GB2561056A - Offshore hydrocarbon processing facility and method of operation - Google Patents

Offshore hydrocarbon processing facility and method of operation Download PDF

Info

Publication number
GB2561056A
GB2561056A GB1801339.1A GB201801339A GB2561056A GB 2561056 A GB2561056 A GB 2561056A GB 201801339 A GB201801339 A GB 201801339A GB 2561056 A GB2561056 A GB 2561056A
Authority
GB
United Kingdom
Prior art keywords
offshore
floating
hydrocarbon processing
submerged
riser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB1801339.1A
Other versions
GB201801339D0 (en
GB2561056B (en
Inventor
Samuelsberg Arild
Haukelisæter Eidesen Bjørgulf
Gotaas Johnsen Cecilie
Ravndal Ola
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Equinor Energy AS
Original Assignee
Statoil Petroleum ASA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Statoil Petroleum ASA filed Critical Statoil Petroleum ASA
Publication of GB201801339D0 publication Critical patent/GB201801339D0/en
Publication of GB2561056A publication Critical patent/GB2561056A/en
Application granted granted Critical
Publication of GB2561056B publication Critical patent/GB2561056B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/36Underwater separating arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/507Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
    • B63B21/508Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets connected to submerged buoy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • E21B19/004Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/0107Connecting of flow lines to offshore structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B43/017Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4473Floating structures supporting industrial plants, such as factories, refineries, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4486Floating storage vessels, other than vessels for hydrocarbon production and storage, e.g. for liquid cargo

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Earth Drilling (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

An offshore hydrocarbon processing facility 2 comprises an offshore floating structure 8 and a submerged floating riser deck 10, connected to a riser 12. Hydrocarbon processing equipment 26, is disposed on the submerged floating riser deck. In some embodiments this equipment allows the riser deck to separate liquid hydrocarbons, flash them, and then store the flashed and separated hydrocarbons. The offshore floating structure 8 may be connected to the submerged floating riser deck 10 using a riser 16 that can be disconnected if there is inclement weather. The offshore floating structure may be unmanned.

Description

(54) Title of the Invention: Offshore hydrocarbon processing facility and method of operation Abstract Title: Offshore hydrocarbon processing facility with submerged floating riser deck (57) An offshore hydrocarbon processing facility 2 comprises an offshore floating structure 8 and a submerged floating riser deck 10, connected to a riser 12. Hydrocarbon processing equipment 26, is disposed on the submerged floating riser deck. In some embodiments this equipment allows the riser deck to separate liquid hydrocarbons, flash them, and then store the flashed and separated hydrocarbons. The offshore floating structure 8 may be connected to the submerged floating riser deck 10 using a riser 16 that can be disconnected if there is inclement weather. The offshore floating structure may be unmanned.
Figure GB2561056A_D0001
At least one drawing originally filed was informal and the print reproduced here is taken from a later filed formal copy.
1/4
1502 18
Figure GB2561056A_D0002
2/4
1502 18
Figure GB2561056A_D0003
Fig. 2
3/4
1502 18
Figure GB2561056A_D0004
Fig. 3
4/4
1502 18
Figure GB2561056A_D0005
- 1 OFFSHORE HYDROCARBON PROCESSING FACILITY
AND METHOD OF OPERATION
The present invention relates to an offshore hydrocarbon processing facility.
A main source of hydrocarbons is offshore oil wells located on the sea bed. Sea bed installations have risers through which hydrocarbons can flow- towards a surface installation, which is either a fixed or a floating installation at or near the surface of the sea.
At the surface installation, the hydrocarbons are processed, for example, by separating natural gas from liquid hydrocarbons and often compressing the natural gas into a liquefied state. These products can then be transferred from the surface installation to tankers or other floating vessels, for subsequent transport to the shore.
Another possibility is that some products are processed at the sea bed and may be piped via a pipeline to shore, without the need for flowing through a riser to the surface of the sea. One problem with this set-up is that the sea bed is often 2-3km below the surface of the water. This means that it is complicated to carry out maintenance work at the sea bed installation, particularly maintenance of the seabed processing equipment.
Another problem Is that surface conditions offshore are more severe in terms of weather, water and ice. For example, high winds, precipitation, hurricanes, monsoons, icebergs, waves and ice floes and other adverse conditions can cause weathering and damage to the riser near the surface of the sea.
According to a first aspect of the present invention, there is provided an offshore hydrocarbon processing facility comprising; an offshore floating structure; a submerged floating riser deck operatively connected to a subsea hydrocarbon riser; and hydrocarbon processing equipment disposed on the submerged floating riser deck.
With this arrangement, hydrocarbons can flow from the sea bed to the submerged floating riser deck for processing there. This reduces or eliminates the need for processing equipment at the sea bed and so less maintenance will be required there.
Moreover, since the submerged riser deck is floating, it is not as far underwater as the sea bed and so the processing equipment on the submerged floating riser deck which needs to be maintained is much easier to maintain. Since hydrocarbon processing can take place at the submerged floating riser deck, the risers, hydrocarbons and processing equipment are unaffected by sea surface conditions such as wind, waves, precipitation and ice floes.
-2The submerged floating riser deck may be located at a depth of between 180m and 500m below the surface of the sea. The sea bed may be between 200m and 4000m deeper than the floating riser deck. Thus the effective level for maintenance can be raised from the sea bed to the more easily accessible location of the submerged riser deck. The riser may be a riser of the conventional type used in offshore hydrocarbon installations.
The submerged floating riser deck is supported in the water in a freely floating fashion. It may float suspended due to its own buoyancy or it may be coupled to positive buoyancy elements. It may hang suspended from the offshore floating structure, and thus may float together with the offshore floating structure. This can be aided by buoyancy of the offshore floating structure and/or by positive buoyancy elements connected to the offshore floating structure to aid floating. Thus, the submerged floating riser deck in example embodiments is not tethered to the sea bed using tension cables. Instead it may be anchored to the sea bed in a way that permits free floating, such as via a catenary mooring system, which may include catenary anchor cables or catenaryrisers. The catenary mooring system may be coupled to the submerged floating riser deck and/or to the offshore floating structure. As is known in the art it is possible to hold an offshore floating structure in a generally fixed location whilst permitting movement with tide and wave motion by using a catenary mooring of various types. Movement may also be permitted to avoid drifting ice, as discussed beiow. The presence of a catenary mooring arrangement as opposed to tension cables forming a taut mooring arrangement can provide one way to distinguish a freely floating structure from a tautly moored structure with positive buoyancy. The latter has a tendency to float but is not freely floating due to the moorings used.
The offshore hydrocarbon processing facility may comprise a riser arranged for disconnectable connection between the offshore floating platform and the submerged floating riser deck. This may be a catenary riser as mentioned above.
With this arrangement, when the surface conditions are not damaging, a riser may carry processed and/or unprocessed hydrocarbons from the submerged floating riser deck up to the offshore floating platform, for processing and/or transfer to a tanker, floating vessel or the like. When the surface conditions are deemed to be potentially damaging, the riser can be disconnected from the offshore floating platform, to avoid damage.
The floating structure (e.g. the platform or spar buoy) may have a mooring system enabling safe use of the structure where drifting ice may be present, such as in
-3ariic/sub-arctic regions, in one arrangement this may be based on an adjustable mooring system or an active mooring system that enables the platform to move horizontally to avoid drifting ice without disconnecting from the risers, in a second possibility a partly disconnected mooring solution may be used for the floating structure.
In some examples, depending on the nature of the possible horizontal movement of the floating structure it may be advantageous for the floating structure to partially or fully disconnect from the submerged riser deck. For example, this may involve the use of disconnectable risers between the submerged riser deck and the floating structure, and/or a disconnectable mooring system coupling the submerged riser deck to the floating structure. In the case where full disconnection is required then the submerged riser deck should be able to float independent of the floating structure. Thus, as noted above the submerged riser deck may have its own inherent buoyancy or it may be supported by additional positive buoyancy elements, such as floats tethered to the submerged deck.
The offshore hydrocarbon processing facility may be an unmanned hydrocarbon processing facility. This may be unmanned in that it has at least one of: no permanent personnel; no provision of facilities for personnel to stay on the offshore hydrocarbon processing facility, for example there may be no shelters for personnel, no toilet facilities, no drinking water, no personnel operated communications equipment and/or no lifeboat; and/or a requirement that personnel be present for fewer than 10,000 maintenance hours per year.
The offshore floating structure may be any structure suitable for use in an offshore hydrocarbon processing facility. It may be an offshore floating platform, which in this sense is taken to include structures such as spar buoys as weil as platform structures with decks. The offshore floating structure can float with a proportion of the structure above sea level and a proportion of the structure below sea level. As discussed above the offshore floating structure may provide buoyancy for supporting the submerged floating riser deck.
The offshore floating structure may be an unmanned structure such as an unmanned platform. In some examples it is an unmanned production platform. The structure may be unmanned in that it has at least one of: no permanent personnel; no provision of facilities for personnel to stay on the platform, for example there may be no shelters for personnel, no toilet facilities, no drinking water, no personnel operated communications equipment and/or no lifeboat; and/or a requirement that personnel be present for fewer than 10,000 maintenance hours per year.
- 4 ~
An unmanned offshore floating structure has no permanent personnel and may only be occupied for particular operations such as maintenance and/or installation of equipment. The unmanned offshore floating structure may be a structure where no personnel are required to be present for the structure to carry out its normal function, for example day-to-day functions relating to handling of oil and/or gas products at the structure.
An unmanned offshore floating structure may be a structure with no provision of facilities for personnel to stay on the platform, for example there may be no shelters for personnel, no toilet facilities, no drinking water and/or no personnel operated communications equipment. The unmanned offshore floating structure may also include no heli-deck and/or no lifeboat, and advantageously may be accessed in normal use solely by a gangway or bridge connected to a service vessel or to another offshore floating structure. For example, the unmanned offshore floating structure may be accessed in normal use solely via a Walk to Work (W2W) system.
An unmanned offshore floating structure may alternatively or additionally be defined as unmanned based on the relative amount of time that personnel are needed to be present on the offshore floating structure during operation. This relative amount of time may be defined as maintenance hours needed per annum, for example, and an unmanned structure may be a structure requiring fewer than 10,000 maintenance hours per year, optionally fewer than 5000 maintenance hours per year, perhaps fewer than 3000 maintenance hours per year.
All of the hydrocarbon processing equipment for the offshore hydrocarbon processing facility may be entirely disposed on the submerged floating riser deck. In this arrangement, the processing can all take place in a submerged location unaffected by surface conditions such as waves, wind, precipitation or ice floes. The processed products are then ready for transfer to floating vessels, tankers or the like whenever surface conditions are appropriate, and/or for piping along pipelines to shore.
Alternatively, the offshore floating structure may comprise topside hydrocarbon processing equipment located on the offshore floating structure in addition to the subsea hydrocarbon processing equipment. The hydrocarbon processing facility may be configured such that a hydrocarbon fluid to be processed is processed first by the subsea hydrocarbon processing equipment and then by the topside hydrocarbon processing equipment. This may involve just a part of the hydrocarbon fluid being passed to the offshore floating structure from the subsea riser deck, with another part of the hydrocarbon fluid, which may be a product of the processing at the subsea riser
-5deck, being retained at the subsea riser deck or directed to a destination other than the offshore platform. This other destination may for example be a buoy as discussed below.
tn this arrangement, all of or a part of the processing can take place at the 5 subsea riser deck before the hydrocarbons are transferred to the offshore floating structure, allowing processing to carry on even during adverse surface conditions.
The hydrocarbon processing equipment at the subsea riser deck and/or at the floating structure (where present) may be arranged to produce at least one of a hydrocarbon iiquid product, a hydrocarbon semi-stable liquid product and a liquefied gas product.
A semi-stable liquid product may consist of any or ail of water, oil, condensate, Liquid Petroleum Gas, LPG, and Natural Gas Liquids, NGL. A liquefied gas product may be stored under pressure or may be exported via a pipeline to the shore or a host such as a floating vessel or tanker.
The processing equipment at the submerged floating riser deck may be arranged to separate liquid hydrocarbons, flash the separated liquid hydrocarbons and store the flashed hydrocarbons at the submerged floating riser deck, in this arrangement, this processing step can be done underwater and so avoid the need for transferring all of the hydrocarbons to the offshore floating structure.
The submerged floating riser deck may comprise a tank for storage of hydrocarbons, for example for storage of unprocessed or processed hydrocarbons, i.e. hydrocarbons before or after processing with the processing equipment at the submerged floating riser deck. In some examples there is a tank for storage of the flashed hydrocarbons.
The offshore floating structure may be horizontally offset from the submerged floating riser deck, such that the two are not vertically aligned.
With this arrangement, an intervention vessel, such as a tanker, floating vessel or the like, may position itself directly above the submerged floating riser deck, for direct communication with the submerged floating riser deck. This allows more direct communication between the submerged floating riser deck and an intervention vessel, without the need to communicate ail fluids via the offshore floating piatform.
The offshore hydrocarbon processing facility may comprise a buoy in addition to the offshore floating structure, wherein the submerged floating riser deck may be operatively connected to the buoy for offload of hydrocarbon products to a floating vessel.
-6With this arrangement, hydrocarbons do not need to be transferred via the offshore floating structure before being transferred to a floating vessel, tanker or the iike,
The processing equipment at the submerged floating riser deck may comprise a separator. The separator may also act as a drain for the hydrocarbon processing equipment and piping, and hence may be at a low point in relation to other parts of the processing equipment.
Electric power for the submerged riser deck may all be provided by submerged and topside units, i.e. units above the surface of the sea on the offshore floating platform. Aiternativeiy, there may be local Hydraulic Power Units, HPU, subsea for providing the power. The power system may include Variable Speed Drive, VSD, for subsea pumps.
According to a second aspect of the invention, there is provided a method of operating the offshore hydrocarbon processing facility of the first aspect, comprising: receiving hydrocarbons at the submerged floating riser deck from the subsea hydrocarbon riser; and processing the hydrocarbons using the hydrocarbon processing equipment.
This method may include the use of any or all of the features described above in relation to the first aspect, thus achieving the same advantages.
The method may include disconnectedly connecting the submerged floating riser 20 deck to the offshore floating structure using a disconnectable riser for transfer of hydrocarbons between them.
This allows a riser to be disconnected from the offshore floating structure when the surface conditions such as wind, precipitation, waves, ice floes and the iike are deemed to be potentially damaging. When the surface conditions are not deemed to be damaging, the riser can carry up processed and/or unprocessed hydrocarbons from the submerged floating riser deck to the offshore floating structure, for processing and/or transfer to a tanker, floating vessel or the iike.
The method may comprise fluidly connecting the submerged floating riser deck to a floating vessel for transfer of hydrocarbons from the submerged floating riser deck to the floating vessel; and/or fiuidiy connecting the submerged floating riser deck to a pipeline for transfer of hydrocarbons from the submerged floating riser deck via the pipeline. The pipeline may be for transporting the hydrocarbons to shore.
With this method, hydrocarbons can be transported either directly from the submerged floating riser deck to shore, or via a floating vessel, tanker or the iike to shore, or both. There is no necessity to transfer the hydrocarbons via the offshore
-7floating structure. In this manner, the hydrocarbon risers and the like need only minimally emerge, or not emerge at ail from the surface of the sea and thus can reduce or avoid damage due to surface conditions.
The method may comprise fluidly connecting the submerged floating riser deck 5 to a buoy; and transferring hydrocarbons from the buoy to a floating vessel.
in some instances, a permanent buoy can be used for floating vessels to connect to for transfer of hydrocarbons. This arrangement allows the hydrocarbons to remain almost entirely submerged until the buoy and thus significantly avoids damage due to adverse surface conditions.
The method may comprise: separating and flashing liquid hydrocarbons at the submerged floating riser deck; and storing the flashed hydrocarbons in storage tanks at the submerged floating riser deck. This processing step can be done underwater and so avoid the need for transferring ail of the hydrocarbons to the offshore floating structure.
The method may further comprise drying and pressuring the gas obtained from the received hydrocarbons, for example as set out in WO2016192813 A1. Optionally, a water stream obtained from the drying process may be reinjected into a well, for example via the riser.
Certain preferred embodiments of the present invention will now be described in greater detail by way of example only and with reference to the accompanying drawings, in which:
Figure 1 shows an offshore hydrocarbon processing facility where an offshore floating structure includes a platform with decks; and
Figure 2 shows another offshore hydrocarbon processing facility where an offshore floating structure is a spar buoy.
Figure 1 shows an offshore hydrocarbon processing facility 2, located offshore, comprising an offshore floating structure 8 {designed to be unmanned as discussed above) and a submerged floating riser deck 10. The offshore floating structure 8 is a platform with decks that may hold equipment as required for the intended use of the offshore facility 2. The submerged floating riser deck 10 is operatively connected to a number of subsea hydrocarbon risers 12, through which hydrocarbons can flow from the seabed 4. The hydrocarbon risers 12 may be steel catenary risers, supported by buoyancy aids 14. The submerged floating riser deck 10 comprises hydrocarbon processing equipment 26 for processing hydrocarbons received via the hydrocarbon risers 12. The submerged floating riser deck 10 is submerged, i.e. fully below sea level
6, but remains floating through the use of buoyancy aids 18 and/or through suspension
-8from the offshore floating structure 8. The platform 8 can be secured to the seabed via a catenary mooring system (not shown).
Floating near the surface of the sea (sea level 8) and at least partially protruding above the surface of the sea level 6 is the offshore floating platform 8, which has hydrocarbon processing equipment 24. The offshore floating platform 8 is connected to the submerged floating riser deck 10 via several risers 16. The risers 16 can be disconnected from the offshore floating platform 8 in case of inclement surface conditions.
Figures 2, 3 and 4 show another hydrocarbon processing faciiity where the 10 offshore floating structure 8 is a spar buoy 8. in this example the spar buoy 8 floats due to its own buoyancy and the submerged floating riser deck 10 is suspended from the spar buoy 8 via a cable suspension system 32. The submerged floating riser deck 10 is fully supported by the Gable suspension system 32 and does not need any additional positive buoyancy elements. The spar buoy 8 is moored via catenary mooring cables 30 and hydrocarbons are transported between the seabed 4, the submerged floating riser deck 10 and the spar buoy (offshore floating structure) 8 via catenary hydrocarbon risers 12 and disconnectable risers 16 in a similar way to Figure 1. The catenary risers 12 are supported by buoyancy aids 14.
Figures 2 and 3 show an example of this spar buoy system at a realistic scale and also include vessels servicing the offshore facility 2, along with subsea structures to which the offshore facility is connected. Figure 4 shows a similar system in a more schematic arrangement similar to Figure 1, with the scaie distorted and the catenary mooring cables 30 omitted from the drawing.
In relation to the offshore facilities 2 of both of Figure 1 and Figure 2 the hydrocarbon processing faciiity 2 has a buoy 20 connected to the offshore floating platform 8 for transferring gas or pressured and cooled gas therefrom to a tanker, floating vessel or the like which can connect to the buoy 20.
The hydrocarbon processing facility 2 also has a buoy 22 connected to the submerged floating riser deck 10 for transferring semi-stable liquid therefrom to a tanker, floating vessel 34 or the like, as shown in Figure 2, which can connect to the buoy 22.
in operation, hydrocarbons flow from the seabed 4 through the risers 12 to the submerged floating riser deck 10. Here, the hydrocarbons may be fully processed, partially processed or not processed at all. Any processing is carried out by the hydrocarbon processing equipment 26. One or more storage tanks at the submerged floating riser deck 10 can be used for storage of fully processed, part processed or
-9unprocessed hydrocarbons. In the exemplar/ diagram shown in the Figures, the hydrocarbons can be processed out by the hydrocarbon processing equipment 26 at. the subsea riser deck 10 to produce two products, namely a gaseous product and a semistable liquid product. The former is transferred to the offshore fioating structure 8 via the disconnectable risers 16, while the latter is transferred to the semi-stable liquid buoy 22. The semi-stabie iiquid product may comprise any or all of water, oil condensate, LPG and NGL.
At the offshore floating structure 8, the received gas product is optionally processed using hydrocarbon processing equipment 24. The processing may include drying and/or cooling and pressurising. The final product, which may be liquefied, is transferred to buoy 20. Alternatively, the offshore faciiity 2 may be arranged so that ail of the required processing is done at the submerged riser deck 10 with no processing equipment on the offshore fioating structure 8. This can allow the offshore floating structure 8 to be a smaller fioating platform such as the spar buoy 8 of Figure 2.
Tankers, other floating vessels and the like can connect to buoys 20 and 22 to be loaded with the gas and semi-stable liquid products respectively.
In the case of inclement weather conditions at sea level 6, such as wind, waves, hurricanes, tropicai monsoons, precipitation, icebergs, ice floes or other conditions deemed to be harmful to the riser 16, the riser 16 can be disconnected from the offshore floating structure 8 for the duration of the harmful conditions, and can be reconnected once these conditions pass.
Any maintenance work which needs to be carried out on the submerged hydrocarbon processing equipment 26 can be done more easily than in the prior art where the equipment is at the sea bed, since the hydrocarbon processing equipment 26 is not as deep underwater as the sea bed 4.
in some embodiments the offshore fioating structure does not have any role in processing the hydrocarbons that are processed at the submerged fioating riser deck. For example, the spar buoy Thus, hydrocarbons may be processed at the submerged riser deck and transferred elsewhere, via the offshore floating structure or via other means such as the buoys, without any processing aboard the floating structure.

Claims (13)

  1. CLAIMS:
    1. An offshore hydrocarbon processing faciiity comprising: an offshore floating structure;
    5 a submerged floating riser deck operatively connected to a subsea hydrocarbon riser; and hydrocarbon processing equipment disposed on the submerged floating riser deck.
    10
  2. 2. An offshore hydrocarbon processing facility according to claim 1, wherein the submerged floating riser deck floats suspended from the offshore floating structure.
  3. 3. An offshore hydrocarbon processing faciiity according to claim 1 or 2, comprising a riser arranged for disconnectable connection between the offshore floating structure
    15 and the submerged floating riser deck.
  4. 4. An offshore hydrocarbon processing faciiity according to claim 1, 2 or 3, wherein the hydrocarbon processing equipment is entirely disposed on the submerged floating riser deck.
  5. 5. An offshore hydrocarbon processing faciiity as claimed in any preceding ciaim, wherein the offshore hydrocarbon processing faciiity is an unmanned hydrocarbon processing faciiity, comprising at least one of:
    no permanent personnel;
    25 no provision of facilities for personnel to stay on the offshore hydrocarbon processing faciiity, for example there may be no shelters for personnei, no toilet facilities, no drinking water, no personnel operated communications equipment and/or no lifeboat; and/or a requirement that personnei be present for fewer than 10,000 maintenance
    30 hours per year.
  6. 6. An offshore hydrocarbon processing faciiity as claimed In any preceding ciaim, wherein the offshore floating structure is an unmanned structure and/or an unmanned production structure, comprising at ieast one of:
    35 no permanent personnei;
    -11 no provision of facilities for personnel to stay on the platform, for example there may be no shelters for personnel, no toilet facilities, no drinking water, no personnel operated communications equipment and/or no lifeboat; and/or a requirement that personnel be present for fewer than 10,000 maintenance 5 hours per year.
  7. 7. An offshore hydrocarbon processing facility as claimed in claim 1, wherein the offshore floating structure further comprises topside processing equipment located on the offshore floating structure, arranged to produce at ieast one of a hydrocarbon liquid
    10 product, a hydrocarbon semi-stable liquid product and a liquefied gas product.
  8. 8. An offshore hydrocarbon processing facility as claimed in claim 7, wherein the facility is configured such that a hydrocarbon fluid to be processed is processed first by the subsea equipment and then by the topside equipment.
  9. 9. An offshore hydrocarbon processing facility as claimed in any preceding claim, wherein the offshore floating structure is horizontally offset from the submerged floating riser deck, such that the two are not vertically aligned,
    20 10. An offshore hydrocarbon processing facility as claimed in any preceding claim, wherein the submerged floating riser deck is arranged to separate liquid hydrocarbons, flash the separated liquid hydrocarbons and store the flashed hydrocarbons at the submerged floating riser deck.
    25 11. An offshore hydrocarbon processing facility as claimed in any preceding claim further comprising a buoy, wherein the submerged floating riser deck is operatively connected to the buoy for offload of hydrocarbon products to a floating vessel.
    12. A method of operating the offshore hydrocarbon processing facility of any of
    30 claims 1 to 11, comprising;
    receiving hydrocarbons at the submerged floating riser deck from the subsea hydrocarbon riser; and processing the hydrocarbons using the hydrocarbon processing equipment.
    - 1213. A method of operating the offshore hydrocarbon processing facility as claimed in claim 12, comprising disconnectably connecting the submerged floating riser deck to the offshore floating platform using a riser for transfer of hydrocarbons between them.
    5 14. A method of operating the offshore hydrocarbon processing facility as claimed in ciaim 12 or 13, comprising:
    fluidly connecting the submerged floating riser deck to a floating vessel for transfer of hydrocarbons from the submerged floating riser deck to the floating vessel; and/or
  10. 10 fluidly connecting the submerged floating riser deck to a pipeline for transfer of hydrocarbons from the submerged floating riser deck via the pipeline,
  11. 15. A method of operating the offshore hydrocarbon processing facility as claimed in claim 12,13 or 14, comprising:
    15 fluidly connecting the submerged floating riser deck to a buoy; and transferring hydrocarbons from the buoy to a floating vessel·
  12. 16. A method of using the offshore hydrocarbon processing facility as claimed in any of claims 12 to 15, comprising:
  13. 20 separating and flashing liquid hydrocarbons at the submerged floating riser deck;
    and storing the flashed hydrocarbons In storage tanks at the submerged floating riser deck.
    Intellectual
    Property
    Office
    Application No: GB1801339.1 Examiner: Mr Michael Shaw
GB1801339.1A 2017-01-26 2018-01-26 Offshore hydrocarbon processing facility and method of operation Expired - Fee Related GB2561056B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO2017050024 2017-01-26

Publications (3)

Publication Number Publication Date
GB201801339D0 GB201801339D0 (en) 2018-03-14
GB2561056A true GB2561056A (en) 2018-10-03
GB2561056B GB2561056B (en) 2021-08-11

Family

ID=62979540

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1801339.1A Expired - Fee Related GB2561056B (en) 2017-01-26 2018-01-26 Offshore hydrocarbon processing facility and method of operation

Country Status (8)

Country Link
US (1) US20190360319A1 (en)
AU (1) AU2018212306A1 (en)
BR (1) BR112019015018A2 (en)
CA (1) CA3051050A1 (en)
GB (1) GB2561056B (en)
MX (1) MX2019008636A (en)
NO (1) NO20191026A1 (en)
WO (1) WO2018139939A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2584079A (en) * 2019-05-13 2020-11-25 Equinor Energy As A method and system for preparing a fluid produced at an offshore production facility for transportation
WO2021194357A1 (en) * 2020-03-26 2021-09-30 Equinor Energy As Offshore spar platform
GB2598781A (en) * 2020-09-14 2022-03-16 Equinor Energy As A method and vessel for transporting a semi-stable oil product

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO346560B1 (en) 2018-04-24 2022-10-03 Equinor Energy As System and method for offshore hydrocarbon Processing
GB2585368B (en) * 2019-06-28 2022-02-16 Equinor Energy As A method and system for preparing and transporting a fluid produced at an offshore production facility
US11401154B2 (en) * 2019-11-29 2022-08-02 Bluewater Energy Services B.V. System for transferring crude oil from an onshore location to a vessel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4100752A (en) * 1976-09-15 1978-07-18 Fmc Corporation Subsea riser system
US4130076A (en) * 1977-03-17 1978-12-19 Vetco, Inc. Single point mooring apparatus
GB2050995A (en) * 1979-05-30 1981-01-14 Licentia Gmbh A transfer system for transfer of liquid between an underwater pipe and a vessel
CN202391346U (en) * 2011-12-24 2012-08-22 大连理工大学 Tensioned mooring underwater drilling system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2133446B (en) * 1982-12-14 1986-10-15 Treasure Offshore Production S Offshore installation
FR2780442B1 (en) * 1998-06-30 2000-07-28 Inst Francais Du Petrole POLYPHASIC PRODUCTION SYSTEM SUITABLE FOR LARGE WATER DEPTHS
US6672391B2 (en) * 2002-04-08 2004-01-06 Abb Offshore Systems, Inc. Subsea well production facility
NO326575B1 (en) * 2006-07-19 2009-01-12 Framo Eng As Hydrocarbon production system and vessel and method for intervention on subsea equipment
WO2009042307A1 (en) * 2007-09-25 2009-04-02 Exxonmobile Upstream Research Company Method and apparatus for flow assurance management in subsea single production flowline
US20150128840A1 (en) * 2013-11-08 2015-05-14 Seahorse Equipment Corp Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments
GB2549079A (en) * 2016-03-29 2017-10-11 Sllp 134 Ltd Apparatus and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4100752A (en) * 1976-09-15 1978-07-18 Fmc Corporation Subsea riser system
US4130076A (en) * 1977-03-17 1978-12-19 Vetco, Inc. Single point mooring apparatus
GB2050995A (en) * 1979-05-30 1981-01-14 Licentia Gmbh A transfer system for transfer of liquid between an underwater pipe and a vessel
CN202391346U (en) * 2011-12-24 2012-08-22 大连理工大学 Tensioned mooring underwater drilling system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2584079A (en) * 2019-05-13 2020-11-25 Equinor Energy As A method and system for preparing a fluid produced at an offshore production facility for transportation
GB2584079B (en) * 2019-05-13 2022-02-09 Equinor Energy As A method and system for preparing a fluid produced at an offshore production facility for transportation
WO2021194357A1 (en) * 2020-03-26 2021-09-30 Equinor Energy As Offshore spar platform
GB2598781A (en) * 2020-09-14 2022-03-16 Equinor Energy As A method and vessel for transporting a semi-stable oil product
GB2598781B (en) * 2020-09-14 2023-03-01 Equinor Energy As A method and vessel for transporting a semi-stable oil product

Also Published As

Publication number Publication date
US20190360319A1 (en) 2019-11-28
GB201801339D0 (en) 2018-03-14
AU2018212306A1 (en) 2019-08-01
CA3051050A1 (en) 2018-08-02
GB2561056B (en) 2021-08-11
BR112019015018A2 (en) 2020-03-10
NO20191026A1 (en) 2019-08-26
WO2018139939A1 (en) 2018-08-02
MX2019008636A (en) 2019-09-09

Similar Documents

Publication Publication Date Title
US20190360319A1 (en) Offshore hydrocarbon processing facility and method of operation
US5582252A (en) Hydrocarbon transport system
RU2125949C1 (en) System for transportation of fluid media to or from floating ship
DK179631B1 (en) Deepwater production system
US6817809B2 (en) Seabed oil storage and tanker offtake system
US20120024391A1 (en) Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
US10059409B2 (en) Taut inverted catenary mooring system
CN1356945A (en) Submerged pipeline manifold for offloading mooring buoy and method of installation
GB2133446A (en) Offshore installation
NO20141099A1 (en) System for anchoring a production vessel
US20150128840A1 (en) Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments
US20120037376A1 (en) System and Method For Well Clean-Up
KR20140140751A (en) Single point mooring system for conventional tanker and shuttle tanker
GB2585488A (en) Shuttle loading system
US6012530A (en) Method and apparatus for producing and shipping hydrocarbons offshore
US20160251944A1 (en) Process for transporting extraction fluids such as for example natural gas, oil or water, and underwater vehicle for effecting said process
EP3898401B1 (en) Ship-to-ship transfer of hydrocarbon liquids
KR101511360B1 (en) Processing apparatus for single point mooring
KR101665405B1 (en) Natural flowing type crude oil loading and unloading apparatus
Wodehouse et al. The Development of an FPSO for the Deepwater Gulf of Mexico
RU2713533C1 (en) Floating hatchback system for unloading oil products on unequipped shore from tankers
Ribeiro et al. The Design of an FPSO to Operate in Gulf of Mexico
Wilson Turritella FPSO-Design and Fabrication of the World’s Deepest Producing Unit
US20150129237A1 (en) FPSO Field Development System for Large Riser Count and High Pressures for Harsh Environments
NO852733L (en) METHOD OF PROCEDURE AND SYSTEM FOR PRODUCTION, PROCESSING AND TRANSPORTATION OF OIL / GAS FROM FIELDS TO SEA.

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee

Effective date: 20240126