ES2264597B1 - SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. - Google Patents
SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. Download PDFInfo
- Publication number
- ES2264597B1 ES2264597B1 ES200400259A ES200400259A ES2264597B1 ES 2264597 B1 ES2264597 B1 ES 2264597B1 ES 200400259 A ES200400259 A ES 200400259A ES 200400259 A ES200400259 A ES 200400259A ES 2264597 B1 ES2264597 B1 ES 2264597B1
- Authority
- ES
- Spain
- Prior art keywords
- support
- welded
- pillar
- ship
- air extraction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Rod-Shaped Construction Members (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Sistema de soporte y fijación de una pasarela estructural posicionadora de los conductos de extracción de aire localizados sobre la cubierta de una nave industrial que comprende montar sobre cerchas de la nave piezas que se fijan convenientemente a dichas cerchas. En la cara superior de cada una de las piezas se suelda el extremo de un soporte tubular de sección igual a la que presenta un pilar que discurre por el interior del soporte y se suelda al mismo, quedando posicionado el pilar de forma vertical y emerge a través de una escotadura practicada a tal efecto en la cubierta y que remata por el extremo libre en una platabanda soldada sobre las que apoya y fijan los conductos de extracción de aire de la nave.Support system and fixation of a structural positioning gateway of the air extraction ducts located on the deck of an industrial building that includes mounting parts that are conveniently fixed to said trusses on trusses of the building. On the upper face of each of the pieces, the end of a tubular support of equal section is welded to the one that presents a pillar that runs through the inside of the support and is welded to it, the pillar being positioned vertically and emerging to through a recess made for this purpose on the deck and that ends at the free end in a welded platform on which supports and fix the air extraction ducts of the ship.
Description
Sistema de soporte y fijación de una pasarela estructural posicionadora de los conductos de extracción de aire localizado sobre la cubierta de una nave industrial.Support system and fixation of a gangway structural positioning of the air extraction ducts located on the deck of an industrial building.
La presente invención tiene por objeto un sistema de soporte y fijación de una pasarela estructural posicionadora de los conductos de extracción de aire localizado sobre la cubierta de una nave industrial.The present invention aims at a support system and fixation of a structural gateway positioning of the localized air extraction ducts on the deck of an industrial building.
Asimismo estos conductos pueden ser de agua para uso exclusivo de bomberos en el caso de producirse un incendio.Also these ducts can be water for exclusive use of firefighters in the event of a fire.
En la actualidad el sistema de instalación de estructuras de pasarelas para el soporte y fijación de los conductos de aireación y de agua para bomberos se realiza antes de colocar o montar la cubierta de la nave.Currently the installation system of gangway structures for the support and fixation of aeration and water ducts for firefighters is done before place or mount the deck of the ship.
Este sistema implica unas pérdidas de tiempo en cuanto al uso industrial de la nave muy importantes, lo que se traduce en pérdidas económicas.This system implies a waste of time in as for the industrial use of the ship very important, what It translates into economic losses.
La aplicación del sistema de la invención evita estos inconvenientes, ya que permite montar la estructura de la pasarela con la cubierta colocada y sin necesidad de desmontarla.The application of the system of the invention avoids these inconveniences, since it allows to assemble the structure of the walkway with the cover in place and without the need of take it apart
El sistema de estructura de la invención es sencillo en lo constructivo y muy fácil de montar sin necesidad de quitar la cubierta de la nave.The structure system of the invention is simple in construction and very easy to assemble without the need for Remove the deck of the ship.
Además, una de las ventajas propias del sistema consiste en construir los propios soportes o pilares que emergen de la cubierta para que éstos sean verticales y presenten la superficie libre de asiento horizontal y nivelada para que estas superficies de apoyo sean coplanares y se facilite el apoyo y fijación de la pasarela que va a soportar los tubos o conductos pertenecientes a la aireación y extracción de aire del interior de la nave así como los conductos de agua para los bomberos en caso de incendio.In addition, one of the advantages of the system it consists of building the supports or pillars that emerge from the cover so that these are vertical and present the horizontal and level seat free surface so that you are support surfaces are coplanar and support is facilitated and fixing of the catwalk that will support the pipes or ducts belonging to the aeration and extraction of air inside the ship as well as the water pipes for firefighters in case of fire.
De acuerdo con la invención el sistema comprende utilizar las cerchas de hormigón o metálicas para fijar unas piezas de apoyo en la parte superior inclinada.According to the invention the system comprises use the concrete or metal trusses to fix some support pieces on the inclined upper part.
Cada una de estas piezas abrazan esta zona de la cercha en la cara extrema superior y parte de las caras laterales verticales y se fijan a la cercha por medio de pasadores roscados con tuercas de apriete, en el caso de cerchas metálicas la unión de las piezas a las cerchas es por soldadura.Each of these pieces embrace this area of the truss on the upper end face and part of the side faces vertical and fixed to the truss by means of threaded pins with tightening nuts, in the case of metal trusses the union of the pieces to the trusses is by welding.
Cada una de estas piezas de apoyo presentan soldados en su cara extrema superior cuatro perfiles estructurales en U, cuyas almas soldadas se posicionan de modo que determinan un contorno interior cuadrangular en el que se posiciona el pilar respectivo aproximadamente de igual sección que el contorno hueco.Each of these support pieces present soldiers on its upper end face four structural profiles at U, whose welded souls are positioned so that they determine a quadrangular interior contour in which the pillar is positioned respective of approximately the same section as the contour hole.
Los cuatro perfiles estructurales en U por lo tanto van soldados y el extremo de apoyo del conjunto que forman se suelda en la cara extrema superior de las piezas de apoyo, presentando un plano, por lo general inclinado, en relación con el lado inclinado correspondiente de la cercha de hormigón.The four structural U-profiles so both go soldiers and the support end of the set that form is welded on the upper end face of the support pieces, presenting a plane, usually inclined, in relation to the corresponding inclined side of the concrete truss.
La inclinación del asiento del conjunto de los perfiles en U permite acomodar y soldar cada uno de los pilares y conseguir que éstos salgan verticales por las aberturas que se practican en la cubierta.The inclination of the seat of the set of U profiles allow to accommodate and weld each of the pillars and get these out vertical through the openings that are They practice on the deck.
Los pilares llevan soldados en sus extremos libres unas platabandas planas que determinan un plano de apoyo de fijación de la estructura de la pasarela como soporte de los tubos de extracción del aire de la nave.The pillars carry soldiers at their ends free some flat platforms that determine a support plane of fixation of the structure of the gangway as support of the tubes of air extraction from the ship.
Los espacios libres abiertos entre las aberturas practicadas en la cubierta y los pilares se cierran con material que permita un cierre estanco al agua, este material puede estar constituido a base de resinas o materiales similares actos para tal fin.Open spaces between openings practiced on the roof and the pillars are closed with material that allows a waterproof seal, this material can be constituted based on resins or similar materials acts for such finish.
La figura 1 muestra una vista seccionada de una parte de la cubierta de la nave donde va montado el sistema de la invención.Figure 1 shows a sectional view of a part of the deck of the ship where the system is mounted invention.
La figura 2 muestra un detalle ampliado de la unión del pilar a la cercha a través de la pieza soporte correspondiente.Figure 2 shows an enlarged detail of the union of the pillar to the truss through the support piece correspondent.
La figura 3 muestra una vista seccionada por la línea III-III de la figura 2.Figure 3 shows a sectional view of the line III-III of figure 2.
El sistema 1 de la invención comprende utilizar las cerchas de hormigón o metálicas 2 de la propia nave, no representada.System 1 of the invention comprises using the concrete or metal trusses 2 of the ship itself, not represented.
En estas cerchas se montan piezas 3 que abrazan la parte o zona superior correspondiente de la cercha y se fijan mediante pasadores roscados 4 con tuercas de apriete 5; también se fijan las piezas a las cerchas metálicas por soldadura.In these trusses 3 pieces that hug the corresponding upper part or area of the truss and are fixed by threaded pins 4 with clamping nuts 5; I also know They fix the pieces to the metal trusses by welding.
Estos pasadores roscados 4 se introducen en taladros pasantes 6 que tienen conformadas las cerchas.These threaded pins 4 are introduced in through holes 6 that have the trusses shaped.
En la parte superior plana 7 de estas piezas 3 se sueldan los extremos de perfiles en U 8 que se posicionan por sus almas 9 y conforman una especie de prisma tubular 10 de sección cuadrangular, en cuyo interior se posiciona y fija el pilar 11 que emerge por la abertura 12 practicada en la cubierta 13 de la nave.On the flat top 7 of these pieces 3 the ends of U 8 profiles that are positioned by their souls 9 and make up a kind of tubular prism 10 of section quadrangular, inside which the 11th pillar is positioned and fixed emerges through the opening 12 made in the cover 13 of the ship.
El pilar 11 queda posicionado verticalmente y en el extremo libre del pilar se suelda una platabanda horizontal 14 de forma preferentemente cuadrangular.Pillar 11 is positioned vertically and in the free end of the pillar is welded a horizontal band 14 preferably quadrangular.
Sobre las platabandas de los pilares se montan la estructura de pasarela 15 y sobre ella los soportes 16 de las conducciones de aire 17, para la extracción de aire de la nave y/o los conductos de agua utilizados por los bomberos en caso de incendio.On the pillars of the pillars are mounted the gateway structure 15 and on it the supports 16 of the air ducts 17, for the extraction of air from the ship and / or the water pipes used by firefighters in case of fire.
Es importante indicar que el asiento del prisma tubular 10 citado y el correspondiente al pilar 11 debe ser inclinado para conseguir la correcta verticalidad de ambos y sobre todo del pilar.It is important to indicate that the prism seat tubular 10 cited and the one corresponding to pillar 11 must be inclined to get the correct verticality of both and over all of the pillar.
Entre las aberturas 12 practicadas en la cubierta 13 de la nave y la superficie perimetrales los pilares hay espacios abiertos 18 que hay que cubrir con material que permita una perfecta estanqueidad al agua.Among the openings 12 made in the deck 13 of the ship and the perimeter surface the pillars there are open spaces 18 to be covered with material that allows Perfect water tightness.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200400259A ES2264597B1 (en) | 2004-02-05 | 2004-02-05 | SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200400259A ES2264597B1 (en) | 2004-02-05 | 2004-02-05 | SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2264597A1 ES2264597A1 (en) | 2007-01-01 |
ES2264597B1 true ES2264597B1 (en) | 2007-12-16 |
Family
ID=37813647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES200400259A Expired - Fee Related ES2264597B1 (en) | 2004-02-05 | 2004-02-05 | SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2264597B1 (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS556048A (en) * | 1978-06-26 | 1980-01-17 | Chiyouriyou Setsukei Koumushiy | Supporter for level adjustment |
JPH06341238A (en) * | 1993-05-31 | 1994-12-13 | Ishikawajima Harima Heavy Ind Co Ltd | Long size block and support structure thereof |
JPH07248093A (en) * | 1994-03-09 | 1995-09-26 | Mitsubishi Materials Corp | Branch device of piping cover |
JPH1078170A (en) * | 1996-09-02 | 1998-03-24 | Babcock Hitachi Kk | Duct support frame |
JP2002310475A (en) * | 2001-04-13 | 2002-10-23 | Misawa Homes Co Ltd | Attaching structure for central ventilating system |
ES1056669Y (en) * | 2004-02-05 | 2004-08-01 | I M F Alzira Montadores S L Un | SUPPORT STRUCTURE AND FIXING OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. |
-
2004
- 2004-02-05 ES ES200400259A patent/ES2264597B1/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
ES2264597A1 (en) | 2007-01-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2555222T3 (en) | Folding lattice beam, truss and construction that includes such a beam | |
ES2389952T3 (en) | Formwork of master beams with automatic formwork of the lower board | |
NO751644L (en) | ||
WO2008068366A1 (en) | Multi-purpose part | |
ES2871017T3 (en) | Procedure for producing a roof element and roof formwork | |
ES2562405T3 (en) | Vertical metal frame element | |
ES2264597B1 (en) | SUPPORT AND FIXING SYSTEM OF A POSITIONING STRUCTURAL GATE OF THE LOCATED AIR EXTRACTION DUCTS ON THE COVER OF AN INDUSTRIAL SHIP. | |
ES1056669U (en) | Support structure and fixing of a structural positioning gateway of the air extraction ducts located on the cover of an industrial ship. (Machine-translation by Google Translate, not legally binding) | |
ES2870966T3 (en) | Transition construction to bridge a construction joint | |
ES2568690T3 (en) | Wall or roof construction | |
ES2333305T3 (en) | SYSTEM OF STRUCTURAL COMPONENTS FOR STREETS / PLATFORMS AND / OR TRIBUNES AND / OR RATES. | |
CN211369216U (en) | Assembled light steel structure archaized roof | |
JP2006291696A (en) | Placing type shelf structural unit and placing type shelf structure | |
ES2358502A1 (en) | High-precision integral modular formwork system for the construction of monolithic reinforced-concrete structures | |
ES2220236B1 (en) | "MULTIPLANTA BUILDING STRUCTURE". | |
ES2921932B2 (en) | Construction safety fixing and railing | |
JP2006291696A6 (en) | Mounting shelf structure unit and mounting shelf structure | |
ES2333559T3 (en) | U-PROFILE BEAM OF A COVER, SHIP, TRIBUNA, STAIRCASE, SANDWAY OR STRETCH. | |
ES2577020T3 (en) | Lost formwork plate and lost formwork block comprising such a plate | |
ES2445705T3 (en) | Coating device to seal storage tanks of solid or liquid products | |
ES2207994B1 (en) | POLIDIMENSIONABLE AND / OR EXPANDABLE CONTAINER UNIT APPLICABLE AS ACCOMMODATION OF TELECOMMUNICATIONS OR SIMILAR EQUIPMENT. | |
ES2297076T3 (en) | KIT FOR THE CONSTRUCTION OF CELOSIA TYPE STRUCTURES. | |
ES2622416T3 (en) | Overflow gutter system for a tank | |
ES2681997B1 (en) | Removable base for joining profile beams H with wooden piles of circular section | |
CN211369343U (en) | Entrance wall major structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EC2A | Search report published |
Date of ref document: 20070101 Kind code of ref document: A1 |
|
FG2A | Definitive protection |
Ref document number: 2264597B1 Country of ref document: ES |
|
FD2A | Announcement of lapse in spain |
Effective date: 20180809 |