IT1254303B - Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti. - Google Patents
Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti.Info
- Publication number
- IT1254303B IT1254303B ITRM920085A ITRM920085A IT1254303B IT 1254303 B IT1254303 B IT 1254303B IT RM920085 A ITRM920085 A IT RM920085A IT RM920085 A ITRM920085 A IT RM920085A IT 1254303 B IT1254303 B IT 1254303B
- Authority
- IT
- Italy
- Prior art keywords
- foundations
- realization
- procedure
- lands
- pole
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000005056 compaction Methods 0.000 abstract 1
- 238000000605 extraction Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Sampling And Sample Adjustment (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Procedimento per la realizzazione di un micropalo per fondazioni nel quale un tuboforma (1) di forma sostanzialmente cilindrica viene vibroinfisso nel terreno (2), inserendo poi l'armatura (6) nel tuboforma (1), e quindi iniettando a pressione del calcestruzzo (7) nel tuboforma (1). L'estrazione del tuboforma (1) dal terreno (2) avviene pure mediante vibrazioni, consentendo un costipamento ottimale del calcestruzzo (7) nel terreno (2), che nel frattempo è uscito attraverso una cerniera situata sulla estremità inferiore (3) del tuboforma (1).(FIG. 4).
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITRM920085A IT1254303B (it) | 1992-02-07 | 1992-02-07 | Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti. |
PCT/IT1993/000008 WO1993016236A1 (en) | 1992-02-07 | 1993-02-03 | Method for obtaining a micropile for foundations |
AU34626/93A AU3462693A (en) | 1992-02-07 | 1993-02-03 | Method for obtaining a micropile for foundations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITRM920085A IT1254303B (it) | 1992-02-07 | 1992-02-07 | Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti. |
Publications (3)
Publication Number | Publication Date |
---|---|
ITRM920085A0 ITRM920085A0 (it) | 1992-02-07 |
ITRM920085A1 ITRM920085A1 (it) | 1993-08-07 |
IT1254303B true IT1254303B (it) | 1995-09-14 |
Family
ID=11400667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ITRM920085A IT1254303B (it) | 1992-02-07 | 1992-02-07 | Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti. |
Country Status (3)
Country | Link |
---|---|
AU (1) | AU3462693A (it) |
IT (1) | IT1254303B (it) |
WO (1) | WO1993016236A1 (it) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1012243C2 (nl) * | 1999-06-04 | 2000-12-12 | Voorbij Groep Bv | Werkwijze en inrichting voor het in de bodem vervaardigen van een paal. |
DE10218330A1 (de) * | 2002-04-24 | 2003-11-13 | Vibroflotation B V | Verfahren und Vorrichtung zur Herstellung von Materialsäulen im Boden |
DE10310727B4 (de) * | 2003-03-12 | 2007-09-13 | Bauer Spezialtiefbau Gmbh | Füllrohr |
NL1025689C2 (nl) * | 2004-03-10 | 2005-09-20 | Konink Bam Groep Nv | Boorbuis met boorpunt alsmede werkwijze voor het vormen van een funderingspaal in de grond. |
WO2006027000A1 (en) * | 2004-09-07 | 2006-03-16 | Osama Kamal Roshdy | Full displacement technique for soil improvement and constructing walls and piles |
US20060191719A1 (en) | 2005-02-28 | 2006-08-31 | Roussy Raymond J | Method of geothermal loop installation |
US8210281B2 (en) | 2005-02-28 | 2012-07-03 | Roussy Raymond | Method and system for installing geothermal transfer apparatuses with a sonic drill |
US8136611B2 (en) | 2005-02-28 | 2012-03-20 | Roussy Raymond | Method and system for installing micropiles with a sonic drill |
US7647988B2 (en) | 2005-02-28 | 2010-01-19 | Raymond J. Roussy | Method and system for installing geothermal transfer apparatuses with a sonic drill |
FR2915498B1 (fr) | 2007-04-25 | 2011-09-30 | Jean Marie Renovation | Dispositif et procede de mise en place d'un micropieu helicoidal de fondation |
US7891440B2 (en) | 2008-02-22 | 2011-02-22 | Roussy Raymond J | Method and system for installing geothermal transfer apparatuses with a sonic drill and a removable or retrievable drill bit |
US8118115B2 (en) * | 2008-02-22 | 2012-02-21 | Roussy Raymond J | Method and system for installing geothermal heat exchangers, micropiles, and anchors using a sonic drill and a removable or retrievable drill bit |
US8511020B2 (en) * | 2009-08-18 | 2013-08-20 | Crux Subsurface, Inc. | Composite cap |
BE1025657B1 (nl) * | 2017-10-20 | 2019-05-23 | Olivier Industrie Nv | Grondverdringende boor en werkwijze voor het omvormen van een grondverdringende boor |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4126007A (en) * | 1977-01-03 | 1978-11-21 | L.B. Foster Company | Compaction of soil |
EP0417111A1 (en) * | 1989-03-22 | 1991-03-20 | Iniectojet S.P.A. | A procedure for the forming of consolidation and foundation piles with embedded reinforcements |
-
1992
- 1992-02-07 IT ITRM920085A patent/IT1254303B/it active
-
1993
- 1993-02-03 WO PCT/IT1993/000008 patent/WO1993016236A1/en active Application Filing
- 1993-02-03 AU AU34626/93A patent/AU3462693A/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
ITRM920085A0 (it) | 1992-02-07 |
WO1993016236A1 (en) | 1993-08-19 |
AU3462693A (en) | 1993-09-03 |
ITRM920085A1 (it) | 1993-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
IT1254303B (it) | Procedimento per la realizzazione di un micropalo per fondazioni di edifici adatto a terreni con caratteristiche meccaniche scadenti. | |
MY101133A (en) | Ground treatment. | |
ES464213A1 (es) | Perfeccionamientos introducidos en un pilote de cimientos para esfuerzos alternados de compresion y traccion. | |
CY1105546T1 (el) | Μεθοδος και διαταξη για την κατασκευη ενος πασσαλου απο μπετον στην οριστικη του θεση | |
GB796262A (en) | Improvements in or relating to piles | |
GB1434964A (en) | Pile driving | |
JPS6424913A (en) | Formation of expanded pit in ground | |
ES522624A0 (es) | Disposicion de cuerpo de cimentacion hueco. | |
GB2064625A (en) | Method of Hole Forming for Miniature Piles | |
JPS6433315A (en) | Formation of hardened column using cloth cylinder under ground | |
JPS57209325A (en) | Concrete-steel pipe composite pile | |
KR960034591A (ko) | 콤팩션 그라우팅(Compaction Grauting)을 이용한 지중 기초 구축공법 | |
PT90610A (pt) | Bloco de construcao | |
JPS573915A (en) | Method and apparatus for construction of reaction resistor body underground | |
JPS5628942A (en) | Foundation structure of stationary crane | |
GB884810A (en) | Improvements in or relating to the production of concrete piles | |
JPS5552428A (en) | Method of constructing pile foundation | |
JPS57137520A (en) | Manufacture of reinforced concrete pile | |
JPS5589526A (en) | Driving method for foundation pile | |
NL7505230A (en) | Hollow concrete soil foundation pile - is formed by driving concentric pipes and pouring concrete between them during extraction | |
ES8204790A1 (es) | Perfeccionamientos en los sistemas de estabilizacion de ele-mentos de obra civil | |
JPS5634829A (en) | Foundation constructing method by steel plate cell | |
JPS56142926A (en) | Foundation pile with enlarged bottom by splitting at underground | |
JPS5733628A (en) | Construction method for independent foundation | |
GB1131326A (en) | Foundation piles |