FR2527193A2 - Rail frame for handling loads - has open frame with dimensions varied as required to suit - Google Patents

Rail frame for handling loads - has open frame with dimensions varied as required to suit Download PDF

Info

Publication number
FR2527193A2
FR2527193A2 FR8208683A FR8208683A FR2527193A2 FR 2527193 A2 FR2527193 A2 FR 2527193A2 FR 8208683 A FR8208683 A FR 8208683A FR 8208683 A FR8208683 A FR 8208683A FR 2527193 A2 FR2527193 A2 FR 2527193A2
Authority
FR
France
Prior art keywords
gantry
wheels
frame
adapt
suit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR8208683A
Other languages
French (fr)
Inventor
Pierre Odobez
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAINTE CATHERINE ATELIERS
Original Assignee
SAINTE CATHERINE ATELIERS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAINTE CATHERINE ATELIERS filed Critical SAINTE CATHERINE ATELIERS
Priority to FR8208683A priority Critical patent/FR2527193A2/en
Publication of FR2527193A2 publication Critical patent/FR2527193A2/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/02Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries collapsible

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The support beam has an open frame with movable sections (3-6) which can be folded or slid away, or taken off to reduce external dimensions. The wheels (11-14), steering, drawbar and drive can operate once the beam is adjusted to a given size. At least three of the wheels are steerable, and one of these is positioned for size adjustment. The removable parts may be replaced by others, of different lengths, to adapt the dimensions of the assembly to exact requirements, possibly telescopically (28,29).

Description

Par rapport aux grues classiques, les portiques offrent, dans le domaine de la manutention de sérieux avantages
- Ils enjambent la charge assurant ainsi une grande stabilité donc une grande sécurité.
Compared to conventional cranes, gantries offer serious advantages in the field of handling.
- They straddle the load thus ensuring great stability therefore great safety.

- Ils ne travaillent pas en porte-à-faux, d'où une construction légère et economique. - They do not work in overhang, hence a light and economical construction.

- Certains peuvent se déplacer sur un sol non préparé (sans rails ni balastage). - Some can move on unprepared ground (without rails or ballast).

Par contre, les grues souvent automotrices; peuvent se rendre d'un chantier à un autre par leurs propres moyens. On the other hand, often self-propelled cranes; can go from one site to another on their own.

Les gros portiques se déplacent sur des rails ou sont a poste fixe. Large gantry cranes move on rails or are stationary.

L'importance et la complexité de leur démontage les intègrent obligatoirement au site.The importance and the complexity of their dismantling obligatorily integrate them into the site.

Les portiques de plus petite taille peuvent être utilisés en complé mentarité avec les plus gros, ou bien sur des chantiers de moindre importance. Dans l'exploitation de ces chantiers, le poste "manutention" ne nécessite pas toujours l'utilisation d'un portique à temps complet, et celui-ci devrait pouvoir partager ses services entre plusieurs autres chantiers. Malheuresement, la dimension de ces portiques leur interdit pratiquement tout déplacement hors site, et leur démontage nécessiterait l'intervention de spécialistes et mettrait en oeuvre des moyens de manutention non négligeables. Smaller gantry cranes can be used in addition to larger ones, or on smaller construction sites. In the operation of these sites, the "handling" position does not always require the use of a full-time gantry crane, and this should be able to share its services between several other sites. Unfortunately, the size of these gantries practically prevents them from moving off-site, and their dismantling would require the intervention of specialists and would employ significant handling means.

La présente invention apporte une solution à cet état de chose, en ramenant les dimensions extérieures du portique conformes à celles des gabarits de transport, celui-ci pouvant être routier, ferroviaire, mariti me- ou autres. La description suivante se rapporte à un portique décrit et couvert par le brevet nO 8106056. The present invention provides a solution to this state of affairs, by bringing the external dimensions of the gantry in accordance with those of the transport jigs, which can be road, rail, maritime or others. The following description relates to a gantry described and covered by patent No. 8106056.

La figure 1 représente le portique en configuration "manutention" suivant une vue en élévation. Les vérins de levage 3, 4, 5, 6 sont logés à l'intérieur des montants des arceaux 1 et 2. Chaque- montant est articulé surun longeron 9 ou 10 par l'intermédiaires d'axes 15 et 16 pour l'avant, 17 et 18 pour l'arrière. FIG. 1 shows the gantry crane in the "handling" configuration in an elevation view. The lifting cylinders 3, 4, 5, 6 are housed inside the uprights of the arches 1 and 2. Each upright is articulated on a spar 9 or 10 by means of axes 15 and 16 for the front, 17 and 18 for the rear.

Cette rotation est contrarié par l'action des broches amovibles 19 et 20 pour l'avant et 21 et 22 pour l'arrière. On remarque sur cette figure les roues avant: 11 et 13 assurant la direction de l'engin, et les roues arrière: 12 et 14 dont seule la roue 12 située à gauche est orientable indé pendannent de deux autres roues il et 13. This rotation is counteracted by the action of the removable pins 19 and 20 for the front and 21 and 22 for the rear. Note on this figure the front wheels: 11 and 13 ensuring the direction of the machine, and the rear wheels: 12 and 14 of which only the wheel 12 located on the left is steerable independently of two other wheels il and 13.

La figure 2 est une vue en pianétablie en concordance avec la figure 1.  FIG. 2 is a piano view drawn up in accordance with FIG. 1.

Les poutres 24 et 25 servent d'entretoise et leurs brides extrèmes 26 sont boulonnées sur des brides correspondantes 27 solidaires des montants des arceaux.The beams 24 and 25 serve as spacers and their end flanges 26 are bolted to corresponding flanges 27 integral with the uprights of the arches.

On remarque que chaque longeron 9 et 10 est en deux parties, coulissantes l'une dans l'autre, les positions extrèmes étant verrouillées par les broches 28 et 29. It is noted that each side member 9 and 10 is in two parts, sliding one inside the other, the extreme positions being locked by the pins 28 and 29.

La figure 3 est une vue en bout correspondant aux figures 1 et 2. Les palonniers 7 (avant) et 8 (arrière) apparaissent. Ils prennent appui sur les vérins et soulèvent la charge. Leur partie centrale est démontable de la même façon que les poutres 24 et 25. Figure 3 is an end view corresponding to Figures 1 and 2. The pedals 7 (front) and 8 (rear) appear. They are supported on the cylinders and lift the load. Their central part is removable in the same way as the beams 24 and 25.

La figure 4 représente la première phase de la mise au gabarit : les broches 19, 20, 21, 22 ont été retirées, et les arceaux 1 et 2 ont été basculés sur les longerons 9 et 10 jusqu'à l'horizontale. On a également procédé au raccourcissement de la longueur du portique. La figure 5 représente l'appareil dans l'état de la figure 4 en predisposition pour la prochaine opération de mise au gabarit en vue de réduire sa largeur. Pour de faire, deux traverses coulissantes 23 sont adaptées entre les longerons. Ces traverses assureront la stabilité des parties droite et gauche du portique lorsque 24, 25 et 7, 8 auront été retirées, et que le mouvement de rétraction n'aura pas été entièrement assuré. Ce mouvement est controlé par les roues Il et 12 qui ont prisU/4oerientation transversale (dans le sens du mou- vement).Les poutres 24 et 25 sont tombées ainsi que la partie centrale des palonniers 7, 8. Maintenant, la mise en largeur peut être excutée.  Figure 4 shows the first phase of the layout: the pins 19, 20, 21, 22 have been removed, and the arches 1 and 2 have been tilted on the side members 9 and 10 to the horizontal. The length of the gantry was also shortened. FIG. 5 represents the apparatus in the state of FIG. 4 in predisposition for the next jigging operation in order to reduce its width. To do this, two sliding crosspieces 23 are fitted between the side members. These crosspieces will ensure the stability of the right and left parts of the gantry when 24, 25 and 7, 8 have been removed, and the retraction movement has not been fully ensured. This movement is controlled by the wheels 11 and 12 which have taken U / 4 transverse orientation (in the direction of the movement). The beams 24 and 25 have fallen as well as the central part of the lifting beams 7, 8. Now, the setting in width can be enforced.

Sur.la figure 6, les brides 27 ont été reboulonnées entre elles, ce qui assure au portique une très bonne rigidité dans cette configuration routière. Sur.la Figure 6, the flanges 27 have been rebutted together, which provides the gantry very good rigidity in this road configuration.

Il est à remarquer que, dans cette coTlfiPrlrntinn. Si Le portique doit: se déplacer par route, il peut être soit chargé sur un plateau routier, soit etre remorqué, soit autonome s'il est automoteur. It should be noted that in this coTlfiPrlrntinn. If the gantry crane must: travel by road, it can either be loaded on a road platform, or be towed, or autonomous if it is self-propelled.

La remise en configuration "portique de manutention" se fait de la même façon que sa mise en gabarit, mais en ordre inverse. The resetting to "gantry handling" configuration is done in the same way as its layout, but in reverse order.

Cette description est relative à un exemple de réalisation. D'autres, usant du même principe, peuvent présenter des variantes, comme dans les assemblages (ceux-ci ne font pas partie de la protection) sans pour?autant sortir du domaine de la protection.  This description relates to an exemplary embodiment. Others, using the same principle, may present variants, as in assemblies (these are not part of the protection) without departing from the field of protection.

Claims (5)

REVENDICATIONS 1 - Portique suivant la revendication 1 du brevet, dans lequel le cadre ouvert comporte des éléments mobiles pouvant se replier ou, se demonter ou coulisser, afin de réduire l'encombrement extérieur du portique à un gabarit routier, ferroviaire, maritime ou autres.1 - Gantry according to claim 1 of the patent, in which the open frame comprises movable elements which can be folded or dismantled or slide, in order to reduce the external dimensions of the gantry to a road, rail, maritime or other gauge. 2 - Portique suivant la revendication 1 de l'addition, dans lequel les organes de translation (roues, direction, timon, motorisation éventuelle) gardent toutes leurs fonctions une fois le portique ramené à un gabarit quelconque.2 - Gantry crane according to claim 1 of the addition, in which the translation members (wheels, steering, drawbar, possible motorization) keep all their functions once the gantry crane is reduced to any size. 3 - Portique suivant la revendication 2 de l'addition dans le lequel au moins 3 roues sont directrices, dont une spécialement orientée pour les manoeuvres de mise au gabarit.3 - Gantry according to claim 2 of the addition in which at least 3 wheels are steered, including one specially oriented for the maneuvers of the template. 4 - Portique suivant les revendications 1, 2 et 3 dans lequel les parties démontables autorisant la mise au gabarit transversale, peuvent etre remplacées par d'autres, de longueurs diférentes, afin d'adapter la largeur intérieure du portique à des besoins précis.4 - Gantry according to claims 1, 2 and 3 wherein the removable parts allowing the setting to the transverse template, can be replaced by others, of different lengths, in order to adapt the interior width of the gantry to specific needs. 5 - Portique suivant les revendications 1, 2 et 3 dans lequel la longueur du portique peut être modifiée par télescopage des longerons horizontaux afin d'adapter la longueur du portique à des besoins précis. 5 - Gantry according to claims 1, 2 and 3 wherein the length of the gantry can be changed by telescoping horizontal beams to adapt the length of the gantry to specific needs.
FR8208683A 1982-05-18 1982-05-18 Rail frame for handling loads - has open frame with dimensions varied as required to suit Pending FR2527193A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8208683A FR2527193A2 (en) 1982-05-18 1982-05-18 Rail frame for handling loads - has open frame with dimensions varied as required to suit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8208683A FR2527193A2 (en) 1982-05-18 1982-05-18 Rail frame for handling loads - has open frame with dimensions varied as required to suit

Publications (1)

Publication Number Publication Date
FR2527193A2 true FR2527193A2 (en) 1983-11-25

Family

ID=9274157

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8208683A Pending FR2527193A2 (en) 1982-05-18 1982-05-18 Rail frame for handling loads - has open frame with dimensions varied as required to suit

Country Status (1)

Country Link
FR (1) FR2527193A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661754A (en) * 2020-06-22 2020-09-15 哈尔滨工业大学(威海) Pipeline underwater construction device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3081883A (en) * 1960-08-03 1963-03-19 Manning Maxwell & Moore Inc Steerable gantry crane
US3272362A (en) * 1964-11-02 1966-09-13 Drott Mfg Corp Boat hoist apparatus
GB1212425A (en) * 1967-05-12 1970-11-18 Gordon Reginald Himsworth Mobile gantry frames
US3831791A (en) * 1973-01-17 1974-08-27 C Gonzales Carpet hoist
FR2420502A1 (en) * 1978-03-23 1979-10-19 Alsthom Cgee Mobile gantry crane - has adjustable span and height to allow use on tracks of varying width

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3081883A (en) * 1960-08-03 1963-03-19 Manning Maxwell & Moore Inc Steerable gantry crane
US3272362A (en) * 1964-11-02 1966-09-13 Drott Mfg Corp Boat hoist apparatus
GB1212425A (en) * 1967-05-12 1970-11-18 Gordon Reginald Himsworth Mobile gantry frames
US3831791A (en) * 1973-01-17 1974-08-27 C Gonzales Carpet hoist
FR2420502A1 (en) * 1978-03-23 1979-10-19 Alsthom Cgee Mobile gantry crane - has adjustable span and height to allow use on tracks of varying width

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661754A (en) * 2020-06-22 2020-09-15 哈尔滨工业大学(威海) Pipeline underwater construction device

Similar Documents

Publication Publication Date Title
US3301416A (en) Combination vehicle trailer and lifting device
FR2504467A1 (en) VEHICLE FOR TRANSPORTING AN OIL WELL DRILLING EQUIPMENT
EP0768968B1 (en) Folding bicycle
FR2631548A1 (en) AUTONOMOUS MODULE OF INTENSIVE CARE AND RESUSCITATION
FR2573014A1 (en) VEHICLE CAR RACK HAVING INDIVIDUAL CROSS-SECTIONAL CARRIER STRUCTURES FOR EACH WHEEL TRAIN
US3734466A (en) Lift device for variably displaying and facilitating repairs of vehicles such as snowmobiles
FR2516591A1 (en) MOBILE HARVESTER CONSISTING OF TWO ARTICULATED PARTS RELATIVE TO THE OTHER
FR2534237A1 (en) HIGH-STRENGTH ROLLING CRANE WITH EXTENDABLE BOOM, ESPECIALLY WITH TELESCOPIC BOOM
EP0046234B1 (en) Material-handling and earth-moving vehicle
FR2399790A1 (en) AGRICULTURAL MACHINE CONSISTING OF A BASE FRAME, TWO EXTERIOR FRAMES AND A MAIN FRAME
ES2200357T3 (en) TRAILER.
US3036650A (en) Carrier with demountable side frames
FR2527193A2 (en) Rail frame for handling loads - has open frame with dimensions varied as required to suit
EP0873964B1 (en) Device for erecting the tower for a telescopic crane
US2266866A (en) Lift truck
FR2545075A1 (en) METHOD AND APPARATUS FOR REMOVAL OF CRUSHED AIRCRAFT
FR2485451A1 (en) Straddle type tractor arrangement - has hydraulic motor drive for each wheel and four adjustable height wheel support columns
FR2461678A1 (en) MOBILE LIFTING CRANE MOUNTED ON CROWN
US2939226A (en) Elevating graders
FR2920405A1 (en) Handling device for pleasure boat, has portal cranes including height-adjustable pedestals moving horizontally on support, where ends of each pedestal are provided with rollers and circulate strap driven by winches
US2242695A (en) Tree mover
EP0096133A1 (en) Straddle lifting device for the vertical handling of loads
FR2461436A1 (en) REMOVABLE DEVICE FOR TRANSPORTING AND OPERATING A TOOL THAT CAN BE MOUNTED ON A TACTOR
JPH04103476A (en) Farm working vehicle
US3186571A (en) Truck-mounted lifting device