KR20020041064A - Pc core pre-construction method - Google Patents

Pc core pre-construction method Download PDF

Info

Publication number
KR20020041064A
KR20020041064A KR1020000070808A KR20000070808A KR20020041064A KR 20020041064 A KR20020041064 A KR 20020041064A KR 1020000070808 A KR1020000070808 A KR 1020000070808A KR 20000070808 A KR20000070808 A KR 20000070808A KR 20020041064 A KR20020041064 A KR 20020041064A
Authority
KR
South Korea
Prior art keywords
construction
building
panel
core
slab
Prior art date
Application number
KR1020000070808A
Other languages
Korean (ko)
Inventor
김희
이진섭
고동일
Original Assignee
김희, 이방주
현대피씨엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김희, 이방주, 현대피씨엔지니어링 주식회사 filed Critical 김희, 이방주
Priority to KR1020000070808A priority Critical patent/KR20020041064A/en
Publication of KR20020041064A publication Critical patent/KR20020041064A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE: A construction method of a building by pre-assembling the core of a building with a PC panel is provided to reduce construction expenses by shortening the period of construction and to obtain a high-quality structure. CONSTITUTION: The construction method of a building by pre-assembling the core of a building with a PC panel comprises the steps of pitting the appropriate ground, constructing core parts(11) formed into a stairs room(12), an elevator room(13) or a washroom to a PC panel(15) for a wall, a PC panel(16) for a slab and a PC panel for stairs, and constructing a slab(22) or a wall of a building except the core parts(11) with an RC method.

Description

피씨판넬로 건축물의 코아를 선조립 시공하는 건축물의 시공방법{Pc core pre-construction method}Construction method of building that pre-assembles core of building with PC panel {Pc core pre-construction method}

본 발명은 주거용 건물인 아파트나 비주거용 건물인 오피스빌딩과 같은 고층건물의 시공방법에 관한 것으로, 특히, 코아부분을 조립식 PC판넬을 사용하여 다른 슬라브 보다 3-5층 먼저 시공토록 하는 건축물의 시공방법에 관한 것이다.The present invention relates to a construction method of high-rise buildings, such as apartments for residential buildings or office buildings that are non-residential buildings, and in particular, a method for constructing a building in which the core portion is constructed 3-5 floors earlier than other slabs using a prefabricated PC panel. It is about.

아파트나 오피스빌딩과 같은 고층건물의 시공에 있어서는 맨 먼저 터파기 공사를 한 후, 이에 토대를 구축한 다음, 지하층으로부터 한층 한층 거푸집을 설치하고, 이에 철근을 배근한 다음, 콘크리트를 부어 굳힌 후, 거푸집을 제거하고, 그 상층에 또다시 거푸집 설치하는 동일한 작업을 통해 지하의 맨 저층으로부터 지상의 맨 꼭대기층까지 한층 한층 건물의 뼈대에 해당하는 철근 콘크리트 구조물을 구축하여 건물을 시공하는 것을 볼 수 있다.In the construction of high-rise buildings such as apartments and office buildings, the first step is to dig, then build a foundation, then install a formwork from the basement, reinforce the reinforcement, pour concrete, By removing the formwork and installing the formwork on the upper floor again, we can see the construction of the reinforced concrete structure corresponding to the skeleton of the building from the bottom of the basement to the top floor of the ground. .

한편, 오피스빌딩과 같은 상업용 건물은 대개 건축물의 중앙부에 계단실, 화장실, 엘리베이터실 등의 용도를 가지는 구획부를 갖게 되며, 아프트 등과 같은 고층 주거용 건물의 중심부에는 계단실, 엘리베이터실 등의 비주거공간을 갖게 되는 것을 볼 수 있는데 이러한 중앙 구획부를 주로 코아(core)라고 호칭하는 것이 보통이다.On the other hand, commercial buildings such as office buildings usually have compartments in the center of the building, such as staircases, toilets, elevators, etc., and non-residential spaces such as stairs and elevators in the center of high-rise residential buildings such as apartments. It can be seen that these central compartments are usually called cores.

즉, 좌우호실이 마주보는 계단식 아파트의 사이나 복도를 갖는 복도식 아파트에 있어서는 아파트 중심에 엘리베이터나 계단이 설치되는 것을 볼 수 있으며, 이를 통상 코아(core)라고 호칭하게 된다.That is, in a corridor-type apartment having a corridor or a corridor between facing apartments, it is seen that an elevator or a staircase is installed at the center of the apartment, which is commonly referred to as a core.

본 발명은 오피스빌딩의 계단실, 화장실, 엘리베이터가 설치되는 코아 부분이나 아파트의 계단, 엘리베이터가 설치되는 공간부인 코아부를 조립 PC판넬로 이를 구성토록 하며, 건물을 수평으로 일정하게 한층 한층 순차적으로 시공하는 것이 아니라 코아부분을 3-5층 조립식 PC판넬로 먼저 시공하여 코아부분을 구축한 후, 이에 RC공법이나 PC판넬 공법을 이용하여 슬라브를 연결 구축하여 건물을 시공토록 하는 건물 시공방법을 제공토록 하는 것이다.The present invention is to construct a core part of the core part of the office building staircase, toilets, elevators are installed or the core part of the stairs of the apartment, the space in which the elevator is installed as an assembled PC panel, and the construction of the building to be sequentially and evenly sequentially Instead of constructing the core part by constructing the core part with 3-5-layer prefabricated PC panel, connect the slab by using RC method or PC panel method to provide the building construction method. will be.

유럽등지에 있어서는 건물의 중앙부에 위치하는 코아를 슬라이딩폼(Sliding form)을 이용하여 철근 콘크리트 구조물을 주변의 구조부보다 먼저 시공한 후에 코아를 지지체로 하여 주변의 구조부를 최하층에서부터 순차적으로 상부로 공사를 진행하여 최상층까지 도달하는 건축물을 시공하는 공법 즉, 슬라이딩폼을 이용하여 코아를 선구축하고, 이를 지지체로 하여 슬라브를 연결하는 시공방법이 사용되고 있음을 볼 수 있다.In Europe, the core located in the center of the building is constructed by using a sliding form to reinforce concrete structures before the surrounding structures, and then the surrounding structures are sequentially constructed from the lowest floor to the top with the core as a support. It can be seen that a construction method for constructing a building reaching the uppermost floor, that is, a construction method for constructing a core using a sliding foam and connecting the slabs with the support as a support is used.

이와 같이 슬라이딩폼을 이용한 선시공된 코아를 이용한 고층 건축물의 시공방법은 건축물이 설치될 부분에 터파기를 하고 건축물의 기초부를 완성한 후, 그 기초부위의 소정위치에 코아부를 맨 저층에서 맨 상층까지 슬라이딩폼 등을 이용하여 코아를 선시공하여 구축하고, 구축된 코아부에 맨 저층에서 맨 상층까지 철재기둥, 철재보 등으로 철골골조부를 시공한 후에 맨 저층에서 시작하여 맨 상층까지순차적으로 콘크리트 슬라브를 타설하여 고층 건축물을 구축 완성토록 하는 것을 볼 수 있다.In this way, the construction method of high-rise buildings using pre-coated cores using sliding foam is to dig in the part where the building is to be installed, complete the foundation part of the building, and then slide the core part from the lowest floor to the top floor at a predetermined position of the foundation part. The core is pre-constructed using the back, and the steel frame is constructed with steel pillars, steel beams, etc. from the bottom to the top of the constructed core part, and then the concrete slabs are poured sequentially from the bottom to the top. We can see building high-rise building completion.

이와 같이 선시공된 코아를 이용한 고층건축물의 시공방법은 슬라이딩 폼을 이용하여 선시공된 코아를 기타 건물의 구조물에 대한 지지구조체로 이용함으로써 전체적인 건축공사의 진행이 원활하게 진행될 뿐아니라 일반적으로 복잡한 계단실, 화장실, 엘리베이터실 등의 내부에 설치되는 복잡한 시설물 등의 설치공사를 미리 진행할 수 있으므로 말미암아 전체적으로 건물의 건축공사 기간을 단축하는 장점을 갖는 것을 볼 수 있다.In the construction method of high-rise buildings using pre-installed cores, the pre-built cores using sliding foams are used as supporting structures for the structures of other buildings. Since the installation work of the complex facilities, etc. installed inside the elevator room can be carried out in advance, it can be seen that it has the advantage of shortening the building construction period of the building as a whole.

그러나, 이와 같이 슬라이딩폼을 이용하여 코아를 선시공하는 고층건축물은 코아를 제외한 기타의 골조부나 철근 콘크리트의 구축은 맨 저층에서부터 상부로 순차적으로 진행토록 하므로 말미암아 하층의 공사가 완료되지 못하면, 그 상층의 공사가 진행되지 못하는 단점을 갖게 되므로 슬라이딩폼 내측에 매립하는 콘크리트가 양생될때까지 기다려야 하는 이유로 인하여 건축공사 기간을 획기적으로 단축시키는데 한계점을 갖게 됨을 볼 수 있다.However, high-rise buildings that use cores for sliding construction, such as the construction of other frameworks and reinforced concrete, except cores, proceed sequentially from the lowest floor to the upper part, so if the construction of the lower floor is not completed, Since construction has a disadvantage that cannot proceed, it can be seen that there is a limit to significantly shortening the construction period due to the reason for waiting until the concrete buried inside the sliding foam is cured.

이와 같은 것을 종래 슬라이딩폼에 의한 선시공 코아구축 건축시공방법보다도 공사기간을 획기적으로 단축할 수 있는 방법을 제공토록 하기 위하여 본 발명이 안출된 것으로, 본 발명은 건물의 중심에 위치하는 엘리베이터실, 계단실, 화장실 등의 코아부분을 슬라이딩폼이나 현장 타설 콘크리트 거푸집에 의한 콘크리트 양생방법과는 달리 공장에서 미리 제작된 PC판넬로 코아를 조립 구축하고, 코아를 기준으로 하여 슬라브를 PC판넬 또는 현장 타설 콘크리트에 의해 일체로 구축되도록 하여 구조가 복잡한 코아구축 및 건설에 대한 시간을 단축하므로 말미암아 건축물의 전체 공사기간을 줄여 공사비용을 절감할 수 있도록 한 것이다.The present invention has been made in order to provide a method that can significantly shorten the construction period compared to the prior construction core construction construction method by the conventional sliding foam, the present invention is an elevator room, stairs room located in the center of the building Unlike the concrete curing method by sliding foam or cast-in-place concrete formwork for core parts such as toilets, the cores are assembled and constructed by PC panels pre-fabricated at the factory, and slabs are placed on PC panels or cast-in-place concrete based on cores. By shortening the time for core construction and construction with complicated structure, it is possible to reduce the construction cost by reducing the overall construction period of the building.

본 발명은 아파트나 오피스빌딩과 같은 고층건물을 건설함에 있어 공사기간을 단축하여 공사비용을 절감할 수 있도록 하기 위한 것으로, 통상 건물의 중앙부에 집중되는 엘리베이터실, 계단실, 화장실 등의 구조물을 PC판넬로 조립 구축하면서 이에 보, 슬라브, 벽체 등의 골조를 서로 연결 고정하며, 연결부위를 콘크리트로 밀봉토록 하여 고층건물을 시공토록 하는 것이다.The present invention is to reduce the construction period by reducing the construction period in the construction of high-rise buildings such as apartments or office buildings, PC panels for structures such as elevator rooms, staircase rooms, restrooms that are usually concentrated in the center of the building As a result of the construction of the furnace, the frames such as beams, slabs, and walls are connected and fixed to each other, and the connecting parts are sealed with concrete so that high-rise buildings can be constructed.

대개 건물의 중앙부에 위치하는 건물의 계단실, 엘리베이터실을 차지하는 부분인 코아에 해당하는 부분의 벽체나 슬라브 또는 계단 등을 미리 PC판넬로 제작한 것을 크레인 등을 이용하여 서로 조립하여 코아를 선시공 구축하고 이 코아를 중심으로 건물의 벽체나 바닥이나 천장에 해당하는 슬라브 등은 PC판넬이나 RC구조로 시공하여 건축공기를 단축할 수 있도록 한 것이다.In general, the walls, slabs or stairs of the core corresponding to the core, which occupies the staircases and elevators of the building located in the center of the building, are pre-fabricated by using a crane or the like. The core of the core, slabs that correspond to the walls, floors or ceilings of the building are constructed with PC panels or RC structures to shorten the construction air.

도1 - 본 발명에 의해 시공되는 아파트의 건축과정을 보인 부분사시도.1-a partial perspective view showing the construction process of an apartment constructed by the present invention.

도2 - 본 발명에 의해 시공되는 아파트의 개략정면도.2 is a schematic front view of an apartment constructed in accordance with the present invention.

도3 - 본 발명에 의해 시공되는 아파트의 코아부를 보인 부분분해사시도.3 is a partially exploded perspective view showing the core portion of the apartment constructed by the present invention.

도4 - 본 발명에 의해 시공되는 아파트의 코아부를 보인 부분분해사시도.4 is a partially exploded perspective view showing the core portion of the apartment constructed by the present invention.

도5 - 본 발명에 의해 시공되는 아파트의 기초부를 구축한 것을 보인5 shows that the foundation of the apartment to be constructed in accordance with the present invention

부분분해사시도.Partially exploded perspective view.

도6 - 본 발명에 의해 시공되는 아파트 기준층의 부분평단면도.Fig. 6-A partial cross sectional view of an apartment reference floor constructed in accordance with the present invention.

도7 - 본 발명에 의해 시공되는 아파트 기준층의 부분확대평단면도.7-an enlarged partial cross-sectional view of an apartment reference floor constructed in accordance with the present invention;

도8 - 본 발명에 있어 RC공법으로 구축되는 슬라브층과 코아부를 구성하는8-Slab layer and core portion constructed by the RC method in the present invention

PC판넬의 연결부위의 결합상태를 보인 부분단면도.Partial cross-sectional view showing the connection of PC panel connection part.

도9 - 본 발명에 있어 RC공법으로 구축되는 슬라브층과 코아부를 구성하는9-Slab layer and core part constructed by RC method in the present invention

PC판넬의 연결부위의 결합상태를 보인 부분단면도.Partial cross-sectional view showing the connection of PC panel connection part.

도10 - 본 발명에 있어 "T"자형 연결부위의 일례를 도시한 부분단면도.Fig. 10-A partial cross sectional view showing an example of a "T" shaped connecting portion in the present invention.

도11 - 본 발명에 있어 "T"자형 연결부위의 일례를 도시한 부분단면도.Fig. 11-A partial sectional view showing an example of a "T" shaped connecting portion in the present invention.

도12 - 본 발명에 있어 "T"자형 연결부위의 일례를 도시한 부분단면도.Figure 12-Partial cross-sectional view showing one example of a "T" shaped connection in the present invention.

도13 - 본 발명에 있어 "ㄱ"자형 연결부위의 일례를 도시한 부분단면도.13 is a partial cross-sectional view showing an example of the "a" shaped connection in the present invention.

도14 - 본 발명에 있어 "ㅡ"자형 연결부위의 일례를 도시한 부분단면도.14 is a partial cross-sectional view showing an example of a "-" shaped connecting portion in the present invention.

도15 - 본 발명에 있어 "ㅡ"자형 연결부위의 일례를 도시한 부분단면도.Fig. 15 is a partial cross-sectional view showing an example of a "-" shaped connecting portion in the present invention.

건물을 시공함에 있어서 해당지면에 터파기를 수행한 후, 이에 통상의 RC공법에 의해 기초부(21)를 시공완료하고, 계단실(12), 엘리베이터실(13) 또는 화장실로 구성되는 코아부(11)를 미리 제작된 벽체용 PC판넬(15), 슬라브용 PC판넬(16) 및 계단용 PC판넬(17)등을 이용하여 조립 설치하는 코아부(11)는 기준 벽체(23)나 기준 슬라브(22)보다 3-5층 먼저 조립 시공토록 하며, 상기 미리 조립 구축된 코아부(11)를 구성하는 PC판넬의 테두리에 돌출되는 연결철근(18)이나 체결구(19)와 연결되는 또다른 PC판넬의 테두리에 돌출시킨 연결철근(18) 및 체결구(19)를 서로 연결하고, 연결부위에 콘크리트몰탈(25)을 충진하여 일체로 연결 고정하며, 상기 PC판넬과 연결 조립되는 기준 벽체나 슬라브(22)는 연결철근으로 연결한 후, 이에 콘크리트를 타설하는 RC공법으로 또다른 벽체나 슬라브(22)를 연결하여 건물을 구축토록 하는 것이다.In the construction of the building, after discharging the ground, the construction of the foundation 21 is completed by a conventional RC method, and the core part 11 composed of a staircase room 12, an elevator room 13, or a bathroom. ) The core part 11, which is assembled using a prefabricated wall PC panel 15, a slab PC panel 16, and a staircase PC panel 17, is used as a reference wall 23 or a reference slab ( 22) is to be assembled three to five layers earlier, another PC connected to the connecting reinforcing bar 18 or fasteners 19 protruding to the edge of the PC panel constituting the pre-assembled core portion (11). Connecting reinforcing bars 18 and fasteners 19 protruding from the edge of the panel, and connected to each other by filling the concrete mortar 25 in the connection portion, and fixed to connect integrally, the reference wall or slab connected to the PC panel assembled (22) is another wall by the RC method of placing concrete after connecting with connecting rebar Connect the slab (22) to ever build a building.

이와 같은 본 발명을 보다 구체적으로 설명하면 다음과 같다.The present invention will be described in more detail as follows.

건물을 시공함에 있어서, 각 층에 해당하는 벽체나 슬라브 보다 건물의 중앙에 해당하는 엘리베이터실(13), 계단실(12)등을 구성하는 코아(11) 부분을 미리 제작된 벽체용 PC판넬(15), 슬라브용 PC판넬(16), 계단용 PC판넬(17) 등을 이용하여 엘리베이터실(13), 계단실(12)을 건물의 각 층 슬라브보다 3-5층 먼저 조립 구축하며, 이와 같이 미리 구축된 코아부(11)에 해당하는 벽체용 PC판넬(15)의 돌출부위 또는 연결을 위해 테두리에 돌출시킨 연결철근(18), 연결구(19) 등의 연결철물과 슬라브(22) 또는 벽체를 구성하는 철근(28) 등에 연결 고정하여 코아부(11)의 PC판넬과 기준 벽체 및 슬라브(22)를 연결토록 하며, 코아부를 제외한 기타 슬라브(22)나 벽체는 RC공법에 의한 철근 콘크리트 구조물을 구축토록 하여 건물을 시공토록 하는 것이다.In constructing a building, a PC panel for wall 15, in which a core 11 part constituting an elevator room 13, a staircase room 12, etc., which corresponds to the center of the building, rather than a wall or slab corresponding to each floor is manufactured in advance. ), Using the slab PC panel 16, the staircase PC panel 17, etc., the elevator room 13 and the staircase room 12 are assembled and built 3-5 floors earlier than each floor slab of the building. Connecting steel and slab 22 or wall such as connecting reinforcing bar 18, connector 19, etc. protruding at the rim for connection or protrusion of the wall PC panel 15 corresponding to the core part 11 constructed. The PC panel of the core part 11 and the reference wall and the slab 22 are connected by fixing and fixing the reinforcing bars 28, and the other slabs 22 or the wall except the core part are reinforced concrete structures by the RC method. It is to allow the construction of the building.

이와 같이 벽체용 PC판넬(15), 슬라브용 PC판넬(16), 계단용 PC판넬(17) 등의 PC판넬로 건축되는 코아부(11)는 기존층보다 3-5층 선시공하되 벽체를 구성하는 벽체용 PC판넬(15)과 벽체용 PC판넬(15) 또는 슬라브용 PC판넬(16) 및 계단용 PC판넬(17) 등을 연결함에 있어 연결부위에 따라 "ㄱ"자형 접합부위(41), "T"자형 접합부위(42), "ㅡ"자형 접합부위(43) 또는 "L"자형 접합부위를 갖게 된다.In this way, the core part 11 constructed of PC panels, such as a wall PC panel 15, a slab PC panel 16, and a staircase PC panel 17, is constructed with three to five floors above the existing floor. In the connection between the wall PC panel 15 and the wall PC panel 15 or the slab PC panel 16 and the staircase PC panel 17, the "A" shaped joints 41 , &Quot; T " shaped joint 42, "-" shaped joint 43, or " L " shaped joint.

이러한 접합부위는 각각의 PC판넬의 테두리에 돌출 형성되는 연결철근(18)이나 체결구(19) 따위의 연결철물을 서로 연결시킨 후, 그 위에 콘크리트몰탈(25)을 충진하여 코아부(11)를 조립 구성하게 되며, 코아부(11)의 외측 기준 슬라브(22)나 기준 벽체(23)는 기존공법인 RC공법을 이용하되, 즉, PC판넬의 테두리에 돌설되는 연결철근(18)이나 체결구(19) 따위의 연결철물과 슬라브(22)나 기준 벽체의 철근을 연결한 후, 콘크리트몰탈을 부어 기존층의 슬라브나 벽체를 연결 구성하게 되는 것이다.These joints are connected to each other, such as connecting reinforcing bars 18 or fasteners 19 formed on the edge of each PC panel, and then connected to each other, and then filling the concrete mortar 25 thereon core part 11 The outer reference slab 22 or the reference wall 23 of the core part 11 is assembled using the existing RC method, that is, the connecting reinforcing bars 18 or fasteners rushing to the edge of the PC panel (19) After connecting the connecting steel and the slab 22 or the reinforcing bar of the reference wall, and then poured concrete mortar to connect the slab or wall of the existing layer.

고층건물을 건설함에 있어서 다양한 건설공법이 사용되고 있다.Various construction methods are used to construct high-rise buildings.

그 하나는 보통 RC공법인 철근 콘크리트 구축공법과 건물의 벽체와 슬라브등을 미리 제작한 PC판넬을 이용한 조립에 의한 건물구축공법이 일반적인 건물의 구축공법이라 할 수 있다.One of them is general building construction method by reinforced concrete construction method which is RC method and building construction method by assembling using PC panel which pre-fabricated building walls and slabs.

통상, PC판넬을 이용한 PC공법은 시공에 있어서, 가설재가 불필요하거나 적은 수요의 가설재가 소요되며, 미리 공장에서 계획 설계에 의해 규격화로 제작이 가능하며, 규격화된 것을 조립 설치하므로 인해 공정이 단순하며, 우천시에도 작업이 가능하므로 기후에 영향이 적으며, 시공시 작업통로의 확보가 용이하며, 시공정밀도가 뛰어나며, 시공후 현장이 깨끗하여 현장정리가 불필요하게 된다.In general, the PC method using the PC panel requires no temporary materials or requires temporary materials in construction, and can be manufactured by standard design by factory design in advance. In addition, it is possible to work even in rainy weather, so it has little influence on the climate, it is easy to secure the working passage during construction, and it has excellent construction process density, and the site is clean after construction, which makes the site cleanup unnecessary.

또한, 구조 및 품질에 있어서도 공장에서 균일 생산하므로 품질이 뛰어나며, 이로 인한 견고한 구조를 얻을 수 있으며, 작업의 단순화로 안전성이 뛰어나는 잇점을 갖게 된다.In addition, in terms of structure and quality, the production is uniform in the factory, so the quality is excellent, and a solid structure is obtained thereby, and the safety is simplified by simplifying the work.

이에 반해 통상 철근 콘크리트 구축공법인 RC공법은, 시공에 있어서 가설재가 필히 필요하며, 가설재의 설치 및 철거에 많은 비용 및 시간이 소요되며, 악천후에는 공사를 할 수 없는 등 기후에 많은 영향을 받게 되며, 가설재, 거푸집 등으로 인해 작업통로의 확보가 어려우며, 콘크리트 양생시간 기간을 거쳐야 하므로 공사기간이 길어지게 되며, 현장이 매우 복잡하여 정리정돈에 많은 시간과 비용이 소요됨을 볼 수 있다.On the other hand, RC construction method, which is usually a reinforced concrete construction method, requires a temporary construction material for construction, requires a lot of cost and time to install and dismantle the temporary construction material, and can not be constructed in bad weather. It is difficult to secure the work path due to the temporary materials and formwork, and the construction period is long because it needs to go through the concrete curing time period, and the site is very complicated, and it can be seen that it takes much time and money to tidy up.

또한, RC공법에 있어서, 콘크리트 수급상황에 의해 품질관리가 용이하지 않으며, 불량 콘크리트 사용시 이에 대한 보수를 수행하여야 하며, RC구조물의 버팀 통로의 확보를 위한 거푸집 가설재 등의 건설재가 다량 소요됨으로 인해 안전성이 낮게 되며, 특히, 거푸집을 해체할 때 주위가 어두워 안전사고가 빈번하게 발생되는 것을 볼 수 있으며, 품질면에 있어서도 현장시공 및 보수가 수반되는 등 그 품질이 뛰어나지 못한 것을 볼 수 있다.In addition, in the RC method, quality control is not easy due to the supply and demand situation of concrete, and it is necessary to carry out repairs when using poor concrete, and safety due to the large amount of construction materials such as formwork and temporary materials for securing the support passage of RC structures. This will be low, especially when the formwork is dismantled, the surroundings are dark, and safety accidents are frequently generated, and in terms of quality, it can be seen that the quality is not excellent, including on-site construction and repair.

이와 같이 건물의 구축공법에 있어 PC판넬 공법과 기존 RC공법을 비교할 때 PC판넬 공법은 RC공법에 비해 많은 장점을 갖게 된다.As such, when comparing the PC panel method and the existing RC method in the construction method of the building, the PC panel method has many advantages over the RC method.

본 발명은 이와 같은 PC판넬 공법으로 건물의 중앙부에 위치하는 엘리베이터실, 계단실 또는 화장실 등의 코아부를 기존층보다 3-5층 먼저 시공하게 되면, 엘리베이터실은 건설에 필요한 자재를 이용하는 운반통로로 이를 활용할 수 있게 되며, 계단실은 작업자의 통로로 이를 활용할 수 있어 기존 건설공사시에서 볼 수 있는 가설재로 작업통로의 구축이 불필요하게 되며, 계단실을 구성하는 계단을 공장에서 제작한 계단용 PC판넬로 이를 조립 설치할 경우 기존 RC공법에서와 같이 계단을 구성하는데 필요한 거푸집이나 기타 구조물의 설치가 필요없으므로 적은 비용 및 단시간에 계단을 구축할 수 있으며, 이로 인한 작업통로를 확보할 수 잇점을 갖게 된다.According to the present invention, when a core part such as an elevator room, a staircase room, or a bathroom located at the center of a building is constructed 3-5 floors earlier than an existing floor, the elevator room is utilized as a transport passage using materials required for construction. As the staircase room can be used as a worker's passageway, it is not necessary to construct a work path as a temporary material that can be seen in the existing construction work, and assembling it with the PC panel for the stairs manufactured by the factory If the installation does not require the installation of the formwork or other structures necessary to construct the stairs, as in the existing RC method, it is possible to build the stairs in a low cost and short time, thereby having the advantage of securing a work path.

이와 같이 고층건물을 엘리베이터실, 계단실, 화장실 등의 코아부를 PC판넬로 3-5층 미리 시공하므로 말미암아 전체 공사기간을 단축할 수 있어 공사비용의 절감은 물론 양질의 구조물을 얻을 수 있는 아주 유용한 발명인 것이다.As such, high-rise buildings are constructed with 3-5 floors of cores such as elevators, staircases, and toilets in advance by PC panels, which can shorten the entire construction period, resulting in a reduction in construction costs and a very useful inventor. will be.

Claims (1)

건물을 시공함에 있어서 해당지면에 터파기를 수행한 후, 이에 통상의 RC공법에 의해 기초부(21)를 시공완료하고, 계단실(12), 엘리베이터실(13) 또는 화장실로 구성되는 코아부(11)를 미리 제작된 벽체용 PC판넬(15), 슬라브용 PC판넬(16) 및 계단용 PC판넬(17) 등을 이용하여 조립 설치하며, 상기 코아부(11)를 제외한 건축물의 슬라브(22)나 벽체는 RC공법으로 구축토록 하며, 상기 코아부(11)는 다른 슬라브(22)나 벽체보다 3-5층 먼저 조립 시공토록 하는 것을 특징으로 하는 PC판넬로 건축물의 코아를 조립 형성하는 건축물의 시공방법.In the construction of the building, after discharging the ground, the construction of the foundation 21 is completed by a conventional RC method, and the core part 11 composed of a staircase room 12, an elevator room 13, or a bathroom. ) Is fabricated and installed using a prefabricated wall PC panel 15, a slab PC panel 16, and a staircase PC panel 17, and the slab 22 of the building except for the core part 11. B wall is to be constructed by RC method, and the core part 11 of the building to assemble the core of the building as a PC panel, characterized in that the construction of 3-5 floors earlier than the other slabs 22 or walls. Construction method.
KR1020000070808A 2000-11-27 2000-11-27 Pc core pre-construction method KR20020041064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000070808A KR20020041064A (en) 2000-11-27 2000-11-27 Pc core pre-construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000070808A KR20020041064A (en) 2000-11-27 2000-11-27 Pc core pre-construction method

Publications (1)

Publication Number Publication Date
KR20020041064A true KR20020041064A (en) 2002-06-01

Family

ID=19701577

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000070808A KR20020041064A (en) 2000-11-27 2000-11-27 Pc core pre-construction method

Country Status (1)

Country Link
KR (1) KR20020041064A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100472639B1 (en) * 2002-09-06 2005-03-08 삼성물산 주식회사 The installation method of lift car for multistoried building's construction, using core preceding construction method
CN108571063A (en) * 2017-03-16 2018-09-25 吕少雅 A kind of shear wall structure building assembly System Design
KR20210079355A (en) * 2018-11-14 2021-06-29 이노베이티브 빌딩 테크놀러지스 엘엘씨 Modular Staircase and Elevator Shaft Systems and Methods

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263334A (en) * 1988-04-14 1989-10-19 Takenaka Komuten Co Ltd Core part precedence type construction method
US5012627A (en) * 1989-05-25 1991-05-07 Lundmark Bo J Construction process for multiple-story concrete building
JPH0497041A (en) * 1990-08-14 1992-03-30 Taisei Corp Construction method of building
JPH04149333A (en) * 1990-10-11 1992-05-22 Mitsubishi Heavy Ind Ltd Method of constructing building
JPH04336141A (en) * 1991-05-14 1992-11-24 Mitsui Constr Co Ltd Construction of structure
KR0171873B1 (en) * 1994-05-24 1999-02-18 최훈 Constructive method of a high building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01263334A (en) * 1988-04-14 1989-10-19 Takenaka Komuten Co Ltd Core part precedence type construction method
US5012627A (en) * 1989-05-25 1991-05-07 Lundmark Bo J Construction process for multiple-story concrete building
JPH0497041A (en) * 1990-08-14 1992-03-30 Taisei Corp Construction method of building
JPH04149333A (en) * 1990-10-11 1992-05-22 Mitsubishi Heavy Ind Ltd Method of constructing building
JPH04336141A (en) * 1991-05-14 1992-11-24 Mitsui Constr Co Ltd Construction of structure
KR0171873B1 (en) * 1994-05-24 1999-02-18 최훈 Constructive method of a high building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100472639B1 (en) * 2002-09-06 2005-03-08 삼성물산 주식회사 The installation method of lift car for multistoried building's construction, using core preceding construction method
CN108571063A (en) * 2017-03-16 2018-09-25 吕少雅 A kind of shear wall structure building assembly System Design
KR20210079355A (en) * 2018-11-14 2021-06-29 이노베이티브 빌딩 테크놀러지스 엘엘씨 Modular Staircase and Elevator Shaft Systems and Methods

Similar Documents

Publication Publication Date Title
US10190309B2 (en) Slab construction system and method for constructing multi-story buildings using pre-manufactured structures
US7665250B2 (en) System for construction of a compression structure with corner blocks, key blocks, and corner block supports
EP1971727B1 (en) Construction of buildings
EA000200B1 (en) Prefabricated construction panels and modules for multistory buildings and methods for their use
US3678638A (en) Building construction of modular units with settable material therebetween
JP2002004610A (en) Prefabricated bathroom
JP2009528464A (en) Prefabricated reinforced concrete single-person house and method for constructing the house
KR101389203B1 (en) Method for constructing residential building using precast concrete and modular unit
KR20040016371A (en) Construction of high-rise building with large modular units
KR20020041064A (en) Pc core pre-construction method
KR100365138B1 (en) Stairway room construction method use of precast concrete
JPH08135049A (en) Construction method of building using precast concrete wall member
KR100829954B1 (en) Utility system in modular housing
CN215443303U (en) Assembled accessible elevator access & exit structure and subway access & exit
US20210071409A1 (en) High-rise self-supporting formwork building system
KR930012072B1 (en) Complex wire panels
JP3597183B2 (en) Barrier-free construction method of staircase type apartment house by building outer frame
JP3190059B2 (en) How to build a building
JPH08184204A (en) Apartment house
KR100377134B1 (en) Corridor and balcony of ultra higher stories apartment half slab construction method
EP1532330A2 (en) In-situ construction of concrete building
KR100386354B1 (en) method of apartment construction for the slip form construction method
KR20240097464A (en) Stairs quick construction method of elevator chamber in remodeling works of apartment house
Marriage Core: planning
AU648918B2 (en) Building construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application