FR3053711A1 - QUICK COUPLING TEMPLATES (GCR) - Google Patents
QUICK COUPLING TEMPLATES (GCR) Download PDFInfo
- Publication number
- FR3053711A1 FR3053711A1 FR1601079A FR1601079A FR3053711A1 FR 3053711 A1 FR3053711 A1 FR 3053711A1 FR 1601079 A FR1601079 A FR 1601079A FR 1601079 A FR1601079 A FR 1601079A FR 3053711 A1 FR3053711 A1 FR 3053711A1
- Authority
- FR
- France
- Prior art keywords
- gcr
- product
- base
- piece
- heart
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
- E04G13/021—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0472—Details of connection of the hose to the formwork, e.g. inlets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Notre invention de nom Gabarit pour Coulage Rapide (GCR*) est un matériau de construction préfabriqué en béton. Il peut être armé avec du chaînage comme il peut être sans. Il est composé essentiellement de deux pièces distinctes : d'une GCR*support-Poutre, qu'on fixe en premier à n'importe quelle position souhaitée et d'une GCR*-Poutre, qu'on glisse dedans et qui se maintient automatiquement en perpendiculaire par rapport à celle-ci. On utilise ce produit actuellement pour bâtir des poutres sous plusieurs formes et dimensions, avec précision et une rapidité extrême, sans avoir besoin de coffrage ni des grands moyens qu'on emploi habituellement. Donc, cette méthode pratique est accessible pour tous ; elle est simple, rapide et peu couteuse. Mieux encore ; en se basant sur ce principe de fonctionnement pour cette invention, on peut diversifier nos produits en fabriquant des poutres sous plusieurs formes et dimensions voir des murs et même à des constructions plus complexes.Our invention of quick casting name (GCR *) is a precast concrete construction material. He can be armed with chaining as he can be without. It consists essentially of two separate parts: a GCR * support-Beam, which is fixed first at any desired position and a GCR * -Other, that slides in and is maintained automatically perpendicular to it. This product is currently being used to build beams in many shapes and sizes, with precision and extreme speed, without the need for formwork or the large means usually used. So this practical method is accessible to all; it is simple, fast and inexpensive. Even better ; Based on this operating principle for this invention, we can diversify our products by making beams in many shapes and sizes, even walls and even more complex constructions.
Description
La description :The description :
Notre invention de nom : Gabarit pour Coulage Rapide (GCR*) est un produit de BTP en béton, composé de 2 pièces distinctes ; (1) le GCR*support-poutre et (2) le GCR*-poutre.Our name invention: Fast Casting Template (GCR *) is a concrete construction product, consisting of 2 separate parts; (1) the GCR * support-beam and (2) the GCR * -hub.
Il est conçu en premier pour permettre aux particuliers et aux petites entreprises de BTP d'accéder à la construction des poutres en béton sans avoir besoin de gros moyens comme le coffrage, la grue...It is designed first to allow individuals and small construction companies access to the construction of concrete beams without the need for large means such as formwork, crane ...
En effet, c'est le produit lui-même qui sert de coffrage pour le béton et qui se maintient seul grâce à son système ingénieux.Indeed, it is the product itself that serves as formwork for concrete and is maintained alone thanks to its ingenious system.
Actuellement dans tous les chantiers ; quand on veut couler des poutres en béton ; on coffre autour avec du bois, ou avec des banches en métal ou on pose directement des gabarits en carton... Par après on fixe l'ensemble avec des outils, on serre, on prend des mesures avant de couler le béton... Et quand c'est sec on décoffre...Currently in all shipyards; when you want to cast concrete beams; We lock around with wood, or with metal panels or we put directly cardboard templates ... Afterwards we set the set with tools, we tighten, we take action before pouring the concrete ... And when it's dry we offer ...
Une fois terminé on contrôle l'alignement des poutres d'en haut, on constate souvent qu'il y a des décalages entre elles dû à l'encombrement du coffrage et à la mise en œuvre ; ce décalage peut être petit ou grand, cela dépend souvent des moyens employés et de la performance de l'entreprise.Once completed we check the alignment of the beams from above, we often find that there are delays between them due to the size of the formwork and implementation; this gap can be small or large, it often depends on the means employed and the performance of the company.
Donc, cette technique demande de la main d'œuvres spécialisées et des gros moyens ; elle est coûteuse, lente, encombrante...So this technique requires the hand of specialized works and large means; it is expensive, slow, cumbersome ...
Alors, l'application de notre méthode de construction avec notre produit de BTP : GCR* support-poutre et GCR*-poutre nous permet d'éviter tous ces inconvénients.Then, the application of our construction method with our construction product: GCR * support-beam and GCR * -poutre allows us to avoid all these disadvantages.
Nous allons vous décrire en premier notre produit, ensuite on vous expliquera comment ça fonctionne.We will first describe our product, then we will explain how it works.
Notre produit de BTP est composé de 2 pièces uniques ; qui s'emboîte l'une dans l'autre comme il est représenté à la page 11. Ce produit est de forme rectangulaire. Mais il peut être sous d'autres formes, comme par exemple celle représenté à la page 12 de forme circulaire. L'essentiel c'est qu'elles ont toutes le même principe de fonctionnement qui est au cœur de notre invention et que l'on vous expliquera à la suite.Our construction product is composed of 2 unique pieces; which fits into each other as shown on page 11. This product is rectangular in shape. But it can be in other forms, such as the one shown on page 12 of circular form. The bottom line is that they all have the same operating principle that is at the heart of our invention and will be explained later.
La première pièce est le GCR*support-poutre, elle est représentée à la page 10, fig. 2 On la décrit comme suite : 1- GCR*support-poutre : pièce (1) 1.0- cœur de (1) 1.1- parois de (1.0) 1.2- seuil de (1.1) 1.3- chambre de (1) 1.4- orifices de (1) 1.4- orifices fermés de (1) : ils sont couverts avec une fine couche de béton qu'on peut facilement percer pour faire passer diverses conduites si nécessaires.The first part is the GCR * support-beam, it is represented on page 10, fig. 2 It is described as follows: 1- GCR * support-beam: part (1) 1.0- core of (1) 1.1- walls of (1.0) 1.2- threshold of (1.1) 1.3- chamber of (1) 1.4- orifices (1) 1.4- Closed orifices of (1): they are covered with a thin layer of concrete that can be easily drilled to pass various pipes if necessary.
Et la 2éme pièce, c'est le GCR*-poutre, elle est représentée à la page 10, fig.l On la décrit comme suite : 2- GCR*-poutre : pièce (2) 2.0 - base de (2) 2.1- corps de (2.0) 2.2- seuil de (2.0) 2.3- corps de (2) 2.4- le dessus de (ou le haut) (2) 2.5- orifices fermés de (2), ils sont couverts avec une fine couche de béton qu'on peut facilement percer pour faire passer diverses conduites si nécessaires.And the second part is the GCR * -poutre, it is represented on page 10, fig.l It is described as follows: 2- GCR * -poutre: part (2) 2.0 - base of (2) 2.1 - body of (2.0) 2.2- threshold of (2.0) 2.3- body of (2) 2.4- the top of (or the top) (2) 2.5- orifices closed of (2), they are covered with a thin layer of concrete that can be easily drilled to pass various pipes if necessary.
Notre solution technique fonctionne comme suite : La pièce (1) possède une surface plane bien lisse qui nous serre de base pour positionner dessus l'instrument de mesure comme un niveau classique ou laser. Au centre de cette surface on trouve une ouverture ; c'est le cœur (1.0) de la pièce (1).Our technical solution works as follows: The workpiece (1) has a very smooth flat surface that squeezes our base to position the measuring instrument as a classic or laser level. In the center of this surface is an opening; it is the heart (1.0) of the piece (1).
Ce cœur (1.0) est entouré d'orifices (1.4), ces orifices nous permettent de remplir la chambre (1.3) avec du béton. Leurs nombres ainsi que leurs formes et leurs côtes ne sont pas définies pour laisser un libre choix.This heart (1.0) is surrounded by orifices (1.4), these orifices enable us to fill the chamber (1.3) with concrete. Their numbers as well as their shapes and their ribs are not defined to leave a free choice.
Le cœur (1.0) serre à loger la base (2.0). Il possède des parois (1.1) symétriques et coaxiales au corps (2.1); ces parois (1.1) sont perpendiculaires à la surface de la pièce (1).The heart (1.0) tightens to house the base (2.0). It has walls (1.1) symmetrical and coaxial with the body (2.1); these walls (1.1) are perpendicular to the surface of the workpiece (1).
Donc le fait de positionner la pièce (1) à l'horizontal, de la fixer, d'introduire la base (2.0) au cœur (1.0), permet à la pièce (2) de se maintenir automatiquement à la vertical et en perpendiculaire par rapport à la pièce (1) ; donc au sol. Après on fait couler le béton par-dessus. Qui va remplir en premier la chambre (1.3) ; ensuite il remonte jusqu'aux bords de la pièce (2).Therefore positioning the piece (1) horizontally, to fix it, to introduce the base (2.0) to the heart (1.0), allows the piece (2) to automatically maintain the vertical and perpendicular relative to the workpiece (1); so on the ground. Afterwards the concrete is poured over. Who will fill the room first (1.3); then it goes up to the edges of the room (2).
Comme on peut souder les 2 pièces en premier en faisant couler le béton à travers les orifices (1.4) de la pièce (1). Le béton va remplir la chambre (1.3) de la pièce (1) qui enveloppe le cœur (1.0) de la pièce (1) et la base (2.0) de la pièce (2) et on laisse durcir. Par après on fait couler le béton par-dessus de la pièce (1).As we can weld the two pieces first by pouring the concrete through the orifices (1.4) of the piece (1). The concrete will fill the chamber (1.3) of the part (1) which envelopes the core (1.0) of the workpiece (1) and the base (2.0) of the workpiece (2) and is allowed to harden. Afterwards the concrete is poured over the piece (1).
Cette méthode convient efficacement pour placer des GCR*-poutre pleins, ou autre qui pourrait être d'une matière et de forme différentes. Puisque les 2 pièces sont fabriquées séparément ; donc on peut les vendre séparément aussi.This method is effective for placing full GCR * -poutre, or other that could be of a different material and shape. Since the 2 pieces are made separately; so we can sell them separately too.
Le pourtour rectangulaire du GCR*support-poutre (pièce (1)) peut nous servir de guidage pour bien aligner nos poutres les une en face des autres à la perfection.The rectangular perimeter of the GCR * support-beam (part (1)) can be used as a guide to align our beams perfectly opposite each other.
Les encoches qui portent le bas et le haut de la pièce (2) ainsi que le cœur de la pièce (1) de notre produit permettent de souder les surfaces de contacts et de combler le jeu entre elles par le béton qui s'infiltre à travers.The notches which carry the bottom and the top of the piece (2) as well as the heart of the part (1) of our product make it possible to weld the surfaces of contacts and to fill the game between them by the concrete which infiltrates with through.
Afin de mieux comprendre notre produit nous allons procéder à des explications techniques standards qui dévoilent les détails cachés et qui échappent aux apparences.In order to better understand our product we will proceed to standard technical explanations which reveal the hidden details and which escape the appearances.
Sur la page 18 nous avons le dessin en perspective du GCR*support-poutre (pièce (1)) qui est la pièce maîtresse de notre produit sous forme rectangulaire. Et sur la page 19 nous avons 3 figures essentiels : (1) - vue de face en coupe (2) - vue de dessus (3) - vue de dessousOn page 18 we have the perspective drawing of the GCR * support-beam (part (1)) which is the centerpiece of our product in rectangular form. And on page 19 we have 3 essential figures: (1) - front view in section (2) - view from above (3) - view from below
Sur la page 20 nous avons le dessin en perspective de notre produit ; GCR*support-poutre (pièce (1)) sous forme circulaire avec 2 pourtours différents : circulaire et rectangulaire.On page 20 we have the perspective drawing of our product; GCR * support-beam (part (1)) in circular form with 2 different edges: circular and rectangular.
Et sur les pages suivantes 21 et 22 nous avons 3 figures essentiels de cette pièce (1) : (1) - vue de face en coupe (2) - vue de dessus (3) - vue de dessousAnd on the following pages 21 and 22 we have 3 essential figures of this piece (1): (1) - front view in section (2) - view from above (3) - view from below
On constate que les 2 vues de faces en coupe pour ces 2 formes rectangulaire et circulaire sont pratiquement les mêmes. Cela explique bien que ces 2 produits différents dans leurs formes aboutissent au même principe de fonctionnement ; qui est au cœur de notre invention.It can be seen that the two sectional faces views for these two rectangular and circular shapes are practically the same. This explains why these 2 different products in their forms lead to the same principle of operation; which is at the heart of our invention.
Sur la page 23 nous avons les dessins en perspective et en coupe du GCR*-poutre (pièce (2)) de notre produit sous forme rectangulaire et circulaire. Elle peut avoir plusieurs tailles et longueurs. Cela dépend de l'offre et la demande. (1) - vue de face en perspective (2) - vue de dessus (3) - vue de dessousOn page 23 we have the drawings in perspective and in section of the GCR * -poutre (part (2)) of our product in rectangular and circular form. It can have several sizes and lengths. It depends on supply and demand. (1) - perspective front view (2) - top view (3) - bottom view
Sur la page 24 nous avons trois figures représentant 3 schémas cinématiques qui expliquent d'une manière claire concise et précise le mécanisme de fonctionnement de notre produit. Ils sont en perspective sur les pages 10 et 11. fig.lOn page 24 we have three figures representing three kinematic diagrams that clearly and concisely explain the operating mechanism of our product. They are in perspective on pages 10 and 11. fig.l
Pièce (2) 2.0 - base de (2) 2.1- corps de (2.0) 2.2- seuil de (2.0) 2.3- corps de (2) 2.4- le dessus (ou le haut) de (2)Part (2) 2.0 - base of (2) 2.1- body of (2.0) 2.2- threshold of (2.0) 2.3- body of (2) 2.4- the top (or the top) of (2)
Fig.2Fig.2
Pièce (1) 1.0- cœur de (1) 1.1- parois de (1.0) 1.2- seuil de (1.1) 1.3- chambre de (1) 1.4- orifices de (1)Piece (1) 1.0- core of (1) 1.1- walls of (1.0) 1.2- threshold of (1.1) 1.3- chamber of (1) 1.4- orifices of (1)
Fig.3 1- pièce (1) : GCR*support-poutre 2- pièce (2) : GCR*-poutre 3 - cœur d'assemblage de (1) et de (2) 4- l'invention dans sa forme la plus simple.FIG. 3 - part (1): GCR * support-beam 2- piece (2): GCR * -hole 3 - assembly core of (1) and (2) 4- the invention in its form simpler.
Sur la page 25 nous avons une représentation cinématique de notre produit composé de 2 pièces essentielles. Nous avons démontré toutes les cotes essentielles qui constituent notre invention, mais nous n'avons pas donné des mesures précises pour mieux la protéger et pour laisser une large liberté de choix au bureau d'étude qui les déterminera selon le cahier de charge de l'offre et de la demande.On page 25 we have a cinematic representation of our product consisting of 2 essential pieces. We have demonstrated all the essential dimensions which constitute our invention, but we have not given precise measures to better protect it and to leave a large freedom of choice to the design office which will determine them according to the specifications of the supply and demand.
En effet, : la cote (a2) peut être supérieur à (dl) inférieur ou supérieur à (d2) ; (al) peut être supérieur ou égale à (b2) inferieur ou égale à (c) ; (bl) peut être inférieur ou égale à (b2) et (b2) peut être inférieur ou égale à (c) ; (dl) peut être inférieur ou égale à (d2) ; (d3) peut être inférieur ou égale à (d4).Indeed, the dimension (a2) may be greater than (dl) less than or greater than (d2); (a1) may be greater than or equal to (b2) less than or equal to (c); (b1) may be less than or equal to (b2) and (b2) may be less than or equal to (c); (d1) may be less than or equal to (d2); (d3) may be less than or equal to (d4).
Certes, Les mesures seront déterminées par le bureau d'étude qui les déterminera selon le cahier de charge de l'offre et de la demandeAdmittedly, the measures will be determined by the consulting firm that will determine them according to the specifications of supply and demand
Nous allons exposer deux modes d'emplois de notre produit sur 2 chantiers différents ; la première est une application sur un sol fini en béton armé d'un entrepôt ou autre ; et la deuxième par terre au-dessus des fondations.We will expose two ways of using our product on 2 different sites; the first is an application on a reinforced concrete floor of a warehouse or other; and the second on the ground above the foundations.
Appliquons la première : on commence par positionner en équilibre horizontal les GCR*support-poutres pièce (1) au cœur des chaînages comme il est indiqué sur la fig.l-page 16. Ensuite on les fixe avec des vis par l'intermédiaire des trous autour, ou on les cèle avec du mortier et on laisse durcir.Let's apply the first one: we start by positioning in horizontal equilibrium GCR * support-beams piece (1) at the heart of the chaining as it is indicated in fig.l-page 16. Then we fix them with screws by means of holes around, or they are mortared and allowed to harden.
Après, on passe les conduites d'électricité ou autre via les orifices (1.4) prévus à cet effet, (voir-fig.l-pagel6).Afterwards, the electricity or other lines are passed through the orifices (1.4) provided for this purpose, (see-fig.l-pagel6).
Par après, on encastre les GCR*-poutres dedans comme il est présenté à la page 11 et on vérifie de nouveau nos mesures de sorte qu'ils soient tous de niveau à la vertical et bien alignés à la perfection.Afterwards, we embed the GCR-brackets in it as shown on page 11 and check our measurements again so that they are all level and aligned perfectly.
Enfin on coule du béton dans les GCR* support -poutres via les orifices qui sont autour pour souder les 2 parties ensemble et laisser durcir. Ensuite on coule les GCR*-poutres par-dessus.Finally concrete is poured into the GCR * support-brackets through the orifices that are around to weld the two parts together and allow to harden. Then pour the GCR * -poutres over it.
Comme on peut couler les 2 en même temps via le dessus du GCR*-poutre.As one can sink both at the same time via the top of the GCR * -hub.
Il est possible une fois que les poutres sont bien sèches de se débarrasser du pourtour bas d'épaisseur (e) qui sert à fixer le GCR*support-poutre, afin de diminuer la surface qu'il occupe (voir fig. page 13)Once the beams are dry, it is possible to get rid of the low rim (e) used to fix the GCR * support-beam, in order to reduce the area it occupies (see fig.
La deuxième est une application parterre au-dessus des fondations.The second is an application on the ground above the foundations.
On commence par préparer les fondations des poutres à un niveau plus bas que le niveau du sol d'épaisseur (e) ; égale à l'épaisseur du support poutre (voir fig.2- page 14)We begin by preparing the foundations of the beams at a level lower than the level of the soil of thickness (e); equal to the thickness of the beam support (see fig.2- page 14)
On pose tous les GCR*Supports-Poutres à leurs places.We put all GCR * Supports-Beams in their places.
On les aligne parfaitement avec un laser ou autre.They are perfectly aligned with a laser or other.
On les règle bien à l'horizontal avec un niveau laser ou autre.They are adjusted well horizontally with a laser level or other.
Ensuite, on les scelle avec du ciment ou autre tout autour.Then, they are sealed with cement or other all around.
Par après, on passe les conduites d'électricité ou autre via les orifices (1.4) prévus à cet effet, (voir page-15) et On pose dessus le GCR*-poutres.Afterwards, we pass the electricity pipes or other via the orifices (1.4) provided for this purpose, (see page-15) and We put on the GCR * -poutres.
Si le GCR*poutre est de grande taille, on encastre dedans le chaînage, puis on le pose en place (voir figure 2-page 16).If the GCR * beam is large, embed the chaining and then put it in place (see Figure 2-page 16).
Comme on peut fixer le chaînage en premier puis on empile les GCR*-poutres de petites tailles, (voir figure -page 17).As we can fix the chaining first and then stack the small GCR * -poutres, (see figure-page 17).
Une fois que toutes les GCR*-poutres sont posés avec succès, on vérifie encore leur alignement avant de couler pour rectifier rapidement nos erreurs si elles persistent.Once all the GCR-brackets are successfully installed, their alignment is checked again before sinking to quickly rectify our errors if they persist.
Et quand tout est posé parfaitement, on coule à la chaîne du béton autours des GCR*supports-poutres jusqu'au niveau du sol, pour assurer une véritable stabilité de l'ensemble et laisser durcir.And when everything is set perfectly, we cast the concrete chain around the GCR * supports-beams down to the ground level, to ensure a true stability of all and allow to harden.
Ensuite on coule à la chaîne tous les GCR*-poutres par le dessus.Then we run the chain all GCR * -poutres from above.
Notre produit GCR*poutre et support-poutre pourrait trouver usage dans tous les domaines de BTP. Et dans certain cas, il pourrait remplacer les charpentes métalliques employées dans la construction des locaux industriels, d'agricultures... De même, il peut servir pour fixer des poteaux pour des panneaux publicitaires, l'EDF, France Télécom...Our product GCR * beam and support-beam could find use in all areas of construction. And in some cases, it could replace the metal structures used in the construction of industrial premises, agriculture ... Similarly, it can be used to fix poles for billboards, EDF, France Telecom ...
En effet, grâce à sa simplicité, notre produit est facile à fabriquer par moulage. Mais aussi on peut sous-traiter sa fabrication par tout ailleurs, auprès des usines industrielles sans avoir recours à des lourds fonds d'investissement au démarrage de notre projet.Indeed, thanks to its simplicity, our product is easy to manufacture by molding. But also we can outsource its manufacturing by any other, from industrial factories without resorting to heavy investment funds at the start of our project.
Donc, notre produit est facile à fabriquer, à utiliser et son prix de revient est très abordable. Il pourrait trouver sa place par tout ailleurs et surtout dans les pays sous-développés et en envoi de développements, là où le bois se fait rare pour coffrer et les outils de BTP sont dérisoires et très limités.So our product is easy to manufacture, to use and its cost price is very affordable. It could find its place everywhere and especially in underdeveloped countries and sending developments, where wood is scarce for formwork and construction tools are derisory and very limited.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1601079A FR3053711A1 (en) | 2016-07-11 | 2016-07-11 | QUICK COUPLING TEMPLATES (GCR) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1601079A FR3053711A1 (en) | 2016-07-11 | 2016-07-11 | QUICK COUPLING TEMPLATES (GCR) |
Publications (1)
Publication Number | Publication Date |
---|---|
FR3053711A1 true FR3053711A1 (en) | 2018-01-12 |
Family
ID=60917622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1601079A Pending FR3053711A1 (en) | 2016-07-11 | 2016-07-11 | QUICK COUPLING TEMPLATES (GCR) |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR3053711A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984572A (en) * | 2019-12-20 | 2020-04-10 | 张勇 | Template clamping equipment for building reinforcement |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2233861A5 (en) * | 1973-06-14 | 1975-01-10 | Sib | Method of setting plastic posts in concrete - concrete flows into the post through openings at base of post |
DE9403651U1 (en) * | 1994-03-04 | 1994-05-05 | Schrade Eberhard | Device for the production of supports or columns in the construction of buildings |
US5800727A (en) * | 1995-12-07 | 1998-09-01 | Croghan; Morris T. | Base mold for concrete post |
WO2002036898A2 (en) * | 2000-11-06 | 2002-05-10 | Soundfootings, Llc | Footing form |
-
2016
- 2016-07-11 FR FR1601079A patent/FR3053711A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2233861A5 (en) * | 1973-06-14 | 1975-01-10 | Sib | Method of setting plastic posts in concrete - concrete flows into the post through openings at base of post |
DE9403651U1 (en) * | 1994-03-04 | 1994-05-05 | Schrade Eberhard | Device for the production of supports or columns in the construction of buildings |
US5800727A (en) * | 1995-12-07 | 1998-09-01 | Croghan; Morris T. | Base mold for concrete post |
WO2002036898A2 (en) * | 2000-11-06 | 2002-05-10 | Soundfootings, Llc | Footing form |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110984572A (en) * | 2019-12-20 | 2020-04-10 | 张勇 | Template clamping equipment for building reinforcement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3126583B1 (en) | Formwork plate for walls and arches | |
FR3053711A1 (en) | QUICK COUPLING TEMPLATES (GCR) | |
EP1521887A1 (en) | Building block | |
FR2547848A1 (en) | PREFABRICATED WALL FOR THE CONSTRUCTION OF HOUSES AND OTHER BUILDINGS AND METHOD OF MANUFACTURING THE SAME | |
FR2514394A1 (en) | Shuttering panel for forming opening in cast walls - comprises telescopically adjustable diagonal arms pivotally attached to support plate | |
FR2538293A2 (en) | Panel with visible stones | |
FR2900173A1 (en) | Calibrated concrete element assembly for constructing e.g. wall, has stackable blocks arranged vertically and horizontally in complementary shapes, where each block includes partition which forms beam between walls | |
FR2567561A1 (en) | Method and prefabricated elements for the construction and foundation of enclosure walls | |
FR2777923A1 (en) | Foundation module that is prefabricated | |
FR3107538A1 (en) | Pair of connecting pieces for securing a first construction structure with a second construction structure | |
FR2902447A1 (en) | PREFABRICATED PANEL FOR BUILDING CONSTRUCTION AND METHOD FOR MANUFACTURING SUCH PANEL | |
FR3095823A1 (en) | ELEMENT AND SET OF ELEMENTS OF CONSTRUCTION, METHOD OF MANUFACTURING, MOLD, WALL CONTAINING SUCH ELEMENT AND REAL ESTATE CONSTRUCTION | |
WO2020157065A1 (en) | Formwork insert for wall forms | |
BE1027580B1 (en) | Insert for a constituent element of a construction | |
FR3067373A1 (en) | SAFETY DEVICE FOR ARMATURES FOR REALIZING A FOUNDATION SOLE OF A CONCRETE WORK | |
FR2970469A1 (en) | FLAN OF RIGID OR SEMI-RIGID MATERIAL AND BOX OF RESERVATION OBTAINED BY FOLDING THE SAME FLAN | |
FR3071859A1 (en) | CALIPER SHAPED IN TWO HALF-STRETCHERS WITH MALE ARMS AND EMBLEMABLE FEMALE ARMS | |
FR2977904A1 (en) | BUILDING BLOCK | |
FR3085980A1 (en) | LOST FORMWORK MODULE, READY TO MOUNT ASSEMBLY FOR REALIZING LOST FORMWORK AND WALL BUILDING METHOD | |
BE513136A (en) | ||
FR2781241A1 (en) | Construction block for buildings has channeled face to cooperate with window frame | |
FR3122192A1 (en) | Modular shielding for site excavation | |
FR3050476A1 (en) | KIT FOR MANUFACTURING A FORMWORK MANNEQUIN | |
FR2773830A1 (en) | Earth wall supporting system for excavation, e.g. foundation pit | |
FR2523182A1 (en) | Prefabricated corner stone for building construction - has adjacent sides projecting as different length cheeks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20181109 |