JPH0986867A - Hanger for construction of brace block - Google Patents

Hanger for construction of brace block

Info

Publication number
JPH0986867A
JPH0986867A JP27069195A JP27069195A JPH0986867A JP H0986867 A JPH0986867 A JP H0986867A JP 27069195 A JP27069195 A JP 27069195A JP 27069195 A JP27069195 A JP 27069195A JP H0986867 A JPH0986867 A JP H0986867A
Authority
JP
Japan
Prior art keywords
balance
stage
suspension
hanging
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP27069195A
Other languages
Japanese (ja)
Inventor
Yasuhisa Horiba
靖久 堀場
Kazuhiro Azuma
和弘 東
Tsuneyoshi Hioki
恒義 日置
Takuya Tamura
卓也 田村
Yumiko Iwashita
由美子 岩下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUFUJI SHEET PILING
MARUFUJI SHIITOPAIRU KK
Original Assignee
MARUFUJI SHEET PILING
MARUFUJI SHIITOPAIRU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUFUJI SHEET PILING, MARUFUJI SHIITOPAIRU KK filed Critical MARUFUJI SHEET PILING
Priority to JP27069195A priority Critical patent/JPH0986867A/en
Publication of JPH0986867A publication Critical patent/JPH0986867A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate the construction work at the time of attaching a brace block to a wale. SOLUTION: A balance type hanger is composed of a hanging balance B1 for upper stage and a hanging balance B2 for lower stage arranged in upper and lower two stages, a sling S1 attached to the hooks provided at both ends of the topside so as to support the hanging balance B1 for upper stage, and a sling S2 capable of being attached to the hooks provided at both ends of the bottom of the hanging balance B1 for upper stage and the hooks provided at both ends of the topside of the hanging balance B2 and the hook provided at the center, respectively, being provided between the hanging balance B1 for upper stage and the hanging balance B2 for lower stage. A user can hang the center position of a brace block easily when hanging a brace block into the specified position at the second stage or onward, using this hanger. Moreover, safe and speedy hanging-in work can be performed without being obstructed by the frame member on the upper stage.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する利用分野】本発明は、山留支保工に使用
される火打ブロックの架設用吊り具に関し、特に2段目
以降の火打ブロックを腹起に取り付ける際の架設作業の
容易化を図った天秤式吊り具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suspending tool for erection of a hammering block used for mountain brace support, and particularly, for facilitating the erection work when attaching the hammering blocks of the second and subsequent steps to the abdomen. It relates to a balance-type hanging device.

【0002】[0002]

【従来技術】地下構造物の構築に際しては、従来より周
辺地盤の崩壊を防ぐために山留工事が行われている。こ
の山留工事においては、まず、矢板やパイルで形成した
山留壁間の掘削予定地盤を掘削し、切梁の布設に必要な
最小限の地盤高さまで掘削する。次に山留壁に水平方向
に腹起を添わせると共に、この腹起に直交する状態に切
梁を架設している。そして、前記腹起と切梁の連結部に
は、腹越しの曲げモーメントを少くするため、切梁の両
側面から斜めに火打材を装着することが多い。最近にお
いては、省力化の要請からこの火打材を現場でその都度
組み立てるという施工方法をとらずに、例えば図16に
示すように、前記火打材a,aと切梁材bの一部とを予
め溶接によって一体化させて一種のブロック構造とな
し、このもの(以下、単に火打ブロックという)21を
切梁24にジョイントして固定するという手法がとられ
るようになってきた。
2. Description of the Related Art When constructing an underground structure, mountain retaining work has been conventionally performed to prevent the surrounding ground from collapsing. In this mountain retaining work, first, the ground to be excavated between the retaining walls formed of sheet piles and piles is excavated to the minimum ground height necessary for laying the beams. Next, a ridge is attached to the mountain retaining wall in the horizontal direction, and a girder is installed in a state orthogonal to the ridge. And, in order to reduce the bending moment over the belly, the connecting portion between the uprising and the girder is often fitted with a hammering material diagonally from both side surfaces of the girder. Recently, due to a demand for labor saving, the construction method of assembling the fire-punched material each time at the site is not taken, and, for example, as shown in FIG. A technique has been adopted in which the block structure is integrated by welding in advance to form a kind of block structure, and this structure (hereinafter, simply referred to as a fired block) 21 is jointed and fixed to a cross beam 24.

【0003】ところで前記のように一体化された火打ブ
ロック21の2段目以降の架設を行う場合においては、
対向する山留壁の一方の側から切梁を架設する。すなわ
ち図7に示すように山留壁25の水平方向に添わせた腹
起26に対して火打ブロックと切梁とをジョイントし、
切梁ブラケットで保持できる長さにした上で、次に切梁
24を必要な長さまで延長し、その延長端に、反対側の
火打ブロック21を吊り込み架設するのである。
By the way, in the case of constructing the firing block 21 integrated as described above from the second stage onward,
A girder will be installed from one side of the facing mountain retaining wall. That is, as shown in FIG. 7, the flint block and the girder are jointed to the uprising 26 along the horizontal direction of the mountain retaining wall 25,
After having a length that can be held by the cutting beam bracket, the cutting beam 24 is then extended to a required length, and the firing block 21 on the opposite side is suspended and installed at the extended end.

【0004】[0004]

【発明が解決しようとする課題】しかしながらこの火打
ブロックを2段目以降の所定位置にクレーンで吊り込み
架設するとき、上段の火打ブロックが邪魔をしてブロッ
クの重心位置を吊ることができない。そのため不安定の
まま作業せざるをえなくなり、吊り込み作業の際にバラ
ンスを崩し他の物体に接触したり衝突したり、場合によ
っては落下、離脱事故を生じて安全上好ましくない。そ
こで従来は、別にチェーンブロック等を使用して、必要
な位置に下段の火打ブロックを引っ張り込むような状態
にして架設することが行われているが、この作業は極め
て面倒であり時間がかかる。しかも吊り込みにクレーン
を使用する他に別にチェーンブロック等を使用しなけれ
ばならないから、架設作業の迅速化、省力化という要請
を満足させることができないという問題があった。
However, when this firing block is suspended and erected at a predetermined position after the second stage by a crane, the firing block in the upper stage interferes and the center of gravity of the block cannot be suspended. For this reason, it is inevitable to work in an unstable manner, and during lifting work, the balance is lost, and other objects may come into contact with or collide with each other, or in some cases, they may fall or come off, which is not preferable for safety. Therefore, conventionally, a chain block or the like is separately used to erect the lower firing block at a required position so as to be pulled, but this work is extremely troublesome and takes time. Moreover, since it is necessary to use a chain block or the like in addition to using a crane for hoisting, there is a problem that it is not possible to satisfy the demands for speeding up the erection work and labor saving.

【0005】そこで本発明の目的は、上記した従来の火
打ブロックの架設法の問題点に鑑み、2段目以降の火打
ブロックを腹起に取り付ける際の架設作業の容易化を図
るために、構造簡単で、しかもチェーンブロックを使用
せずに、容易に上段の火打ブロックをかわして所用の位
置に吊り込み架設することのできる下記構造の天秤式吊
り具を提供することを目的とする。
Therefore, in view of the above-mentioned problems of the conventional method of constructing a batting block, an object of the present invention is to provide a structure for facilitating the erection work when mounting the batting blocks of the second and subsequent stages on the abdomen. An object of the present invention is to provide a balance-type hanging device having the following structure, which is simple and can be easily suspended and erected at a required position by bypassing the upper struck block without using a chain block.

【0006】[0006]

【課題を達成するための手段】前述した目的を達成する
ため、本発明の吊り具は、上下2段に配設された上段用
吊り天秤B1及び下段用吊り天秤B2と、前記上段用吊り
天秤B1を支持するためにその上面両端に設けた掛具に
取り付けられているスリングS1と、前記上段用吊り天
秤B1と下段用吊り天秤B2との間に設けられ、上段用吊
り天秤B1の下面両端に設けた掛具と前記下段用吊り天
秤B2の上面両端及び中央に設けた掛具とにそれぞれ取
り付けることのできるスリングS2とからなることを特
徴としている。
In order to achieve the above-mentioned object, the suspending tool of the present invention comprises an upper stage suspension balance B1 and a lower stage suspension balance B2, which are arranged in upper and lower stages, and the upper stage suspension balance. Slings S1 attached to hooks provided at both ends of the upper surface for supporting B1 and between the upper suspension balance B1 and the lower suspension balance B2, and both lower ends of the upper suspension balance B1. And a sling S2 that can be attached to the hooks provided at both ends and the center of the upper surface of the lower stage suspension balance B2, respectively.

【0007】ここで使用されるスリングとは荷物支持の
ためのチェーン、ワイヤ、ロープまたは帯体などをい
い、掛具はスリングを掛けて吊り下げるシャックル等の
部材を意味している。
The sling used here means a chain, a wire, a rope or a band for supporting a load, and the hook means a member such as a shackle for hanging and hanging the sling.

【0008】なお上下2段に配設される前記の吊り天秤
B1及びB2はいずれもH鋼製のビームを主体に形成され
ている。上段用の吊り天秤B1にはその両端部における
上下両面に、シャックル取り付け用吊りプレートが固定
される。また、下段用の吊り天秤B2にはその中央上面
並びに両端部上面に、シャックル取り付け用吊りプレー
トが固定されている。
The suspension balances B1 and B2, which are arranged in the upper and lower two stages, are mainly formed by a beam made of H steel. Shackle mounting suspension plates are fixed to both upper and lower surfaces at both ends of the upper balance B1. Further, a shackle mounting suspension plate is fixed to the upper surface of the center and the upper surfaces of both ends of the suspension balance B2 for the lower stage.

【0009】[0009]

【発明の実施の形態】次に、本発明の一実施例を図面を
参照して具体的に説明する。図1と図2は上段用の吊り
天秤B1の側面及び平面を示した図である。図4と図5
は下段用吊り天秤B2の側面及び平面を示した図であ
る。図示の天秤B1及びB2は、一例として150×15
0×7×10×3400(単位mm)の寸法を有したH
鋼製のビーム材で形成させる。
BEST MODE FOR CARRYING OUT THE INVENTION Next, an embodiment of the present invention will be specifically described with reference to the drawings. 1 and 2 are views showing a side surface and a plane of the suspension balance B1 for the upper stage. 4 and 5
[Fig. 3] is a view showing a side surface and a plane surface of a lower balance B2. The illustrated balances B1 and B2 are, for example, 150 × 15
H with dimensions 0x7x10x3400 (unit mm)
It is made of steel beam material.

【0010】上記図1〜図6において、符号5と6は、
前記したビーム材の両端部における上下フランジ1、2
または3、4間に取り付けた補強プレートであり、溶接
によりビームに一体に固定させる。
1 to 6, the reference numerals 5 and 6 are
Upper and lower flanges 1 and 2 at both ends of the beam material described above.
Alternatively, it is a reinforcing plate attached between 3 and 4, and is integrally fixed to the beam by welding.

【0011】符号7と8で示すものは、上段用吊り天秤
B1を構成するビーム材の両端部における上下フランジ
面1、2から上下方向に突出するように溶接により取り
付けたシャックル取り付け用吊りプレートである。これ
らのプレートにはそれぞれビームの長手方向に対して直
角方向にシャックルピンを通す穴9、10が開設されて
いる。
Reference numerals 7 and 8 denote shackle mounting suspension plates attached by welding so as to vertically project from the upper and lower flange surfaces 1 and 2 at both ends of the beam material constituting the upper stage suspension balance B1. is there. Holes 9 and 10 for passing shackle pins are formed in these plates at right angles to the longitudinal direction of the beam.

【0012】符号11、12で示すプレートは、下段用
の吊り天秤B2を構成するビーム材の中央部上面並びに
両端部におけるフランジ3上面から上方に突出するよう
に溶接により取り付けたシャックル取り付け用吊りプレ
ートであり、両端部のプレートには、前記上段用吊り天
秤B1のと同様に、ビームの長手方向と直角方向にシャ
ックルピンを通す穴13が開設されている。また中央の
ものには、ビームの長手方向と平行にシャックルピンを
通すための一対の穴14、14が開設されている。ちな
みに符号15は中央の吊りプレート下方に位置するよう
に取り付けた補強プレートである。
Plates denoted by reference numerals 11 and 12 are shackle-mounting hanging plates attached by welding so as to project upward from the upper surface of the central portion of the beam material constituting the lower balance B2 and the upper surfaces of the flanges 3 at both ends. The plates at both ends are provided with holes 13 through which the shackle pins are inserted in the direction perpendicular to the longitudinal direction of the beam, as in the upper suspension balance B1. In the center, a pair of holes 14, 14 for passing the shackle pins are formed in parallel with the longitudinal direction of the beam. Incidentally, reference numeral 15 is a reinforcing plate attached so as to be positioned below the central hanging plate.

【0013】図7に示したように、本発明の吊り具20
は、上段用吊り天秤B1から吊りおろした左右のスリン
グS2を下段用吊り天秤B2に対してそれぞれの吊りプレ
ートに取り付けたシャックルで連結するとともに、上段
用吊り天秤B1をスリングS1を介してクレーン(図示
略)のフックから懸垂させて下記のように使用する。
As shown in FIG. 7, the lifting device 20 of the present invention.
Connects the left and right slings S2 suspended from the upper suspension balance B1 to the lower suspension balance B2 with shackles attached to the respective suspension plates, and connects the upper suspension balance B1 to the crane via the sling S1 ( It is suspended from a hook (not shown) and used as follows.

【0014】本発明の吊り具20を使用して火打ブロッ
クを2段目の腹起と切梁間にクレーンで吊り込み架設す
る方法ついて述べる。本発明の吊り具は、前述のよう
に、作業前には、図示省略したクレーンのフックからチ
ェーン、ワイヤ、ロープまたは帯体等からなるスリング
S1を介して懸垂されているが、これを、まず地組され
て一体化した火打ブロック21に向かって吊り下げる。
次に下段用の吊り天秤B2を前記火打ブロック21の重
心位置にC形クランプ22を介して図10また図11に
示すように固定する。なお必要に応じて火打ちブロック
21には取付フック23等の取り付け金具を取り付けて
おく(図10と図12参照)。
A method for suspending and constructing a struck block using the suspender 20 of the present invention by suspending it with a crane between the second stage uprising and the girder will be described. As described above, the hanging device of the present invention is suspended from a hook of a crane (not shown) via a sling S1 made of a chain, a wire, a rope, a belt, or the like before the work. It is hung toward the fire block 21 which is assembled and integrated.
Next, the suspension balance B2 for the lower stage is fixed to the center of gravity of the blow block 21 via the C-shaped clamp 22 as shown in FIGS. It should be noted that attachment fittings such as attachment hooks 23 are attached to the firing block 21 as needed (see FIGS. 10 and 12).

【0015】次に、上段用吊り天秤B1から吊り降ろし
た左右のスリングS2を下段用の吊り天秤B2のビーム中
央の吊りプレートに設けた取り付け穴14にシャックル
を介して固定する。このようにするときは、図7ないし
図9に示すように、上段と下段の天秤B1とB2とが相互
にほぼ直角となるような位置関係に置くことができる。
Next, the left and right slings S2 hung from the upper suspension balance B1 are fixed to the mounting holes 14 provided in the suspension plate at the beam center of the lower suspension balance B2 through shackles. In this case, as shown in FIGS. 7 to 9, the upper and lower balances B1 and B2 can be placed in a positional relationship such that they are substantially perpendicular to each other.

【0016】次に、図8に仮想線で示したように、本発
明の吊り具20で火打ブロック21を吊り上げ掘削した
地盤上に吊り降ろす。前記のように上段の天秤B1と下
段の天秤B2とは、相互にほぼ直角となるような位置関
係になっているから、火打ブロックをクレーンで吊り降
ろすとき、上段の切梁をかわして2段目の切梁の直下位
置まで、容易に当該火打ブロックを吊り降ろすことがで
きる。
Next, as shown by a phantom line in FIG. 8, the slinging block 21 of the present invention is used to hoist the hopping block 21 to hang it on the excavated ground. As described above, since the upper balance B1 and the lower balance B2 are in a positional relationship such that they are substantially at right angles to each other, when the firing block is hung by the crane, the upper beam is evaded and the upper beam is doubled. The hitting block can be easily hung down to a position directly below the eye beam.

【0017】次に、吊り降ろした火打ブロック21に固
定された下段用の吊り天秤B2の中央の吊りプレートか
ら左右のスリングS2を外し、上段用用吊り天秤B1を上
方に持ち上げる。続いて上段用吊り天秤B1から吊り降
ろした左右のスリングS2を振り分けて、図13ないし
図15に示すように、切梁24を跨ぐようにして再度、
上段用用吊り天秤B1を吊り降ろす。
Next, the left and right slings S2 are removed from the central suspension plate of the suspension balance B2 for the lower stage, which is fixed to the fired block 21 that has been suspended, and the suspension balance B1 for the upper stage is lifted up. Subsequently, the left and right slings S2 suspended from the upper-stage suspension balance B1 are distributed, and as shown in FIG. 13 to FIG.
Suspend the suspension balance for upper stage B1.

【0018】しかる後、左右のスリングS2をそれぞれ
下段用の吊り天秤B2の左右端部に取り付けた吊りプレ
ート11に対してシャックルを介して固定する。次に図
13または図15の仮想線で示すように、本発明の吊り
具20全体をクレーンで持ち上げるようにしながら2段
目の切梁の直下を移動させ、火打ブロック21を2段目
の腹起26と切梁24間に吊り込んだ上、ジョイントし
て架設作業を終える。
After that, the left and right slings S2 are fixed to the suspension plates 11 attached to the left and right ends of the suspension balance B2 for the lower stage via shackles. Next, as shown by the phantom line in FIG. 13 or FIG. 15, the lifting device 20 of the present invention is lifted by a crane and moved immediately below the second-level beam to move the firing block 21 to the second-stage belly. The work is suspended between the rise 26 and the girder 24, and the joint work is completed.

【0019】[0019]

【発明の効果】以上述べたように、本発明の吊り具を使
用するときは、火打ブロックを2段目以降の所定位置に
クレーンで吊り込み架設するとき、火打ブロックの重心
位置を容易に吊ることができる。また上段の架設材に邪
魔をされることなく、安全かつスピーデーな吊り込み作
業をおこなうことができる。したがって本発明によれ
ば、クレーンのみでチェーンブロック等を使用する必要
がなくなり、架設作業の迅速化、省力化という要請を満
足させることができるものである。
As described above, when the hoisting tool of the present invention is used, the center of gravity of the batting block can be easily hung when the batting block is hung and erected at a predetermined position after the second stage by a crane. be able to. In addition, the suspending work can be performed safely and speedily without being hindered by the erection material on the upper stage. Therefore, according to the present invention, it is not necessary to use a chain block or the like only with a crane, and it is possible to satisfy the demands for speeding up the erection work and labor saving.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の吊り具に使用される上段用吊り天秤
の側面図。
FIG. 1 is a side view of a suspension balance for an upper stage used in a suspension of the present invention.

【図2】 同上平面図。FIG. 2 is a plan view of the same.

【図3】 図1のA矢視図FIG. 3 is a view on arrow A of FIG.

【図4】 本発明の吊り具に使用される下段用吊り天秤
の側面図。
FIG. 4 is a side view of the lower stage suspension balance used in the suspension of the present invention.

【図5】 同上平面図。FIG. 5 is a plan view of the same.

【図6】 図4のB矢視図。FIG. 6 is a view on arrow B of FIG.

【図7】 本発明の吊り具を使用状態を示す図で、地組
一体化した火打ブロック21を掘削面に吊り降ろした状
況の説明図。
FIG. 7 is a view showing a usage state of the lifting tool of the present invention, and an explanatory view of a situation in which the ground-integrated firing block 21 is hung on the excavation surface.

【図8】 同上平面図。FIG. 8 is a plan view of the same.

【図9】 図8のA−A断面図。9 is a sectional view taken along line AA of FIG.

【図10】 下段用の吊り天秤B2と火打ブロック21
とをC形クランプ22を介して固定した状態を示した
図。
[Fig. 10] Suspended balance B2 for lower stage and flint block 21
The figure showing the state where and were fixed via a C-shaped clamp 22.

【図11】 図10のC−C断面図11 is a sectional view taken along line CC of FIG.

【図12】 火打ブロック21には取付フック23を取
り付けた状態を示した図。
FIG. 12 is a view showing a state in which a mounting hook 23 is attached to the flint block 21.

【図13】 本発明の吊り具で火打ブロック21を所定
の架設位置に固定する状況の説明図。
FIG. 13 is an explanatory view of a situation in which the slinging block 21 is fixed to a predetermined erection position by the lifting device of the present invention.

【図14】 同上平面図。FIG. 14 is a plan view of the same.

【図15】 図14のB−B断面図。15 is a cross-sectional view taken along the line BB of FIG.

【図16】 火打ブロックを一例を示した斜視図。FIG. 16 is a perspective view showing an example of a flint block.

【符号の説明】[Explanation of symbols]

B1、B2 天秤 S1、S2 スリング 1、2、3、4 フランジ 5、6、15 補強プレート 7、8 吊りプレート 9、10、13、14穴 11、12 吊りプレート 20 吊り具 21 火打ブロック 22 C形クランプ 23 取り付けフック 24 切梁 25 山留壁 B1, B2 Balance S1, S2 Sling 1,2,3,4 Flange 5,6,15 Reinforcing plate 7,8 Hanging plate 9,10,13,14 holes 11,12 Hanging plate 20 Hanging tool 21 Whipping block 22 C type Clamp 23 Mounting hook 24 Girder 25 Yamadome wall

フロントページの続き (72)発明者 田村 卓也 東京都中央区日本橋本町1−6−5 丸藤 シートパイル株式会社内 (72)発明者 岩下 由美子 東京都中央区日本橋本町1−6−5 丸藤 シートパイル株式会社内Front page continuation (72) Inventor Takuya Tamura 1-6-5 Nihonbashihonmachi, Chuo-ku, Tokyo Marufuji Sheet Pile Co., Ltd. (72) Inventor Yumiko Iwashita 1-6-5 Nihonbashihonmachi, Chuo-ku, Tokyo Marufuji Sheet Inside Pile Co., Ltd.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】上下2段に配設された上段用吊り天秤B1
及び下段用吊り天秤B2と、前記上段用吊り天秤B1を支
持するために天秤B1の上面両端に設けた掛具に取り付
けられているスリングS1と、前記上段用吊り天秤B1と
下段用吊り天秤B2との間に設けられ、上段用吊り天秤
B1の下面両端に設けた掛具と前記下段用吊り天秤B2の
上面両端及び中央に設けた掛具とにそれぞれ取り付ける
ことのできるスリングS2とからなることを特徴とする
火打ブロックの架設用吊り具。
1. A suspension balance B1 for the upper stage, which is arranged in upper and lower two stages.
And a lower stage suspension balance B2, slings S1 attached to hooks provided at both ends of the upper surface of the balance B1 for supporting the upper stage suspension balance B1, the upper stage suspension balance B1 and the lower stage suspension balance B2. And a sling S2 which is provided between the hooks provided at both ends of the lower surface of the upper suspension balance B1 and the hooks provided at both ends of the upper surface and the center of the lower suspension balance B2. Hanger for erection of flint block.
【請求項2】前記吊り天秤B1及びB2はいずれもH鋼製
のビームを主体に形成されている請求項1記載の架設用
吊り具。
2. The suspender for erection according to claim 1, wherein each of the suspension balances B1 and B2 is mainly formed of an H steel beam.
【請求項3】掛具はスリングを掛けて吊り下げうるシャ
ックル取り付け部材である請求項1または2記載の架設
用吊り具。
3. The hanging tool for installation according to claim 1, wherein the hanging tool is a shackle attachment member capable of hanging by hanging a sling.
【請求項4】上段用の吊り天秤B1にはその両端部にお
ける上下両面に、吊りプレートが固定され、下段用の吊
り天秤B2にはその中央上面並びに両端部上面に吊りプ
レートが固定されている請求項1、2または3記載の架
設用吊り具。
4. A suspension plate is fixed to the upper and lower surfaces of both ends of the suspension balance B1 for the upper stage, and a suspension plate is fixed to the upper surface of the center and the upper faces of both ends of the suspension balance B2 for the lower stage. The hanging tool for installation according to claim 1, 2 or 3.
JP27069195A 1995-09-26 1995-09-26 Hanger for construction of brace block Pending JPH0986867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27069195A JPH0986867A (en) 1995-09-26 1995-09-26 Hanger for construction of brace block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27069195A JPH0986867A (en) 1995-09-26 1995-09-26 Hanger for construction of brace block

Publications (1)

Publication Number Publication Date
JPH0986867A true JPH0986867A (en) 1997-03-31

Family

ID=17489618

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27069195A Pending JPH0986867A (en) 1995-09-26 1995-09-26 Hanger for construction of brace block

Country Status (1)

Country Link
JP (1) JPH0986867A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540420A (en) * 2015-12-24 2016-05-04 国家电网公司 Suspension balance type conveying device
CN107857191A (en) * 2017-12-06 2018-03-30 安徽马钢设备检修有限公司 A kind of frock for the big part of duplicate rows car handling and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105540420A (en) * 2015-12-24 2016-05-04 国家电网公司 Suspension balance type conveying device
CN107857191A (en) * 2017-12-06 2018-03-30 安徽马钢设备检修有限公司 A kind of frock for the big part of duplicate rows car handling and preparation method thereof

Similar Documents

Publication Publication Date Title
JP6783011B1 (en) Suspended scaffolding
JPH0986867A (en) Hanger for construction of brace block
JPH08133661A (en) Concrete block lifting means
JP4787381B1 (en) Girder bridge suspension method using girder bridge suspension jig
JP6842738B1 (en) Suspended scaffolding
JP7463766B2 (en) Lifting device and reinforcing cage installation method
JP3394942B2 (en) Hanging tools
CN110171766B (en) Steel bar transportation lifting appliance
JP3199539B2 (en) How to lift heavy objects
CN210366599U (en) Reinforcing steel bar transportation lifting appliance
JP2022144148A (en) Lifting tool
JP3949320B2 (en) Uprising hanger sheet pile method
JP3457168B2 (en) Construction method of long structure and lifting beam used in this method
CN218758292U (en) Steel reinforcement cage
JP2024118488A (en) Device for erecting long materials for high-altitude work equipment, and method for erecting long materials
JP2937683B2 (en) Precast slab construction method in suspended slab bridge construction method and jig used for the construction method
JP7091135B2 (en) Suspension jig for column girders
JPH11171466A (en) Panel lifting sling and lifting method therefor
JP4363855B2 (en) Method for holding long member connection structure in installation holding device
JPH092767A (en) Lifting method for escalator truss
JPH09151074A (en) Suspender for shape steel material
JP2000087353A (en) Earth retaining strut and positioning method thereof
JPH04360960A (en) Removing method for suspended scaffolding, and suspension jig
JP2004068397A (en) Core-material building member and core-material building method in diaphragm wall
JP2591690B2 (en) Hoisting winch for reinforcement ring