HU0202208D0 - - Google Patents
Info
- Publication number
- HU0202208D0 HU0202208D0 HU0202208A HUP0202208A HU0202208D0 HU 0202208 D0 HU0202208 D0 HU 0202208D0 HU 0202208 A HU0202208 A HU 0202208A HU P0202208 A HUP0202208 A HU P0202208A HU 0202208 D0 HU0202208 D0 HU 0202208D0
- Authority
- HU
- Hungary
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
- E02D3/054—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/26—Compacting soil locally before forming foundations; Construction of foundation structures by forcing binding substances into gravel fillings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| HU0202208A HU225407B1 (en) | 2002-07-08 | 2002-07-08 | Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof |
| AU2002353250A AU2002353250A1 (en) | 2002-07-08 | 2002-12-20 | Method for increasing load-bearing capacity of soil |
| PCT/HU2002/000156 WO2004005626A1 (en) | 2002-07-08 | 2002-12-20 | Method for increasing load-bearing capacity of soil |
| EP02788270A EP1521886A1 (en) | 2002-07-08 | 2002-12-20 | Method for increasing load-bearing capacity of soil |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| HU0202208A HU225407B1 (en) | 2002-07-08 | 2002-07-08 | Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| HU0202208D0 true HU0202208D0 (enExample) | 2002-09-28 |
| HUP0202208A2 HUP0202208A2 (hu) | 2003-12-29 |
| HU225407B1 HU225407B1 (en) | 2006-11-28 |
Family
ID=89980604
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| HU0202208A HU225407B1 (en) | 2002-07-08 | 2002-07-08 | Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof |
Country Status (4)
| Country | Link |
|---|---|
| EP (1) | EP1521886A1 (enExample) |
| AU (1) | AU2002353250A1 (enExample) |
| HU (1) | HU225407B1 (enExample) |
| WO (1) | WO2004005626A1 (enExample) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7226246B2 (en) | 2000-06-15 | 2007-06-05 | Geotechnical Reinforcement, Inc. | Apparatus and method for building support piers from one or successive lifts formed in a soil matrix |
| GB2403964B (en) * | 2003-07-18 | 2006-09-27 | Roxbury Ltd | Ground improvement |
| GB2437960B (en) | 2006-05-08 | 2008-08-13 | Aqs Holdings Ltd | Ground engineering method |
| CN101974898B (zh) * | 2010-11-03 | 2011-12-14 | 成都四海岩土工程有限公司 | 一种碾压砼垫层换填方法 |
| CN106337411B (zh) * | 2016-08-30 | 2018-07-31 | 中国十七冶集团有限公司 | 一种载体桩的预制桩及施工方法 |
| CN108708364A (zh) * | 2018-06-06 | 2018-10-26 | 中国电建集团山东电力建设有限公司 | Ddc桩基施工工艺 |
| CN110761264A (zh) * | 2019-10-18 | 2020-02-07 | 中国有色金属工业昆明勘察设计研究院有限公司 | 一种滨海淤泥软土地基二次强夯碎石置换加固方法 |
| CN115852932B (zh) * | 2023-02-13 | 2024-02-23 | 北京波森特岩土工程有限公司 | 一种载体桩的施工方法 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR388552A (fr) * | 1908-03-27 | 1908-08-17 | Armand Gabriel Considere | Formation, à la base des pieux, de bases élargies |
| AT296168B (de) * | 1968-11-05 | 1972-02-10 | Ignaz Dipl Ing Zeissl | Verfahren zur Herstellung eines abschnittsweise hergestellten Ortbetonpfahles mittels eines Dieselrammbären und eines Rammrohres |
| US3842609A (en) * | 1972-10-20 | 1974-10-22 | Gilberd Hadfield Pile Co Ltd | Piling methods |
| NL1007690C2 (nl) * | 1997-12-04 | 1999-06-09 | Ballast Nedam Funderingstechni | Werkwijze en inrichting voor het in een ondergrond aanbrengen van een paal. |
| WO2001096669A1 (en) * | 2000-06-15 | 2001-12-20 | Geotechnical Reinforcement Company, Inc. | Lateral displacement pier and method of installing the same |
-
2002
- 2002-07-08 HU HU0202208A patent/HU225407B1/hu not_active IP Right Cessation
- 2002-12-20 WO PCT/HU2002/000156 patent/WO2004005626A1/en not_active Ceased
- 2002-12-20 EP EP02788270A patent/EP1521886A1/en not_active Withdrawn
- 2002-12-20 AU AU2002353250A patent/AU2002353250A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| WO2004005626A1 (en) | 2004-01-15 |
| HUP0202208A2 (hu) | 2003-12-29 |
| AU2002353250A1 (en) | 2004-01-23 |
| HU225407B1 (en) | 2006-11-28 |
| EP1521886A1 (en) | 2005-04-13 |
Similar Documents
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FH92 | Termination of representative |
Representative=s name: VARGA TAMAS PETER SZABADALMI UEGYVIVOE, HU |
|
| MM4A | Lapse of definitive patent protection due to non-payment of fees | ||
| NF4A | Restoration of patent protection | ||
| NF4A | Restoration of patent protection | ||
| MM4A | Lapse of definitive patent protection due to non-payment of fees |