FR2591275A2 - Method for the construction of structures under railways in service and device for the implementation of this method - Google Patents

Method for the construction of structures under railways in service and device for the implementation of this method Download PDF

Info

Publication number
FR2591275A2
FR2591275A2 FR8614098A FR8614098A FR2591275A2 FR 2591275 A2 FR2591275 A2 FR 2591275A2 FR 8614098 A FR8614098 A FR 8614098A FR 8614098 A FR8614098 A FR 8614098A FR 2591275 A2 FR2591275 A2 FR 2591275A2
Authority
FR
France
Prior art keywords
abutments
abutment
floors
levels
forepeaks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR8614098A
Other languages
French (fr)
Other versions
FR2591275B2 (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from FR8606694A external-priority patent/FR2593549B1/en
Application filed by Individual filed Critical Individual
Priority to FR8614098A priority Critical patent/FR2591275B2/en
Priority to AT87400959T priority patent/ATE49263T1/en
Priority to ES87400959T priority patent/ES2012490B3/en
Priority to DE8787400959T priority patent/DE3761319D1/en
Priority to EP87400959A priority patent/EP0245155B1/en
Publication of FR2591275A2 publication Critical patent/FR2591275A2/en
Application granted granted Critical
Publication of FR2591275B2 publication Critical patent/FR2591275B2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Improvement to the method according to the main patent characterised in that the hollow abutments A, while remaining monolithic, are divided into a plurality of levels 1, each level having a height which is determined as a function of the nature of the ground to be penetrated. The levels 1 of the abutments have inclined forepeaks 2 equal in number to that of the levels. The tips 3 of these forepeaks are located in the same vertical plane 4. Each level is separated by an intermediate slab forming bracing. The weight 11 from the upper forepeak 10 determines an excess load preventing the half-abutment A from moving up at the start of the driving operation.

Description

le présent certificat d'addition concerne un perfectionnement au procédé selon le brevet principal nO 86-06694 du 9 mai 1986. this certificate of addition relates to an improvement to the process according to main patent no. 86-06694 of May 9, 1986.

Le fonçage des culées de grande hauteur peut présenter deux risques importants d'éboulements.The sinking of very large abutments can present two significant risks of landslides.

. Lors du fonçage la cohésion du terrain a une incidence
directe de ce point de vue.
. When driving the cohesion of the ground has an impact
direct from this point of view.

. En outre, après accostage des demi-culées lors du terras
sement des merlons centraux, la difficulté et les dangers
augmentent proportionnellement à la longueur à blinder.
. In addition, after docking the half-abutments during the terras
the central merlons, the difficulty and the dangers
increase in proportion to the length to be shielded.

Selon la présente invention, les culées creuses, tout en restant monolithes sont àsvisees en un ou plusieurs étages, chaque étage présentant une hauteur déterminée en fonction de la nature du terrain à traverser.According to the present invention, the hollow abutments, while remaining monoliths, are screwed into one or more stages, each stage having a height determined according to the nature of the terrain to be crossed.

Selon une caractéristique particulière, les étages des culées présentent des avant-becs inclinés en nombre égal à celui des étages des culées creuses. Ainsi la pointe de chaque avant-bec se situe sur un même plan vertical.According to a particular characteristic, the stages of the abutments have inclined fore-nozzles in a number equal to that of the stages of the hollow abutments. Thus the tip of each forebeak is on the same vertical plane.

Les caractéristiques de la présente addition seront plus explicitement encore précisées à travers la description qui suit dtun exemple de réalisation donné à titre indicatif et non limitatif, en référence au dossier annexé sur lequel: . La figure 1 est une vue en coupe transversale d'une
demi-culée à deux étages selon l'invention.
The characteristics of this addition will be more explicitly specified in the following description of an exemplary embodiment given by way of non-limiting example, with reference to the attached file in which:. Figure 1 is a cross-sectional view of a
two-stage half-abutment according to the invention.

. La figure 2 précise, avec la demi-culée selon la figure 1.  . Figure 2 specifies, with the half-abutment according to Figure 1.

le gain réalisé sur la distance de porte à faux d'une
culée de même hauteur non étagée.
the gain achieved over the cantilever distance of one
abutment of the same height, not stepped.

. La figure 3 illustre, vu de côté, l'accostage ae deux
demi-culées selon la figure 1.
. Figure 3 illustrates, seen from the side, docking with two
half-abutments according to Figure 1.

. La figure 4 illustre un perfectionnement complémentaire
apporté à la demi-culée selon l'invention.
. Figure 4 illustrates a further development
brought to the half-abutment according to the invention.

Sur la figure 1 la référence (1) désigne les deux étages d'une demi-culée A qui présentent chacun un avant-bec (2) incliné avec une trousse coupante ou pointe (3) se situant dans un même plan (41. In FIG. 1, the reference (1) designates the two stages of a half-abutment A which each have a front spout (2) inclined with a cutting bag or point (3) lying in the same plane (41.

L'inclinaison moyenne des avant-becs (2) étant dans l'exemple donné de 450 (1/13, on peut donc conserver une pente (5) à 3/2 lors du terrassement du front de taille en cours de fonçage (voir figure 2). Le résultat est ainsi une diminution (6), ou gain, représentatif de la longueur théoriquement nécessaire en cas d'avant-bec à pente unique pour assurer la stabilité du talus.The average inclination of the fore-beaks (2) being in the example given 450 (1/13, it is therefore possible to keep a slope (5) to 3/2 during the earthworks of the cutting face during sinking (see The result is thus a reduction (6), or gain, representative of the length theoretically necessary in the case of a single-slope forearm to ensure the stability of the slope.

L'accostage des deux demi-culées A étant réalisé (voir figure 3), il est nécessaire de blinder les piedroits latéraux de celles-ci au fur et à mesure du terrassement des merlons centraux (7). Ce terrassement et ce blindage sont exécutés de haut en bas. Le fractionnement des avantbecs (2) permet de réduire la longueur et la surface de blindage.The docking of the two half-abutments A having been carried out (see FIG. 3), it is necessary to shield the lateral legs thereof as and when the central merlons (7) are earthed. This earthworks and this shielding are carried out from top to bottom. The splitting of the fronts (2) makes it possible to reduce the length and the area of shielding.

En plus des deux cas précités (sécurité au fonçage et au blindage après accostage) les culées étagées A apportent deux avantages supplémentaires.In addition to the two aforementioned cases (driving safety and shielding after docking) the stepped abutments A provide two additional advantages.

. La ou les dalles intermédiaires (8) servent Be buton
en phase définitive ; elles permettent donc de diminuer
la quantité d'acier dans les piedroits.
. The intermediate slab (s) (8) serve as Be buton
in the final phase; they therefore reduce
the amount of steel in the legs.

. De plus les avant-becs étant eux aussi fractionnés en
"dents de scie" (voir figure 4) au début du fonçage
il n'y a que la adent" ou bec inférieur (9) qui pénètre
dans le talus. La charge du remblai (B) sur cet avant-bec
est donc relativement faible, ce qui entraine un risque
de soulèvement (ceci est aussi vrai avec un avant-bec
à une seule partie). L'avant-bec supérieur (10) apporte
donc une surcharge permanente schématisée par la
fleche (11) qui évite ainsi tout risque de soulèvement
des culées (1).
. In addition, the fore-beaks also being divided into
"sawtooth" (see figure 4) at the start of driving
there is only the adent "or lower beak (9) which penetrates
in the embankment. The fill load (B) on this forebeak
is therefore relatively low, which entails a risk
lifting (this is also true with a forearm
to a single party). The upper front spout (10) provides
therefore a permanent overload schematized by the
arrow (11) which thus avoids any risk of lifting
abutments (1).

Claims (5)

REVENDICATIONS 1/ Dispositif pour la mise en oeuvre du procédé selon1 / Device for implementing the method according to l'une quelconque des revendications 1 a 5 du brevet any one of claims 1 to 5 of the patent principal caractérisée en ce que les culées creuses main characterized in that the hollow abutments tout en restant monolithes sont divisées en un ou while remaining monoliths are divided into one or plusieurs étages (1), chaque étage présentant une several stages (1), each stage having a hauteur déterminée en fonction de la nature du terrain height determined according to the nature of the terrain à traverser. to cross. 2/ Dispositif selon la revendication 1 caractérisé en2 / Device according to claim 1 characterized in ce que les étages des culées présentent des avant-becs what the abutment floors have forepeaks inclinés (2) en nombre égal à celui des étages des inclined (2) in number equal to that of the floors of the culées creuses. hollow abutments. 3/ Dispositif selon les revendications 1 ou 2 carac3 / Device according to claims 1 or 2 charac térisé en ce que la pointe de chaque avant-bec se terized in that the tip of each forebeak is situe dans un même plan vertical. located in the same vertical plane. 4/ Dispositif selon l'une quelconque des revendications4 / Device according to any one of claims 1 à 3, caractérisé en ce que dans chaque demi-culée 1 to 3, characterized in that in each half abutment les étages sont séparés par une dalle intermédiaire(8) the floors are separated by an intermediate slab (8) formant buton. forming buton. 5/ Dispositif selon l'une quelconque des revendications5 / Device according to any one of claims 1 à 4, les demi-culées sont agencées de telle sorte 1 to 4, the half-abutments are arranged so que le poids apporté par l'étage supérieur au niveau that the weight brought by the floor above the level de l'avant-bec correspondant détermine une surcharge of the corresponding front spout determines an overload évitant le soulèvement de la demi-culée au début avoiding the lifting of the half-abutment at the start de l'opération de foncage.  of the driving operation.
FR8614098A 1986-05-09 1986-10-10 PROCESS FOR THE CONSTRUCTION OF STRUCTURES UNDER RAILWAYS IN OPERATION AND DEVICE FOR CARRYING OUT SAID METHOD Expired FR2591275B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
FR8614098A FR2591275B2 (en) 1986-05-09 1986-10-10 PROCESS FOR THE CONSTRUCTION OF STRUCTURES UNDER RAILWAYS IN OPERATION AND DEVICE FOR CARRYING OUT SAID METHOD
AT87400959T ATE49263T1 (en) 1986-05-09 1987-04-24 PROCESSES FOR THE MANUFACTURE OF STRUCTURES UNDER OPERATING RAILWAYS.
ES87400959T ES2012490B3 (en) 1986-05-09 1987-04-24 PROCEDURE FOR CONSTRUCTION WORKS UNDER OPERATING RAILWAYS.
DE8787400959T DE3761319D1 (en) 1986-05-09 1987-04-24 METHOD FOR THE PRODUCTION OF CONSTRUCTIONS UNDER OPERATING RAILWAY TRACKS.
EP87400959A EP0245155B1 (en) 1986-05-09 1987-04-24 Process for carrying out works under railway tracks in operation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR8606694A FR2593549B1 (en) 1986-05-09 1986-05-09 PROCESS FOR THE CONSTRUCTION OF STRUCTURES UNDER RAILWAYS IN OPERATION AND DEVICE FOR CARRYING OUT SAID METHOD
FR8614098A FR2591275B2 (en) 1986-05-09 1986-10-10 PROCESS FOR THE CONSTRUCTION OF STRUCTURES UNDER RAILWAYS IN OPERATION AND DEVICE FOR CARRYING OUT SAID METHOD

Publications (2)

Publication Number Publication Date
FR2591275A2 true FR2591275A2 (en) 1987-06-12
FR2591275B2 FR2591275B2 (en) 1988-05-27

Family

ID=26225229

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8614098A Expired FR2591275B2 (en) 1986-05-09 1986-10-10 PROCESS FOR THE CONSTRUCTION OF STRUCTURES UNDER RAILWAYS IN OPERATION AND DEVICE FOR CARRYING OUT SAID METHOD

Country Status (1)

Country Link
FR (1) FR2591275B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH434335A (en) * 1966-04-06 1967-04-30 Reymond Fritz Method of construction of a passage under track and installation for the implementation of this method
DE2108505A1 (en) * 1971-02-23 1972-09-07 Arbeitsgemeinschaft Baugerate Vermietung, Hermann Moller/Johann Keller GmbH, 2000 Hamburg Process for the production of wide sub-tunnels of, in particular, railway bodies
DE2148366A1 (en) * 1971-09-28 1973-04-12 Emka Ingenieurgesellschaft Fue PROCEDURE FOR ROAD UNDERCARRIAGE
GB1463632A (en) * 1975-01-10 1977-02-02 Genton J C Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby
FR2337248A1 (en) * 1975-12-29 1977-07-29 Gaillard Rene Rectangular section tunnelling shield - has horizontal partitions advanced by pistons to make different depths of cut
FR2354444A1 (en) * 1976-06-11 1978-01-06 Gaillard Rene Tunnel driving machine structure - has head consisting of tubular components movable in relation to each other by rams

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH434335A (en) * 1966-04-06 1967-04-30 Reymond Fritz Method of construction of a passage under track and installation for the implementation of this method
DE2108505A1 (en) * 1971-02-23 1972-09-07 Arbeitsgemeinschaft Baugerate Vermietung, Hermann Moller/Johann Keller GmbH, 2000 Hamburg Process for the production of wide sub-tunnels of, in particular, railway bodies
DE2148366A1 (en) * 1971-09-28 1973-04-12 Emka Ingenieurgesellschaft Fue PROCEDURE FOR ROAD UNDERCARRIAGE
GB1463632A (en) * 1975-01-10 1977-02-02 Genton J C Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby
FR2337248A1 (en) * 1975-12-29 1977-07-29 Gaillard Rene Rectangular section tunnelling shield - has horizontal partitions advanced by pistons to make different depths of cut
FR2354444A1 (en) * 1976-06-11 1978-01-06 Gaillard Rene Tunnel driving machine structure - has head consisting of tubular components movable in relation to each other by rams

Also Published As

Publication number Publication date
FR2591275B2 (en) 1988-05-27

Similar Documents

Publication Publication Date Title
FR2749333A1 (en) TELESCOPIC CHASSIS APPARATUS FOR HOLLOWING TRENCHES IN THE GROUND
FR2591275A2 (en) Method for the construction of structures under railways in service and device for the implementation of this method
FR2471452A1 (en) PROCESS FOR CONTINUOUSLY GROUNDING AND VERTICALLY TRANSPORTING CUTTINGS AND INSTALLATION FOR CARRYING OUT SAID METHOD
DE1924669A1 (en) Support structure for an excavator
FR2794149A1 (en) Pile driver for building foundations has cross bar at top of vertical support frames to anchor drive cylinder rods
FR2959252A1 (en) FUSH INCREASE FOR HYDRAULIC WORKING PARTICULARLY OF DAM TYPE.
FR2533610A1 (en) Method for installing a scaffold, bracing used for the implementation of this method and scaffold equipped with the said bracing.
FR3070169A1 (en) PROTECTIVE TERMINAL FORMING A URBAN FURNITURE HAVING GROUND HANGING POINTS
US1976160A (en) Method and apparatus for moving trees
US3010231A (en) Underwater grading means
EP0222954A1 (en) Stopping and supporting device driven into the soil by percussion for the realisation of espaliers, fences, etc.
US3618328A (en) Bearing support for piling
US6238140B1 (en) Method for laying tile or pipe underground
FR2560268A1 (en) Stopping and supporting devices intended to be driven into the ground by percussion in order to install training equipment, fences, etc.
FR2616830A1 (en) TELESCOPIC SELF-LIFTING MATERIAL
BE892818A (en) Underground soil retaining wall - is formed by casting concrete over prestressed reinforcement frameworks placed in trench
FR2670526A1 (en) Device for tearing up pillars, in particular pillars anchored in a mass of concrete
JP6113474B2 (en) Suspended protective fence
FR2592413A3 (en) Foundation with floating base for offshore structures
FR2551107A1 (en) Improvements to the direct fixation of soils, particularly of dunes
CH93186A (en) Coating for constructions susceptible to settling.
KR200297241Y1 (en) A block for protecting slope surface preventing earth and sand from washing away and collapsing and giving enter stairs and seat
BE849341A (en) PROCESS FOR CONCRETING THE BONDING OF A WORK OF ART AND SUPPORT ELEMENT USED FOR THIS PURPOSE
FR2530696A1 (en) Breakwater dyke crest.
Wanner The decision on the excavation method for tunnels from the geologist's point of view