IE84811B1 - Construction of buildings - Google Patents
Construction of buildings Download PDFInfo
- Publication number
- IE84811B1 IE84811B1 IE2006/0906A IE20060906A IE84811B1 IE 84811 B1 IE84811 B1 IE 84811B1 IE 2006/0906 A IE2006/0906 A IE 2006/0906A IE 20060906 A IE20060906 A IE 20060906A IE 84811 B1 IE84811 B1 IE 84811B1
- Authority
- IE
- Ireland
- Prior art keywords
- structural
- pod
- floor
- building
- walls
- Prior art date
Links
- 238000010276 construction Methods 0.000 title abstract description 22
- 238000000034 method Methods 0.000 claims abstract description 28
- 238000005253 cladding Methods 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 239000004567 concrete Substances 0.000 claims description 19
- 238000009413 insulation Methods 0.000 claims description 15
- 238000004519 manufacturing process Methods 0.000 claims description 11
- 241001310793 Podium Species 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 4
- 239000011490 mineral wool Substances 0.000 claims description 4
- 238000009428 plumbing Methods 0.000 claims description 4
- 238000005266 casting Methods 0.000 claims description 3
- 238000005192 partition Methods 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 238000007789 sealing Methods 0.000 claims description 2
- 238000000926 separation method Methods 0.000 claims description 2
- 239000002699 waste material Substances 0.000 abstract description 3
- 229910000746 Structural steel Inorganic materials 0.000 description 7
- 238000010586 diagram Methods 0.000 description 7
- 239000011150 reinforced concrete Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229920002635 polyurethane Polymers 0.000 description 2
- 239000004814 polyurethane Substances 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005007 materials handling Methods 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000011495 polyisocyanurate Substances 0.000 description 1
- 229920000582 polyisocyanurate Polymers 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000011376 self-consolidating concrete Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/0069—Charging or discharging for charge maintenance, battery initiation or rejuvenation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
- H02J7/0071—Regulation of charging or discharging current or voltage with a programmable schedule
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/007—Regulation of charging or discharging current or voltage
- H02J7/00711—Regulation of charging or discharging current or voltage with introduction of pulses during the charging process
-
- H02J7/045—
Abstract
ABSTRACT A building is constructed in a method (1) by constructing in a factory a number of pods, transporting them to the site, placing them one atop the other and side-by-side to provide the rooms, and then erecting external cladding and a roof. The pods are complete, with no need for internal work to be performed. Moreover, they prvide the building structure, and so there is no need for any structural work to be done on site other than providing a ground-level floor and a stair or elevator cores. Vertical load is transferred down through load-bearing structural walls (32), primarily through box- section steel vertical studs (61), and also through structural ceiling trusses (33) and structural floors (31). The extent of work done on site is considerably reduced in comparison with conventional construction methods, giving better quality, much reduced construction time, less waste, less distruption to nearby premises or roads or footpaths.
Description
Construction of Buildings INTRODUCTION Field of the Invention The invention relates to construction of buildings.
Prior Art Discussion At present, the most common approach to constructing multi-storey buildings such as apartment blocks is to erect a structural frame of reinforced concrete or structural steel and then construct the walls, both internal and external, on site. The interior work such as second fix electrical and plumbing work is completed towards the end of the project.
In recent years there has been a trend towards using modules or “pods” for particular rooms, particularly bathrooms and kitchens. This development has reduced the extent of finishing work performed on site, such as second fix plumbing and electrical fittings, tiling, and floor covering. However, considerable care must be taken to ensure co-ordination of the building frame on site and the pods in the factory so that the pods fit in as desired. Any ‘error in construction of the frame in terms of physical dimensions of the supporting floor or external walls or in terms of provision of utility supplies matching those of the pods can be very difficult to rectify.
US4,l07,886 describes a construction method in which building modules are formed into a building by placing a layer of modules with one side wall of each module adjacent but spaced apart from one side wall of a different module. Concrete is poured into the space between the side walls to fonn a supporting column which is reinforced by bar girders extending out from the side walls. For multi-storey construction, a shoulder or saddle is formed on top of the supporting column for supporting modules to be placed directly above. While this method appears to speed up building construction, there is still considerable on-site work required.
US4,050,2l 5 describes a modular construction method for a multi—storey building. U- shaped reinforced concrete modules are placed one atop the other to build up the building height, and at the top level there is a layer of modules having both floors and ceilings. These modules are used to provide the building frame and the remaining construction work is then performed.
EP0544609 describes a modular construction method, but gives very little detail about how this is achieved. It appears that a concrete mould is made and the module is then unmoulded.
The invention is directed towards providing for greater efficiency in construction of 1nulti—storey buildings, both in terms of labour required and/or materials required.
Another object is to provide a more consistent achievement of building quality. A still further object is to achieve better control of a project, with better predictability of dates for completion of activities. Another object is to reduce the extent of time and materials handling on site. A further object is to reduce construction materials waste.
SUMMARY OF THE INVENTION According to the invention, there is provided a building pod comprising: a structural floor, structural walls secured to the structural floor, and a structural ceilin g spanning the structural walls, wherein the structural floor, walls, and ceiling have sufficient load-bearing strength to support at least one other pod; wherein the structural walls each comprise a structural metal frame of structural members including box-section steel structural members, and the structural members include vertical load-bearing studs; wherein the structural ceiling comprises a plurality of vertical trusses interconnecting and spanning opposed structural walls; and wherein the interior is finished to finished room specifications with plumbing. electrical services, and fitted furniture.
In one embodiment, the structural floor comprises concrete cast in a structural frame.
In another embodiment, the floor structural frame comprises edge structural members having top horizontal flanges.
In a further embodiment, the structural walls are secured to the top flanges.
In one embodiment, the structural walls are secured by bolting to the top flanges.
In another embodiment, the edge structural members have a C-shape in cross section, comprising the top flange, a vertical web providing an edge surface of the floor, and a bottom horizontal flange.
In a further embodiment, the structural floor comprises reinforcing bar and meshes within the concrete.
In another embodiment, the trusses each comprise at least two horizontal structural members interconnected by vertical studs.
In a further embodiment, the structural members and studs of the vertical trusses are of box—section steel.
In one embodiment, each ceiling truss comprises a horizontal bearing plate overlying a wall plate of a structural wall, and a vertical plate in contact with a structural wall and to which the horizontal structural members are Connected.
In another embodiment, the bearing plate overlies a vertical stud of the structural wall.
In a further embodiment, the walls comprise non-combustible board cladding on both sides, with insulation such as mineral wool between the claddings.
In another embodiment, the building pod further comprises internal partition walls defining a plurality of rooms within the pod.
In a further embodiment, the building pod further comprises a balcony secured to the structural floor.
In another aspect, there is provided a method of manufacturing any pod as defined above, the method comprising the steps of placing a floor frame on a platform and casting concrete into the frame to provide the structural floor, and securing the structural walls or structural frames of the walls to the structural floon securing a structural ceiling frame to the structural walls to span and interconnect the structural wall frames, constructing the interior of the pod to substantially complete the structural walls and ceiling to complete a room or rooms with in the pod, and sealing the pod for transport and handling on site.
In one embodiment, the method comprises the steps of moving the platform from one work position to the next with successive steps being performed to erect the walls and the ceiling.
In another embodiment, the platform is moved on rollers.
In a further embodiment, the pod is lifted for transport by lifting it from lifting points on the floor.
In one embodiment, lifting rods are secured to the floor frame and extend to a height greater than the walls, and the pod is lifted by engagement of lifting tackle with the lifting rods.
In another embodiment, the rods extend upwardly from edge members of the structural floor frame and through the structural walls.
In a further embodiment, the rods engage in sockets between flanges of floor edge structural members.
In one embodiment, the platform is coated with oil to allow easy separation of the floor concrete from the platform.
In another embodiment, the structural ceiling is manufactured by placing a number of vertical trusses horizontally across a jig, securing internal cladding to the trusses, and lifting and flipping over the ceiling so that it spans the structural walls.
In another aspect, there is provided a method of constructing a building comprising the steps of: manufacturing a plurality of pods in any method as defined above, transporting the pods to a site where a podium structure or basement has been poured, and lifting and placing the pods to provide a multi-storey self- supporting arrangement of the pods, with at least some pods atop lower pods and being supported by said lower pods, erecting an outer wall leaf tied to exposed pod walls, erecting a building roof over the pods, and commissioning services to the pods.
In one embodiment, the pods are placed with structural walls aligned so that vertical load is transferred down through the pod structural walls.
In another embodiment, the method comprises the further step of erecting a stair or elevator core on site over the podium structure, and some pods are placed to butt against the core.
In a further embodiment, the method comprises the further step of embedding a metal plate in a wall of the core, and the floor of a pod butts against said embedded plate.
In one embodiment, an interface structural member is mounted between the floor and the embedded core plate.
In another embodiment, the interface structural member has a vertical flange welded to the core plate and a horizontal flange welded to the pod floor.
DETAILED DESCRIPTIO OF THE INVENTION Brief Description of the Drawings The invention will be more clearly understood from the following description of some embodiments thereof, given by way of example only with reference to the accompanying drawings in which:- Fig. l is a flow diagram indicating the major steps of a method of the invention for constructing a multi-storey building; Fig. 2 is a vertical cross—sectional view through part of a floor, a full wall, and part of a ceiling of a pod; Fig. 3 is a perspective view from above of the structural frameworks of pods where they are placed one above the other and side-by-side, details such as cladding and insulation being omitted for clarity; Fig. 4 is a diagram showing how a floor of a pod is manufactured, and Figs. (a) and 5(b) are diagrams showing how lifting rods are inserted for lifting of a pod; Fig. 6 is a vertical section at floor level of two adjoining pods, showing how they are placed on pods underneath; Fig. 7 is a cross-sectional plan view showing interconnection of pods at a corner; Fig. 8 is a vertical section showing how a pod fits atop another pod at an external wall; Fig. 9 is a plan section showing construction of a window in a pod wall; Figs 10 and 11 are a perspective view and a cross-sectional elevation respectively of a balcony of a pod; Fig. 12 is a cross-sectional elevation of a parapet of a pod; and Fig. 13 is a cross-sectional elevation showing connection of a pod floor to a stair core.
Description of the Embodiments Referring to Fig. 1 a building is constructed in a method 1 by constructing in a factory a number of modules (or “pods”), transporting them to the site, placing them one atop the other and side-by-side to provide the rooms, and then erecting external cladding and a roof. The pods are complete, with no need for internal work to be performed.
Moreover, they provide the building structure, and so there is no need for any structural work to be done on site other than providing a ground-level floor. The extent of work done on site is considerably reduced in comparison with conventional construction methods.
In summary, the following are the steps for constructing a building: Fabrication of a structural floor framework in a factory, using C-section structural steel around the edges and re—bar meshes inside.
Pouring self-levelling self-compacting concrete into the framework so that it is flush with the upper surfaces of the structural frame, to complete a structural floor.
Wall panels are separately manufactured by fabricating structural steel frames according to the building specification, inserting services and insulation, and securing board to the internal and external surfaces.
Placing the wall panels by crane onto the floor, one at each edge, and bolting each wall in place onto the floor framework.
Lifting rods are screwed into sockets in the structural frame at the edges of the floor so that they extend vertically at spaced-apart locations around the periphery of the frame. The lifting rods extend through the wall panels, passing through apertures in the wall panel frame. , 16, Structural steel vertical trusses for the ceiling are placed on a jig and board is secured in the upper plane using self-drilling and tapping screws.
The interconnected trusses are rotated by crane and placed over the wall panels, with bearing plates of the ceiling trusses resting on the wall panels, and then welded in place. The ceiling truss bearing plates are directly over wall panel vertical structural studs.
The interior of the pod is finished in the manner of a conventional pod, with all services, fitted furniture, sanitary ware, tiling, windows, doors, and painting.
The pod is then sealed and no further interior work will be required until final inspection of the building. Because all of the interior work is done in the factory there is excellent quality control and little waste. This completes the factory work.
After covering with rain—proof GRP sheeting over the ceiling the pod is lifted into position on a lorry with a crane lifting tackle engaging the lifting rods, and so the pod is lifted from the floor.
In parallel with the above factory work, on-site, a podium structure or basement is poured to provide a base for the building, and underground building services are incorporated according to the plans. Also a stair core and/or an elevator core is erected by casting re—enforced concrete.
When the site is ready, the pods are lifted into position with some side-by-side with opes in alignment, and the pods are placed one atop the other so that vertical load is applied down through the wall panels and floor frames of the pods. Pods adjoining the stair or elevator core are butt-jointed to the core. The pods are lifted from the bottom, as described in more detail below, thus avoiding distortion of the pods during lifting. The utility services protruding from the sealed pods are hooked up to the main building services, or alternatively this is left until final commissioning of building services in step 23. There is no need for construction of support structures above ground level, the pods themselves being se1f—supporting.
Finally, external cladding is secured to the external wall pod wall panels and a roof is constructed over the top-most pods.
, The building services are commissioned.
The method is now described in more detail with reference to Figs. 2 to 13 inclusive.
Referring to Figs. 2 and 3 an individual pod 30 is shown. The main components are a structural floor 31, structural walls 32, and a structural ceiling 33.
The floor 31 comprises C-section edge frame structural members 35, poured concrete 36 with enmeshed re-bars 37 moulded in situ within the frame, and bolt fasteners 40 securing wall panels 32 to the floor 31.
The wall panels 32, each comprise a structural steel frame cladded on the outside by non-combustible board 45 and on the inside by board 46 and plasterboard 47. The frame comprises a wall plate 60 of angle—section steel, a bottom angle-section 62, and vertical box-section studs 61 at typically 600mm spacings.
The structural ceiling 33 comprises multiple vertical trusses 33(a), each having upper and lower horizontal box—section members 50 and vertical box-section steel studs 51 at 300 mm spacings, a bearing plate 52 resting on top of the wall panel 32, and a vertical plate 53 to which the horizontal members 50 and the bearing plate 52 are welded.
The structural aspects of the pod are shown most clearly in Fig. 3, the non-structural items being omitted for clarity. The ceiling vertical trusses 33(a) terminate at both ends with the vertical plate 53 to which the bearing plates 52 are welded, and this diagram shows how the bearing plates 52 are carefully positioned on the wall panel angle—section wall plate 60 at locations directly over the box-section vertical studs 61.
Thus the vertical loading is transferred primarily down through successive bearing plates and wall panel vertical studs 61. Because of the structural interconnection of the vertical studs 61 and their close spacing (600 mm) the load is evenly distributed across the studs. This diagram also shows the bottom angle-section members 62 of the wall panels to which the vertical studs 61 are welded. All structural steel is surface treated for corrosion resistance. Fig. 3 also shows a corner vertical stud 70 welded to adjoining vertical studs 61. It also shows an interface plate 71 interconnecting four pods at their corners.
The walls illustrated are the external walls of the pod. and these are structural. The pod may contain a number of rooms defined by internal non-structural walls. Indeed, a pod may be a complete apartment or a combined hotel room or suite with integrated bathroom.
Manufacture of a floor 31 is shown in more detail in Figs. 4, 5(a) and 5(b). In the factory, a platform 80 is movable along a production line on rollers 81. It has a flat planar upper surface and the rollers 81 are carefully positioned so that the top surface of the platform is perfectly horizontal. A film of oil is deposited on the platform top surface. The fabricated floor frame with the edge members 35 is placed by crane onto the platform (or alternatively the floor frame may be fabricated in situ on the platform 80). Re—bar and steel meshes (shown generally as 37) are placed into the frame between the members 35, spacers (not shown) being used to provide a gap between them and the platform surface. Concrete with a low viscosity is poured into the mould formed by the edge frame members 35 until it is flush with the top surfaces of them.
As shown in Figs. 5(a) and (b) sockets 85 are welded into the edge frame members 35 at a mutual spacing chosen according to the estimated final weight of the pod. Lifting rods 87 are subsequently screwed into the sockets 85 at threaded rod ends 86. The lifting rods 87 also have threaded upper ends 88 for subsequent engagement with lifting tackle of a crane.
After the wall panels 32 are positioned on the structural floor 31 the lifting rods are threaded through the wall panel (there are apertures in the wall plate member 60 and the bottom member 62 to accommodate the rods) to engage into the sockets 85 within the floor frame. Connection of the wall panels to the floor and of the ceiling trusses 33 to the wall panels is shown most clearly in Fig. 3.As all of this work is done in the factory, overhead gantry cranes are used for lifting and placing the wall panels and ceiling assemblies. This lends itself to a large degree of automation and allows accurate placement of the various assemblies.
Fig. 6 shows details of how two pairs of pods are placed alongside each other and atop each other. The wall panels 32 have mineral wool insulation 105. It is clear from this drawing how vertical loads are transferred, directly down via the wall panels 32, the edge floor members 35 and the reinforced concrete of the floor adjacent the members A plan section is show in Fig. 7, in which insulation 11] is visible between pods for preventing fire spread and flanking sound transmission. There is a layer of insulation 110 directly on the outside of the extenral pod wall panels 32. This is applied on site or in the factory. An external stone cladding 112 is tied to the external pod walls. This diagram also shows the vertical angle-section structural member 70 interconnecting adjoining wall panels, vertical strips 116 of non-combustible board within the wall panels, a breathable membrane 115 on the outer surface of the insulation 110, and vertical timber battens 114 between polyis0cyanurate/ polyurethane insulation 110 and the fire insulation 111.
Fig. 8 also shows how one pod is placed above another at an external wall. In this case, there is a stone cladding 130 tied to the pod external wall structural frame by ties 131. There is a layer 125 of polyiso/polyurethane insulation on the outside of the pod external walls, which is retained by wood battens 135. This diagram also shows mineral wool cavity barriers 136 and 137 separated by a stone support bracket 139.
An example of pod construction at a window is shown in Fig. 9. In this case the pod external wall has a layer 150 of insulation applied in the factory, and cladding 155 is tied in place over this on site. The window comprises a conventional window 140 secured in place offset from the wall panel by treated timber battens 157. This drawing also shows a high-density insulation packer piece 156, and an end vertical strip of board 158 forming an internal window reveal.
A pod may be provided with a balcony, again manufactured off-sitc as an integral part of manufacturing a pod. Refening to Figs 10 and 11 a balcony assembly 200 is secured to an edge floor member 35 via an interface 201 having vertical connector plates 202. The balcony assembly 200 comprises a vertical connector plate 210, horizontal I-beams 211, horizontal angle beams 212, and a peripheral C—shaped member 215 with the flanges extending outwardly. This illustrates versatility of the construction method, and the avoidance of on-site work.
Referring to Fig. 12, a parapet 250 comprises a reinforced concrete slab 260 supporting a vertical parapet having a steel frame 255, inner slab panels 256, external stone cladding 257, and a hand-rail 252.
Referring to Fig. 13, a corridor floor 265 is simply an integral extension of a pod structural floor. It is supported by a pod 30 underneath, and it supports a wall 32. The floor 265 abuts a stair core 270, which was previously cast on site. The stair core comprises cast concrete 271 with embedded re-bars 272, and a side butting plate 278 cast into the side of the concrete 271. An angle-section member 275 is welded to the edge frame member 35 of the floor 265, and is in turn welded to the embedded plate . Concrete 276 is cast into the gap between the members 35 and 275.
This detail together with the pod-to-pod connections enable excellent lateral stability of the building to be provided. The stiff structural floors of the pods span as deep plates between the stair and elevator cores under lateral loads.
In the final building the cast concrete floors provide not only considerable structural strength but also fire and sound insulation. In some embodiments the concrete floor is covered by a soft covering matting, which reduces sound from impacts on the floor.
Also, the floors 3 provide an excellent foundation for the wall panels. The structural continuity through the wall panels (particularly the vertical studs), the bearing plates 52, and the floor C-section frame members 35 provide sufficient load-bearing strength to allow up to at least 10 pods to be placed one atop the other for a ten storey building.
Because of the structural aspects, the work on site is dramatically reduced as compared to traditional construction methods. Figs. 7 to 9 for example illustrate how simple it is to finish an external cladding of the building, with excellent insulation being provided for the external pods. Construction of the cladding is not required to provide building structural support and so a wide Variety of types of materials can be used at the choice of the architect. Figs. 11 and 12 further demonstrate the versatility, as a parapet or balcony can be manufactured off-site, with the option of connecting the balcony to the relevant pod off site or on site if desired.
The invention therefore achieves the benefit of factory-production of individual rooms or groups of rooms with completely finished interiors, on a much greater scale than heretofore. Here is also a dramatic reduction in the extent of work required on site because the pods are structural and so there is no need for supporting structures to be built on site other than the ground-level floor and a stair and/or elevator core. Also, there is a large reduction in the extent of building materials required, as manufacture is largely off site in the much more controlled environment of a factory. Because of the extent of work done off site, there is better quality control, less snagging work, and much more control of costs of construction.. Further, there is a dramatic reduction in time for construction on site, which is particularly advantageous where access to the site is restricted and there is disruption to adjacent premises, roads, or footpaths.
It will be appreciated that the invention overcomes the perception that one can not provide simultaneously both structural frames and room finishing work. Heretofore the approach had been to attempt modularity in terms of “drop—in” pods such as bathrooms, or pre-cast structural steel or formwork pods — not both together.
The invention is not limited to the embodiments described but may be varied in construction and detail.
Claims (4)
1.A building pod comprising: a structural floor, structural walls secured to the structural floor, and a structural ceiling spanning the structural walls, wherein the structural floor, walls, and ceiling have sufficient load-bearing strength to support at least one other pod; wherein the structural walls each comprise a structural metal frame of structural members including box-section steel structural members, and the structural members include vertical load-bearing studs; wherein the structural ceiling comprises a plurality of vertical trusses interconnecting and spanning opposed structural walls; and wherein the interior is finished to finished room specifications with plumbing. electrical services, and fitted furniture. A building pod as claimed in claim 1, wherein the structural floor comprises concrete cast in a structural frame. A building pod as claimed in claim 2, wherein the floor structural frame comprises edge structural members having top horizontal flanges. A building pod as claimed in claim 3, wherein the structural walls are secured to the top flanges. A building pod as claimed in claim 4, wherein the structural walls are secured by bolting to the top flanges. A building pod as claimed in any of claims 3 to 5, wherein the edge structural members have a C-shape in cross section, comprising the top flange, a vertical web providing an edge surface of the floor, and a bottom horizontal flange. A building pod as claimed in any of claims 2 to 6, wherein the structural floor comprises reinforcing bars and meshes within the concrete. A building pod as claimed in any preceding claim, wherein the trusses each comprise at least two horizontal structural members interconnected by vertical studs. A building pod as claimed in claim 8, wherein the structural members and studs of the vertical trusses are of box-section steel. A building pod as claimed in claims 8 or 9, wherein each ceiling truss Comprises a horizontal bearing plate overlying a wall plate of a structural wall, and a vertical plate in contact with a structural wall and to which the horizontal structural members are connected. A building pod as claimed in claim 10, wherein the bearing plate overlies a vertical stud of the structural wall. A building pod as claimed in any preceding claim, wherein the walls comprise non-combustible board cladding on both sides, with insulation such as mineral wool between the claddings. A building pod as claimed in any preceding claim, further comprising internal partition walls defining a plurality of rooms within the pod. 14. 15. 16. 17. 18. 19. A building pod as claimed in any preceding claim, fiirther comprising a balcony secured to the structural floor. A method of manufacturing a pod as claimed in any preceding claim, the method comprising the steps of placing a floor frame on a platform and casting concrete into the frame to provide the structural floor, and securing the structural walls or structural frames of the walls to the structural floon securing a structural ceiling frame to the structural walls to span and interconnect the structural wall frames, constructing the interior of the pod to substantially complete the structural walls and ceiling to complete a room or rooms with in the pod, and sealing the pod for transport and handling on site. A method as claimed in claim 15, comprising the steps of moving the platform from one work position to the next with successive steps being performed to erect the walls and the ceiling. A method as claimed in claim 16, wherein the platform is moved on rollers. A method as claimed in any of claims 15 to 17, wherein the pod is lifted for transport by lifting it from lifting points on the floor. A method as claimed in claim 18, wherein lifting rods are secured to the floor frame and extend to a height greater than the walls, and the pod is lifted by engagement of lifting tackle with the lifting rods. 20. l\) l\) 23. 24. 25. A method as claimed in claim 19, wherein the rods extend upwardly from edge members of the structural floor frame and through the structural walls. A method as claimed in claim 20, wherein the rods engage in sockets between flanges of floor edge structural members. A method as claimed in any of claims 15 to 21, wherein the platform is coated with oil to allow easy separation of the floor concrete from the platform. A method as claimed in any of claims 15 to 22, wherein the structural ceiling is manufactured by placing a number of vertical trusses horizontally across a jig, securing internal cladding to the trusses, and lifting and flipping over the ceiling so that it spans the structural walls. A method of constructing a building comprising the steps of: manufacturing a plurality of pods in a method as claimed in any of claims 15 to 23, transporting the pods to a site where a podium structure or basement has been poured, and lifting and placing the pods to provide a mu1ti—storey self- supporting arrangement of the pods, with at least some pods atop lower pods and being supported by said lower pods, erecting an outer wall leaf tied to exposed pod walls, erecting a building roof over the pods, and commissioning services to the pods. A method as claimed in claim 24, wherein the pods are placed with structural walls aligned so that vertical load is transferred down through the pod structural walls. 26. 30. 31. A method as claimed in claims 24 or 25, comprising the further step of erecting a stair or elevator core on site over the podium structure, and some pods are placed to butt against the core. A method as claimed in claim 26, comprising the further step of embedding a metal plate in a wall of the core, and the floor of a pod butts against said embedded plate. A method as claimed in claim 27, wherein an interface structural member is mounted between the floor and the embedded core plate. A method as claimed in claim 28, wherein the interface structural member has a vertical flange welded to the core plate and a horizontal flange welded to the pod floor. A building pod substantially as described with reference to the accompanying drawings. A method of manufacturing a building pod substantially as described with reference to the accompanying drawings. A method of constructing a building substantially as described with reference to the accompanying drawings. 84811 1/12 1 Fabricate floor framework / 10—/‘ 12 W 11 , Fabricate k Pour Concrete Wall Panels l A_ Drop Wall Panels and Secure Jixz 13 L Connect Lifting Rods L...’ 14 ll 15 1" Mount Ceiling Sub—frames on Jig V Apply 16 Plasterboard V 17 Liz Rotate and Drop Onto 20 Wall Panels 1 Pour Building F, , h I‘t _ 13 Podium ms 11 error Lg Structure On- l site 19 Lift at Rods onto Lorry J’’// 1 ___/ 21 Lift into Position & ' Interconnect 22 . / Complete External Cladding & Roof 1 Commission Building Services Fig.1 84811 \
2. \/ 47 84811 84811 «Q; \E O C O O O O O _ _ x X \ \F/ J
3..HII|lIl..L.:HIIIIIIII|h,II«MIIlIIIM(..IIIIIIHIL,/..% lHHHHHH.HHHHHHWHHHHHHHHHHEJ ow L..lI.I.|zm.|||||dJ.l||||I:||||.I: w.fl|||.|ml.. | | I | J I I I I I I 1 | IIL. 1 _Fr I I I r a : I Ink : I : : : l \ I : I l|\ ....1:1\:1.:1u§ 1 1 L : I : 1 I 1 r 1 :1L_ mm r mm \\\\% a/»m‘\\\\ mm EH9; only $59; _ _ _ ) _ _ 3 _ mm. 2 1 _ M J a _ _ _ _ _ mm _ _ _ _ _ _ ww \\\‘I: ////B _ \\ .5 - g - , , , fl , \\\\\lI1i//I 8\\\\ c z 5/12 84811 Fig.6 84811 mi 6/‘I2 n\ .\ .l\mS . J \ § § \ u S s : . § : \\\\I\\\\\\ n\\\.\\\\\\\‘ 1 \\\\\\\\\\\\\\\\\\\\\\\ D \\\~\\\\\\\\\\\\\\\ § § 5\ S V 2 >8: 36 7/12 \\ \\\ _lL‘J \ // /// /// % L / 33 4 %%%%%%%%%%% W 105»/"’M / /k/I / \‘I \ \\\\5X '\H\\\‘ —— 139 84811 8/12 \\ \ mm.//////x om.///// \\ \ \ \\ \\ \ \\ \\\ \ /\ \ \\ \\ \\ \ mam O9 2 \ 1 , I 1 1 1 1 I I I 1 1 1 | . | I | 1 I . I 1 |1 1 \ \\\_\\ \\ %§§%§%»_ mo, \. mm 84811 9/12 Fig.10 84811 10/12 215 /211 Fig.11 210 \ \ ‘ ‘ \ \ \ \ xx \ 42 35 84811 11/12 252 250 257 fig mm U T .w / /7 /////// . ...../... / / /...: ...? ...‘ ... . ... ... . .Iq1I.J..)::_|1....J .... ..f_|r.L.¢./._\.—A
4.—..»<_E . ._// / O0 .00. O0 O0 O0 O0 6 5 2 255 l_l|_I‘|_ll_J|_.l|_JLL| . I %% ,_._ 260
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IE2006/0906A IE84811B1 (en) | 2006-12-13 | Construction of buildings |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IEIRELAND12/01/20062006/0016 | |||
IE20060016 | 2006-01-12 | ||
IE20060126 | 2006-02-21 | ||
IE2006/0906A IE84811B1 (en) | 2006-12-13 | Construction of buildings |
Publications (2)
Publication Number | Publication Date |
---|---|
IE20060906A1 IE20060906A1 (en) | 2007-09-05 |
IE84811B1 true IE84811B1 (en) | 2008-02-06 |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1971727B1 (en) | Construction of buildings | |
US3751864A (en) | Interstitial space frame system | |
US5867964A (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
CN109072604B (en) | Method for constructing multi-storey building using stacked structural steel wall truss | |
US6651393B2 (en) | Construction system for manufactured housing units | |
EP1992750A1 (en) | Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling | |
US5737895A (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
US4136492A (en) | Industrialized building construction | |
US7421828B2 (en) | Integral forming technology, a method of constructing steel reinforced concrete structures | |
WO1997022770A9 (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
CN108005410B (en) | Assembled steel-concrete combined structure residential system and construction method thereof | |
KR101389203B1 (en) | Method for constructing residential building using precast concrete and modular unit | |
KR20040016371A (en) | Construction of high-rise building with large modular units | |
CN117403934A (en) | Novel assembled concrete structure system for low-rise residence | |
KR101204767B1 (en) | Structural System for One-Room Type Multi-Story Building | |
EP2738316A1 (en) | Modular construction system | |
IE84811B1 (en) | Construction of buildings | |
RU218225U1 (en) | Volumetric reinforced concrete block for housing construction with flexible housing | |
US20210071409A1 (en) | High-rise self-supporting formwork building system | |
AU2003269072A1 (en) | In-situ construction of concrete building | |
JP3190059B2 (en) | How to build a building | |
AU713617C (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
JPH08184204A (en) | Apartment house | |
CN118056956A (en) | Modular building and method of constructing the same | |
CZ16786U1 (en) | Modular house |