FR3083149B1 - Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine - Google Patents
Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine Download PDFInfo
- Publication number
- FR3083149B1 FR3083149B1 FR1855801A FR1855801A FR3083149B1 FR 3083149 B1 FR3083149 B1 FR 3083149B1 FR 1855801 A FR1855801 A FR 1855801A FR 1855801 A FR1855801 A FR 1855801A FR 3083149 B1 FR3083149 B1 FR 3083149B1
- Authority
- FR
- France
- Prior art keywords
- underground cavity
- conforming
- filling
- area including
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000009412 basement excavation Methods 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B3/00—Destroying solid waste or transforming solid waste into something useful or harmless
- B09B3/30—Destroying solid waste or transforming solid waste into something useful or harmless involving mechanical treatment
- B09B3/35—Shredding, crushing or cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B1/00—Dumping solid waste
- B09B1/008—Subterranean disposal, e.g. in boreholes or subsurface fractures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B3/00—Destroying solid waste or transforming solid waste into something useful or harmless
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B09—DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
- B09B—DISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
- B09B5/00—Operations not covered by a single other subclass or by a single other group in this subclass
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
La présente invention concerne un procédé de remblaiement et de confortement d'une zone comprenant au moins une cavité souterraine, comprenant les étapes successives suivantes : a) Evaluer la nature géochimique de la zone et choisir un déblai ; b) Dépolluer éventuellement le déblai ; c) Fabriquer un matériau destiné à remblayer et à conforter la zone à partir du déblai obtenu à l'issue de l'étape b) ; d) Injecter ledit matériau dans la zone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1855801A FR3083149B1 (fr) | 2018-06-27 | 2018-06-27 | Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1855801A FR3083149B1 (fr) | 2018-06-27 | 2018-06-27 | Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine |
FR1855801 | 2018-06-27 |
Publications (2)
Publication Number | Publication Date |
---|---|
FR3083149A1 FR3083149A1 (fr) | 2020-01-03 |
FR3083149B1 true FR3083149B1 (fr) | 2021-04-02 |
Family
ID=65685420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1855801A Active FR3083149B1 (fr) | 2018-06-27 | 2018-06-27 | Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR3083149B1 (fr) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2632283B1 (fr) * | 1988-06-02 | 1993-04-09 | Geostock Sarl | Procede d'abandon rapide de grandes cavites lessivees en sel gemme |
DE3833676A1 (de) * | 1988-10-04 | 1990-04-05 | Petri Juergen Dipl Ing Dr | Verfahren zur endlagerung von eingebundenen abfallstoffen |
NO172217C (no) * | 1990-11-28 | 1993-06-23 | Norske Stats Oljeselskap | Anlegg for behandling av borekaks |
-
2018
- 2018-06-27 FR FR1855801A patent/FR3083149B1/fr active Active
Also Published As
Publication number | Publication date |
---|---|
FR3083149A1 (fr) | 2020-01-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AP1516A (en) | Underground mining method. | |
JP2016183516A (ja) | トンネル構造およびトンネル施工方法 | |
CN109356596A (zh) | 利用可回收地下连续墙和钢套筒始发及接收盾构机的方法 | |
ITMO20130343A1 (it) | Procedimento per la costruzione di infrastrutture di trasporto sotterranee | |
JP2012036624A (ja) | トンネル構築方法 | |
KR20170047365A (ko) | 통합된 잭킹 파이프 | |
FR3083149B1 (fr) | Procede de remblaiement et de confortement d'une zone comprenant au moins une cavite souterraine | |
CN204002832U (zh) | 一种盾构隧道洞门结构 | |
JP4661937B2 (ja) | セグメントの補強方法及びセグメントの補強構造 | |
CN110331981A (zh) | 一种井巷分段采掘方法 | |
SG11201805951XA (en) | Earth retaining method and supporting system | |
JP5382432B2 (ja) | 近接双設トンネルの掘削方法 | |
CN104500092A (zh) | 隧道拱顶接地端子漏埋植入结构及其植入方法 | |
CN109386289B (zh) | 一种爆破、封孔、注浆一体化施工方法 | |
JP6460777B2 (ja) | 補強鋼管及び拡径治具のセット並びに補強鋼管を用いた掘削補助工法 | |
JP2017125369A (ja) | マンホール改修工法及びマンホール改修構造 | |
CN203891008U (zh) | 微型隔离桩 | |
JP2676012B2 (ja) | トンネルの構築方法 | |
CN110374631B (zh) | 一种软弱地层小净距隧道后行隧洞超前注浆施工方法 | |
JP2014091938A (ja) | トンネル用エントランス構造およびシールド掘削機の発進方法 | |
FR3084380B1 (fr) | Procede d'installation d'un pieu metallique tubulaire dans un sol rocheux | |
CN106285696A (zh) | 砂卵石地层矩形盾构顶掘土压平衡建立施工方法 | |
CN104675407A (zh) | 一种单线矿山法地铁隧道斜井进正洞的处理方法 | |
Mancinelli | Evaluation of superficial settlements in low overburden tunnel TBM excavation: Numerical approaches | |
JP2018031150A (ja) | トンネルの拡幅方法、及び、トンネルの補強装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20200103 |
|
PLFP | Fee payment |
Year of fee payment: 3 |
|
PLFP | Fee payment |
Year of fee payment: 4 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |