However, since the structures P1 and P2 carried to the construction site are unloaded in a vertically installed state with their wall surfaces grounded, first,
This is turned over by 90 ° and placed in a horizontal position (that is, the structure P
1, P2 is actually installed).

【0069】図10は、構造物施工装置1を用いて縦置
き状態の構造体P1,P2を90°横転させる横転方法
を説明するための説明図であり、(イ)は、構造体P
1,P2が縦置き姿勢のまま構造体横転装置72により
吊り上げられる直前の状態、(ロ)は、吊り上げられた
構造体P1,P2が構造体横転装置72の駆動で順次横
転される状態をそれぞれ示している。
FIG. 10 is an explanatory view for explaining a rollover method for rolling over the structures P1 and P2 in a vertically placed state by 90 ° using the structure construction apparatus 1. FIG.
(B) is a state immediately before the structures P1 and P2 are lifted by the structure rollover device 72 in the vertical position, and (b) is a state in which the lifted structures P1 and P2 are sequentially rolled by the drive of the structure rollover device 72. Is shown.

【0070】まず、構造体P1,P2は、構造物施工装
置1の走行により各壁部が支柱部材2にそれぞれ対向し
た状態で一対の支柱部材2間に挟持され、この状態で横
転用スプロケット74に掛け回された横転用チェーン7
5の一方の(図10の(イ)における左方の)下端部
が、直立している構造体P1,P2の上方左端部であっ
て、その壁面に形成されている第1係止点Z1に係止さ
れる一方、他方の下端部が構造体P1,P2の下方右端
部であって、その壁面に形成されている第2係止点Z2
に係止される。なお、各係止点Z1,Z2には、係止用
の突片が突設されているとともに、横転用チェーン75
の各端部には上記突片に係止するフックが設けられてい
る。
First, the structures P1 and P2 are sandwiched between a pair of support members 2 with the respective walls facing the support members 2 by running of the structure construction apparatus 1, and in this state, the rollover sprocket 74 is held. Overturned chain 7
5 is the upper left end of the upright structures P1 and P2 and the first locking point Z1 formed on the wall surface thereof. While the other lower end is the lower right end of each of the structures P1 and P2, and the second engagement point Z2 formed on the wall surface thereof.
Is locked. At each of the locking points Z1 and Z2, a protruding piece for locking is protruded, and a rollover chain 75 is provided.
Each end is provided with a hook for locking to the protruding piece.

【0071】ついで、支柱伸縮手段6(図1)の駆動に
より上部支柱部材22を所定高さにまで上昇させること
により、構造体P1,P2が図10の(イ)に示す状態
から横転用チェーン75によって吊持された状態にな
る。
Next, by raising the upper column member 22 to a predetermined height by driving the column expansion / contraction means 6 (FIG. 1), the structures P1 and P2 are turned from the state shown in FIG. The state is suspended by 75.

【0072】この状態で、横転用チェーン75の駆動に
より横転用スプロケット74を支持軸74a回りに緩や
かに反時計方向に回転させることにより、掛け回されて
いる横転用チェーン75が横転用スプロケット74回り
に反時計方向に移動させられる。
In this state, the roll sprocket 74 is rotated gently counterclockwise around the support shaft 74a by the drive of the roll chain 75, so that the rolled chain 75 rotates around the sprocket 74. Is moved counterclockwise.

【0073】この場合、横転用チェーン75の長さ寸法
は一定であるため、横転用チェーン75の上記移動によ
って第1係止点Z1と横転用スプロケット74との間の
距離が漸増する一方、第2係止点Z2と横転用スプロケ
ット74との間の距離が漸減し、図10の(ロ)−に
示すように、構造体P1,P2は、順次傾けられてい
き、ついには、図10の(ロ)−に示すように、水平
姿勢になる。
In this case, since the length of the rollover chain 75 is constant, the above-described movement of the rollover chain 75 gradually increases the distance between the first locking point Z1 and the rollover sprocket 74, The distance between the two locking points Z2 and the rollover sprocket 74 gradually decreases, and as shown in (b)-of FIG. 10, the structures P1 and P2 are sequentially inclined, and finally, the structures P1 and P2 of FIG. (B) As shown in-, the posture is horizontal.

【0074】そして、構造体P1,P2が水平姿勢にな
った時点で、横転モータ76(図7)が停止され、これ
によって構造体P1,P2の水平姿勢が維持された状態
になる。この状態で、支柱伸縮手段6の逆駆動により梁
材3を下降させることにより、図10の(ロ)−に示
すように、構造体P1,P2の横転が完了する。なお、
図10の(ロ)−に示す状態において、直ちに吊持さ
れている構造体P1,P2を縦穴H内に吊り降ろす施工
を行うときには、構造体P1,P2を一旦地面に降ろす
ことなく構造物施工装置1を施工位置まで走行させ、直
ちに構造体P1,P2の吊り降ろし作業が実行される。
Then, when the structures P1 and P2 are in the horizontal posture, the rollover motor 76 (FIG. 7) is stopped, whereby the horizontal posture of the structures P1 and P2 is maintained. In this state, by lowering the beam 3 by reverse driving of the column extending / contracting means 6, the overturning of the structures P1 and P2 is completed as shown in FIG. In addition,
In the state shown in (b)-of FIG. 10, when the constructions P1 and P2 which are immediately suspended are suspended in the vertical holes H, the constructions are carried out without the structures P1 and P2 being temporarily lowered to the ground. The apparatus 1 is moved to the construction position, and the work of suspending the structures P1 and P2 is immediately performed.

【0075】このような構造体横転装置72を用いて縦
置き姿勢の構造体P1,P2を横転させるようにすれ
ば、横転用スプロケット74を介して振り分けられた前
後の横転用チェーン75に加わる張力は、構造体P1,
P2の姿勢の変化に拘らずに常に等しくかつ常に一定に
保持することができるため、従来のクレーン車等の作業
機械を用いた場合に比較して安定した、かつ、安全な横
転作業が実現する。
If the structures P1 and P2 in the vertical posture are rolled over using such a structure rollover device 72, the tension applied to the front and rear roll chains 75 distributed via the roll sprocket 74. Is the structure P1,
Since it is possible to always maintain the same and always constant regardless of the change in the posture of P2, a stable and safe rollover operation is realized as compared with the case where a conventional working machine such as a crane truck is used. .

【0076】図11は、構造物施工装置1による構造体
P1,P2の縦穴H内への据付け作業を説明するための
説明図であり、(イ)は、構造体P1,P2を吊持した
構造物施工装置1が縦穴Hを跨いで位置設定された状
態、(ロ)は、構造体P1,P2を縦穴Hに吊り降ろし
つつある状態をそれぞれ示している。
FIG. 11 is an explanatory view for explaining the work of installing the structures P1 and P2 in the vertical hole H by the structure construction apparatus 1. FIG. 11A is a diagram in which the structures P1 and P2 are suspended. (B) shows a state in which the structure construction apparatus 1 is positioned over the vertical hole H, and (b) shows a state in which the structures P1 and P2 are being suspended in the vertical hole H, respectively.

【0077】構造体P1,P2を縦穴Hに据え付けるに
際しては、まず、先の図10の(ロ)−に示す、地上
に載置された構造体P1,P2を、チェーンブロック7
1を介して吊持し直し、引き続き構造物施工装置1を走
行させて、図11の(イ)に示すように、一対の支柱部
材2が縦穴Hを跨いだ状態にする。なお、図11の
(イ)に示す状態にする前に、縦穴Hの規模に応じて一
対の支柱部材2間の距離が予め設定されている。
When mounting the structures P1 and P2 in the vertical hole H, first, the structures P1 and P2 placed on the ground shown in (b)-of FIG.
1 and the structure construction apparatus 1 is run continuously, so that the pair of support members 2 straddle the vertical hole H as shown in FIG. Before the state shown in FIG. 11A, the distance between the pair of support members 2 is set in advance according to the size of the vertical hole H.

【0078】ついで、支柱伸縮手段6の駆動で上部支柱
部材22を緩やかに下降させることにより、上部支柱部
材22と一体の梁材3が緩やかに下降し、これによっ
て、図11の(ロ)に実線で示すように、構造体P1,
P2は、縦穴Hの開口位置にまで吊り降ろされた状態に
なる。この状態で、チェーンブロック71を操作してチ
ェーンCを緩やかに繰り出させることにより、構造体P
1,P2は、緩やかに吊り降ろされて、図11の(ロ)
に二点鎖線で示すように、縦穴H内に据え付けられた状
態になる。
Next, by lowering the upper support member 22 slowly by driving the support expansion / contraction means 6, the beam 3 integrated with the upper support member 22 gradually lowers, and as a result, as shown in FIG. As shown by the solid line, the structures P1,
P2 is in a state of being suspended down to the opening position of the vertical hole H. In this state, by operating the chain block 71 to slowly unwind the chain C, the structure P
1 and P2 are gently hung down, and FIG.
As shown by a two-dot chain line in FIG.

【0079】図12は、構造物施工装置1の旋回を説明
するための平面視の説明図であり、(イ)は、梁材3が
左右方向に延びるように構造物施工装置1が位置設定さ
れた状態、(ロ)は、梁材3が前後方向に延びるように
構造物施工装置1が位置設定された状態をそれぞれ示し
ている。まず、図12の(イ)に示す状態では、各車輪
54,57は、一点鎖線で示す各軸心が梁材3の中心点
Oを通るように向きが変更される。この状態で、一方の
駆動輪54と他方の駆動輪54とが互いに逆方向に駆動
される。言葉を変えれば、各駆動輪54から中心点Oを
見た状態で軸心回りに同一方向に駆動される。
FIG. 12 is a plan view for explaining the turning of the structure construction apparatus 1. FIG. 12A shows the position setting of the structure construction apparatus 1 so that the beam 3 extends in the left-right direction. (B) shows a state in which the position of the structure construction apparatus 1 is set such that the beam 3 extends in the front-rear direction. First, in the state shown in FIG. 12A, the directions of the wheels 54 and 57 are changed so that the axes indicated by dashed lines pass through the center point O of the beam 3. In this state, one drive wheel 54 and the other drive wheel 54 are driven in opposite directions. In other words, the driving wheels 54 are driven in the same direction around the axis while viewing the center point O from each driving wheel 54.

【0080】そして、例えば中心点Oを見て各駆動輪5
4を軸心回りに時計方向に回転させると、構造物施工装
置1は、矢印で示すように、中心点O回りに反時計方向
に旋回する。この旋回を90°で停止させることによ
り、図12の(ロ)に示すように、構造物施工装置1は
図12の(イ)に示す位置から90°位相が変位した状
態になる。
Then, for example, looking at the center point O, each drive wheel 5
When the object 4 is rotated clockwise around the axis, the structure construction device 1 turns counterclockwise around the center point O as indicated by the arrow. By stopping this turning at 90 °, as shown in FIG. 12B, the structure construction apparatus 1 is in a state where the phase is shifted by 90 ° from the position shown in FIG.

【0081】従って、構造物施工装置1は、縦横に走行
が可能であることに加えてこのような旋回が可能である
ことにより、狭隘な敷地内での構造体P1,P2の据え
付け作業を、現場の地形に応じて自在に行うことができ
る。
Therefore, the structure construction apparatus 1 is capable of running in the vertical and horizontal directions, and is also capable of performing such a turn, so that the installation work of the structures P1 and P2 in the narrow premises can be performed. It can be done freely according to the terrain at the site.

【0082】以上詳述したように、本発明の構造物施工
装置1によれば、構造体P1,P2を、縦穴Hを跨いだ
状態の梁材3にロープRを介して容易に吊持した状態に
することができるため、チェーンブロック71からチェ
ーンCを繰り出させるという簡単な操作を行うことで、
構造体P1,P2を縦穴H内に容易に据え付けることが
可能になり、従来の大型クレーン車等の作業機械を用い
た構造体P1,P2の据付け作業に比べて大幅な据付け
作業の効率化を実現することができる。
As described in detail above, according to the structure construction apparatus 1 of the present invention, the structures P1 and P2 are easily suspended via the ropes R on the beam members 3 straddling the vertical holes H. Since it can be in a state, by performing a simple operation of extending the chain C from the chain block 71,
The structures P1 and P2 can be easily installed in the vertical hole H, and the efficiency of the installation work is greatly improved as compared with the conventional work of installing the structures P1 and P2 using a working machine such as a large crane truck. Can be realized.

【0083】さらに、本発明の構造物施工装置1を用い
た据付け作業の作業域を示す図13に示すように、6畳
の間規模の構造体P1,P2を縦穴Hに据え付けるに際
しては、縦穴Hの周りに縦穴Hを含めて略8m×略9m
(略72m2)の敷地(作業時専有面積)さえあれば、
横転をも含めた構造体P1,P2を縦穴Hに据え付ける
ための全施工作業を実行することが可能である。
Further, as shown in FIG. 13 showing a work area of the installation work using the structure construction apparatus 1 of the present invention, when the structures P1 and P2 having a size of 6 tatami mats are installed in the vertical hole H, About 8m x about 9m including vertical hole H around H
(Approximately 72 m 2 ) site (occupied area for work)
It is possible to execute all construction work for installing the structures P1 and P2 including the rollover in the vertical hole H.

【0084】これに対し、先に従来技術の欄で、図17
を基に説明したように、従来の大型クレーン等の作業機
械を用いた場合には、6畳間規模の構造体P1,P2を
施工するに際し、敷地面積が略221m2(17m×1
3m)も必要になるのに比較し、本発明によれば従来の
32%の広さの専有面積でよく、大幅に作業面積を削減
することができる。従って、従来、施工現場への構造体
P1,P2の運び込み、および構造体P1,P2の縦穴
Hへの施工が困難であったために普及しなかった大都市
の市街地でのコンクリートユニットを利用した建築物の
構築が、本発明の構造物施工装置1を用いることにより
可能になり、これによって今後コンクリートユニットを
用いた建築物の構築が普及すると考えられる。
On the other hand, FIG.
As described on the basis of the above, when a conventional working machine such as a large crane is used, the site area is approximately 221 m 2 (17 m × 1
According to the present invention, the occupation area may be 32% larger than that of the related art, and the working area can be greatly reduced. Therefore, it has been difficult to carry the structures P1 and P2 to the construction site and to construct the structures P1 and P2 in the vertical holes H. Therefore, the construction using the concrete unit in the urban area of a large city, which has not been popularized, has conventionally been used. The construction of a building is made possible by using the structure construction apparatus 1 of the present invention, and it is considered that the construction of a building using a concrete unit will become widespread in the future.

【0085】図14は、構造物施工装置1aの他の実施
形態を示す斜視図である。この実施形態の構造物施工装
置1aは、梁材3aがテレスコープ式に伸縮自在になっ
ている。すなわち、梁材3aは、各上部支柱部材22の
頂部からそれぞれ互いに対向する方向に突設された一対
の角筒状の外梁材33と、各側部がそれぞれの外梁材3
3に摺接状態で内嵌される内梁材34とから構成されて
いる。また、油圧ストッパー25は、各外梁材33の先
端部に設けられている。その他の構成は、先の構造物施
工装置1と同様である。
FIG. 14 is a perspective view showing another embodiment of the structure construction apparatus 1a. In the structure construction apparatus 1a of this embodiment, the beam 3a is telescopically expandable and contractable. That is, the beam 3a is composed of a pair of rectangular tubular outer beams 33 projecting from the tops of the upper support members 22 in directions facing each other, and each side portion of the outer beam 3
3 and an inner beam material 34 which is fitted inside the sliding member 3 in a sliding contact state. The hydraulic stopper 25 is provided at the tip of each outer beam member 33. Other configurations are the same as those of the above-described structure construction apparatus 1.

【0086】この実施形態に構造物施工装置1aによれ
ば、走行機構5の駆動で対向方向に対して一対の支柱部
材2を進退させることにより、内梁材34が一対の外梁
材33に対して出没して梁材3aの有効長を調節し得る
という、先の実施形態のものと同様の作用を得ることが
できる。
According to the structure construction apparatus 1a of this embodiment, the inner beam member 34 is moved to the pair of outer beam members 33 by moving the pair of support members 2 in the facing direction by driving the traveling mechanism 5. On the other hand, it is possible to obtain the same effect as that of the previous embodiment, in which the movable length can be adjusted to adjust the effective length of the beam 3a.

【0087】本発明は、上記の実施形態に限定されるも
のではなく、以下の内容をも包含するものである。
The present invention is not limited to the above embodiment, but includes the following contents.

【0088】(1)上記の実施形態においては、車輪方
向変更手段56としてウォーム56bおよびウォームギ
ヤ56cが採用されているが、本発明は、車輪方向変更
手段56がウォーム56bおよびウォームギヤ56cを
備えて構成されることに限定されるものではなく、これ
らに代えてシリンダ装置の駆動で駆動輪54および従動
輪57の方向を変換するようにしてもよい。
(1) In the above embodiment, the worm 56b and the worm gear 56c are employed as the wheel direction changing means 56, but the present invention is configured such that the wheel direction changing means 56 includes the worm 56b and the worm gear 56c. Instead, the directions of the driving wheels 54 and the driven wheels 57 may be changed by driving the cylinder device.

【0089】(2)上記の実施形態においては、走行台
車73が台車走行モータ77の駆動によって梁材3内を
走行するようにしているが、本発明は、走行台車73を
台車走行モータ77の駆動で走行させることに限定され
るものではなく、特に台車走行モータ77を設けること
なく走行台車73を手動で動かすようにしてもよい。
(2) In the above embodiment, the traveling carriage 73 travels in the beam 3 by the driving of the carriage traveling motor 77. However, in the present invention, the traveling carriage 73 is The invention is not limited to running by driving, and the traveling carriage 73 may be moved manually without providing the carriage traveling motor 77.

【0090】(3)上記の実施形態においては、チェー
ンブロック71は、梁材3に直接取り付けられたロープ
Rに吊持されているが、こうする代わりにロープRを走
行台車73の結着突片731aに結着し、このロープR
でチェーンブロック71を吊持するようにしてもよい。
こうすることによって横転用チェーン75による構造体
P1,P2の吊持位置と、チェーンブロック71による
構造体P1,P2の吊持位置とが常に同一位置になるた
め、構造体P1,P2の寸法が変わる度にチェーンブロ
ック71の吊持位置を変更するような面倒な作業を回避
することができる。
(3) In the above-described embodiment, the chain block 71 is hung on the rope R directly attached to the beam 3. The rope R is attached to the piece 731a.
May be used to suspend the chain block 71.
By doing so, the position where the structures P1 and P2 are hung by the rollover chain 75 and the position where the structures P1 and P2 are hung by the chain block 71 are always at the same position. The troublesome work of changing the hanging position of the chain block 71 every time it changes can be avoided.

【0091】(4)上記の実施形態においては、構造物
施工装置1に走行手段として車輪54,57が採用され
ているが、本発明は、走行手段が車輪54,57である
ことに限定されるものではなく、クローラを採用しても
よい。
(4) In the above embodiment, the wheels 54 and 57 are adopted as the traveling means in the structure construction apparatus 1, but the present invention is limited to the traveling means being the wheels 54 and 57. Instead, a crawler may be employed.

【0092】(5)上記の実施形態においては、車輪駆
動手段として電動の走行モータ55aが採油されている
が、電動の走行モータ55aに代えて油圧モータを採用
してもよい。
(5) In the above embodiment, the electric traveling motor 55a is used as the wheel driving means, but a hydraulic motor may be used instead of the electric traveling motor 55a.

【0093】(6)上記の実施形態においては、構造物
施工装置1を地下室構造体Pの施工工事に適用している
が、本発明は、構造物施工装置1を地下室構造体Pの施
工のみに適用することに限定されるものではなく、地上
に設置する各種の建造物の施工に適用することができる
ほか、各種の大型の機械装置の据え付け工事にも適用す
ることができる。
(6) In the above embodiment, the structure construction device 1 is applied to the construction work of the basement structure P. However, the present invention is applied to the case where the structure construction device 1 is used only for the construction of the basement structure P. The present invention is not limited to the application to various types of construction, and can be applied to the construction of various buildings installed on the ground, and can also be applied to the installation of various large-sized mechanical devices.

【0094】[0094]

【実施例】本発明に係る構造物施工装置1を用い、図1
5に示すように、6畳規模の地下室構造体を2組連設し
て12畳規模の地下室を設置する工事を施工した。な
お、図15は、この工事における地下室の施行方法を説
明するための説明図であり、(イ)は、縦穴近傍の作業
域で構造物施工装置が90°の方向変換を行う状態、
(ロ)および(ハ)は、縦穴を跨いだ構造物施工装置が
構造体を吊り降ろしつつある状態、(ニ)は、2組の地
下室構造体の施工が完了した状態をそれぞれ示してい
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIG.
As shown in FIG. 5, two sets of basement structures each having a size of 6 tatami mats were connected in series to construct a basement having a size of 12 tatami mats. FIG. 15 is an explanatory view for explaining a method of performing the basement in this construction. (A) shows a state in which the structure construction device performs a 90 ° direction change in a work area near a vertical hole.
(B) and (c) show a state in which the structure construction apparatus straddling the vertical hole is hanging down the structure, and (d) shows a state in which the construction of the two sets of basement structures is completed.

【0095】この施工においては、本発明に係る施行方
法が適用される。すなわち、本発明の施行方法は、外壁
面が接地状態で荷降ろしされた構造体(構造物)P1,P
2(この実施例では、後述する第1下部および上部構造
体PA1,PA2並びに第2下部および上部構造体PB
1,PB2)を、支柱部材2および梁材3からなる門形架
構体間で構造体横転装置72により吊り上げて横転する
横転工程と、この横転工程で横転された構造体P1,P
2を門形架構体間でチェーンブロック71により吊り上
げて構造物の施工位置まで移送する移送工程と、この移
送工程で施工位置まで移送された門形架構体を、各支柱
部材間に施工位置が位置するように位置設定する位置設
定工程と、門形架構体が施工位置で位置設定された状態
でクレーン装置の駆動により構造物を施工位置に吊り降
ろす構造物吊降ろし工程とからなっている。
In this construction, the construction method according to the present invention is applied. That is, the enforcement method of the present invention relates to a structure (structure) P1, P
2 (In this embodiment, the first lower and upper structures PA1 and PA2 and the second lower and upper
1, PB2) is lifted and rolled over by a structure rollover device 72 between portal structures composed of the column members 2 and the beam members 3, and the structures P1, P rolled over in the rollover process
2 is lifted by the chain block 71 between the portal structures and transported to the construction position of the structure, and the portal structure transferred to the construction position in this transport process is moved between the column members. The method includes a position setting step of setting the position so as to be positioned, and a structure hanging step of hanging the structure to the working position by driving the crane device in a state where the portal frame is set at the working position.

【0096】まず、この地下室施工で使用した地下室構
造体について説明する。この工事では、図15の(ハ)
に示すように、第1下部構造体PA1および第1上部構
造体PA2からなる第1地下室構造体PAと、第2下部
構造体PB1および第2上部構造体PB2とからなる第
2地下室構造体PBとを、それらの間口X同士を接合
し、2組の地下室構造体PA,PBでて奥行きYの長い
地下室構造体Pを施工する。
First, the basement structure used in the construction of the basement will be described. In this construction, (c) of FIG.
As shown in FIG. 2, a first basement structure PA including a first lower structure PA1 and a first upper structure PA2, and a second basement structure PB including a second lower structure PB1 and a second upper structure PB2. The frontage X is joined to each other, and a basement structure P having a long depth Y is constructed by two sets of basement structures PA and PB.

【0097】各地下室構造体PA,PBは、基本的に同
一の構造および寸法を呈しているが、第1下部構造体P
A1は、その底部に間口X方向に延びる奥行きY方向一
対の歯止め凸状P4が設けられているのに対し、第2下
部構造体PB1は、その底部に滑り凸条P5が設けられ
ている点が両者の相違点である。上記各凸条P4,P5
は、縦穴Hの底部に施工された基礎Bに凹設されている
歯止め凹溝B1および滑り凹溝B2にそれぞれ嵌め込ま
れるものであり、これによって各地下室構造体PA,P
Bの位置決めが適正に行われるようにしている。
Each basement structure PA, PB has basically the same structure and dimensions, but the first lower structure P
A1 is provided with a pair of pawl projections P4 in the depth Y direction extending in the frontage X direction at the bottom thereof, whereas the second lower structure PB1 is provided with a sliding projection P5 at the bottom thereof. Are the differences between the two. Each of the above ridges P4, P5
Are fitted into the pawl groove B1 and the sliding groove B2, respectively, which are recessed in the foundation B constructed at the bottom of the vertical hole H, whereby the basement structures PA, P
The positioning of B is performed appropriately.

【0098】特に、滑り凹溝B2は、第1下部構造体P
A1の方向に向かう先下がりの傾斜面を有しているとと
もに、滑り凸条P5にはこの傾斜面に対応した傾斜面を
有しているため、滑り凸条P5が滑り凹溝B2に嵌め込
まれた状態で滑り凸条P5が滑り凹溝B2の傾斜面上を
滑り、これによって第2下部構造体PB1が第1下部構
造体PA1の方向に移動するため、第2下部構造体PB
1の壁面が第1下部構造体PA1の壁面を押圧し、これ
によって両地下室構造体PA,PBが互いに隙間のない
密着状態で連設されることになる。
In particular, the sliding groove B2 is formed by the first lower structure P
The sliding ridge P5 has a sloping surface corresponding to this sloping surface in addition to the forwardly sloping inclined surface toward the direction of A1, so that the sliding ridge P5 is fitted into the sliding concave groove B2. In this state, the sliding ridge P5 slides on the inclined surface of the sliding groove B2, whereby the second lower structure PB1 moves in the direction of the first lower structure PA1.
The wall surface of the first lower structure PA1 presses the wall surface of the first lower structure PA1, whereby the two basement structures PA and PB are continuously connected to each other with no gap therebetween.

【0099】そして、このような2組の地下室構造体P
A,PBの縦穴H内への施工を、第1下部構造体PA
1、第1上部構造体PA2、第2下部構造体PB1、第
2上部構造体PB2の順に行った。
Then, such two sets of basement structures P
A, PB is installed in the vertical hole H by the first lower structure PA.
1, the first upper structure PA2, the second lower structure PB1, and the second upper structure PB2 were performed in this order.

【0100】まず、図15の(イ)に示すように、第1
下部構造体PA1は、先に行われた横転操作(横転工程
(図10参照))によって梁材3と第1下部構造体PA
1の奥行きY方向とが平行になるように吊持されて構造
物施工装置1(二点鎖線)により縦穴Hに隣接した作業
域に運び込まれるため、このままでは、構造物施工装置
1は、縦穴Hを跨いだ状態で第1下部構造体PA1を縦
穴H内に吊り降ろすことができない。そこで、一旦、第
1下部構造体PA1は吊り降ろされ、この状態で構造物
施工装置1は、その中心位置回りに90°旋回させ、こ
うすることで構造物施工装置1を、図15の(イ)に実
線で示すように、第1下部構造体PA1を間口X方向に
跨いだ状態にした。
First, as shown in FIG.
The lower structure PA <b> 1 is formed by the beam member 3 and the first lower structure PA by the rollover operation (the rollover process (see FIG. 10)) performed earlier.
1 is carried in a working area adjacent to the vertical hole H by the structure construction device 1 (two-dot chain line) so that the depth Y direction is parallel to the depth Y direction. The first lower structure PA1 cannot be suspended in the vertical hole H while straddling H. Then, the first lower structure PA1 is once suspended, and in this state, the structure construction device 1 is turned by 90 ° around its center position, and by doing so, the structure construction device 1 is moved to the position shown in FIG. As shown by the solid line in (a), the first lower structure PA1 was straddled in the frontage X direction.

【0101】この状態で第1下部構造体PA1を再度吊
り上げて、図15の(イ)に矢印で示すように構造物施
工装置1を移動させ(移送工程)、図15の(ロ)に示
すように構造物施工装置1が縦穴Hを間口X方向に跨い
だ状態にして施工位置に位置設定した(位置設定工
程)。
In this state, the first lower structure PA1 is lifted again, and the structure construction apparatus 1 is moved as shown by an arrow in FIG. 15A (transfer step), and is shown in FIG. As described above, the structure construction apparatus 1 straddles the vertical hole H in the frontage X direction and sets the position at the construction position (position setting step).

【0102】この状態でチェーンブロック71を操作し
て第1下部構造体PA1を吊り降ろしてその歯止め凸状
P4を基礎Bの歯止め凹溝B1に嵌め合わせることによ
り、図15の(ハ)に示す縦穴Hの左下に示すように、
第1下部構造体PA1を基礎B上に据え付け、引き続き
第1上部構造体PA2について上記同様の操作を行い、
縦穴H内の第1下部構造体PA1の上に積み重ねた(構
造物吊降ろし工程)。
In this state, the first lower structure PA1 is suspended by operating the chain block 71, and the pawl projections P4 are fitted into the pawl grooves B1 of the base B, as shown in FIG. As shown in the lower left of the vertical hole H,
The first lower structure PA1 is installed on the foundation B, and the same operation as above is performed on the first upper structure PA2.
It was stacked on the first lower structure PA1 in the vertical hole H (structure hanging process).

【0103】ついで、同様の第2下部構造体PB1につ
いて、上記同様の操作を行い、図15の(ハ)に示すよ
うに、第1地下室構造体PAに隣接するように第2下部
構造体PB1を縦穴H内に吊り降ろした。このとき第2
下部構造体PB1の底部の滑り凸条P5を基礎Bの滑り
凹溝B2に嵌め込むように細心の注意を払いながら吊り
降ろし操作を行った。
Next, the same operation as described above is performed on the same second lower structure PB1 so that the second lower structure PB1 is adjacent to the first basement structure PA as shown in FIG. Was suspended in the vertical hole H. At this time
The suspension operation was performed with great care so that the sliding ridge P5 at the bottom of the lower structure PB1 was fitted into the sliding groove B2 of the foundation B.

【0104】この操作によって、滑り凸条P5が滑り凹
溝B2に嵌まり込んだ後、チェーンブロック71の操作
で第2下部構造体PB1を降下させると、滑り凸条P5
が滑り凹溝B2の傾斜に案内されて第1下部構造体PA
1の方向に移動し、これによって第2下部構造体PB1
の図15の(ハ)および(ニ)における左方の外壁面が
第1下部構造体PA1の同右方の外壁面に密着した状態
で基礎B上に据え付けられたことを確認した。
After the sliding ridge P5 is fitted into the sliding concave groove B2 by this operation, the second lower structure PB1 is lowered by operating the chain block 71.
Is guided by the inclination of the sliding groove B2 and the first lower structure PA
1 so that the second substructure PB1
15 (c) and (d) of FIG. 15 was confirmed to be installed on the foundation B in a state in which the left outer wall surface was in close contact with the right outer wall surface of the first lower structure PA1.

【0105】ついで、第2上部構造体PB2を、上記同
様の操作で第2下部構造体PB1上に吊り降ろすことに
より、図15の(ニ)に示すように、二組の地下室構造
体P(第1地下室構造体PAおよび第2地下室構造体P
B)が縦穴H内に施工された状態になった。
Next, by suspending the second upper structure PB2 on the second lower structure PB1 by the same operation as described above, as shown in FIG. 15D, two sets of basement structures P ( First basement structure PA and second basement structure P
B) was in the state where it was constructed in the vertical hole H.

【0106】この実施例で判る通り、本発明の構造物施
工装置1は、地下室構造体を、作業域に運び込まれたと
きの壁面が接地した縦置き姿勢から、据え付け直前の横
置き姿勢に横転し得るとともに、地下室構造体を吊持し
た状態での横行、縦行および旋回が自在であるため、縦
穴Hの形状や各構造体の組み合わせの態様に合わせて構
造体を自由に移動させたり姿勢や方向を変えることが可
能であり、地下室構造体の据付け工事を極めて効率的に
施工し得ることが確認された。
As can be seen from this embodiment, the structural construction apparatus 1 of the present invention rolls the basement structure from the vertical position in which the wall surface is brought into contact with the work area to the horizontal position immediately before installation. In addition, since the basement structure can be traversed, traversed, and swung freely while the basement structure is suspended, the structure can be freely moved or positioned according to the shape of the vertical hole H or the combination of the structures. It was confirmed that the installation of the basement structure could be performed extremely efficiently.

【0107】[0107]

【発明の効果】請求項1記載の発明によれば、互いに対
向した一対の支柱部材と、これら支柱部材の頂部間に架
設された梁材とによって門形架構体を構成し、各支柱部
材の下部に移動用の車輪をそれぞれ設け、梁材には、構
造物を吊持するクレーン装置を設けたため、車輪の転動
で門形架構体を移動させ、地面に載置された構造物を一
対の支柱部材間に位置させることにより、門形架構体が
構造物を跨いだ状態にすることができる。この状態で、
梁材に設けられたクレーン装置により構造物を吊り上
げ、引き続き門形架構体を構造物の施工位置まで移動し
た後、クレーン装置の駆動で構造物を吊り降ろすことに
より、構造物を所定の位置に据え付けることができる。
According to the first aspect of the present invention, a pair of pillar members opposing each other and a beam material provided between the tops of these pillar members constitute a gate-shaped frame structure. Moving wheels are provided at the lower part, and a crane device is provided on the beam for hanging the structure.The rolling of the wheels moves the portal frame, and a pair of structures placed on the ground , The portal frame can straddle the structure. In this state,
The structure is lifted by the crane device provided on the beam material, and then the portal frame is moved to the construction position of the structure.Then, the structure is suspended by the drive of the crane device, and the structure is moved to the predetermined position. Can be installed.

【0108】このように、構造物は、門形架構体に跨れ
た状態で常に門形架構体の略中心位置に位置するため、
構造物の吊持状態を常に安定した状態にすることができ
るとともに、クレーン装置の駆動による構造物の昇降も
常に安定した状態で行うことができる。また、支柱には
車輪が設けられているため、構造物を吊持した状態の門
形架構体を施工位置まで容易に移動することができる。
そして、門形架構体が施工位置を跨いだ状態で吊持して
いる構造物を単純に吊り降ろすという熟練を要さない簡
単な操作で構造物を目的の場所に容易に施工することが
できる。
As described above, since the structure is always positioned substantially at the center of the portal frame while straddling the portal frame,
The suspended state of the structure can always be kept stable, and the lifting and lowering of the structure by driving the crane device can always be performed in a stable state. In addition, since the pillars are provided with wheels, the portal frame in a state where the structure is suspended can be easily moved to the construction position.
Then, the structure can be easily constructed at the intended place by a simple operation without skill, such as simply hanging down the structure suspended by the portal frame structure straddling the construction position. .

【0109】また、大型のクレーン車で据付け工事を行
うに際しては、クレーン車が占める位置を施工現場の敷
地内に確保する必要がある他、構造物を仮置きする位置
をも確保しなければならず、結局構造物の施工面積に比
べて数倍広い作業域を必要とするのに対し、この発明に
よれば、門形架構体が構造物を跨いだ状態にすることが
できるため、構造物の仮置き位置と構造物施工装置の作
業域とを共用することが可能になり、これによって作業
域は、従来必要であった作業域の数分の1で済ませるこ
とができる。
Further, when performing the installation work with a large crane truck, it is necessary to secure the position occupied by the crane truck on the site of the construction site, and also to secure the position where the structure is temporarily placed. Instead, a work area several times wider than the construction area of the structure is required, whereas according to the present invention, the portal frame can be straddled by the structure, And the work area of the structure construction apparatus can be shared, whereby the work area can be reduced to a fraction of the work area conventionally required.

【0110】従って、この発明によれば、従来、市街地
の狭隘な敷地内での大きな構造物の施工が困難であった
という不都合を解消することができ、狭隘な敷地内であ
っても構造物を容易に施工することができる。特に構造
物が地下室用のコンクリートユニットである場合など、
市街地の狭い敷地に快適な居住空間を確保するべくその
需要が多いにも拘らず、施工が困難なために普及しなか
ったという不都合が解消され、地下室用コンクリートユ
ニットの普及に貢献することができる。
Therefore, according to the present invention, it is possible to solve the inconvenience that it has conventionally been difficult to construct a large structure in a narrow site in an urban area. Can be easily constructed. Especially when the structure is a concrete unit for basement,
Despite the high demand for securing a comfortable living space on a narrow site in an urban area, the inconvenience of not being popularized due to the difficulty of construction has been resolved, and it can contribute to the spread of concrete units for basements. .

【0111】そして、この車輪駆動手段の駆動により構
造物施工装置を自走させることができるため、他の車両
で構造物施工装置を牽引して移動させることに比較し、
重量物の据付け作業をより効率的に行うことができる。
[0111] Then, since the structure construction apparatus can be driven by the driving of the wheel driving means, it is possible to compare the structure construction apparatus with another vehicle by pulling and moving the structure construction apparatus.
The work of installing heavy objects can be performed more efficiently.

【0112】さらに、車輪の方向を変える車輪方向変更
手段を設けたため、この車輪方向変更手段の操作で構造
物施工装置を直進だけでなく旋回させることも可能にな
り、重量物の据付け作業のさらなる効率化に貢献するこ
とができる。
Further, since the wheel direction changing means for changing the direction of the wheels is provided, it is possible to turn the structure construction apparatus not only in a straight line but also by turning the wheel direction changing means. It can contribute to efficiency.

【0113】特に車輪方向変更手段の操作で車輪の方向
を最大90°変更し得るように構成することにより、旋
回させることなく構造物施工装置の横行および縦行間の
切換えを極めて短時間で行うことが可能になり、重量物
の据付け作業を格段に効率化することができる。
In particular, by switching the direction of the wheels by a maximum of 90 ° by operating the wheel direction changing means, the switching between the traverse and the traverse of the structure construction apparatus can be performed in a very short time without turning. Is possible, and the work of installing heavy objects can be made much more efficient.

【0114】請求項2記載の発明によれば、クレーン本
体に装着され、かつ、構造物を1壁面当り少なくとも2
点(表裏の2壁面で合計4点)で吊持する吊持条と、各
吊持条のクレーン本体からの垂下長を調節する垂下長調
節手段とを設けたため、構造物を垂下長が同一に設定さ
れた1壁面当り2本の吊持条により2点で吊持した状態
で、垂下長調節手段の駆動で一方の吊持条の垂下長を順
次短くする一方、他方の吊持条の垂下長を順次長くする
ことにより、構造物は順次傾いていき、ついには90°
変位した横転状態にすることができる。従って、特殊搬
送車両から運搬の都合上、縦置きで荷降ろしされた重量
物を、重量物の施工姿勢である横置姿勢に容易に横転さ
せることができ、作業効率を向上させることができる。
According to the second aspect of the present invention, the structure is mounted on the crane main body and the structure is provided at least two per wall.
Since the hanging strips hanging at points (total of 4 points on the front and back walls) and the hanging length adjusting means for adjusting the hanging length of each hanging strip from the crane body are provided, the structures have the same hanging length. While hanging at two points with two hanging strips per one wall set in the above, while the hanging length of one hanging strip is sequentially shortened by driving the hanging length adjusting means, the other hanging strip is By gradually increasing the droop length, the structure gradually tilts and finally reaches 90 °
A displaced rollover state can be achieved. Therefore, for convenience of transportation from the special transport vehicle, the heavy object unloaded vertically can be easily rolled over to the horizontal posture, which is the construction posture of the heavy object, and the work efficiency can be improved.

【0115】請求項3記載の発明によれば、支柱部材
を、下部支柱部材と、この下部支柱部材に上下動可能に
連設された上部支柱部材とから構成するとともに、上部
支柱部材を上下動させる支柱上下動手段を設けたため、
まず、支柱上下動手段の駆動による梁材の昇降によっ
て、梁材を、重量物の高さ寸法に合わせることができ
る。そして、重量物を、ロープ等を介して梁材に支持さ
せた状態で、支柱上下動手段の駆動により上部支柱部材
を下部支柱部材から上方に向けて突出することにより、
重量物をロープ等を介して梁材に吊持された状態にする
ことができる一方、この状態で構造物施工装置を施工位
置まで移動させてから、上部支柱部材を下部支柱部材内
に収納していくことにより、梁材に吊持された重量物を
下降させて所定の位置に据え付けることができる。この
ように、上部支柱を昇降させ得るように構成すること
で、クレーン装置との併用で重量物の上下動の範囲を拡
大することが可能になるため、特に、重量物が地下室用
のコンクリートユニットである場合、縦穴内へのコンク
リートユニットの吊り降ろし操作をより円滑に行うこと
ができる。
According to the third aspect of the present invention, the support member is composed of the lower support member and the upper support member connected to the lower support member so as to be vertically movable. Because of the provision of vertical support
First, the beam can be adjusted to the height of the heavy object by lifting and lowering the beam by driving the column vertical movement means. Then, in a state where the heavy object is supported on the beam member via a rope or the like, the upper column member is projected upward from the lower column member by driving the column vertical movement means,
While the heavy object can be suspended from the beam material via a rope or the like, the structure construction device is moved to the construction position in this state, and then the upper support member is stored in the lower support member. By moving, the heavy object suspended on the beam material can be lowered and installed at a predetermined position. In this way, by configuring the upper column to be able to be raised and lowered, it is possible to expand the range of vertical movement of the heavy object in combination with the crane device. In this case, the operation of suspending and lowering the concrete unit in the vertical hole can be performed more smoothly.

【0116】請求項4記載の発明によれば、梁材の有効
長を調節可能に構成したため、吊持するべき重量物の幅
寸法が変わっても、梁材の有効長を調節することにより
幅寸法の変化に対応することが可能になり、構造物施工
装置の汎用性を向上させることができる。
According to the fourth aspect of the present invention, since the effective length of the beam is adjustable, even if the width of the heavy object to be suspended changes, the effective length of the beam is adjusted. It is possible to cope with a change in size, and the versatility of the structure construction apparatus can be improved.

【0117】請求項5記載の発明によれば、各支柱に設
けられた駆動手段を逆駆動させることによる門形架構体
の旋回によって地面に載置された構造物の吊持方向を任
意に転換することができる。従って、この旋回で構造体
が予め設定されている施工位置に合うように容易に方向
転換することができるため、従来のように大型クレーン
車の吊上げアームを操作することによって構造物の方向
を転換する場合に比較し、構造物が門形架構体に跨れた
状態になっていることから狭い作業域で済ませることが
できる上、転換作業を容易かつ安全に行うことができ
る。
According to the fifth aspect of the present invention, the direction of suspension of the structure placed on the ground is arbitrarily changed by turning the portal frame structure by reversely driving the driving means provided on each column. can do. Therefore, since the structure can be easily turned by this turning so as to match the preset construction position, the direction of the structure can be changed by operating the lifting arm of the large crane truck as in the past. Compared to the case where the structure is provided, the structure is straddled by the portal frame, so that the work can be completed in a narrow work area and the conversion work can be performed easily and safely.

【0118】そして、一旦構造物の方向転換を行った後
は、門形架構体を施工位置まで移動して施工位置を跨が
せてから構造物を吊り降ろせばよく、構造物の据付け作
業の全体的な効率化を実現する上で極めて有効である。
Then, once the direction of the structure has been changed, the portal frame is moved to the construction position, straddled the construction position, and then the structure is hung down. This is extremely effective in achieving overall efficiency.

【0119】請求項6記載の発明によれば、横転工程に
おいて、外壁面が接地状態で荷降ろしされた構造物は、
門形架構体間でクレーン装置により吊り上げられて横転
され、この横転された構造物は、移送工程において、門
形架構体間でクレーン装置により吊り上げられて構造物
の施工位置まで移送され、施工位置に移送された門形架
構体は、位置設定工程において各支柱部材間に施工位置
が位置するように位置設定され、引き続き吊降ろし工程
において構造物は、施工位置に吊り降ろされ、これによ
って構造物を施工位置に確実かつ容易に施工することが
できる。そして、構造物施工装置を用いてかかる各工程
を実行することにより、上記請求項1乃至4に記載の発
明の作用効果と同様の作用効果を得ることができる。
According to the sixth aspect of the present invention, in the rollover step, the structure unloaded with the outer wall surface in contact with the ground is
In the transfer process, the crane is lifted by the crane device between the portal structures and transferred to the construction position of the structure. In the position setting step, the portal-type frame structure transferred to the position is set so that the construction position is located between the respective strut members, and then in the suspension step, the structure is suspended at the construction position, whereby the structure is suspended. Can be reliably and easily constructed at the construction position. By executing each of these steps using the structure construction apparatus, it is possible to obtain the same functions and effects as those of the first to fourth aspects of the present invention.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る構造物施工装置の一実施形態を示
す斜視図であり、上部支柱部材が最下位位置に下降した
状態を示している。
FIG. 1 is a perspective view showing an embodiment of a structure construction apparatus according to the present invention, and shows a state in which an upper support member is lowered to a lowermost position.

【図2】図1に示す構造物施工装置の上部支柱部材が最
上位位置に上昇した状態を示している。
FIG. 2 shows a state in which an upper support member of the structure construction apparatus shown in FIG. 1 has been raised to an uppermost position.

【図3】図1に示す構造物施工装置の正面図である。FIG. 3 is a front view of the structure construction apparatus shown in FIG.

【図4】油圧ストッパーの一実施形態を示す断面図であ
る。
FIG. 4 is a cross-sectional view showing one embodiment of a hydraulic stopper.

【図5】走行機構の一実施形態を示す一部切欠き斜視図
であり、車輪が梁材の延びる方向に直交する方向に向け
られた状態を示している。
FIG. 5 is a partially cutaway perspective view showing one embodiment of a traveling mechanism, and shows a state in which wheels are directed in a direction orthogonal to a direction in which a beam extends.

【図6】図5に示す走行機構の車輪が梁材の伸びる方向
と同一方向に向けられた状態を示す一部切欠き斜視図で
ある。
FIG. 6 is a partially cutaway perspective view showing a state in which wheels of the traveling mechanism shown in FIG. 5 are directed in the same direction as the direction in which the beam extends.

【図7】構造体横転装置の一実施形態を示す一部切欠き
斜視図である。
FIG. 7 is a partially cutaway perspective view showing one embodiment of the structure rollover device.

【図8】図7に示す構造体横転装置のA線視図である。FIG. 8 is a view on line A of the structure rollover device shown in FIG. 7;

【図9】構造物施工装置の搬送車両への搭載方法を説明
するための説明図であって、(イ)は、構造物施工装置
が搬送車両に搭載される直前の状態、(ロ)は、構造物
施工装置が搬送車両に搭載されつつある状態、(ハ)
は、構造物施工装置が搬送車両に搭載された状態をそれ
ぞれ示している。
9A and 9B are explanatory diagrams for explaining a method of mounting the structure construction apparatus on a transport vehicle, wherein FIG. 9A shows a state immediately before the structure construction apparatus is mounted on the transport vehicle, and FIG. The state in which the structure construction equipment is being mounted on the transport vehicle, (c)
Indicates a state in which the structure construction device is mounted on the transport vehicle.

【図10】構造物施工装置を用いて縦置き状態の構造体
を90°横転させる横転方法を説明するための説明図で
あり、(イ)は、構造体が縦置き姿勢のまま構造体横転
装置により吊り上げられた状態、(ロ)の〜は、吊
り上げられた構造体が構造体横転装置の駆動で順次横転
される状態をそれぞれ示している。
FIG. 10 is an explanatory view for explaining a rollover method of rolling a structure in a vertically placed state by 90 ° using a structure construction apparatus. FIG. (B) indicates a state in which the suspended structure is sequentially rolled over by driving the structure rollover device.

【図11】構造物施工装置による構造体の縦穴H内への
据付け作業を説明するための説明図であり、(イ)は、
構造体を吊持した構造物施工装置が縦穴を跨いで位置設
定された状態、(ロ)は、構造体を縦穴に吊り降ろしつ
つある状態をそれぞれ示している。
FIG. 11 is an explanatory diagram for explaining an installation work of the structure in the vertical hole H by the structure construction apparatus;
(B) shows a state in which the structure-constructing apparatus that suspends the structure is positioned over the vertical hole, and (b) shows a state in which the structure is being suspended in the vertical hole.

【図12】構造物施工装置の旋回を説明するための平面
視の説明図であり、(イ)は、梁材が左右方向に延びる
ように構造物施工装置が位置設定された状態、(ロ)
は、梁材が前後方向に延びるように構造物施工装置が位
置設定された状態をそれぞれ示している。
FIG. 12 is an explanatory plan view for explaining the turning of the structure construction apparatus, in which (a) is a state in which the structure construction apparatus is positioned so that the beam material extends in the left-right direction; )
Indicates a state in which the position of the structure construction apparatus is set such that the beam material extends in the front-rear direction.

【図13】本発明の構造物施工装置を用いた据付け作業
の作業域を示す平面視の説明図である。
FIG. 13 is an explanatory plan view showing a work area of an installation work using the structure construction apparatus of the present invention.

【図14】本発明に係る構造物施工装置の他の実施形態
を示す斜視図である。
FIG. 14 is a perspective view showing another embodiment of the structure construction apparatus according to the present invention.

【図15】地下室構造体の施行方法を説明するための説
明図であり、(イ)は、縦穴近傍の作業域で構造物施工
装置が90°の方向変換を行う状態、(ロ)および
(ハ)は、縦穴を跨いだ構造物施工装置が構造体を吊り
降ろしつつある状態、(ニ)は、2組の地下室構造体の
施工が完了した状態をそれぞれ示している。
FIG. 15 is an explanatory view for explaining a method of implementing a basement structure, in which (a) shows a state in which the structure construction apparatus performs a 90 ° direction change in a work area near a vertical hole, (b) and (b). (C) shows a state in which the structure construction apparatus straddling the vertical hole is suspending the structure, and (d) shows a state in which the construction of two sets of basement structures is completed.

【図16】重量物の一種である地下室構造体を例示する
一部切欠き斜視図であり、(イ)は、上部構造体が下部
構造体に積層される直前の状態、(ロ)は、上部構造体
が下部構造体に積層された状態をそれぞれ示している。
FIGS. 16A and 16B are partially cutaway perspective views illustrating a basement structure which is a kind of heavy object, wherein FIG. 16A is a state immediately before an upper structure is stacked on a lower structure, and FIG. Each of the figures shows a state in which the upper structure is stacked on the lower structure.

【図17】従来の重量物の施工方法における施工現場の
クレーン車の配置を例示した平面図である。
FIG. 17 is a plan view illustrating the arrangement of crane vehicles at a construction site in a conventional method of constructing heavy objects.

【符号の説明】[Explanation of symbols]

1 構造物施工装置 10 搬送車両 11 車両本体 12 可傾荷台 13 水平軸 14 後部フレーム 2 支柱部材 21 下部支柱部材 22 上部支柱部材 23 上部支柱本体 23a 上部受け板 24 被嵌挿部材 24a 角孔 24b ストッパー支持筒体 25 油圧ストッパー 25a シリンダ 25b ピストンロッド 25c ブレーキ片 3 梁材 31 長尺開口 32 走行路 4 架台 41 デッキ部 41a 挿通孔 42 垂下部 42a 下部受け板 5 走行機構 51 駆動車輪支持板 51a 垂直軸 51b,58b スラストベアリング 52 駆動輪側垂下板 53 車軸 54 駆動輪 55 走行手段 55a 走行モータ(車輪駆動手段) 55b 駆動スプロケット 55c 従動スプロケット 55d 動力伝達チェーン 56 車輪方向変更手段 56a 方向変換モータ 56b ウォーム 56c ウォームギヤ 57 従動輪 57a 従動軸 58 従動車輪支持板 58a 垂直軸 59従動輪側垂下板 6 支柱伸縮手段(支柱上下動手段) 61 伸縮シリンダ 62 ピストンロッド 7 構造体昇降装置 71 チェーンブロック 71a ケーシング 71b 巻取りドラム 71c ホイストモータ 72 構造体横転装置(垂下長調節手段) 73 走行台車 73a 第1側板 73b 第2側板 73c 仕切板 74 横転用スプロケット 74a 支持軸 75 横転用チェーン(吊持条) 76 横転モータ 76a 減速機 77 台車走行モータ 78 車輪 78a 台車軸 8 発電機 9 油圧ユニット C チェーン R ロープ R1 フック H 縦穴 P 地下室構造体 P1 下部構造体 P2 上部構造体 P3 被係止突起 O 中心点 Z1 第1係止点 Z2 第2係止点 PA 第1地下室構造体 PA1 第1下部構造体 PA2 第1上部構造体 PB 第2地下室構造体 PB1 第2下部構造体 PB2 第2上部構造体 P4 歯止め凸状 P5 滑り凸条 B 基礎 B1 歯止め凹溝 B2 滑り凹溝 C チェーン(吊持条) DESCRIPTION OF SYMBOLS 1 Structure construction apparatus 10 Conveyance vehicle 11 Vehicle main body 12 Tiltable loading platform 13 Horizontal axis 14 Rear frame 2 Support member 21 Lower support member 22 Upper support member 23 Upper support body 23a Upper receiving plate 24 Fitting insertion member 24a Square hole 24b Stopper Support cylinder 25 Hydraulic stopper 25a Cylinder 25b Piston rod 25c Brake piece 3 Beam 31 Long opening 32 Running path 4 Mount 41 Deck 41a Insertion hole 42 Hanging part 42a Lower receiving plate 5 Running mechanism 51 Drive wheel support plate 51a Vertical shaft 51b, 58b Thrust bearing 52 Drive wheel side hanging plate 53 Axle 54 Drive wheel 55 Traveling means 55a Traveling motor (wheel driving means) 55b Drive sprocket 55c Followed sprocket 55d Power transmission chain 56 Wheel direction changing means 56a Direction conversion motor 5 b Worm 56c Worm Gear 57 Driven Wheel 57a Driven Shaft 58 Driven Wheel Support Plate 58a Vertical Shaft 59 Driven Wheel Side Hanging Plate 6 Strut Extending / Retracting Means (Strut Up / Down Moving Means) 61 Telescopic Cylinder 62 Piston Rod 7 Structure Lifting Device 71 Chain Block 71a 71b Take-up drum 71c Hoist motor 72 Structure rollover device (hanging length adjusting means) 73 Traveling trolley 73a First side plate 73b Second side plate 73c Partition plate 74 Rollover sprocket 74a Support shaft 75 Rollover chain (suspension strip) 76 Rollover Motor 76a Reduction gear 77 Bogie traveling motor 78 Wheel 78a Bogie shaft 8 Generator 9 Hydraulic unit C Chain R Rope R1 Hook H Vertical hole P Basement structure P1 Lower structure P2 Upper structure P3 Locked protrusion O Center point Z1 First Locking point Z2 Second engagement Point PA 1st basement structure PA1 1st lower structure PA2 1st upper structure PB 2nd basement structure PB1 2nd lower structure PB2 2nd upper structure P4 Raised convex P5 Slope convex B Basic B1 Raised concave Groove B2 Sliding groove C Chain (hanging strip)

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 吊持した構造物を吊り降ろすことにより
構造物を所定の位置に施工する用に供される構造物施工
装置であって、互いに対向した一対の支柱部材および各
支柱部材の頂部間に架設された梁材からなる門形架構体
と、上記梁材に設けられた上記構造物を吊持するクレー
ン装置と、上記各支柱部材当り少なくとも1つの駆動車
輪を備えた移動用の所定個数の車輪と、上記駆動車輪を
駆動する駆動手段と、上記車輪の方向を変える車輪方向
変更手段とが備えられ、上記駆動手段は、上記各駆動車
輪を他の駆動車輪と独立して正逆駆動し得るように構成
され、上記車輪方向変更手段は、車輪の90°の方向変
換によって門形構造体の進行方向を横行と縦行との間で
変換し得るように構成されていることを特徴とする構造
物施工装置。
An apparatus for constructing a structure at a predetermined position by suspending and suspending a suspended structure, comprising: a pair of strut members facing each other and a top of each strut member. A gate-shaped frame structure composed of a beam material interposed therebetween, a crane device for suspending the structure provided on the beam material, and a predetermined moving device having at least one drive wheel for each of the support members. A number of wheels, driving means for driving the driving wheels, and wheel direction changing means for changing the direction of the wheels, wherein the driving means drives each of the driving wheels independently of the other driving wheels. And the wheel direction changing means is configured to change the traveling direction of the portal structure between horizontal and vertical by changing the direction of the wheels by 90 °. Characteristic structure construction equipment.
【請求項2】 上記クレーン装置は、梁材に沿って正逆
移動可能なクレーン本体と、このクレーン本体に装着さ
れ、かつ、構造物を少なくとも2点で吊持する吊持条
と、各吊持条のクレーン本体からの垂下長を調節する垂
下長調節手段とを備えていることを特徴とする請求項1
記載の構造物施工装置。
2. The crane apparatus according to claim 1, further comprising: a crane body movable forward and backward along the beam, a hanging strip mounted on the crane body, and suspending the structure at at least two points. 2. A droop length adjusting means for adjusting the droop length of the holding strip from the crane body.
The structure construction apparatus according to the above.
【請求項3】 上記支柱部材は、下部支柱部材と、この
下部支柱部材に上下動可能に連設された上部支柱部材と
から構成されているとともに、上部支柱部材を上下動さ
せる支柱上下動手段を有していることを特徴とする請求
項1または2記載の構造物施工装置。
3. The above-mentioned strut member comprises a lower strut member and an upper strut member connected to the lower strut member so as to be vertically movable, and a strut vertical moving means for vertically moving the upper strut member. The structure construction apparatus according to claim 1 or 2, further comprising:
【請求項4】 上記梁材は、各支柱部材間の有効長が可
変になるように各支柱部材間に架設されていることを特
徴とする請求項1乃至3のいずれかに記載の構造物施工
装置。
4. The structure according to claim 1, wherein the beam member is provided between the support members so that the effective length between the support members is variable. Construction equipment.
【請求項5】 請求項1乃至4に記載の構造物施工装置
を用いて構造物を施工する構造物施行方法であって、据
付け姿勢で地面に載置された構造物を上記門形架構体と
は縁切り状態で門形架構体に跨がせた上で、一方の支柱
に設けられた上記駆動手段と、他方の支柱に設けられた
上記駆動手段とをそれぞれ逆駆動することにより門形架
構体をその中心回りに旋回させて門形架構体の構造物に
対する吊持姿勢を施工位置の平面形状に合うように方向
転換させたのち、構造物を吊持した門形架構体を、施工
位置を跨ぐ位置まで移動して構造物を吊り降ろすことを
特徴とする構造物施工方法。
5. A method for constructing a structure using the structure construction apparatus according to claim 1, wherein the structure is mounted on the ground in an installation posture. Is straddled over the gate-shaped frame in a marginal state, and the driving means provided on one of the columns and the driving means provided on the other column are driven in reverse, respectively, to thereby form the portal-shaped frame. After pivoting the body around its center and changing the hanging posture of the portal frame to the structure to match the plane shape of the construction position, the portal structure holding the structure is moved to the construction position. A structure construction method characterized by moving a structure to a position where the structure is straddled and hanging down the structure.
【請求項6】 請求項1乃至4に記載の構造物施工装置
を用いて構造物を施工する構造物施行方法であって、外
壁面が接地状態で荷降ろしされた構造物を上記門形架構
体間でクレーン装置により吊り上げて横転する横転工程
と、この横転工程で横転された構造物を門形架構体間で
再度クレーン装置により吊り上げて構造物の施工位置ま
で移送する移送工程と、この移送工程で施工位置まで移
送された門形架構体を、各支柱部材間に施工位置が位置
するように位置設定する位置設定工程と、門形架構体が
施工位置で位置設定された状態でクレーン装置の駆動に
より構造物を施工位置に吊り降ろす構造物吊降ろし工程
とからなることを特徴とする構造物施工方法。
6. A method for constructing a structure using the structure constructing apparatus according to claim 1, wherein the structure having the outer wall surface unloaded is grounded. A rollover process in which the body is lifted and rolled over between the bodies by a crane device, a structure in which the structure rolled in the rollover process is lifted again between the portal frame structures by the crane device and transferred to a construction position of the structure; A position setting step of setting the portal structure transferred to the construction position in the process so that the construction position is located between the strut members, and a crane device in a state where the portal structure is set at the construction position A structure construction method, comprising: a structure suspension step of suspending and lowering the structure at a construction position by driving the vehicle.
JP2000103278A 2000-04-05 2000-04-05 Structure execution work device and execution work method Pending JP2001146387A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000103278A JP2001146387A (en) 2000-04-05 2000-04-05 Structure execution work device and execution work method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000103278A JP2001146387A (en) 2000-04-05 2000-04-05 Structure execution work device and execution work method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2001315025A Division JP2002179384A (en) 2001-10-12 2001-10-12 Structure constructing device and constructing method

Publications (1)

Publication Number Publication Date
JP2001146387A true JP2001146387A (en) 2001-05-29

Family

ID=18617022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000103278A Pending JP2001146387A (en) 2000-04-05 2000-04-05 Structure execution work device and execution work method

Country Status (1)

Country Link
JP (1) JP2001146387A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004115179A (en) * 2002-09-25 2004-04-15 Mitsubishi Heavy Ind Ltd Mobile unit crane, and bridge erection method
CN102061681A (en) * 2010-12-14 2011-05-18 中国水电建设集团十五工程局有限公司 Fixed dual-hoisting point cantilever track type joist truss installing method
JP2017078311A (en) * 2015-10-21 2017-04-27 株式会社大林組 Heavy load installation device
CN108116977A (en) * 2017-12-21 2018-06-05 合肥市春华起重机械有限公司 A kind of stable portal gantry
CN110177662A (en) * 2016-12-22 2019-08-27 高级建筑机器人技术股份有限公司 Automatic equipment and system for the iterative task in construction project
CN111994801A (en) * 2020-09-11 2020-11-27 中国水利水电夹江水工机械有限公司 Self-propelled hydraulic lifting method
CN112173962A (en) * 2020-08-10 2021-01-05 铜陵有色金属集团股份有限公司 Hoist device is used in civil engineering construction
CN113697675A (en) * 2021-08-27 2021-11-26 中国十七冶集团有限公司 Construction method of building assembly type combined lifting appliance capable of being automatically finely adjusted

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004115179A (en) * 2002-09-25 2004-04-15 Mitsubishi Heavy Ind Ltd Mobile unit crane, and bridge erection method
CN102061681A (en) * 2010-12-14 2011-05-18 中国水电建设集团十五工程局有限公司 Fixed dual-hoisting point cantilever track type joist truss installing method
CN102061681B (en) * 2010-12-14 2012-02-08 中国水电建设集团十五工程局有限公司 Fixed dual-hoisting point cantilever track type joist truss installing method
JP2017078311A (en) * 2015-10-21 2017-04-27 株式会社大林組 Heavy load installation device
CN110177662A (en) * 2016-12-22 2019-08-27 高级建筑机器人技术股份有限公司 Automatic equipment and system for the iterative task in construction project
JP2020504254A (en) * 2016-12-22 2020-02-06 アドバンスト コンストラクション ロボティクス,インコーポレイテッドAdvanced Construction Robotics,Inc. Autonomous devices and systems for repetitive tasks in construction projects
JP7055418B2 (en) 2016-12-22 2022-04-18 アドバンスト コンストラクション ロボティクス,インコーポレイテッド Autonomous devices and systems for repetitive work in construction projects
CN110177662B (en) * 2016-12-22 2022-09-27 高级建筑机器人技术股份有限公司 Automated apparatus and system for repetitive tasks in a construction project
CN108116977A (en) * 2017-12-21 2018-06-05 合肥市春华起重机械有限公司 A kind of stable portal gantry
CN112173962A (en) * 2020-08-10 2021-01-05 铜陵有色金属集团股份有限公司 Hoist device is used in civil engineering construction
CN111994801A (en) * 2020-09-11 2020-11-27 中国水利水电夹江水工机械有限公司 Self-propelled hydraulic lifting method
CN113697675A (en) * 2021-08-27 2021-11-26 中国十七冶集团有限公司 Construction method of building assembly type combined lifting appliance capable of being automatically finely adjusted

Similar Documents

Publication Publication Date Title
JP2002179384A (en) Structure constructing device and constructing method
JP2764891B2 (en) Lifting device and method of transporting construction materials using the device
JP2007112526A (en) Self-traveling type small sized crane
JP2001146387A (en) Structure execution work device and execution work method
JP2971042B2 (en) Girder transporter and girder transport method
JP5793062B2 (en) Tunnel construction apparatus and tunnel construction method
JPH082874A (en) Transport device
JPH0860853A (en) Construction method of wall balustrade and mobile scaffold for use thereof
JP2000177955A (en) Luggage loading/unloading device for lifting carrier device
JP2022020976A (en) Cargo hanging unit and movable body equipped with the same
JPH092780A (en) Jib-type traveling crane provided with jack up device
JP7331504B2 (en) A load suspension unit and a moving object equipped with a load suspension unit
JPH0519280U (en) Overhead traveling crane device
JP6869403B1 (en) Column member building-up device and column member building-up method
JP6719110B1 (en) Underground structure transportation device and underground structure transportation method in excavation method
JPH07237855A (en) Elevating device
JPH0930786A (en) Heavy object carrying device
JP3309937B2 (en) Heavy load transport installation machine
JP3718783B2 (en) Horizontal jib crane and traveling horizontal jib crane
JPH07113286B2 (en) Parking lot and lift balance mechanism
JP2983094B2 (en) Installation method of underground parking facilities and installation work vehicle used therefor
JP4739096B2 (en) Construction equipment inside the tunnel
JP2000177979A (en) Portal crane
JP2001146843A (en) Building work execution device and work execution method
JP2022038010A (en) Material transportation system

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20011113