JP2001107565A - Building construction method - Google Patents

Building construction method

Info

Publication number
JP2001107565A
JP2001107565A JP28531399A JP28531399A JP2001107565A JP 2001107565 A JP2001107565 A JP 2001107565A JP 28531399 A JP28531399 A JP 28531399A JP 28531399 A JP28531399 A JP 28531399A JP 2001107565 A JP2001107565 A JP 2001107565A
Authority
JP
Japan
Prior art keywords
building
floor
room
wall
walls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28531399A
Other languages
Japanese (ja)
Inventor
Shigeo Kubota
重雄 窪田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Construction Co Ltd
Kubota Kensetsu KK
Original Assignee
Kubota Construction Co Ltd
Kubota Kensetsu KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Construction Co Ltd, Kubota Kensetsu KK filed Critical Kubota Construction Co Ltd
Priority to JP28531399A priority Critical patent/JP2001107565A/en
Publication of JP2001107565A publication Critical patent/JP2001107565A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a building construction method allowing savings of form members for construction of walls or the like and therefore a reduction in cost of building materials, and facilitating installation of various facilities inside rooms for enhanced productivity. SOLUTION: The process of constructing the walls of a room on a story and then constructing the walls of an adjacent room on the same story is repeated to construct in sequence the entire walls on the same story. A variety of indoor facilities 10 are inserted from the tops of the walls and installed in each of the rooms separated by the walls, and the floor of the upper story is constructed above the rooms in which the variety of indoor facilities 10 are installed. The walls of rooms on the upper story whose floor has been constructed are similarly constructed to construct an entire building.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築物の床と壁
を、型枠内にコンクリートを打設することで建築してい
く建築物の建築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for a building in which a floor and walls of a building are constructed by placing concrete in a formwork.

【0002】[0002]

【従来の技術】従来、鉄筋コンクリート製の建築物を、
型枠内にコンクリートを打設することで建築していく場
合、以下の建築工法が用いられていた。
2. Description of the Related Art Conventionally, buildings made of reinforced concrete are
When building by casting concrete in a formwork, the following construction method was used.

【0003】即ち図10に示すように、床81の上にそ
の階に設ける全ての壁83と上の階の床85とを作るた
めの型枠を組み、この型枠内にコンクリートを打設して
硬化するのを待ち、その後型枠を取り外すことでこの階
の全ての壁83と上の階の床85を建造し、この作業を
下の階から上の階に向かって順次行うことで、建築物を
建築していた。そして型枠を取り外した後の部屋80に
は、水周り設備87を設置するとか、各部屋の間仕切り
を行う等の作業を行っていた。
That is, as shown in FIG. 10, a formwork is formed on a floor 81 to form all the walls 83 provided on the floor and a floor 85 on the upper floor, and concrete is poured into the formwork. And then harden, then remove the formwork to build all the walls 83 of this floor and the floor 85 of the upper floor, and perform this work sequentially from the lower floor to the upper floor Was building a building. In the room 80 from which the formwork has been removed, the water surrounding equipment 87 is installed, or work such as partitioning each room is performed.

【0004】しかしながらこのような従来の建築工法に
あっては、以下のような問題点があった。 一度にその階の全ての壁83等を建造するための型枠
を組むので、型枠に必要な板材などの型枠部材が大量に
必要になり、建築資材コストの低減化が図れなかった。
However, such a conventional construction method has the following problems. Since a formwork for building all the walls 83 and the like on the floor at one time is assembled, a large amount of formwork members such as plate materials necessary for the formwork are required, and the cost of building materials cannot be reduced.

【0005】壁83と上の階の床85を作るための型
枠を組んだとき、打設したコンクリートの重みで床85
となる部分の型枠が撓まないようにするため、従来床8
5となる型枠を下から支える型枠支保工を設置する必要
があったが、この点からも作業が煩雑で建築資材コスト
の低減化が図れなかった。
When the formwork for forming the wall 83 and the floor 85 of the upper floor is assembled, the floor 85 is weighted by the weight of the concrete poured.
The conventional floor 8
Although it was necessary to install a formwork support for supporting the formwork No. 5 from below, the work was also complicated from this point, and the cost of building materials could not be reduced.

【0006】水周り設備87を設置するとか、室内の
間仕切りを行う場合、これらの設備は完成品のままでは
大きすぎて部屋80の出入口や窓となる部分から搬入で
きないので、これらを分解した部品の状態で部屋80内
に搬入し、部屋80の中で組み立てて設置する必要があ
った。このためその作業が煩雑になっていた。
[0006] In the case of installing the water surrounding equipment 87 or partitioning the room, these equipments are too large as finished products and cannot be carried in from the entrance or exit of the room 80 or the window. In the room 80, and must be assembled and installed in the room 80. Therefore, the work has been complicated.

【0007】[0007]

【発明が解決しようとする課題】本発明は上述の点に鑑
みてなされたものでありその目的は、壁等を建造するた
めの型枠部材を節約できて建築資材コストの低減化が図
れる建築物の建築工法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and has as its object to reduce the cost of building materials by saving form members for building walls and the like. It is to provide a building construction method of goods.

【0008】また本発明の目的は、部屋の内部への各種
設備の設置が容易に行えて作業性が向上する建築物の建
築工法を提供することにある。
Another object of the present invention is to provide a construction method for a building in which various facilities can be easily installed in a room and workability is improved.

【0009】[0009]

【課題を解決するための手段】上記問題点を解決するた
め本発明は、建築物の床と壁を、型枠内にコンクリート
を打設することで下の階から上の階に向けて順次建築し
ていく建築物の建築工法において、下の階の壁を建造し
た後に、前記壁で囲まれた下の階の内部に壁の上側から
各種室内設備を挿入して設置し、その後下の階の壁の上
に、上の階の床と壁を建造していくことを、建築しよう
とする建築物の階数分繰り返すことで、建築物全体を建
築するように構成した。また本発明は、各階毎に複数の
部屋がある建築物の床と壁を、型枠内にコンクリートを
打設することで下の階から上の階に向けて順次建築して
いく建築物の建築工法において、同一階の1つの部屋の
壁を建造した後に、隣の部屋の壁を建造する工程を繰り
返すことで同一階の壁全体を順次建造していくととも
に、前記壁で仕切られた各部屋の内部に壁の上側から各
種室内設備を挿入して設置し、前記各種室内設備を設置
した部屋の上に上の階の床を建造し、さらに床を建造し
た上の階の各部屋の壁を前記と同様に建造していくこと
を、建築しようとする建築物の階数分繰り返すことで、
建築物全体を建築するように構成した。また本発明は、
同一階に複数の部屋がある建築物の壁を、型枠内にコン
クリートを打設することで建築する建築物の建築工法に
おいて、1つの部屋の壁を建造した後に、この1つの部
屋の壁を建造するのに用いた型枠を用いて隣の部屋の壁
を建造することを繰り返すことで各部屋の壁を順次建造
していくように構成した。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention is to sequentially cast floors and walls of a building from a lower floor to an upper floor by placing concrete in a formwork. In the construction method of a building to be built, after building the lower floor wall, insert and install various indoor facilities from the upper side of the wall inside the lower floor surrounded by the wall, and then install the lower floor By constructing the floor and walls of the upper floor on the floor of the floor repeatedly for the number of floors of the building to be constructed, the entire building is constructed. In addition, the present invention provides a method for constructing a building in which floors and walls of a building having a plurality of rooms for each floor are sequentially constructed from a lower floor to an upper floor by placing concrete in a formwork. In the construction method, after building the wall of one room on the same floor, the entire wall on the same floor is sequentially built by repeating the process of building the wall of the next room, and each of the walls partitioned by the wall Insert and install various indoor facilities from the upper side of the wall inside the room, build a floor on the upper floor above the room where the various indoor facilities are installed, and further build each floor on the upper floor By repeating the building of the wall in the same way as the above for the number of floors of the building to be built,
It was configured to build the whole building. The present invention also provides
In the construction method of a building in which a plurality of rooms on the same floor are constructed by placing concrete in a formwork, a wall of one room is built, and then a wall of the one room is built. The wall of each room was constructed sequentially by repeating the process of building the wall of the next room using the formwork used to build the room.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて詳細に説明する。図1乃至図9は、本発明を用
いて建築される建築物の建築工程を示す図であり、それ
ぞれ図(a)は概略平面図、図(b)は概略側断面図で
ある。なおこの建築物には、実際にはベランダや階段な
どが設置され、また型枠内には鉄筋が内蔵されるが、説
明を簡単にするためそれらの記載は省略している。
Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 9 are diagrams showing a construction process of a building constructed using the present invention, wherein FIG. 1 (a) is a schematic plan view and FIG. 1 (b) is a schematic side sectional view. Note that a veranda, stairs, and the like are actually installed in this building, and a reinforcing bar is built in the formwork, but these are omitted for the sake of simplicity.

【0011】この建築物を建築するには図1に示すよう
に、まず1階の1号室の外壁用の壁となる型枠Aを組み
立て、型枠A内にコンクリートを打設する。なお型枠を
組み立てる前に実際にはその部分に鉄筋をセットする
が、以下鉄筋セットの説明は省略する。また建築物の基
礎となる1階の床部分も図示はしないが、予めコンクリ
ートを打設することで形成されている。
In order to construct this building, as shown in FIG. 1, first, a formwork A serving as an outer wall of the first room on the first floor is assembled, and concrete is poured into the formwork A. Note that before actually assembling the formwork, a reinforcing bar is actually set in that part, but the description of the reinforcing bar set will be omitted below. The floor of the first floor, which is the foundation of the building, is not shown, but is formed by casting concrete in advance.

【0012】次に図2において、前記型枠Aを取り外し
た後、部屋を仕切るための壁となる型枠Bを組み立て、
図3に示すようにその中にコンクリートを打設する。こ
れによって1階の1号室101の壁が完成する。このと
き1号室101の天井はなく、開放されている。そして
コンクリートが所定の硬度になった後に型枠Bを取り外
す。
Next, in FIG. 2, after removing the form A, a form B serving as a wall for partitioning a room is assembled.
Concrete is poured into it as shown in FIG. Thus, the wall of the first room 101 on the first floor is completed. At this time, the ceiling of the first room 101 is not open and is open. Then, the mold B is removed after the concrete reaches a predetermined hardness.

【0013】次に図4において、前記完成した1号室1
01の壁の開放された上部(天井となる部分)から、あ
らかじめ工場で浴槽やトイレ等を一体化した水周り設備
10を、クレーンで吊り上げてその中に挿入し取り付け
る。同時に1号室101内の部屋と部屋を仕切る室内壁
11等も、クレーンなどによって開放された上部から挿
入し、組み立てる。
Next, referring to FIG. 4, the completed room 1
From the open upper part of the wall of No. 01 (the part to be the ceiling), the water surrounding equipment 10 previously integrated with a bathtub and a toilet in a factory is lifted by a crane and inserted and mounted therein. At the same time, the interior walls 11 and the like separating the rooms in the first room 101 are inserted from the upper part opened by a crane or the like and assembled.

【0014】このように本発明によれば、壁を建造する
際に天井部分は作らず、これによって壁で覆われた部屋
の内部に壁の上側から水周り設備10等の各種室内設備
を挿入して設置できるので、壁とともに天井も作ってし
まう従来の建築工法のように各種室内設備を出入り口や
窓などから運び入れる必要はなく、クレーンで容易に搬
入でき、その製造が容易になる。特に従来、ユニットバ
ス等でもこれを部品として部屋内に搬入し、部屋内にお
いて組み立てていたが、本発明によれば完成したユニッ
トバス自体を容易に部屋内に搬入できる。特にこの実施
形態の場合はユニットバス単体ではなく、バスやトイレ
等を一体化した水周り設備10を工場で組み立ててユニ
ット化し、これをそのままクレーンで部屋内に挿入、セ
ットするようにしたので、作業性の著しい向上が図れ
る。
As described above, according to the present invention, a ceiling portion is not formed when a wall is constructed, and various indoor facilities such as a water plumbing facility 10 are inserted from above the wall into a room covered with the wall. Since there is no need to carry various indoor equipment through doorways or windows as in the conventional construction method that creates a ceiling along with walls, it can be easily carried in by a crane, and its manufacture becomes easy. In particular, conventionally, even a unit bus or the like is transported as a component into a room and assembled in the room, but according to the present invention, the completed unit bus itself can be easily transported into the room. In particular, in the case of this embodiment, instead of the unit bath alone, the water surrounding equipment 10 integrating the bath and toilet etc. was assembled at the factory into a unit, and this was inserted into the room with a crane as it was, and set. Workability can be significantly improved.

【0015】次に図5において、前記1号室101の壁
を作るのに用いて取り外した前記型枠Bを2号室102
の壁を作るための型枠Bとして再び組み立て、その中に
コンクリートを打設する。このとき同時に1号室101
の壁の上に、2階の1号室201の床となる型枠Cを組
み立て、その中にもコンクリートを打設する。このとき
型枠Cは、1階の1号室101内に収納した水周り設備
10や室内壁11等によって支えられるので、打設する
コンクリートの重さによって撓むことはなく、このため
従来必要であった型枠支保工は不要になった(又は少数
のみで良くなった)。そしてコンクリートが所定の硬度
になった段階で型枠B,Cを取り外す。
Next, referring to FIG. 5, the form B removed to form the wall of the first room 101 is removed from the second room 102.
Is reassembled as a formwork B for making a wall, and concrete is poured into it. At the same time, Room 1 101
A formwork C to be the floor of the first room 201 on the second floor is assembled on the wall, and concrete is poured into the formwork C. At this time, since the formwork C is supported by the water surrounding equipment 10 and the indoor wall 11 housed in the first room 101 on the first floor, the formwork C does not bend due to the weight of the concrete to be cast, and is therefore conventionally required. The former formwork support was no longer necessary (or improved with only a few). Then, when the concrete reaches a predetermined hardness, the molds B and C are removed.

【0016】そして図6に示すように、2号室102内
に水周り設備10等の各種室内設備を挿入・設置した後
に、前記取り外した型枠B,Cを用いて3号室103用
の壁と2階の2号室202用の床の型枠を組み立て、上
記と同様にコンクリートを打設して型枠B,Cを取り外
す。
Then, as shown in FIG. 6, after inserting and installing various indoor facilities such as the water surrounding facility 10 in the second room 102, the mold B and C are used to remove the wall for the third room 103 using the removed formwork B and C. A floor form for the second room 202 on the second floor is assembled, and concrete is cast in the same manner as above to remove the forms B and C.

【0017】以下同様にして4号室104の壁を建造し
た後、図7に示すように2階の1号室201の外壁用の
壁となる型枠Aを組み立て、型枠A内にコンクリートを
打設する。この型枠Aは図1において1階の1号室10
1の外壁用の壁を作るのに用いて取り外しておいたもの
である。同時に1階の4号室104の壁の上にも、2階
の4号室204の床となる型枠Cを組み立て、その中に
もコンクリートを打設する。
After the walls of the fourth room 104 are constructed in the same manner, a formwork A to be a wall for the outer wall of the first room 201 on the second floor is assembled as shown in FIG. Set up. This form A is the first room 10 on the first floor in FIG.
It has been removed to make the wall for the outer wall of No. 1. At the same time, a formwork C to be the floor of the fourth room 204 on the second floor is assembled also on the wall of the fourth room 104 on the first floor, and concrete is poured into the inside.

【0018】以下同様の工法を用いて図8に示すように
2階部分を建造し、さらに図9に示すように3階部分を
建造していけば、この実施形態に係る3階建ての建築物
が完成する。
A second floor is constructed as shown in FIG. 8 and a third floor is further constructed as shown in FIG. 9 by using the same construction method. Things are completed.

【0019】以上本発明の実施形態を説明したが、本発
明は上記実施形態に限定されるものではなく、特許請求
の範囲に記載された技術的思想の範囲内で種々の変形が
可能である。例えば建築する建築物は1,2階建てであ
っても良く、4階建て以上であっても良い。また上記実
施形態では水周り設備10としてバスやトイレが一体化
されたものを示したが、これらは別々に設置するもので
あっても良いことは言うまでもない。
Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and various modifications can be made within the technical idea described in the claims. . For example, the building to be built may be one or two stories or four or more stories. Further, in the above embodiment, the water surrounding equipment 10 is shown as one in which a bath and a toilet are integrated, but it is needless to say that these may be separately installed.

【0020】[0020]

【発明の効果】以上詳細に説明したように本発明によれ
ば以下のような優れた効果を有する。 壁で囲まれた部屋の内部に壁の上側から水周り等の各
種室内設備を挿入して設置するので、クレーンなどを用
いることで容易に重い各種室内設備を設置でき、また各
種室内設備を分解しなくても室内に挿入でき、作業性が
著しく向上し、室内の内装工事期間も短縮できる。また
設置した各種室内設備自体が上の階の床を作るための型
枠を支える型枠支保工の代わりをするので、従来必要で
あった型枠支保工は不要又は少数で良くなり、建築資材
コストの低減化が図れる。
As described in detail above, the present invention has the following excellent effects. Since various indoor facilities such as water surroundings are inserted and installed from the upper side of the wall inside the room surrounded by the wall, it is easy to install various heavy indoor facilities by using a crane and disassemble various indoor facilities It can be inserted into the room without the need, significantly improving workability and shortening the period of interior interior work. In addition, since the installed various indoor facilities themselves replace the formwork support that supports the formwork for making the floor of the upper floor, the formwork support that was required conventionally becomes unnecessary or requires only a small number, and building materials Cost can be reduced.

【0021】1つの部屋の壁を建造した後に、この1
つの部屋の壁を建造するのに用いた型枠を用いて隣の部
屋の壁を建造することを繰り返すことで各部屋の壁を順
次建造していくことができるので、壁等を建造するため
の型枠部材を節約できて建築資材コストの低減化が図れ
る。
After building the wall of one room,
To repeatedly build the walls of the next room using the formwork used to build the walls of one room, the walls of each room can be built sequentially, so to build walls etc. And the cost of building materials can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による建築物の建築工程を示す図であ
り、図1(a)は概略平面図、図1(b)は概略側断面
図である。
FIG. 1 is a view showing a building process of a building according to the present invention, wherein FIG. 1 (a) is a schematic plan view and FIG. 1 (b) is a schematic side sectional view.

【図2】本発明による建築物の建築工程を示す図であ
る。
FIG. 2 is a diagram showing a building process of a building according to the present invention.

【図3】本発明による建築物の建築工程を示す図であ
る。
FIG. 3 is a diagram showing a building process of a building according to the present invention.

【図4】本発明による建築物の建築工程を示す図であ
る。
FIG. 4 is a diagram showing a building process of a building according to the present invention.

【図5】本発明による建築物の建築工程を示す図であ
る。
FIG. 5 is a diagram showing a building process of a building according to the present invention.

【図6】本発明による建築物の建築工程を示す図であ
る。
FIG. 6 is a diagram showing a building process of a building according to the present invention.

【図7】本発明による建築物の建築工程を示す図であ
る。
FIG. 7 is a view showing a building process of a building according to the present invention.

【図8】本発明による建築物の建築工程を示す図であ
る。
FIG. 8 is a diagram showing a building process of a building according to the present invention.

【図9】本発明による建築物の建築工程を示す図であ
る。
FIG. 9 is a view showing a building process of a building according to the present invention.

【図10】従来の鉄筋コンクリート製の建築物の建築工
法の説明図である。
FIG. 10 is an explanatory view of a construction method for a conventional reinforced concrete building.

【符号の説明】[Explanation of symbols]

A 型枠 B 型枠 C 型枠 101〜104 1階の1〜4号室 201〜204 2階の1〜4号室 301〜304 3階の1〜4号室 10 水周り設備(各種室内設備) 11 室内壁(各種室内設備) A formwork B formwork C formwork 101-104 Room 1-4 on the first floor 201-204 Room 1-4 on the second floor 301-304 Room 1-4 on the third floor 10 Water facilities (various indoor facilities) 11 indoors Walls (various indoor equipment)

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 建築物の床と壁を、型枠内にコンクリー
トを打設することで下の階から上の階に向けて順次建築
していく建築物の建築工法において、 下の階の壁を建造した後に、 前記壁で囲まれた下の階の内部に壁の上側から各種室内
設備を挿入して設置し、 その後下の階の壁の上に、上の階の床と壁を建造してい
くことを、建築しようとする建築物の階数分繰り返すこ
とで、建築物全体を建築することを特徴とする建築物の
建築工法。
Claims: 1. In a construction method of a building in which floors and walls of a building are sequentially built from a lower floor to an upper floor by placing concrete in a formwork, After building the wall, insert and install various indoor facilities from the upper side of the wall inside the lower floor surrounded by the wall, and then place the floor and wall of the upper floor on the wall of the lower floor. A building construction method characterized by building the entire building by repeating building for the number of floors of the building to be built.
【請求項2】 各階毎に複数の部屋がある建築物の床と
壁を、型枠内にコンクリートを打設することで下の階か
ら上の階に向けて順次建築していく建築物の建築工法に
おいて、 同一階の1つの部屋の壁を建造した後に、隣の部屋の壁
を建造する工程を繰り返すことで同一階の壁全体を順次
建造していくとともに、 前記壁で仕切られた各部屋の内部に壁の上側から各種室
内設備を挿入して設置し、 前記各種室内設備を設置した部屋の上に上の階の床を建
造し、 さらに床を建造した上の階の各部屋の壁を前記と同様に
建造していくことを、建築しようとする建築物の階数分
繰り返すことで、建築物全体を建築することを特徴とす
る建築物の建築工法。
2. A building in which floors and walls of a building having a plurality of rooms for each floor are sequentially constructed from a lower floor to an upper floor by casting concrete in a formwork. In the construction method, after building the wall of one room on the same floor, by repeating the process of building the wall of the next room, the whole wall on the same floor is sequentially built, and each of the walls partitioned by the wall Various room facilities are inserted and installed from the upper side of the wall inside the room, the floor of the upper floor is built on the room where the various room facilities are installed, and A building construction method for a building characterized by building the entire building by repeating building the walls in the same manner as described above for the number of floors of the building to be built.
【請求項3】 同一階に複数の部屋がある建築物の壁
を、型枠内にコンクリートを打設することで建築する建
築物の建築工法において、 1つの部屋の壁を建造した後に、この1つの部屋の壁を
建造するのに用いた型枠を用いて隣の部屋の壁を建造す
ることを繰り返すことで各部屋の壁を順次建造していく
ことを特徴とする建築物の建築工法。
3. A building construction method for building a wall having a plurality of rooms on the same floor by casting concrete in a formwork, wherein after building a wall of one room, A building construction method for a building characterized by successively building the walls of each room by repeatedly building the walls of the next room using the formwork used to build the walls of one room. .
JP28531399A 1999-10-06 1999-10-06 Building construction method Pending JP2001107565A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28531399A JP2001107565A (en) 1999-10-06 1999-10-06 Building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28531399A JP2001107565A (en) 1999-10-06 1999-10-06 Building construction method

Publications (1)

Publication Number Publication Date
JP2001107565A true JP2001107565A (en) 2001-04-17

Family

ID=17689925

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28531399A Pending JP2001107565A (en) 1999-10-06 1999-10-06 Building construction method

Country Status (1)

Country Link
JP (1) JP2001107565A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100614794B1 (en) 2004-12-21 2006-08-22 박무용 Construction method using skip-floor
WO2014157971A1 (en) * 2013-03-29 2014-10-02 (주)한미글로벌건축사사무소 Method for constructing concrete structure of which one floor is built every two days

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100614794B1 (en) 2004-12-21 2006-08-22 박무용 Construction method using skip-floor
WO2014157971A1 (en) * 2013-03-29 2014-10-02 (주)한미글로벌건축사사무소 Method for constructing concrete structure of which one floor is built every two days

Similar Documents

Publication Publication Date Title
EP1971727A1 (en) Construction of buildings
IL31617A (en) Modular building construction
JP2002004610A (en) Prefabricated bathroom
US5644871A (en) Modular building system
KR20040016371A (en) Construction of high-rise building with large modular units
US8834754B2 (en) Manufacturing process of compact monolithic prismatic modules for construction
US6530553B1 (en) Method and apparatus for making concrete buildings
JP2001107565A (en) Building construction method
JP3190059B2 (en) How to build a building
KR20140046322A (en) Building and fabrication method using the module house
KR102281887B1 (en) Factory manufactured toilet module construction method using the ceiling slab opening of the building
JPH08199820A (en) Method for executing facility unit
WO2003097950A2 (en) In-situ construction of concrete building
KR20020041064A (en) Pc core pre-construction method
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
KR930000808B1 (en) Construction method of a high-rise by slide form
JPH09100627A (en) Construction method of building
JP2000008515A (en) Wall precast concrete panel and its execution method to reinforced concrete skeleton
JPH08184204A (en) Apartment house
JPH0518010A (en) Combining method of unit and panel
IE84811B1 (en) Construction of buildings
JPH09217417A (en) Execution method of middle-high-rise building
JPH07102716A (en) Construction method of precast concrete stair
JPH01290841A (en) Building toilet installing method
WO2001073233A1 (en) Method of constructing a building