ITMI20081670A1 - STAND FOR THE TOTAL SAFETY OF THE PONTISTS - Google Patents
STAND FOR THE TOTAL SAFETY OF THE PONTISTS Download PDFInfo
- Publication number
- ITMI20081670A1 ITMI20081670A1 IT001670A ITMI20081670A ITMI20081670A1 IT MI20081670 A1 ITMI20081670 A1 IT MI20081670A1 IT 001670 A IT001670 A IT 001670A IT MI20081670 A ITMI20081670 A IT MI20081670A IT MI20081670 A1 ITMI20081670 A1 IT MI20081670A1
- Authority
- IT
- Italy
- Prior art keywords
- attached drawing
- sheet
- diameter
- shape
- battens
- Prior art date
Links
- 229910052751 metal Inorganic materials 0.000 claims description 5
- 239000002184 metal Substances 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 206010037844 rash Diseases 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Description
OGGETTO: CAVALLETTO PER LA TOTALE SICUREZZA DEI PONTISTI, UTILIZZABILE NEL MONTAGGIO E SMONTAGGIO DI PONTEGGI METALLICI PREFABBRICATI. OBJECT: STAND FOR TOTAL SAFETY OF PONTISTS, USED IN THE ASSEMBLY AND DISMANTLING OF PREFABRICATED METAL SCAFFOLDING.
Nelle costruzioni e manutenzioni edili è frequente l'utilizzo di ponteggi metallici prefabbricati di varie tipologie e marche. Tali ponteggi metallici prefabbricati devono attenersi a precise prescrizioni ministeriali per dò che concerne dimensione, forma e portata di servizio dei piani di lavoro. Il loro montaggio viene effettuato sempre dall' ultimo piano di lavoro e questo modo di operare comporta un grave rischio di caduta dall ' alto per T operatore. Questo rischio è talmente elevato che l'amministrazione pubblica in materia ha legiferato molto per sensibilizzare sia gli addetti ai lavori che le autorità preposte al controllo. V attrezzo in oggetto è stato studiato per consentire il montaggio e lo smontaggio dei ponteggi metallici prefabbricati in totale sicurezza consentendo di montare e smorte il ponteggio prefabbricato dal piano sottostante l'ultimo piano di lavoro. In construction and building maintenance it is common to use prefabricated metal scaffolding of various types and brands. These prefabricated metal scaffolding must comply with precise ministerial prescriptions as regards the size, shape and service capacity of the work surfaces. Their assembly is always carried out from the last work surface and this way of operating involves a serious risk of falling from above for the operator. This risk is so high that the public administration has legislated a lot on the matter to sensitize both the experts and the supervisory authorities. The tool in question has been designed to allow the assembly and disassembly of the prefabricated metal scaffolding in total safety, allowing the prefabricated scaffolding to be assembled and dismantled from the floor below the last work surface.
E<1>implicito che operando sotto l'ultimo piano di lavoro si lavora in totale sicurezza in quanto tale piano è completo di tutti i parapetti e le tavole fermapiede, come da prescrizioni vigenti, in tal modo si consente agli operatori di completare l'ultimo piano , come prescritto dalla legge, prima di accedervi, in totale sicurezza perché si opera sempre da piani di lavoro completi per realizzarne altri. It is implicit that by operating under the last work surface you work in total safety as this floor is complete with all the parapets and toe boards, as per the regulations in force, thus allowing the operators to complete the top floor, as required by law, before accessing it, in total safety because you always work from complete work plans to create others.
L' attrezzo in oggetto, che chiameremo cavalletto, come si può vedere dalla allegato disegno n°l è un elemento in ferro, alluminio o altri materiali meccanicamente resistenti e idonei per V impiego richiesto. L' attrezzo è composto da un telaio avente nella sua estremità superiore due perni a forma cilindrica di diametro 1⁄2 pollice lunghi 8cm, con passo tra loro di 105,00cm (vedi posizione 1 foglio 1 di 2 allegato disegno n°l). The tool in question, which we will call a tripod, as can be seen from the attached drawing no. 1, is an element made of iron, aluminum or other mechanically resistant materials suitable for the required use. The tool is composed of a frame having at its upper end two cylindrical pins with a diameter of 1⁄2 inch, 8cm long, with a pitch of 105.00cm between them (see position 1 sheet 1 of 2 attached drawing n ° l).
Sotto di essi ad una distanza di 41,00 cm si trovano altri due perni a forma cilindrica di diametro 1⁄2 pollice lunghi 4cm (vedi posizione 2 foglio 1 di 2 allegato disegno n°l). Questi 4 perni hanno la funzione di rendere stabile il cavalletto all'elemento prefabbricato, detto montante del ponteggio, in modo da poterlo gestire in sicurezza sia nelle operazioni di montaggio sia in quelle di smontaggio, operazioni come sopra detto eseguibili dal piano sottostante l'ultimo impalcato che si vuole realizzare. V attrezzo consente di far lavorare gli operatori su un piano di lavoro completo di parapetti , quindi in sicurezza, consentendo agli stessi di posizionare tutti i montanti prefabbricati del piano sovrastante il loro annullando il rischio di caduta accidentale dall' alto. Below them, at a distance of 41.00 cm, there are two other cylindrical pins with a diameter of 1⁄2 inch, 4 cm long (see position 2 sheet 1 of 2 attached drawing n ° l). These 4 pins have the function of making the trestle stable to the prefabricated element, called the scaffolding upright, in order to be able to manage it safely both in the assembly and in the disassembly operations, operations as mentioned above that can be carried out from the floor below the last. deck that you want to build. The tool allows operators to work on a work surface complete with parapets, therefore in safety, allowing them to position all the prefabricated uprights of the floor above them, eliminating the risk of accidental fall from above.
A questo punto gli operatori terminato il posizionamento dei morntanti prefabbricati possono installare i correntini nell' impalcato sovrastante quello in cui si trovano. At this point, once the operators have finished positioning the prefabricated walls, they can install the battens in the deck above the one in which they are located.
Tale operazione richiederà T impiego dell' attrezzo utilizzando i ganci a forma di C, (vedi posizione 3 foglio 1 di 2 allegato disegno n°l), con diametro interno 18,00mm e passo tra loro di 50,00cm. Questi due ganci hanno la funzione di contenere al loro interno , sia nelle fasi di montaggio sia in quelle di smontaggio, i corrcntini del ponteggio ; cosi da poterli manovrare in sicurezza. A questo punto gli operatori utilizzeranno il cavalletto per inserire tutti i correntini nei ganci predisposti nei montanti del ponteggio prefabbricato rendendoli stabili e solidali tra loro, cosi realizzando V ossatura principale del parapetto dell' ultimo piano di lavoro, il tutto sempre in totale sicurezza perché si opera da un piano di lavoro già munito di parapetti posto un piano sotto Γ ultimo che si deve realizzare. Fatte tutte queste operazioni in regime di sicurezza che senza T attrezzo denominato cavalletto non sarebbero state possibili (se non operando con i vecchi sistemi di montaggio dei ponteggi prefabbricati con i vari pericoli di montaggio che si conoscono ), gli operatori andranno ad ultimare il piano prospiciente il loro posizionando tutte le tavole fermapiede, le testate del ponteggio prefabbricato e per ultimo andranno a posizionare tutte le pedane di calpestio con le botole e le scale come indicato da progetto o da disegni ministeriali inseriti nel libretto di uso e manutenzione di suddetto ponteggio prefabbricato. This operation will require the use of the tool using the C-shaped hooks, (see position 3 sheet 1 of 2 attached drawing n ° 1), with an internal diameter of 18.00mm and a pitch of 50.00cm between them. These two hooks have the function of containing inside them, both in the assembly and in the disassembly phases, the scaffolding rods; so you can maneuver them safely. At this point the operators will use the trestle to insert all the battens into the hooks provided in the uprights of the prefabricated scaffolding making them stable and integral with each other, thus creating the main framework of the parapet of the last work surface, all always in total safety because it operates from a work surface already equipped with parapets placed one floor below Γ the last one to be built. Once all these operations have been carried out under safety conditions that without the tool called a tripod would not have been possible (if not working with the old prefabricated scaffolding assembly systems with the various known assembly dangers), the operators will complete the plan facing their positioning all the toe boards, the heads of the prefabricated scaffolding and lastly they will position all the walking platforms with the hatches and stairs as indicated by the project or by ministerial drawings included in the use and maintenance booklet of the aforementioned prefabricated scaffolding.
Solo a questo punto gli operatori accederanno al piano superiore il loro, che sarà un piano di lavoro completo di tutti i parapetti e tavole ferma piede e di conseguenza si troveranno in un luogo sicuro a rischio di caduta accidentale nullo e potranno nuovamente ripetere le eruzioni Only at this point the operators will access their upper floor, which will be a work surface complete with all the parapets and foot boards and consequently they will find themselves in a safe place with no risk of accidental fall and will be able to repeat the eruptions again.
sopra finche non si raggiunge V altezza prevista del ponteggio prefabbricato. Nelle operazioni di smontaggio dovranno essere eseguite le operazioni inverse del montaggio , ma a differenza del montaggio oltre al cavalletto bisognerà utilizzare un utensile che denominato scrocco , (vedi posizione 4 foglio 2 di 2 allegato disegno n°l), che avrà il compito di annullare le sicure di bloccaggio dei correntini, che ovviamente non sono raggiungibili manualmente perché sono poste ad un piano sovrastante il piano di servizio degli operatori. above until the planned height of the prefabricated scaffolding is reached. In the disassembly operations, the reverse assembly operations must be carried out, but unlike assembly, in addition to the stand, a tool called latch must be used (see position 4 sheet 2 of 2 attached drawing n ° l), which will have the task of canceling the safety battens for blocking the battens, which obviously cannot be reached manually because they are placed on a level above the service level of the operators.
L' utilizzo dell' attrezzo denominato scrocco prevede un operatore che sblocchi le sicure dei correntini mentre V altro operatore con V ausilio dell' attrezzo denominato cavalletto andrà nello smontaggio dei correntini che saranno liberi da suddette sicure. The use of the tool called latch requires an operator to release the safety bars of the battens while the other operator with the aid of the tool called tripod will disassemble the battens which will be free from the aforementioned safety devices.
Claims (4)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT001670A ITMI20081670A1 (en) | 2008-09-22 | 2008-09-22 | STAND FOR THE TOTAL SAFETY OF THE PONTISTS |
FR0903851A FR2936537A1 (en) | 2008-09-22 | 2009-08-04 | Prefabricated metallic scaffold assembling and disassembling tool for e.g. maintenance site of building, has C-shaped hooks placed in bottom part of tool, and firmly attaching and holding rails so as to be fixed on pre-fabricated uprights |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT001670A ITMI20081670A1 (en) | 2008-09-22 | 2008-09-22 | STAND FOR THE TOTAL SAFETY OF THE PONTISTS |
Publications (1)
Publication Number | Publication Date |
---|---|
ITMI20081670A1 true ITMI20081670A1 (en) | 2010-03-23 |
Family
ID=40821762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
IT001670A ITMI20081670A1 (en) | 2008-09-22 | 2008-09-22 | STAND FOR THE TOTAL SAFETY OF THE PONTISTS |
Country Status (2)
Country | Link |
---|---|
FR (1) | FR2936537A1 (en) |
IT (1) | ITMI20081670A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITBA20110027A1 (en) * | 2011-05-31 | 2012-12-01 | Gianfranco Giordano | PERFECT FALL STRUCTURAL PARAPET |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2732706A1 (en) * | 1995-04-10 | 1996-10-11 | Comabi Const Mat Batiment | Single piece safety rails for outer edge of scaffolding |
EP0995860A1 (en) * | 1998-05-08 | 2000-04-26 | ULMA C y E, S. COOP. | New process for mounting handrails in scaffolds |
WO2003025311A1 (en) * | 2001-09-19 | 2003-03-27 | Turner Access Limited | Improvements in and relating to scaffolding |
EP1700976A2 (en) * | 2005-03-03 | 2006-09-13 | Marcus Maurer | Fall prevention device for construction scaffolding |
GB2431427A (en) * | 2005-05-13 | 2007-04-25 | Youngman Group Ltd | Scaffolding guard rail |
-
2008
- 2008-09-22 IT IT001670A patent/ITMI20081670A1/en unknown
-
2009
- 2009-08-04 FR FR0903851A patent/FR2936537A1/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2732706A1 (en) * | 1995-04-10 | 1996-10-11 | Comabi Const Mat Batiment | Single piece safety rails for outer edge of scaffolding |
EP0995860A1 (en) * | 1998-05-08 | 2000-04-26 | ULMA C y E, S. COOP. | New process for mounting handrails in scaffolds |
WO2003025311A1 (en) * | 2001-09-19 | 2003-03-27 | Turner Access Limited | Improvements in and relating to scaffolding |
EP1700976A2 (en) * | 2005-03-03 | 2006-09-13 | Marcus Maurer | Fall prevention device for construction scaffolding |
GB2431427A (en) * | 2005-05-13 | 2007-04-25 | Youngman Group Ltd | Scaffolding guard rail |
Also Published As
Publication number | Publication date |
---|---|
FR2936537A1 (en) | 2010-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2570209C2 (en) | Improved falsework support | |
CN107313506B (en) | Building frame structure with boundary beam and construction method thereof | |
EP3114292B1 (en) | A formwork support structure | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN103422668A (en) | Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof | |
US20140175259A1 (en) | Modular Panel Concrete Form For Self-Lifting Concrete Form System | |
CN102777030A (en) | Method for building up formwork construction platform of lift shaft | |
CN108331336A (en) | The integrated lifting steel plateform system and its construction method of floor synchronous construction | |
JP2010048060A (en) | Construction method of structure | |
CN102912996B (en) | Steel tube concrete column high-altitude construction safety protection system | |
EP2918748B1 (en) | Dismantling method for smokestacks | |
CN202954552U (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
US20070096006A1 (en) | Overhead beam assembly | |
ITBO990704A1 (en) | SYSTEM FOR BUILDING VIADUCTS. | |
ITMI20081670A1 (en) | STAND FOR THE TOTAL SAFETY OF THE PONTISTS | |
US20090272604A1 (en) | Lifting Platform And Method For Setting Up A Lifting Platform | |
JP6339986B2 (en) | How to assemble a suspended scaffold using a slide frame | |
CN207160217U (en) | Building frame construction provided with side bar | |
CN207847078U (en) | Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam | |
CN208870379U (en) | The integrated lifting steel plateform system of floor synchronous construction | |
WO2007041427A2 (en) | Overhead beam assembly | |
Shalenny | Safe technologies for cutting reinforced concrete structures by means of diamond tools | |
KR200146049Y1 (en) | Movable gang scaffold | |
CN217326481U (en) | I-steel subassembly fast combination construction structures |