ES2704142A1 - CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) - Google Patents
CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) Download PDFInfo
- Publication number
- ES2704142A1 ES2704142A1 ES201831002A ES201831002A ES2704142A1 ES 2704142 A1 ES2704142 A1 ES 2704142A1 ES 201831002 A ES201831002 A ES 201831002A ES 201831002 A ES201831002 A ES 201831002A ES 2704142 A1 ES2704142 A1 ES 2704142A1
- Authority
- ES
- Spain
- Prior art keywords
- building
- panels
- facade
- paneled
- procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000009423 ventilation Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 abstract description 14
- 238000009434 installation Methods 0.000 abstract description 7
- 238000005192 partition Methods 0.000 abstract description 4
- 238000009428 plumbing Methods 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 abstract description 2
- 230000006872 improvement Effects 0.000 abstract description 2
- 238000005253 cladding Methods 0.000 abstract 1
- 230000036449 good health Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 4
- 238000009413 insulation Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60S—SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
- B60S1/00—Cleaning of vehicles
- B60S1/02—Cleaning windscreens, windows or optical devices
- B60S1/04—Wipers or the like, e.g. scrapers
- B60S1/32—Wipers or the like, e.g. scrapers characterised by constructional features of wiper blade arms or blades
- B60S1/38—Wiper blades
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/28—Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60S—SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
- B60S1/00—Cleaning of vehicles
- B60S1/02—Cleaning windscreens, windows or optical devices
- B60S1/04—Wipers or the like, e.g. scrapers
- B60S1/32—Wipers or the like, e.g. scrapers characterised by constructional features of wiper blade arms or blades
- B60S1/38—Wiper blades
- B60S2001/3827—Wiper blades characterised by the squeegee or blade rubber or wiping element
- B60S2001/3829—Wiper blades characterised by the squeegee or blade rubber or wiping element characterised by the material of the squeegee or coating thereof
- B60S2001/3832—Wiper blades characterised by the squeegee or blade rubber or wiping element characterised by the material of the squeegee or coating thereof cleaning by rigid or semi-rigid scraping elements, e.g. for removing ice
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60S—SERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
- B60S1/00—Cleaning of vehicles
- B60S1/02—Cleaning windscreens, windows or optical devices
- B60S1/04—Wipers or the like, e.g. scrapers
- B60S1/32—Wipers or the like, e.g. scrapers characterised by constructional features of wiper blade arms or blades
- B60S1/38—Wiper blades
- B60S2001/3827—Wiper blades characterised by the squeegee or blade rubber or wiping element
- B60S2001/3836—Wiper blades characterised by the squeegee or blade rubber or wiping element characterised by cross-sectional shape
- B60S2001/3837—Wiper blades characterised by the squeegee or blade rubber or wiping element characterised by cross-sectional shape with more than one wiping edge or lip
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
DESCRIPCIÓNDESCRIPTION
PROCEDIMIENTO DE CERRAMIENTO DE FACHADA PANELADACLOSURE PROCEDURE OF PANELED FACADE
Objeto de la invención y Campo de aplicación de la invenciónObject of the invention and Field of application of the invention
El objeto de la invención se centra en un nuevo proceso de ejecución de cerramiento de fachadas mediante paneles que mejora las condiciones de confort de los operarios que realizan las obras interiores, tales como trasdosados, particiones, solados y falsos techos, y las instalaciones internas del edificio, tales como saneamiento, fontanería, iluminación, electricidad. El nuevo procedimiento permite reducir los tiempos de ejecución, reduciendo por tanto los costes.The object of the invention is focused on a new process of execution of closing of facades by panels that improves the comfort conditions of the workers who perform the interior works, such as walls, partitions, floors and false ceilings, and the internal installations of the building, such as sanitation, plumbing, lighting, electricity. The new procedure allows reducing the execution times, thus reducing costs.
La presente invención se enmarca dentro del sector de la construcción, centrándose particularmente en el ámbito de la ejecución de fachadas y cerramientos de edificaciones.The present invention is part of the construction sector, focusing particularly on the field of the execution of facades and building enclosures.
Antecedentes de la invenciónBACKGROUND OF THE INVENTION
Uno de los procedimientos más habituales de cerramientos de fachadas con paneles, que la presente invención pretende mejorar, consiste en:One of the most common methods of closing facades with panels, which the present invention aims to improve, consists of:
1. Una vez que se dispone de la estructura del edificio se colocan todos los paneles de fachada con aberturas para los huecos, en todas las plantas, siguiendo las indicaciones del fabricante para su fijación a la estructura. La colocación se realiza desde el exterior, siendo necesario el uso de andamiaje en fachada.1. Once the structure of the building is available, all facade panels with openings for the holes are placed on all the floors, following the manufacturer's instructions for fixing it to the structure. The placement is done from the outside, being necessary the use of scaffolding on the facade.
Cada uno de los paneles a colocar tiene asignado un lugar concreto en la fachada, ya que los paneles vienen de fábrica cortados considerando los huecos de las futuras ventanas del edificio.Each of the panels to be placed is assigned a specific place on the facade, since the panels come from the factory cut considering the holes in the future windows of the building.
2. Una vez que los paneles han sido colocados en su lugar correspondiente, se realiza la obra interior del edificio, comprendiendo procesos como: realizar las particiones interiores, la instalación de los solados o de los falsos techos así como todas las instalaciones de fontanería, saneamiento, iluminación y climatización.2. Once the panels have been placed in their corresponding place, the interior work of the building is carried out, comprising processes such as: making the interior partitions, installing the flooring or the false ceilings as well as all the plumbing installations, sanitation, lighting and air conditioning.
3. Posteriormente a la realización de la obra interior, se instalan las carpinterías correspondientes a los huecos, así como posibles terminaciones exteriores del edificio, como por ejemplo los aislamientos exteriores de la fachada, la inclusión de fachadas ventiladas o similares. 3. After the completion of the interior work, the joinery corresponding to the gaps are installed, as well as possible exterior terminations of the building, such as the exterior insulation of the facade, the inclusion of ventilated facades or similar.
Con la presente invención se pretende aportar al estado de la técnica un mejorado proceso de construcción de fachadas que aporte nuevas ventajas para los trabajadores en materias relacionadas con la seguridad, comodidad y la salud de éstos, así como la reducción de los tiempos de ejecución de los procesos de la edificación y la precisión de las tareas.With the present invention it is intended to contribute to the state of the art an improved process of construction of facades that provides new advantages for workers in matters related to the safety, comfort and health of these, as well as the reduction of the execution times of the processes of building and the precision of the tasks.
Los paneles utilizados en la presente invención pueden ser de diferentes tipos, normalmente de suelo-techo o bien colocados de forma apaisada. Esta amplia posibilidad de uso de tipos de paneles, existentes en el mercado, permite que el procedimiento sea aplicable a un gran número de casos.The panels used in the present invention may be of different types, usually floor-to-ceiling or alternatively placed horizontally. This wide possibility of using types of panels, existing in the market, allows the procedure to be applicable in a large number of cases.
DESCRIPCIÓN DE LA INVENCIÓNDESCRIPTION OF THE INVENTION
La invención se refiere a un procedimiento concreto de colocación de los paneles de fachada y apertura de los huecos, que aporta grandes ventajas en relación al procedimiento habitual para este tipo de fachadas. El procedimiento consiste en la colocación de paneles ciegos de fachada sobre la estructura de una edificación, es decir, la colocación de paneles que no tienen huecos u orificios. Estos paneles se colocan de forma continua y desde el interior del edificio, de modo que los huecos para alojar las ventanas se realizan al término de la obra interior del edificio.The invention relates to a specific method of placing the facade panels and opening the gaps, which provides great advantages in relation to the usual procedure for this type of facades. The procedure consists of the placement of blind facade panels on the structure of a building, that is, the placement of panels that do not have holes or holes. These panels are placed continuously and from the interior of the building, so that the holes to house the windows are made at the end of the interior work of the building.
De esta forma, el objetivo principal del procedimiento es el de cerrar la estructura de la edificación lo antes posible siendo el panel, con el que se realiza el cerramiento, de cualquier tipo que permita dicho cierre.In this way, the main objective of the procedure is to close the structure of the building as soon as possible with the panel, with which the enclosure is made, of any type that allows such closure.
En cualquier caso, el procedimiento de ejecución en obra es aplicable a los diferentes paneles existentes en el mercado, siempre y cuando éstos puedan ser cortados para la realización de huecos una vez colocados en la edificación.In any case, the on-site execution procedure is applicable to the different panels existing in the market, as long as these can be cut to make holes once placed in the building.
Dicho procedimiento de cerramiento de fachada panelada en plantas de una estructura de una edificación, comprende las siguientes etapas:Said façade closing procedure paneled into floors of a building structure, comprises the following stages:
1. Colocar sobre la estructura de la edificación un bastidor de fijación de paneles, dejando previsto en dicho bastidor unos pre-marcos para los huecos de fachada. 2. Colocar a cinta corrida y fijar unos paneles ciegos de cerramiento, sin orificios ni aberturas, en el bastidor colocado en la estructura de la edificación;1. Place a panel fixing frame on the structure of the building, leaving pre-frames for the facade openings in said frame. 2. Place a continuous strip and fix some blind panels of closing, without holes or openings, in the frame placed in the structure of the building;
3. Instalar un sistema de ventilación en el interior de la edificación; 3. Install a ventilation system inside the building;
4. Abrir los huecos en los paneles de la fachada mediante el corte de dichos paneles a partir de los pre-marcos fijados previstos en el bastidor colocado en la estructura de la edificación; y4. Open the gaps in the panels of the facade by cutting said panels from the fixed pre-frames provided in the frame placed in the structure of the building; Y
5. Colocar las carpinterías de los huecos abiertos en los paneles.5. Place the joinery of the open holes in the panels.
En una realización, en el procedimiento de cerramiento de fachada panelada, los paneles se fijan a la fachada desde el interior de la edificación, sin necesidad de andamiajes.In one embodiment, in the paneled façade closing process, the panels are fixed to the façade from inside the building, without the need for scaffolding.
En una realización, en el procedimiento de cerramiento de fachada panelada, el procedimiento comprende la etapa de ejecutar el trasdosado interior, configurando los huecos de fachada. Dicho trasdosado interior consiste en aplicar por el interior del panel un aislamiento y dando posteriormente un acabado con placa de yeso laminado o bien con fábrica de ladrillo dependiendo de las condiciones de diseño.In one embodiment, in the paneled façade closing process, the method comprises the step of executing the internal lining, configuring the façade voids. Said internal screed consists of applying an insulation on the inside of the panel and subsequently finishing with plasterboard plaster or with a brick factory depending on the design conditions.
En una realización, previamente a la colocación de las carpinterías de los huecos abiertos, el procedimiento de cerramiento de fachada puede comprender una etapa para instalar la terminación exterior de la fachada. Dicha etapa de terminación exterior es necesaria en fachadas ventiladas o cuando el aislamiento se coloque por el exterior, dependiendo del tipo de panel y de fachada. Esta etapa es la única que precisaría de andamiaje.In one embodiment, prior to the placement of the joinery of the open spaces, the façade closing process may comprise a step to install the exterior finish of the façade. Said outer termination stage is necessary on ventilated facades or when the insulation is placed on the outside, depending on the type of panel and facade. This stage is the only one that would require scaffolding.
Este proceso permite que se puedan compaginar en el tiempo aquellas obras del exterior del edificio, como el acerado perimetral en planta baja, al mismo tiempo que se realizan las obras del interior (trasdosados, falsos techos, instalaciones etc.).This process allows those works on the exterior of the building, such as the steel perimeter on the ground floor, to be combined over time, while the interior works are carried out (siding, false ceilings, installations, etc.).
En una obra con procedimientos convencionales, estas tareas exteriores no pueden acometerse hasta desmontar los andamios en fachada. Es decir, con el sistema propuesto, el andamiaje es necesario en caso de que la fachada necesite un acabado exterior y éste se coloca al final de la obra, habiendo por tanto tiempo suficiente para completar dichas tareas al término de la estructura.In a work with conventional procedures, these external tasks can not be undertaken until the scaffolding on the façade is dismantled. That is, with the proposed system, the scaffolding is necessary in case the façade needs an exterior finish and this is placed at the end of the work, having enough time to complete these tasks at the end of the structure.
En una realización, el procedimiento de cerramiento comprende una etapa de ejecutar las obras interiores de la edificación después de instalar un sistema de ventilación interna y antes de abrir al menos un hueco en los paneles de la fachada. In one embodiment, the closing process comprises a step of executing the interior works of the building after installing an internal ventilation system and before opening at least one hole in the facade panels.
En una realización, los paneles de cerramiento comprenden unos orificios configurados para permitir la extracción de aire del interior de la edificación cuando la totalidad de la fachada se encuentra cerrada, antes de la apertura de los huecos de los paneles.In one embodiment, the enclosing panels comprise orifices configured to allow the extraction of air from the interior of the building when the entire facade is closed, before the opening of the holes in the panels.
El procedimiento descrito proporciona una serie de ventajas, como son:The described procedure provides a series of advantages, such as:
- Rapidez de montaje: dado que se colocan los paneles a cinta corrida, sin necesidad de replanteo de huecos ni uniones complejas en paneles especiales de formación de huecos.- Quick assembly: given that the panels are placed on a running belt, without the need to rethink holes or complex joints in special hollow-forming panels.
- Disminución de errores de colocación, ya que todos los paneles son idénticos y su colocación también.- Reduction of placement errors, since all panels are identical and their placement too.
- Abaratamiento de costes de suministro de paneles, dado que todos son de medida estándar del fabricante, sin uso de paneles especiales.- Cost reduction of panel supply costs, given that all are standard manufacturer's measurements, without the use of special panels.
- Una alta precisión en el replanteo y apertura de huecos y su coordinación con fachadas modulares, ya que se fijan y realizan en la propia obra.- High precision in setting out and opening gaps and coordinating them with modular facades, since they are fixed and made on site.
- Adelanto del comienzo de la obra interior, y por tanto, de la finalización de la misma. - Mejora de las condiciones de trabajo, al poder climatizar el interior del edificio desde el principio lo que redunda en un mayor rendimiento de los operarios en condiciones de ambiente externo extremo.- Advancement of the beginning of the interior work, and therefore, of the completion of it. - Improvement of working conditions, by being able to air-condition the interior of the building from the beginning, which results in a greater performance of the operators in extreme external environment conditions.
- Ausencia de andamiaje exterior. En caso de que la fachada necesite un acabado exterior, será necesario colocar un andamiaje exterior cuando finalicen las obras del interior, pero su colocación se retrasa en el tiempo con lo que se optimiza su uso y se abarata su alquiler.- Absence of external scaffolding. In case the façade needs an exterior finish, it will be necessary to place an external scaffolding when the interior works are finished, but its placement is delayed in time, thus optimizing its use and lowering its rent.
En definitiva, la invención que se presenta consiste en un nuevo proceso constructivo de fachadas que permite reducir considerablemente los tiempos y el coste, y además de presentar numerosas ventajas competitivas, mejorando la seguridad en todo el proceso.In short, the invention that is presented consists of a new construction process of facades that allows to reduce considerably the times and the cost, and in addition to presenting numerous competitive advantages, improving the security in the whole process.
Así, el proceso constructivo supone una destacable novedad para el sector, ya que a tenor de su implementación, se alcanzan las ventajas anteriormente señaladas, estando los detalles que describen el proceso.Thus, the constructive process supposes a remarkable novelty for the sector, since according to its implementation, the previously mentioned advantages are achieved, being the details that describe the process.
BREVE DESCRIPCIÓN DE LAS FIGURASBRIEF DESCRIPTION OF THE FIGURES
Para complementar la descripción que se está realizando del objeto de la invención y para ayudar a una mejor comprensión de las características que lo distinguen, se acompaña la presente memoria descriptiva, como parte integrante de la misma, de un juego de figuras, en los que con carácter ilustrativo y no limitativo se ha representado lo siguiente:To complement the description that is being made of the object of the invention and to help a better understanding of the characteristics that distinguish it, the present descriptive memory, as an integral part thereof, of a set of figures, in which the following has been represented with an illustrative and non-limiting character:
• La figura 1 muestra la estructura terminada de una edificación consistente en las vigas, columnas y forjados de piso.• Figure 1 shows the finished structure of a building consisting of beams, columns and floor slabs.
• La figura 2 muestra la colocación de los bastidores de fijación de paneles en una planta, desde el interior, sin andamiaje exterior.• Figure 2 shows the placement of the panel fixing frames in a plant, from the inside, without external scaffolding.
• La figura 3 muestra la colocación de todos los paneles ciegos de fachada en todas las plantas, desde el interior, sin andamiaje exterior. Todos los paneles son ciegos y del mismo tamaño estándar. Se muestra cómo el aire es extraído a través de las aperturas practicadas en los paneles ciegos mediante el sistema de ventilación.• Figure 3 shows the placement of all blind facade panels on all floors, from the inside, without external scaffolding. All panels are blind and of the same standard size. It shows how the air is extracted through the openings made in the blind panels through the ventilation system.
• La figura 4 muestra la realización de la obra interior como las particiones, solados, techos, carpinterías internas e instalaciones interiores.• Figure 4 shows the completion of the interior work such as partitions, floorings, ceilings, internal joinery and interior installations.
• La figura 5 muestra la apertura de los huecos en fachada de los paneles.• Figure 5 shows the opening of the holes in the facade of the panels.
DESCRIPCIÓN PREFERENTE DE LA INVENCIÓNPREFERRED DESCRIPTION OF THE INVENTION
Como se observa en la figura 1, el procedimiento descrito para el cerramiento de una fachada panelada comienza cuando la estructura (1) de la edificación ha sido terminada.As seen in Figure 1, the procedure described for the closing of a paneled facade begins when the structure (1) of the building has been completed.
Una vez que estos elementos estructurales (1) han sido terminados/construidos, se procede a fijar un bastidor (2) que comprende unos pre-marcos (3) de unos huecos de fachada, que servirá de soporte a los paneles de fachada.Once these structural elements (1) have been finished / constructed, a frame (2) is added, which comprises pre-frames (3) of some facade openings, which will serve as support for the facade panels.
Una vez que el bastidor (2) ha sido fijado, se procede a colocar los paneles (4) ciegos, cerrando la totalidad de las plantas de la edificación, como se muestra en la figura 3, de modo que dichos paneles (4) carecen de orificios o aberturas que permitan la comunicación del interior del edificio con el exterior, salvo por unos pequeños orificios (5) situados en cada panel (4).Once the frame (2) has been fixed, the blind panels (4) are placed, closing all the floors of the building, as shown in figure 3, so that said panels (4) lack of holes or openings that allow the communication of the inside of the building with the outside, except for a few small holes (5) located in each panel (4).
Cuando toda la fachada ha sido cerrada con estos paneles (4) ciegos, se consigue en el interior de la edificación unas condiciones ambientales más óptimas para realizar los trabajos constructivos e instalaciones propias de la edificación. When the entire façade has been closed with these blind panels (4), optimum environmental conditions are obtained in the interior of the building to carry out the construction work and facilities of the building.
Sin embargo, para poder realizar estos trabajos, es preciso realizar previamente una instalación de ventilación, que permita la llegada de aire fresco a los trabajadores que llevan a cabo dichas funciones, como se muestra en la figura 4. Para conseguir que la ventilación proporcionada sea la adecuada, los pequeños orificios (5) de los paneles (4) están configurados para extraer el aire del interior, sin perder las condiciones ambientales conseguidas con el cerramiento con los paneles (4).However, in order to carry out these works, it is necessary to previously perform a ventilation installation, which allows the arrival of fresh air to workers who carry out these functions, as shown in figure 4. To ensure that the ventilation provided is the appropriate, the small holes (5) of the panels (4) are configured to extract the air from the interior, without losing the environmental conditions achieved with the enclosure with the panels (4).
Una vez las instalaciones están finalizadas y los cerramiento internos ejecutados (, se abren los huecos (6) en las fachadas cortando los paneles (4) a partir de los pre-marcos (3) fijados, como se muestra en la figura 5, colocando las carpinterías correspondientes de dichos huecos. Once the installations are finished and the internal enclosures executed (, the gaps (6) in the façades are opened by cutting the panels (4) from the pre-frames (3) fixed, as shown in figure 5, placing the corresponding carpentries of said holes.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201831002A ES2704142A1 (en) | 2018-10-17 | 2018-10-17 | CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201831002A ES2704142A1 (en) | 2018-10-17 | 2018-10-17 | CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) |
Publications (1)
Publication Number | Publication Date |
---|---|
ES2704142A1 true ES2704142A1 (en) | 2019-03-14 |
Family
ID=65681321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES201831002A Pending ES2704142A1 (en) | 2018-10-17 | 2018-10-17 | CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2704142A1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2332732A (en) * | 1942-10-24 | 1943-10-26 | Laucks I F Inc | Stressed panel double wall construction |
US3762110A (en) * | 1971-11-03 | 1973-10-02 | J Boss | Movable windbreaker for steel buildings |
US5819498A (en) * | 1996-10-29 | 1998-10-13 | Geraci; Joseph R. | Home construction methodology |
CN105971192A (en) * | 2016-07-06 | 2016-09-28 | 盐城工学院 | Assembly type breathable wall board and assembled wall |
-
2018
- 2018-10-17 ES ES201831002A patent/ES2704142A1/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2332732A (en) * | 1942-10-24 | 1943-10-26 | Laucks I F Inc | Stressed panel double wall construction |
US3762110A (en) * | 1971-11-03 | 1973-10-02 | J Boss | Movable windbreaker for steel buildings |
US5819498A (en) * | 1996-10-29 | 1998-10-13 | Geraci; Joseph R. | Home construction methodology |
CN105971192A (en) * | 2016-07-06 | 2016-09-28 | 盐城工学院 | Assembly type breathable wall board and assembled wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7587868B2 (en) | Method of installing windows into a concrete structure | |
ES2762852T3 (en) | Enhanced Composite Concrete and Framing System and Method for Building Construction | |
US20070130841A1 (en) | Construction module system and method | |
WO2019221617A1 (en) | Prefabricated construction element and the method of erecting objects made of prefabricated construction elements | |
ES2357202A1 (en) | Wet-area container module and private and general installations for residential, hotel and hospital buildings | |
ES2704142A1 (en) | CLOSURE PROCEDURE OF PANELED FACADE (Machine-translation by Google Translate, not legally binding) | |
AU2015274243B2 (en) | Improvements in buildings | |
EP2792803B1 (en) | Method for construction of a building | |
JP6038732B2 (en) | How to secure outdoor installations | |
RU2582155C2 (en) | Frame-panel building | |
ES2529603B1 (en) | Modular wooden building construction system | |
IT201700007964A1 (en) | FRAME WITH MODULES PREFABRICATED IN CLS REINFORCED FOR SANDWICH BUFFING | |
JP6770829B2 (en) | Joining structure and joining method of building units and wall panels | |
JP4246756B2 (en) | housing complex | |
RU2140509C1 (en) | Domestic house of the first mass series with attic floor of volumetric block-rooms, method for arrangement of attic floor and complex reconstruction of house | |
JPH04237746A (en) | House structure in air-cycle assembly system | |
RU120122U1 (en) | SYSTEM FOR FLOORING CONSTRUCTION OF MONOLITHIC REINFORCED CONCRETE BUILDINGS IN WINTER CONDITIONS | |
KR20240102353A (en) | Method For Constructing modular house Using the assembly block | |
ES1065599U (en) | Renovation frame for windows and doors | |
ES1216325U (en) | Enclosure for building construction systems. (Machine-translation by Google Translate, not legally binding) | |
BR102022022581A2 (en) | CONSTRUCTIVE SYSTEM OF EXPANDED POLYSTYRENE MONOLITHIC PANEL WITH INCLUSION OF DUCTS AND PIPES | |
JP2007321494A (en) | Apartment house | |
ES2292276B1 (en) | MODULAR CONSTRUCTION SYSTEM. | |
BR102014001192A2 (en) | thermal house | |
PL130918U1 (en) | Prefabricated spatial element made of reinforced concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
BA2A | Patent application published |
Ref document number: 2704142 Country of ref document: ES Kind code of ref document: A1 Effective date: 20190314 |
|
FC2A | Grant refused |
Effective date: 20210909 |