US20150128840A1 US14/536,263 US201414536263A US2015128840A1 US 20150128840 A1 US20150128840 A1 US 20150128840A1 US 201414536263 A US201414536263 A US 201414536263A US 2015128840 A1 US2015128840 A1 US 2015128840A1
Authority
US
United States
Prior art keywords
semisubmersible
shuttle
fso
harsh environments
tanker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/536,263
Inventor
Oriol Rijken
Randy Jordan
Kent Davies
Jos Bronneberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seahorse Equipment Corp
Original Assignee
Seahorse Equipment Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seahorse Equipment Corp filed Critical Seahorse Equipment Corp
Priority to US14/536,263 priority Critical patent/US20150128840A1/en
Assigned to SEAHORSE EQUIPMENT CORP. reassignment SEAHORSE EQUIPMENT CORP. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BRONNEBERG, JOS, JORDAN, RANDY, RIJKEN, ORIOL, DAVIES, KENT
Publication of US20150128840A1 publication Critical patent/US20150128840A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B21/507Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B22/02Buoys specially adapted for mooring a vessel
    • B63B22/021Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/30Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
    • B63B27/34Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures using pipe-lines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/448Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO]

Definitions

  • the present invention generally relates to the offshore production of oil and gas. More particularly, it relates to surface vessels used to receive, process and store hydrocarbons from subsea wells.
  • the invention relates to a field development methodology for offshore oil and gas fields in harsh environments (e.g. hurricane/cyclonic) for a frontier location where the existing pipeline infrastructure is insufficient during the entire field life or during the early phases thereof.
  • harsh environments e.g. hurricane/cyclonic
  • An “FPSO” is a Floating Production Storage and Offloading system—a floating facility installed above or close to an offshore oil and/or gas field to receive, process, store and export hydrocarbons.
  • the mooring configuration may be of the spread mooring type or a single point mooring system, generally a turret.
  • the high pressure mixture of produced fluids is delivered to the process facilities mounted on the deck of the tanker, where the oil, gas and water are separated.
  • the water is discharged overboard after treatment to eliminate hydrocarbons.
  • the stabilized crude oil is stored in the cargo tanks and subsequently transferred into shuttle tankers either via a buoy or by laying side by side or in tandem to the FPSO.
  • the gas is used for enhancing the liquid production through gas lift, and for energy production onboard the vessel. The remainder is compressed and transported by pipeline to shore or re-injected into the reservoir.
  • An “FSO” is a similar vessel but without the process facilities.
  • the invention comprises a semisubmersible, at least two offloading terminals and shuttle tankers in optional combination with an FSO.
  • a system according to the invention may be deployed in deep water harsh environments where riser performance (either SCR or LWSCR) is a key performance parameter.
  • the semisubmersible is used to support the risers because of its favorable motion characteristics under harsh conditions.
  • the semisubmersible supports the entire process train and provides well maintenance, which may include water and/or gas injection.
  • the semisubmersible may provide work-over capabilities for well intervention.
  • the produced hydrocarbons are exported through flexible pipes to at least two off-loading buoys.
  • a FSO or shuttle tanker receives the produced hydrocarbons. Two or more off-loading buoys may be employed to allow for uninterrupted production when a shuttle-tanker-only solution is utilized.
  • FIG. 1 is a schematic plan view of an offshore field development according to an embodiment of the invention.
  • FIG. 2 is a top plan schematic view of another embodiment of the present invention that uses an FSO and a shuttle tanker.
  • FIG. 3 is a side schematic view of a field development in operating conditions according to the present invention.
  • FIG. 4 is a side schematic view of the field development shown in FIG. 3 in extreme metocean conditions.
  • FIG. 5 is a side schematic view of the field development shown in FIG. 3 in a mature stage.
  • the invention comprises a semisubmersible, at least two offloading terminals and shuttle tankers in possible combination with an FSO.
  • a system according to the invention may be deployed in deep water harsh environments where riser performance (either SCR or LWSCR) is a key performance parameter.
  • the semisubmersible supports the risers because of its favorable motion characteristics under harsh conditions.
  • the semisubmersible supports the entire process train and provides well maintenance, which may include water and/or gas injection.
  • the semisubmersible could provide work-over capabilities for well intervention.
  • the produced hydrocarbons are exported through flexible pipes to at least two off-loading buoys.
  • a FSO or shuttle tanker receives the produced hydrocarbons ( FIG. 3 or FIG. 2 ). At least two off-loading buoys are necessary to allow for uninterrupted production ( FIG. 1 ) when a shuttle-tanker—only solution is utilized (i.e. no FSO), see FIG. 2 .
  • the pipeline infrastructure may reach the location where this semisubmersible is located.
  • the pipeline infrastructure can be an oil line, a gas line or both.
  • the gas can then be exported via the gas pipeline while the oil could be the existing offloading terminals.
  • the offloading terminals can be removed if an oil pipeline is present.
  • the shuttle tanker/FSO disconnects from the offloading terminal when the environment becomes too intense.
  • the offloading terminal is connected to the semisubmersible via a bundle of lines which include power and data. This allows for controlled ballast operations on the offloading terminal to submerge it to reduce the environmental forces.
  • the invention is intended for use in harsh environments.
  • the methodology is highly applicable to locations where the harsh environments are rare but intense (a benign methodology might work except for those rare occasions). Such locations include the many of the hurricane/cyclonic areas of the world.
  • the system is similar to the Rapid Deployment Offloading System (RDOS) which was developed for Shell, BP and Chevron, 2007-2009, project 46028.
  • RDOS Rapid Deployment Offloading System
  • the RDOS is intended to provide temporary offloading capacity in case of a non-functional pipeline.
  • the design life is specified as typically ten deployments of 6 months each.
  • a system according to the invention may have a single deployment ranging from several years to field design life.
  • Competing systems include the FPSO or semisubmersible by itself, a disconnect able buoy similar to White Rose or Stones or the MoorSpar, or RDOS.
  • the advantages of the proposed methodology include:
  • the independent innovative aspects of the invention include:

Abstract

A system comprising a semisubmersible, at least two offloading terminals and shuttle tankers in optional combination with an FSO may be deployed in deep water harsh environments where riser performance (either SCR or LWSCR) is a key performance parameter. The semisubmersible is used to support the risers because of its favorable motion characteristics under harsh conditions. The semisubmersible supports the entire process train and provides well maintenance, which may include water and/or gas injection. The semisubmersible may provide work-over capabilities for well intervention. The produced hydrocarbons are exported through flexible pipes to at least two off-loading buoys. A FSO or shuttle tanker receives the produced hydrocarbons. Two or more off-loading buoys may be employed to allow for uninterrupted production when a shuttle-tanker-only embodiment is utilized.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims the benefit of U.S. Provisional Application No. 61/901,758 filed on Nov. 8, 2013.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable
  • BACKGROUND OF THE INVENTION
  • 1. Field of the Invention
  • The present invention generally relates to the offshore production of oil and gas. More particularly, it relates to surface vessels used to receive, process and store hydrocarbons from subsea wells.
  • 2. Description of the Related Art
  • Including information disclosed under 37 CFR 1.97 and 1.98.
  • The invention relates to a field development methodology for offshore oil and gas fields in harsh environments (e.g. hurricane/cyclonic) for a frontier location where the existing pipeline infrastructure is insufficient during the entire field life or during the early phases thereof.
  • An “FPSO” is a Floating Production Storage and Offloading system—a floating facility installed above or close to an offshore oil and/or gas field to receive, process, store and export hydrocarbons.
  • It consists of a floater, which is either a newly built or converted tanker, permanently moored on site. The cargo capacity of the vessel is used as buffer storage for the oil produced. The process facilities (topsides) and accommodation are installed on the floater. The mooring configuration may be of the spread mooring type or a single point mooring system, generally a turret.
  • The high pressure mixture of produced fluids is delivered to the process facilities mounted on the deck of the tanker, where the oil, gas and water are separated. The water is discharged overboard after treatment to eliminate hydrocarbons. The stabilized crude oil is stored in the cargo tanks and subsequently transferred into shuttle tankers either via a buoy or by laying side by side or in tandem to the FPSO. The gas is used for enhancing the liquid production through gas lift, and for energy production onboard the vessel. The remainder is compressed and transported by pipeline to shore or re-injected into the reservoir.
  • An “FSO” is a similar vessel but without the process facilities.
  • BRIEF SUMMARY OF THE INVENTION
  • The invention comprises a semisubmersible, at least two offloading terminals and shuttle tankers in optional combination with an FSO. A system according to the invention may be deployed in deep water harsh environments where riser performance (either SCR or LWSCR) is a key performance parameter. The semisubmersible is used to support the risers because of its favorable motion characteristics under harsh conditions. The semisubmersible supports the entire process train and provides well maintenance, which may include water and/or gas injection. The semisubmersible may provide work-over capabilities for well intervention. The produced hydrocarbons are exported through flexible pipes to at least two off-loading buoys. A FSO or shuttle tanker receives the produced hydrocarbons. Two or more off-loading buoys may be employed to allow for uninterrupted production when a shuttle-tanker-only solution is utilized.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWING(S)
  • FIG. 1 is a schematic plan view of an offshore field development according to an embodiment of the invention.
  • FIG. 2 is a top plan schematic view of another embodiment of the present invention that uses an FSO and a shuttle tanker.
  • FIG. 3 is a side schematic view of a field development in operating conditions according to the present invention.
  • FIG. 4 is a side schematic view of the field development shown in FIG. 3 in extreme metocean conditions.
  • FIG. 5 is a side schematic view of the field development shown in FIG. 3 in a mature stage.
  • DETAILED DESCRIPTION OF THE INVENTION
  • The invention comprises a semisubmersible, at least two offloading terminals and shuttle tankers in possible combination with an FSO. A system according to the invention may be deployed in deep water harsh environments where riser performance (either SCR or LWSCR) is a key performance parameter. The semisubmersible supports the risers because of its favorable motion characteristics under harsh conditions. The semisubmersible supports the entire process train and provides well maintenance, which may include water and/or gas injection. The semisubmersible could provide work-over capabilities for well intervention. The produced hydrocarbons are exported through flexible pipes to at least two off-loading buoys. A FSO or shuttle tanker receives the produced hydrocarbons (FIG. 3 or FIG. 2). At least two off-loading buoys are necessary to allow for uninterrupted production (FIG. 1) when a shuttle-tanker—only solution is utilized (i.e. no FSO), see FIG. 2.
  • The pipeline infrastructure may reach the location where this semisubmersible is located. The pipeline infrastructure can be an oil line, a gas line or both. The gas can then be exported via the gas pipeline while the oil could be the existing offloading terminals. The offloading terminals can be removed if an oil pipeline is present. Use of a system according to the invention allows for a delay on the decision to build the pipeline infrastructure; a pipeline infrastructure to a frontier area is an expensive preposition.
  • The shuttle tanker/FSO disconnects from the offloading terminal when the environment becomes too intense. The offloading terminal is connected to the semisubmersible via a bundle of lines which include power and data. This allows for controlled ballast operations on the offloading terminal to submerge it to reduce the environmental forces.
  • The invention is intended for use in harsh environments. The methodology is highly applicable to locations where the harsh environments are rare but intense (a benign methodology might work except for those rare occasions). Such locations include the many of the hurricane/cyclonic areas of the world.
  • The system is similar to the Rapid Deployment Offloading System (RDOS) which was developed for Shell, BP and Chevron, 2007-2009, project 46028. The RDOS is intended to provide temporary offloading capacity in case of a non-functional pipeline. The design life is specified as typically ten deployments of 6 months each. A system according to the invention may have a single deployment ranging from several years to field design life.
  • Competing systems include the FPSO or semisubmersible by itself, a disconnect able buoy similar to White Rose or Stones or the MoorSpar, or RDOS. The advantages of the proposed methodology include:
      • Support for a large number of risers under harsh conditions, including high pressure, sour service, high H2S content;
      • A fluid transfer system between the semisubmersible and shuttle tanker that is “low pressure”, and comprises of only a few lines. Therefore simplifying the design and allowing for more motion;
      • A disconnect able buoy which supports only a few lines and may not have any rotational parts;
      • A swivel requiring only a few flow paths and an electronic data path;
      • The entire system comprises of field proven hardware;
      • Ability to start producing a field before pipeline infrastructure; and,
      • Limited additional hardware required before pipe line infrastructure is present.
  • The possible disadvantages of this system include:
      • Requirement for one semisubmersible and two offloading terminals in relatively close proximity, with associated mooring line infrastructure; and,
      • Operation of three vessels in relatively close proximity to one another.
  • Systems or methodologies that perform similar functions include the FPSO, the semisubmersible, the disconnect able FPSO, the MoorSpar, riser tower and RDOS. Each system has advantages and disadvantages. Most of these systems cannot meet at least one of the following requirements: many risers, high pressure, sour service, high H2S content, large quantities and/or high pressure water injection, harsh environment, storage & offloading.
  • The independent innovative aspects of the invention include:
      • Support deep water risers in harsh environment without initial pipeline infrastructure;
      • Support deep water risers that will have to withstand high H2S levels and/or high temperatures and/or sour service, without initial pipeline infrastructure;
      • Use of one or more shuttle tankers to directly store the all or some of the hydrocarbons that are being produced/processed by the semisubmersible; and,
      • Use of one or more FSOs to directly store all or some of the hydrocarbons that are being produced/processed by the semisubmersible.
  • Although particular embodiments of the present invention have been shown and described, they are not intended to limit what this patent covers. One skilled in the art will understand that various changes and modifications may be made without departing from the scope of the present invention as literally and equivalently covered by the following claims.

Claims (1)

What is claimed is:
1. A system for offshore oilfield development comprising:
a semi-submersible having hydrocarbon processing equipment thereon;
a plurality of subsea risers in fluid communication with the hydrocarbon processing equipment and wellheads on the seafloor;
a submersible mooring buoy having means for fluid connection to a shuttle tanker moored to the mooring buoy; and
at least one fluid conduit connecting the mooring buoy to the hydrocarbon processing equipment on the semi-submersible.
US14/536,263 2013-11-08 2014-11-07 Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments Abandoned US20150128840A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/536,263 US20150128840A1 (en) 2013-11-08 2014-11-07 Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361901758P 2013-11-08 2013-11-08
US14/536,263 US20150128840A1 (en) 2013-11-08 2014-11-07 Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments

Publications (1)

Publication Number Publication Date
US20150128840A1 true US20150128840A1 (en) 2015-05-14

Family

ID=53042556

Family Applications (1)

Application Number Title Priority Date Filing Date
US14/536,263 Abandoned US20150128840A1 (en) 2013-11-08 2014-11-07 Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments

Country Status (1)

Country Link
US (1) US20150128840A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018139939A1 (en) * 2017-01-26 2018-08-02 Statoil Petroleum As Offshore hydrocarbon processing facility and method of operation
CN109871609A (en) * 2019-02-18 2019-06-11 中国海洋大学 The prediction technique that marine floating type platform mooring system is responded based on BP-FEM
US10718185B2 (en) 2016-09-15 2020-07-21 Equinor Energy As Handling of hydrocarbons and equipment of an offshore platform
US10888724B2 (en) 2016-09-15 2021-01-12 Equinor Energy As Optimising fire protection for an offshore platform
US11196255B2 (en) 2017-03-10 2021-12-07 Equinor Energy As Power supply system for an offshore platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4995762A (en) * 1988-07-19 1991-02-26 Goldman Jerome L Semisubmersible vessel with captured constant tension buoy
US20050042953A1 (en) * 2002-01-24 2005-02-24 Christian Bauduin Wave motion absorbing offloading system comprising a slender mooring buoy
US20080096448A1 (en) * 2004-09-28 2008-04-24 Lokken Roald T Combined Riser, Offloading and Mooring System
US20110033244A1 (en) * 2008-01-28 2011-02-10 Single Buoy Moorings Inc. Long distance submerged hydrocarbon transfer system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4995762A (en) * 1988-07-19 1991-02-26 Goldman Jerome L Semisubmersible vessel with captured constant tension buoy
US20050042953A1 (en) * 2002-01-24 2005-02-24 Christian Bauduin Wave motion absorbing offloading system comprising a slender mooring buoy
US20080096448A1 (en) * 2004-09-28 2008-04-24 Lokken Roald T Combined Riser, Offloading and Mooring System
US20110033244A1 (en) * 2008-01-28 2011-02-10 Single Buoy Moorings Inc. Long distance submerged hydrocarbon transfer system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10718185B2 (en) 2016-09-15 2020-07-21 Equinor Energy As Handling of hydrocarbons and equipment of an offshore platform
US10888724B2 (en) 2016-09-15 2021-01-12 Equinor Energy As Optimising fire protection for an offshore platform
WO2018139939A1 (en) * 2017-01-26 2018-08-02 Statoil Petroleum As Offshore hydrocarbon processing facility and method of operation
US11196255B2 (en) 2017-03-10 2021-12-07 Equinor Energy As Power supply system for an offshore platform
US11601011B2 (en) 2017-03-10 2023-03-07 Equinor Energy As Power supply system for an offshore platform
CN109871609A (en) * 2019-02-18 2019-06-11 中国海洋大学 The prediction technique that marine floating type platform mooring system is responded based on BP-FEM

Similar Documents

Publication Publication Date Title
US5582252A (en) Hydrocarbon transport system
AU2007275960B2 (en) System and vessel hydrocarbon production and method for intervention on subsea equipment
US20150128840A1 (en) Frontier Field Development System for Large Riser Count and High Pressures for Harsh Environments
US9458700B2 (en) Use of underground gas storage to provide a flow assurance buffer between interlinked processing units
US10253471B2 (en) Hydrocarbon production and storage facility
US9074428B2 (en) Connector for steel catenary riser to flexible line without stress-joint or flex-joint
US20190360319A1 (en) Offshore hydrocarbon processing facility and method of operation
CN104203742A (en) System for mooring a production vessel
NO20121567A1 (en) Subsea completions and well interventions using support vessels
US20120037376A1 (en) System and Method For Well Clean-Up
CA2911428C (en) Deepwater disconnectable turret system with lazy wave rigid riser configuration
CA2887345C (en) System and method for obstacle avoidance during hydrocarbon operations
US20150129237A1 (en) FPSO Field Development System for Large Riser Count and High Pressures for Harsh Environments
Newport A Historical Review of Disconnectable Moorings for Ship Shaped Floating Production Units
US9133691B2 (en) Large-offset direct vertical access system
US20220388610A1 (en) Operation of an Unmanned Productive Platform
Lim et al. Evolution of the production semisubmersible
KR102477560B1 (en) Hybrid offshore structure
Zuccolo et al. The Low Motion FPSO (LM-FPSO); a Novel SCR Friendly Floater for Deepwater in Brazil Persistent Swell Environment
Ribeiro et al. The Design of an FPSO to Operate in Gulf of Mexico
Davison et al. Fast-Track Development of Deepwater Kuito Field, Offshore Angola
Carter et al. Evolutionary developments advancing the floating production, storage, and offloading concept
Gudmestad et al. Sub Sea Versus Surface Developments in Arctic Waters
Saint-Marcoux et al. DEEPWATER GAS FIELD PRODUCTION FROM SUBSEA WELLS INTO COMPRESSED NATURAL GAS CARRIERS THROUGH A HYBRID RISER TOWER
KR20160022674A (en) Buoy Type Production System

Legal Events

Date Code Title Description
AS Assignment

Owner name: SEAHORSE EQUIPMENT CORP., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:RIJKEN, ORIOL;JORDAN, RANDY;DAVIES, KENT;AND OTHERS;SIGNING DATES FROM 20141113 TO 20141114;REEL/FRAME:034288/0898

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION