CN109386289B - 一种爆破、封孔、注浆一体化施工方法 - Google Patents
一种爆破、封孔、注浆一体化施工方法 Download PDFInfo
- Publication number
- CN109386289B CN109386289B CN201910003187.3A CN201910003187A CN109386289B CN 109386289 B CN109386289 B CN 109386289B CN 201910003187 A CN201910003187 A CN 201910003187A CN 109386289 B CN109386289 B CN 109386289B
- Authority
- CN
- China
- Prior art keywords
- blasting
- pvc pipe
- grouting
- upper section
- lower section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005422 blasting Methods 0.000 title claims abstract description 59
- 238000007789 sealing Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 239000002360 explosive Substances 0.000 claims abstract description 20
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000005553 drilling Methods 0.000 claims abstract description 7
- 239000002002 slurry Substances 0.000 claims abstract description 5
- 239000012466 permeate Substances 0.000 claims abstract description 3
- 239000011435 rock Substances 0.000 claims description 11
- 230000000903 blocking effect Effects 0.000 claims description 10
- 239000004568 cement Substances 0.000 claims description 9
- 239000004576 sand Substances 0.000 claims description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 230000001427 coherent effect Effects 0.000 abstract description 3
- 238000004904 shortening Methods 0.000 abstract description 3
- 239000010438 granite Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Soil Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910003187.3A CN109386289B (zh) | 2019-01-03 | 2019-01-03 | 一种爆破、封孔、注浆一体化施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910003187.3A CN109386289B (zh) | 2019-01-03 | 2019-01-03 | 一种爆破、封孔、注浆一体化施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109386289A CN109386289A (zh) | 2019-02-26 |
CN109386289B true CN109386289B (zh) | 2020-09-01 |
Family
ID=65430929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910003187.3A Active CN109386289B (zh) | 2019-01-03 | 2019-01-03 | 一种爆破、封孔、注浆一体化施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109386289B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685716A (zh) * | 2019-10-12 | 2020-01-14 | 中铁隧道局集团有限公司 | 孤石爆破处理后的袖阀管注浆方法 |
CN110656947B (zh) * | 2019-10-30 | 2021-07-23 | 中铁隧道局集团有限公司 | 海底基岩凸起段的掘进方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101713624A (zh) * | 2009-11-17 | 2010-05-26 | 广东爆破工程有限公司 | 地下隐蔽岩体地面钻孔爆破破碎方法 |
CN102518442A (zh) * | 2011-12-14 | 2012-06-27 | 中铁十二局集团第二工程有限公司 | 一种盾构掘进溶沟地段孤石群的处理方法 |
KR101368999B1 (ko) * | 2010-06-30 | 2014-02-28 | 유재호 | 관거매설공의 보강이 가능한 관거 추진장치 및 이를 이용한 관거 시공 공법 |
DE102014110132B3 (de) * | 2014-07-18 | 2015-10-15 | Werner Möbius Engineering GmbH | Schildvortriebsmaschine (SVM) und Verfahren zum Lockern und/oder Zerkleinern von Steinen in einer SVM |
CN106524844A (zh) * | 2016-09-26 | 2017-03-22 | 中铁十六局集团北京轨道交通工程建设有限公司 | 一种盾构隧道沿线孤石勘查和爆破处理的施工方法 |
CN109000525A (zh) * | 2018-08-15 | 2018-12-14 | 中铁十六局集团有限公司 | 一种盾构掘进上软下硬地层预裂爆破施工方法 |
CN109026037A (zh) * | 2018-09-25 | 2018-12-18 | 中铁十二局集团有限公司 | 盾构隧道遇基岩孤石地层预处理施工方法 |
-
2019
- 2019-01-03 CN CN201910003187.3A patent/CN109386289B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101713624A (zh) * | 2009-11-17 | 2010-05-26 | 广东爆破工程有限公司 | 地下隐蔽岩体地面钻孔爆破破碎方法 |
KR101368999B1 (ko) * | 2010-06-30 | 2014-02-28 | 유재호 | 관거매설공의 보강이 가능한 관거 추진장치 및 이를 이용한 관거 시공 공법 |
CN102518442A (zh) * | 2011-12-14 | 2012-06-27 | 中铁十二局集团第二工程有限公司 | 一种盾构掘进溶沟地段孤石群的处理方法 |
DE102014110132B3 (de) * | 2014-07-18 | 2015-10-15 | Werner Möbius Engineering GmbH | Schildvortriebsmaschine (SVM) und Verfahren zum Lockern und/oder Zerkleinern von Steinen in einer SVM |
CN106524844A (zh) * | 2016-09-26 | 2017-03-22 | 中铁十六局集团北京轨道交通工程建设有限公司 | 一种盾构隧道沿线孤石勘查和爆破处理的施工方法 |
CN109000525A (zh) * | 2018-08-15 | 2018-12-14 | 中铁十六局集团有限公司 | 一种盾构掘进上软下硬地层预裂爆破施工方法 |
CN109026037A (zh) * | 2018-09-25 | 2018-12-18 | 中铁十二局集团有限公司 | 盾构隧道遇基岩孤石地层预处理施工方法 |
Non-Patent Citations (1)
Title |
---|
跨海盾构区间孤石及基岩凸起处理施工关键技术;吴载清;《江西建材》;20160531(第5期);第181-183页 * |
Also Published As
Publication number | Publication date |
---|---|
CN109386289A (zh) | 2019-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10612378B2 (en) | Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars | |
CN104790978B (zh) | 小净距立体交叉隧道环形导坑施工方法 | |
CN101603431B (zh) | 一种突出危险煤层石门揭煤加固方法 | |
CN104533467B (zh) | 一种高承压水、断层破碎巷道的支护方法 | |
CN105735995A (zh) | 一种松软顶板切顶下的沿空留巷方法 | |
CN102635327B (zh) | 破碎煤岩体注浆方法及系统 | |
CN110080771B (zh) | 一种深井高应力大巷煤柱释能改性防治冲击地压的方法 | |
AU2021355609B2 (en) | Method for mining by filling and caving | |
CN104481540A (zh) | 一种利用高位钻孔注浆控制多种煤矿开采灾害的方法 | |
CN102322262A (zh) | 煤矿孤岛煤柱顺槽冲击地压控制方法 | |
CN113187486B (zh) | 一种深井无煤柱沿空掘巷方法以及形成的巷道 | |
CN102146794B (zh) | 注浆固结沿空掘巷工艺方法 | |
CN111997639B (zh) | Tbm施工隧道不良地质段卡机脱困及加固改良地质的方法 | |
CN109386289B (zh) | 一种爆破、封孔、注浆一体化施工方法 | |
CN111608726A (zh) | 一种间隔式覆岩碎胀充填钢筋笼囊袋注浆减损方法 | |
WO2016150188A1 (zh) | 一种致裂相邻采煤工作面遗留充填墙体的方法 | |
CN102644471A (zh) | 封孔器及使用封孔器进行小孔径注浆锚固锚索的封孔方法 | |
CN105019924A (zh) | 一种强力顶板支护墩柱和用于保护区段煤柱的方法 | |
CN104879149A (zh) | 三软高应力区域巷道的锚注支护方法 | |
CN202416312U (zh) | 一种可预爆钻注锚一体化的锚杆 | |
CN110130978A (zh) | 一种充填复采小窑破坏区厚煤层破碎煤帮封堵方法 | |
CN112943306A (zh) | 一种基于失稳变形研究的巷道过断层带支护方法及步骤 | |
CN210798914U (zh) | 钻孔多段封堵、致裂、注浆、注水一体化设备 | |
CN109458214B (zh) | 一种低透气性煤层静态爆破增透瓦斯抽采方法 | |
CN110940242B (zh) | 一种含深裂隙边坡岩体爆破开挖方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 510000 floor 2 and 3, building 4, No. 204, Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province (office use only) Patentee after: Guangzhou Metro Engineering Consulting Co.,Ltd. Country or region after: China Patentee after: GUANGZHOU DIHENG ENGINEERING CONSULTATION Co.,Ltd. Address before: 510010 floor 2 and 3, building 4, No. 204, Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province (office use only) Patentee before: GUANGZHOU MASS TRANSIT ENGINEERING CONSULTANT Co.,Ltd. Country or region before: China Patentee before: GUANGZHOU DIHENG ENGINEERING CONSULTATION Co.,Ltd. |