HRP20060296A2 - Method of constructing strip foundations with longitudinal socket - Google Patents
Method of constructing strip foundations with longitudinal socketInfo
- Publication number
- HRP20060296A2 HRP20060296A2 HR20060296A HRP20060296A HRP20060296A2 HR P20060296 A2 HRP20060296 A2 HR P20060296A2 HR 20060296 A HR20060296 A HR 20060296A HR P20060296 A HRP20060296 A HR P20060296A HR P20060296 A2 HRP20060296 A2 HR P20060296A2
- Authority
- HR
- Croatia
- Prior art keywords
- trench
- prefabricated
- elements
- cup
- holding
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/02—Flat foundations without substantial excavation
Abstract
Trakasti temelj sa uzdužnim čašicama se formira od predfabricirane betonsko-čašične komponente obješene nad pripremljenim rovom i tu ujedinjeno spojene pomoću betona na gradilištu. Dizalica, koja se stalno snabdijeva predfabriciranim elementima, kreće se uzduž iskopanog rova potpomognuta sa svega nekoliko radnika koji kvače i pričvršćuju držeće/nivelirajuće naprave na predfabricirane čašične elemente i pomažu da se smjeste da vise privremeno nadrovom. Čašični elementi se redom podešavaju i niveliraju pomoću držećih/nivelirajućih naprava koje se u nizu, trajno ugrađuju u trakaste temelje, preko stršeće armature, zalivene u rovu ispod njih. Napredujući uzduž rova, u uvjetima bez prekida i ometanja, ovaj se postupak izvršava brzinom 1m/1min što čini 60 metara na sat.The strip foundation with longitudinal cups is formed from a prefabricated concrete-cup component hung over the prepared trench and joined together with concrete on the construction site. The crane, which is constantly supplied with prefabricated elements, moves along the excavated trench assisted by only a few workers who hook and fasten the holding / leveling devices to the prefabricated cup elements and help to place them temporarily hanging on the superstructure. The cup elements are sequentially adjusted and leveled by means of holding / leveling devices which, in series, are permanently installed in the strip foundations, via protruding fittings, poured into the trench below them. Advancing along the trench, in conditions without interruption and interference, this procedure is performed at a speed of 1m / 1min, which is 60 meters per hour.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/HR2004/000003 WO2005078198A1 (en) | 2004-02-12 | 2004-02-12 | Method of constructing strip foundations with longitudinal socket |
Publications (1)
Publication Number | Publication Date |
---|---|
HRP20060296A2 true HRP20060296A2 (en) | 2006-10-31 |
Family
ID=34856824
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
HR20060296A HRP20060296A2 (en) | 2004-02-12 | 2006-09-11 | Method of constructing strip foundations with longitudinal socket |
Country Status (7)
Country | Link |
---|---|
US (1) | US20080006003A1 (en) |
EP (1) | EP1721048A1 (en) |
CN (1) | CN100529274C (en) |
EA (1) | EA009928B1 (en) |
HR (1) | HRP20060296A2 (en) |
TW (1) | TW200532076A (en) |
WO (1) | WO2005078198A1 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550764B (en) * | 2008-04-06 | 2012-12-05 | 孙长顺 | Concrete pouring machine |
CN101818501B (en) * | 2009-07-29 | 2011-11-16 | 兰州理工大学 | Construction method of reinforced concrete foundation on top of large-scale trenched pipe culvert |
EP2729627B1 (en) | 2011-07-08 | 2016-02-10 | Contech Engineered Solutions LLC | Foundation system for bridges and other structures |
US8925282B2 (en) | 2011-07-08 | 2015-01-06 | Contech Engineered Solutions LLC | Foundation system for bridges and other structures |
CA2884519C (en) | 2011-09-16 | 2017-02-21 | Goss Construction, Inc. | Concrete forming systems and methods |
ITPI20120001A1 (en) * | 2012-01-04 | 2013-07-05 | Alessandro Bertocchi | METHOD FOR THE PRODUCTION OF PUREE, OR JUICE, FROM FOOD PRODUCTS WITH HIGH CAPACITY AND MACHINE THAT ACTIVES THIS METHOD |
NZ708317A (en) * | 2012-12-13 | 2017-08-25 | Contech Eng Solutions Llc | Foundation system for bridges and other structures |
US9695558B2 (en) | 2012-12-13 | 2017-07-04 | Contech Engineered Solutions LLC | Foundation system for bridges and other structures |
US11174614B2 (en) | 2017-08-14 | 2021-11-16 | Contech Engineered Solutions LLC | Metal foundation system for culverts, buried bridges and other structures |
CN109505309B (en) * | 2019-01-07 | 2023-09-26 | 浙江大学城市学院 | Pipe gallery segment displacement system and pipe gallery installation method using same |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3228679A (en) * | 1963-08-08 | 1966-01-11 | Kansas Sheet Metal Co Inc | Apparatus for supporting conduits in trenches |
US3207465A (en) * | 1963-09-13 | 1965-09-21 | Lawrence E Papin | Foundation form apparatus |
JPH032422A (en) * | 1989-05-29 | 1991-01-08 | San Aroo Plan:Kk | Construction of foundation sill |
FR2659592A1 (en) * | 1990-03-19 | 1991-09-20 | Hourdeaux Jacques | Modular mould for tank |
GB2254099A (en) * | 1991-02-12 | 1992-09-30 | Robert Michael Sloma | Formwork apparatus. |
JP2000517387A (en) * | 1996-07-17 | 2000-12-26 | モナキノ,モーセ | Base element, a method of manufacturing a prefabricated structure including these elements, especially prefabricated tunnels and prefabricated structures |
FR2777923A1 (en) * | 1998-04-22 | 1999-10-29 | Philippe Blanc | Foundation module that is prefabricated |
-
2004
- 2004-02-12 WO PCT/HR2004/000003 patent/WO2005078198A1/en active Application Filing
- 2004-02-12 EP EP04710442A patent/EP1721048A1/en not_active Withdrawn
- 2004-02-12 CN CNB2004800416242A patent/CN100529274C/en not_active Expired - Fee Related
- 2004-02-12 EA EA200601407A patent/EA009928B1/en not_active IP Right Cessation
- 2004-02-12 US US10/588,819 patent/US20080006003A1/en not_active Abandoned
-
2005
- 2005-02-04 TW TW094103572A patent/TW200532076A/en unknown
-
2006
- 2006-09-11 HR HR20060296A patent/HRP20060296A2/en not_active Application Discontinuation
Also Published As
Publication number | Publication date |
---|---|
CN1914381A (en) | 2007-02-14 |
US20080006003A1 (en) | 2008-01-10 |
CN100529274C (en) | 2009-08-19 |
TW200532076A (en) | 2005-10-01 |
EP1721048A1 (en) | 2006-11-15 |
WO2005078198A1 (en) | 2005-08-25 |
EA200601407A1 (en) | 2006-12-29 |
EA009928B1 (en) | 2008-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
HRP20060296A2 (en) | Method of constructing strip foundations with longitudinal socket | |
CN106567717B (en) | It is a kind of to double as construction access ramp structure and construction method using subway entrance | |
CN103741714B (en) | Underground engineering full sheltered reverse excavation construction method | |
CN104060629B (en) | The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo | |
CN105696622B (en) | A kind of prefabricated city piping lane and its construction method | |
CN105756059A (en) | Back anchor type anti-floating anchor and construction method | |
CN108930275A (en) | It is a kind of to face forever in conjunction with the ultra-deep shaft rapid constructing method along inverse combination | |
MX358690B (en) | Concrete forming systems and methods. | |
CN106120801A (en) | In water-rich sand layer, pipeline crosses the construction method at foundation ditch | |
CN110043269A (en) | A kind of excavation construction process of freeway tunnel barrel | |
CN204212162U (en) | A kind of side slope grouting reinforcement structure | |
CN106760851A (en) | The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure | |
CN108843346A (en) | Lining construction method of the large section shallow-depth-excavation tunnel in water-rich sand layer | |
CN205934931U (en) | Lid is in same direction as foundation ditch structure of digging way of doing things construction | |
JP2004137685A (en) | Caisson submergement method and supporting method using regular foundation pile | |
CN107587476B (en) | Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof | |
CN106545343A (en) | A kind of construction method of tunneling underground pipe gallery and storage well | |
CN110820756A (en) | Shield well and vertical shaft deep foundation pit excavation safety construction method | |
CN106638611A (en) | Micro steel pipe pile-anchor combined support construction method | |
CN105986830A (en) | Underground-excavation building method for roadside strip-shaped underground garage | |
CN210368935U (en) | Miniature pile structure, crown beam structure and miniature pile foundation pit supporting system | |
CN206015720U (en) | A kind of prefabricated ground-connecting-wall with limiting card groove plate joint | |
CN106284303A (en) | Prefabricated ground-connecting-wall that a kind of band angle steel joint is spacing and construction method thereof | |
CN205591217U (en) | Back anchor formula anti -floating anchor rod | |
AU2016102393A4 (en) | A Method of constructing a column, a tunnel, and a tunnel made from the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A1OB | Publication of a patent application | ||
ARAI | Request for the grant of a patent on the basis of the submitted results of a substantive examination of a patent application | ||
ODRP | Renewal fee for the maintenance of a patent |
Payment date: 20120210 Year of fee payment: 9 |
|
OBST | Application withdrawn |