EP4315559A1 - Method and system for ascertaining a relative power consumption, computer program product, and storage means - Google Patents

Method and system for ascertaining a relative power consumption, computer program product, and storage means

Info

Publication number
EP4315559A1
EP4315559A1 EP22734501.4A EP22734501A EP4315559A1 EP 4315559 A1 EP4315559 A1 EP 4315559A1 EP 22734501 A EP22734501 A EP 22734501A EP 4315559 A1 EP4315559 A1 EP 4315559A1
Authority
EP
European Patent Office
Prior art keywords
power
power generation
clock
consumer
generated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP22734501.4A
Other languages
German (de)
French (fr)
Inventor
Nicholas Ord
Laura FÄRBER
Eugenio SCIONTI
Matthew TIMMS
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
EOn Digital Technology GmbH
Original Assignee
EOn Digital Technology GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by EOn Digital Technology GmbH filed Critical EOn Digital Technology GmbH
Publication of EP4315559A1 publication Critical patent/EP4315559A1/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/25Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
    • G01R19/2513Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/063Details of electronic electricity meters related to remote communication

Definitions

  • the present invention relates to a method and a system for determining a relative power consumption between different power consumers and/or between generated power and consumed power in a power grid, in particular in a low-voltage grid.
  • the invention also relates to a computer program product for carrying out such a method and a storage medium on which such a computer program product is stored.
  • the object of the present invention is to at least partially take account of the problems described above.
  • the object of the present invention is to provide a method and a system for determining a relative power consumption of power from different power generation units in a power grid as simply, precisely and in particular quickly as possible.
  • Determining a relative power consumption generated by a power consumer of the power generated by the first power generation unit and/or the power generated by the further power generation unit at a power consumption time and determining the power consumption time by means of a consumer clock, the first producer clock, the further producer clock and the consumer clock being controlled by a computer network-based protocol are synchronized with each other and the relative power consumption is determined using the first power generation time, the further power generation time and the power consumption time.
  • relative power consumption can be determined in a simple manner with particularly high accuracy and speed or a high clock rate by means of a time synchronization or a corresponding synchronization using a computer network-based protocol.
  • power generation values and power consumption values can be read particularly quickly and in relation to one another. For example, a relative consumption of electricity that is generated kilometers away in a wind farm and of electricity that is generated again kilometers away in a nuclear power plant can be determined and/or calculated in real time or almost in real time.
  • a consumption of electricity that is generated kilometers away in a wind farm in relation to a consumption of electricity that is generated again kilometers away in a nuclear power plant can be determined and/or calculated in real time or almost in real time. Due to the computer network-based synchronization, particularly short Response times of, for example, below 1 Hz can be achieved. This can be of decisive advantage in particular when using and/or distributing the generated streams.
  • the relative electricity consumption can be the consumption of electricity from a first energy generation unit in relation to the consumption of electricity from another energy generation unit, the consumption of electricity from one energy generation unit in relation to electricity generated by this energy generation unit and/or the consumption of electricity from a number of energy generation units be understood in relation to generated power from the multiple power generation units.
  • the current generated by the first current generation unit and/or the current generated by the second current generation unit can be determined via at least one transformer and/or a current transformed at the at least one transformer.
  • the transformer can be understood to mean a node at which various or all energy transactions converge and/or take place. Every change in energy always correlates to local power generation and local power consumption.
  • the current generated by the first current generating unit is determined via a first transformer or the current transformed there and the current generated by the second current generating unit is determined via a second transformer or the current transformed there.
  • the relative power consumption via the at least one transformer and/or a current transformed on the at least one transformer can be determined in an analogous manner. This eliminates the need for measuring devices in houses, vehicles and/or industrial plants. The method can thus be carried out correspondingly efficiently.
  • the at least one transformer can be considered part of a power generation unit and/or part of a power consumer.
  • each power generation unit and each power consumer or the associated clocks are or can be synchronized with one another by means of a computer network-based protocol.
  • the first producer clock, the further producer clock and the consumer clock preferably each have a suitable network access, in particular an Internet access.
  • the first producer clock, the further producer clock and/or the consumer clock can, for example, initially receive and/or derive their respective time from a GPS signal.
  • the first producer clock, the further producer clock and/or the consumer clock can each be understood as a digital and/or computer-implemented clock and/or a correspondingly configured time measurement unit.
  • the power generation time and/or the power consumption time can each be understood as at least one point in time or at least one period of time.
  • the power generation time can be understood to mean the length of time in which power is generated by a power generation unit, or points in time at which power is generated by the power generation unit.
  • the electricity consumption time can accordingly be understood to mean the length of time in which electricity is consumed by an electricity consumer, or points in time at which electricity is consumed by the electricity consumer.
  • the respective time can also be understood to mean a time at which electricity is generated and/or consumed.
  • the first power generation time and the further power generation time can partially or completely overlap.
  • the clocks can be synchronized using a central atomic clock, coordinated universal time (UTC) and/or a corresponding atomic time.
  • the first electricity generation unit can be understood to mean, for example, a power plant or a plant for generating electricity from renewable energies, ie a wind power plant, a hydroelectric power plant or a solar plant.
  • the further power generation unit can be understood, for example, as a power plant or a plant for generating power from fossil fuels and/or nuclear energy, ie a coal-fired power plant or a nuclear power plant.
  • the further power generation unit can also be understood to mean a further and/or different power plant for generating power from renewable energies.
  • the at least one electricity consumer can be an industrial plant, a household, an electrical device in the household and/or a mobile electrical device such as a smartphone or a vehicle. Devices such as transformers and/or fuse boxes can also be understood as consumers of electricity.
  • the method is preferably configured to determine a relative power consumption in a power grid, in particular in a low-voltage grid. That means it will preferably determines the relative power consumption of at least one power consumer within a low-voltage network.
  • the power generation units can also be located or connected to a medium-voltage grid and/or a high-voltage grid.
  • the power generated by the first power generation unit, the power generated by the further power generation unit and/or the relative power consumption generated by the power consumer and/or the data packets representing the power values can each be identified by a token and sent to a determination and/or control unit for determination using a blockchain of the relative electricity consumption.
  • the power consumption can thus be determined with a particularly high level of data security.
  • a high level of operational stability can also be achieved by using the tokens and their unique identification.
  • the first producer clock, the further producer clock and/or the consumer clock can be synchronized with one another in a method using an NT protocol.
  • the computer network-based protocol can be understood as the NT protocol or the computer network-based protocol can include the NT protocol.
  • the generator clocks and the consumer clock and/or consumer clocks or the respective times in devices that are many hundreds of kilometers apart can be synchronized with high accuracy. This is particularly useful for power plants and/or installations that are correspondingly far apart.
  • the NT protocol can be understood as a so-called Network Time Protocol (NTP) for synchronizing clocks in computer systems via packet-based communication networks.
  • NTP Network Time Protocol
  • the NT protocol preferably includes and/or uses the connectionless transport protocol UDP or the connection-related transport protocol TCP.
  • the NT protocol can be understood to mean both the protocol and the software reference implementation of the same.
  • a simplified NT protocol (SNTP) can also be used instead of the NT protocol.
  • the NT protocol is preferably used as an NTP service, ie not in the form of an NTP server, for example. A particularly high level of reliability can be achieved in this way.
  • the generator clocks and the consumer clock and/or consumer clocks or the respective times in devices can be synchronized with a particularly high level of accuracy using the PT protocol.
  • the PT protocol can be understood as a so-called Precision Time Protocol (PTP) for effecting the synchronicity of the time settings of a number of devices in a computer network.
  • PTP Precision Time Protocol
  • the PT protocol can achieve accuracy in the nanosecond range in hardware implementation and in the submicrosecond range in software implementation.
  • the PT protocol is preferably used as a PTP service, ie not in the form of a PTP server, for example. A high level of reliability can be achieved in this way.
  • the first producer clock and the other producer clock can be synchronized by or using the NT protocol, with at least one producer clock and the consumer clock being synchronized using the PT protocol.
  • the time of the generator clock can be used as a benchmark and/or master.
  • the method for the producer clocks is defined by a first standard and the method for the consumer clocks is defined by a second standard. It could be that the first standard prescribes an NT protocol and the second standard prescribes a PT protocol. In this case, the three clocks can be advantageously synchronized with one another through the interaction of a number of synchronization protocols.
  • the power generation units can also be correspondingly precisely controlled. For example, electricity generation by a wind farm can be ended or reduced if it is recognized that fewer electricity consumers are currently drawing or want to draw electricity from wind energy. As an alternative to stopping or reducing power generation, the The electricity generated can also be used alternatively, i.e. either temporarily stored and/or diverted. Changing can therefore be understood to mean that more or less electricity is generated or the distribution and/or use of the electricity generated is changed.
  • Programmed power consumers are also conceivable, which check the different availability of different power generation units every second or minute and, based on this, flexibly or dynamically generate different currents and/or types of current, for example first electricity from wind energy from power plant A, then electricity from nuclear energy from power plant B and then use electricity from wind energy from power plant C. This means that the consumer can not only work efficiently and cost-effectively, it can also be used to create peak loads in power plants and/or a power distribution that is as even as possible.
  • a user of the electricity consumer it is also possible for a user of the electricity consumer to be suggested or determined for the electricity consumer based on the determined relative electricity consumption at what time the electricity generated by the additional electricity generation unit and/or the electricity generated by the additional electricity generation unit should be used are.
  • Such a time control and corresponding time proposals can be implemented particularly effectively and sensibly by the time-synchronized power generation units and power consumers. If, for example, it is determined that electricity from a solar system is currently predominantly used, the relative power consumption of electricity using solar energy is generated, ie correspondingly high, but the sun will soon set, it can be proposed to an electricity consumer or the user of the electricity consumer to switch to, for example, electricity from a nuclear power plant or a hydroelectric power plant.
  • a corresponding power change for the power consumer it is possible to automatically determine a corresponding power change for the power consumer.
  • different times of the day, times, weather parameters and/or geopositions of the power generation units and/or the at least one power consumer can also be taken into account. Proposing and/or determining based on the determined relative power consumption can accordingly be understood as suggesting and/or determining using and/or taking into account the determined relative power consumption, with other parameters and/or operating states being considered and/or used in addition to the relative power consumption can.
  • a system for determining a relative power consumption and in particular for carrying out a method as described in detail above includes: a determination unit
  • the system according to the invention thus brings with it the same advantages as have been described in detail with reference to the method according to the invention.
  • the system can be designed in the form of a computer and/or a central control unit.
  • the system can also include the power generation units, the at least one power consumer, the producer clocks and/or the consumer clocks.
  • the synchronization unit can be configured to synchronize the first producer clock, the further producer clock and the consumer clock using the NT protocol or using the PT protocol. Furthermore, the system can have a control unit that is configured
  • the first generator clock is configured in the first electricity generation unit
  • the additional producer clock is configured in the additional electricity generation unit
  • the consumer clock is configured in the electricity consumer.
  • network-capable clocks and/or time measurement units are implemented in the electricity generation units and in the at least one electricity consumer.
  • the generated and consumed currents can be set in relation to one another in a particularly advantageous manner in order to determine the relative current consumption.
  • a further aspect of the present invention relates to a computer program product comprising instructions which cause a system as described in detail above to carry out the method described.
  • a computer-readable, in particular non-volatile storage medium is proposed, on which such a computer program product is stored.
  • the computer program product may be implemented as computer-readable instruction code in any suitable machine and/or programming language, such as JAVA, C, C++, C#, and/or Python.
  • the computer program product can be stored on a storage medium such as a data disk, a removable drive, or a built-in memory/processor.
  • the instruction code can program a computer or other programmable device, such as a controller, to perform the desired functions.
  • the computer program product can be and/or be provided on a network such as the Internet, from which it can be downloaded by a user when required.
  • the computer program product can be and/or be implemented both by means of software and by means of one or more special electronic circuits, ie in hardware or in any hybrid form, ie by means of software components and hardware components.
  • FIG. 1 shows a representation for describing a power grid with power generation units, power consumers and network clocks implemented there
  • FIG. 2 shows a block diagram for describing the function of a system according to a preferred embodiment of the present invention
  • FIG. 3 shows a storage means with a computer program product stored thereon according to an embodiment of the present invention
  • FIG. 4 shows a flow chart for explaining a method according to a preferred embodiment of the present invention.
  • Fig. 1 shows a power grid 10 with various power generation units 11, 12, 13 and power consumers 17, 18, 19, 20.
  • a first power generation unit 11 in the form of a coal-fired power plant
  • a second power generation unit 12 in the form of a biogas plant
  • a third power generation unit 13 connected to a nuclear power plant.
  • the power generation units 11, 12, 13 transmit the power generated via a high-voltage network 41, a medium-voltage network 42, various transformers 35 and a low-voltage network 43 to three electricity consumers 17, 18, 19 in the form of private households and to a fourth electricity consumer 20 in the form of an industrial plant.
  • the power generation units 11, 12, 13 each have a generator clock 14, 15, 16.
  • the current consumers 17, 18, 19, 20 each have a consumer clock 21, 22, 23, 24.
  • the producer clocks 14, 15, 16 and the consumer clocks 21, 22, 23, 24 can be understood as network clocks, are each connected to the Internet and are set or operated in a manner that is synchronized with one another by a computer network-based protocol.
  • Fig. 2 is a system 50 for determining a relative power consumption with a first power generation unit 11, a second power generation unit 12, a
  • Power generation unit 11 has a first generator clock 14 and the second Power generation unit 12 has a second generator clock 15 .
  • the power consumer 17 has a consumer clock 21 .
  • the control unit 30 has a determination unit 31 , a synchronization unit 32 and a computer program product 33 installed in the control unit 30 .
  • the control unit 30 has a signal connection to the power generation units 11 , 12 and to the power consumer 17 .
  • the determination unit 31 is for determining a power generated by the first power generation unit 11 at a first power generation time and for determining the first power generation time using the first generator clock 14, for determining the power generated by the second power generation unit 12 at a further power generation time and for determining the further power generation time configured by means of the second producer clock 15. This means that the determination unit 31 can record the exact point in time and/or period of time in which which current, ie which current strength and/or which current quantity, is generated.
  • the determination unit 31 is further configured to determine a relative power consumption generated by the power consumer 17 of the power generated by the first power generation unit 11 and the power generated by the further power generation unit 12 at a power consumption time and to determine the power consumption time using the consumer clock 21 .
  • the synchronization unit 32 is configured to synchronize the first producer clock 14, the second producer clock 15 and the consumer clock 21 by a computer network-based protocol, wherein the determination unit 31 is configured to determine the relative power consumption using the first power generation time, the further power generation time and the power consumption time.
  • consumer clock 21 can always be used to determine the exact time and/or the exact period of power consumption by power consumer 17 and to determine and/or calculate the relative power consumption with reference to the previously accurately measured power generated.
  • the synchronization unit 32 is configured to synchronize the first producer clock 14, the second producer clock 15 and the consumer clock 21 using the PT protocol.
  • the control unit 30 is for changing the power generation by the first power generation unit 11 and/or for changing the power generation by the second power generation unit 12 on the basis of the determined relative power consumption configured.
  • the control unit 30 is configured to make different currents from different current generation units 11, 12 available to the current consumer 17 at different points in time and/or periods based on the determined relative current consumption. That is, a timing at which to use the power generated by the first power generation unit 11 and another timing at which to use the power generated by the second power generation unit 12 are determined.
  • the first producer clock 14 is configured in the first electricity generation unit 11, the second producer clock 15 in the further electricity generation unit 12 and the consumer clock 21 in the electricity consumer 17.
  • a power generated by the first power generation unit 11 at a first power generation time is determined using the first generator clock 14.
  • a power generated by the second power generation unit 12 at a second power generation time is determined using the second generator clock 15.
  • a relative power consumption generated by the power consumer 17 of the power generated by the first power generation unit 11 and power generated by the second power generation unit 12 at a power consumption time is determined, the power consumption time being determined using the consumer clock 21.
  • the first producer clock 14, the second producer clock 15 and the consumer clock 21 are synchronized with one another using a computer network-based protocol, with the relative power consumption being determined using the first power generation time, the further power generation time and the power consumption time.
  • the synchronization unit 32 can be configured to synchronize a producer clock 14, 15, 16 and/or a consumer clock 21, 22, 23, 24 using the NT protocol.
  • the control unit 30 can be configured based on the determined relative power consumption to propose different currents from different current generation units 11, 12 to a human user of the current consumer 17 at different points in time and/or periods of time. That is, a timing in which the power generated by the first power generation unit 11 is preferable to be used and another timing or period in which the power generated by the second power generation unit 12 is preferable to be used are suggested. This can be realized through visualization on a screen, for example on a monitor and/or a display of a smartphone. The method can be performed according to the configured system 50.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method for ascertaining a relative power consumption, having the steps of: ascertaining a power which is generated by a first power generating unit (11) and a first power generating time, ascertaining the first power generating time using a first generator clock (14), ascertaining a power generated by another power generating unit (12, 13) at another power generating time, ascertaining the other power generating time using another generator clock (15, 16), ascertaining a relative power consumption by a power load (17, 18, 19, 20) of the power generated by the first power generating unit (11) and/or the power generated by the other power generating unit (12, 13) at a power consumption time, and ascertaining the power consumption time using a load clock (21, 22, 23, 24), wherein the first generator clock (14), the other generator clock (15, 16), and the load clock (21, 22, 23, 24) are synchronized using a computer network-based protocol, and the relative power consumption is ascertained using the first power generating time, the other power generating time, and the power consumption time. The invention additionally relates to a system (50) and a computer program product (33) for carrying out such a method and to a storage means (34), on which such a computer program product (33) is stored.

Description

Bochum, 2. Mai 2022 Bochum, May 2, 2022
Ih re Nach richt Ih r Zeichen Unser Zeichen You r message You r File Ou r FileYour message Your sign Our sign You r message Your file Our file
IN047123-PCT IN047123-PCT
E.ON Digital Technology GmbH Tresckowstr. 5 30457 Hannover E.ON Digital Technology GmbH Tresckowstr. 5 30457 Hanover
Verfahren und System zum Ermitteln eines relativen Stromverbrauchs, Computerprogrammprodukt und Speichermittel Method and system for determining relative power consumption, computer program product and storage medium
B e s c h r e i b u n g Description
Die vorliegende Erfindung betrifft ein Verfahren und ein System zum Ermitteln eines relativen Stromverbrauchs zwischen unterschiedlichen Stromverbrauchern und/oder zwischen erzeugtem Strom und verbrauchtem Strom in einem Stromnetz, insbesondere in einem Niederspannungsnetz. Die Erfindung betrifft ferner ein Computerprogrammprodukt zum Durchführen eines solchen Verfahrens sowie ein Speichermittel, auf dem ein solches Computerprogrammprodukt gespeichert ist. The present invention relates to a method and a system for determining a relative power consumption between different power consumers and/or between generated power and consumed power in a power grid, in particular in a low-voltage grid. The invention also relates to a computer program product for carrying out such a method and a storage medium on which such a computer program product is stored.
Im Stand der Technik sind verschiedene Verfahren und Systeme zum Betreiben eines Stromnetzes sowie zum Betreiben von verschiedenen Funktionseinheiten im Stromnetz bekannt. Unter den Funktionseinheiten können Stromerzeugungseinheiten wie Kohlekraftwerke, Wasserkraftwerke, Windkraftwerke bzw. Windparks, Solarkraftwerke bzw. Solarparks und Kernkraftwerke, Stromverbraucher wie Industrieanlagen, private Haushalte und einzelne Elektrogeräte sowie verschiedene Schalt- und/oder Wandeleinheiten zum Leiten und Umwandeln des Stroms bzw. entsprechender elektrischer Signale verstanden werden. In derzeit verfügbaren Stromnetzen und den zugehörigen Systemen stellt es stets eine große Herausforderung dar, den relativen Stromverbrauch von Strom aus unterschiedlichen Stromerzeugungsquellen mit möglichst kostengünstigen Mitteln und/oder mit einer ausreichend hohen Genauigkeit zu erfassen. Ungeachtet dessen besteht der Wunsch, den relativen Stromverbrauch möglichst in Echtzeit zu ermitteln und/oder überwachen zu können, um den erzeugten Strom bzw. unterschiedliche Stromarten, eine zugehörige Stromerzeugung und/oder den Stromverbrauch basierend darauf zu verwenden, zu verteilen und/oder einzustellen. Ein Ansatz zum Lösen dieser Problematik kann der internationalen Patentanmeldung WO 2017/199053 A1 entnommen werden. Dort wird ein System zum Abgleichen von unterschiedlich regenerativ erzeugten Strömen mit davon verbrauchtem Strom mittels Blockchain und geeigneten Token beschrieben. Ein solches Verfahren bietet zwar eine hohe Datensicherheit, ist jedoch relativ träge, komplex in der Anwendung und weist durch Verwenden der Blockchain bereits selbst einen relativ hohen Stromverbrauch auf. Various methods and systems for operating a power grid and for operating various functional units in the power grid are known in the prior art. Among the functional units, power generation units such as coal-fired power plants, hydroelectric power plants, wind power plants or wind farms, solar power plants or solar parks and nuclear power plants, electricity consumers such as industrial plants, private households and individual electrical devices and various switching and / or conversion units for conducting and converting the current or corresponding electrical signals are understood. In currently available power grids and the associated systems, it is always a major challenge to record the relative power consumption of power from different power generation sources using the most cost-effective means possible and/or with a sufficiently high degree of accuracy. Irrespective of this, there is a desire to be able to determine and/or monitor the relative power consumption in real time, if possible, in order to use, distribute and/or adjust the power generated or different types of power, an associated power generation and/or the power consumption based thereon. One approach to solving this problem can be found in international patent application WO 2017/199053 A1. There, a system for comparing different regeneratively generated currents with the current consumed by them using blockchain and suitable tokens is described. Although such a method offers a high level of data security, it is relatively sluggish, complex to use and already has a relatively high power consumption itself due to the use of the blockchain.
Aufgabe der vorliegenden Erfindung ist es, der voranstehend beschriebenen Problematik zumindest teilweise Rechnung zu tragen. Insbesondere ist es Aufgabe der vorliegenden Erfindung, ein Verfahren und ein System zum möglichst einfachen, genauen und insbesondere schnellen Ermitteln eines relativen Stromverbrauchs von Strom aus unterschiedlichen Stromerzeugungseinheiten in einem Stromnetz zur Verfügung zu stellen. The object of the present invention is to at least partially take account of the problems described above. In particular, the object of the present invention is to provide a method and a system for determining a relative power consumption of power from different power generation units in a power grid as simply, precisely and in particular quickly as possible.
Die voranstehende Aufgabe wird durch die Patentansprüche gelöst. Insbesondere wird die voranstehende Aufgabe durch das Verfahren gemäß Anspruch 1 , das System gemäß Anspruch 7, das Computerprogrammprodukt gemäß Anspruch 14 sowie das Speichermittel gemäß Anspruch 15 gelöst. Weitere Vorteile der Erfindung ergeben sich aus den Unteransprüchen, der Beschreibung und den Figuren. Dabei gelten Merkmale, die im Zusammenhang mit dem Verfahren beschrieben sind, selbstverständlich auch im Zusammenhang mit dem erfindungsgemäßen System, dem erfindungsgemäßen Computerprogrammprodukt, dem erfindungsgemäßen Speichermittel und jeweils umgekehrt, sodass bezüglich der Offenbarung zu den einzelnen Erfindungsaspekten stets wechselseitig Bezug genommen wird und/oder werden kann. Gemäß einem ersten Aspekt der vorliegenden Erfindung wird ein Verfahren zum Ermitteln eines relativen Stromverbrauchs zur Verfügung gestellt. Das Verfahren weist die folgenden Schritte auf: The above object is solved by the patent claims. In particular, the above object is achieved by the method according to claim 1, the system according to claim 7, the computer program product according to claim 14 and the storage means according to claim 15. Further advantages of the invention result from the dependent claims, the description and the figures. Features that are described in connection with the method also apply, of course, in connection with the system according to the invention, the computer program product according to the invention, the storage means according to the invention and vice versa, so that the disclosure of the individual aspects of the invention is and/or is always referred to mutually can. According to a first aspect of the present invention, a method for determining a relative power consumption is provided. The procedure has the following steps:
- Ermitteln eines durch eine erste Stromerzeugungseinheit erzeugten Stroms zu einer ersten Stromerzeugungszeit und Ermitteln der ersten Stromerzeugungszeit mittels einer ersten Erzeugeruhr, - determining a power generated by a first power generation unit at a first power generation time and determining the first power generation time by means of a first generator clock,
- Ermitteln eines durch eine bzw. wenigstens eine weitere Stromerzeugungseinheit erzeugten Stroms zu einer weiteren Stromerzeugungszeit und Ermitteln der weiteren Stromerzeugungszeit mittels einer weiteren Erzeugeruhr, - Determining a power generated by one or at least one further power generation unit at a further power generation time and determining the further power generation time by means of a further generator clock,
- Ermitteln eines durch einen Stromverbraucher erzeugten relativen Stromverbrauchs des durch die erste Stromerzeugungseinheit erzeugten Stroms und/oder des durch die weitere Stromerzeugungseinheit erzeugten Stroms zu einer Stromverbrauchszeit und Ermitteln der Stromverbrauchszeit mittels einer Verbraucheruhr, wobei die erste Erzeugeruhr, die weitere Erzeugeruhr und die Verbraucheruhr durch ein computernetzwerkbasiertes Protokoll miteinander synchronisiert werden und der relative Stromverbrauch unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit ermittelt wird. - Determining a relative power consumption generated by a power consumer of the power generated by the first power generation unit and/or the power generated by the further power generation unit at a power consumption time and determining the power consumption time by means of a consumer clock, the first producer clock, the further producer clock and the consumer clock being controlled by a computer network-based protocol are synchronized with each other and the relative power consumption is determined using the first power generation time, the further power generation time and the power consumption time.
Im Rahmen der vorliegenden Erfindung wurde erkannt, dass durch einen Uhrzeitabgleich bzw. eine entsprechende Synchronisierung mittels eines computernetzwerkbasierten Protokolls relative Stromverbräuche auf einfache Weise mit besonders hoher Genauigkeit sowie Geschwindigkeit bzw. einer hohen Taktrate ermittelt werden können. Genauer gesagt können mittels der vorgeschlagenen Uhrzeitsynchronisierung zwischen den Stromerzeugungseinheiten und dem wenigstens einen Stromverbraucher Stromerzeugungswerte und Stromverbrauchswerte besonders schnell und mit Bezug zueinander ausgelesen werden. So kann beispielsweise in Echtzeit oder annähernd in Echtzeit ein im Vergleich zu einem erzeugten Strom relativer Verbrauch von Strom, der Kilometer entfernt in einem Windpark erzeugt wird sowie von Strom, der nochmals Kilometer entfernt in einem Kernkraftwerk erzeugt wird, ermittelt und/oder berechnet werden. Ebenso kann in Echtzeit oder annähernd in Echtzeit ein Verbrauch von Strom, der Kilometer entfernt in einem Windpark erzeugt wird im Verhältnis zu einem Verbrauch von Strom, der nochmals Kilometer entfernt in einem Kernkraftwerk erzeugt wird, ermittelt und/oder berechnet werden. Durch das computernetzwerkbasierte Synchronisieren können besonders kurze Reaktionszeiten von beispielsweise unter 1 Hz erreicht werden. Dies kann insbesondere beim Verwenden und/oder Verteilen der erzeugten Ströme von entscheidendem Vorteil sein. Unter dem relativen Stromverbrauch können der Verbrauch von Strom aus einer ersten Energieerzeugungseinheit in Relation zu einem Verbrauch von Strom aus einer weiteren Energieerzeugungseinheit, der Verbrauch von Strom aus einer Energieerzeugungseinheit in Relation zu durch diese Energieerzeugungseinheit erzeugtem Strom und/oder der Verbrauch von Strom aus mehreren Energieerzeugungseinheiten in Relation zu erzeugtem Strom aus den mehreren Energieerzeugungseinheiten verstanden werden. Der durch die erste Stromerzeugungseinheit erzeugte Strom und/oder der durch die zweite Stromerzeugungseinheit erzeugte Strom kann über wenigstens einen Transformator und/oder eines am wenigstens einen Transformator transformierten Stroms ermittelt werden. Unter dem Transformer kann vorliegend ein Knotenpunkt verstanden werden, an welchem verschiedene oder sämtliche Energietransaktionen zusammenlaufen und/oder stattfinden. Jede Energieänderung korreliert stets zu einer lokalen Stromerzeugung und einem lokalen Stromverbrauch. Vorzugsweise wird der durch die erste Stromerzeugungseinheit erzeugte Strom über einen ersten Transformator bzw. den dort transformierten Strom ermittelt und der durch die zweite Stromerzeugungseinheit erzeugte Strom wird über einen zweiten Transformator bzw. den dort transformierten Strom ermittelt. Auf analoge Weise kann der relative Stromverbrauch über den wenigstens einen Transformator und/oder einen am wenigstens einen Transformator transformierten Strom ermittelt werden. Auf Messgeräte in Häusern, Fahrzeugen und/oder Industrieanlagen kann dadurch verzichtet werden. Das Verfahren kann damit entsprechend effizient durchgeführt werden. Der wenigstens eine Transformator kann als Teil einer Stromerzeugungseinheit und/oder als Teil eines Stromverbrauchers betrachtet werden. Within the scope of the present invention, it was recognized that relative power consumption can be determined in a simple manner with particularly high accuracy and speed or a high clock rate by means of a time synchronization or a corresponding synchronization using a computer network-based protocol. To put it more precisely, using the proposed time synchronization between the power generation units and the at least one power consumer, power generation values and power consumption values can be read particularly quickly and in relation to one another. For example, a relative consumption of electricity that is generated kilometers away in a wind farm and of electricity that is generated again kilometers away in a nuclear power plant can be determined and/or calculated in real time or almost in real time. Likewise, a consumption of electricity that is generated kilometers away in a wind farm in relation to a consumption of electricity that is generated again kilometers away in a nuclear power plant can be determined and/or calculated in real time or almost in real time. Due to the computer network-based synchronization, particularly short Response times of, for example, below 1 Hz can be achieved. This can be of decisive advantage in particular when using and/or distributing the generated streams. The relative electricity consumption can be the consumption of electricity from a first energy generation unit in relation to the consumption of electricity from another energy generation unit, the consumption of electricity from one energy generation unit in relation to electricity generated by this energy generation unit and/or the consumption of electricity from a number of energy generation units be understood in relation to generated power from the multiple power generation units. The current generated by the first current generation unit and/or the current generated by the second current generation unit can be determined via at least one transformer and/or a current transformed at the at least one transformer. In the present case, the transformer can be understood to mean a node at which various or all energy transactions converge and/or take place. Every change in energy always correlates to local power generation and local power consumption. Preferably, the current generated by the first current generating unit is determined via a first transformer or the current transformed there and the current generated by the second current generating unit is determined via a second transformer or the current transformed there. The relative power consumption via the at least one transformer and/or a current transformed on the at least one transformer can be determined in an analogous manner. This eliminates the need for measuring devices in houses, vehicles and/or industrial plants. The method can thus be carried out correspondingly efficiently. The at least one transformer can be considered part of a power generation unit and/or part of a power consumer.
Entscheidend für das vorgeschlagene Verfahren ist es, dass jede Stromerzeugungseinheit und jeder Stromverbraucher bzw. die zugehörigen Uhren mittels computernetzwerkbasiertem Protokoll miteinander synchronisiert werden oder werden können. Dazu weisen die erste Erzeugeruhr, die weitere Erzeugeruhr und die Verbraucheruhr bevorzugt jeweils einen geeigneten Netzwerkzugang, insbesondere einen Internetzugang, auf. Die erste Erzeugeruhr, die weitere Erzeugeruhr und/oder die Verbraucheruhr können beispielsweise initial ihre jeweilige Uhrzeit durch ein GPS-Signal erhalten und/oder ableiten. Unter der ersten Erzeugeruhr, der weiteren Erzeugeruhr und/oder der Verbraucheruhr kann jeweils eine digitale und/oder computerimplementierte Uhr und/oder eine entsprechend konfigurierte Zeitmesseinheit verstanden werden. Die Stromerzeugungszeit und/oder die Stromverbrauchszeit können jeweils als wenigstens ein Zeitpunkt oder wenigstens ein Zeitraum verstanden werden. So können unter der Stromerzeugungszeit die Zeitdauer, in welcher durch eine Stromerzeugungseinheit Strom erzeugt wird, oder Zeitpunkte, zu welchen Strom durch die Stromerzeugungseinheit erzeugt wird, verstanden werden. Unter der Stromverbrauchszeit kann entsprechend die Zeitdauer, in welcher Strom durch einen Stromverbraucher verbraucht wird, oder Zeitpunkte, in welchen Strom durch den Stromverbraucher verbraucht wird, verstanden werden. Unter der jeweiligen Zeit kann ferner eine Uhrzeit verstanden werden, zu welcher Strom erzeugt und/oder verbraucht wird. Die erste Stromerzeugungszeit und die weitere Stromerzeugungszeit können sich teilweise oder vollständig überschneiden. Das Synchronisieren der Uhren kann mittels einer zentralen Atomuhr, einer koordinierten Weltzeit (UTC) und/oder einer entsprechenden Atomzeit durchgeführt werden. It is crucial for the proposed method that each power generation unit and each power consumer or the associated clocks are or can be synchronized with one another by means of a computer network-based protocol. For this purpose, the first producer clock, the further producer clock and the consumer clock preferably each have a suitable network access, in particular an Internet access. The first producer clock, the further producer clock and/or the consumer clock can, for example, initially receive and/or derive their respective time from a GPS signal. The first producer clock, the further producer clock and/or the consumer clock can each be understood as a digital and/or computer-implemented clock and/or a correspondingly configured time measurement unit. The power generation time and/or the power consumption time can each be understood as at least one point in time or at least one period of time. Thus, the power generation time can be understood to mean the length of time in which power is generated by a power generation unit, or points in time at which power is generated by the power generation unit. The electricity consumption time can accordingly be understood to mean the length of time in which electricity is consumed by an electricity consumer, or points in time at which electricity is consumed by the electricity consumer. The respective time can also be understood to mean a time at which electricity is generated and/or consumed. The first power generation time and the further power generation time can partially or completely overlap. The clocks can be synchronized using a central atomic clock, coordinated universal time (UTC) and/or a corresponding atomic time.
Unter der ersten Stromerzeugungseinheit kann beispielsweise ein Kraftwerk oder eine Anlage zum Erzeugen von Strom aus erneuerbaren Energien, also ein Windkraftwerk, ein Wasserkraftwerk oder eine Solaranlage, verstanden werden. Unter der weiteren Stromerzeugungseinheit kann beispielsweise ein Kraftwerk oder eine Anlage zum Erzeugen von Strom aus fossilen Energieträgern und/oder Kernenergie, also ein Kohlekraftwerk oder ein Kernkraftwerk, verstanden werden. Unter der weiteren Stromerzeugungseinheit kann allerdings auch ein weiteres und/oder anderes Kraftwerk zum Erzeugen von Strom aus erneuerbaren Energien verstanden werden. Dasselbe gilt auf analoge Weise für unterschiedliche Kraftwerke und/oder Anlagen zum Erzeugen von Strom aus fossilen Energieträgern und/oder aus Kernenergie. Der wenigstens eine Stromverbraucher kann eine Industrieanlage, ein Haushalt, ein elektrisches Gerät im Haushalt und/oder ein mobiles elektrisches Gerät wie ein Smartphone oder ein Fahrzeug sein. Unter einem Stromverbraucher können auch Geräte wie Transformatoren und/oder Sicherungskästen verstanden werden. The first electricity generation unit can be understood to mean, for example, a power plant or a plant for generating electricity from renewable energies, ie a wind power plant, a hydroelectric power plant or a solar plant. The further power generation unit can be understood, for example, as a power plant or a plant for generating power from fossil fuels and/or nuclear energy, ie a coal-fired power plant or a nuclear power plant. However, the further power generation unit can also be understood to mean a further and/or different power plant for generating power from renewable energies. The same applies in an analogous manner to different power plants and/or plants for generating electricity from fossil fuels and/or from nuclear energy. The at least one electricity consumer can be an industrial plant, a household, an electrical device in the household and/or a mobile electrical device such as a smartphone or a vehicle. Devices such as transformers and/or fuse boxes can also be understood as consumers of electricity.
Das Verfahren ist bevorzugt zum Ermitteln eines relativen Stromverbrauchs in einem Stromnetz, insbesondere in einem Niederspannungsnetz, konfiguriert. Das heißt, es wird vorzugsweise der relative Stromverbrauch von wenigstens einem Stromverbraucher innerhalb eines Niederspannungsnetztes ermittelt. Die Stromerzeugungseinheiten können sich auch in einem Mittelspannungsnetz und/oder einem Hochspannungsnetz befinden bzw. dort angebunden sein. The method is preferably configured to determine a relative power consumption in a power grid, in particular in a low-voltage grid. That means it will preferably determines the relative power consumption of at least one power consumer within a low-voltage network. The power generation units can also be located or connected to a medium-voltage grid and/or a high-voltage grid.
Der durch die erste Stromerzeugungseinheit erzeugte Strom, der durch die weitere Stromerzeugungseinheit erzeugte Strom und/oder der durch den Stromverbraucher erzeugte relative Stromverbrauch und/oder die Stromwerte repräsentierende Datenpakete können jeweils durch einen Token gekennzeichnet und mittels Blockchain an eine Ermittlungs und/oder Kontrolleinheit zum Ermitteln des relativen Stromverbrauchs übermittelt werden. Damit kann das Ermitteln des Stromverbrauchs mit einer besonders hohen Datensicherheit durchgeführt werden. Durch die Verwendung der Token und deren eindeutige Kennung kann außerdem eine hohe Betriebsstabilität erreicht werden. The power generated by the first power generation unit, the power generated by the further power generation unit and/or the relative power consumption generated by the power consumer and/or the data packets representing the power values can each be identified by a token and sent to a determination and/or control unit for determination using a blockchain of the relative electricity consumption. The power consumption can thus be determined with a particularly high level of data security. A high level of operational stability can also be achieved by using the tokens and their unique identification.
Gemäß einer Ausführungsform der vorliegenden Erfindung ist es möglich, dass die erste Erzeugeruhr, die weitere Erzeugeruhr und/oder die Verbraucheruhr bei einem Verfahren durch ein NT-Protokoll miteinander synchronisiert werden. Das heißt, unter dem computernetzwerkbasierten Protokoll kann das NT-Protokoll verstanden werden oder das computernetzwerkbasierte Protokoll kann das NT-Protokoll aufweisen. Mittels NT-Protokoll können die Erzeugeruhren und die Verbraucheruhr und/oder Verbraucheruhren bzw. die jeweiligen Uhrzeiten in Geräten, die viele hundert Kilometer voneinander beabstandet sind, mit hoher Genauigkeit synchronisiert werden. Dies bietet sich insbesondere für entsprechend weit voneinander entfernte Kraftwerke und/oder Anlagen an. Unter dem NT-Protokoll kann ein sogenanntes Network Time Protocol (NTP) zur Synchronisierung von Uhren in Computersystemen über paketbasierte Kommunikationsnetze verstanden werden. Das NT- Protokoll umfasst und/oder verwendet vorzugsweise das verbindungslose Transportprotokoll UDP oder das verbindungsbezogene Transportprotokoll TCP. Unter dem NT-Protokoll kann sowohl das Protokoll als auch die Software-Referenzimplementierung desselben verstanden werden. Anstelle des NT-Protokolls kann auch ein vereinfachtes NT-Protokoll (SNTP) verwendet werden. Das NT-Protokoll wird vorzugsweise als NTP-Service, also beispielsweise nicht in Form eines NTP-Servers, verwendet. Damit kann eine besonders hohe Ausfallsicherheit erreicht werden. Außerdem ist es möglich, dass bei einem erfindungsgemäßen Verfahren die erste Erzeugeruhr, die weitere Erzeugeruhr und/oder die Verbraucheruhr durch ein PT-Protokoll miteinander synchronisiert werden. Das heißt, unter dem computernetzwerkbasierten Protokoll kann das PT-Protokoll verstanden werden oder das computernetzwerkbasierte Protokoll kann das PT-Protokoll aufweisen. Mittels PT-Protokoll können die Erzeugeruhren und die Verbraucheruhr und/oder Verbraucheruhren bzw. die jeweiligen Uhrzeiten in Geräten mit besonders hoher Genauigkeit synchronisiert werden. Unter dem PT-Protokoll kann ein sogenanntes Precision Time Protocol (PTP) zum Bewirken der Synchronität der Uhrzeiteinstellungen mehrerer Geräte in einem Computernetzwerk verstanden werden. Das PT-Protokoll kann in Hardware-Ausführung eine Genauigkeit im Bereich von Nanosekunden und in Software-Ausführung im Bereich weniger Mikrosekunden erzielen. Das PT-Protokoll wird vorzugsweise als PTP-Service, also beispielsweise nicht in Form eines PTP-Servers, verwendet. Damit kann eine hohe Ausfallsicherheit erreicht werden. Im Rahmen der vorliegenden Erfindung ist es möglich, dass die erste Erzeugeruhr und die weitere Erzeugeruhr durch bzw. mittels NT-Protokoll synchronisiert werden, wobei eine Synchronisierung zwischen wenigstens einer Erzeugeruhr und der Verbraucheruhr mittels PT- Protokoll durchgeführt wird. Hierbei kann beispielsweise die Zeit der Erzeugeruhr als Maßstab und/oder Master genutzt werden. Dies kann beispielsweise dann von Vorteil sein, wenn das Verfahren für die Erzeugeruhren durch einen ersten Standard definiert wird und das Verfahren mit den Verbraucheruhren durch einen zweiten Standard definiert wird. Es könnte sein, dass der erste Standard ein NT-Protokoll vorschreibt und der zweite Standard ein PT-Protokoll vorschreibt. In diesem Fall können die drei Uhren durch das Zusammenspiel von mehreren Synchronisationsprotokollen miteinander vorteilhaft synchronisiert werden. According to one embodiment of the present invention, it is possible for the first producer clock, the further producer clock and/or the consumer clock to be synchronized with one another in a method using an NT protocol. That is, the computer network-based protocol can be understood as the NT protocol or the computer network-based protocol can include the NT protocol. Using the NT protocol, the generator clocks and the consumer clock and/or consumer clocks or the respective times in devices that are many hundreds of kilometers apart can be synchronized with high accuracy. This is particularly useful for power plants and/or installations that are correspondingly far apart. The NT protocol can be understood as a so-called Network Time Protocol (NTP) for synchronizing clocks in computer systems via packet-based communication networks. The NT protocol preferably includes and/or uses the connectionless transport protocol UDP or the connection-related transport protocol TCP. The NT protocol can be understood to mean both the protocol and the software reference implementation of the same. A simplified NT protocol (SNTP) can also be used instead of the NT protocol. The NT protocol is preferably used as an NTP service, ie not in the form of an NTP server, for example. A particularly high level of reliability can be achieved in this way. In addition, it is possible in a method according to the invention for the first producer clock, the further producer clock and/or the consumer clock to be synchronized with one another by means of a PT protocol. That is, the computer network-based protocol can be understood as the PT protocol or the computer network-based protocol can have the PT protocol. The generator clocks and the consumer clock and/or consumer clocks or the respective times in devices can be synchronized with a particularly high level of accuracy using the PT protocol. The PT protocol can be understood as a so-called Precision Time Protocol (PTP) for effecting the synchronicity of the time settings of a number of devices in a computer network. The PT protocol can achieve accuracy in the nanosecond range in hardware implementation and in the submicrosecond range in software implementation. The PT protocol is preferably used as a PTP service, ie not in the form of a PTP server, for example. A high level of reliability can be achieved in this way. Within the scope of the present invention, it is possible for the first producer clock and the other producer clock to be synchronized by or using the NT protocol, with at least one producer clock and the consumer clock being synchronized using the PT protocol. Here, for example, the time of the generator clock can be used as a benchmark and/or master. This can be advantageous, for example, when the method for the producer clocks is defined by a first standard and the method for the consumer clocks is defined by a second standard. It could be that the first standard prescribes an NT protocol and the second standard prescribes a PT protocol. In this case, the three clocks can be advantageously synchronized with one another through the interaction of a number of synchronization protocols.
Gemäß einer weiteren Ausführungsvariante ist es möglich, dass bei einem Verfahren anhand des ermittelten relativen Stromverbrauchs eine Stromerzeugung durch die erste Stromerzeugungseinheit und/oder eine Stromerzeugung durch die weitere Stromerzeugungseinheit verändert wird. Unter Berücksichtigung der synchronisierten Uhren bzw. Uhrzeiten und des entsprechend genau ermittelten relativen Stromverbrauchs können auch die Stromerzeugungseinheiten entsprechend genau kontrolliert werden. So kann Stromerzeugung durch einen Windpark beispielsweise beendet oder reduziert werden, wenn erkannt wird, dass aktuell weniger Stromverbraucher Strom aus Windenergie beziehen oder beziehen möchten. Alternativ zum Beenden oder Reduzieren der Stromerzeugung kann der erzeugte Strom auch alternativ verwendet, also entweder zwischengespeichert und/oder umgeleitet werden. Unter dem Verändern kann mithin verstanden werden, dass mehr oder weniger Strom erzeugt wird oder die Verteilung und/oder Verwendung des erzeugten Stroms verändert wird. According to a further embodiment variant, it is possible that in a method based on the determined relative power consumption, power generation by the first power generation unit and/or power generation by the further power generation unit is changed. Taking into account the synchronized clocks or times and the correspondingly precisely determined relative power consumption, the power generation units can also be correspondingly precisely controlled. For example, electricity generation by a wind farm can be ended or reduced if it is recognized that fewer electricity consumers are currently drawing or want to draw electricity from wind energy. As an alternative to stopping or reducing power generation, the The electricity generated can also be used alternatively, i.e. either temporarily stored and/or diverted. Changing can therefore be understood to mean that more or less electricity is generated or the distribution and/or use of the electricity generated is changed.
Weiterhin ist es möglich, dass bei einem Verfahren gemäß der vorliegenden Erfindung anhand des ermittelten relativen Stromverbrauchs einem Nutzer des Stromverbrauchers vorgeschlagen wird oder für den Stromverbraucher bestimmt wird, den durch die erste Stromerzeugungseinheit erzeugten Strom und/oder den durch die weitere Stromerzeugungseinheit erzeugten Strom zu verwenden. Anhand des präzise und mit einer hohen Taktzeit erfassten relativen Stromverbrauchs ist es möglich, die erzeugten Ströme entsprechend für die gewünschten Aufgaben schnell zuzuordnen und/oderzu verwenden. Das heißt, Stromverbrauchern bzw. deren Nutzern können beispielsweise im Sekundentakt unterschiedliche Stromtarife für unterschiedliche Stromarten und/oder Stromerzeugungseinheiten vorgeschlagen werden. Ebenso sind programmierte Stromverbraucher denkbar, die im Sekunden- oder Minutentakt unterschiedliche Verfügbarkeiten von verschiedenen Stromerzeugungseinheiten überprüfen und basierend darauf flexibel bzw. dynamisch unterschiedliche Ströme und/oder Stromarten, also beispielsweise zunächst Strom aus Windenergie aus Kraftwerk A, anschließend Strom aus Kernenergie aus Kraftwerk B und danach Strom aus Windenergie aus Kraftwerk C, verwenden. Damit kann der Verbraucher nicht nur effizient und kostensparend arbeiten, vielmehr können damit auch Lastspitzen in Kraftwerken und/oder eine möglichst gleichmäßige Stromverteilung geschaffen werden. Furthermore, it is possible that in a method according to the present invention, based on the determined relative power consumption, it is proposed to a user of the power consumer or it is determined for the power consumer to use the power generated by the first power generation unit and/or the power generated by the further power generation unit . Based on the relative power consumption recorded precisely and with a high cycle time, it is possible to quickly allocate and/or use the generated currents accordingly for the desired tasks. This means that different electricity tariffs for different types of electricity and/or electricity generation units can be proposed to electricity consumers or their users every second, for example. Programmed power consumers are also conceivable, which check the different availability of different power generation units every second or minute and, based on this, flexibly or dynamically generate different currents and/or types of current, for example first electricity from wind energy from power plant A, then electricity from nuclear energy from power plant B and then use electricity from wind energy from power plant C. This means that the consumer can not only work efficiently and cost-effectively, it can also be used to create peak loads in power plants and/or a power distribution that is as even as possible.
Bei einem erfindungsgemäßen Verfahren ist es zudem möglich, dass anhand des ermittelten relativen Stromverbrauchs einem Nutzer des Stromverbrauchers vorgeschlagen wird oder für den Stromverbraucher bestimmt wird, in welcher Zeit der durch die weitere Stromerzeugungseinheit erzeugte Strom und/oder der durch die weitere Stromerzeugungseinheit erzeugte Strom zu verwenden sind. Eine solche Zeitsteuerung und entsprechende Zeitvorschläge lassen sich durch die zeitlich synchronisierten Stromerzeugungseinheiten und Stromverbraucher besonders effektiv bzw. sinnvoll realisieren. Wird beispielsweise festgestellt, dass aktuell überwiegend Strom aus einer Solaranlage verwendet wird, der relative Stromverbrauch von Strom, der mittels Solarenergie erzeugt wird, also entsprechend hoch, die Sonne aber bald untergehen wird, kann einem Stromverbraucher oder dem Nutzer des Stromverbrauchers vorgeschlagen werden, auf beispielsweise Strom aus einem Kernkraftwerk oder einem Wasserkraftwerk umzusteigen. Alternativ ist es möglich, einen entsprechenden Stromwechsel automatisiert für den Stromverbraucher zu bestimmen. Zusätzlich zum relativen Stromverbrauch können, beispielsweise auch verschiedene Tageszeiten, Uhrzeiten, Parameter zum Wetter und/oder Geopositionen der Stromerzeugungseinheiten und/oder des wenigstens einen Stromverbrauchers berücksichtigt werden. Das Vorschlägen und/oder Bestimmen anhand des ermittelten relativen Stromverbrauchs kann entsprechend als Vorschlägen und/oder Bestimmen unter Verwendung und/oder Berücksichtigen des ermittelten relativen Stromverbrauchs verstanden werden, wobei neben dem relativen Stromverbrauch noch weitere Parameter und/oder Betriebszustände berücksichtigt und/oder verwendet werden können. In a method according to the invention, it is also possible for a user of the electricity consumer to be suggested or determined for the electricity consumer based on the determined relative electricity consumption at what time the electricity generated by the additional electricity generation unit and/or the electricity generated by the additional electricity generation unit should be used are. Such a time control and corresponding time proposals can be implemented particularly effectively and sensibly by the time-synchronized power generation units and power consumers. If, for example, it is determined that electricity from a solar system is currently predominantly used, the relative power consumption of electricity using solar energy is generated, ie correspondingly high, but the sun will soon set, it can be proposed to an electricity consumer or the user of the electricity consumer to switch to, for example, electricity from a nuclear power plant or a hydroelectric power plant. Alternatively, it is possible to automatically determine a corresponding power change for the power consumer. In addition to the relative power consumption, different times of the day, times, weather parameters and/or geopositions of the power generation units and/or the at least one power consumer can also be taken into account. Proposing and/or determining based on the determined relative power consumption can accordingly be understood as suggesting and/or determining using and/or taking into account the determined relative power consumption, with other parameters and/or operating states being considered and/or used in addition to the relative power consumption can.
Gemäß einem weiteren Aspekt der vorliegenden Erfindung wird ein System zum Ermitteln eines relativen Stromverbrauchs und insbesondere zum Durchführen eines wie vorstehend im Detail beschriebenen Verfahrens zur Verfügung gestellt. Das System umfasst: eine Ermittlungseinheit According to a further aspect of the present invention, a system for determining a relative power consumption and in particular for carrying out a method as described in detail above is provided. The system includes: a determination unit
- zum Ermitteln eines durch eine erste Stromerzeugungseinheit erzeugten Stroms zu einer ersten Stromerzeugungszeit und zum Ermitteln der ersten Stromerzeugungszeit mittels einer ersten Erzeugeruhr, - for determining a power generated by a first power generation unit at a first power generation time and for determining the first power generation time by means of a first generator clock,
- zum Ermitteln eines durch eine weitere Stromerzeugungseinheit erzeugten Stroms zu einer weiteren Stromerzeugungszeit und zum Ermitteln der weiteren- for determining a current generated by a further power generation unit at a further power generation time and for determining the further
Stromerzeugungszeit mittels einer weiteren Erzeugeruhr, sowie Power generation time using another generator clock, as well as
- zum Ermitteln eines durch einen Stromverbraucher erzeugten relativen- To determine a generated by a current consumer relative
Stromverbrauchs des durch die erste Stromerzeugungseinheit erzeugten Stroms und/oder des durch die weitere Stromerzeugungseinheit erzeugten Stroms zu einer Stromverbrauchszeit und zum Ermitteln der Stromverbrauchszeit mittels einer Verbraucheruhr, und eine Synchronisierungseinheit zum Synchronisieren der ersten Erzeugeruhr, der weiteren Erzeugeruhr und der Verbraucheruhr durch ein computernetzwerkbasiertes Protokoll, wobei die Ermittlungseinheit zum Ermitteln des relativen Stromverbrauchs io unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit konfiguriert ist. Power consumption of the power generated by the first power generation unit and/or the power generated by the further power generation unit at a power consumption time and for determining the power consumption time by means of a consumer clock, and a synchronization unit for synchronizing the first producer clock, the further producer clock and the consumer clock by a computer network-based protocol, wherein the determination unit for determining the relative power consumption io is configured using the first power generation time, the further power generation time, and the power consumption time.
Damit bringt das erfindungsgemäße System die gleichen Vorteile mit sich, wie sie ausführlich mit Bezug auf das erfindungsgemäße Verfahren beschrieben worden sind. Das System kann in Form eines Computers und/oder einer zentralen Kontrolleinheit ausgestaltet sein. Das System kann ferner die Stromerzeugungseinheiten, den wenigstens einen Stromverbraucher, die Erzeugeruhren und/oder die Verbraucheruhren umfassen. The system according to the invention thus brings with it the same advantages as have been described in detail with reference to the method according to the invention. The system can be designed in the form of a computer and/or a central control unit. The system can also include the power generation units, the at least one power consumer, the producer clocks and/or the consumer clocks.
Bei dem System kann die Synchronisierungseinheit zum Synchronisieren der ersten Erzeugeruhr, der weiteren Erzeugeruhr und der Verbraucheruhr mittels NT-Protokoll oder mittels PT-Protokoll konfiguriert sein. Fernern kann das System eine Kontrolleinheit aufweisen, die konfiguriert ist, In the system, the synchronization unit can be configured to synchronize the first producer clock, the further producer clock and the consumer clock using the NT protocol or using the PT protocol. Furthermore, the system can have a control unit that is configured
- anhand des ermittelten relativen Stromverbrauchs eine Stromerzeugung durch die erste Stromerzeugungseinheit und/oder eine Stromerzeugung durch die weitere Stromerzeugungseinheit zu verändern, - to change power generation by the first power generation unit and/or power generation by the further power generation unit on the basis of the determined relative power consumption,
- anhand des ermittelten relativen Stromverbrauchs einem Nutzer des Stromverbrauchers vorzuschlagen oder für den Stromverbraucher zu bestimmen, den durch die erste Stromerzeugungseinheit erzeugten Strom und/oder den durch die weitere Stromerzeugungseinheit erzeugten Strom zu verwenden, und/oder - to propose based on the determined relative electricity consumption to a user of the electricity consumer or to determine for the electricity consumer to use the electricity generated by the first electricity generation unit and/or the electricity generated by the further electricity generation unit, and/or
- anhand des ermittelten relativen Stromverbrauchs einem Nutzer des Stromverbrauchers vorzuschlagen oder für den Stromverbraucher zu bestimmen, in welcher Zeit der durch die erste Stromerzeugungseinheit erzeugte Strom und/oder der durch die weitere Stromerzeugungseinheit erzeugte Strom zu verwenden sind. - to propose based on the determined relative electricity consumption a user of the electricity consumer or to determine for the electricity consumer in which time the electricity generated by the first electricity generation unit and/or the electricity generated by the further electricity generation unit are to be used.
Darüber hinaus ist es möglich, dass bei einem erfindungsgemäßen System die erste Erzeugeruhr in der ersten Stromerzeugungseinheit ausgestaltet ist, die weitere Erzeugeruhr in der weiteren Stromerzeugungseinheit ausgestaltet ist und/oder die Verbraucheruhr im Stromverbraucher ausgestaltet ist. Das heißt, in den Stromerzeugungseinheiten und in dem wenigstens einen Stromverbraucher sind jeweils selbst netzwerkfähige Uhren und/oder Zeitmesseinheiten, insbesondere digital oder überwiegend digital, implementiert. Damit können die erzeugten und verbrauchten Ströme zum Ermitteln des relativen Stromverbrauchs besonders vorteilhaft zueinander ins Verhältnis gesetzt werden. Ein weiterer Aspekt der vorliegenden Erfindung betrifft ein Computerprogrammprodukt, das Befehle umfasst, die bewirken, dass ein wie vorstehend im Detail beschriebenes System das beschriebene Verfahren ausführt. Darüber hinaus wird ein computerlesbares, insbesondere nichtflüchtiges Speichermittel vorgeschlagen, auf welchem ein solches Computerprogrammprodukt gespeichert ist. Damit bringen auch das erfindungsgemäße Computerprogrammprodukt sowie das Speichermittel die vorstehend beschriebenen Vorteile mit sich. Das Computerprogrammprodukt kann als computerlesbarer Anweisungscode in jeder geeigneten Maschinensprache und/oder Programmiersprache wie beispielsweise in JAVA, C, C++, C# und/oder Python implementiert sein. Das Computerprogrammprodukt kann auf einem Speichermittel wie einer Datendisk, einem Wechsel laufwerk, oder einem eingebauten Speicher/Prozessor abgespeichert sein. Der Anweisungscode kann einen Computer oder andere programmierbare Geräte wie ein Steuergerät derart programmieren, dass die gewünschten Funktionen ausgeführt werden. Ferner kann das Computerprogrammprodukt in einem Netzwerk wie beispielsweise dem Internet bereitgestellt werden und/oder sein, von dem es bei Bedarf von einem Nutzer heruntergeladen werden kann. Das Computerprogrammprodukt kann sowohl mittels einer Software, als auch mittels einer oder mehrerer spezieller elektronischer Schaltungen, das heißt in Hardware oder in beliebig hybrider Form, das heißt mittels Software-Komponenten und Hardware-Komponenten, realisiert werden und/oder sein. In addition, it is possible that in a system according to the invention the first generator clock is configured in the first electricity generation unit, the additional producer clock is configured in the additional electricity generation unit and/or the consumer clock is configured in the electricity consumer. This means that network-capable clocks and/or time measurement units, in particular digital or predominantly digital, are implemented in the electricity generation units and in the at least one electricity consumer. In this way, the generated and consumed currents can be set in relation to one another in a particularly advantageous manner in order to determine the relative current consumption. A further aspect of the present invention relates to a computer program product comprising instructions which cause a system as described in detail above to carry out the method described. In addition, a computer-readable, in particular non-volatile storage medium is proposed, on which such a computer program product is stored. Thus, the computer program product according to the invention and the storage means also have the advantages described above. The computer program product may be implemented as computer-readable instruction code in any suitable machine and/or programming language, such as JAVA, C, C++, C#, and/or Python. The computer program product can be stored on a storage medium such as a data disk, a removable drive, or a built-in memory/processor. The instruction code can program a computer or other programmable device, such as a controller, to perform the desired functions. Furthermore, the computer program product can be and/or be provided on a network such as the Internet, from which it can be downloaded by a user when required. The computer program product can be and/or be implemented both by means of software and by means of one or more special electronic circuits, ie in hardware or in any hybrid form, ie by means of software components and hardware components.
Weitere, die Erfindung verbessernde Maßnahmen ergeben sich aus der nachfolgenden Beschreibung zu verschiedenen Ausführungsbeispielen der Erfindung, welche in den Figuren schematisch dargestellt sind. Sämtliche aus den Ansprüchen, der Beschreibung oder den Figuren hervorgehende Merkmale und/oder Vorteile, einschließlich konstruktiver Einzelheiten und räumlicher Anordnungen können sowohl für sich als auch in den verschiedenen Kombinationen erfindungswesentlich sein. Further measures improving the invention result from the following description of various exemplary embodiments of the invention, which are shown schematically in the figures. All of the features and/or advantages resulting from the claims, the description or the figures, including structural details and spatial arrangements, can be essential to the invention both on their own and in the various combinations.
Es zeigen jeweils schematisch: They each show schematically:
Figur 1 eine Darstellung zum Beschreiben eines Stromnetzes mit Stromerzeugungseinheiten, Stromverbrauchern und dort implementierten Netzwerkuhren, Figur 2 ein Blockschaltbild zum Beschreiben der Funktion eines Systems gemäß einer bevorzugten Ausführungsform der vorliegenden Erfindung, FIG. 1 shows a representation for describing a power grid with power generation units, power consumers and network clocks implemented there, FIG. 2 shows a block diagram for describing the function of a system according to a preferred embodiment of the present invention,
Figur 3 ein Speichermittel mit einem darauf gespeicherten Computerprogrammprodukt gemäß einer Ausführungsform der vorliegenden Erfindung, und FIG. 3 shows a storage means with a computer program product stored thereon according to an embodiment of the present invention, and
Figur 4 ein Flussdiagramm zum Erläutern eines Verfahrens gemäß einer bevorzugten Ausführungsform der vorliegenden Erfindung. FIG. 4 shows a flow chart for explaining a method according to a preferred embodiment of the present invention.
Elemente mit gleicher Funktion und Wirkungsweise sind in den Figuren jeweils mit den gleichen Bezugszeichen versehen. Elements with the same function and mode of operation are each provided with the same reference symbols in the figures.
Fig. 1 zeigt ein Stromnetz 10 mit verschiedenen Stromerzeugungseinheiten 11, 12, 13 und Stromverbraucher 17, 18, 19, 20. An dem gezeigten Stromnetz 10 sind eine erste Stromerzeugungseinheit 11 in Form eines Kohlekraftwerks, eine zweite Stromerzeugungseinheit 12 in Form einer Biogasanlage und eine dritte Stromerzeugungseinheit 13 eines Kernkraftwerks angeschlossen. Die Stromerzeugungseinheiten 11, 12, 13 übertragen den erzeugten Strom über ein Hochspannungsnetz 41, ein Mittelspannungsnetz 42, verschiedene Transformatoren 35 und ein Niederspannungsnetz 43 an drei Stromverbraucher 17, 18, 19 in Form von Privathaushalten und an einen vierten Stromverbraucher 20 in Form einer Industrieanlage. Wie in Fig. 1 gezeigt, weisen die Stromerzeugungseinheiten 11, 12, 13 jeweils eine Erzeugeruhr 14, 15, 16 auf. Die Stromverbraucher 17, 18, 19, 20 weisen jeweils eine Verbraucheruhr 21, 22, 23, 24 auf. Die Erzeugeruhren 14, 15, 16 und die Verbraucheruhren 21, 22, 23, 24 können als Netzwerkuhren verstanden werden, sind jeweils mit dem Internet verbunden und durch ein computernetzwerkbasiertes Protokoll miteinander synchronisiert eingestellt bzw. betrieben. Fig. 1 shows a power grid 10 with various power generation units 11, 12, 13 and power consumers 17, 18, 19, 20. On the power grid 10 shown are a first power generation unit 11 in the form of a coal-fired power plant, a second power generation unit 12 in the form of a biogas plant and a third power generation unit 13 connected to a nuclear power plant. The power generation units 11, 12, 13 transmit the power generated via a high-voltage network 41, a medium-voltage network 42, various transformers 35 and a low-voltage network 43 to three electricity consumers 17, 18, 19 in the form of private households and to a fourth electricity consumer 20 in the form of an industrial plant. As shown in FIG. 1, the power generation units 11, 12, 13 each have a generator clock 14, 15, 16. The current consumers 17, 18, 19, 20 each have a consumer clock 21, 22, 23, 24. The producer clocks 14, 15, 16 and the consumer clocks 21, 22, 23, 24 can be understood as network clocks, are each connected to the Internet and are set or operated in a manner that is synchronized with one another by a computer network-based protocol.
In Fig. 2 ist ein System 50 zum Ermitteln eines relativen Stromverbrauchs mit einer ersten Stromerzeugungseinheit 11, einer zweiten Stromerzeugungseinheit 12, einemIn Fig. 2 is a system 50 for determining a relative power consumption with a first power generation unit 11, a second power generation unit 12, a
Stromverbraucher 17 und einer Kontrolleinheit 30 dargestellt. Die erstePower consumers 17 and a control unit 30 shown. The first
Stromerzeugungseinheit 11 weist eine erste Erzeugeruhr 14 auf und die zweite Stromerzeugungseinheit 12 weist eine zweite Erzeugeruhr 15 auf. Der Stromverbraucher 17 weist eine Verbraucheruhr 21 auf. Die Kontrolleinheit 30 weist eine Ermittlungseinheit 31, eine Synchronisierungseinheit 32 und ein in der Kontrolleinheit 30 installiertes Computerprogrammprodukt 33 auf. Die Kontrolleinheit 30 steht mit den Stromerzeugungseinheiten 11 , 12 und mit dem Stromverbraucher 17 in Signalverbindung. Power generation unit 11 has a first generator clock 14 and the second Power generation unit 12 has a second generator clock 15 . The power consumer 17 has a consumer clock 21 . The control unit 30 has a determination unit 31 , a synchronization unit 32 and a computer program product 33 installed in the control unit 30 . The control unit 30 has a signal connection to the power generation units 11 , 12 and to the power consumer 17 .
Die Ermittlungseinheit 31 ist zum Ermitteln eines durch die erste Stromerzeugungseinheit 11 erzeugten Stroms zu einer ersten Stromerzeugungszeit und zum Ermitteln der ersten Stromerzeugungszeit mittels der ersten Erzeugeruhr 14, zum Ermitteln des durch die zweite Stromerzeugungseinheit 12 erzeugten Stroms zu einer weiteren Stromerzeugungszeit und zum Ermitteln der weiteren Stromerzeugungszeit mittels der zweiten Erzeugeruhr 15 konfiguriert. Das heißt, die Ermittlungseinheit 31 kann den genauen Zeitpunkt und/oder Zeitraum erfassen, in welchem welcher Strom, also welche Stromstärke und/oder welche Strommenge, erzeugt werden. Die Ermittlungseinheit 31 ist ferner zum Ermitteln eines durch den Stromverbraucher 17 erzeugten relativen Stromverbrauchs des durch die erste Stromerzeugungseinheit 11 erzeugten Stroms und des durch die weitere Stromerzeugungseinheit 12 erzeugten Stroms zu einer Stromverbrauchszeit und zum Ermitteln der Stromverbrauchszeit mittels der Verbraucheruhr 21 konfiguriert. Die Synchronisierungseinheit 32 ist zum Synchronisieren der ersten Erzeugeruhr 14, der zweiten Erzeugeruhr 15 und der Verbraucheruhr 21 durch ein computernetzwerkbasiertes Protokoll konfiguriert, wobei die Ermittlungseinheit 31 zum Ermitteln des relativen Stromverbrauchs unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit konfiguriert ist. Das heißt, mittels der Verbraucheruhr 21 kann stets der genaue Zeitpunkt und/oder der genaue Zeitraum des Stromverbrauchs durch den Stromverbraucher 17 ermittelt und entsprechend genau der relative Stromverbrauch mit Bezug auf den zuvor entsprechend genau gemessenen erzeugten Strom ermittelt und/oder berechnet werden. The determination unit 31 is for determining a power generated by the first power generation unit 11 at a first power generation time and for determining the first power generation time using the first generator clock 14, for determining the power generated by the second power generation unit 12 at a further power generation time and for determining the further power generation time configured by means of the second producer clock 15. This means that the determination unit 31 can record the exact point in time and/or period of time in which which current, ie which current strength and/or which current quantity, is generated. The determination unit 31 is further configured to determine a relative power consumption generated by the power consumer 17 of the power generated by the first power generation unit 11 and the power generated by the further power generation unit 12 at a power consumption time and to determine the power consumption time using the consumer clock 21 . The synchronization unit 32 is configured to synchronize the first producer clock 14, the second producer clock 15 and the consumer clock 21 by a computer network-based protocol, wherein the determination unit 31 is configured to determine the relative power consumption using the first power generation time, the further power generation time and the power consumption time. This means that consumer clock 21 can always be used to determine the exact time and/or the exact period of power consumption by power consumer 17 and to determine and/or calculate the relative power consumption with reference to the previously accurately measured power generated.
In dem in Fig. 2 gezeigten System 50 ist die Synchronisierungseinheit 32 zum Synchronisieren der ersten Erzeugeruhr 14, der zweiten Erzeugeruhr 15 und der Verbraucheruhr 21 mittels PT-Protokoll konfiguriert. Die Kontrolleinheit 30 ist zum Verändern der Stromerzeugung durch die erste Stromerzeugungseinheit 11 und/oder zum Verändern der Stromerzeugung durch die zweite Stromerzeugungseinheit 12 anhand des ermittelten relativen Stromverbrauchs konfiguriert. Außerdem ist die Kontrolleinheit 30 konfiguriert, anhand des ermittelten relativen Stromverbrauchs für den Stromverbraucher 17 zu unterschiedlichen Zeitpunkten und/oder Zeiträumen unterschiedliche Ströme von unterschiedlichen Stromerzeugungseinheiten 11, 12 zur Verfügung zu stellen. Das heißt, es werden ein Zeitpunkt bzw. Zeitraum, in welchem der durch die erste Stromerzeugungseinheit 11 erzeugte Strom zu verwenden ist und ein anderer Zeitpunkt bzw. Zeitraum, in welchem der durch die zweite Stromerzeugungseinheit 12 erzeugte Strom zu verwenden ist, bestimmt. Wie in Fig. 2 gezeigt, sind die erste Erzeugeruhr 14 in der ersten Stromerzeugungseinheit 11, die zweite Erzeugeruhr 15 in der weiteren Stromerzeugungseinheit 12 und die Verbraucheruhr 21 im Stromverbraucher 17 ausgestaltet. In the system 50 shown in FIG. 2, the synchronization unit 32 is configured to synchronize the first producer clock 14, the second producer clock 15 and the consumer clock 21 using the PT protocol. The control unit 30 is for changing the power generation by the first power generation unit 11 and/or for changing the power generation by the second power generation unit 12 on the basis of the determined relative power consumption configured. In addition, the control unit 30 is configured to make different currents from different current generation units 11, 12 available to the current consumer 17 at different points in time and/or periods based on the determined relative current consumption. That is, a timing at which to use the power generated by the first power generation unit 11 and another timing at which to use the power generated by the second power generation unit 12 are determined. As shown in FIG. 2, the first producer clock 14 is configured in the first electricity generation unit 11, the second producer clock 15 in the further electricity generation unit 12 and the consumer clock 21 in the electricity consumer 17.
Fig. 3 zeigt ein computerlesbares und nichtflüchtiges Speichermittel 34 mit einem darauf gespeicherten Computerprogrammprodukt 33. Das Computerprogrammprodukt 33 ist zum Durchführen eines Verfahrens zum Ermitteln eines relativen Stromverbrauchs konfiguriert, das anschließend mit Bezug auf die Figuren 2 und 4 erläutert wird. In einem ersten Schritt S1 wird ein durch die erste Stromerzeugungseinheit 11 erzeugter Strom zu einer ersten Stromerzeugungszeit mittels der ersten Erzeugeruhr 14 ermittelt. In einem zweiten Schritt S2 wird ein durch die zweite Stromerzeugungseinheit 12 erzeugter Strom zu einer zweiten Stromerzeugungszeit mittels der zweiten Erzeugeruhr 15 ermittelt. In einem dritten Schritt S3 wird ein durch den Stromverbraucher 17 erzeugter relativer Stromverbrauch des durch die erste Stromerzeugungseinheit 11 erzeugten Stroms und durch die zweite Stromerzeugungseinheit 12 erzeugten Stroms zu einer Stromverbrauchszeit ermittelt, wobei die Stromverbrauchszeit unter Verwendung der Verbraucheruhr 21 ermittelt wird. Die erste Erzeugeruhr 14, die zweite Erzeugeruhr 15 und die Verbraucheruhr 21 werden hierbei durch ein computernetzwerkbasiertes Protokoll miteinander synchronisiert, wobei der relative Stromverbrauch unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit ermittelt wird. 3 shows a computer-readable and non-volatile storage medium 34 with a computer program product 33 stored thereon. The computer program product 33 is configured to carry out a method for determining a relative power consumption, which is subsequently explained with reference to FIGS. In a first step S1, a power generated by the first power generation unit 11 at a first power generation time is determined using the first generator clock 14. In a second step S2, a power generated by the second power generation unit 12 at a second power generation time is determined using the second generator clock 15. In a third step S3, a relative power consumption generated by the power consumer 17 of the power generated by the first power generation unit 11 and power generated by the second power generation unit 12 at a power consumption time is determined, the power consumption time being determined using the consumer clock 21. The first producer clock 14, the second producer clock 15 and the consumer clock 21 are synchronized with one another using a computer network-based protocol, with the relative power consumption being determined using the first power generation time, the further power generation time and the power consumption time.
Die Erfindung lässt neben den dargestellten Ausführungsformen weitere Gestaltungsgrundsätze zu. Das heißt, die Erfindung soll nicht auf die mit Bezug auf die Figuren erläuterten Ausführungsbeispiele beschränkt betrachtet werden. So kann bei einem System 50 die Synchronisierungseinheit 32 zum Synchronisieren einer Erzeugeruhr 14, 15, 16 und/odereiner Verbraucheruhr 21, 22, 23, 24 mittels NT-Protokoll konfiguriert sein. Außerdem kann die Kontrolleinheit 30 konfiguriert sein, anhand des ermittelten relativen Stromverbrauchs einem menschlichen Nutzer des Stromverbrauchers 17 zu unterschiedlichen Zeitpunkten und/oder Zeiträumen unterschiedliche Ströme von unterschiedlichen Stromerzeugungseinheiten 11, 12 vorzuschlagen. Das heißt, es werden ein Zeitpunkt bzw. Zeitraum, in welchem der durch die erste Stromerzeugungseinheit 11 erzeugte Strom vorzugsweise zu verwenden ist und ein anderer Zeitpunkt bzw. Zeitraum, in welchem der durch die zweite Stromerzeugungseinheit 12 erzeugte Strom vorzugsweise zu verwenden ist, vorgeschlagen. Dies kann durch die Visualisierung auf einem Bildschirm, beispielsweise auf einem Monitor und/oder einem Display eines Smartphones, realisiert werden. Das Verfahren kann entsprechend dem konfigurierten System 50 durchgeführt werden. In addition to the illustrated embodiments, the invention permits further design principles. That is, the invention should not be considered limited to the exemplary embodiments explained with reference to the figures. Thus, in a system 50, the synchronization unit 32 can be configured to synchronize a producer clock 14, 15, 16 and/or a consumer clock 21, 22, 23, 24 using the NT protocol. In addition, the control unit 30 can be configured based on the determined relative power consumption to propose different currents from different current generation units 11, 12 to a human user of the current consumer 17 at different points in time and/or periods of time. That is, a timing in which the power generated by the first power generation unit 11 is preferable to be used and another timing or period in which the power generated by the second power generation unit 12 is preferable to be used are suggested. This can be realized through visualization on a screen, for example on a monitor and/or a display of a smartphone. The method can be performed according to the configured system 50.
B ez u g s ze i c h e n l i ste Stromnetz Stromerzeugungseinheit Stromerzeugungseinheit Stromerzeugungseinheit Erzeugeruhr Erzeugeruhr Erzeugeruhr Stromverbraucher Stromverbraucher Stromverbraucher Stromverbraucher Verbraucheruhr Verbraucheruhr Verbraucheruhr Verbraucheruhr Kontrolleinheit Ermittlungseinheit Synchronisierungseinheit Computerprogrammprodukt Speichermittel T ransformator Hochspannungsstromnetz Mittelspannungsnetz Niederspannungsnetz System LIST OF REFERENCES Power grid Power generation unit Power generation unit Power generation unit Generator clock Generator clock Generator clock Electricity consumer Electricity consumer Electricity consumer Electricity consumer Consumer clock Consumer clock Consumer clock Consumer clock Control unit Determination unit Synchronization unit Computer program product Storage medium Transformer High-voltage power grid Medium-voltage grid Low-voltage grid System

Claims

P a t e n t a n s p r ü c h e P atentClaims
1. Verfahren zum Ermitteln eines relativen Stromverbrauchs, aufweisend die Schritte: 1. A method for determining a relative power consumption, comprising the steps:
- Ermitteln eines durch eine erste Stromerzeugungseinheit (11) erzeugten Stroms zu einer ersten Stromerzeugungszeit und Ermitteln der ersten Stromerzeugungszeit mittels einer ersten Erzeugeruhr (14), - Determining a power generated by a first power generation unit (11) at a first power generation time and determining the first power generation time by means of a first generator clock (14),
- Ermitteln eines durch eine weitere Stromerzeugungseinheit (12, 13) erzeugten Stroms zu einer weiteren Stromerzeugungszeit und Ermitteln der weiteren Stromerzeugungszeit mittels einerweiteren Erzeugeruhr (15, 16), - Determining a power generated by a further power generation unit (12, 13) at a further power generation time and determining the further power generation time by means of a further generator clock (15, 16),
- Ermitteln eines durch einen Stromverbraucher (17, 18, 19, 20) erzeugten relativen Stromverbrauchs des durch die erste Stromerzeugungseinheit (11) erzeugten Stroms und/oder des durch die weitere Stromerzeugungseinheit (12, 13) erzeugten Stroms zu einer Stromverbrauchszeit und Ermitteln der Stromverbrauchszeit mittels einer Verbraucheruhr (21, 22, 23, 24), dadurch gekennzeichnet, dass die erste Erzeugeruhr (14), die weitere Erzeugeruhr (15, 16) und die Verbraucheruhr (21, 22, 23, 24) durch ein computernetzwerkbasiertes Protokoll miteinander synchronisiert werden und der relative Stromverbrauch unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit ermittelt wird. - Determining a power consumption generated by a power consumer (17, 18, 19, 20) relative to the power generated by the first power generation unit (11) and/or the power generated by the further power generation unit (12, 13) at a power consumption time and determining the power consumption time by means of a consumer clock (21, 22, 23, 24), characterized in that the first producer clock (14), the further producer clock (15, 16) and the consumer clock (21, 22, 23, 24) are synchronized with one another by a computer network-based protocol and the relative power consumption is determined using the first power generation time, the further power generation time and the power consumption time.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die erste Erzeugeruhr (14), die weitere Erzeugeruhr (15, 16) und/oder die Verbraucheruhr (21, 22, 23, 24) durch ein NT-Protokoll miteinander synchronisiert werden. 2. Method according to claim 1, characterized in that the first producer clock (14), the further producer clock (15, 16) and/or the consumer clock (21, 22, 23, 24) are synchronized with one another by an NT protocol.
3. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass die erste Erzeugeruhr (14), die weitere Erzeugeruhr (15, 16) und/oder die Verbraucheruhr (21, 22, 23, 24) durch ein PT-Protokoll miteinander synchronisiert werden. 3. The method according to claim 1, characterized in that the first producer clock (14), the further producer clock (15, 16) and/or the consumer clock (21, 22, 23, 24) are synchronized with one another by a PT protocol.
4. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass anhand des ermittelten relativen Stromverbrauchs eine Stromerzeugung durch die erste Stromerzeugungseinheit (11) und/oder eine Stromerzeugung durch die weitere Stromerzeugungseinheit (12, 13) verändert wird. 4. The method according to any one of the preceding claims, characterized in that based on the determined relative power consumption power generation by the first power generation unit (11) and / or power generation by the further power generation unit (12, 13) is changed.
5. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass anhand des ermittelten relativen Stromverbrauchs einem Nutzer des5. The method according to any one of the preceding claims, characterized in that based on the determined relative power consumption a user of the
Stromverbrauchers (17, 18, 19, 20) vorgeschlagen wird oder für den Stromverbraucher (17, 18, 19, 20) bestimmt wird, den durch die erste Stromerzeugungseinheit (11) erzeugten Strom und/oder den durch die weitere Stromerzeugungseinheit (12, 13) erzeugten Strom zu verwenden. electricity consumer (17, 18, 19, 20) or is intended for the electricity consumer (17, 18, 19, 20), the electricity generated by the first electricity generation unit (11) and/or the electricity generated by the further electricity generation unit (12, 13 ) generated electricity to use.
6. Verfahren nach einem der voranstehenden Ansprüche, dadurch gekennzeichnet, dass anhand des ermittelten relativen Stromverbrauchs einem Nutzer des6. The method according to any one of the preceding claims, characterized in that based on the determined relative power consumption a user of the
Stromverbrauchers (17, 18, 19, 20) vorgeschlagen wird oder für den Stromverbraucher (17, 18, 19, 20) bestimmt wird, in welcher Zeit der durch die ersteElectricity consumer (17, 18, 19, 20) is proposed or for the electricity consumer (17, 18, 19, 20) is determined at what time by the first
Stromerzeugungseinheit (11) erzeugte Strom und/oder der durch die weitere Stromerzeugungseinheit (12, 13) erzeugte Strom zu verwenden sind. Power generation unit (11) generated power and / or by the further power generation unit (12, 13) generated electricity are to be used.
7. System (50) zum Ermitteln eines relativen Stromverbrauchs, aufweisend: eine Ermittlungseinheit (31) 7. System (50) for determining a relative power consumption, comprising: a determining unit (31)
- zum Ermitteln eines durch eine erste Stromerzeugungseinheit (11) erzeugten Stroms zu einer ersten Stromerzeugungszeit und zum Ermitteln der ersten Stromerzeugungszeit mittels einer ersten Erzeugeruhr (14), - for determining a power generated by a first power generation unit (11) at a first power generation time and for determining the first power generation time by means of a first generator clock (14),
- zum Ermitteln eines durch eine weitere Stromerzeugungseinheit (12, 13) erzeugten Stroms zu einer weiteren Stromerzeugungszeit und zum Ermitteln der weiteren Stromerzeugungszeit mittels einerweiteren Erzeugeruhr (15, 16), sowie- for determining a power generated by a further power generation unit (12, 13) at a further power generation time and for determining the further power generation time by means of a further generator clock (15, 16), and
- zum Ermitteln eines durch einen Stromverbraucher (17, 18, 19, 20) erzeugten relativen Stromverbrauchs des durch die erste Stromerzeugungseinheit (11) erzeugten Stroms und/oder des durch die weitere Stromerzeugungseinheit (12, 13) erzeugten Stroms zu einer Stromverbrauchszeit und zum Ermitteln der Stromverbrauchszeit mittels einer Verbraucheruhr (21, 22, 23, 24), und eine Synchronisierungseinheit (32) zum Synchronisieren der ersten Erzeugeruhr (14), der weiteren Erzeugeruhr (15, 16) und der Verbraucheruhr (21, 22, 23, 24) durch ein computernetzwerkbasiertes Protokoll, wobei die Ermittlungseinheit (31) zum Ermitteln des relativen Stromverbrauchs unter Verwendung der ersten Stromerzeugungszeit, der weiteren Stromerzeugungszeit und der Stromverbrauchszeit konfiguriert ist. - for determining a power consumption generated by a power consumer (17, 18, 19, 20) of the first power generation unit (11) generated power and/or the power generated by the further power generation unit (12, 13) at a power consumption time and for determining the power consumption time by means of a consumer clock (21, 22, 23, 24), and a synchronization unit (32) for synchronizing the first generator clock ( 14), the further producer clock (15, 16) and the consumer clock (21, 22, 23, 24) by a computer network-based protocol, wherein the determination unit (31) for determining the relative power consumption using the first power generation time, the further power generation time and the power consumption time is configured.
8. System (50) nach Anspruch 7, dadurch gekennzeichnet, dass die Synchronisierungseinheit (32) zum Synchronisieren der ersten Erzeugeruhr (14), der weiteren Erzeugeruhr (15, 16) und/oder der Verbraucheruhr (21, 22, 23, 24) mittels NT-Protokoll konfiguriert ist. 8. System (50) according to claim 7, characterized in that the synchronization unit (32) for synchronizing the first producer clock (14), the further producer clock (15, 16) and/or the consumer clock (21, 22, 23, 24) configured using the NT protocol.
9. System (50) nach Anspruch 7, dadurch gekennzeichnet, dass die Synchronisierungseinheit (32) zum Synchronisieren der ersten Erzeugeruhr (14), der weiteren Erzeugeruhr (15, 16) und/oder der Verbraucheruhr (21, 22, 23, 24) mittels PT-Protokoll konfiguriert ist. 9. System (50) according to claim 7, characterized in that the synchronization unit (32) for synchronizing the first producer clock (14), the further producer clock (15, 16) and/or the consumer clock (21, 22, 23, 24) configured using the PT protocol.
10. System (50) nach einem der Ansprüche 7 bis 9, gekennzeichnet durch, eine Kontrolleinheit (30) zum Verändern der Stromerzeugung durch die erste Stromerzeugungseinheit (11) und/oder der Stromerzeugung durch die weitere Stromerzeugungseinheit (12, 13) anhand des ermittelten relativen Stromverbrauchs. 10. System (50) according to any one of claims 7 to 9, characterized by a control unit (30) for changing the power generation by the first power generation unit (11) and / or the power generation by the further power generation unit (12, 13) based on the determined relative power consumption.
11. System (50) nach einem der Ansprüche 7 bis 10, gekennzeichnet durch eine Kontrolleinheit (30) die konfiguriert ist, anhand des ermittelten relativen11. System (50) according to any one of claims 7 to 10, characterized by a control unit (30) which is configured based on the determined relative
Stromverbrauchs einem Nutzer des Stromverbrauchers (17, 18, 19, 20) vorzuschlagen oder für den Stromverbraucher (17, 18, 19, 20) zu bestimmen, den durch die erste Stromerzeugungseinheit (11) erzeugten Strom und/oder den durch die weitere Stromerzeugungseinheit (12, 13) erzeugten Strom zu verwenden. To propose power consumption to a user of the power consumer (17, 18, 19, 20) or to determine for the power consumer (17, 18, 19, 20) the power generated by the first power generation unit (11) and/or the power generated by the further power generation unit ( 12, 13) to use generated electricity.
12. System (50) nach einem der Ansprüche 7 bis 11, gekennzeichnet durch eine Kontrolleinheit (30) die konfiguriert ist, anhand des ermittelten relativen12. System (50) according to any one of claims 7 to 11, characterized by a control unit (30) which is configured based on the determined relative
Stromverbrauchs einem Nutzer des Stromverbrauchers (17, 18, 19, 20) vorzuschlagen oder für den Stromverbraucher (17, 18, 19, 20) zu bestimmen, in welcher Zeit der durch die erste Stromerzeugungseinheit (11) erzeugte Strom und/oder der durch die weitere Stromerzeugungseinheit (12, 13) erzeugte Strom zu verwenden sind. To propose power consumption to a user of the power consumer (17, 18, 19, 20) or to determine for the power consumer (17, 18, 19, 20) at what time the power generated by the first power generation unit (11) and / or by the further power generation unit (12, 13) generated electricity are to be used.
13. System (50) nach einem der Ansprüche 7 bis 12, dadurch gekennzeichnet, dass die erste Erzeugeruhr (14) in der ersten Stromerzeugungseinheit (11) ausgestaltet ist, die weitere Erzeugeruhr (15, 16) in der weiteren Stromerzeugungseinheit (12, 13) ausgestaltet ist und/oder die Verbraucheruhr (21, 22, 23, 24) im Stromverbraucher (17, 18, 19, 20) ausgestaltet ist. 13. System (50) according to one of Claims 7 to 12, characterized in that the first producer clock (14) is configured in the first power generation unit (11), the further producer clock (15, 16) in the further power generation unit (12, 13 ) is configured and/or the consumer clock (21, 22, 23, 24) is configured in the electricity consumer (17, 18, 19, 20).
14. Computerprogrammprodukt (33), umfassend Befehle, die bewirken, dass ein System (50) nach einem der Ansprüche 7 bis 13 ein Verfahren nach einem der Ansprüche 1 bis 6 ausführt. A computer program product (33) comprising instructions which cause a system (50) according to any one of claims 7 to 13 to carry out a method according to any one of claims 1 to 6.
15. Computerlesbares Speichermittel (34) mit einem darauf gespeicherten Computerprogrammprodukt (33) nach Anspruch 14. 15. Computer-readable storage means (34) with a computer program product (33) according to claim 14 stored thereon.
EP22734501.4A 2021-06-18 2022-06-02 Method and system for ascertaining a relative power consumption, computer program product, and storage means Pending EP4315559A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102021115859.1A DE102021115859A1 (en) 2021-06-18 2021-06-18 Method and system for determining relative power consumption, computer program product and storage medium
PCT/EP2022/065042 WO2022263186A1 (en) 2021-06-18 2022-06-02 Method and system for ascertaining a relative power consumption, computer program product, and storage means

Publications (1)

Publication Number Publication Date
EP4315559A1 true EP4315559A1 (en) 2024-02-07

Family

ID=82270749

Family Applications (1)

Application Number Title Priority Date Filing Date
EP22734501.4A Pending EP4315559A1 (en) 2021-06-18 2022-06-02 Method and system for ascertaining a relative power consumption, computer program product, and storage means

Country Status (3)

Country Link
EP (1) EP4315559A1 (en)
DE (1) DE102021115859A1 (en)
WO (1) WO2022263186A1 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010011883A1 (en) * 2010-03-18 2011-09-22 Stephan Arens Method for influencing current consumption of power customer by e.g. power supplier in electric power network, involves switching auxiliary electric meter by electric meter that detects total current consumption of power customers
WO2016110920A1 (en) * 2015-01-06 2016-07-14 日本電気株式会社 Power identification device, power identification method, and non-transitory computer readable medium storing power identification program
WO2017199053A1 (en) 2016-05-19 2017-11-23 Mayne Timothy Method of matching renewable energy production to end-user consumption via blockchain systems
US10374456B2 (en) 2016-09-26 2019-08-06 National Instruments Corporation Time-locked data alignment in distributed embedded systems
WO2020141175A2 (en) * 2018-12-31 2020-07-09 Vito Nv Methods and systems for generating real time guarantees of origin and determining the operative state of an electricity network

Also Published As

Publication number Publication date
DE102021115859A1 (en) 2022-12-22
WO2022263186A1 (en) 2022-12-22

Similar Documents

Publication Publication Date Title
EP3048687B1 (en) Method for controlling an electrical energy distribution network
DE112016003814B4 (en) Power distribution for DC microgrids
EP2867971B1 (en) Control of a plurality of inverters connected to a common network interconnection point
DE102013222277A1 (en) Control of decentralized energy producers and / or consumers in an electrical interconnected network
DE102013222452A1 (en) Method for operating a wind energy plant
EP2549280A1 (en) System and method for determining electrical characteristics
DE102011081446A1 (en) Method for operating a wind energy plant
EP3146606A1 (en) Device and method for controlling decentralized power generation plants
WO2013174415A1 (en) Method and device for assigning individual phase conductors in a polyphase energy distribution network
WO2014166524A1 (en) Method for operating an entire energy supply network, wherein energy generation is decentralised
DE102011106114A1 (en) Method for distributing electrical energy in a power network having a plurality of distribution cells
DE102014220421A1 (en) Measuring node, system and method for monitoring the state of a power supply network
DE102013210674A1 (en) Method for determining losses in a distribution network
EP4315559A1 (en) Method and system for ascertaining a relative power consumption, computer program product, and storage means
DE102018106200B4 (en) Harmonics measurement in power grids
EP4120508A1 (en) Method and central computer system for predicting a network state and computer program product
EP2978096A1 (en) Method, system and computer program product for controlling and/or regulating an electric energy system
DE102013008812A1 (en) System and method for determining electrical characteristics
EP3959795A1 (en) System for designing a low-voltage distribution network at a secondary unit substation
EP3576243A1 (en) Technical decoupling of a micro-grid
DE102014214906A1 (en) Method for stabilizing an energy distribution network
WO2022263187A1 (en) Method and device for assigning electric power to a power generating unit, computer program product, and storage means
EP3731370B1 (en) Method and system for establishing an allocation between a consumption meter and a control device
DE102016119422A1 (en) Method for operating an electrical power supply network, computer program, power electronic device and power supply network
EP3404500A1 (en) Method for monitoring functional modules

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20231026

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR