Method of laying manhole by its cutting in existing buried pipe, and manhole for laying by its cutting in

Info

Publication number
JP2001131997A
JP2001131997A JP31107699A JP31107699A JP2001131997A JP 2001131997 A JP2001131997 A JP 2001131997A JP 31107699 A JP31107699 A JP 31107699A JP 31107699 A JP31107699 A JP 31107699A JP 2001131997 A JP2001131997 A JP 2001131997A
Authority
JP
Japan
Prior art keywords
pipe
hole
existing
manhole
buried pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP31107699A
Other languages
Japanese (ja)
Other versions
JP3470954B2 (en
Inventor
Eiji Onishi
英二 大西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raito Kogyo Co Ltd
Original Assignee
Raito Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raito Kogyo Co Ltd filed Critical Raito Kogyo Co Ltd
Priority to JP31107699A priority Critical patent/JP3470954B2/en
Publication of JP2001131997A publication Critical patent/JP2001131997A/en
Application granted granted Critical
Publication of JP3470954B2 publication Critical patent/JP3470954B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To simplify work execution. SOLUTION: A manhole's cutting-in part 2 in an existing buried pipe is bored to be exposed in an excavated hole 5, a manhole 10 provided with a cut part 12 in which the existing buried pipe 1 is engaged is placed in the excavated hole 5, with the manhole interruption part 2 inserted into the cut part 12, to be exposed in an inner cavity 11 from outer parts as a closing body 20 is provided in the inner cavity 11 to isolate an inner cavity part 11U above the cut part 12 from an inner cavity part 11L below the cut part 12, the excavated hole 5 except for the upper inner cavity part 11U is filled with stabilizing liquid B, the closing body 20 is removed after the stabilizing liquid B in the excavated hole 5 is solidified, and solidified matter G and a tube wall of the existing buried pipe 1 between the inner cavity part 11 U and the existing pipe 1 are removed from the upper inner cavity part 11U, thereby the inner cavity 11 of the manhole 10 communicates with the existing pipe 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、既設埋設管に対す
る人孔の割り込み敷設方法、および割り込み敷設用人孔
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for laying a manhole in an existing buried pipe and a manhole for laying a manhole.

【0002】[0002]

【従来の技術】図24にも示すように、従来の人孔41
0は底板部413を有する筒状体をなしており、底板部
413よりも上側の側壁414,414部位に横管接続
用の貫通孔411,411がそれぞれ形成されたもので
あった。したがって、かかる人孔410を既設埋設管に
対して割り込ませるためには、同図に示すように、既設
埋設管401における人孔割り込み部分を掘り当て掘削
孔405内に露出させてから、この露出する既設埋設管
401を所定長さ切除し、しかる後に切除端部間402
に人孔410を挿入敷設することを要していた。
2. Description of the Related Art As shown in FIG.
Numeral 0 is a cylindrical body having a bottom plate 413, and through holes 411, 411 for connecting horizontal pipes are formed in the side walls 414, 414 above the bottom plate 413, respectively. Therefore, in order to insert the human hole 410 into the existing buried pipe, as shown in FIG. The existing buried pipe 401 to be cut is cut off by a predetermined length, and thereafter, between the cut ends 402
It was necessary to insert and lay a human hole 410 in the hole.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、かかる
従来方法では、人孔の掘削孔内への敷設に先立って作業
員が掘削孔内に入り、既設埋設管を所定長切除する必要
があるため、その切除作業が終わるまでは掘削孔内を安
定液で満たすことができず、したがってシートパイルや
土留め矢板の建込み等により掘削孔壁を保持する必要が
あるなど、施行が複雑となっていた。
However, in such a conventional method, it is necessary for an operator to enter the excavation hole and cut off the existing buried pipe for a predetermined length before laying the human hole in the excavation hole. Until the excision work was completed, the drilling hole could not be filled with the stabilizing liquid, so the drilling hole wall had to be held by installing a sheet pile or earth retaining sheet pile, etc. .

【0004】他方、既設埋設管の掘り当てに際し、バッ
クホウ等を用いると既設管を破壊する恐れがあった。
On the other hand, when a backhoe or the like is used for digging an existing buried pipe, the existing pipe may be destroyed.

【0005】そこで、本発明の主たる課題は、施行の簡
易化を図ることにある。また他の課題は、既設管を破壊
することなく掘り当て掘削孔内に露出させることにあ
る。
Therefore, a main object of the present invention is to simplify the implementation. Another object is to expose an existing pipe in a digging hole without breaking the existing pipe.

【0006】[0006]

【課題を解決するための手段】上記課題を解決した本発
明のうち、請求項1記載の発明は、既設埋設管における
人孔割り込み部分を掘り当て、掘削孔内に露出させ、少
なくとも外部から内空内に露出するまで前記既設埋設管
が嵌め入れられる切欠部を設けた人孔を、前記掘削孔内
に敷設し且つ前記切欠部内に前記人孔割り込み部分を挿
入するとともに、前記既設埋設管内を除く、少なくとも
前記切欠部以下の掘削孔内スペースが、固化材で充填さ
れた状態となし、この固化材の固化後、前記人孔の内空
と前記既設管内とを連通させることを特徴とする、既設
埋設管に対する人孔の割り込み敷設方法である。
According to the present invention, which solves the above-mentioned problems, the invention according to claim 1 digs a human hole interrupting portion in an existing buried pipe, exposes it to the inside of the drilling hole, and at least from inside to outside. A human hole provided with a cutout portion into which the existing buried pipe is fitted until exposed to the air is laid in the excavation hole, and the human hole interruption portion is inserted into the cutout portion, and the inside of the existing buried pipe is removed. Except, at least the space in the excavation hole below the notch portion is filled with a solidified material, and after solidification of the solidified material, the inner space of the human hole communicates with the existing pipe. This is a method of laying a human hole in an existing buried pipe.

【0007】請求項2記載の発明は、既設埋設管におけ
る人孔割り込み部分を掘り当て、掘削孔内に露出させ、
少なくとも外部から内空内に露出するまで前記既設埋設
管が嵌め入れられる切欠部を設けた人孔を、その内空内
に蓋部を設けて前記切欠部よりも上側の内空部分を前記
切欠部以下の内空部分から隔離した状態で、前記掘削孔
内に敷設し且つ前記切欠部内に前記人孔割り込み部分を
挿入するとともに、前記蓋部よりも上側の内空部分を除
く前記掘削孔内を安定液で満たし、しかる後に、前記掘
削孔内の安定液を固化させてから前記蓋部を取り除き、
前記切欠部よりも上側の内空部分内から当該内空部分と
前記既設管との間の固化体ならびに既設埋設管の管壁を
除去し、前記人孔の内空と前記既設管内とを連通させる
ことを特徴とする、既設埋設管に対する人孔の割り込み
敷設方法である。
According to a second aspect of the present invention, a human hole interrupting portion of an existing buried pipe is dug and exposed in the excavation hole.
A human hole provided with a cutout portion into which the existing buried pipe is fitted at least until it is exposed from the outside into the inside space, a lid portion is provided in the inside space, and the inside space portion above the notch portion is cut out. Laying in the drilling hole and inserting the manhole interruption portion in the cutout portion, while being isolated from the inner space portion below the lower portion, and excluding the inner space portion above the lid portion, Is filled with a stabilizing liquid, and then, after solidifying the stabilizing liquid in the borehole, the lid is removed,
The solidified body between the hollow portion and the existing pipe and the pipe wall of the existing buried pipe are removed from the hollow portion above the notch, and the hollow space of the human hole and the existing pipe are communicated. A method of laying a human hole in an existing buried pipe.

【0008】請求項3記載の発明は、前記人孔割り込み
部分の掘り当てに際し、少なくとも既設管の裏側地盤部
分については、当該部位に対する流体の高圧噴射により
掘削を行う、請求項1または2記載の既設埋設管に対す
る人孔の割り込み敷設方法である。
The invention according to claim 3 is the method according to claim 1 or 2, wherein, at the time of digging of the human hole interruption portion, at least the underground portion of the existing pipe is excavated by high-pressure injection of fluid to the portion. This is a method of laying a human hole in an existing buried pipe.

【0009】他方、請求項4記載の発明は、既設埋設管
に対して人孔を割り込み敷設する際に使用される、割り
込み敷設用人孔であって、少なくとも外部から内空内に
露出するまで前記既設埋設管が嵌め入れられる切欠部が
形成されていることを特徴とする、割り込み敷設用人孔
である。
On the other hand, the invention according to claim 4 is an interruption laying manhole used when laying a manhole on an existing buried pipe, wherein the manhole is at least exposed from the outside to the inside. It is a manhole for laying an interruption, characterized in that a cutout portion into which an existing buried pipe is fitted is formed.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施の形態につい
て添付図面を参照しつつ詳説する。 <掘削工程>本発明においては、先ず、既設埋設管にお
ける人孔割り込み部分を掘り当て、掘削孔内に露出させ
る。このため、例えば図1に示すように、既設埋設管1
における人孔割り込み部分2の周辺地盤をバックホウ3
により泥水掘削し、掘削孔5を形成する。この際の排土
・排泥は例えばバックホウあるいはエアリフトにより行
う。
Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. <Drilling Step> In the present invention, first, a human hole interrupting portion of an existing buried pipe is dug to be exposed inside the drilled hole. Therefore, for example, as shown in FIG.
Backhoe 3 around the ground around the manhole interruption part 2
And drilling holes 5 are formed. At this time, earth removal and mud removal are performed by, for example, a backhoe or an air lift.

【0011】ただし、かかる掘り当てに際し、バックホ
ウ等の掘削機械3によって既設埋設管1の裏側地盤部分
(図示の場合下側)4まで掘削を行うことは困難である
ので、かかる裏側地盤部分4については作業員が掘削孔
5内に入り掘削除去するか、あるいは好適には図2およ
び図3に示すように、先端部に噴射口6aが形成された
噴射管6を掘削孔5内に挿入し、その噴射口6aを既設
埋設管の裏側地盤部分4側面に臨ませた状態で、当該噴
射管6を介して当該裏側地盤部分4に対して流体(特に
水等の液体)を高圧噴射させ、当該裏側地盤部分4を掘
削(切削)する。特に図3に示すように、噴射口の形状
・構造により流体を扇状に噴射させるようにすると、掘
削効率を高めることができる。そして、噴射管6を軸心
周りに回転させたり、既設管1長手方向に移動させたり
しながら裏側地盤部分4全体を掘削する。
However, since it is difficult to excavate to the backside ground portion (lower side in the case shown) 4 of the existing buried pipe 1 by using a digging machine 3 such as a backhoe during such digging, the backside ground portion 4 is difficult to dig. The operator enters the drilling hole 5 and excavates or removes it, or preferably inserts the injection pipe 6 having the injection port 6a at the tip into the drilling hole 5 as shown in FIGS. In a state where the injection port 6a faces the side of the back ground portion 4 of the existing buried pipe, a fluid (particularly, a liquid such as water) is injected at high pressure to the back ground portion 4 through the injection pipe 6, The back ground portion 4 is excavated (cut). In particular, as shown in FIG. 3, excavating efficiency can be increased by injecting the fluid in a fan shape according to the shape and structure of the injection port. Then, the entire backside ground portion 4 is excavated while rotating the injection pipe 6 around the axis or moving the injection pipe 6 in the longitudinal direction of the existing pipe 1.

【0012】もちろん、他の部位についてもかかる流体
高圧噴射による掘削を行うことができる。図示しない
が、例えば、既設埋設管上に若干の土かぶりが残る程度
までバックホウによる掘削を行い、残部を流体高圧噴射
による掘削により除去するようにすることもできる。
Of course, the excavation can be performed on other parts by the fluid high-pressure injection. Although not shown, for example, excavation with a backhoe may be performed to the extent that some soil cover remains on the existing buried pipe, and the remainder may be removed by excavation with high-pressure fluid injection.

【0013】かくして、既設埋設管1の破壊防止を図り
ながらも、既設埋設管1の裏側地盤部分4まで掘削し、
少なくとも人孔割り込み部分2の全周面を掘削孔5内に
露出させることができる。また高圧噴射流体として水等
の安定液構成材を用いて掘削を行えば、掘削泥水を後の
安定液材料として利用でき、掘削孔5から取り出して廃
棄等の後処理をする必要がなくなる利点がある。
In this way, excavation is performed up to the ground portion 4 on the back side of the existing buried pipe 1 while preventing the existing buried pipe 1 from being destroyed.
At least the entire peripheral surface of the manhole interruption part 2 can be exposed in the borehole 5. Further, if drilling is performed using a stable liquid component such as water as the high-pressure jet fluid, drilling mud can be used as a later stable liquid material, and there is an advantage that it is not necessary to take out from the drill hole 5 and perform post-treatment such as disposal. is there.

【0014】<人孔敷設工程>次に人孔の敷設を行う。
本発明では、図4および図5に示すように、少なくとも
外部から内空11内に露出するまで既設管1が嵌め入れ
られる切欠部12が形成された人孔10を用いる。図示
の人孔10においては、底盤13が径方向に沿って既設
管1の外径以上の幅で切り欠かれるとともに、その底盤
切欠部分の径方向一端および他端にそれぞれ連続するよ
うに側壁14が上下方向に沿って所定の接続部位まで既
設管1の外径以上の幅で切り欠かれることによって、既
設管1が若干の遊びをもって嵌め入れられる本発明の切
欠部12が形成されている。
<Manhole laying step> Next, a manhole is laid.
In the present invention, as shown in FIGS. 4 and 5, a human hole 10 having a cutout portion 12 into which the existing pipe 1 is fitted at least until the internal pipe 11 is exposed from the outside is used. In the illustrated human hole 10, the bottom plate 13 is cut out along the radial direction with a width equal to or larger than the outer diameter of the existing pipe 1, and the side wall 14 is connected to one end and the other end in the radial direction of the cutout portion of the bottom plate. Is cut out along the vertical direction to a predetermined connection portion with a width equal to or larger than the outer diameter of the existing pipe 1, thereby forming the notch 12 of the present invention into which the existing pipe 1 is fitted with some play.

【0015】さらに好適には、図6に示すように、人孔
内空11内に閉塞体20を設けて切欠部12よりも上側
の内空部分11Uを切欠部以下の内空部分11Lから隔
離した状態となす。この閉塞体20の具体例が図7およ
び図8に示されている。すなわち、人孔10の内壁面1
5に、周方向に沿って離間させて複数のホールインアン
カー22,22…を2段打ち込み、これら上下段のホー
ルインアンカー22,22…にブラケット23,23を
ナット24,24によりそれぞれ連結固定し、これら上
下ブラケット23,23間に複数枚重ねられたコンパネ
21,21…を閉塞体20として挟持固定している。し
たがってかかる閉塞体20は人孔内空11内に対して着
脱自在(外すときにはブラケット23とホールインアン
カー22とのナット連結を解けば良い)となっている。
また図示例においては、下端が閉塞体20を貫通して閉
塞体20の下側に開口するとともに、上端が少なくとも
人孔上部開口16より突出するエア抜き管25を設けて
いる。
More preferably, as shown in FIG. 6, a closing body 20 is provided in the human hole 11 to isolate the inner space 11U above the notch 12 from the inner space 11L below the notch. State. A specific example of the closing body 20 is shown in FIGS. That is, the inner wall surface 1 of the human hole 10
5 are driven in a two-step manner while being spaced apart in the circumferential direction, and brackets 23, 23 are connected and fixed to the upper and lower hole-in anchors 22, 22 by nuts 24, 24, respectively. A plurality of control panels 21, 21... Stacked between the upper and lower brackets 23 are clamped and fixed as a closing body 20. Therefore, the closing body 20 is detachable from the inside of the human hole 11 (when it is removed, the nut connection between the bracket 23 and the hole-in anchor 22 may be released).
Further, in the illustrated example, an air vent pipe 25 whose lower end penetrates the closing body 20 and opens on the lower side of the closing body 20 and whose upper end projects at least from the upper opening 16 of the human hole is provided.

【0016】また図示例においては、人孔10の重量を
増加させて安定液中に安定して沈めて載置しておくため
に、また人孔外壁の保護のために、H鋼等の鋼材31,
31…により形成された立体枠組み台座30が人孔10
外面に一体化されている。
Further, in the illustrated example, a steel material such as H steel is used to increase the weight of the human hole 10 and stably immerse it in the stabilizing solution and place it thereon, and to protect the outer wall of the human hole. 31,
The three-dimensional frame pedestal 30 formed by 31.
It is integrated on the outer surface.

【0017】他方、かかる段取りが終了したならば、一
体化人孔(以下、単に人孔ともいう)10が適宜の吊り
降ろし装置によって、図9および図10に示すように掘
削孔5内に吊りおろされ敷設されるとともにその切欠部
12内に既設管1の人孔割り込み部分2が嵌め入れら
れ、既設管1の割り込み部分2が人孔10内の所定の接
続位置に収められる。このとき、図示例のように既設管
1の人孔割り込み部分2の全周が人孔内空11内に露出
するようにするのが好ましいが、適宜の部分たとえば上
半分のみが人孔内空11内に露出するようにしても良い
(図示せず)。なお、このように、本発明では人孔10
の敷設に先立って既設管1を切除しない。また、上述の
閉塞体20は人孔10の掘削孔5内への敷設後において
人孔10内に取り付けても良い。
On the other hand, when the setup is completed, an integrated human hole (hereinafter also simply referred to as a human hole) 10 is suspended in the excavation hole 5 as shown in FIGS. The manhole interruption part 2 of the existing pipe 1 is fitted in the cutout 12 and the interruption part 2 of the existing pipe 1 is stored in a predetermined connection position in the manhole 10. At this time, it is preferable that the entire periphery of the manhole interruption portion 2 of the existing pipe 1 is exposed in the manhole space 11 as shown in the illustrated example, but only an appropriate part, for example, only the upper half, is formed in the manhole space. 11 may be exposed (not shown). As described above, in the present invention, the human hole 10
The existing pipe 1 is not cut off before laying. Further, the above-described closing body 20 may be attached to the human hole 10 after the human hole 10 is laid in the excavation hole 5.

【0018】<固化材の充填・固化工程>また、例えば
この人孔の敷設後、図11に示すように人孔10におけ
る閉塞体20よりも上側の内空部分11Uを除く掘削孔
5内(すなわち、人孔10外面と掘削孔5内面との隙
間、および閉塞体20下側の人孔内空部分11Lと既設
管1外面との隙間)を安定液Bで満たす。このため、図
示例では人孔上部開口16よりも下側に安定液面B1が
位置するようにしている。特にこの際人孔10内の閉塞
体20下側に気泡が溜まり易いが、図示例では閉塞体2
0を貫通するエア抜き管25が設けられているので、閉
塞体20下側の気泡はかかるエア抜き管25を介して地
上へ排気される。また、安定液Bとしては前述の掘削工
程により生じた泥土を用いることができる。
<Filling / solidifying step of solidified material> Further, for example, after the human hole is laid, as shown in FIG. 11, the inside of the excavation hole 5 excluding the inner space portion 11U above the closed body 20 in the human hole 10 ( That is, the gap between the outer surface of the manhole 10 and the inner surface of the excavation hole 5 and the gap between the inner space 11L of the manhole below the closed body 20 and the outer surface of the existing pipe 1) are filled with the stable liquid B. For this reason, in the illustrated example, the stable liquid level B1 is positioned below the upper opening 16 of the human hole. In this case, air bubbles tend to accumulate below the closing body 20 in the human hole 10 in particular.
Since the air vent pipe 25 that penetrates through the air outlet 0 is provided, air bubbles below the closing body 20 are exhausted to the ground via the air vent pipe 25. Further, as the stabilizing liquid B, mud generated by the above-described excavation step can be used.

【0019】続いて、この安定液Bを固化材の混入およ
び攪拌等によって固化させ、図12等に示すように固化
体Gを形成させる。攪拌方法としてはエア攪拌が好まし
い。かかるエア攪拌においては固化体G内に気泡等が形
成残留する懸念があるものの、本例においては安定液B
中に供給されるエアのうち人孔10内の閉塞体20下側
に到達するものは前述のエア抜き管25により、他のも
のは安定液面B1から排気されるので、固化体G内の気
泡形成は効果的に防止される。
Subsequently, the stable liquid B is solidified by mixing a solidifying material and stirring to form a solid G as shown in FIG. Air stirring is preferable as the stirring method. In this air stirring, there is a concern that bubbles and the like are formed and remain in the solidified body G, but in this example, the stable liquid B is used.
Among the air supplied into the solidified body G, the air that reaches the lower side of the closed body 20 in the human hole 10 is exhausted from the stable liquid level B1 by the above-described air vent pipe 25. Bubble formation is effectively prevented.

【0020】なお本発明においては、既設埋設管内を除
く、少なくとも切欠部以下の掘削孔内スペースが、固化
材で充填された状態となれば良い。したがって、必ずし
も安定液を用いる必要はなく、また掘削孔内スペース全
体にわたる固化材の充填固化を1回で行う必要もない。
例えば図示しないが、少なくとも2回に分けて掘削孔内
に固化材を充填し、1回目の充填においては固化材上面
が人孔切欠部よりも若干上側となるようにして、既設管
内を除く切欠部以下の掘削孔内スペースだけ固化材の充
填を行い、この1回目の固化材の固化後に、その固化体
上側であって人孔外面と掘削孔壁面との間に2回目の固
化材充填を行うようにすると、上述の閉塞体を設けずと
も、蓋部を設けた場合と同様の固化体形成を行うことが
できる。またこの場合において、2回目に充填される固
化材に代えて土砂等の公知の埋め戻し材を用いて、残部
スペースを埋め戻すこともできる。
In the present invention, it is sufficient that at least the space in the excavation hole below the notch except the inside of the existing buried pipe is filled with the solidified material. Therefore, it is not always necessary to use the stabilizing liquid, and it is not necessary to perform the filling and solidification of the solidifying material over the entire space in the borehole at one time.
For example, although not shown, the excavated hole is filled with the solidified material at least twice, and in the first filling, the solidified material upper surface is slightly higher than the cutout of the human hole, and the cutout except for the existing pipe is formed. After the first solidification of the solidified material, a second solidification material filling is performed between the outer surface of the human hole and the wall surface of the excavation hole on the solidified body after the first solidification of the solidified material. By doing so, it is possible to form a solidified body similar to the case where the lid is provided, without providing the above-described closing body. In this case, the remaining space can be backfilled by using a known backfill material such as earth and sand instead of the solidified material to be filled for the second time.

【0021】<接続工程>固化材の充填・固化が完了し
たならば、切欠部12よりも上側の内空部分11U内に
作業員が入り、先ず閉塞体20を取り除き(この際、図
示例の場合にはブラケット23およびホールインアンカ
ー22も取り除きまたは切除するのが好ましい)、続い
て、例えば図12または図15に示すように、下側内空
部分11Lの固化体(上側内空部分11Uと既設管1と
の間の固化体)ならびに既設管1における割り込み部分
2における管壁を切削等により除去し、人孔内空11と
既設管1内とを連通させる。
<Connecting Step> When the filling and solidification of the solidified material is completed, an operator enters the inner space portion 11U above the notch portion 12, and first removes the closing body 20 (in this case, the illustrated example) In this case, it is preferable that the bracket 23 and the hole-in anchor 22 are also removed or cut off), and then, as shown in FIG. 12 or 15, for example, the solidified body of the lower inner space 11L (the upper inner space 11U and The solidified body between the existing pipe 1) and the pipe wall at the interruption part 2 of the existing pipe 1 are removed by cutting or the like, and the inside of the human hole 11 and the inside of the existing pipe 1 are communicated.

【0022】この場合、図12〜図14に示すように既
設埋設管1における割り込み部分2の上部だけを除去し
たり、図15に示すように割り込み部分2の全体を切断
除去することもできる。前者の場合、下側内空部分11
L内に形成された固化体の上部のみを除去し、残部固化
体上面G1における既設埋設管がわ端縁が既設埋設管1
の側部切除面と同じ高さとなるようにし、かつ残部固化
体上面G1全体として、既設埋設管1の上部切除開口へ
と下る傾斜面となるようにするのが好ましい。後者の場
合、人孔割り込み部分2が切断されるという点では従来
の人孔敷設前に人孔割り込み部分2を切断した場合と似
た接続状態となる。
In this case, it is possible to remove only the upper part of the interruption part 2 in the existing buried pipe 1 as shown in FIGS. 12 to 14, or to cut and remove the entire interruption part 2 as shown in FIG. In the former case, the lower inner space portion 11
L, only the upper part of the solidified body formed in L is removed, and the remaining embedded solid pipe on the upper surface G1 of the remaining solidified body has an edge of the existing embedded pipe 1.
It is preferable that the upper surface G1 of the remaining solidified body has an inclined surface descending to the upper cutout opening of the existing buried pipe 1 as a whole. In the latter case, the connection state is similar to that in the case where the human hole interruption part 2 is cut before the conventional manhole laying in that the human hole interruption part 2 is cut off.

【0023】そして接続後においては、例えば、人孔1
0に人孔蓋40を取り付けるとともに、固化体Gの上側
に舗装50を施して、人孔割り込み敷設の施行完了とす
る。
After the connection, for example, the human hole 1
At the same time, the manhole cover 40 is attached to the surface 0, and the pavement 50 is provided on the upper side of the solidified body G to complete the execution of the manhole interruption laying.

【0024】<その他> (イ)上記例においては、人孔内空11内に閉塞体20
を設けて切欠部12よりも上側の内空部分11Uを切欠
部以下の下側内空部分11Lから隔離した状態となして
いるが、この場合、下側内空部分11L内には固化体が
形成されてしまうため、当該部分の固化体を除去しなけ
ればならない。そこで請求項3記載の発明に従って、上
述の閉塞体20に代えて、図16および図17に示すよ
うに、切欠部12の切欠面12Fに沿うアーチ状蓋体6
0を用い、これにより切欠口12Mを塞ぐことを提案す
る。その他は、例えば下端がアーチ状蓋体60を貫通し
て蓋体60の下側に開口するとともに、上端が少なくと
も人孔上部開口16より突出するエア抜き管25を設け
る点など、上記例と基本的に同様に作業を行う。かかる
アーチ状蓋体60を用いると、人孔内空全体11(切欠
部を除く)が外部と隔離され固化材が充填されなくなる
ので、当該内空11内に固化体が形成されなくなり、上
記例のような除去作業は実質的に不要となる。なお、か
かるアーチ状蓋体60は、図示しないが上記例の閉塞体
と同様ホールインアンカーやブラケット等の適宜の取付
金具を用いて、人孔10に対して取付けることができ
る。
<Others> (A) In the above example, the closing body 20
Is provided to isolate the inner space 11U above the notch 12 from the lower inner space 11L below the notch. In this case, the solidified body is in the lower inner space 11L. Since it is formed, it is necessary to remove the solidified body in the portion. Therefore, according to the third aspect of the present invention, as shown in FIGS. 16 and 17, instead of the closing body 20, the arched lid 6 along the cutout surface 12F of the cutout 12 is provided.
0, thereby closing the notch 12M. In addition to the above, the basic structure is the same as that of the above example. Work in the same way. When the arched lid 60 is used, the entire inner space 11 of the human hole (excluding the cutout portion) is isolated from the outside and is not filled with the solidifying material. Such a removal operation is substantially unnecessary. Although not shown, the arched lid 60 can be attached to the human hole 10 by using an appropriate attachment such as a hole-in anchor or a bracket, similarly to the closing body of the above example.

【0025】特にかかるアーチ状蓋体60を用いるとと
もに、既設埋設管1と人孔2との接続に際し前述図12
〜図14に示すように既設埋設管1における割り込み部
分2の上部だけを切除する場合には、少なくともアーチ
状蓋体60の取り外しに先立って、図18に示すように
人孔10の切欠部以下の下側内空部分11L内にコンク
リート等の充填材65を充填し、充填材上面65aにお
ける既設埋設管がわ端縁の高さ位置が既設埋設管1の側
部切除面となる高さ位置66と同じとなるようにし、か
つ充填材上面65a全体として、既設埋設管1の上部切
除開口へと下る傾斜面となしておくと、後の接続作業が
簡易となる利点がある。
In particular, such an arched lid 60 is used, and the connection between the existing buried pipe 1 and the human hole 2 is made as shown in FIG.
When only the upper part of the interruption part 2 of the existing buried pipe 1 is cut off as shown in FIG. 14, at least prior to the removal of the arch-shaped lid 60, the cut portion of the human hole 10 and below are cut off as shown in FIG. Is filled with the filler 65 such as concrete in the lower inner space portion 11L, and the height position of the edge of the existing buried pipe on the filler upper surface 65a becomes the side cut surface of the existing buried pipe 1. 66, and if the entire upper surface 65a of the filler is formed as an inclined surface that descends to the upper resection opening of the existing buried pipe 1, there is an advantage that the subsequent connection work is simplified.

【0026】(ロ)本発明においては孔壁維持のため、
掘削孔内を安定液で満たした後に人孔を敷設しても良
い。この場合、掘削孔内に、安定液面から突出するよう
にガイド部材を設け、このガイド部材に沿って人孔を掘
削孔内に吊り降ろすことにより、自動的に人孔の切欠部
に既設埋設管が嵌め入れられるようにするのが好ましい
(図示せず)。
(B) In the present invention, in order to maintain the hole wall,
After filling the inside of the borehole with the stabilizing liquid, a human hole may be laid. In this case, a guide member is provided in the borehole so as to protrude from the stable liquid level, and the manhole is suspended in the borehole along the guide member, thereby automatically burying the existing hole in the notch of the manhole. Preferably, the tube is fitted (not shown).

【0027】(ハ)上記例においては底盤部下側から上
下方向に沿って既設管が切欠部内に嵌め入れられること
になるが、本発明はこれに限定されない。例えば、図1
9に示すように人孔110の側方から所定の接続部位ま
で横方向に沿って既設管1が嵌め入れられるように切欠
部112を形成したり、図20に示すように人孔210
の下端の隅部から所定の接続部位まで斜め方向に沿って
既設管1が嵌め入れられるように切欠部212を形成し
たりすることもできる。これらの例は掘削孔5の中央に
既設管1を露出させることができない場合に適してい
る。
(C) In the above example, the existing pipe is fitted into the cutout along the vertical direction from below the bottom portion, but the present invention is not limited to this. For example, FIG.
As shown in FIG. 9, a notch 112 is formed so that the existing pipe 1 is fitted along the lateral direction from the side of the human hole 110 to a predetermined connection portion, or the human hole 210 is formed as shown in FIG.
The notch 212 can be formed so that the existing pipe 1 can be fitted along the diagonal direction from the lower end corner to the predetermined connection portion. These examples are suitable when the existing pipe 1 cannot be exposed at the center of the excavation hole 5.

【0028】(ニ)切欠部の形状は適宜定めることがで
き、例えば図21に示すように人孔310の切欠部分3
12が下側に向かうに吊れて広がるようにすると、特に
掘削孔内を安定液で満たした後に人孔を敷設するような
場合において、既設管の挿入が容易にかつ円滑に行うこ
とができるようになる。
(D) The shape of the notch can be determined as appropriate. For example, as shown in FIG.
If the hole 12 is suspended downward and spreads, particularly in the case where a human hole is laid after filling the inside of the drilling hole with the stabilizing liquid, the existing pipe can be easily and smoothly inserted. become.

【0029】(ホ)本発明の人孔は、従来型マンホール
に対して所定部位の切除等の改造を施すことによって製
造できるが、最初から切欠部を有するものとして一体的
に成形することもできる。
(E) The human hole of the present invention can be manufactured by modifying the conventional manhole such as cutting off a predetermined portion or the like, but can also be integrally formed with a notch from the beginning. .

【0030】(ヘ)本発明では、上記例におけるエア抜
き管25のほか、閉塞体や蓋体外側の安定液または固化
材混入安定液を排出するためのブロー管や、閉塞体や蓋
体外側に固化材を供給する固化剤注入管をエア抜き管に
代えてまたはエア抜き管とともに並設することができ
る。この例として、円盤状の閉塞体20を用いる場合に
エア抜き管25とともにブロー管26および注入管27
を並設した例を図22に、アーチ状蓋体60を用いる場
合にエア抜き管25とともにブロー管26および注入管
27を並設した例を図23にそれぞれ示した。これらブ
ロー管26および注入管27は、例えば図示しないブロ
ーポンプおよび注入材供給装置に接続される。
(F) In the present invention, in addition to the air vent pipe 25 in the above-described example, a blow pipe for discharging a stabilizing liquid or a stabilizing liquid mixed with a solidifying material outside the closing body or the lid, or a blowing pipe outside the closing body or the lid. The solidifying agent injection pipe for supplying the solidifying material to the pipe can be provided in parallel with or instead of the air release pipe. As an example of this, when the disc-shaped closing body 20 is used, the blow pipe 26 and the injection pipe 27 together with the air release pipe 25 are used.
FIG. 22 shows an example in which the blow pipes 26 and the injection pipe 27 are juxtaposed together with the air release pipe 25 when the arch-shaped lid 60 is used. The blow tube 26 and the injection tube 27 are connected to, for example, a blow pump and an injection material supply device (not shown).

【0031】[0031]

【発明の効果】以上のとおり本発明によれば、施行の簡
易化を図ることができるようになる。また、既設管を破
壊することなく掘り当て掘削孔内に露出させることがで
きるようになる。
As described above, according to the present invention, the implementation can be simplified. In addition, the existing pipe can be exposed in the digging hole without being destroyed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】バックホウによる掘削工程を示す縦断面図であ
る。
FIG. 1 is a longitudinal sectional view showing an excavation process using a backhoe.

【図2】本発明に係る流体高圧噴射による掘削工程を示
す縦断面図である。
FIG. 2 is a longitudinal sectional view showing an excavation step by high-pressure fluid injection according to the present invention.

【図3】本発明に係る流体高圧噴射による掘削工程を示
す平面図である。
FIG. 3 is a plan view showing an excavation step by high-pressure fluid injection according to the present invention.

【図4】本発明に係る人孔の斜視図である。FIG. 4 is a perspective view of a human hole according to the present invention.

【図5】本発明に係る人孔の側面図である。FIG. 5 is a side view of a human hole according to the present invention.

【図6】本発明に係る人孔の縦断面図である。FIG. 6 is a vertical sectional view of a human hole according to the present invention.

【図7】図6のVII部分の拡大図である。FIG. 7 is an enlarged view of a portion VII in FIG. 6;

【図8】図6の横断面図である。FIG. 8 is a cross-sectional view of FIG.

【図9】人孔敷設工程を示す縦断面図である。FIG. 9 is a longitudinal sectional view showing a human hole laying step.

【図10】他の方向から見た、人孔敷設工程を示す縦断
面図である。
FIG. 10 is a longitudinal sectional view showing a human hole laying step viewed from another direction.

【図11】安定液の充填工程を示す縦断面図である。FIG. 11 is a vertical sectional view showing a filling step of a stabilizing solution.

【図12】人孔と既設管との接続工程を示す縦断面図で
ある。
FIG. 12 is a longitudinal sectional view showing a process of connecting a human hole to an existing pipe.

【図13】他の方向から見た、人孔と既設管との接続工
程を示す縦断面図である。
FIG. 13 is a vertical cross-sectional view showing a connection process between a human hole and an existing pipe, as viewed from another direction.

【図14】人孔と既設管との接続工程を示す縦断面斜視
図である。
FIG. 14 is a vertical cross-sectional perspective view showing a process of connecting a human hole to an existing pipe.

【図15】他の、人孔と既設管との接続工程を示す縦断
面図である。
FIG. 15 is a longitudinal sectional view showing another process of connecting a human hole to an existing pipe.

【図16】他の人孔内外隔離形態を示す側面図である。FIG. 16 is a side view showing another inside and outside isolation mode of the human hole.

【図17】他の人孔内外隔離形態を示す、部分断面斜視
図である。
FIG. 17 is a partial cross-sectional perspective view showing another inside and outside isolation mode of a human hole.

【図18】充填材を充填する形態を示す、部分断面斜視
図である。
FIG. 18 is a partial cross-sectional perspective view showing a form in which a filler is filled.

【図19】他の切欠部例を示す縦断面図である。FIG. 19 is a longitudinal sectional view showing another example of a notch.

【図20】他の切欠部例を示す縦断面図である。FIG. 20 is a longitudinal sectional view showing another example of a notch.

【図21】他の切欠部例を示す縦断面図である。FIG. 21 is a longitudinal sectional view showing another example of a notch.

【図22】ブロー管および固化材注入管を設けた人孔例
を示す縦断面図である。
FIG. 22 is a longitudinal sectional view showing an example of a human hole provided with a blow pipe and a solidification material injection pipe.

【図23】ブロー管および固化材注入管を設けた人孔例
を示す縦断面図である。
FIG. 23 is a longitudinal sectional view showing an example of a human hole provided with a blow pipe and a solidification material injection pipe.

【図24】従来例を示す縦断面図である。FIG. 24 is a longitudinal sectional view showing a conventional example.

【符号の説明】[Explanation of symbols]

1…既設埋設管、10…人孔、11…人孔内空、12…
切欠部、20…閉塞体。
1 ... existing buried pipe, 10 ... human hole, 11 ... empty in human hole, 12 ...
Notch, 20 ... closed body.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】既設埋設管における人孔割り込み部分を掘
り当て、掘削孔内に露出させ、 少なくとも外部から内空内に露出するまで前記既設埋設
管が嵌め入れられる切欠部を設けた人孔を、前記掘削孔
内に敷設し且つ前記切欠部内に前記人孔割り込み部分を
挿入するとともに、 少なくとも、前記切欠部を除く人孔内と前記既設埋設管
内とを除いた前記掘削孔内スペースが、固化材で充填さ
れた状態となし、 この固化材の固化後、前記人孔内空側から人孔内空と前
記既設管内とを連通させることを特徴とする、既設埋設
管に対する人孔の割り込み敷設方法。
1. A human hole provided with a cut-out portion into which a human hole interrupted portion of an existing buried pipe is digged and exposed inside the digging hole, and into which the existing buried pipe is fitted at least until it is exposed from the outside to the inside. Laying in the excavation hole and inserting the manhole interruption portion into the notch portion, and at least the space in the excavation hole excluding the inside of the manhole except the notch portion and the inside of the existing buried pipe is solidified. After the solidification of the solidified material, the inside of the manhole and the inside of the existing pipe are communicated from the inside of the manhole. Method.
【請求項2】既設埋設管における人孔割り込み部分を掘
り当て、掘削孔内に露出させ、 少なくとも外部から内空内に露出するまで前記既設埋設
管が嵌め入れられる切欠部を設けた人孔を、その内空内
に閉塞体を設けて前記切欠部よりも上側の内空部分を前
記切欠部以下の内空部分から隔離した状態で、前記掘削
孔内に敷設し且つ前記切欠部内に前記人孔割り込み部分
を挿入するとともに、前記閉塞体よりも上側の内空部分
を除く前記掘削孔内を安定液で満たし、 しかる後に、前記掘削孔内の安定液を固化させてから前
記閉塞体を取り除き、前記切欠部よりも上側の内空部分
内から当該内空部分と前記既設管との間の固化体ならび
に既設埋設管の管壁を除去し、前記人孔の内空と前記既
設管内とを連通させることを特徴とする、既設埋設管に
対する人孔の割り込み敷設方法。
2. A human hole having a cut-out portion into which a human hole interruption portion of an existing buried pipe is digged and exposed in a digging hole, and into which the existing buried pipe is fitted at least until it is exposed from the outside to the inside. A occluding body is provided in the inner space, and the inner space above the notch is separated from the inner space below the notch, and is laid in the excavation hole and the person is inserted in the notch. While inserting the hole interruption part, the inside of the drilling hole excluding the inner space above the closing body is filled with the stabilizing liquid, and after that, after solidifying the stabilizing liquid in the drilling hole, the closing body is removed. Removing the solidified body between the hollow portion and the existing pipe and the pipe wall of the existing buried pipe from within the hollow portion above the notch, and removing the inner space of the human hole and the inside of the existing pipe. To communicate with existing buried pipes Interrupt laying method of people holes.
【請求項3】既設埋設管における人孔割り込み部分を掘
り当て、掘削孔内に露出させ、 少なくとも外部から内空内に露出するまで前記既設埋設
管が嵌め入れられる切欠部を設けた人孔を、その切欠部
の口を切欠面に沿う蓋体により塞いだ状態で、前記掘削
孔内に敷設し且つ前記切欠部内に前記人孔割り込み部分
を挿入するとともに、前記既設埋設管内を除く、前記蓋
体を含む人孔の外面と前記掘削孔内面との間の掘削孔内
スペースを安定液で満たし、 しかる後に、前記掘削孔内の安定液を固化させてから前
記蓋体を取り除き、前記人孔内空側から当該内空と前記
既設管との間の固化体ならびに既設埋設管の管壁を除去
し、前記人孔の内空と前記既設管内とを連通させること
を特徴とする、既設埋設管に対する人孔の割り込み敷設
方法。
3. A human hole provided with a cut-out portion into which a human hole interrupted portion of an existing buried pipe is dug and exposed in the digging hole, at least until the exposed buried pipe is exposed from the outside to the inside. Laying in the excavation hole and inserting the human hole interrupting portion into the notch, and excluding the inside of the existing buried pipe, with the opening of the notch closed by a lid along the notch surface. Filling the space in the borehole between the outer surface of the borehole including the body and the inner surface of the borehole with a stabilizing liquid, and then solidifying the stabilizing liquid in the borehole and removing the lid, Removing the solidified body between the inner space and the existing pipe and the pipe wall of the existing buried pipe from the inner space side, and communicating the inner space of the human hole with the inside of the existing pipe; How to lay a manhole on a pipe.
【請求項4】前記人孔割り込み部分の掘り当てに際し、
少なくとも既設管の裏側地盤部分については、当該部位
に対する流体の高圧噴射により掘削を行う、請求項1〜
3のいずれか1項に記載の既設埋設管に対する人孔の割
り込み敷設方法。
4. The digging of the human hole interruption part,
The excavation is performed by high-pressure injection of fluid to the portion at least on the backside ground portion of the existing pipe.
3. The method for laying a human hole in an existing buried pipe according to any one of the items 3).
【請求項5】既設埋設管に対して人孔を割り込み敷設す
る際に使用される、割り込み敷設用人孔であって、 少なくとも外部から内空内に露出するまで前記既設埋設
管が嵌め入れられる切欠部が形成されていることを特徴
とする、割り込み敷設用人孔。
5. A notch for laying an interrupter, which is used when laying a human hole in an existing buried pipe, wherein the notch in which the existing buried pipe is fitted at least until it is exposed from the outside to the inside. A manhole for interrupt laying, characterized in that a part is formed.
JP31107699A 1999-11-01 1999-11-01 Method of laying interruption of manhole to existing buried pipe Expired - Fee Related JP3470954B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31107699A JP3470954B2 (en) 1999-11-01 1999-11-01 Method of laying interruption of manhole to existing buried pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31107699A JP3470954B2 (en) 1999-11-01 1999-11-01 Method of laying interruption of manhole to existing buried pipe

Publications (2)

Publication Number Publication Date
JP2001131997A true JP2001131997A (en) 2001-05-15
JP3470954B2 JP3470954B2 (en) 2003-11-25

Family

ID=18012838

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31107699A Expired - Fee Related JP3470954B2 (en) 1999-11-01 1999-11-01 Method of laying interruption of manhole to existing buried pipe

Country Status (1)

Country Link
JP (1) JP3470954B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100413001B1 (en) * 2001-11-07 2003-12-31 주식회사 준별에프알피산업 A valve room struture and method of constructing valve room to make use of compositeness construction material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100413001B1 (en) * 2001-11-07 2003-12-31 주식회사 준별에프알피산업 A valve room struture and method of constructing valve room to make use of compositeness construction material

Also Published As

Publication number Publication date
JP3470954B2 (en) 2003-11-25

Similar Documents

Publication Publication Date Title
JP2014134009A (en) Creating method for solidified body, burying method for steel pipe pile using the same, and burying structure for steel pipe pile
JP2002047676A (en) Buoyancy preventing structure and its construction method
JP3752560B2 (en) Basic structure for constructing a new building in an existing basement and its construction method
JP4485006B2 (en) Construction method for underground structures
JP2001131997A (en) Method of laying manhole by its cutting in existing buried pipe, and manhole for laying by its cutting in
JP2002138475A (en) Method and device for cutting and pulling out existing pile
JP2842236B2 (en) Grout injection method into back of underground continuous wall and its injection device
JP2607966B2 (en) Expanded connecting wall construction method
JP2681760B2 (en) Sediment removal device in cast steel pipe pile and method for removing sediment in the steel pipe pile
JP2008075336A (en) Construction method for precast pile
JP2000178966A (en) Structure of diaphragm wall
JP6952159B1 (en) Pile excavation backfill method
JPH11217837A (en) Soil improvement method
JPH1046573A (en) Bottom enlarged cast-in-place pile and its construction method
JPH08209687A (en) Partial casing pile construction method
JP2899915B2 (en) Settlement method of latent box body and latent box body
JPH0489916A (en) Embedding method for already fabricated pipe
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP3264437B2 (en) Water shielding device and method of measuring water permeability
JP2019210649A (en) Reinforcement method of earth retaining around excavation site
JPH1121909A (en) Whole rotational type caisson and immersion method thereof
JPH1113070A (en) Forming method for consolidation grouting hole
JPH0816434B2 (en) Negative pressure shield body excavation method
JPH11350474A (en) Construction method for liner plate vertical shaft
JPH0565657B2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080912

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090912

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100912

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120912

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120912

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130912

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140912

Year of fee payment: 11