ES2012490B3 - Procedimiento para obras de construccion bajo vias ferreas en explotacion. - Google Patents
Procedimiento para obras de construccion bajo vias ferreas en explotacion.Info
- Publication number
- ES2012490B3 ES2012490B3 ES87400959T ES87400959T ES2012490B3 ES 2012490 B3 ES2012490 B3 ES 2012490B3 ES 87400959 T ES87400959 T ES 87400959T ES 87400959 T ES87400959 T ES 87400959T ES 2012490 B3 ES2012490 B3 ES 2012490B3
- Authority
- ES
- Spain
- Prior art keywords
- procedure
- under operating
- works under
- construction works
- railways
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Road Paving Structures (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8606694A FR2593549B1 (fr) | 1986-05-09 | 1986-05-09 | Procede pour la construction d'ouvrages sous des voies ferrees en exploitation et dispositif pour la mise en oeuvre de ce procede |
FR8614098A FR2591275B2 (fr) | 1986-05-09 | 1986-10-10 | Procede pour la construction d'ouvrages sous des voies ferrees en exploitation et dispositif pour la mise en oeuvre de ce procede |
FR8614099A FR2591276B2 (fr) | 1986-05-09 | 1986-10-10 | Procede pour la construction d'ouvrages sous des voies ferrees en exploitation et dispositif pour la mise en oeuvre de ce procede |
Publications (1)
Publication Number | Publication Date |
---|---|
ES2012490B3 true ES2012490B3 (es) | 1990-04-01 |
Family
ID=27251366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES87400959T Expired - Lifetime ES2012490B3 (es) | 1986-05-09 | 1987-04-24 | Procedimiento para obras de construccion bajo vias ferreas en explotacion. |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0245155B1 (de) |
DE (1) | DE3761319D1 (de) |
ES (1) | ES2012490B3 (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2262445A1 (es) * | 2006-03-13 | 2006-11-16 | Petrucco S.A. | Elemento de cajon hincado. |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2651813B1 (fr) * | 1989-09-14 | 1992-11-06 | Beauthier Jean Marie | Procede pour la construction d'ouvrages, notamment de passages sous une voie ferree. |
FR2653144B1 (fr) * | 1989-10-17 | 1994-05-06 | Bertrand Claude | Procede pour la construction d'ouvrages d'art sous les voies ferrees en exploitation. |
GB8927648D0 (en) * | 1989-12-07 | 1990-02-07 | Aeb Jacked Structures Ltd | Improvements in and relating to forming a passageway through the ground |
IT1255694B (it) * | 1992-09-29 | 1995-11-10 | Struttura provvisoria per il sostegno di binari ferroviari | |
FR2699594B1 (fr) * | 1992-12-17 | 1995-02-03 | Beauthier Jean Marie | Procédé pour la réalisation d'un passage transversal sous une voie ferrée ou une chaussée. |
FR2701734B1 (fr) | 1993-02-19 | 1995-04-07 | Beauthier Jean Marie | Procédé pour la construction d'ouvrages sous un talus de supprt d'une voie ferrée ou analogue. |
KR100463715B1 (ko) * | 2002-03-18 | 2004-12-29 | 한 성 육 | 비개착식 선로 횡단 지하통로 구축장치와 이를 이용한노선 횡단 지하통로 시공방법 |
EP1820934A1 (de) * | 2006-02-17 | 2007-08-22 | Aix Research Limited | Methode und System zur Erstellung eines Tunnels unter einer Bahn |
PT2282007E (pt) * | 2006-05-29 | 2014-09-29 | Petrucco S A | Disposição de suporte |
FR3002955B1 (fr) * | 2013-03-07 | 2016-09-09 | Soc Nat Des Chemins De Fer Francais Sncf | Raidisseur pour voie ferree et procede de fabrication d'un tel raidisseur |
CN108442933B (zh) * | 2018-03-02 | 2020-11-24 | 中铁十二局集团有限公司 | 盾构始发基座和盾构始发方法 |
CN108867664B (zh) * | 2018-09-04 | 2023-09-15 | 临沂大学 | 一种基于逆作法的路改桥段基坑支护结构及其施工方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1101479B (de) * | 1959-09-23 | 1961-03-09 | Gruen & Bilfinger Ag | Verfahren zum Herstellen eines Tunnels oder Stollens durch Vortrieb eines im Erdreich verbleibenden Tunnelrohres |
US3372553A (en) * | 1964-05-12 | 1968-03-12 | Nii Osnovany I Padzemnykh Soor | Unit for driving tunnels in loose ground |
CH434335A (fr) * | 1966-04-06 | 1967-04-30 | Reymond Fritz | Procédé de construction d'un passage sous voie et installation pour la mise en oeuvre de ce procédé |
FR1586544A (de) * | 1968-10-23 | 1970-02-20 | ||
DE2219567A1 (de) * | 1972-04-21 | 1973-10-31 | Held & Francke Bau Ag | Verfahren zum nachtraeglichen einbau eines unterfuehrungsbauwerkes |
GB1463632A (en) * | 1975-01-10 | 1977-02-02 | Genton J C | Method of positioning and underpass below another roadway by hydraulic drive-through and the constructive work obtained thereby |
DE2546491C2 (de) * | 1975-10-17 | 1977-10-13 | Weiss, Richard, 4130 Moers | Verfahren und Vorrichtung zum Begradigen von nach dem Vorpreßverfahren hergestellten Stollen und Kanälen |
FR2337248A1 (fr) * | 1975-12-29 | 1977-07-29 | Gaillard Rene | Structure de penetration pour la construction d'un tunnel |
FR2354444A1 (fr) * | 1976-06-11 | 1978-01-06 | Gaillard Rene | Structure de penetration pour la construction d'un tunnel par poussage |
GB2101177A (en) * | 1981-06-25 | 1983-01-12 | Tung Hsing Long Construction C | Method of constructing underpass across railway and highway without affecting normal traffic thereof |
-
1987
- 1987-04-24 ES ES87400959T patent/ES2012490B3/es not_active Expired - Lifetime
- 1987-04-24 EP EP87400959A patent/EP0245155B1/de not_active Expired - Lifetime
- 1987-04-24 DE DE8787400959T patent/DE3761319D1/de not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2262445A1 (es) * | 2006-03-13 | 2006-11-16 | Petrucco S.A. | Elemento de cajon hincado. |
Also Published As
Publication number | Publication date |
---|---|
EP0245155B1 (de) | 1990-01-03 |
DE3761319D1 (de) | 1990-02-08 |
EP0245155A1 (de) | 1987-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES540597A0 (es) | Procedimiento para la obtencion de piridonas. | |
ES557642A0 (es) | Procedimiento para la obtencion de amidas de acidos benzoheterociclilalcanoicos. | |
ES556550A0 (es) | Un procedimiento para la preparacion de androsta -1-4-dien-3,17-dionas. | |
ES532004A0 (es) | Procedimiento de conversion de hidrocarburos. | |
ES2032299T3 (es) | Procedimiento para obtener derivados de metil-penicilina 3-beta-sustituida. | |
ES2007557B3 (es) | Procedimiento para la preparacion de (2,2)- paraciclofano. | |
ES2012490B3 (es) | Procedimiento para obras de construccion bajo vias ferreas en explotacion. | |
ES555839A0 (es) | Procedimiento para la obtencion de quinoloncarboxilatos. | |
ES2000251B3 (es) | Equipo desodorizador para equipos traumatologicos. | |
DE3772871D1 (de) | Bahnformierungsanlage. | |
ES532240A0 (es) | Procedimiento para la obtencion de benzoil-ureas. | |
ES2019385B3 (es) | Acoplador para osteotomia. | |
ES557525A0 (es) | Un procedimiento mejorado para preparar poliarilen-polieteres. | |
ES2021690B3 (es) | Procedimiento para la fabricacion de hidroxido de cobre. | |
ES556208A0 (es) | Un procedimiento para la preparacion de benzimidazoles. | |
ES2016964B3 (es) | Procedimiento para la preparacion de bitumen. | |
ES544459A0 (es) | Procedimiento para la obtencion de benzo -c- -1,8-naftiridi-nas | |
ES549429A0 (es) | Procedimiento para la obtencion de acemetacina. | |
ES2018532B3 (es) | Procedimiento para la preparacion de compuestos carbonilicos. | |
MX12003A (es) | Procedimiento para la preparacion de composicionesherbicidas. | |
ES531766A0 (es) | Procedimiento para la obtencion de benzofuranonas. | |
ES553523A0 (es) | Procedimiento para la obtencion de la n-fosfonometilglicina. | |
ES532239A0 (es) | Procedimiento para la obtencion de la 1-amino-3-2-diamino-metilen-amino-4-tiazolil-metil-tio-propiliden-sulfamida. | |
ES552099A0 (es) | Un procedimiento para la preparacion de piridazino (4,5-b)indoles | |
ES553402A0 (es) | Procedimiento para la obtencion de benzo-furanos 7-sustituidos con estructuras 1,4-dihidropiridinicas |