EP4635893A1 - Verfahren zur sicherheitssteuerung vor ort für turmkran, steuerung und computervorrichtung - Google Patents

Verfahren zur sicherheitssteuerung vor ort für turmkran, steuerung und computervorrichtung

Info

Publication number
EP4635893A1
EP4635893A1 EP23906054.4A EP23906054A EP4635893A1 EP 4635893 A1 EP4635893 A1 EP 4635893A1 EP 23906054 A EP23906054 A EP 23906054A EP 4635893 A1 EP4635893 A1 EP 4635893A1
Authority
EP
European Patent Office
Prior art keywords
maximum allowable
hook
tower crane
current
axial space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP23906054.4A
Other languages
English (en)
French (fr)
Other versions
EP4635893A4 (de
Inventor
Zhouyin LIU
Ping Zhao
Xugang CHENG
Xingwang LI
Baojun HAO
Xiaojia YUAN
Hailiang TENG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyland Technology Co Ltd
Original Assignee
Kyland Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyland Technology Co Ltd filed Critical Kyland Technology Co Ltd
Publication of EP4635893A1 publication Critical patent/EP4635893A1/de
Publication of EP4635893A4 publication Critical patent/EP4635893A4/de
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/46Position indicators for suspended loads or for crane elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/48Automatic control of crane drives for producing a single or repeated working cycle; Program control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • B66C23/90Devices for indicating or limiting lifting moment
    • B66C23/905Devices for indicating or limiting lifting moment electrical

Definitions

  • the present disclosure relates to the field of intelligent control, and more particularly, to an on-site safety control method for a tower crane, a controller, and a computing device.
  • each axis of the tower crane is driven according to a planned trajectory, to drive the hook to move.
  • each axis of the tower crane complies with kinematics constraints to ensure safety of the tower crane.
  • the kinematic constraints are not obtained according to the actual weight and the actual position of the tower crane. Rather, the maximum speed of each axis remains the same regardless of different hoisting weights and positions, which is obviously unreasonable. A large hoisting weight may lead to mechanical safety hazards at some positions, damaging an axle mechanism or a motor of the tower crane.
  • each axis of the tower crane is driven according to a predetermined trajectory, to drive the hook to move, and obstacles are avoided in time during the movement to ensure safety of the tower crane on the moving trajectory.
  • the maximum movement speed of each axis under specific weights and positions is not taken into account.
  • the large hoisting weight may lead to mechanical safety hazards at some positions, damaging the axle mechanism or the motor of the tower crane.
  • an embodiment of the present disclosure provides an on-site safety control method for a tower crane, a controller, and a computing device.
  • a current maximum allowable speed in each axis direction is obtained based on the hoisting weight and the current luffing length, to control a speed in each axis not to exceed a maximum speed of the axis in the next control cycle, so as to ensure safe movement of the tower crane.
  • an on-site safety control method for a tower crane includes: controlling a hook to move in an axial space according to planned path points, where the hook is controlled to move between every two adjacent planned path points through a plurality of control cycles, where a coordinate in a luffing axis direction is represented by a luffing length; obtaining a current maximum allowable speed of the hook in each direction of the axial space, based on a current luffing length, a hoisting weight, and a working parameter of the tower crane; and obtaining coordinates of an arrival position and a target speed of the tower crane in the axial space in a next control cycle, based on the current coordinates and a current speed of the hook in the axial space, the current maximum allowable speed, and coordinates of an un-reached planned path point of the hook.
  • the current maximum allowable speed in each axis direction is obtained based on the hoisting weight and the current luffing length, to control the speed on each axis not to exceed the maximum speed of the axis in the next control cycle, which can realize safe movement of the tower crane.
  • the obtaining the current maximum allowable speed of the hook in each direction of the axial space, based on the current luffing length, the hoisting weight, and the working gear of the tower crane includes: obtaining a current maximum allowable hoisting weight and a maximum allowable working torque in the luffing axis direction, based on the current luffing length; calculating a current weight ratio and a current torque ratio, the weight ratio being a ratio of the hoisting weight to the maximum allowable hoisting weight, and the torque ratio being a ratio of a working torque of the tower crane in the luffing axis direction to the maximum allowable working torque; and obtaining the current maximum allowable speed of the hook in each direction of the axial space, based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio.
  • the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction are obtained by using the tower crane based on the current luffing length, and the current maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane, the ratio of the current hoisting weight to the maximum allowable hoisting weight, and the ratio of the current working torque in the luffing axis direction to the maximum allowable working torque.
  • the maximum allowable speed is more accurate, further improving movement safety of the tower crane.
  • the obtaining the current maximum allowable speed of the hook in each direction of the axial space, based on the working parameter of the tower crane and the at least one of the weight ratio and the torque ratio includes at least one of: obtaining a first maximum allowable speed of the hook in each direction of the axial space based on the weight ratio and a working gear of the tower crane, and determining, for each direction of the axial space, the first maximum allowable speed in the direction as the maximum allowable speed in the direction; obtaining a second maximum allowable speed of the hook in each direction of the axial space based on the torque ratio and the working gear, and determining, for each direction of the axial space, the second maximum allowable speed in the direction as the maximum allowable speed in the direction; and determining, for each direction of the axial space, a smaller one of the first maximum allowable speed in the direction and the second maximum allowable speed in the direction as the maximum allowable speed in the direction.
  • the current first maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane, and the ratio of the current hoisting weight to the maximum allowable hoisting weight, the current second maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane and the ratio of the current working torque in the luffing axis direction to the maximum allowable working torque, and then the smaller one is determined as the maximum allowable speed, to further improve the movement safety of the tower crane.
  • the obtaining the current maximum allowable speed of the hook in each direction of the axial space, based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio further includes: for each direction of the axial space, obtaining a third maximum allowable speed of the hook in the direction, based on the working gear and at least one of a position limit and a deceleration limit of the tower crane in the direction of the axial space, where the working parameter further includes at least one of the position limit and the deceleration limit; and determining a smaller one of the third maximum allowable speed of the hook in the direction and the maximum allowable speed in the direction as the maximum allowable speed in the direction.
  • the position limit and/or deceleration limit of the tower crane are used to correct the maximum allowable speed, further improving the movement safety of the tower crane.
  • the obtaining the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction, based on the current luffing length includes: obtaining the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction, based on the current luffing length and by using a first curve group of the tower crane, where the first curve group includes relationships between allowable hoisting weights of the tower crane and luffing lengths at different tower crane reeving.
  • the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction are obtained based on the relationships between the allowable hoisting weights of the tower crane and the luffing lengths at different tower crane reeving, to further improve the movement safety of the tower crane.
  • the obtaining the first maximum allowable speed of the hook in each direction of the axial space based on the weight ratio and the working gear of the tower crane includes: obtaining the first maximum allowable speed of the hook in each direction of the axial space based on the weight ratio and the working gear of the tower crane and by using a second curve group, where the second curve group includes relationship curves between maximum allowable speed limits of the hook in each direction of the axial space and the weight ratio at respective working gears of the tower crane.
  • the first maximum allowable speed is obtained based on the relationship curve between the maximum allowable speed limit of the hook in each direction of the axial space and the weight ratio at each working gear of the tower crane, further improving the movement safety of the tower crane.
  • the obtaining the second maximum allowable speed of the hook in each direction of the axial space based on the torque ratio and the working gear includes: obtaining, the second maximum allowable speed of the hook in each direction of the axial space based on the torque ratio and the working gear and by using a third curve group, where the third curve group includes relationship curves between maximum allowable speeds of the hook in each direction of the axial space and the torque ratio at respective working gears of the tower crane.
  • the second maximum allowable speed is obtained based on the relationship curve between maximum allowable speed of the hook in each direction of the axial space and the torque ratio at each working gear of the tower crane, further improving the movement safety of the tower crane.
  • the method further includes: stopping movement of the tower crane and outputting a planned path abnormality signal when the current torque ratio is greater than a rated torque.
  • the axial space further has a hoisting direction and a slewing direction.
  • the obtaining current coordinates of the hook in the axial space in each control cycle includes: obtaining the current coordinates of the hook in the axial space in each control cycle by an encoder on each axis of the tower crane.
  • the method further includes obtaining the hoisting weight by a weight sensor after the tower crane hoists the hook.
  • the current maximum allowable speed in each axis direction is obtained based on the hoisting weight and the current luffing length, to control the speed on each axis not to exceed the maximum speed of the axis in the next control cycle, which can realize safe movement of the tower crane.
  • the safety control module is configured to: obtain a current maximum allowable hoisting weight and a maximum allowable working torque in the luffing axis direction, based on the current luffing length; calculate a current weight ratio and a current torque ratio, the weight ratio being a ratio of the current hoisting weight to the maximum allowable hoisting weight, and the torque ratio being a ratio of a working torque of the tower crane in the luffing axis direction to the maximum allowable working torque; and obtain the current maximum allowable speed of the hook in each direction of the axial space, based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio.
  • the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction are obtained by using the tower crane based on the current luffing length, and the current maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane, the ratio of the current hoisting weight to the maximum allowable hoisting weight, and the ratio of the current working torque in the luffing axis direction to the maximum allowable working torque.
  • the maximum allowable speed is more accurate, further improving movement safety of the tower crane.
  • the current first maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane, and the ratio of the current hoisting weight to the maximum allowable hoisting weight, the current second maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane and the ratio of the current working torque in the luffing axis direction to the maximum allowable working torque, and then the smaller one is determined as the maximum allowable speed, to further improve the movement safety of the tower crane.
  • the safety control module being configured to obtain the current maximum allowable speed of the hook in each direction of the axial space, based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio further includes: the safety control module being configured to, for each direction of the axial space, obtain a third maximum allowable speed of the hook in the direction, based on the working gear and at least one of a position limit and a deceleration limit of the tower crane in the direction of the axial space, where the working parameter further includes at least one of the position limit and the deceleration limit; and determining a smaller one of the third maximum allowable speed of the hook in the direction and the maximum allowable speed in the direction as the maximum allowable speed in the direction.
  • the position limit and/or deceleration limit of the tower crane are used to correct the maximum allowable speed, further improving the movement safety of the tower crane.
  • the tower crane controller further includes a process control module configured to stop movement of the tower crane and output a planned path abnormality signal when the current working torque ratio is greater than the rated torque.
  • the safety control module being configured to obtain the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction, based on the current luffing length includes: the safety control module being configured to obtain the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction, based on the current luffing length and by using a first curve group of the tower crane, where the first curve group includes relationships between allowable hoisting weights of the tower crane and luffing lengths at different tower crane reeving.
  • the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction are obtained according to the relationships between the allowable hoisting weights of the tower crane and the luffing lengths at different tower crane reeving, to further improve the movement safety of the tower crane.
  • the first maximum allowable speed is obtained based on the relationship curves between maximum allowable speed limits of the hook in each direction of the axial space and the weight ratio at each working gear of the tower crane, further improving the movement safety of the tower crane.
  • the second maximum allowable speed is obtained based on the relationship curves between maximum allowable speeds of the hook in each direction of the axial space and the torque ratio at each working gear of the tower crane, further improving the movement safety of the tower crane.
  • the axial space of the hook further has a hoisting direction and a slewing direction.
  • the data obtaining module is configured to obtain, in each control cycle, the current coordinates of the hook in the axial space by using an encoder on each axis of the tower crane.
  • the data obtaining module is further configured to obtain the hoisting weight by using a weight sensor after the tower crane hoists the hook.
  • the actual hoisting weight is obtained by using the weight sensor, resulting in more accurate safety control for the tower crane.
  • a computing device in a third aspect, includes: a bus; a communication interface connected to the bus; at least one processor connected to the bus; and at least one memory connected to the bus and storing program instructions.
  • the program instructions when executed by the at least one processor, cause the at least one processor to implement the method according to any of the embodiments of the first aspect of the present disclosure.
  • a computer-readable storage medium is provided according to the embodiment of the present disclosure.
  • the computer-readable storage medium has program instructions stored thereon.
  • the program instructions when executed by a computer, cause the computer to implement the method according to any of the embodiments of the first aspect of the present disclosure.
  • first/second/third or a module A, a module B, a module C mentioned in the embodiments of the present disclosure are used only to distinguish between similar objects or different embodiments, rather than implying a particular sequence of the objects. It should be understood that the terms “first/second/third” may be interchanged in a particular order or sequence where permitted, to enable the embodiments of the present disclosure described herein to be implemented in an order other than that illustrated or described herein.
  • references numerals denoting steps such as S110, S 120, etc., do not necessarily mean that the steps must be performed in that specific order.
  • the sequence of steps may be interchanged or the steps may be executed simultaneously, where permitted.
  • an on-site safety control method for a tower crane, a controller, and a computing device includes: controlling a hook to move in an axial space according to planned path points, where the hook is controlled to move between every two adjacent planned path points through a plurality of control cycles; obtaining, in each of the plurality of control cycles, current coordinates of the hook in the axial space; obtaining a current maximum allowable speed of the hook in each direction of the axial space, based on a current luffing length, a hoisting weight, and a working parameter of the tower crane; and obtaining coordinates of an arrival position and a target speed of the tower crane in the axial space in a next control cycle, based on the current coordinates and a current speed of the hook in the axial space, the current maximum allowable speed of the hook, and a next planned path point of the hook.
  • a current maximum allowable speed of the hook in each axis direction is obtained based on the hoisting weight and the current luffing length, to control a speed of the hook in each axis not to exceed the maximum allowable speed in the axis in the next control cycle, so as to ensure safe movement of the tower crane.
  • a tower crane system which includes a tower crane and a tower crane controller.
  • the tower crane includes several axes, for example, a luffing axis, a hoisting axis, and a slewing axis.
  • An encoder is mounted at each axis for recording a position of each axis, i.e. coordinates in the axial space.
  • the tower crane further includes a weight sensor for sensing a hoisting weight.
  • the working parameter of the tower crane includes a working gear, and a position limit and a deceleration limit on each axis.
  • the working gear includes five gears.
  • the position limit includes: an outer luffing stop limit and an inner luffing stop limit for the luffing axis, which are a maximum luffing length and a minimum luffing length, respectively; an upper hoisting stop limit and a lower hoisting stop limit of the hoisting axis, which are a maximum value and a minimum value of a hoisting height, respectively; and a left slewing stop limit and a right slewing stop limit of the slewing axis, which are a maximum leftward slewing angle and a maximum rightward slewing angle, respectively.
  • the deceleration limit includes: an outer luffing deceleration limit and an inner luffing deceleration limit of the luffing axis, which are an outer luffing length and an inner luffing length at which outward and inward movement must begin to decelerate in the luffing axis direction, respectively; an upper hoisting deceleration limit and a lower hoisting deceleration limit of the hoisting axis are hoisting heights at which deceleration must occur during upward and downward movement, respectively; a left slewing deceleration limit and a right slewing deceleration limit for the slewing axis are slewing angles at which the slewing must begin to decelerate in a leftward direction and a rightward direction, respectively.
  • a first embodiment of an on-site safety control method for a tower crane according to the present disclosure will be described below with reference to FIG. 1 .
  • the first embodiment of the on-site safety control method for the tower crane is performed in a tower crane controller.
  • the method includes: controlling a hook to move in an axial space according to planned path points, where the hook is controlled to move between every two adjacent planned path points through a plurality of control cycles; obtaining, in each of the plurality of control cycles, current coordinates of the hook in the axial space; obtaining a current maximum allowable speed of the hook in each direction of the axial space based on a current luffing length, a hoisting weight, and a working parameter of the tower crane; and obtaining coordinates of an arrival position and a target speed of the tower crane in the axial space in a next control cycle, based on the current coordinates and the current speed of the hook in the axial space, the current maximum allowable speed of the hook, and the next planned path point of the hook.
  • the current maximum allowable speed in each axis direction is obtained based on the hoisting weight and the current luffing length, to control the speed in each axis not to exceed the maximum allowable speed in the axis in the next control cycle, so as to ensure safe movement of the tower crane.
  • FIG. 1 shows a flowchart of a first embodiment of an on-site safety control method for a tower crane, including following steps S110 to S140.
  • an axis of a tower crane is controlled to move in an axial space according to planned path points.
  • the planned path points are key point between a hook-hoisting point and a hook-dropping point of the hook.
  • the hook is controlled to move between every two adj acent planned path points through a plurality of control cycles.
  • Coordinates of the planned path points which are obtained from another module of the tower crane, are coordinates in the axial space of the tower crane. If the obtained coordinates are coordinates in Cartesian space, the coordinates are converted into coordinates in the axial space of the tower crane through kinematic inverse solution.
  • the position is represented by coordinates in the axial space of the tower crane, which includes at least a coordinate in a luffing axis direction.
  • the coordinate in the luffing axis direction is represented by the luffing length.
  • the coordinates in the axial space of the tower crane further include a coordinate in a hoisting axis direction represented by a hoisting height, and a coordinate in a slewing axis direction represented by a slewing angle.
  • the current position of the hook in the axial space is obtained in real time through an encoder mounted on each axis of the tower crane.
  • the hoisting weight is obtained by a weight sensor after the tower crane hoists the hook.
  • the working parameter of the tower crane includes at least a working gear of the tower crane.
  • a current maximum allowable hoisting weight and a maximum allowable working torque in the luffing axis direction are obtained based on the current luffing length; a current weight ratio and a current torque ratio are calculated, where the weight ratio is a ratio of the hoisting weight to the current maximum allowable hoisting weight, and the torque ratio is a ratio of a working torque of the tower crane in the luffing axis direction to the current maximum allowable working torque; and the current maximum allowable speed of the hook in each direction of the axial space is obtained based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio.
  • the working parameter of the tower crane further includes at least one of: a position limit and a deceleration limit of the tower crane in each direction of the axial space.
  • a third maximum allowable speed of the hook in the direction is further obtained based on the working gear of the tower crane and one of the position limit and the deceleration limit of the tower crane in the direction of the axial space, the maximum allowable speed in the direction is adjusted based on the third maximum allowable speed of the hook in the direction, where the adjusted maximum allowable speed of the hook in the direction is a smaller one of the maximum allowable speed in the direction before adjustment and the third maximum allowable speed in the direction.
  • the obtaining the current maximum allowable speed of the hook in each direction of the axial space based on the working parameter of the tower crane and at least one of the weight ratio and the torque ratio includes the following three possible embodiments.
  • a target position and a target speed to be reached by the hook in the axial space in a next control cycle are obtained, based on the current position and a current speed of the hook in the axial space, the current maximum allowable speeds of the hook in three directions of the axial space, and coordinates of an un-reached planned path point of the hook.
  • step S130 planning is performed while the tower crane is in motion to determine the target position and the target speed in each axis to be reached in the next control cycle. During movement from the current position to the target position for the next control cycle, the tower crane's speed does not exceed the maximum speed obtained in step S130, to ensure safe operation of the tower crane.
  • This step may be performed through a trajectory planning algorithm.
  • all un-reached planned path points are selected to participate in the calculation.
  • a number of planned path points closest in time are selected to participate in the calculation to reduce the calculation volume.
  • a second embodiment of the on-site safety control method for the tower crane according to the present disclosure will be described below with reference to FIG. 2 .
  • the maximum allowable speed obtained based on the hoisting weight, the working torque, and the position limit and the deceleration limit for each axis improves the safety.
  • the second embodiment of the on-site safety control method for the tower crane is performed in the tower crane controller, and is a more detailed implementation of the first embodiment of the on-site safety control method for the tower crane.
  • a current first maximum allowable speed of the tower crane is obtained based on the working gear and a ratio of the current hoisting weight to a current maximum allowable hoisting weight
  • a current second maximum allowable speed of the tower crane is obtained based on the working gear and a ratio of a current working torque to a current maximum allowable working torque
  • a third maximum allowable speed of the tower crane on each axis is obtained based on the working gear of the tower crane, and the position limit and the deceleration limit for each axis.
  • a smallest one of the first maximum allowable speed, the current second maximum allowable speed, and the third maximum allowable speed for each axis is determined as the current maximum allowable speed in the direction, in such a manner that the speed of the tower crane is controlled not to exceed the maximum allowable speed in the next control cycle, realizing the safe movement of the tower crane.
  • the working indication signal includes: an abnormality signal indicating that the tower crane is working abnormally and the tower crane needs to stop; an abnormality ID indicating a cause for the abnormality; a completion signal indicating whether the hook has reached the hook-dropping point; a working signal indicating that the hook is to move in the next control cycle.
  • FIG. 2 shows a flowchart of a second embodiment of an on-site safety control method for a tower crane, including following steps S210 to S310.
  • the working parameter shown in Table 1 includes a factory parameter (the reeving, the rated torque) of the tower crane and the set working gear, the set position limit, and the set deceleration limit.
  • the hoisting weight is obtained by the weight sensor after the tower crane hoists the hook, and is maintained during subsequent movement of the hook.
  • the planned path is obtained from a planning module, and is represented by the planned hoisting point array, the planned luffing point array, and the planned slewing point array shown in Table 1.
  • the axis of the tower crane is controlled to move according to coordinates of the planned path points in the axial space.
  • the hook is controlled to move between every two adjacent planned path points through the plurality of control cycles.
  • a position reached in each control cycle includes not only the adjacent planned path points, but also an intermediate position between the adjacent planned path points.
  • the control cycle is a working cycle of the tower crane.
  • the current position of the hook of the axial space is obtained by the encoder at each control cycle, and the current working torque is calculated.
  • the position coordinates in the axial space include the luffing length, the hoisting height, and the slewing angle.
  • the working torque is a product of the hoisting weight and the luffing length.
  • step S240 it is determined whether the current working torque exceeds the rated torque. If the current working torque does not exceed the rated torque, step S250 is executed, otherwise step S310 is executed.
  • the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction are obtained based on the luffing length and the reeving of the tower crane by using a first curve group.
  • the first curve group includes relationship curves between maximum allowable hoisting weights and luffing lengths at different reeving, which are determined by characteristics of the tower crane and derived from the tower crane's factory settings.
  • Table 3 shows a relationship between the maximum allowable hoisting weight and the luffing length at different magnifications in tabular form, where R represents reeving, RHW represents rated hoisting weight, LL represents luffing length, MAHW represents maximum allowable hoisting weight, MAWT represents maximum allowable working torque.
  • the maximum allowable working torque is a product of the maximum allowable hoisting weight and the luffing length. In practical scenarios, a range and an interval of the luffing length can be set as desired.
  • the current maximum allowable speed of the hook in each of three directions of the axial space is obtained based on the hoisting weight, the current maximum allowable hoisting weight, the maximum allowable working torque, and the working parameter.
  • Step S260 includes the following four sub-steps.
  • the weight ratio is the ratio of the current hoisting weight to the maximum allowable hoisting weight.
  • the second curve group includes relationship curves between the first maximum allowable speed of the hook in each of the three directions of the axial space and the weight ratio under each working gear.
  • Each relationship curve is derived from the tower crane's factory settings. There are 15 second curves for the five working gears. Each second curve corresponds to a combination of one working gear and one direction of the axial space.
  • the torque ratio is the ratio of the current working torque in the luffing axis direction to the maximum allowable working torque.
  • the third maximum allowable speed in an outward luffing direction and an inward luffing direction of the luffing axis is obtained based on the outer luffing stop limit, the inner luffing stop limit, the outer luffing deceleration limit, the inner luffing deceleration limit for the luffing axis, and the working gear of the tower crane.
  • the third maximum allowable speed in a leftward slewing direction and a rightward slewing direction of the slewing axis is obtained based on the left slewing stop limit, the right slewing stop limit, the left slewing deceleration limit, the right slewing deceleration limit on the slewing axis, and the working gear of the tower crane.
  • Step (3) may be executed once during entire movement of the tower crane, and the obtained third maximum allowable speeds may be reused in subsequent control cycles.
  • Various third maximum allowable speeds obtained in step (3) are derived from the tower crane's factory settings.
  • the third maximum allowable speeds under different working gears, the position limit, and the deceleration limit are presented in the tabular form.
  • Table 4 shows a direction in which the third maximum allowable speed exists when the working parameter is set to various values. Numbers in each cell corresponding to each position limit and deceleration limit are an example, not the real third maximum allowable speed.
  • the maximum allowable speed of the hook is restricted to the third maximum allowable speed in the corresponding direction in cells with a black background.
  • the maximum allowable speed of the hook in each of the three directions of the axial space is obtained based on the first maximum allowable speed, the second maximum allowable speed, and the third maximum allowable speed.
  • the maximum allowable speed of the hook in the direction of the axial space is the smallest one of the first maximum allowable speed, the second maximum allowable speed, and the third maximum allowable speed in the direction.
  • the first maximum allowable speed corresponding to the second curve group and the second maximum allowable speed corresponding to the third curve group are tabulated.
  • Table 5 shows the first maximum allowable speed under combinations of different working gears and different weight ratios, as well as the second maximum allowable speed under combinations of different working gears and different torque ratios.
  • the numbers in each cell corresponding to one combination is an example, not the real first maximum allowable speed or the real second maximum allowable speed.
  • the maximum allowable speed of the hook is restricted to the first maximum allowable speed or the second maximum allowable speed limits in the corresponding direction in cells with a black background,.
  • the target position and the target speed to be reached in the next control cycle are obtained based on the current position and the current speed of the hook in the axial space, a to-be-reached planned path point, and the maximum allowable speeds of the hook in the three directions of the axial space.
  • the target position and the target speed obtained in this step are input to corresponding positions in Table 2.
  • the tower crane is driven to move according to the obtained target position and the obtained target speed.
  • step S290 it is whether the hook-dropping point is reached. If the hook-dropping point is not reached, step S230 is performed. If the hook-dropping point is reached, step S300 is executed.
  • the current first maximum allowable speed of the tower crane is obtained based on the working gear and the ratio of the current hoisting weight to the current maximum allowable hoisting weigh
  • the current second maximum allowable speed of the tower crane is obtained based on the working gear and the ratio of the current working torque to the current maximum allowable working torque
  • the third maximum allowable speed of the tower crane on each axis is obtained based on the working gear of the tower crane, and the position limit and the deceleration limit of each axis.
  • the smallest one among the third maximum allowable speed, the current first maximum allowable speed, and the current second maximum allowable speed for each axis is determined as the current maximum allowable speed in the direction, in such a manner that the speed of the tower crane is controlled not to exceed the maximum allowable speed in the next control cycle, realizing the safe movement of the tower crane.
  • the second embodiment of the on-site safety control method for the tower crane by obtaining the maximum allowable speed based on the hoisting weight, the working torque, and the position limit and the deceleration limit of each axis, working safety of the tower crane can be improved.
  • a first embodiment of a tower crane controller of the present disclosure is described below with reference to FIG. 3 .
  • the first embodiment of a tower crane controller implements the first embodiment of the on-site safety control method for the tower crane and has all the advantages of the first embodiment of the on-site safety control method for the tower crane.
  • FIG. 3 shows a structure of the first embodiment of a tower crane controller.
  • the structure includes a motion control module 310, a data obtaining module 320, a safety control module 330, and a trajectory control module 340.
  • the motion control module 310 is configured to control an axis of a tower crane to move in an axial space according to planned path points. Reference can be made to the step S110 of the first embodiment of the on-site safety control method for the tower crane for the principle and the advantages thereof.
  • the data obtaining module 320 is configured to obtain the current position of the hook in the axial space in each control cycle. Reference can be made to the step S120 of the first embodiment of the on-site safety control method for the tower crane for the principle and the advantages thereof.
  • the safety control module 330 is configured to obtain current maximum allowable speeds of the hook in three directions of the axial space according to the current luffing length, the hoisting weight, and the working parameter of the tower crane. Reference can be made to the step S130 of the first embodiment of the on-site safety control method for the tower crane for the principle and the advantages thereof.
  • the trajectory control module 340 is configured to obtain an arrival position and a target speed to be reached by the tower crane in the axial space in the next control cycle based on the current position and the current speed of the hook in the axial space, the maximum allowable speeds of the hook in three directions in the axial space, and coordinates of an un-reached planned path point of the hook.
  • a second embodiment of a tower crane controller of the present disclosure is described below with reference to FIG. 4 .
  • the second embodiment of the tower crane controller implements the second embodiment of the on-site safety control method for the tower crane and has all the advantages of the second embodiment of the on-site safety control method for the tower crane.
  • FIG. 3 shows a structure of the second embodiment of the tower crane controller.
  • the structure includes a data obtaining module 410, a motion control module 420, a safety control module 430, a trajectory control module 440, and a process control module 450.
  • the data obtaining module 410 is configured to obtain the working parameter, the planned path, and the hoisting weight of the tower crane, which are filled in the corresponding table entries of the input parameter table shown in Table 1, and is further configured to obtain a current position of the hook in the axial space by using the encoder in each control cycle, and calculate the current working torque.
  • the motion control module 420 is configured to control an axis of the tower crane to move based on coordinates of planned path points in an axial space.
  • the motion control module 420 is further configured to drive the tower crane to move according to the obtained target position and the obtained target speed when the target position and the target speed for the next control cycle are obtained.
  • the safety control module 430 is configured to obtain the current maximum allowable hoisting weight and the maximum allowable working torque in the luffing axis direction by using the first curve group based on the luffing length and reeving of the tower crane.
  • the safety control module 430 is further configured to obtain the current maximum allowable speeds of the hook in three directions of the axial space based on the hoisting weight, the current maximum allowable hoisting weight, the maximum allowable working torque, and the working parameter.
  • the trajectory control module 440 is configured to obtain a target position and a target speed to be reached in the next control cycle based on the current position and the current speed of the hook in the axial space, a to-be-reached planned path point, and the current maximum allowable speeds of the hook in three directions of the axial space.
  • the process control module 450 is configured to determine whether the current working torque exceeds a rated torque.
  • the process control module 450 is further configured to determine whether the hook-dropping point is reached.
  • the process control module 450 is further configured to stop the movement of the tower crane when the tower crane reaches the hook-dropping point.
  • the process control module 450 is further configured to stop the movement of the tower crane when the current working torque exceeds the rated torque and output an abnormality signal.
  • a computing device is further provided according to an embodiment of the present disclosure, which is described in detail in FIG. 5 below.
  • the computing device 500 includes a processor 510, a memory 520, a communication interface 530, and a bus 540.
  • the communication interface 530 in the computing device 500 illustrated in FIG.5 may be configured to communicate with other devices.
  • the processor 510 may be connected to the memory 520.
  • the memory 520 may be configured to store the program code and data. Therefore, the memory 520 may be a storage unit inside the processor 510, or an external storage unit independent of the processor 510, or a component including the storage unit inside the processor 510 and the external storage unit independent of the processor 510.
  • the computing device 500 may further include the bus 540.
  • the memory 520 and the communication interface 530 may be connected to the processor 510 by the bus 540.
  • the bus 540 may be a Peripheral Component Interconnect (PCI) bus, an Extended Industry Standard Architecture (EISA) bus, or the like.
  • PCI Peripheral Component Interconnect
  • EISA Extended Industry Standard Architecture
  • the bus 540 may be classified into an address bus, a data bus, a control bus, etc. For ease of representation, in the figure the bus is represented by only one thick line, which does not mean that there is only one bus or one type of bus.
  • the processor 510 may be a Central Processing Unit (CPU).
  • the processor may be other general-purpose processors, a Digital Signal Processor (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other programmable logic components, a discrete gate or a transistor logic component, and a discrete hardware component.
  • DSP Digital Signal Processor
  • ASIC Application Specific Integrated Circuit
  • FPGA Field Programmable Gate Array
  • the general-purpose processor may be a microprocessor, or the processor may further be any conventional processor, etc.
  • the processor 510 adopts one or more integrated circuits for executing related programs to implement the technical solution provided by the embodiments of the present disclosure.
  • the memory 520 may include a read-only memory and a random access memory, and provide instructions and data to the processor 510.
  • a portion of the processor 510 may also include a non-volatile random access memory.
  • the processor 510 may also store information of a device type.
  • the processor 510 executes computer-executable instructions in the memory 520 to perform operational steps of the method embodiments.
  • the computing device 500 may correspond to a corresponding body in performing a method according to the embodiments of the present disclosure.
  • the above-described and other operations and/or functions of each module in the computing device 500 are intended to implement a corresponding flow of each method according to the embodiments of the present disclosure, respectively, and will not be repeated herein for the sake of brevity.
  • the units described as separate components may or may not be physically separate.
  • the units displayed as units may or may not be physical units. That is, the units may be located in one place or may be distributed over a plurality of network units. Some or all of the units may be selected as desired to achieve the purpose of the solution of the method embodiment.
  • functional units may be integrated in one processing unit, or respective units may be separate physical existence, or two or more units may be integrated in one unit.
  • the functions When the functions are implemented in the form of a software functional unit and sold or used as a standalone product, the functions can be stored in a computer-readable storage medium. Based on this understanding, all or part of the technical solutions according to the present disclosure, or the part thereof that contributes to the related art, can be embodied in the form of a software product.
  • the computer software product may be stored in a storage medium and contain instructions to enable a computer device (which may be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the decoding method described in each of the embodiments.
  • the above-mentioned storage medium may include various mediums capable of storing program codes, such as a Universal Serial Bus flash drive, a mobile hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disc.
  • program codes such as a Universal Serial Bus flash drive, a mobile hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disc.
  • a computer-readable storage medium is further provided according to the embodiments of the present disclosure.
  • the computer-readable storage medium has s computer program stored thereon.
  • the program when executed by the processor, is configured to implement the steps of the method embodiments.
  • the computer storage medium of the embodiments of the present disclosure may employ any combination of one or more computer-readable media.
  • a computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium.
  • the computer-readable storage medium may be, for example, but is not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof.
  • Computer-readable storage media may include electrical connections having one or more wires, a portable computer magnetic disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an Erasable Programmable Read Only Memory (EPROM or a flash memory), an optical fiber, a portable Compact Disc Read-Only Memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof.
  • the computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction apparatus, system, or device.
  • the computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave in which a computer-readable computer program is carried. Such propagated data signals may take a variety of forms, including, but not being limited to, electromagnetic signals, optical signals, or any suitable combination of the foregoing.
  • the computer-readable signal medium may also be any computer-readable medium other than the computer-readable storage medium that can transmit, propagate, or transport a program for use by or in connection with an instruction execution system, an apparatus, or a device.
  • the program code contained on the computer-readable medium may be transmitted using any suitable medium, including, but not being limited to, wireless, wired, optical cable, RF, etc., or any suitable combination thereof.
  • Computer program codes for performing the operations of the present disclosure may be written in one or more programming languages, or combinations thereof.
  • the above programming languages include object-oriented programming languages, such as Java, Smalltalk, C++, as well as conventional procedural programming languages, such as the "C" language or similar programming languages.
  • the program code may be executed entirely or partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or a server.
  • the remote computer may be connected to the user's computer through any kind of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet through an Internet service provider).
  • LAN local area network
  • WAN wide area network
  • Internet service provider e.g., via the Internet through an Internet service provider

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Jib Cranes (AREA)
  • Control And Safety Of Cranes (AREA)
EP23906054.4A 2022-12-23 2023-12-21 Verfahren zur sicherheitssteuerung vor ort für turmkran, steuerung und computervorrichtung Pending EP4635893A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202211666618.2A CN115838119B (zh) 2022-12-23 2022-12-23 一种塔吊的现场安全控制方法、控制器及计算设备
PCT/CN2023/140690 WO2024131897A1 (zh) 2022-12-23 2023-12-21 一种塔吊的现场安全控制方法、控制器及计算设备

Publications (2)

Publication Number Publication Date
EP4635893A1 true EP4635893A1 (de) 2025-10-22
EP4635893A4 EP4635893A4 (de) 2026-04-08

Family

ID=85579145

Family Applications (1)

Application Number Title Priority Date Filing Date
EP23906054.4A Pending EP4635893A4 (de) 2022-12-23 2023-12-21 Verfahren zur sicherheitssteuerung vor ort für turmkran, steuerung und computervorrichtung

Country Status (3)

Country Link
EP (1) EP4635893A4 (de)
CN (1) CN115838119B (de)
WO (1) WO2024131897A1 (de)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115838119B (zh) * 2022-12-23 2024-11-29 北京东土科技股份有限公司 一种塔吊的现场安全控制方法、控制器及计算设备
CN116835447B (zh) * 2023-06-30 2025-01-28 北京东土科技股份有限公司 一种塔吊轴位置的标定方法、控制器、设备和存储介质

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3810506B2 (ja) * 1997-02-28 2006-08-16 富士電機ホールディングス株式会社 クレーンの制御方法
DE10115312A1 (de) * 2001-03-28 2002-10-02 Man Wolffkran Verfahren zur Steuerung von Kranbewegungen sowie Kran
US7793918B2 (en) * 2007-09-05 2010-09-14 Key Energy Services, Llc Method and system for governing block speed
CN207226824U (zh) * 2017-08-30 2018-04-13 西安建工建筑机械有限公司 太阳能防倾覆高效吊钩
CN110844810B (zh) * 2019-10-23 2021-08-17 湖南中联重科建筑起重机械有限责任公司 塔式起重机负载力矩保护方法及设备
JP2021147139A (ja) * 2020-03-18 2021-09-27 戸田建設株式会社 タワークレーンの自動経路設定システム
CN111532986B (zh) * 2020-05-18 2022-07-05 浙江三一装备有限公司 起重机力矩控制方法、装置和电子设备
CN112093672A (zh) * 2020-08-13 2020-12-18 中联重科股份有限公司 基于速度控制的行程限位控制系统、方法及塔式起重机
CN113415728B (zh) * 2021-06-29 2024-05-14 广州市建筑科学研究院集团有限公司 一种塔机吊运路径自动规划方法及系统
CN112919348A (zh) * 2021-04-02 2021-06-08 中国电建集团重庆工程有限公司 一种塔吊安全监测系统及方法
CN113911922B (zh) * 2021-09-13 2023-06-02 杭州大杰智能传动科技有限公司 智能塔吊回转全过程状况监测传感方法和系统
CN114148930B (zh) * 2021-11-26 2024-09-24 西安理工大学 塔机智能控制系统的路径规划与动态避让方法
CN115159353B (zh) * 2022-06-22 2023-04-18 北京东土科技股份有限公司 一种塔吊控制的方法、装置、计算设备及存储介质
CN115072568B (zh) * 2022-06-22 2025-01-28 北京东土科技股份有限公司 一种塔吊的控制系统及方法
CN115179299B (zh) * 2022-08-26 2024-11-29 北京东土科技股份有限公司 一种多轴设备的关节空间轨迹的规划方法及装置
CN115838119B (zh) * 2022-12-23 2024-11-29 北京东土科技股份有限公司 一种塔吊的现场安全控制方法、控制器及计算设备

Also Published As

Publication number Publication date
EP4635893A4 (de) 2026-04-08
CN115838119A (zh) 2023-03-24
WO2024131897A1 (zh) 2024-06-27
CN115838119B (zh) 2024-11-29

Similar Documents

Publication Publication Date Title
EP4635893A1 (de) Verfahren zur sicherheitssteuerung vor ort für turmkran, steuerung und computervorrichtung
US11372414B2 (en) Robotic motion control method and apparatus and robot using the same
CN103092128B (zh) 一种多轴运动控制器
CN114180460B (zh) 一种吊具防撞保护方法、控制器、系统及岸桥
CN107450466A (zh) 一种冲压机器人控制器及其高速平稳控制方法
WO1987005721A1 (fr) Controleur de robot
CN112147994A (zh) 一种机器人及其回充控制方法和装置
CA1169158A (en) Communication multiplexer variable priority scheme
US5068784A (en) Method and system for monitoring the number of available buffers
CN115408795B (zh) 一种起重设备吊装分析方法、装置及计算机设备
AU2004322424A1 (en) Process and system for avoiding collisions for moveable machines
RU2856966C2 (ru) Способ управления безопасностью на рабочем месте для башенного крана, контроллера и вычислительного устройства
US10635118B2 (en) Method, terminal device, and computer readable storage medium for controlling rotation of servo
CN116040325A (zh) 码垛方法、工控机、响应端、电子设备及存储介质
CN115374618A (zh) 基于起吊平衡的模具设计方法、装置、设备及存储介质
CN115167422A (zh) 无人叉车控制方法、装置、设备及存储介质
WO2025112914A1 (zh) 轴组运动控制系统、方法及设备
CN115159353A (zh) 一种塔吊控制的方法、装置、计算设备及存储介质
CN116038713A (zh) 一种保密环境下的无硬连接的多移动机器人协同搬运方法
JPS6234680B2 (de)
CN111198533A (zh) 一种立库堆垛机使用的epos双闭环控制装置
CN121424382A (zh) 头部转动控制方法、装置、计算机设备和可读存储介质
CN112629408B (zh) 对位装置和对位方法
CN211786793U (zh) 一种普通电机的位置闭环处理系统
CN110716567A (zh) 移动设备及其控制方法、控制装置

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20250715

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Free format text: PREVIOUS MAIN CLASS: B66C0013180000

Ipc: B66C0013480000

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20260311

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 13/48 20060101AFI20260305BHEP

Ipc: B66C 13/46 20060101ALI20260305BHEP

Ipc: B66C 23/26 20060101ALI20260305BHEP

Ipc: B66C 23/90 20060101ALI20260305BHEP