JP2000096530A - Execution method for guard fence using precast guard- fence block made of concrete, and guard fence employing precast guard-fence block executed by the same - Google Patents

Execution method for guard fence using precast guard- fence block made of concrete, and guard fence employing precast guard-fence block executed by the same

Info

Publication number
JP2000096530A
JP2000096530A JP11310057A JP31005799A JP2000096530A JP 2000096530 A JP2000096530 A JP 2000096530A JP 11310057 A JP11310057 A JP 11310057A JP 31005799 A JP31005799 A JP 31005799A JP 2000096530 A JP2000096530 A JP 2000096530A
Authority
JP
Japan
Prior art keywords
guard fence
guard
precast
block
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11310057A
Other languages
Japanese (ja)
Other versions
JP3188436B2 (en
Inventor
Kozo Akashi
石 幸 三 明
Shunichi Karasuda
俊一 烏田
Yukio Tanada
幸夫 棚田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEIKON KK
Original Assignee
KEIKON KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEIKON KK filed Critical KEIKON KK
Priority to JP31005799A priority Critical patent/JP3188436B2/en
Publication of JP2000096530A publication Critical patent/JP2000096530A/en
Application granted granted Critical
Publication of JP3188436B2 publication Critical patent/JP3188436B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the execution method for a guard fence using a guard-fence block made of concrete, in which the workability of the execution of works is improved, a period under the state of the non-installation of the guard fence is shortened and strength is increased, and the structure of the guard fence executed by the execution method. SOLUTION: A foundation post 29 is buried into a ground in such a state that a beforehand installed guard fence is left as it is, and then the beforehand installed guard fence is removed. The execution method of the guard fence is composed of a process, in which the precast guard-fence block 21 is set up while the foundation post 29 is placed in a space 25, and a process, in which fillers 30 are injected into the space 25 through an opening 26, and the foundation post 29 and the precast guard-fence block 21 are combined.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、高速道路の中央分離帯
や道路の側面に立設されるコンクリート製のプレキャス
トガードフェンスブロックを使用したガードフエンスの
施工方法及び該施工方法により施工されたプレキャスト
ガードフェンスブロックを使用したガードフェンスの構
造に関し、更に詳しくは、ガードフェンスをコンクリー
ト製のプレキャストガードフエンスブロック構造とし、
該プレキャストガードフェンスブロックを使用して簡単
に施工でき、施工期間を短縮すると同時に、既設のガー
ドフェンスの取外し期間を短縮することによって車両等
の通行に支障を来すことのないようにしたガードフエン
スの施工方法、及び該施工方法により施工されたプレキ
ャストガードフェンスブロックを使用したガードフェン
スの構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a guard fence using a concrete precast guard fence block erected on a median strip of a highway or the side of a road, and a precast constructed by the method. Regarding the structure of the guard fence using the guard fence block, more specifically, the guard fence is a concrete precast guard fence block structure,
Guard fence that can be easily constructed using the precast guard fence block, shortening the construction period and shortening the removal period of the existing guard fence so as not to hinder the traffic of vehicles etc. And a guard fence structure using a precast guard fence block constructed by the construction method.

【0002】[0002]

【従来の技術】一般の道路や高速道路では、中央分離帯
や道路の両側にガードフェンスを設けて走行する車両が
万一道路側へ飛び出すのを防止している。従来公知のガ
ードフェンスはポールを地中に埋設し、該ポールに金属
製のレール状のガードフェンスを保持させる構造となっ
ていた。しかしながら、ガードフェンスの耐久性、強
度、コストの面から、近年現場打ちのコンクリート製ガ
ードフェンスあるいはプレキャストコンクリートブロッ
ク製のガードフェンスが設置されつつある。
2. Description of the Related Art On general roads and highways, guard fences are provided on both sides of a median strip and a road to prevent a traveling vehicle from jumping to the road. Conventionally known guard fences have a structure in which a pole is buried underground and the pole holds a metal rail-shaped guard fence. However, in view of the durability, strength and cost of guard fences, in recent years, cast-in-place concrete guard fences or precast concrete block guard fences have been installed.

【0003】このようにコンクリート製あるいはプレキ
ャストコンクリートブロック製のガードフェンスを設置
する場合、従来の金属製ガードフェンスに代えてコンク
リート製のガードフェンスを設置するものとなることが
多いので、その交換設置に当たっては通常の交通に支障
を来さないようにできるだけ短期間に交換設置しなけれ
ばならない。即ち、交換設置に当たって従来の金属製ガ
ードフェンスを取り外してしまうと、ガードフェンスの
無設置状態となり、このような時に交通事故が発生する
と大事故になるおそれがある。そこで、従来の金属製ガ
ードフェンスからコンクリート製のガードフェンスに切
り替える時のガードフェンス無設置期間を極力短縮する
ことが肝要となる。
When a guard fence made of concrete or precast concrete block is installed as described above, a guard fence made of concrete is often installed instead of the conventional metal guard fence. Must be replaced in the shortest possible time so as not to interfere with normal traffic. That is, if the conventional metal guard fence is removed for replacement installation, the guard fence is not installed, and if a traffic accident occurs in such a case, there is a possibility that a serious accident may occur. Therefore, it is important to minimize the period during which a guard fence is not installed when switching from a conventional metal guard fence to a concrete guard fence.

【0004】従来公知の金属製のガードフェンスからコ
ンクリート製のガードフェンスへの交換工事の設置工法
の一例を示すと、図11及び図12に示すようなものと
なっている。即ち、図12は既設の金属製ガードフェン
スを示すものであり、金属製のガードフェンス1は基礎
コンクリート2に立設されたポール3に保持されてい
る。基礎コンクリート2は両側から縁石4によって補強
されている。基礎コンクリート2の内部には鉄筋5が埋
設されている。
FIG. 11 and FIG. 12 show an example of an installation method for replacing a conventionally known metal guard fence with a concrete guard fence. That is, FIG. 12 shows an existing metal guard fence, and the metal guard fence 1 is held by a pole 3 erected on a foundation concrete 2. The foundation concrete 2 is reinforced by curbs 4 from both sides. A reinforcing bar 5 is buried inside the foundation concrete 2.

【0005】図12に示すような既設の金属製ガードフ
ェンスをコンクリート製のガードフェンスに交換工事を
行う場合には、次のようにして行われる。図11に加
え、前記図12も参照して、既設の金属製ガードフェン
スに代えて新規にコンクリート製のガードフェンスを設
置する場合、図12の金属製のガードフェンス1、ポー
ル3及び縁石4を外し、基礎コンクリート2の上側を破
壊して鉄筋5を露出させる。そして、図11に示すよう
に、その上にプレキャストコンクリート製のガードフェ
ンスブロック6を被せる。ガードフェンスブロック6に
は鉄筋7が突出して設けられており、この鉄筋7と前記
鉄筋5とを交叉させて新規に鉄筋8を取り付けて鉄筋7
と鉄筋5とを連結する。ガードフェンスブロック6はス
カート部9を有しており、該スカート部9の中に基礎コ
ンクリート2が配置されるものとなる。ガードフェンス
ブロック6の側面には貫通孔12が開口されており、該
貫通孔12にはコンクリート注入孔10がスカート部9
の内部へ貫通設置されている。そして、ガードフェンス
ブロック6のコンクリート注入穴10から生コンクリー
ト11を注入し、基礎コンクリート2とガードフェンス
ブロック6とを結合する。
[0005] When replacing an existing metal guard fence as shown in FIG. 12 with a concrete guard fence, the replacement is performed as follows. In addition to FIG. 11, referring to FIG. 12, when a new concrete guard fence is installed instead of the existing metal guard fence, the metal guard fence 1, the pole 3 and the curb 4 of FIG. Then, the upper side of the foundation concrete 2 is broken to expose the reinforcing bar 5. Then, as shown in FIG. 11, a guard fence block 6 made of precast concrete is put thereon. The guard fence block 6 is provided with a reinforcing bar 7 projecting therefrom. The reinforcing bar 7 crosses the reinforcing bar 5 and a reinforcing bar 8 is newly attached to the guard fence block 6.
And the rebar 5 are connected. The guard fence block 6 has a skirt portion 9 in which the foundation concrete 2 is placed. A through hole 12 is opened in the side surface of the guard fence block 6, and a concrete injection hole 10 is formed in the through hole 12.
It is installed through the inside of. Then, the fresh concrete 11 is injected from the concrete injection hole 10 of the guard fence block 6, and the foundation concrete 2 and the guard fence block 6 are connected.

【0006】[0006]

【発明が解決しようとする課題】ところが、上記図11
に示す従来公知のコンクリート製のガードフェンスに
は、以下のような問題点があった。
However, FIG.
The conventional well-known concrete guard fence shown in (1) has the following problems.

【0007】上記従来公知の施工方法は、図12に示す
ように既存の基礎コンクリート2が連続して長く配設さ
れている構造となっている場合しか適用できず、例えば
図13及び図14に示すような、間隔を置いて基礎コン
クリート2A及びポール3Aが個別的に埋設され、これ
にガードフェンス固定枠12を固定し、このガードフェ
ンス固定枠12にガードフェンス1Aを対向して設置し
ているような既存の中央分離帯ガードフェンスには適用
することができない。即ち、このような場合には基礎コ
ンクリート2Aが連続して設置されていないため、その
基礎コンクリート2Aを使用することができないためで
ある。
[0007] The above-mentioned conventionally known construction method can be applied only when the existing foundation concrete 2 has a structure in which the existing foundation concrete 2 is continuously long as shown in FIG. 12. As shown, the foundation concrete 2A and the pole 3A are individually buried at intervals, and the guard fence fixing frame 12 is fixed thereto, and the guard fence 1A is installed facing the guard fence fixing frame 12. It cannot be applied to such existing median guard fences. That is, in such a case, since the base concrete 2A is not continuously installed, the base concrete 2A cannot be used.

【0008】又、既設の金属製のガードフェンスをコン
クリート製のガードフェンスに交換設置する工程面から
見た場合、先ず図12のガードフェンス1を部分的に取
外し、更にポール3を取り外した後、基礎コンクリート
2を破壊し、既設鉄筋5を露出させ、該露出された鉄筋
5を変形させ、該変形させた鉄筋5に図11に示すよう
にガードフェンスブロック6に取付けられた鉄筋7を交
叉させ、前記変形させた鉄筋5とガードフェンスブロッ
ク6の鉄筋7とを新規鉄筋6で連結する作業を行ない、
その後にコンクリート製のガードフェンスブロック7を
設置しなければならないので、ガードフェンス無設置状
態の期間が長く、道路の車両交通に支障を来す場合が生
ずる。
When the existing metal guard fence is replaced with a concrete guard fence, the guard fence 1 shown in FIG. 12 is partially removed, and the pole 3 is removed. The foundation concrete 2 is destroyed, the existing reinforcing bar 5 is exposed, the exposed reinforcing bar 5 is deformed, and the deformed reinforcing bar 5 is crossed with the reinforcing bar 7 attached to the guard fence block 6 as shown in FIG. Performing a work of connecting the deformed reinforcing bar 5 and the reinforcing bar 7 of the guard fence block 6 with a new reinforcing bar 6;
After that, since the guard fence block 7 made of concrete must be installed, the period in which the guard fence is not installed is long, which may hinder the vehicle traffic on the road.

【0009】又、前述のような交換設置工程を採るの
で、作業工程が複雑かつ高コストとなってしまう。更に
又、基礎コンクリート2とガードフェンスブロック7と
の結合が比較的低い部分で行われているため、車両がガ
ードフェンスブロック7の上部分に衝突した場合、ガー
ドフェンスブロック7が倒壊して反対側の路面に飛び出
したり、あるいは道路の外側に落下してしまうおそれが
あった。
In addition, since the above-described replacement installation process is employed, the work process becomes complicated and costly. Furthermore, since the connection between the foundation concrete 2 and the guard fence block 7 is performed at a relatively low portion, when the vehicle collides with the upper portion of the guard fence block 7, the guard fence block 7 collapses and is opposite to the other side. There is a risk of jumping out of the road or falling out of the road.

【0010】そこで、本発明の目的は前記従来公知のガ
ードフェンスブロックによる欠点を改善し、施工の作業
性がよく、更にガードフェンス無設置状態の期間が短
く、更には強度を向上させたプレキャストガードフェン
スブロックを使用したガードフエンスの施工方法、及び
該施工方法によって施工されたプレキャストガードフェ
ンスブロックを使用したガードフェンスの構造を提供す
るにある。
Therefore, an object of the present invention is to improve the drawbacks of the above-mentioned guard fence block, improve the workability of the work, shorten the period of no guard fence installation, and improve the strength of the precast guard. It is an object of the present invention to provide a guard fence construction method using a fence block and a guard fence structure using a precast guard fence block constructed by the construction method.

【0011】[0011]

【課題を解決するための手段】本発明の特徴とするとこ
ろは、以下の構成にある。ガードフエンスが既に設置さ
れている個所に新規にコンクリート製のプレキャストガ
ードフエンスブロックを使用したガードフエンスを設置
する施工方法であって、前記既に設置されているガード
フエンスを取り外したガードフエンス無設置期間を極力
短縮する施工方法において、内部に空間を有し、上面に
前記空間と連通する開口を有するコンクリート製のプレ
キャストガードフェンスブロックを使用し、前記既設置
のガードフエンスを取り付けた状態のままで、地中に基
礎柱を埋設する工程と、既設置のガードフエンスを取り
外す工程と、前記基礎柱を空間内に位置させながら前記
プレキャストガードフェンスブロックを設置する工程
と、前記空間に前記開口を介して充填物を注入し、前記
基礎柱とプレキャストガードフェンスブロックとを結合
する工程と、からなること。
The features of the present invention are as follows. Guard fence is a construction method of installing a guard fence using a new concrete precast guard fence block in a place where the guard fence has already been installed, and the guard fence installation period in which the guard fence already installed has been removed. In the construction method for shortening as much as possible, a concrete precast guard fence block having a space inside and an opening communicating with the space on the upper surface is used, and the ground guard is installed with the existing guard fluence attached. A step of burying a foundation pillar therein, a step of removing an existing guard fence, a step of installing the precast guard fence block while positioning the foundation pillar in a space, and filling the space through the opening Inject material into the foundation pillar and precast guard fence block And bonding the made possible from.

【0012】又、本発明の他の特徴とするところは、以
下の構成にある。ガードフエンスが既に設置されている
個所に新規に設置されるガードフエンスであって、前記
既に設置されているガードフエンスが取り外されている
ガードフエンス無設置期間を極力短縮するコンクリート
製のプレキャストガードフエンスブロックを使用したガ
ードフエンスの構造において、地中に埋設された基礎柱
と、内部に該基礎柱が挿入される空間を有し、上面に該
空間と連通する充填物注入用の開口を有するコンクリー
ト製のプレキャストガードフェンスブロックと、前記空
間に注入され、前記基礎柱と前記プレキャストガードフ
ェンスブロックとを固定する充填物と、からなり、前記
基礎柱は、既設のガードフエンスを取り外すことなく設
置されたものであり、道路の端部あるいは中央分離帯に
設置されることを特徴とするプレキャストガードフェン
スブロックを使用したガードフエンスの構造。
Another feature of the present invention is as follows. A guard fence newly installed at a place where the guard fence is already installed, and a concrete precast guard fence block for minimizing the guard fence non-installation period in which the already installed guard fence is removed. In the structure of a guard fence using, a foundation pillar buried in the ground, having a space in which the foundation pillar is inserted, and having an opening for filling injection communicating with the space on the upper surface made of concrete A precast guard fence block, and a filler injected into the space and fixing the foundation pillar and the precast guard fence block, wherein the foundation pillar is installed without removing an existing guard fence. And installed at the end of the road or at the median strip. Structure of Gadofuensu using the strike guard fence block.

【0013】更に又、本発明の特徴とするところは、以
下の構成にある。充填物が、前記プレキャストガードフ
ェンスブロックを前記基礎柱に対して移動可能に固定す
る緩衝体からなること、及びプレキャストガードフェン
スブロックの端部に隣接して設置されるプレキャストガ
ードフェンスブロックの係合用の凹凸を設けたこと、更
にはプレキャストガードフェンスブロックの上部に道路
標識、水銀灯、遮音壁等の立設体を設けてなること。
The feature of the present invention lies in the following configuration. The filler is formed of a buffer body for movably fixing the precast guard fence block to the foundation pillar, and for engaging a precast guard fence block installed adjacent to an end of the precast guard fence block. Roughness shall be provided, and standing structures such as road signs, mercury lamps, and sound insulation walls shall be provided above the precast guard fence block.

【0014】[0014]

【実施例】以下、図によって本発明の一実施例について
説明する。図1は本発明の一実施例を示すプレキャスト
ガードフェンスブロックの平面図であり、図2は図1の
プレキャストガードフェンスブロックの側面図、図3は
図1のプレキャストガードフェンスブロックのA−A断
面図、図4は図1のプレキャストガードフェンスブロッ
クのB−B断面図、図5は図1のプレキャストガードフ
ェンスブロックのC−C断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a plan view of a precast guard fence block showing one embodiment of the present invention, FIG. 2 is a side view of the precast guard fence block of FIG. 1, and FIG. FIG. 4 is a sectional view taken along line BB of the precast guard fence block shown in FIG. 1, and FIG. 5 is a sectional view taken along line CC of the precast guard fence block shown in FIG.

【0015】図を参照して、本発明のガードフェンスブ
ロック21は、コンクリート製のプレキャストとなって
おり、上面22、側面23、端面24とからなってい
る。該ガードフェンスブロック21は内部に空間25を
有している。空間25には後述の基礎柱が配設されて充
填物によって固定されるものであり、該基礎柱及び充填
物が収容される程度の容積、高さとなっているものであ
る。上面22には前記空間に連通する開口26が形成さ
れている。開口26は後述の充填物が注入されるもので
ある。側面24の下部には緩い傾斜の裾部24Aが形成
されている。ガードフェンスブロック21の一方の端面
24には係合特記27が形成され、他方の端部には係合
凹部28が形成されている。これらの係合突起27及び
係合凹部28は隣接するガードフェンスブロック21の
係合凹部28あるいは係合突起27と係合するものであ
る。
Referring to the drawings, a guard fence block 21 of the present invention is a concrete precast, and has an upper surface 22, a side surface 23, and an end surface 24. The guard fence block 21 has a space 25 inside. The space 25 is provided with a base pillar, which will be described later, and is fixed by a filler, and has a volume and a height sufficient to accommodate the base pillar and the filler. An opening 26 communicating with the space is formed in the upper surface 22. The opening 26 is filled with a filling material described later. A gentle slope 24A is formed at the lower portion of the side surface 24. An engagement feature 27 is formed on one end surface 24 of the guard fence block 21, and an engagement recess 28 is formed on the other end. These engagement projections 27 and engagement recesses 28 engage with the engagement recesses 28 or the engagement projections 27 of the adjacent guard fence block 21.

【0016】上記のように構成されたガードフェンスブ
ロック21について、その設置状態の構造について説明
する。図6を参照して、地中に埋設して立てられた基礎
柱29をガードフェンスブロック21の空間25に配置
し、コンクリート、モルタル等の充填物30を開口26
から注入して基礎柱29とガードフェンスブロック21
とを固定する。ここで、ガードフェンスブロック21は
長手方向に多数連結して設置されるものであり、図7に
示すように隣接するガードフェンスブロック21の端面
24に形成された係合突起27と係合凹部28とが互い
に嵌合して連結される。尚、この実施例ではガードフェ
ンスブロック21の一方側に円形水路31が埋設されて
いるが、この円形水路31は必ずしも必要な構成ではな
い。
The structure of the guard fence block 21 configured as described above in the installed state will be described. Referring to FIG. 6, a foundation pillar 29 buried and buried in the ground is placed in space 25 of guard fence block 21, and filler 30 such as concrete or mortar is opened in opening 26.
From the foundation pillar 29 and guard fence block 21
And fix. Here, a large number of guard fence blocks 21 are connected and installed in the longitudinal direction, and as shown in FIG. Are fitted and connected to each other. In this embodiment, the circular waterway 31 is buried on one side of the guard fence block 21. However, the circular waterway 31 is not always required.

【0017】次に、上記構造のガードフェンスブロック
21の施工方法について、図8を参照して以下に説明す
る。先ず(A)に示すように、掘削機(図示しない)に
よって基礎柱29を挿入する挿入穴32を所定の間隔を
置いて掘削し、その挿入穴32に基礎柱29を挿入設置
する。この場合、必要に応じて充填物を注入して基礎柱
29を挿入穴32に固定する。この作業状態において
は、既設の金属製のガードフェンス1及びポール3はそ
のまま設置状態とし、通常の交通に支障を来さないよう
にして置く。次に、(B)で示すように、(A)に示す
既設の金属製ガードフェンス1及びポール3を取り外
す。この状態では挿入穴32に基礎柱29が立設された
ものとなっている。そして、(C)に示すように本発明
のガードフェンスブロック21をクレーン(図示しな
い)によって吊り下げて移動させ、基礎柱29がガード
フェンスブロック21内部の空間(図4の符号25)に
挿入されるようにして配設される。この設置作業に当た
っては、隣接するガードフェンスブロック21の端部の
係合突起27と係合凹部28が互いに係合するようにし
て設置される。次に、ガードフェンスブロック21の開
口からコンクリート、モルタル等の充填物を注入(図の
矢印P)する。
Next, a method of constructing the guard fence block 21 having the above structure will be described below with reference to FIG. First, as shown in FIG. 1A, an excavator (not shown) digs an insertion hole 32 into which a base column 29 is inserted at a predetermined interval, and inserts and installs the base column 29 in the insertion hole 32. In this case, the base pillar 29 is fixed to the insertion hole 32 by injecting a filling material as necessary. In this work state, the existing metal guard fence 1 and the pole 3 are left as they are, so that they do not hinder ordinary traffic. Next, as shown in (B), the existing metal guard fence 1 and pole 3 shown in (A) are removed. In this state, the foundation pillar 29 is erected in the insertion hole 32. Then, the guard fence block 21 of the present invention is suspended and moved by a crane (not shown) as shown in FIG. It is arranged in such a way. In this installation work, the guard fence block 21 is installed such that the engagement projection 27 and the engagement recess 28 at the end of the adjacent guard fence block 21 engage with each other. Next, a filler such as concrete or mortar is injected from the opening of the guard fence block 21 (arrow P in the figure).

【0018】尚、上記実施例では、1個のプレキャスト
ガードフェンスブロックに2個の空間が設けられている
が、空間は1個でも良いし、又3個以上であっても良
い。又、プレキャストガードフェンスブロックの外形は
上記実施例構造に限定されるものではない。又、基礎柱
の構造は、図のH型鋼に限定されるものではなく、その
他の構造の柱であっても良い。更に、端部の凹凸は必ず
しも必要な構成ではなく、省略が可能であるし、更には
他の構造の係合構造を採用することも可能である。
In the above embodiment, two spaces are provided in one precast guard fence block, but the space may be one or three or more. Further, the outer shape of the precast guard fence block is not limited to the structure of the embodiment. Further, the structure of the foundation pillar is not limited to the H-shaped steel shown in the figure, and may be a pillar having another structure. Further, the unevenness at the end is not always necessary, and can be omitted. Further, an engaging structure having another structure can be adopted.

【0019】以上に説明した他、本発明は以下のような
構造のプレキャストガードフェンスの構造とすることが
できる。図6を参照して、この実施例では充填物30と
してコンクリートを使用し、プレキャストガードフェン
スブロック21と基礎柱29とを固定しているが、コン
クリートの代わりに緩衝体を使用し、該緩衝体によって
空間25を埋めるだけの構造とし、プレキャストガード
フェンスブロック21に車両が衝突したときにプレキャ
ストガードフェンスブロック21と基礎柱29に対して
相対的に移動できるようにした構造とすることもでき
る。このような構造とすることにより、車両衝突時に緩
衝作用を生ぜしめ、もって車両衝突時の衝撃を吸収緩和
するものである。この場合、緩衝体としては、砂、プラ
スチックの粒体、ゴムの粒体、プラスチックあるいは流
動状のゴム自体を充填すること等、種々の構造とするこ
とができる。
In addition to the above, the present invention can be applied to a precast guard fence having the following structure. Referring to FIG. 6, in this embodiment, concrete is used as filler 30 and precast guard fence block 21 and base pillar 29 are fixed, but a buffer is used instead of concrete. Thus, a structure that only fills the space 25 can be used, and when the vehicle collides with the precast guard fence block 21, the structure can be relatively moved with respect to the precast guard fence block 21 and the foundation pillar 29. With such a structure, a buffering action is generated at the time of a vehicle collision, and thereby the shock at the time of a vehicle collision is absorbed and reduced. In this case, the buffer may have various structures such as filling with sand, plastic granules, rubber granules, plastic or fluid rubber itself.

【0020】又、図9に示すように、ガードフェンスブ
ロック21の上に道路標識41あるいは水銀灯42、更
には遮音板43等を立設する構造とすることもできる。
ここで、遮音板43はガードフェンスブロック21の外
側の地面上に立設する構造とすることもできる。
Further, as shown in FIG. 9, a structure in which a road sign 41 or a mercury lamp 42, a sound insulation plate 43 and the like are erected on the guard fence block 21 may be adopted.
Here, the sound insulation plate 43 may be configured to stand upright on the ground outside the guard fence block 21.

【0021】更に、図10に示す構造は本発明の更に他
の実施例を示すものであり、この実施例においてはプレ
キャストガードフェンスブロック21の一方側の地面4
4と他方側の地面45とに段差が設けられており、プレ
キャストガードフェンスブロック21が土留め兼用とし
て設けられてなるところにある。
Further, the structure shown in FIG. 10 shows still another embodiment of the present invention. In this embodiment, the ground 4 on one side of the precast guard fence block 21 is shown.
There is a step between the ground surface 4 and the ground 45 on the other side, and the precast guard fence block 21 is provided also as a soil retaining.

【0022】[0022]

【発明の効果】以上説明したように、本発明によると以
下のような効果を奏する。既存の中央分離帯ガードフェ
ンスや既存の道路端設置のガードフェンスに簡単に適用
することが可能である。又、ガードフェンス無設置状態
の期間が短く、道路の車両交通に支障を来すことが少な
い。又、作業工程が簡単かつ低コストであり、かつ迅速
な設置が可能となる。更に、基礎柱とプレキャストガー
ドフェンスブロックとの結合が比較的高い部分で行われ
ているため、車両がガードフェンスブロックの上部分に
衝突してもガードフェンスブロックが倒壊して反対側の
路面に車両が飛び出したり、あるいは道路の外側に車両
が落下してしまうことがない。又、プレキャストガード
フェンスブロックに充填する充填物として、緩衝体を使
用することにより、車両衝突時の緩衝作用を生ぜしめ、
もって重大事故を低減することができるものとなる。ガ
ードフェンスブロックの上に交通標識、水銀灯、遮音板
等の立設物を設置することにより、これらの設置場所を
取らないようにすることができる。ガードフェンスを土
留め兼用とすることにより、地面に段差のある箇所にガ
ードフェンスを設置することができるものとなる。
As described above, according to the present invention, the following effects can be obtained. It can be easily applied to existing median strip guard fences and existing roadside guard fences. Further, the period in which the guard fence is not installed is short, and there is little hindrance to vehicle traffic on the road. In addition, the operation process is simple and low cost, and quick installation is possible. Furthermore, since the connection between the foundation pillar and the precast guard fence block is relatively high, even if the vehicle collides with the upper part of the guard fence block, the guard fence block collapses and the vehicle is placed on the opposite road surface. The vehicle does not jump out or fall outside the road. In addition, by using a shock absorber as a filling material for filling the precast guard fence block, a shock absorbing effect at the time of a vehicle collision is generated,
Thus, serious accidents can be reduced. By installing standing objects such as traffic signs, mercury lamps, and sound insulation boards on the guard fence block, it is possible to save the installation space for these. By using the guard fence as the earth retaining, it is possible to install the guard fence in a place having a step on the ground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明の一実施例を示すプレキャスト
ガードフェンスブロックの平面図である。
FIG. 1 is a plan view of a precast guard fence block showing one embodiment of the present invention.

【図2】図2は、図1のプレキャストガードフェンスブ
ロックの側面図である。
FIG. 2 is a side view of the precast guard fence block of FIG. 1;

【図3】図3は、図1のプレキャストガードフェンスブ
ロックのA−A断面図である。
FIG. 3 is a sectional view of the precast guard fence block of FIG. 1 taken along the line AA.

【図4】図4は、図1のプレキャストガードフェンスブ
ロックのB−B断面図である。
FIG. 4 is a cross-sectional view of the precast guard fence block of FIG. 1 taken along line BB.

【図5】図5は、図1のプレキャストガードフェンスブ
ロックのC−C断面図である。
FIG. 5 is a cross-sectional view of the precast guard fence block of FIG. 1 taken along line CC.

【図6】図6は、本発明のプレキャストガードフェンス
ブロックの設置状態を示す断面図である。
FIG. 6 is a cross-sectional view showing an installation state of a precast guard fence block of the present invention.

【図7】図7は、本発明のプレキャストガードフェンス
ブロックの設置状態を示す平面図である。
FIG. 7 is a plan view showing an installation state of a precast guard fence block of the present invention.

【図8】図8の(A)、(B)、(C)、(D)は、本
発明のプレキャストガードフェンスブロックの設置工程
を説明するための略図である。
8 (A), (B), (C), and (D) are schematic diagrams for explaining a step of installing a precast guard fence block of the present invention.

【図9】図9は、本発明のプレキャストガードフェンス
の他の実施例を示す斜視図である。
FIG. 9 is a perspective view showing another embodiment of the precast guard fence of the present invention.

【図10】図10は、本発明のプレキャストガードフェ
ンスの更に他の実施例を示す断面図である。
FIG. 10 is a sectional view showing still another embodiment of the precast guard fence of the present invention.

【図11】図11は、従来公知のコンクリート製のガー
ドフェンスを示す断面図であり、(A)は断面図、
(B)は斜視図である。
FIG. 11 is a cross-sectional view showing a conventionally known concrete guard fence, where (A) is a cross-sectional view,
(B) is a perspective view.

【図12】図12は、従来公知の金属製のガードフェン
スを示す断面図である。
FIG. 12 is a cross-sectional view showing a conventionally known metal guard fence.

【図13】図13は、従来公知の中央分離帯の一例を示
す概略平面図である。
FIG. 13 is a schematic plan view showing an example of a conventionally known median strip.

【図14】図14は、図11のD−D部分断面図であ
る。
FIG. 14 is a partial sectional view taken along the line DD of FIG. 11;

【符号の説明】[Explanation of symbols]

21 ガードフェンス 22 上面 23 側面 24 端面 25 空間 26 開口 27 係合突起 28 係合凹部 29 基礎柱 30 充填物 31 円形水路 32 挿入穴 41 道路標識 42 水銀灯 43 遮音板 44 地面 45 地面 DESCRIPTION OF SYMBOLS 21 Guard fence 22 Top surface 23 Side surface 24 End surface 25 Space 26 Opening 27 Engagement projection 28 Engagement concave part 29 Foundation pillar 30 Filling material 31 Circular channel 32 Insertion hole 41 Road sign 42 Mercury lamp 43 Sound insulation plate 44 Ground 45 Ground

───────────────────────────────────────────────────── フロントページの続き (54)【発明の名称】 コンクリ―ト製のプレキャストガ―ドフェンスブロックを使用したガ―ドフエンスの施工方法及 び該施工方法により施工されたプレキャストガ―ドフエンスブロックを使用したガ―ドフェンス の構造 ──────────────────────────────────────────────────続 き Continued on the front page (54) [Title of Invention] Construction method of guard fuence using precast guard fence block made of concrete and precast guard fuence block constructed by the construction method Guard fence structure using

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】ガードフエンスが既に設置されている個所
に新規にコンクリート製のプレキャストガードフエンス
ブロックを使用したガードフエンスを設置する施工方法
であって、前記既に設置されているガードフエンスを取
り外したガードフエンス無設置期間を極力短縮する施工
方法において、 内部に空間を有し、上面に前記空間と連通する開口を有
するコンクリート製のプレキャストガードフェンスブロ
ックを使用し、 前記既設置のガードフエンスを取り付けた状態のまま
で、地中に基礎柱を埋設する工程と、 既設置のガードフエンスを取り外す工程と、 前記基礎柱を空間内に位置させながら前記プレキャスト
ガードフェンスブロックを設置する工程と、 前記空間に前記開口を介して充填物を注入し、前記基礎
柱とプレキャストガードフェンスブロックとを結合する
工程と、からなることを特徴とするコンクリート製のプ
レキャストガードフェンスブロックを使用したガードフ
ェンスの施工方法。
1. A method for installing a guard fuence using a concrete precast guard fuence block at a place where a guard fuence is already installed, wherein the guard fuence which has already been installed is removed. In the construction method for minimizing the fence non-installation period as much as possible, a state in which a space is provided inside and a concrete precast guard fence block having an opening communicating with the space on the upper surface is used, and the existing guard fence is attached. Burying the foundation pillar in the ground, removing the guard guard already installed, placing the precast guard fence block while locating the foundation pillar in the space, Inject the filling through the opening, said foundation pillar and precast guard A step of bonding the Ensuburokku, construction of guard fence using concrete precast guard fence block, characterized in that it consists of.
【請求項2】ガードフエンスが既に設置されている個所
に新規に設置されるガードフエンスであって、前記既に
設置されているガードフエンスが取り外されているガー
ドフエンス無設置期間を極力短縮するコンクリート製の
プレキャストガードフエンスブロックを使用したガード
フエンスの構造において、地中に埋設された基礎柱と、
内部に該基礎柱が挿入される空間を有し、上面に該空間
と連通する充填物注入用の開口を有するコンクリート製
のプレキャストガードフェンスブロックと、前記空間に
注入され、前記基礎柱と前記プレキャストガードフェン
スブロックとを固定する充填物と、からなり、 前記基礎柱は、既設のガードフエンスを取り外すことな
く設置されたものであり、道路の端部あるいは中央分離
帯に設置されることを特徴とするプレキャストガードフ
ェンスブロックを使用したガードフエンスの構造。
2. A guard fence newly installed at a place where a guard fence has already been installed, wherein the guard fence is made of concrete for minimizing a guard fence non-installation period in which the guard fence is removed. In the structure of guard fence using the precast guard fence block of, the foundation pillar buried underground,
A precast guard fence block made of concrete having a space into which the base pillar is inserted, and having an opening for filling filling communicating with the space on the upper surface, and the base pillar and the precast being injected into the space. And a filler for fixing the guard fence block, wherein the foundation pillar is installed without removing the existing guard fence, and is installed at an end of a road or a median strip. Guard fence structure using precast guard fence blocks.
【請求項3】充填物が、前記プレキャストガードフェン
スブロックを前記基礎柱に対して移動可能に固定する緩
衝体からなることを特徴とする請求項2記載のプレキャ
ストガードフェンスブロックを使用したガードフエンス
の構造。
3. The guard fence using a precast guard fence block according to claim 2, wherein the filler comprises a buffer for movably fixing the precast guard fence block with respect to the foundation pillar. Construction.
【請求項4】プレキャストガードフェンスブロックの端
部に隣接して設置されるプレキャストガードフェンスブ
ロックの係合用の凹凸を設けたことを特徴とする請求項
2または請求項3記載のプレキャストガードフェンスブ
ロックを使用したガードフエンスの構造。
4. The precast guard fence block according to claim 2, wherein the precast guard fence block is provided with irregularities for engaging the precast guard fence block installed adjacent to the end of the precast guard fence block. The structure of the guard fence used.
【請求項5】プレキャストガードフェンスブロックの上
部に道路標識、水銀灯、遮音壁等の立設体を設けてなる
ことを特徴とする請求項2ないし請求項4のいずれか1
項記載のプレキャストガードフェンスブロックを使用し
たガードフエンスの構造。
5. The precast guard fence block is provided with a standing body such as a road sign, a mercury lamp, a sound insulation wall, and the like above the precast guard fence block.
Guard fence structure using the precast guard fence block described in the item.
JP31005799A 1999-10-29 1999-10-29 Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method Expired - Fee Related JP3188436B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31005799A JP3188436B2 (en) 1999-10-29 1999-10-29 Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31005799A JP3188436B2 (en) 1999-10-29 1999-10-29 Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP30595892A Division JP3188328B2 (en) 1992-10-21 1992-10-21 Structure of concrete precast guard fence

Publications (2)

Publication Number Publication Date
JP2000096530A true JP2000096530A (en) 2000-04-04
JP3188436B2 JP3188436B2 (en) 2001-07-16

Family

ID=18000656

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31005799A Expired - Fee Related JP3188436B2 (en) 1999-10-29 1999-10-29 Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method

Country Status (1)

Country Link
JP (1) JP3188436B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100979257B1 (en) 2010-01-18 2010-09-01 주식회사 백제 Road safety facility improvement method and improvement device
JP2013221380A (en) * 2012-04-19 2013-10-28 Kcon Kk Multifunctional guardfence having built in drain channel
CN113431426A (en) * 2021-06-11 2021-09-24 安徽博晟亿电力科技有限公司 Railway fence overtaking eviction warning device and implementation method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047247B (en) * 2014-07-09 2016-10-05 上海市城市建设设计研究总院 Fixed central strip pier

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100979257B1 (en) 2010-01-18 2010-09-01 주식회사 백제 Road safety facility improvement method and improvement device
JP2013221380A (en) * 2012-04-19 2013-10-28 Kcon Kk Multifunctional guardfence having built in drain channel
CN113431426A (en) * 2021-06-11 2021-09-24 安徽博晟亿电力科技有限公司 Railway fence overtaking eviction warning device and implementation method thereof

Also Published As

Publication number Publication date
JP3188436B2 (en) 2001-07-16

Similar Documents

Publication Publication Date Title
KR101274974B1 (en) Earth retaining wall and construction method thereof
KR100640716B1 (en) Precast concrete block for cantilever retaining wall and construction method using the same
KR20090100867A (en) The method construction work and unit metal tubing constructing system for the road underground driveway
JP3188328B2 (en) Structure of concrete precast guard fence
JP3188436B2 (en) Construction method of guard fence using precast guard fence block made of concrete and structure of guard fence using precast guard fence block constructed by the construction method
KR100510092B1 (en) A one-piece type arch-shaped structure with the precast concrete pannel and the steel frame under the earth, and method for manufacturing it
JP4144702B2 (en) How to build an enlarged tunnel
JP2717126B2 (en) Repair method of median strip and protective wall block used for it
KR101137475B1 (en) Double steel pipe foundation and construction method thereof
KR101165451B1 (en) Pillar foundation structure of street facility and construction method thereof
JP2612599B2 (en) How to repair the median strip
KR200420394Y1 (en) Precast concrete block for cantilever retaining wall
JP2005240426A (en) Erection structure for steel-pipe column
CN110144818B (en) Construction method of cast-in-place concrete guardrail
JP3549158B2 (en) Sound insulation wall mounting structure
KR20070088114A (en) Steel pipe roof assembly and the construction method for tunnel using thereof
JP2010168845A (en) Road widening structure
JP2004084184A (en) Precast continuous footing for guardfence
CN214460528U (en) Protective structure is administered to anti-skidding slope
KR101186563B1 (en) Construction method and foundation structure used pile foundation of precast concrete for soundproofing fence
KR200323116Y1 (en) Precast concrete block for retaining wall
KR102670724B1 (en) Embedded Support Member And Protective Fence For Side Walk Including The Same
KR100488130B1 (en) Precast concrete counterforts retaining wall
JP7324474B1 (en) Reconstruction method and structure of existing fence
KR101316719B1 (en) Structure for reinforcing sloping ground of roadside having guardrail

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees