JP3597183B2 - Barrier-free construction method of staircase type apartment house by building outer frame - Google Patents

Barrier-free construction method of staircase type apartment house by building outer frame Download PDF

Info

Publication number
JP3597183B2
JP3597183B2 JP2002290899A JP2002290899A JP3597183B2 JP 3597183 B2 JP3597183 B2 JP 3597183B2 JP 2002290899 A JP2002290899 A JP 2002290899A JP 2002290899 A JP2002290899 A JP 2002290899A JP 3597183 B2 JP3597183 B2 JP 3597183B2
Authority
JP
Japan
Prior art keywords
staircase
apartment house
outer frame
type apartment
precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002290899A
Other languages
Japanese (ja)
Other versions
JP2004124527A (en
Inventor
秀俊 多賀
毅子彦 森山
Original Assignee
オリエンタル建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by オリエンタル建設株式会社 filed Critical オリエンタル建設株式会社
Priority to JP2002290899A priority Critical patent/JP3597183B2/en
Publication of JP2004124527A publication Critical patent/JP2004124527A/en
Application granted granted Critical
Publication of JP3597183B2 publication Critical patent/JP3597183B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は老朽化した階段室式共同住宅の改修工法において、特にエレベーターの設置等によるバリアフリー化と耐震補強とを兼ねた低コストの改修工法に関する。
【0002】
【従来の技術】
我が国における公営住宅のストックは相当数にのぼる。しかし、かかる公営住宅のうち、昭和40年代に建築されたものがほぼ半分を占めており、近年ではその老朽化対策、特に大規模地震に対応した耐震補強が問題となっている。
【0003】
また公営住宅のストックの内訳においては、2階建て以上でエレベーターのない共同住宅(以下、階段室式共同住宅と称する)が高い比率を占めている。このような階段室式共同住宅では、居住者の高齢化によりバリアフリー化に対応した改修の要請が非常に高まっている。
【0004】
このような階段室式共同住宅を改修する場合において、特に高齢化した居住者に多額の工費負担を求めることは困難である。そのため、改修工事の低コスト化によって居住者の負担を最小限にすることが求められている。しかし、階段室式共同住宅には外廊下がないため、そのままではエレベーターを複数基設置しなければならず、この場合には改修工事がコスト高となってしまう。
【0005】
一方、階段室式共同住宅の耐震補強では、開口部を塞ぐ耐震補強工法の採用は無理があるので、建物の外側にフレームを組む外フレーム工法が有利である。しかし、耐震補強のみの改修工事の場合には別途バリアフリー化の対策が必要となるので、改修工事に多額の費用をかけることができないのが現状である。
【0006】
ここで階段室式共同住宅の改修工法の従来例としては、特許文献1(特開2002−129755公報)が存在する。しかし、特許文献1の改修工法は既存の階段をそのまま利用しつつバリアフリー化することを主眼とし、老朽化した階段室式共同住宅の耐久性や施工コストなどを重視していないことから、現実に採用することが困難なものがほとんどである。
【0007】
【特許文献1】
特開2002−129755号公報 第2頁−第6頁、図1−図4
【0008】
【発明が解決しようとする課題】
本発明は前記従来技術の課題を解決するためにされたものであり、その目的は老朽化した階段室式共同住宅におけるバリアフリー化と耐震補強とを兼ねた低コストの改修工法を提供することである。
【0009】
【課題を解決するための手段】
(1)第1の発明は、既設の階段室式共同住宅1の階段側に基礎11を築造し、前記基礎11上にプレキャスト柱8とプレキャスト梁9とからなる外フレーム2を構築して、前記外フレーム2と前記階段室式共同住宅1との間に廊下4を新設することで前記階段室式共同住宅1と前記外フレーム2とを一体化するとともに、前記階段室式共同住宅1の階段5を撤去して、階段撤去後の階段室においてエレベーター6の設置または階段5aの架け替えを行うことを特徴とする外フレーム構築による階段室式共同住宅のバリアフリー化工法である。
(2)第2の発明は、第1の発明において、既設の階段室式共同住宅1のベランダ側に基礎11を築造し、前記基礎11上にプレキャスト柱8とプレキャスト梁9とからなる外フレーム3を構築して、前記外フレーム3と前記階段室式共同住宅1とを一体化するベランダ20を新設することを特徴とする。
(3)第3の発明は、第1または第2の発明において、外フレーム2,3を構成するプレキャスト柱8およびプレキャスト梁9にはそれぞれPC鋼材12,13が挿通されており、前記PC鋼材12,13の緊張により外フレーム2,3にプレストレスが付与されていることを特徴とする。
【0010】
<作用>
本発明では、階段室式共同住宅1の階段側に廊下4を新設し、階段撤去後の階段室においてエレベーター6の設置または階段5aの架け替えを行うことで、既設の階段室式共同住宅1をバリアフリー化に対応した共同住宅1aに改修する。
【0011】
また本発明では既設の階段室式共同住宅1の階段側に外フレーム2が設けられており、この外フレーム2が階段室式共同住宅1に作用する地震力を負担する。したがって、本発明では階段室式共同住宅1のバリアフリー化と耐震補強とを同時に行なうことができ、老朽化した階段室式共同住宅1に必要となる改修工事を低コストで行なうことができる。なお、必要に応じて階段室式共同住宅1のベランダ側にも外フレーム3を設けることで、より万全な耐震補強を行なうことも可能である。
【0012】
【発明の実施の形態】
以下、外フレーム構築による階段室式共同住宅のバリアフリー化工法の実施形態について、図面を参照しつつ説明する。図1(a)は本発明工法施工前の階段室式共同住宅の平面図であり、図1(b)は本発明工法施工後の階段室式共同住宅1aの平面図である。また、図2は本発明工法施工後の階段室式共同住宅1aの階段側の状態を示した正面図である。
【0013】
本実施形態の階段室式共同住宅1の改修工法は、既設の階段室式共同住宅1の階段側とベランダ側に外フレーム2,3を構築し、外フレーム2,3と階段室式共同住宅1とを一体化することで耐震補強を行なうものである。また、階段側の外フレーム2と階段室式共同住宅1との間に廊下4を新設し、階段5を撤去した後に階段室にエレベーター6の設置および階段5aの架け替えを行って、かつ新設の廊下4に面した玄関7aを設けることでバリアフリー化を行なうものである。
【0014】
階段室式共同住宅1の外フレーム2,3は、コンクリート製のプレキャスト部材を連結してなるプレキャスト柱8およびプレキャスト梁9から構成されている。この外フレーム2,3は、階段室式共同住宅1の階段側およびベランダ側の両側にそれぞれ近接して立設されている。外フレーム2,3は、階段室式共同住宅1の壁面と平行をなす垂直面に沿って、地盤10に埋設された基礎11上に建て込まれている。なお、図3などに示すように、外フレーム2,3の基礎11は、基礎杭11aと一体化したコンクリート基礎のほかにも地盤がよければ直接基礎としてもよく、布基礎または独立基礎にするなど含めて各種条件により適宜設定される。
【0015】
プレキャスト柱8用のプレキャスト部材8aには、プレキャスト梁9を取付けるための梁支持部8bが設けられており、プレキャスト部材連結時において、プレキャスト柱8に一定間隔ごとに梁支持部8bが位置するようになっている。そして、コンクリート梁用のプレキャスト部材9aがプレキャスト柱8の梁支持部8b間に配設されて外フレーム2,3が構築される。
【0016】
外フレーム2,3には、プレキャスト柱8を縦通する縦シースと、プレキャスト梁9およびプレキャスト柱8の梁支持部8bを横断する横シースとが設けられている。そして、図4に示すように、縦シース内および横シース内にはPC鋼材12,13が挿通配置されており、各シースとPC鋼材12,13との間隙にはグラウトが充填されている。
【0017】
また、プレキャスト部材8a,9aにおけるPC鋼材12,13の定着部には鋼製支圧板が埋設されており、PC鋼材12,13の端部に取付けられた定着具14と鋼製支圧板とが係合することでPC鋼材12,13が緊張定着し、外フレーム2,3を構成するプレキャスト柱8およびプレキャスト梁9にプレストレスが導入されるようになっている。
【0018】
図5は階段室式共同住宅1と階段側の外フレーム2との連結状態を示す断面図である。本実施形態では、階段室式共同住宅1の階段側壁面に一定間隔で打ち付けられた後施工アンカー15と、外フレーム2に一定間隔をあけて設けられたインサート16に挿入された鉄筋17とが結束されている。そして、これらの鉄筋が配置された型枠内にコンクリート18を打設して、階段室式共同住宅1と外フレーム2との間にRC造の廊下4が新設されている。これにより階段室式共同住宅1と外フレーム2とが一体化して耐震補強され、階段室式共同住宅1に作用する地震力は外フレーム2にも負担されるようになる。
【0019】
また、図6は階段室式共同住宅1とベランダ側の外フレーム3との連結状態を示す断面図である。本実施形態では、階段室式共同住宅の既存ベランダ19を改修してRC造の新設ベランダ20に再構築することで、階段室式共同住宅1と外フレーム3とを一体化し、階段室式共同住宅1aを耐震補強している。
【0020】
具体的には、既存ベランダ19は立ち上がり部19aが解体されており、また床面にはコンクリート打設孔19bが開孔される。また既存ベランダ19の下側の壁面には後施工アンカー21が一定間隔毎で打ち付けられている。また後施工アンカー21は、外フレーム3に一定間隔をあけて埋設されたアンカー筋22と鉄筋22aを介して結束されている。また既存ベランダ19のコンクリート打設孔19bには、既存ベランダ19から新設ベランダ20にせん断力を伝達するためのせん断伝達金物23が配筋されている。
【0021】
そして、これらのアンカーおよび鉄筋が配筋された型枠内に、既存ベランダ19のコンクリート打設孔19bからコンクリートを打設して、既存ベランダ19と一体化したRC造の新設ベランダ20が階段室式共同住宅1と外フレーム3との間に構築される。
【0022】
一方、図1(b)に示すように、本発明では階段室式共同住宅1のバリアフリー化のために既存の階段5を一旦撤去して、撤去後の階段室にエレベーター6を設置している。なお、階段室式共同住宅の出入口にはスロープ24を設置してもよい。
【0023】
また、図7は改修工法施工前の階段室を示した図であり、図8は改修工法施工後の階段室を示した図である。本発明における改修工法施工後の共同住宅1aでは、エレベーター6の設置と同時に、新設された廊下4と連絡するように階段5aの架け替えが行なわれている。さらに、共同住宅の各住戸25では、既存の階段室に面した玄関7は閉鎖され、新設の廊下に面した玄関7aが新たに設けられている。
【0024】
以下、本実施形態の階段室式共同住宅の改修工法の手順を簡単に説明する。
【0025】
(1)まず、既存の階段室式共同住宅1の階段側およびベランダ側の外側に、必要に応じて杭基礎11aを築造した後、杭基礎11aと一体にコンクリート基礎11を築造するか、または地盤に割り栗等を敷設して、コンクリート基礎11を築造する。なお、このコンクリート基礎11には、予めプレキャスト柱8用の縦PC鋼材12を埋設しておく。
【0026】
(2)次いで、階段室式共同住宅1の階段側およびベランダ側に外側から足場を組み立てる。
【0027】
(3)コンクリート基礎11の上にプレキャスト柱8およびプレキャスト梁9用のプレキャスト部材8a,9aを配置し、プレキャスト部材8a,9aを一体化して外フレーム2,3を構築する。
【0028】
具体的には、まずプレキャスト部材8aを、基礎に埋設された縦PC鋼材12が縦シースを挿通するようにコンクリート基礎11の上に積み上げる。またプレキャスト柱8の構築と並行して、プレキャスト柱8の梁支持部8b間にプレキャスト部材9aを配置し、横シース内に横PC鋼材13を挿通配置する。
【0029】
そして、プレキャスト部材8a,9aの仮配置後に、プレキャスト柱8の柱頭から片引きで縦PC鋼材12を緊張定着させ、その後、横PC鋼材13を緊張定着させる。さらにシース内にグラウトを充填硬化して、プレキャスト柱8およびプレキャスト梁9を一体化して、外フレーム2,3が構築される。
【0030】
(4)次に階段室式共同住宅1の階段側壁面の所定箇所にケミカルアンカー等の後施工アンカー15を打ち込んで、後施工アンカー15の仕上げ面をハツリ目荒ししておく。そして、階段側の外フレーム2と共同住宅1との間に廊下4用の型枠を設置する。
【0031】
また外フレーム2のインサート16に鉄筋17を挿入し、共同住宅1の外壁に設けた後施工アンカー15と鉄筋17とを結束して型枠内に配筋する。そして、型枠内にコンクリート18を打設して、共同住宅の階段側に廊下4を新設し、階段側の外フレーム2と共同住宅1とを一体化する。
【0032】
(5)同様に、階段室式共同住宅1のベランダ側壁面の所定箇所にケミカルアンカー等の後施工アンカー21を打ち込んで、後施工アンカー21の仕上げ面をハツリ目荒ししておく。また、既存ベランダ19の立ち上がり部19aを解体し、床面にはコンクリート打設孔19bを開孔しておく。
【0033】
その後に、ベランダ側の外フレーム3と共同住宅1との間にベランダ20用の型枠を設置する。また、外フレーム3に埋設されたアンカー筋22と、共同住宅の外壁に設けた後施工アンカー21とを結束し、かつ既設ベランダ19のコンクリート打設孔19bにせん断伝達金物23を配置して型枠内に配筋する。そして型枠内にコンクリート18を打設して、共同住宅1の既存ベランダ19と一体化した新設のベランダ20を構築し、ベランダ側の外フレーム3と共同住宅1とを一体化する。
【0034】
(6)階段室式共同住宅1の各住戸25の階段側の外壁面に新設玄関7a用の開口を設け、各住戸25の既存の玄関7を閉鎖する。そして、共同住宅1の各住戸25において、新設の廊下4に面した階段側の外壁に玄関7aを構築する。必要に応じて、この際に各住戸25の内装および設備のリフォームを行なうこともできる。
【0035】
(7)また、既設の階段5は新設の廊下4と半階分のズレが生じてそのまま利用できないため、既設の階段5を撤去して階段室の階段の架け替えを行なって、新設された廊下4と連絡する新たな階段5aを構築する。かかる階段5aの架け替えは、改修後の共同住宅1aで二方向避難を可能にするべく2箇所以上の階段室で行なうのが好ましい。
【0036】
(8)さらに、階段撤去後の階段室の1つには、共同住宅1のバリアフリー化のためにエレベーター6を設置する。なお、階段室式共同住宅1の出入口にスロープ24を新設してもよい。
【0037】
(9)そして、新設された廊下4およびベランダ20への手すり26の設置や、廊下4等の仕上げモルタル工事や塗装工事を行い、最後に足場を撤去して共同住宅1aの改修が完成する。
【0038】
以上のようにして本発明工法の実施形態を説明してきたが、本発明の特許請求の範囲はこれらの実施形態に限定されるものではない。例えば、共同住宅1aの階段側の外フレーム2のみで構造的に十分な耐震補強となる場合には、ベランダ側に外フレーム3を構築する必要はない。また、階段室にエレベーターの設置が行なえない場合には、外廊下の外側にエレベーターを設置してもよい[ともに図示を省略する]。
【0039】
【発明の効果】
本発明では、階段室式共同住宅の階段側に廊下を新設し、階段撤去後の階段室においてエレベーターの設置および階段の架け替えを行って、かつ新設の廊下に面した玄関を設ける。したがって、全面的な建替えをともなうことなく、既設の階段室式共同住宅をバリアフリー化に対応した良質の共同住宅に改修することができる。
【0040】
また本発明では既設の階段室式共同住宅の階段側に外フレームが設けられており、この外フレームが階段室式共同住宅に作用する地震力を負担する。したがって、本発明では階段室式共同住宅のバリアフリー化と耐震補強とを同時に行なうことができ、老朽化した階段室式共同住宅に必要となる改修工事を低コストで行なうことができる。なお、必要に応じて階段室式共同住宅のベランダ側にも外フレームを設けることで、より万全な耐震補強を行なうことも可能である。
【0041】
さらに本発明における改修後の共同住宅は、新設の廊下と連絡した2つの階段を備えていることから災害時の二方向避難が可能となり、災害時の安全性もより向上する。
【図面の簡単な説明】
【図1】(a)は本発明工法施工前の階段室式共同住宅の平面図であり、(b)は本発明工法施工後の階段室式共同住宅の平面図である。
【図2】本発明工法施工後の階段室式共同住宅の階段側の状態を示した正面図である。
【図3】階段側の外フレームの正面図である。
【図4】外フレームのプレキャスト部材とPC鋼材の状態を示す図である。
【図5】階段室式共同住宅と階段側の外フレームとの連結状態を示す図である。
【図6】階段室式共同住宅とベランダ側の外フレームとの連結状態を示す図である。
【図7】本発明工法施工前の階段室を示した図である。
【図8】本発明工法施工後の階段室を示した図である。
【符号の説明】
1,1a 階段室式共同住宅
2 外フレーム(階段側)
3 外フレーム(ベランダ側)
4 廊下
5,5a 階段
6 エレベーター
7,7a 玄関
8 プレキャスト柱
8a プレキャスト部材
8b 梁支持部
9 プレキャスト梁
9a プレキャスト部材
10 地盤
11 コンクリート基礎
11a 基礎杭
12 縦PC鋼材
13 横PC鋼材
14 定着具
15 後施工アンカー
16 インサート
17 鉄筋
18 コンクリート
19 ベランダ
19a 立ち上がり部
19b コンクリート打設孔
20 ベランダ
21 後施工アンカー
22 アンカー筋
22a 鉄筋
23 せん断伝達金物
24 スロープ
25 住戸
26 手すり
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a renovation method for an aging staircase-type apartment house, and more particularly to a low-cost renovation method that combines barrier-free and earthquake-resistant reinforcement by installing an elevator or the like.
[0002]
[Prior art]
The public housing stock in Japan is considerable. However, almost half of these public housings were constructed in the 1960s. In recent years, countermeasures against their aging, especially seismic reinforcement in response to large-scale earthquakes, have become a problem.
[0003]
In the breakdown of public housing stock, apartments with two or more floors and no elevators (hereinafter referred to as staircase apartments) account for a large percentage. In such a staircase type apartment house, a request for renovation to cope with barrier-free due to the aging of the resident is increasing very much.
[0004]
When renovating such a staircase type apartment house, it is difficult to demand a large amount of construction cost especially for an aging resident. Therefore, it is required to minimize the burden on residents by reducing the cost of renovation work. However, the staircase-type apartment house does not have an outer corridor, so it is necessary to install a plurality of elevators as it is, and in this case, the renovation work becomes expensive.
[0005]
On the other hand, in the case of seismic retrofitting of a staircase type apartment house, it is not possible to adopt a seismic retrofitting method that closes the opening, so the outer frame method of building a frame outside the building is advantageous. However, in the case of rehabilitation work that involves only seismic reinforcement, it is necessary to separately take measures to make it barrier-free.
[0006]
Here, as a conventional example of a renovation method of a staircase type apartment house, there is Japanese Patent Application Laid-Open No. 2002-129755. However, the renovation method of Patent Document 1 focuses on making the barrier stabilization possible while using the existing stairs as they are, and does not attach importance to the durability and construction cost of the aging staircase type apartment house. Most are difficult to adopt.
[0007]
[Patent Document 1]
JP-A-2002-129755, page 2 to page 6, FIGS. 1 to 4
[0008]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION The present invention has been made to solve the problems of the prior art described above, and an object of the present invention is to provide a low-cost renovation method that combines barrier-free and seismic reinforcement in an aged staircase type apartment house. It is.
[0009]
[Means for Solving the Problems]
(1) In the first invention, a foundation 11 is constructed on the stairs side of an existing staircase type apartment house 1, and an outer frame 2 composed of precast columns 8 and precast beams 9 is constructed on the foundation 11, A corridor 4 is newly provided between the outer frame 2 and the staircase-type apartment house 1 to integrate the staircase-type apartment house 1 with the outer frame 2. This is a barrier-free construction method for a staircase-type apartment house by constructing an outer frame, in which the staircase 5 is removed and the elevator 6 is installed or the staircase 5a is replaced in the staircase after the removal of the staircase.
(2) In the second invention, in the first invention, a foundation 11 is built on the veranda side of the existing staircase type apartment house 1, and an outer frame comprising precast columns 8 and precast beams 9 on the foundation 11 is provided. 3 is constructed, and a veranda 20 that integrates the outer frame 3 and the staircase type apartment house 1 is newly provided.
(3) In the third invention, in the first or second invention, PC steel materials 12 and 13 are inserted into the precast pillars 8 and the precast beams 9 constituting the outer frames 2 and 3, respectively. The prestress is applied to the outer frames 2 and 3 by the tension of 12, 13.
[0010]
<Action>
In the present invention, a corridor 4 is newly provided on the stairs side of the staircase type apartment house 1, and an elevator 6 is installed or the staircase 5a is replaced in the staircase room after the stairs are removed, whereby the existing staircase type apartment house 1 is replaced. Will be renovated into an apartment house 1a that is compatible with barrier-free services.
[0011]
Further, in the present invention, the outer frame 2 is provided on the stairs side of the existing staircase type apartment house 1, and the outer frame 2 bears the seismic force acting on the staircase type apartment house 1. Therefore, according to the present invention, barrier-free and seismic reinforcement of the staircase type apartment house 1 can be performed at the same time, and repair work required for the deteriorated staircase type apartment house 1 can be performed at low cost. In addition, by providing the outer frame 3 also on the veranda side of the staircase type apartment house 1 as necessary, it is possible to perform more thorough earthquake-resistant reinforcement.
[0012]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of a barrier-free construction method of a staircase type apartment house by constructing an outer frame will be described with reference to the drawings. FIG. 1A is a plan view of a staircase type apartment house before the construction method of the present invention, and FIG. 1B is a plan view of a staircase type apartment house 1a after the construction method of the invention. FIG. 2 is a front view showing the state of the staircase side of the staircase type apartment house 1a after the construction method according to the present invention.
[0013]
In the renovation method of the staircase type apartment house 1 of the present embodiment, the outer frames 2 and 3 are constructed on the stairs side and the veranda side of the existing staircase type apartment house 1, and the outer frames 2 and 3 and the staircase type apartment house are combined. 1 is integrated to provide seismic reinforcement. In addition, a corridor 4 is newly established between the outer frame 2 on the stairs side and the staircase type apartment house 1, and after removing the stairs 5, an elevator 6 is installed in the stairs room and the stairs 5a are replaced, and the new construction is performed. A barrier-free system is provided by providing an entrance 7a facing the corridor 4 of the building.
[0014]
The outer frames 2 and 3 of the staircase type apartment house 1 are composed of precast columns 8 and precast beams 9 which are connected to concrete precast members. The outer frames 2 and 3 are erected on both sides of the staircase type apartment house 1 on the stairs side and the veranda side, respectively. The outer frames 2 and 3 are built on a foundation 11 buried in the ground 10 along a vertical plane parallel to a wall surface of the staircase type apartment house 1. As shown in FIG. 3 and the like, the foundation 11 of the outer frames 2 and 3 may be a concrete foundation integrated with the foundation pile 11a, or may be a direct foundation if the ground is good, and may be a cloth foundation or an independent foundation. It is appropriately set according to various conditions including the above.
[0015]
The precast member 8a for the precast column 8 is provided with a beam support portion 8b for mounting the precast beam 9, so that the beam support portion 8b is positioned at regular intervals on the precast column 8 when the precast member 8 is connected. It has become. Then, the precast members 9a for the concrete beams are disposed between the beam support portions 8b of the precast columns 8, and the outer frames 2 and 3 are constructed.
[0016]
The outer frames 2 and 3 are provided with a vertical sheath that vertically passes through the precast column 8 and a horizontal sheath that crosses the precast beam 9 and the beam support portion 8b of the precast column 8. As shown in FIG. 4, PC steel materials 12 and 13 are inserted and arranged in the vertical sheath and the horizontal sheath, and the gap between each sheath and the PC steel materials 12 and 13 is filled with grout.
[0017]
Further, a steel support plate is embedded in the fixing portions of the PC steel materials 12 and 13 in the precast members 8a and 9a, and the fixing device 14 and the steel support plate attached to the ends of the PC steel materials 12 and 13 are formed. By the engagement, the PC steel materials 12 and 13 are fixed in tension and prestress is introduced into the precast columns 8 and the precast beams 9 constituting the outer frames 2 and 3.
[0018]
FIG. 5 is a cross-sectional view showing a connected state between the staircase type apartment 1 and the outer frame 2 on the staircase side. In the present embodiment, the post-installed anchor 15 that is hit at a fixed interval on the side wall surface of the staircase of the staircase type apartment house 1 and the reinforcing bar 17 that is inserted into the insert 16 that is provided at regular intervals on the outer frame 2 are provided. You are united. Then, concrete 18 is cast into the formwork on which these reinforcing bars are arranged, and a RC corridor 4 is newly provided between the staircase type apartment house 1 and the outer frame 2. Thereby, the staircase type apartment house 1 and the outer frame 2 are integrated and seismically reinforced, and the seismic force acting on the staircase type apartment house 1 is also borne by the outer frame 2.
[0019]
FIG. 6 is a cross-sectional view showing a connected state between the staircase type apartment house 1 and the outer frame 3 on the veranda side. In the present embodiment, the staircase-type apartment house 1 and the outer frame 3 are integrated by renovating the existing veranda 19 of the staircase-type apartment house and reconstructing it on a new veranda 20 made of RC. The house 1a is seismically reinforced.
[0020]
Specifically, the rising part 19a of the existing veranda 19 is dismantled, and a concrete casting hole 19b is formed on the floor surface. Further, post-installed anchors 21 are struck at regular intervals on the lower wall surface of the existing veranda 19. Further, the post-installed anchor 21 is bound via an anchor bar 22 embedded in the outer frame 3 at fixed intervals and a reinforcing bar 22a. In addition, a shear transmission metal 23 for transmitting a shearing force from the existing veranda 19 to the new veranda 20 is arranged in the concrete pouring hole 19 b of the existing veranda 19.
[0021]
Then, concrete is poured from the concrete placing hole 19b of the existing veranda 19 into the formwork on which these anchors and reinforcing bars are arranged, and a new RC veranda 20 integrated with the existing veranda 19 is provided in the staircase. It is constructed between the type apartment house 1 and the outer frame 3.
[0022]
On the other hand, as shown in FIG. 1 (b), in the present invention, the existing staircase 5 is temporarily removed to make the staircase type apartment house 1 barrier-free, and an elevator 6 is installed in the removed staircase room. I have. In addition, the slope 24 may be installed at the entrance of the staircase type apartment house.
[0023]
FIG. 7 is a view showing the staircase before the repair method is applied, and FIG. 8 is a view showing the staircase after the repair method is applied. In the apartment house 1a after the renovation method according to the present invention, the stairs 5a are replaced so as to communicate with the newly installed corridor 4 at the same time as the elevator 6 is installed. Further, in each dwelling unit 25 of the apartment house, the entrance 7 facing the existing staircase is closed, and a new entrance 7a facing the newly established corridor is provided.
[0024]
Hereinafter, the procedure of the repair method for the staircase type apartment house of the present embodiment will be briefly described.
[0025]
(1) First, after constructing a pile foundation 11a as needed outside the staircase side and the veranda side of the existing staircase type apartment house 1, construct the concrete foundation 11 integrally with the pile foundation 11a, or A concrete foundation 11 is built by laying split chestnuts or the like on the ground. Note that a vertical PC steel material 12 for the precast column 8 is embedded in the concrete foundation 11 in advance.
[0026]
(2) Then, a scaffold is assembled from the outside on the stairs side and the veranda side of the staircase type apartment house 1.
[0027]
(3) Precast members 8a, 9a for the precast columns 8 and the precast beams 9 are arranged on the concrete foundation 11, and the outer frames 2, 3 are constructed by integrating the precast members 8a, 9a.
[0028]
Specifically, first, the precast member 8a is stacked on the concrete foundation 11 so that the vertical PC steel material 12 embedded in the foundation penetrates the vertical sheath. In parallel with the construction of the precast column 8, a precast member 9a is disposed between the beam support portions 8b of the precast column 8, and the horizontal PC steel 13 is inserted and disposed in the horizontal sheath.
[0029]
Then, after the provisional arrangement of the precast members 8a, 9a, the longitudinal PC steel material 12 is tension-fixed by one pull from the capital of the precast column 8, and then the horizontal PC steel material 13 is tension-fixed. Further, the sheath is filled with grout and hardened, and the precast columns 8 and the precast beams 9 are integrated to construct the outer frames 2 and 3.
[0030]
(4) Next, a post-installed anchor 15 such as a chemical anchor is driven into a predetermined location on the side wall of the staircase of the staircase type apartment house 1, so that the finished surface of the post-installed anchor 15 is roughened. Then, a formwork for the corridor 4 is installed between the outer frame 2 on the stairs side and the apartment house 1.
[0031]
In addition, a reinforcing bar 17 is inserted into the insert 16 of the outer frame 2, and the post-installed anchor 15 provided on the outer wall of the apartment house 1 and the reinforcing bar 17 are bound and arranged in the formwork. Then, concrete 18 is poured into the formwork, a corridor 4 is newly established on the stairs side of the apartment house, and the outer frame 2 on the stairs side and the apartment house 1 are integrated.
[0032]
(5) Similarly, a post-installed anchor 21 such as a chemical anchor is driven into a predetermined location on the side wall of the veranda of the staircase type apartment house 1, and the finished surface of the post-installed anchor 21 is roughened. In addition, the rising portion 19a of the existing veranda 19 is dismantled, and a concrete casting hole 19b is formed in the floor surface.
[0033]
Thereafter, a formwork for the veranda 20 is installed between the outer frame 3 on the veranda side and the apartment house 1. Further, the anchor bars 22 embedded in the outer frame 3 and the post-installed anchor 21 provided on the outer wall of the apartment house are bound together, and the shear transmission hardware 23 is arranged in the concrete casting hole 19 b of the existing veranda 19 to form the mold. Arrange the bars in the frame. Then, concrete 18 is poured into the formwork to construct a new veranda 20 integrated with the existing veranda 19 of the apartment house 1, and the outer frame 3 on the veranda side and the apartment house 1 are integrated.
[0034]
(6) An opening for the new entrance 7a is provided on the outer wall of the staircase side of each dwelling unit 25 of the staircase type apartment house 1, and the existing entrance 7 of each dwelling unit 25 is closed. Then, in each dwelling unit 25 of the apartment house 1, the entrance 7a is constructed on the outer wall on the stairs side facing the newly established corridor 4. At this time, the interior and facilities of each dwelling unit 25 can be reformed as necessary.
[0035]
(7) Also, the existing stairs 5 cannot be used as it is because there is a gap of half a floor from the newly established corridor 4, so the existing stairs 5 were removed and the stairs in the staircase were replaced, and the new stairs 5 were installed. Build a new staircase 5a that communicates with corridor 4. Such replacement of the stairs 5a is preferably performed in two or more stair rooms to enable two-way evacuation in the renovated apartment house 1a.
[0036]
(8) In addition, an elevator 6 is installed in one of the staircases after the removal of the stairs to make the apartment house 1 barrier-free. In addition, a slope 24 may be newly provided at the entrance of the staircase type apartment house 1.
[0037]
(9) Then, the handrails 26 are installed on the newly established corridor 4 and the veranda 20, the finishing mortar work and the painting work for the corridor 4 and the like are performed, and finally the scaffold is removed to complete the renovation of the apartment house 1a.
[0038]
The embodiments of the method of the present invention have been described above, but the claims of the present invention are not limited to these embodiments. For example, when structurally sufficient seismic reinforcement is achieved only by the outer frame 2 on the stairs side of the apartment house 1a, it is not necessary to construct the outer frame 3 on the veranda side. If an elevator cannot be installed in the staircase, an elevator may be installed outside the outer corridor (both are not shown).
[0039]
【The invention's effect】
In the present invention, a corridor is newly constructed on the staircase side of a staircase-type apartment house, an elevator is installed and stairs are replaced in the staircase after removing the stairs, and an entrance facing the newly constructed corridor is provided. Therefore, the existing staircase-type apartment house can be renovated into a high-quality apartment house compatible with barrier-free facilities without a complete rebuilding.
[0040]
In the present invention, an outer frame is provided on the stairs side of the existing staircase type apartment house, and the outer frame bears the seismic force acting on the staircase type apartment house. Therefore, according to the present invention, barrier-free and seismic reinforcement of the staircase type apartment house can be performed at the same time, and the repair work required for the deteriorated staircase type apartment house can be performed at low cost. In addition, by providing an outer frame also on the veranda side of the staircase-type apartment house, it is possible to perform more thorough seismic reinforcement as needed.
[0041]
Furthermore, the refurbished apartment house according to the present invention has two stairs connected to the newly-installed corridor, so that a two-way evacuation in the event of a disaster is possible, and safety in the event of a disaster is further improved.
[Brief description of the drawings]
FIG. 1 (a) is a plan view of a staircase type apartment house before construction of the present invention, and FIG. 1 (b) is a plan view of a staircase type apartment house after construction of the present invention.
FIG. 2 is a front view showing the state of the staircase side of the staircase type apartment house after the construction method of the present invention is applied.
FIG. 3 is a front view of an outer frame on a staircase side.
FIG. 4 is a view showing a state of a precast member of an outer frame and a PC steel material.
FIG. 5 is a diagram showing a connection state between a staircase-type apartment house and an outer frame on the staircase side.
FIG. 6 is a view showing a connection state between a staircase type apartment house and an outer frame on the veranda side.
FIG. 7 is a diagram showing a staircase before construction of the method of the present invention.
FIG. 8 is a view showing a staircase after the construction method according to the present invention is performed.
[Explanation of symbols]
1,1a Staircase type apartment house 2 Outer frame (stair side)
3 Outside frame (Veranda side)
4 Corridor 5, 5a Stairs 6 Elevator 7, 7a Entrance 8 Precast pillar 8a Precast member 8b Beam support 9 Precast beam 9a Precast member 10 Ground 11 Concrete foundation 11a Foundation pile 12 Vertical PC steel 13 Horizontal PC steel 14 Fixing tool 15 Post-installation Anchor 16 Insert 17 Reinforcing bar 18 Concrete 19 Veranda 19a Standing portion 19b Concrete pouring hole 20 Veranda 21 Post-installed anchor 22 Anchor bar 22a Reinforcing bar 23 Shear transmission hardware 24 Slope 25 Dwelling unit 26 Handrail

Claims (3)

既設の階段室式共同住宅の階段側に基礎を築造し、前記基礎上にプレキャスト柱とプレキャスト梁とからなる外フレームを構築して、前記外フレームと前記階段室式共同住宅との間に廊下を新設することで前記階段室式共同住宅と前記外フレームとを一体化するとともに、前記階段室式共同住宅の階段を撤去して、階段撤去後の階段室においてエレベーターの設置または階段の架け替えを行うことを特徴とする外フレーム構築による階段室式共同住宅のバリアフリー化工法。Build a foundation on the staircase side of the existing staircase type apartment house, build an outer frame consisting of precast columns and precast beams on the foundation, and provide a corridor between the outer frame and the staircase type apartment house. In addition to integrating the staircase type apartment house and the outer frame by newly installing the staircase type apartment house, removing the stairs of the staircase type apartment house, installing an elevator or replacing stairs in the staircase after removing the stairs A barrier-free construction method for a staircase-type apartment house with an outer frame, which is characterized by the following: 既設の階段室式共同住宅のベランダ側に基礎を築造し、前記基礎上にプレキャスト柱とプレキャスト梁とからなる外フレームを構築して、前記外フレームと前記階段室式共同住宅とを一体化するベランダを新設することを特徴とする請求項1に記載の外フレーム構築による階段室式共同住宅のバリアフリー化工法。A foundation is built on the veranda side of an existing staircase-type apartment house, an outer frame composed of precast columns and precast beams is built on the foundation, and the outer frame and the staircase-type apartment house are integrated. The barrier-free construction method for a staircase-type apartment house according to claim 1, wherein a veranda is newly constructed. 外フレームを構成するプレキャスト柱およびプレキャスト梁にはそれぞれPC鋼材が挿通されており、前記PC鋼材の緊張により外フレームにプレストレスが付与されていることを特徴とする請求項1または請求項2に記載の外フレーム構築による階段室式共同住宅のバリアフリー化工法。The precast column and the precast beam constituting the outer frame each have a PC steel material inserted therein, and a prestress is applied to the outer frame by the tension of the PC steel material. A barrier-free construction method for a staircase type apartment house using the outer frame construction described.
JP2002290899A 2002-10-03 2002-10-03 Barrier-free construction method of staircase type apartment house by building outer frame Expired - Fee Related JP3597183B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002290899A JP3597183B2 (en) 2002-10-03 2002-10-03 Barrier-free construction method of staircase type apartment house by building outer frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002290899A JP3597183B2 (en) 2002-10-03 2002-10-03 Barrier-free construction method of staircase type apartment house by building outer frame

Publications (2)

Publication Number Publication Date
JP2004124527A JP2004124527A (en) 2004-04-22
JP3597183B2 true JP3597183B2 (en) 2004-12-02

Family

ID=32282635

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002290899A Expired - Fee Related JP3597183B2 (en) 2002-10-03 2002-10-03 Barrier-free construction method of staircase type apartment house by building outer frame

Country Status (1)

Country Link
JP (1) JP3597183B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4976938B2 (en) * 2007-07-04 2012-07-18 大成建設株式会社 Seismic reinforcement structure
JP5433036B2 (en) * 2012-02-23 2014-03-05 大成建設株式会社 Seismic reinforcement structure
CN109610875B (en) * 2019-01-25 2023-12-22 江苏瑞永建设工程技术有限公司 Assembled floor door frame of existing building with elevator and construction method

Also Published As

Publication number Publication date
JP2004124527A (en) 2004-04-22

Similar Documents

Publication Publication Date Title
US20090313933A1 (en) Reinforced masonry panel structures
RU2376424C1 (en) Ready-built and solid-cast building construction system
US20190169844A1 (en) Pre-cast concrete formwork, wall system and method of construction
KR102105457B1 (en) Building Core System using Precast Concrete Box Shaped Modules with Connection Hardware at Corners And Core System Construction Method Using Thereof
KR102111337B1 (en) Building Core System using Precast Concrete Panel with Column in the Center
KR101277751B1 (en) Precast Concrete Blocks and Remodeling Reinforcing Construction Methods for Low and Middle-rise Beam-column Buildings by Using that Blocks
JP6615083B2 (en) Seismic and damping control method
JP4163539B2 (en) Seismic reinforcement extension method of building and earthquake resistance reinforcement extension building
JP6744829B2 (en) Building reinforcement method and seismic reinforcement member
JP3597183B2 (en) Barrier-free construction method of staircase type apartment house by building outer frame
RU2590231C1 (en) Ventilation unit and method of its installation
JP2005105531A (en) Foundation structure of building and its construction method
JP5865567B2 (en) Connecting slab and its construction method
JP4976938B2 (en) Seismic reinforcement structure
CA2983519A1 (en) Precast thermally separated cantilevered balcony system and method of using same
JP2004352458A (en) Method for construction of elevator shaft structure
JP3641227B2 (en) Construction method of underground structure
KR101376356B1 (en) Structure of complex window frame for apartment veranda
KR20220049720A (en) Rapid Construction Structure of Core Part Using Multi-Story Precast Wall
JP2004060310A (en) Wooden earthquake-proof construction using earthquake-proof core
KR20210133384A (en) Apartment remodeling construction method for construction duration reduction
JP3235716B2 (en) Seismic retrofitting method for existing buildings
JP2009002079A (en) Aseismatic reinforcing construction method for existing building
JP3559536B2 (en) House renovation method
JPH08270255A (en) Seismic isolation structuring method of existing building

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040830

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040907

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080917

Year of fee payment: 4

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080917

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090917

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees