Earth retaining strut and positioning method thereof

Info

Publication number
JP2000087353A
JP2000087353A JP10254341A JP25434198A JP2000087353A JP 2000087353 A JP2000087353 A JP 2000087353A JP 10254341 A JP10254341 A JP 10254341A JP 25434198 A JP25434198 A JP 25434198A JP 2000087353 A JP2000087353 A JP 2000087353A
Authority
JP
Japan
Prior art keywords
wire
opening
girder
hanging
closing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10254341A
Other languages
Japanese (ja)
Inventor
Kunihiro Ogasawara
邦洋 小笠原
Masamichi Saito
雅道 齋藤
Taizo Shimomura
泰造 下村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP10254341A priority Critical patent/JP2000087353A/en
Publication of JP2000087353A publication Critical patent/JP2000087353A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an earth retaining strut and a positioning method thereof capable of reducing artificial works to the utmost and rationalizing process of works to shorten a construction period of time. SOLUTION: An earth retaining wall strut A is so constituted that split struts 2 and 2 are connected to each other with a center bent hinge mechanism 1. A positioning method of the earth retaining wall strut is so constituted that a strut opening and closing device B is provided in the struts 2 and 2 and that it is suspended to a specific position of an earth retaining site in a state to close a hinge section H of the struts 2 and 2 by the opening and closing device B. Then, the hinge section H of the struts 2 and 2 is horizontally opened by bundling wires 21 and 22 of the strut opening and closing device B and opening and closing wires 25 with the hinge section H of the struts 2 and 2 as a supporting point and is provided between earth retaining walls 4 and 4. Then, a joint section J between the struts 2 and 2 is tightened and, at the same time, the outside ends of the struts 2 are pushed against walls 5 to connect.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、山留め工事に用い
る切梁とその設置方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a girder for use in a retaining work and a method for installing the girder.

【0002】[0002]

【従来の技術】山留め現場において、人為的作業のより
切梁、火打材を夫々別々に腹起しに据付けている。
2. Description of the Related Art At a retaining site, a cross beam and a fired material for artificial work are separately installed on a bulge.

【0003】[0003]

【発明が解決しようとする課題】しかし、切梁、火打材
の据付け作業に多くの要員を必要とする上、多大な手間
・時間がかかる。そのため山留め工事が長期化するなど
の課題があった。
However, the work of installing the girder and the fired material requires a large number of personnel and takes a lot of labor and time. For this reason, there were problems such as the lengthening of the retaining work.

【0004】[0004]

【本発明の目的】上記のような課題を解決するためにな
された本発明は、人為的作業を極力減らし、工程を合理
化して工期の短縮を可能にする山留切梁とその建込み方
法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to reduce erroneous work as much as possible, streamline the process and shorten the construction period, and a method of installing the beam. Is to provide.

【0005】[0005]

【課題を解決するための手段】前記の目的を達成するた
めに、本発明の山留切梁は、分割した切梁を中折れヒン
ジ機構を用いて接合した構成であり、山留切梁の建込み
方法は、前記山留切梁に切梁開閉装置を着装し、同開閉
装置により切梁のヒンジ部が閉じた状態で山留め現場の
所定位置に吊り下げ、切梁開閉装置の玉掛けワイヤ−と
開閉用ワイヤ−とで、切梁のヒンジ部を支点にして水平
に開いて山留壁間に設置し、切梁のジョイント部を締結
すると共に、切梁の外端部を腹起しに押し付けて接合す
ることにある。
Means for Solving the Problems In order to achieve the above-mentioned object, a mountain retaining beam according to the present invention has a configuration in which divided beams are joined using a center-bending hinge mechanism. The method of mounting is to mount a girder opening / closing device on the girder girder, suspend the girder at a predetermined position on the girder with the hinge portion of the girder closed by the opening / closing device, and attach a slinging wire of the girder opening / closing device. With the opening and closing wire, open horizontally with the hinge of the cutting beam as a fulcrum and install it between the retaining walls, fasten the joint of the cutting beam, and bulge the outer end of the cutting beam. Pressing and joining.

【0006】[0006]

【発明の実施の形態】以下、図面を用いて本発明の実施
の形態を説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0007】<イ>山留切梁(図1〜図3、図6,7) 山留切梁Aは切梁2に火打材3を一体接合した火打一体
切梁であり、予め地組により製作する。即ち、分割した
H形鋼の切梁2,2を中折れヒンジ機構1を用いて接合
すると共に、同切梁2の側部に一対の火打材3,3を接
合して形成する。尚、火打材3の先端は切梁2のそれと
同面にしてある。また、切梁2にプレロ−ドジャッキP
を装着しておく。
<B> Cut-off beam (FIGS. 1 to 3, FIGS. 6, 7) The cut-off beam A is a fire-integrated cut beam obtained by integrally joining a cut-off material 3 to a cut-off beam 3. To manufacture. That is, the split beams 2 and 2 of the divided H-section steel are joined using the center-bending hinge mechanism 1, and a pair of fired materials 3 and 3 are joined to the side of the cut beam 2. The tip of the fired material 3 is flush with that of the cutting beam 2. In addition, preload jack P
Is attached.

【0008】また、分割した切梁2,2のジョイント部
Jの端部プレ−ト12には、ボルト14接合用の孔13
があけてある。
Further, the end plate 12 of the joint J of the divided beams 2 is provided with a hole 13 for joining a bolt 14.
Is open.

【0009】山留切梁Aは火打一体切梁に限定すること
なく、火打材3を後施工する場合の山留切梁であっても
よい。
[0009] The piercing beam A is not limited to a piercing beam, but may be a piercing beam when the blasting material 3 is post-constructed.

【0010】<ロ>中折れヒンジ機構1,11(図2,
3) 中折れヒンジ機構1,11は180 度回転するヒンジ金物
であって、図1に示す分割した切梁2,2のジョイント
部Jに用いる。即ち、ヒンジ金物1,11のヒンジ部H
をジョイント部Jに位置させて切梁2,2の下フランジ
7,7下面にボルト15接合する。16はナットであ
る。
<B> Middle folding hinge mechanisms 1 and 11 (FIG. 2)
3) The hinge mechanisms 1 and 11 are hinge hardware that rotates 180 degrees, and are used for the joint J of the divided beams 2 and 2 shown in FIG. That is, the hinge portion H of the hinge hardware 1, 11
Is positioned at the joint J and the bolts 15 are joined to the lower surfaces of the lower flanges 7, 7 of the cutting beams 2, 2. 16 is a nut.

【0011】図示の山留切梁Aは2つ折りにした例であ
るが3つ折りにすることでもよい。前記ヒンジ金物1,
11を図6に示す切梁2,2のジョイント部Jに用いる
場合は、上フランジ6上面にボルト15接合する。
Although the illustrated retaining beam A is an example of being folded in two, it may be folded in three. The hinge hardware 1,
When 11 is used for the joint J of the cutting beams 2 and 2 shown in FIG. 6, the bolt 15 is joined to the upper surface of the upper flange 6.

【0012】ヒンジ金物1,11のヒンジ部Hには、夫
々ピンロッド8,18が貫挿してある。それにより山留
切梁Aは開閉する。
Pin rods 8 and 18 are inserted through hinge portions H of the hinge hardware 1 and 11, respectively. Thereby, the retaining beam A is opened and closed.

【0013】<ハ>切梁開閉装置B,C[その1](図
1,4,5) 図4及び図5の切梁開閉装置B,Cは、切梁2,2を開
閉するためのワイヤ−25と、この開閉用ワイヤ−25
を吊るす吊り治具20,30と、切梁2,2をヒンジ部
Hで吊るす第1玉掛けワイヤ−21,31と、同第1玉
掛けワイヤ−21,31を吊るすワイヤ−23と、前記
吊り治具20,30に取付けた第2玉掛けワイヤ−22
と、同第2玉掛けワイヤ−22を吊るすワイヤ−24と
からなっている。図中28、29はフックである。尚、
前記ワイヤ−23とワイヤ−24とを置き換えることで
もよい。
<C> Cut Beam Opening and Closing Devices B and C [Part 1] (FIGS. 1, 4 and 5) The cut beam open / close devices B and C shown in FIGS. 4 and 5 are used to open and close the cut beams 2 and 2. Wire-25 and the opening / closing wire-25
Jigs 20 and 30 for suspending, the first sling wires 21 and 31 for hanging the cut beams 2 and 2 at the hinge H, the wire 23 for suspending the first sling wires 21 and 31, and the suspending jig. Second slinging wire -22 attached to fixtures 20, 30
And a wire 24 for suspending the second slinging wire-22. In the figure, reference numerals 28 and 29 denote hooks. still,
The wires 23 and 24 may be replaced.

【0014】<ニ>山留切梁Aの建込み方法[その1]
(図1,4) 分割した切梁2,2をヒンジ金物1を用いて接合した山
留切梁A(火打一体切梁)を、切梁開閉装置Bにより建
込む方法の一例について説明する。
<D> Method of setting up the stake beam A [No. 1]
(FIGS. 1, 4) An example of a method of building a stake beam A (a fire-integrated slab beam) in which the divided slab beams 2 and 2 are joined by using a hinge hardware 1 using a slab open / close device B will be described.

【0015】上記切梁Aに前記切梁開閉装置(B又は
C)や吊り治具(10a又は10b)を着装し、それら
によって切梁Aを吊り、ヒンジ部Hが閉じた状態で山留
め現場の所定位置に吊り下げる。その際、切梁2,2の
下端が開かないように結束材で予め仮拘束しておく。
The girder A is fitted with the girder opening / closing device (B or C) and the suspending jig (10a or 10b), and the girder A is hung by them. Hang it in place. At this time, the cutting beams 2 and 2 are temporarily restrained with a binding material in advance so as not to open.

【0016】次に、切梁開閉装置Bにおける一対の第1
玉掛けワイヤ−21,21と開閉用ワイヤ−25,25
とで、操り式に切梁Aのヒンジ部Hを支点にして徐々に
逆V字型に開いて行く。(図1の鎖線、破線)
Next, the pair of first
Slinging wires 21, 21 and opening / closing wires 25, 25
Then, the cutting beam A is gradually opened in an inverted V-shape with the hinge H of the beam A as a fulcrum. (Chain line and broken line in FIG. 1)

【0017】この操作はクレ−ンを用い下記のいずれか
によることができる。
This operation can be performed by using a crane and any of the following.

【0018】(1)吊り治具20に取付けた第2玉掛け
ワイヤ−22をワイヤ−24により吊った状態で、切梁
Aのヒンジ部Hに取付けた第1玉掛けワイヤ−21をワ
イヤ−23によって切梁を展伸させてゆく。
(1) With the second slinging wire 22 attached to the hanging jig 20 suspended by the wire 24, the first slinging wire 21 attached to the hinge H of the cutting beam A is connected by the wire 23. Extend the cutting beam.

【0019】(2)切梁Aのヒンジ部Hに取付けた第1
玉掛けワイヤ−21をワイヤ−23により吊った状態
で、吊り治具20に取付けた第2玉掛けワイヤ−22を
ワイヤ−24により引き上げて、荷重を受け替えながら
切梁2,2を展伸させてゆく。
(2) The first beam attached to the hinge H of the cutting beam A
With the slinging wire -21 hung by the wire -23, the second slinging wire -22 attached to the hanging jig 20 is pulled up by the wire -24, and the cut beams 2, 2 are extended while receiving the load. go.

【0020】(3)上記(1)におけるワイヤ−23
と、(2)におけるワイヤ−24を同時に操作しながら
切梁を展伸させてゆく。
(3) The wire 23 in the above (1)
Then, while simultaneously operating the wire 24 in (2), the cutting beam is extended.

【0021】尚、前記ワイヤ−23とワイヤ−24とを
置き換えることでもよい。
The wires 23 and 24 may be replaced with each other.

【0022】前記操作により切梁Aを水平に開いて繋ぎ
材48に仮置きする。
With the above operation, the cutting beam A is opened horizontally and temporarily placed on the connecting member 48.

【0023】次いで、切梁2,2のジョイント部Jの端
部プレ−ト12,12同士をボルト14により締結す
る。(図2)
Next, the end plates 12, 12 of the joint J of the cutting beams 2, 2 are fastened with bolts 14. (Fig. 2)

【0024】次に、切梁2に装着したプレロ−ドジャッ
キPにより、切梁2及び火打材3の外端部を腹起し5に
押し付けて接合する。図中49は掘削地盤面である。
Next, the outer ends of the cut beam 2 and the fired material 3 are pressed against the bulge 5 and joined by a preload jack P mounted on the cut beam 2. In the figure, reference numeral 49 denotes an excavated ground surface.

【0025】<ホ>切梁開閉装置D[その2](図6,
7) 図7の切梁開閉装置Dは、2本1セット2組の切梁開閉
用ワイヤ−35と、同各ワイヤ−35に沿う滑車36
と、この滑車36を支持する支持プレ−ト37と、前記
の各開閉用ワイヤ−35の上端を固定する吊り治具40
及びワイヤ−35の下端を固定する一対の定着プレ−ト
38と、切梁2,2をヒンジ部Hで吊るす一対の玉掛け
ワイヤ−32と、同玉掛けワイヤ−32を吊るすクレ−
ンのワイヤ−34と、前記吊り治具40を吊るすクレ−
ンのワイヤ−33とからなっている。図中28、29は
フックである。
<E> Cut beam opening / closing device D [2] (FIG. 6,
7) The girder opening / closing device D of FIG. 7 includes two sets of two girder opening / closing wires 35 and pulleys 36 along the respective wires 35.
A support plate 37 for supporting the pulley 36; and a suspending jig 40 for fixing the upper ends of the opening / closing wires 35.
A pair of fixing plates 38 for fixing the lower ends of the wires 35; a pair of slinging wires 32 for hanging the cutting beams 2 and 2 at the hinge portion H;
And a screw for suspending the suspending jig 40.
Wire 33. In the figure, reference numerals 28 and 29 denote hooks.

【0026】尚、前記ワイヤ−33とワイヤ−34とを
置き換えることでもよい。
The wires 33 and 34 may be replaced with each other.

【0027】<ヘ>山留切梁Aの建込み方法[その2]
(図6,7) 山留切梁Aに前記切梁開閉装置Dを着装し、同開閉装置
Dによって切梁Aのヒンジ部Hが閉じた状態で山留め現
場の所定位置に吊り下げる。
<F> Method of setting up stake beam A [Part 2]
(FIGS. 6 and 7) The above-mentioned girder opening / closing device D is mounted on the girder girder girder A, and the girder girder A is hung by the opening / closing device D at a predetermined position on the girder site with the hinge portion H of the girder A closed.

【0028】切梁開閉装置Dの玉掛けワイヤ−32と開
閉用ワイヤ−35とで、操り式に切梁Aのヒンジ部Hを
支点にして徐々にV字型に開いて行く。
The girder wire 32 and the opening / closing wire 35 of the girder opening / closing device D are gradually steerably opened in a V-shape around the hinge H of the girder A as a fulcrum.

【0029】図6の〜は、山留切梁Aが閉じた状態
から水平に開いた状態の過程を示す。
FIGS. 6A to 6D show the process in which the retaining beam A is opened horizontally from the closed state.

【0030】この操作はクレ−ンを用い下記のいずれか
によることができる。
This operation can be performed by using a crane as follows.

【0031】(1)切梁Aのヒンジ部Hに取付けた玉掛
けワイヤ−32をワイヤ−34により吊った状態で、開
閉用ワイヤ−35を固定した吊り治具40を吊るすワイ
ヤ−33により可動させながら下ろしてゆく。
(1) With the slinging wire 32 attached to the hinge H of the cutting beam A suspended by the wire 34, the sling jig 40 to which the opening / closing wire 35 is fixed is moved by the hanging wire 33. While lowering.

【0032】(2)切梁Aのヒンジ部Hに取付けた玉掛
けワイヤ−32をワイヤ−33により吊った状態で、開
閉用ワイヤ−35を固定した吊り治具40をワイヤ−3
4により可動させながら下ろしてゆく。
(2) With the slinging wire 32 attached to the hinge H of the cutting beam A suspended by the wire 33, the hanging jig 40 to which the opening / closing wire 35 is fixed is connected to the wire-3.
Move down by 4 while moving.

【0033】(3)上記(1)におけるワイヤ−33
と、(2)におけるワイヤ−34を同時に可動させなが
ら下ろしてゆく。
(3) The wire 33 in the above (1)
And lowering while simultaneously moving the wire 34 in (2).

【0034】尚、前記ワイヤ−33とワイヤ−34とを
置き換えることでもよい。
The wires 33 and 34 may be replaced with each other.

【0035】前記操作により切梁Aを水平に開いて繋ぎ
材48に仮置きする。
With the above operation, the cutting beam A is opened horizontally and temporarily placed on the connecting member 48.

【0036】次いで、切梁2,2のジョイント部Jの端
部プレ−ト12,12同士をボルト14により締結す
る。(図2参考) 次に、切梁2に装着したプレロ−ドジャッキPにより、
切梁2及び火打材3の外端部を腹起し5に押し付けて接
合する。
Next, the end plates 12, 12 of the joint portion J of the cutting beams 2, 2 are fastened with bolts 14. (Refer to FIG. 2) Next, with the preload jack P attached to the cutting beam 2,
The outer ends of the cutting beam 2 and the fired material 3 are protruded and pressed against 5 to join them.

【0037】<ト>第1吊り治具10a,10b(図
2,3) 吊り治具10a,10bは、山留切梁Aをヒンジ部Hに
おいて吊るための部材である。
<G> First Suspension Jigs 10a and 10b (FIGS. 2 and 3) The suspension jigs 10a and 10b are members for suspending the ridge beam A at the hinge H.

【0038】図2に示す第1の吊り治具10aは、ピン
ロッド8を兼ねる部材であり、ロッド8の両端がヒンジ
部Hより突出しフック9状にしてある。このフック9に
第1玉掛けワイヤ−21を取付け、吊下げることで山留
切梁Aはヒンジ部Hで中折れし閉じる。
The first suspension jig 10a shown in FIG. 2 is a member that also serves as the pin rod 8, and both ends of the rod 8 protrude from the hinge H to form a hook 9. The first slinging wire 21 is attached to the hook 9 and suspended, so that the ridged beam A is folded at the hinge portion H and closed.

【0039】前記吊り治具10aに代え、図3に示す吊
り治具10bは垂直材17と水平材19とから門型に形
成してある。垂直材17の脚部にねじ切りされたピンロ
ッド18を挿通し、ナット16により取付けてある。治
具10bの水平材19に吊り金具45を固設し、これに
玉掛けワイヤ−21を取付けて吊下げることで、山留切
梁Aはヒンジ部Hで中折れし閉じる。
In place of the hanging jig 10a, a hanging jig 10b shown in FIG. A threaded pin rod 18 is inserted through the leg of the vertical member 17 and attached with a nut 16. The hanging metal 45 is fixed to the horizontal member 19 of the jig 10b, the sling wire 21 is attached to the hanging metal 45, and the hanging metal 45 is hung.

【0040】図3に示すピンロッド18はその両端にカ
ウンタ−ウエイト44,44をセットした場合である。
それにより山留切梁Aの展伸を容易にすることができ
る。
The pin rod 18 shown in FIG. 3 is a case where counter weights 44, 44 are set at both ends.
Thereby, the extension of the stake beam A can be facilitated.

【0041】<チ>第2吊り治具20,30,40(図
4,5,7) 図4,5に示す吊り治具20,30は各ワイヤ−を取付
ける水平部材であり、その両端の上下部に吊り金具2
6,27がボルトや溶接により据付けてある。下部の吊
り金具に切梁開閉用ワイヤ−25が、上部の吊り金具に
第2玉掛けワイヤ−22が夫々取付けてある。また、同
玉掛けワイヤ−22の上部をフック29を介しワイヤ−
24により吊る。
<H> Second hanging jigs 20, 30, 40 (FIGS. 4, 5, 7) The hanging jigs 20, 30 shown in FIGS. 4 and 5 are horizontal members to which each wire is attached. Hanging bracket 2 at the top and bottom
6, 27 are installed by bolts or welding. A wire 25 for opening and closing the cut beam is attached to the lower hanging metal fitting, and a second slinging wire 22 is attached to the upper hanging metal fitting, respectively. Further, the upper part of the slinging wire 22 is connected to the wire through a hook 29.
Hang with 24.

【0042】図4の吊り治具20の両側面に溝状のガイ
ド金物41が溶接により取付けてある。溝状のガイド金
物に限定せずラッパ状の金物でもよい。
A groove-shaped guide metal member 41 is attached to both sides of the suspension jig 20 of FIG. 4 by welding. It is not limited to the groove-shaped guide metal, but may be a trumpet-shaped metal.

【0043】図5の吊り治具30の中心の上下方向にガ
イド穴43が設けてある。
A guide hole 43 is provided in the vertical direction of the center of the hanging jig 30 in FIG.

【0044】また、前記ガイド穴43の両側部に1個又
は2個のロ−ラ−を対にして配設し、ガイド穴43とロ
−ラ−の間に玉掛けワイヤ−31を一連に通してもよい
(図示省略)。それにより山留切梁Aの開閉操作が更に
容易になる。
Further, one or two rollers are provided in pairs on both sides of the guide hole 43, and the slinging wire 31 is passed through the guide hole 43 and the roller in series. (Not shown). This further facilitates the opening / closing operation of the retaining beam A.

【0045】前記のガイド金物41やガイド穴43を案
内にして第1玉掛けワイヤ−21,31を配設し、同ワ
イヤ−21,31の上部をフック28を介しワイヤ−2
3により吊る。
The first slinging wires 21 and 31 are disposed by using the guide hardware 41 and the guide holes 43 as guides, and the upper portions of the wires 21 and 31 are connected to the wire 2 via the hooks 28.
Hang by 3.

【0046】図7に示す吊り治具40は、その両側部に
半環状のガイド金物42が溶接により取付けてある。こ
のガイド金物42を案内にして玉掛けワイヤ−32,3
2を配設し、同ワイヤ−32,32の上部をフック29
を介してワイヤ−34により吊っている。
The hanging jig 40 shown in FIG. 7 has semi-annular guide hardware 42 attached to both sides by welding. Using the guide hardware 42 as a guide, the slinging wire-32, 3
2 and the upper portions of the wires 32 and 32 are hooked 29.
And is suspended by a wire 34.

【0047】[0047]

【発明の効果】本発明は以上説明したようになるから、
次のような効果を得ることができる。 (1)山留切梁は分割した切梁を中折れヒンジ機構を用
いて接合し、切梁の側部に一対の火打材を一体接合した
ことにより、 <イ>予め地組みによりユニット化するので、組立て作
業の安全性及び製作精度の向上が図れる。 <ロ>山留切梁は中折れヒンジ機構により容易に開閉で
きるので、運搬、搬入、建込み及び解体等の作業の省力
化が図れる。 (2)切梁開閉装置により、山留切梁のヒンジ部が閉じ
た状態で山留め現場の所定位置に吊り下げ、切梁開閉装
置の玉掛けワイヤ−と開閉用ワイヤ−とで、切梁のヒン
ジ部を支点にして水平に開いて山留壁間に設置し、切梁
のジョイント部を締結すると共に、切梁の外端部を腹起
しに押し付けて接合することにより、 <イ>従来のように山留現場において、多くの要員によ
り切梁、火打材を別々に腹起しに据付ける場合と比べ
て、少人数で、短時間に、安全且つ高能率に施工を行う
ことが可能となる。その結果、山留め工事全般の工程・
管理が合理的に簡素化され、大幅な工期の短縮が図れ
る。 <ロ>開閉装置により山留切梁を閉じて吊り下ろすの
で、山留めスペ−スに埋設管などの障害物があるような
狭隘部でも、建込み作業を確実に行うことが可能とな
る。 <ハ>二段目以後の山留切梁の建込みにおいても、前記
の方法を繰り返して施工するので、地下の深所作業での
安全性及び施工の確実性が確保できる。
Since the present invention has been described above,
The following effects can be obtained. (1) The split beam is joined by using a center-bend hinge mechanism, and a pair of fired materials are integrally joined to the side of the cut beam. Therefore, the safety of the assembling work and the manufacturing accuracy can be improved. <B> Since the buckling beam can be easily opened and closed by the hinge mechanism, labor saving of operations such as transportation, carrying in, erection and dismantling can be achieved. (2) Hanging the hinged beam at a predetermined position at the site of the buckle by the girder opening / closing device with the hinge portion closed, and using the slinging wire of the girder opening / closing device and the opening / closing wire to hinge the girder. Opening horizontally with the part as a fulcrum, installing it between the retaining walls, fastening the joint of the cut beam, and pressing the outer end of the cut beam against the belly to join Thus, it is possible to perform construction safely and efficiently with a small number of people, in a short time, compared to the case where a large number of personnel separately install cutting beams and fire bombs on the erection site at the stake site. Become. As a result, the overall process
The management is reasonably simplified, and the construction period can be significantly reduced. <B> Since the retaining beam is closed and suspended by the opening / closing device, it is possible to reliably perform the erection work even in a narrow portion where there is an obstacle such as a buried pipe in the retaining space. <C> Since the above-mentioned method is repeatedly carried out in the construction of the ridge beam after the second step, the safety and the reliability of the work in deep underground work can be ensured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る山留切梁とその建込み方法の第1
実施例の正面図
FIG. 1 is a first view of a stake beam and its erection method according to the present invention.
Example front view

【図2】(a)はヒンジ機構により切梁を開いた状態の
部分正面図、同図(b)はヒンジ機構により切梁を閉じ
た状態の部分正面図、(c)は同図(b)のイ−イ視側
面図
2 (a) is a partial front view of a state in which a beam is opened by a hinge mechanism, FIG. 2 (b) is a partial front view of a state in which a beam is closed by a hinge mechanism, and FIG. 2 (c) is FIG. )

【図3】(a)は他のヒンジ機構により切梁を閉じた状
態の部分正面図、同図(b)は切梁を開いた状態の部分
正面図、(c)は図3(b)のロ−ロ視側面図
3 (a) is a partial front view showing a state where a cutting beam is closed by another hinge mechanism, FIG. 3 (b) is a partial front view showing a state where a cutting beam is opened, and FIG. 3 (c) is FIG. 3 (b) Roll side view of

【図4】第1実施例に用いる切梁開閉装置の斜視図FIG. 4 is a perspective view of a girder opening / closing device used in the first embodiment.

【図5】第1実施例に用いる切梁開閉装置の変化例の斜
視図
FIG. 5 is a perspective view of a modified example of the girder opening and closing device used in the first embodiment.

【図6】本発明に係る山留切梁の建込み方法の第2実施
例の正面図
FIG. 6 is a front view of a second embodiment of the method for installing a stake beam according to the present invention.

【図7】第2実施例に用いる切梁開閉装置の斜視図FIG. 7 is a perspective view of a girder opening / closing device used in a second embodiment.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】分割した切梁を中折れヒンジ機構を用いて
接合したことを特徴とする、 山留切梁。
1. A ridged beam, wherein the divided beams are joined using a center-bending hinge mechanism.
【請求項2】請求項1に記載の山留切梁において、 切梁の側部に一対の火打材を一体接合して形成したこと
を特徴とする、 山留切梁。
2. A stake beam according to claim 1, wherein a pair of fired materials are integrally joined to a side portion of the stake beam.
【請求項3】請求項1又は2に記載の山留切梁に切梁開
閉装置を着装し、 同切梁開閉装置により、切梁のヒンジ部が閉じた状態で
山留め現場の所定位置に吊り下げ、 切梁開閉装置の玉掛けワイヤ−と開閉用ワイヤ−とで、
切梁のヒンジ部を支点にして水平に開いて山留壁間に設
置し、 切梁のジョイント部を締結すると共に、切梁の外端部を
腹起しに押し付けて接合することを特徴とする、 山留切梁の建込み方法。
3. A beam-opening / closing device is attached to the stake beam according to claim 1 or 2, and the beam-opening / closing device is used to suspend the beam at a predetermined position at a site of the mountain-retaining site with a hinge portion of the beam closed. With the slinging wire of the girder opening and closing device and the wire for opening and closing,
Opening horizontally with the hinge of the cutting beam as a fulcrum, installing it between the retaining walls, fastening the joint of the cutting beam, and pressing the outer end of the cutting beam against the belly to join it How to build a stake beam.
【請求項4】請求項3に記載の山留切梁の建込み方法に
おいて、 切梁開閉装置は、切梁を開閉するワイヤ−と、同ワイヤ
−を吊るす吊り治具と、切梁を吊るす第1玉掛けワイヤ
−と、第1玉掛けワイヤ−を吊るすワイヤ−と、吊り治
具に取付けた第2玉掛けワイヤ−と、第2玉掛けワイヤ
−を吊るすワイヤ−とで構成したことを特徴とする、 山留切梁の建込み方法。
4. The method for constructing a stake beam according to claim 3, wherein the girder opening / closing device includes a wire for opening and closing the girder, a hanging jig for hanging the wire, and a hanger for the girder. A first slinging wire, a wire for hanging the first slinging wire, a second slinging wire attached to the hanging jig, and a wire for hanging the second slinging wire. How to build a stake beam.
【請求項5】請求項3に記載の山留切梁の建込み方法に
おいて、 切梁開閉装置は、切梁を開閉するワイヤ−及び滑車と、
同ワイヤ−を固定する吊り治具と、切梁を吊るす玉掛け
ワイヤ−と、同玉掛けワイヤ−を吊るすワイヤ−と、吊
り治具を吊るすワイヤ−とで構成したことを特徴とす
る、 山留切梁の建込み方法。
5. The method of claim 3, wherein the girder opening and closing device comprises a wire and a pulley for opening and closing the girder.
Characterized by a hanging jig for fixing the wire, a sling wire for hanging the cutting beam, a wire for hanging the sling wire, and a wire for hanging the hanging jig. How to build the beam.
JP10254341A 1998-09-08 1998-09-08 Earth retaining strut and positioning method thereof Pending JP2000087353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10254341A JP2000087353A (en) 1998-09-08 1998-09-08 Earth retaining strut and positioning method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10254341A JP2000087353A (en) 1998-09-08 1998-09-08 Earth retaining strut and positioning method thereof

Publications (1)

Publication Number Publication Date
JP2000087353A true JP2000087353A (en) 2000-03-28

Family

ID=17263664

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10254341A Pending JP2000087353A (en) 1998-09-08 1998-09-08 Earth retaining strut and positioning method thereof

Country Status (1)

Country Link
JP (1) JP2000087353A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003082677A (en) * 2001-09-10 2003-03-19 Tetsuro Kobayashi Removing equipment for civil engineering plate
CN104196033A (en) * 2014-09-09 2014-12-10 中交隧道工程局有限公司 Grooving method for ultra-deep round foundation pit
CN106381865A (en) * 2016-08-31 2017-02-08 徐州徐工基础工程机械有限公司 Drilling and milling combination construction method applicable to hard rock grooving
JP2018178389A (en) * 2017-04-04 2018-11-15 ジェコス株式会社 Installation method of strut for column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003082677A (en) * 2001-09-10 2003-03-19 Tetsuro Kobayashi Removing equipment for civil engineering plate
CN104196033A (en) * 2014-09-09 2014-12-10 中交隧道工程局有限公司 Grooving method for ultra-deep round foundation pit
CN106381865A (en) * 2016-08-31 2017-02-08 徐州徐工基础工程机械有限公司 Drilling and milling combination construction method applicable to hard rock grooving
JP2018178389A (en) * 2017-04-04 2018-11-15 ジェコス株式会社 Installation method of strut for column

Similar Documents

Publication Publication Date Title
JP2000087353A (en) Earth retaining strut and positioning method thereof
JP3027130B2 (en) Assembly structure of hanging scaffold
JP2924659B2 (en) Construction method of assembling scaffold
JP3047196B2 (en) Hanging jig for gripping metal and large-diameter rebar, and installation method of longitudinal rebar
CN216041775U (en) Multifunctional fastener suitable for H-shaped steel beam free of drilling and welding
JP2000226850A (en) Earth retaining strut and erecting method therefor
JPH07286361A (en) Method of mounting balcony
JP3610456B2 (en) S construction frame structure, installation method and installation equipment
JPH03290565A (en) Erection method of beam
JPH0513862Y2 (en)
JP3079750U (en) Folding structure and installation device for S frame
JPH1144093A (en) Tool for lifting external wall panel
JP7194532B2 (en) Steel member reinforcement structure and steel member reinforcement method
JPS644024B2 (en)
JP3100574B2 (en) Suspended scaffold and its erection method
JPS6229590B2 (en)
JP2001159234A (en) Construction method for suspended scaffold and sleeper member for suspended scaffold
CN112459287A (en) Multi-functional precast shear force wall component reinforcing apparatus
JP3069424U (en) Scaffolding hanging brackets that can simultaneously suspend both the suspended under the bridge girder and the two-stage scaffold between the bridge girder
JP2533047Y2 (en) Unit scaffold
JPH11336328A (en) Hanging guide for pipe
JPH05179808A (en) Pipe shaft unit work method and frame set used for this method
JP2000226885A (en) Beam form structure
JPH0986867A (en) Hanger for construction of brace block
JPH1162077A (en) Installation of wall panel and fixture therefor