Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Inventor
John Morrell Rusby
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Application grantedgrantedCritical
Publication of GB190728181ApublicationCriticalpatent/GB190728181A/en
28,181. Rusby, J. M. Jan. 31, [date applied for under Patents Act, 1901]. Producers.-A predetermined amount of air is supplied to the producer 1, carburettor 2, and fixing-chamber 3 of a water-gas plant at each blow. The air is supplied from a main 5 through branches 6, 7, 8, respectively, each of which is fitted with a valve 9 and Venturi tube 10 provided with a pressure gauge.
GB190728181D1907-01-311907-12-21Improvements in or relating to Water Gas Apparatus
ExpiredGB190728181A
(en)