EP3719237B1 - Formwork girder, formwork girder device and ceiling formwork - Google Patents
Formwork girder, formwork girder device and ceiling formwork Download PDFInfo
- Publication number
- EP3719237B1 EP3719237B1 EP19167089.2A EP19167089A EP3719237B1 EP 3719237 B1 EP3719237 B1 EP 3719237B1 EP 19167089 A EP19167089 A EP 19167089A EP 3719237 B1 EP3719237 B1 EP 3719237B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- formwork
- carrier
- coupling part
- formwork carrier
- connecting tab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009415 formwork Methods 0.000 title claims description 230
- 230000008878 coupling Effects 0.000 claims description 47
- 238000010168 coupling process Methods 0.000 claims description 47
- 238000005859 coupling reaction Methods 0.000 claims description 47
- 230000000284 resting effect Effects 0.000 claims description 6
- 239000000969 carrier Substances 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 2
- 230000002349 favourable effect Effects 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000009420 retrofitting Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/483—Supporting heads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
- E04G11/52—Girders, beams, or the like as supporting members for forms of several units arranged one after another
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G25/04—Shores or struts; Chocks telescopic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G2025/003—Supports therefor, e.g. tripods
Definitions
- U.S. 10,053,875 B1 also discloses formwork supports which can be connected to crossbeams using connecting elements which are located on the end faces of the formwork supports and which are designed in the same way.
- the first and the second connecting strap are preferably made of metal, preferably steel or aluminum, or made of a plastic.
- the formwork supports 7 can be connected to one another in pairs by hooking the first coupling part 18 of one formwork support 7 into the second coupling part 20 of the other formwork support 7 .
- the first coupling part 18 and the second coupling part 20 are thus set up for a detachable connection to one another.
- a bolt 21 is provided as the first coupling part 18
- a bolt receptacle 22 in the form of a depression open at the top is provided as the second coupling part 20 .
- the second connecting bracket 19 also has a guide element 23 which protrudes obliquely upwards from the second coupling part 20, here the bolt receptacle 20, in order to facilitate the hanging of the bolt 21 into the bolt receptacle 22.
- the web 15 of the formwork support 7 has at least one through-opening 28, here two through-openings 28 at longitudinal distances from one another, which in the installed state are aligned with fastening openings 29 of the first connecting lug 17 and the second connecting lug 19, respectively, in order to align the arrangement of fasteners 30, here screws to allow.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Die Erfindung betrifft einen Schalungsträger, aufweisend:
- einen oberen Gurt,
- einen unteren Gurt und
- einen Steg, welcher den oberen Gurt mit dem unteren Gurt verbindet, wobei am ersten Ende des Schalungsträgers eine erste Verbindungslasche mit einem ersten Kopplungsteil zur lösbaren Längsverbindung mit einem zweiten Kopplungsteil eines weiteren Schalungsträgers montiert ist, wobei die erste Verbindungslasche je einen Befestigungsschenkel an gegenüberliegenden Längsseiten des Stegs aufweist, wobei am zweiten Ende des Schalungsträgers eine zweite Verbindungslasche mit einem zweiten Kopplungsteil zur lösbaren Längsverbindung mit einem ersten Kopplungsteil des weiteren Schalungsträgers montiert ist, wobei eine erste Verbindungslasche des weiteren Schalungsträgers das erste Kopplungsteil des weiteren Schalungsträgers (7) aufweist.
- a top strap,
- a lower strap and
- a web which connects the upper chord to the lower chord, with a first connecting strap having a first coupling part for the detachable longitudinal connection with a second coupling part of a further formwork support being mounted on the first end of the formwork support, the first connecting strap each having a fastening leg on opposite longitudinal sides of the formwork support web, wherein a second connecting strap with a second coupling part for the detachable longitudinal connection with a first coupling part of the further formwork support is mounted on the second end of the formwork support, wherein a first connecting strap of the further formwork support has the first coupling part of the further formwork support (7).
Weiters betrifft die Erfindung eine Schalungstragvorrichtung, aufweisend:
- einen Schalungsträger und
- einen weiteren Schalungsträger.
- a formwork girder and
- another formwork girder.
Schließlich betrifft die Erfindung eine Deckenschalung, aufweisend:
- mehrere Schalungstragvorrichtungen, und
- mehrere Schalungsstützen zur Abstützung der Schalungstragvorrichtungen.
- several formwork support devices, and
- several formwork supports to support the formwork support devices.
Im Stand der Technik sind Deckenschalungen mit Längs- und Querträgern zur Auflage von Schalungsplatten bekannt (vgl. z.B.
Im Stand der Technik sind weiters Deckenschalungen bekannt, bei denen die Längsträger direkt mit ihren Enden in Köpfe an den Schalungsstützen eingehängt sind. Aus statischer Sicht ergeben sich hierbei jedoch keine wesentlichen Verbesserungen. Demgegenüber besteht die Aufgabe der vorliegenden Erfindung darin, zumindest einzelne Nachteile des Standes der Technik zu lindern bzw. zu beseitigen. Die Erfindung setzt sich insbesondere zum Ziel, einen Schalungsträger zu schaffen, mit welchem die Stabilität einer Deckenschalung erhöht und der Einsatz von Schalungsstützen und den dafür nötigen Stützbeinen reduziert werden kann. Aus dem Stand der Technik sind Träger bzw. Verbindungen für Träger aus
Die
Aus
Diese Aufgabe wird durch eine Schalungsstütze mit den Merkmalen von Anspruch 1, eine Schalungstragvorrichtung mit den Merkmalen von Anspruch 10 und eine Deckenschalung mit den Merkmalen von Anspruch 11 erreicht. Bevorzugte Ausführungsformen sind in den abhängigen Ansprüchen angegeben.This object is achieved by a formwork support having the features of
Erfindungsgemäß gemäß Anspruch 1 ist vorgesehen, dass
- die erste Verbindungslasche des weiteren Schalungsträgers ident zur ersten Verbindungslasche des Schalungsträgers ist;
- das erste Kopplungsteil des Schalungsträgers als Einhängeglied und das zweite Kopplungsteil des Schalungsträgers als Aufnahmeglied ausgebildet ist, wobei sich das erste und das zweite Kopplungsteil des Schalungsträgers voneinander unterscheiden; und
- das erste Kopplungsteil des Schalungsträgers bzw. des weiteren Schalungsträgers von oben in das zweite Kopplungsteil des Schalungsträgers bzw. des weiteren Schalungsträgers einhängbar ist.
- the first connecting strap of the further formwork support is identical to the first connecting strap of the formwork support;
- the first coupling part of the formwork support is designed as a hooking member and the second coupling part of the formwork support is designed as a receiving member, the first and the second coupling part of the formwork support being different from one another; and
- the first coupling part of the formwork support or of the further formwork support can be hooked into the second coupling part of the formwork support or of the further formwork support from above.
Bei Verwendung in einer Deckenschalung sind zwei erfindungsgemäße Schalungsträger über die korrespondierenden Kopplungsteile an den aufeinandertreffenden Stirnseiten der Schalungsträger derart miteinander gekoppelt, dass die Längsachsen der Schalungsträger im Wesentlichen in Linie, d.h. kollinear, angeordnet sind und eine Längsverschiebung der verbundenen Schalungsträger gegeneinander gesperrt ist. Somit können die Schalungsträger an den Stirnseiten lösbar miteinander verbunden werden, um eine Kraftübertragung entlang der Schalungsträger zu bewirken. Vorteilhafterweise kann so die Stabilität der Deckenschalung wesentlich erhöht werden. Günstig ist insbesondere, dass eine Durchlaufträgerwirkung erzielt wird, welche für die notwendige Traglast der Deckenstützen berücksichtigt werden kann. Somit kann die Zahl der Schalungsstützen reduziert werden. Weiters ist es nicht erforderlich, einen seitlichen Versatz zwischen den aufeinanderfolgenden Schalungsträgern vorzusehen, um einen Überlappungsbereich an den Endbereichen zu schaffen. Vorteilhaft ist weiters, dass eine Unterstellung der verbundenen Schalungsträger an der Längsverbindung nicht erforderlich ist. Bei einer bevorzugten Ausführungsform ist daher der Kopplungsbereich zwischen den zwei Schalungsträgern frei von einer Unterstellung mit einer Schalungsstütze. Die erste Verbindungslasche ist am ersten Ende des Schalungsträger montiert, d.h. über eine Befestigungsvorrichtung am ersten Ende des Schalungsträgers angebracht. Vorteilhafterweise ist die erste Verbindungslasche so als Adapter ausgebildet, welche insbesondere auch an herkömmlichen Schalungsträgern befestigt werden kann.When used in a slab formwork, two formwork supports according to the invention are coupled to one another via the corresponding coupling parts on the face sides of the formwork supports that meet in such a way that the longitudinal axes of the formwork supports are essentially in line, i.e. collinear, and a longitudinal displacement of the connected formwork supports against one another is blocked. Thus, the formwork supports can be releasably connected to one another at the end faces in order to effect a force transmission along the formwork supports. Advantageously, the stability of the ceiling formwork can be significantly increased in this way. In particular, it is favorable that a continuous beam effect is achieved, which can be taken into account for the necessary load-bearing capacity of the floor props. In this way, the number of formwork props can be reduced. Furthermore, it is not necessary to provide a lateral offset between the successive formwork beams in order to create an overlapping area at the end areas. Another advantage is that it is not necessary to support the connected formwork girders at the longitudinal connection. In a preferred embodiment, therefore, the coupling area between the two formwork supports is not supported by a formwork support. The first connecting strap is mounted on the first end of the formwork girder, i.e. attached to the first end of the formwork girder via a fastening device. Advantageously, the first connecting lug is designed as an adapter, which can in particular also be attached to conventional formwork supports.
Für die Zwecke dieser Offenbarung beziehen sich die Orts- und Richtungsangaben, wie "horizontal", "vertikal", "oben", "unten", auf einen horizontalen Gebrauchszustand des Schalungsträgers. "Lösbar" bedeutet, dass eine Verbindung ohne erhebliche Funktionseinbußen mehrmals, vorzugsweise werkzeuglos, hergestellt und wieder gelöst werden kann.For purposes of this disclosure, the location and Directional information such as "horizontal", "vertical", "above", "below" indicates a horizontal state of use of the formwork girder. "Releasable" means that a connection can be made and released again several times, preferably without tools, without significant functional losses.
Bevorzugt weisen der untere Gurt und der obere Gurt jeweils eine Breite (d.h. horizontale Erstreckung) von 50 mm bis 100 mm, insbesondere im Wesentlichen 80 mm, auf. Der Steg weist bevorzugt eine Höhe (d.h. vertikale Erstreckung) zwischen den Innenseiten des oberen und unteren Gurts von 50 mm bis 200 mm, insbesondere im Wesentlichen 120 mm, auf. Die Gesamthöhe des Schalungsträgers beträgt bei einer bevorzugten Ausführungsform im Wesentlichen 200 mm bei einer Breite des oberen und unteren Gurtelements von im Wesentlichen 80 mm. Der obere Gurt, der untere Gurt und der Steg sind bevorzugt jeweils überwiegend aus einem Holzwerkstoff gebildet. An den Enden des Schalungsträgers können Schutzkappen, insbesondere aus Kunststoff, vorgesehen sein.Preferably, the lower strap and the upper strap each have a width (i.e. horizontal extent) of 50 mm to 100 mm, in particular substantially 80 mm. The web preferably has a height (i.e. vertical extent) between the insides of the top and bottom chords of from 50mm to 200mm, more preferably substantially 120mm. In a preferred embodiment, the total height of the formwork support is essentially 200 mm with a width of the upper and lower chord elements of essentially 80 mm. The upper chord, the lower chord and the web are each preferably formed predominantly from a wood material. Protective caps, in particular made of plastic, can be provided at the ends of the formwork support.
Am zweiten Ende des Schalungsträgers ist eine zweite Verbindungslasche mit einem zweiten Kopplungsteil zur lösbaren Längsverbindung mit einem ersten Kopplungsteil des weiteren Schalungsträgers montiert. Somit sind die Verbindungslaschen an den beiden gegenüberliegenden Längsenden des Schalungsträgers vorgesehen. Die zweite Verbindungslasche mit dem zweiten Kopplungsteil ist für eine Längsverbindung mit der ersten Verbindungslasche des weiteren Längsträgers eingerichtet, welche ident zur ersten Verbindungslasche des Schalungsträgers ist. Das erste und das zweite Kopplungsteil unterscheiden sich voneinander, um eine einfache Verbindung der Schalungsträger zu ermöglichen. Erfindungsgemäß ist das erste Kopplungsteil als Einhängeglied und das zweite Kopplungsteil als Aufnahmeglied ausgebildet. Dabei wird das erste Kopplungsteil von oben in das zweite Kopplungsteil eingehängt.At the second end of the formwork support, a second connecting strap with a second coupling part for the detachable longitudinal connection with a first coupling part of the further formwork support is mounted. Thus, the connecting straps are provided at the two opposite longitudinal ends of the formwork support. The second connecting strap with the second coupling part is set up for a longitudinal connection with the first connecting strap of the further longitudinal member, which is identical to the first connecting strap of the formwork support. The first and second coupling parts differ from each other in order to enable easy connection of the formwork girders. According to the invention, the first coupling part is designed as a hanging member and the second coupling part is designed as a receiving member. The first coupling part is hooked into the second coupling part from above.
Die erste und die zweite Verbindungslasche sind bevorzugt aus Metall, vorzugsweise Stahl oder Aluminium, oder aus einem Kunststoff gefertigt.The first and the second connecting strap are preferably made of metal, preferably steel or aluminum, or made of a plastic.
Gemäß einer bevorzugten Ausführungsform ist als erstes Kopplungsteil des Schalungsträgers ein Bolzen und/oder als zweites Kopplungsteil eine Bolzenaufnahme vorgesehen. Die Bolzenaufnahme weist einen nach oben offenen Querschnitt auf, so dass der Bolzen von oben in die Bolzenaufnahme eingefügt werden kann.According to a preferred embodiment, a bolt is provided as the first coupling part of the formwork support and/or a bolt receptacle is provided as the second coupling part. The bolt receptacle has a cross section that is open at the top, so that the bolt can be inserted into the bolt receptacle from above.
Gemäß einer bevorzugten Ausführungsform weist die zweite Verbindungslasche des Schalungsträgers oberhalb der Bolzenaufnahme ein Rückhalteelement zur Aushubsicherung auf. Das Rückhalteelement oberhalb, d.h. in einem vertikalen Abstand zur Bolzenaufnahme, verhindert, dass der Schalungsträger von der horizontalen Gebrauchsstellung versehentlich vertikal nach oben ausgehoben werden kann. Bei der Demontage wird der Schalungsträger herunter geschwenkt, wobei das Rückhalteelement in der heruntergeschwenkten Stellung des Schalungsträgers nicht wirksam ist, um die Abnahme des Schalungsträgers zu ermöglichen.According to a preferred embodiment, the second connecting lug of the formwork support has a retaining element for securing against excavation above the bolt receptacle. The retaining element above, i.e. at a vertical distance from the bolt receiver, prevents the formwork support from being accidentally lifted vertically upwards from the horizontal position of use. During disassembly, the formwork support is swung down, the retaining element not being effective in the swung-down position of the formwork support, in order to enable the formwork support to be removed.
Hinsichtlich einer konstruktiv einfachen, zuverlässigen Ausführung ist es günstig, wenn als Rückhalteelement ein Plattenteil vorgesehen ist.With regard to a structurally simple, reliable design, it is advantageous if a plate part is provided as the retaining element.
In einer Ausführungsvariante ist das Rückhalteelement beweglich an der ersten Verbindungslasche des Schalungsträgers angeordnet, um von einer Wirkstellung in eine Demontagestellung überführt zu werden. In der Wirkstellung verhindert das Rückhalteelement, dass der Schalungsträger von der horizontalen Gebrauchsstellung vertikal nach oben abgehoben werden kann. In der Demontagestellung erlaubt das Rückhalteelement die Abnahme des Schalungsträgers aus der horizontalen Gebrauchsstellung heraus.In one embodiment variant, the retaining element is movably arranged on the first connecting lug of the formwork support in order to be transferred from an operative position into a dismantling position. In the operative position, the retaining element prevents the formwork support from being able to be lifted vertically upwards from the horizontal position of use. In the dismantling position, the retaining element allows the formwork support to be removed from the horizontal position of use.
Um die Verbindung des Schalungsträgers mit dem weiteren Schalungsträger zu erleichtern, weist die zweite Verbindungslasche des Schalungsträgers bei einer bevorzugten Ausführungsform ein Führungselement auf, welches von dem zweiten Kopplungsteil, insbesondere von der Bolzenaufnahme, nach oben, insbesondere schräg nach oben, absteht.In order to facilitate the connection of the formwork support to the further formwork support, in a preferred embodiment the second connecting strap of the formwork support has a guide element which protrudes upwards, in particular obliquely upwards, from the second coupling part, in particular from the bolt receptacle.
Zur Ableitung von Lasten im Gebrauch des Schalungsträgers ist es günstig, wenn die erste und/oder zweite Verbindungslasche des Schalungsträgers einen an der Innenseite des oberen Gurts anliegenden oberen Stützteil und/oder einen an der Innenseite des unteren Gurts anliegenden unteren Stützteil aufweist.In order to dissipate loads when using the formwork girder, it is beneficial if the first and/or second connecting strap of the formwork support has an upper support part resting on the inside of the upper flange and/or a lower support part resting on the inside of the lower flange.
Zur Nachrüstung bestehender Schalungsträger weist die erste Verbindungslasche je einen Befestigungsschenkel an gegenüberliegenden Längsseiten des Stegs auf. Bevorzugt sind der erste und der zweite Befestigungsschenkel als Befestigungsplatten ausgeführt, welche im Wesentlichen parallel zum Steg angeordnet sind. Somit wird eine stabile Befestigung der ersten Verbindungslasche am Schalungsträger ermöglicht. Bevorzugt steht der erste und zweite Befestigungsschenkel jeweils seitlich nicht über den oberen und unteren Gurt des Schalungsträgers hinaus. Die zweite Verbindungslasche weist bevorzugt ebenfalls einen ersten und einen zweiten Befestigungsschenkel auf, so dass auf die vorstehenden Erläuterungen verwiesen werden kann.For retrofitting existing formwork supports, the first connecting strap has a fastening leg on opposite long sides of the web. The first and second fastening legs are preferably designed as fastening plates, which are arranged essentially parallel to the web. This enables stable attachment of the first connecting strap to the formwork support. The first and second fastening legs preferably do not protrude laterally beyond the upper and lower chord of the formwork support. The second connecting strap preferably also has a first and a second fastening leg, so that reference can be made to the above explanations.
Um herkömmliche Schalungsträger mit der ersten Verbindungslasche auszustatten, ist es günstig, wenn der Steg zumindest eine Durchgangsöffnung am ersten Ende aufweist, durch welche ein Befestigungselement, insbesondere eine Schraube, der ersten Verbindungslasche geführt ist. Ein besonderer Vorteil dieser Ausführungsform liegt darin, dass viele Schalungsträger bereits eine solche Durchgangsöffnung (z.B. für die Anbringung eines Krangehänges oder eines Seitenschutzadapters) aufweisen, welche somit für die Nachrüstung der ersten Verbindungslasche genutzt werden kann. Bevorzugt ist die Schraube im Wesentlichen senkrecht zur Hauptebene des Stegs zwischen dem oberen Gurt und dem unteren Gurt angeordnet. Besonders bevorzugt ist es, wenn zwei Durchgangsöffnungen in Längsabstand zueinander vorgesehen sind, welche jeweils ein Befestigungselement, insbesondere eine Schraube, aufnehmen. Die zweite Verbindungslasche kann über zumindest ein weiteres Befestigungselement an zumindest einer weiteren Durchgangsöffnung am zweiten Ende des Schalungsträgers befestigt werden.In order to equip conventional formwork supports with the first connecting strap, it is favorable if the web has at least one through-opening at the first end, through which a fastening element, in particular a screw, of the first connecting strap is guided. A particular advantage of this embodiment is that many formwork supports already have such a through opening (e.g. for attaching a crane suspension or a side protection adapter), which can thus be used for retrofitting the first connecting strap. The screw is preferably arranged substantially perpendicularly to the main plane of the web between the upper chord and the lower chord. It is particularly preferred if two through-openings are provided at a longitudinal distance from one another, each of which accommodates a fastening element, in particular a screw. The second connecting strap can be attached to at least one additional through-opening at the second end of the formwork support via at least one additional attachment element.
Beim Aufbau einer Deckenschalung werden zwei Schalungsträger in der zuvor beschriebenen Ausführung lösbar miteinander verbunden. Zu diesem Zweck wird die erste Verbindungslasche des Schalungsträgers mit der zweiten Verbindungslasche des weiteren Schalungsträgers in Eingriff gebracht, so dass der Schalungsträger und der weitere Schalungsträger gegen ein Auseinanderziehen in Längsrichtung gesichert sind. Im verbundenen Gebrauchszustand sind die Längsachsen des Schalungsträgers und des weiteren Schalungsträgers im Wesentlichen fluchtend in derselben Horizontalebene, d.h. kollinear, angeordnet. Bevorzugt sind die Schalungsträger im Gebrauchszustand durch mehrere Schalungsstützen abgestützt.When constructing a ceiling formwork, two formwork supports are detachably connected to one another in the embodiment described above. For this purpose, the first connecting strap of the formwork support is brought into engagement with the second connecting strap of the further formwork support, so that the formwork support and the further formwork support are secured against being pulled apart in the longitudinal direction. In the connected state of use, the longitudinal axes of the formwork support and the further formwork support are essentially aligned in the same horizontal plane, ie collinear. When in use, the formwork supports are preferably supported by a plurality of formwork supports.
Beim Aufbau der Deckenschalung kann zum Beispiel zuerst der weitere Schalungsträger in der im Wesentlichen horizontalen Gebrauchsstellung angeordnet werden, in welcher der weitere Schalungsträger mit mindestens einer Schalungsstütze unterstellt ist. Anschließend wird der Schalungsträger in einer schräg zur Vertikalen angeordneten Zwischenstellung mit dem weiteren Schalungsträger verbunden, danach in die horizontale Gebrauchsstellung aufgeschwenkt und mit einer weiteren Schalungsstütze unterstellt. Auf den direkt auf den Schalungsstützen abgestützten Schalungsträgern, den sogenannten Jochträgern, können anschließend mehrere Querträger, im Wesentlichen quer dazu angeordnet werden. Die Querträger können entsprechend den zuvor beschriebenen Schalungsträgern ausgebildet sein, jedoch kann auch eine herkömmliche Ausführung ohne erste bzw. zweite Verbindungslaschen verwendet werden. Dieser Vorgang wird abhängig von der Dimension der Deckenschalung entsprechend oft wiederholt. Schließlich werden eine Anzahl von Schalungsplatten auf den Querträgern positioniert, so dass eine Deckenschalung zum Betonieren eines Deckenelements zur Verfügung steht.When assembling the ceiling formwork, for example, the further formwork support can first be arranged in the essentially horizontal position of use, in which the further formwork support is supported by at least one formwork support. The formwork support is then connected to the further formwork support in an intermediate position arranged at an angle to the vertical, then pivoted into the horizontal position of use and supported by a further formwork support. On the formwork girders, the so-called primary girders, which are supported directly on the formwork props, several transverse girders can then be arranged essentially transversely to them. The crossbeams can be designed in accordance with the previously described formwork beams, but a conventional design without first or second connecting straps can also be used. This process is repeated as often as required, depending on the dimensions of the ceiling formwork. Finally, a number of formwork panels are positioned on the crossbeams so that a ceiling formwork is available for concreting a ceiling element.
Als Schalungsstützen sind bevorzugt Teleskopstützen jeweils mit einem unteren Stützenteil und einem oberen Stützenteil vorgesehen. Aufgrund der Längsverbindung zwischen den Schalungsträgern können zumindest einzelne Schalungsstützen, insbesondere zwischen den Randbereichen der Deckenschalung, frei von vom unteren Stützenteil abstehenden Stützbeinen sein.Telescopic supports are preferably provided as formwork supports, each with a lower support part and an upper support part. Due to the longitudinal connection between the formwork supports, at least individual formwork supports, in particular between the edge areas of the ceiling formwork, can be free of support legs protruding from the lower support part.
Die Erfindung wird nachstehend anhand eines in den Zeichnungen dargestellten Ausführungsbeispiels weiter erläutert.
-
Fig. 1 zeigt eine erfindungsgemäße Deckenschalung mit Schalungsstützen, darauf abgestützten Schalungsträgern, quer dazu angeordneten Querträgern und Schalungsplatten auf den Querträgern. -
Fig. 2 zeigen einen der inbis 4Fig. 1 ersichtlichen Schalungsträger, welcher am ersten Ende eine erste Verbindungslasche und am zweiten Ende eine zweite Verbindungslasche aufweist. -
Fig. 5 und Fig. 6 zeigen die längsweise Verbindung zweier Schalungsträger mittels der Verbindungslaschen. -
Fig. 7 und Fig. 8 zeigen den Vorgang des Verbindens der zwei Schalungsträger miteinander, wobei die erste Verbindungslasche von oben her in die zweite Verbindungslasche eingehängt wird. -
Fig. 9 zeigt eine Explosionsdarstellung des zweiten Endes des Schalungsträgers. -
Fig. 10 zeigt eine Explosionsdarstellung des ersten Endes des Schalungsträgers. -
Fig. 11 bis Fig. 13 zeigen die Abstützung eines Schalungsträgers auf einer Schalungsstütze mittels eines Haltekopfs, an welchem eine Querstange zur Querverbindung mit dem Haltekopf einer benachbarten Schalungsstütze montiert ist. -
Fig. 14 bis Fig. 16 zeigen das Einhängen der Querstange in den Haltekopf der Schalungsstütze. -
Fig. 17 bis Fig. 20 zeigen die Verbindung des Haltekopfs mit einer Kopfplatte der Schalungsstütze. -
Fig. 21 bis Fig. 24 zeigen das obere Ende der Schalungsstütze mit dem daran montierten Haltekopf. -
Fig. 25 bis Fig. 29 zeigen den Haltekopf unabhängig von der übrigen Schalungsstütze. -
Fig. 30 bis Fig. 33 zeigen die Anordnung des Schalungsträgers am Haltekopf. -
Fig. 34 bis Fig. 37 zeigen den Schalungsträger im Gebrauchszustand an der Schalungsstütze.
-
1 shows a ceiling formwork according to the invention with formwork supports, formwork supports supported thereon, crossbeams arranged transversely thereto and formwork panels on the crossbeams. -
Figures 2 to 4 show one of the in1 visible formwork support, which has a first connecting strap at the first end and a second connecting strap at the second end. -
5 and 6 show the longitudinal connection of two formwork beams using the connecting straps. -
7 and 8 show the process of connecting the two formwork supports to one another, with the first connecting lug being hooked into the second connecting lug from above. -
9 shows an exploded view of the second end of the formwork beam. -
10 shows an exploded view of the first end of the formwork beam. -
Figures 11 to 13 show the support of a formwork girder on a formwork prop by means of a holding head on which a crossbar for transverse connection with the holding head of an adjacent formwork prop is mounted. -
Figures 14 to 16 show how the cross bar is hooked into the retaining head of the formwork prop. -
17 to 20 show the connection of the retaining head with a head plate of the formwork prop. -
Figures 21 to 24 show the upper end of the formwork prop with the retaining head mounted on it. -
25 to 29 show the retaining head independent of the rest of the formwork prop. -
30 to 33 show the arrangement of the formwork girder on the retaining head. -
34 to 37 show the formwork girder in use on the formwork prop.
Wie aus
Wie aus
Wie aus
Somit wird eine günstige Lastabtragung im verbundenen Zustand der Schalungsträger 7 erzielt.In this way, favorable load transfer is achieved when the formwork supports 7 are in the connected state.
Wie insbesondere aus
In den
Wie aus
Wie aus
Wie aus
Die
Weiters ist ein Verriegelungselement 43 vorgesehen, welches unter Freihaltung eines Spalts zur Unterseite 40b des Bodens 40 verschieblich ist, um den Haltekopf 6 am Kopfteil 39 der Schalungsstütze 2 zu befestigen. Das Verriegelungselement 43 ist im Wesentlichen in Längsrichtung des Haltekopfs 6 verschieblich angeordnet. Als Verriegelungselement 43 ist ein Keil 44 vorgesehen, welcher zwischen einer das Kopfteil 39 der Schalungsstütze festklemmenden Klemmstellung (vgl.
Der Haltekopf 6 weist zudem ein Verdrehsicherungselement 49 zur Sicherung des Schalungsträgers 7 gegen ein Verdrehen im Gebrauch auf. Das Verdrehsicherungselement 49 weist eine Feder 50 auf, welche zwischen einer den Schalungsträger 7 gegen Verdrehen sichernden Sicherungsstellung (vgl.
Der Boden 40 des Haltekopfs 6 weist eine Aussparung 52 auf, wobei ein Halteabschnitt 53 der Feder 50 in der Sicherungsstellung durch die Aussparung 52 nach oben vorsteht und in der Montage- bzw. Demontagestellung in die Aussparung 52 abgesenkt ist. Der Halteabschnitt 53 weist eine vertikale Haltefläche 54 auf, welche im Gebrauchszustand an einer Seitenfläche des unteren Gurts 14 des Schalungsträgers 7 angelegt ist. Zudem weist der Halteabschnitt 53 eine horizontale Andrückfläche 55 (vgl.
Claims (14)
- Formwork carrier (7) comprising:- an upper belt (13),- a lower belt (14) and- a strip (15) connecting the upper belt (13) to the lower belt (14),a first connecting tab (17) being mounted on the first end of the formwork carrier (7), the connecting tab having a first coupling part (18) for releasable longitudinal connection to a second coupling part (20) of a further formwork carrier (7), the first connecting tab (17) having a fastening limb (27) on each of opposite longitudinal sides of the strip (15), a second connecting tab (19) being mounted on the second end of the formwork carrier (7), the connecting tab having a second coupling part (20) for releasable longitudinal connection to a first coupling part (18) of the further formwork carrier (7), a first connecting tab (17) of the further formwork carrier having the first coupling part (18) of the further formwork carrier (7); characterised in that- the first connecting tab (17) of the further formwork carrier (7) is identical to the first connecting tab (17) of the formwork carrier (7);- the first coupling part (18) of the formwork carrier (7) is designed as a suspension member and the second coupling part (20) of the formwork carrier (7) is designed as a receiving member, the first (18) and the second coupling part (20) of the formwork carrier (7) differing from one another; and- the first coupling part (18) of the formwork carrier (7) or of the further formwork carrier (7) can be suspended from above into the second coupling part (20) of the formwork carrier (7) or the further formwork carrier (7), respectively.
- Formwork carrier (7) according to claim 1, characterised in that a pin (21) is provided as the first coupling part (18) of the formwork carrier (7).
- Formwork carrier (7) according to either claim 1 or claim 2, characterised in that a pin receptacle (22) is provided as the second coupling part (20) of the formwork carrier (7).
- Formwork carrier (7) according to any of claims 1 to 3, characterised in that the second connecting tab (19) of the formwork carrier (7) has a retaining element (24) above the pin receptacle (22) for securing against removal.
- Formwork carrier (7) according to claim 4, characterised in that a plate part is provided as the retaining element (24).
- Formwork carrier (7) according to any of claims 1 to 5, characterised in that the second connecting tab (19) of the formwork carrier (7) has a guide element (23) which projects upwards, in particular obliquely upwards, from the second coupling part (20) of the formwork carrier (7), in particular from the pin receptacle (22).
- Formwork carrier (7) according to any of claims 1 to 6, characterised in that the second connecting tab (19) of the formwork carrier (7) has an upper supporting part (25) resting against the inner face of the upper belt (13) and/or a lower supporting part (26) resting against the inner face of the lower belt (14).
- Formwork carrier (7) according to any of claims 1 to 7, characterised in that the first connecting tab (17) of the formwork carrier (7) has an upper supporting part (25) resting against the inner face of the upper belt (13) and/or a lower supporting part (26) resting against the inner face of the lower belt (14).
- Formwork carrier (7) according to any of claims 1 to 8, characterised in that the strip (15) has at least one passage opening (28) at the first end, through which passage opening a fastening element (30), in particular a screw, of the first connecting tab (17) is guided.
- Formwork-carrying device, comprising:- a formwork carrier (7) according to any of claims 1 to 9,- a further formwork carrier (7) according to any of claims 1 to 9, wherein the first connecting tab (17) of the formwork carrier (7) is releasably connected to the second connecting tab (19) of the further formwork carrier (7).
- Ceiling formwork (1) comprising:- a plurality of formwork-carrying devices according to claim 10,- a plurality of formwork carriers (2) for supporting the formwork-carrying devices.
- Ceiling formwork (1) according to claim 11, characterised by- a plurality of cross members (8) which are arranged on the formwork-carrying devices substantially perpendicularly thereto.
- Ceiling formwork (1) according to claim 12, characterised by- a plurality of formwork panels (9) which are arranged on the cross members (8).
- Ceiling formwork (1) according to either claim 12 or claim 13, characterised in that telescopic supports each having a lower supporting part (3) and an upper supporting part (4) are provided as formwork supports (2), at least individual formwork supports (2) being free from supporting legs (10) protruding from the lower supporting part (3).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19167089.2A EP3719237B1 (en) | 2019-04-03 | 2019-04-03 | Formwork girder, formwork girder device and ceiling formwork |
ES19167089T ES2934811T3 (en) | 2019-04-03 | 2019-04-03 | Formwork beam, formwork support device and slab formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19167089.2A EP3719237B1 (en) | 2019-04-03 | 2019-04-03 | Formwork girder, formwork girder device and ceiling formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3719237A1 EP3719237A1 (en) | 2020-10-07 |
EP3719237B1 true EP3719237B1 (en) | 2022-11-30 |
Family
ID=66092078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19167089.2A Active EP3719237B1 (en) | 2019-04-03 | 2019-04-03 | Formwork girder, formwork girder device and ceiling formwork |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3719237B1 (en) |
ES (1) | ES2934811T3 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115788108B (en) * | 2022-11-25 | 2024-09-17 | 中建二局安装工程有限公司 | Detachable large-span steel structure non-hardening ground installation support system and installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2106084A (en) * | 1936-11-09 | 1938-01-18 | Reynolds Corp | Joist suspension |
JPS61102714U (en) * | 1984-12-13 | 1986-06-30 | ||
WO2015196264A1 (en) * | 2014-06-24 | 2015-12-30 | Mateeva Mariyana | Connection set for formwork beams |
US10053875B1 (en) * | 2017-07-10 | 2018-08-21 | Doka Gmbh | Formwork support system and formwork support prop |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR744080A (en) * | 1933-04-10 | |||
GB9927012D0 (en) * | 1999-11-16 | 2000-01-12 | Steel Construction The | Connecting apparatus |
ES2258933B1 (en) * | 2005-07-11 | 2007-07-01 | Sistemas Tecnicos De Encofrados, S.A. | BELT BEAM WITH COUPLABLE TERMINALS. |
DE202013104108U1 (en) * | 2013-09-10 | 2013-09-19 | Doka Industrie Gmbh | Carrier unit in the field of construction |
CN205637585U (en) * | 2015-01-21 | 2016-10-12 | 多卡有限责任公司 | Template spandrel girder |
WO2016116543A1 (en) | 2015-01-22 | 2016-07-28 | Koninklijke Philips N.V. | Method and apparatus for preparing noodles |
-
2019
- 2019-04-03 EP EP19167089.2A patent/EP3719237B1/en active Active
- 2019-04-03 ES ES19167089T patent/ES2934811T3/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2106084A (en) * | 1936-11-09 | 1938-01-18 | Reynolds Corp | Joist suspension |
JPS61102714U (en) * | 1984-12-13 | 1986-06-30 | ||
WO2015196264A1 (en) * | 2014-06-24 | 2015-12-30 | Mateeva Mariyana | Connection set for formwork beams |
US10053875B1 (en) * | 2017-07-10 | 2018-08-21 | Doka Gmbh | Formwork support system and formwork support prop |
Also Published As
Publication number | Publication date |
---|---|
ES2934811T3 (en) | 2023-02-27 |
EP3719237A1 (en) | 2020-10-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1987213B1 (en) | Slab formwork system | |
EP3719236B1 (en) | Formwork support, support device and ceiling formwork | |
DE2814930C2 (en) | climbing frame | |
DE3004245C2 (en) | Slab formwork with drop heads | |
DE10108784A1 (en) | Scaffold with vertical supports and horizontal girders | |
EP1538278A2 (en) | Shuttering table | |
DE202015106689U1 (en) | Fastening device for a scaffold or fall protection and scaffolding or fall protection with it | |
DE69603503T2 (en) | LIFTING DEVICE FOR ROOF CHAIRS AND EVENTULE FOR COMPONENTS RESTING ON THESE ROOF CHAIRS | |
EP3719237B1 (en) | Formwork girder, formwork girder device and ceiling formwork | |
EP3702550A1 (en) | Formwork frame, shuttering element, formwork and method | |
EP2006453A2 (en) | U-Shoring frame | |
EP3719238B1 (en) | Supporting head, formwork support and ceiling formwork | |
WO2024008912A1 (en) | Formwork table element, formwork table and method for constructing a ceiling formwork | |
EP2427609B2 (en) | Scaffolding system, method for erecting a scaffolding system and method for using such a scaffolding system | |
WO1990005226A1 (en) | Device for joining accessories to switchboards | |
DE29514636U1 (en) | Ceiling-high shut-off device | |
EP0317695B1 (en) | Metal scaffolding for buildings | |
EP3653809B1 (en) | Formwork system | |
EP1961886B1 (en) | U-shaped beam of a canopy, hall, grandstand, staircase, scaffolding or platform | |
DE102018217043A1 (en) | Coupling plate for mechanically coupling several modular scaffold posts as well as multi-part scaffold stands with such a coupling plate, in particular as part of a heavy-duty support | |
EP3228778A1 (en) | Formwork girder and formwork structure with such a formwork girder | |
EP0512389A2 (en) | Extension for suspended loads for all kinds of containers | |
DE2150950C3 (en) | Coupling for concrete formwork elements | |
DE1907715A1 (en) | Formwork frame for the production of recesses in concrete walls or the like., In particular for door and window openings | |
WO2024017709A1 (en) | Building aid and adjustment method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20210331 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: STREISSELBERGER, THOMAS |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20210722 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20220831 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1534800 Country of ref document: AT Kind code of ref document: T Effective date: 20221215 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502019006391 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2934811 Country of ref document: ES Kind code of ref document: T3 Effective date: 20230227 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20221130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230331 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230228 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230330 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230301 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230517 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502019006391 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20230831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230403 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230403 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230403 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20240524 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240409 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240325 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230404 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240326 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230404 |